Project Stakeholder 10 April 2014 Management Workshop...Project Stakeholder Management Workshop 10...
Transcript of Project Stakeholder 10 April 2014 Management Workshop...Project Stakeholder Management Workshop 10...
![Page 1: Project Stakeholder 10 April 2014 Management Workshop...Project Stakeholder Management Workshop 10 April 2014 Scope of Presentation Introduction and questions to ponder Purpose of](https://reader035.fdocuments.us/reader035/viewer/2022070903/5f68b7c620a4061831508c34/html5/thumbnails/1.jpg)
M A G E Z A C E N T R E O F E X C E L L E N C E for Project (Pty) Ltd
Project Stakeholder Management Workshop
10 April 2014
![Page 2: Project Stakeholder 10 April 2014 Management Workshop...Project Stakeholder Management Workshop 10 April 2014 Scope of Presentation Introduction and questions to ponder Purpose of](https://reader035.fdocuments.us/reader035/viewer/2022070903/5f68b7c620a4061831508c34/html5/thumbnails/2.jpg)
Scope of Presentation
Introduction and questions to ponder
Purpose of today’s presentation
Why Project Stakeholder Management
Theoretical Framework
Real-life projects and issues with Stakeholders
Some challenges triggered by the 10th Knowledge Area
Conclusion
1
2
3
4
5
6
7
![Page 3: Project Stakeholder 10 April 2014 Management Workshop...Project Stakeholder Management Workshop 10 April 2014 Scope of Presentation Introduction and questions to ponder Purpose of](https://reader035.fdocuments.us/reader035/viewer/2022070903/5f68b7c620a4061831508c34/html5/thumbnails/3.jpg)
Scope of Presentation
Introduction and questions to ponder
Purpose of today’s presentation
Why Project Stakeholder Management
Theoretical Framework
Real-life projects and issues with Stakeholders
Some challenges triggered by the 10th Knowledge Area
Conclusion
1
2
3
4
5
6
7
![Page 4: Project Stakeholder 10 April 2014 Management Workshop...Project Stakeholder Management Workshop 10 April 2014 Scope of Presentation Introduction and questions to ponder Purpose of](https://reader035.fdocuments.us/reader035/viewer/2022070903/5f68b7c620a4061831508c34/html5/thumbnails/4.jpg)
Introduction
• Passion driven individual • Work platforms• Mageza Project Management (2006)• Mageza Centre of Excellence for Projects (2012)
• Consulting Project Manager• Project Management competency-builder• Varsity College (Business School)• Durban University of Technology (Business Studies Unit)• Nelson Mandela Metropolitan University (Business Development Unit)
• Professional Member of PMSA and a Member of PMI• Project ZN
![Page 5: Project Stakeholder 10 April 2014 Management Workshop...Project Stakeholder Management Workshop 10 April 2014 Scope of Presentation Introduction and questions to ponder Purpose of](https://reader035.fdocuments.us/reader035/viewer/2022070903/5f68b7c620a4061831508c34/html5/thumbnails/5.jpg)
The story I heard recently…
• Pastor decides to preach about being an astronaut (the topic he was not familiar with)
• The topic changed (the wife did not know about that change)
![Page 6: Project Stakeholder 10 April 2014 Management Workshop...Project Stakeholder Management Workshop 10 April 2014 Scope of Presentation Introduction and questions to ponder Purpose of](https://reader035.fdocuments.us/reader035/viewer/2022070903/5f68b7c620a4061831508c34/html5/thumbnails/6.jpg)
Keep stakeholders involved/ informed/ updated….
![Page 7: Project Stakeholder 10 April 2014 Management Workshop...Project Stakeholder Management Workshop 10 April 2014 Scope of Presentation Introduction and questions to ponder Purpose of](https://reader035.fdocuments.us/reader035/viewer/2022070903/5f68b7c620a4061831508c34/html5/thumbnails/7.jpg)
Questions to ponder
Was there a need for the 10th Project Management Knowledge Area?
Can we control stakeholders?
Relationship between project social facilitators and project managers?
Proj
ect S
take
hold
er M
anag
emen
t
![Page 8: Project Stakeholder 10 April 2014 Management Workshop...Project Stakeholder Management Workshop 10 April 2014 Scope of Presentation Introduction and questions to ponder Purpose of](https://reader035.fdocuments.us/reader035/viewer/2022070903/5f68b7c620a4061831508c34/html5/thumbnails/8.jpg)
Scope of Presentation
Introduction and questions to ponder
Purpose of today’s presentation
Why Project Stakeholder Management
Theoretical Framework
Real-life projects and issues with Stakeholders
Some challenges triggered by the 10th Knowledge Area
Conclusion
1
2
3
4
5
6
7
![Page 9: Project Stakeholder 10 April 2014 Management Workshop...Project Stakeholder Management Workshop 10 April 2014 Scope of Presentation Introduction and questions to ponder Purpose of](https://reader035.fdocuments.us/reader035/viewer/2022070903/5f68b7c620a4061831508c34/html5/thumbnails/9.jpg)
Purpose of this presentation
1 • To share some research findings
2 • To present theoretical framework
3 • To illustrate how stakeholders have impacted on projects
4 • To discuss some challenges triggered by the 10th Knowledge Area
![Page 10: Project Stakeholder 10 April 2014 Management Workshop...Project Stakeholder Management Workshop 10 April 2014 Scope of Presentation Introduction and questions to ponder Purpose of](https://reader035.fdocuments.us/reader035/viewer/2022070903/5f68b7c620a4061831508c34/html5/thumbnails/10.jpg)
Scope of Presentation
Introduction and questions to ponder
Purpose of today’s presentation
Why Project Stakeholder Management?
Theoretical Framework
Real-life projects and issues with Stakeholders
Some challenges triggered by the 10th Knowledge Area
Conclusion
1
2
3
4
5
6
7
![Page 11: Project Stakeholder 10 April 2014 Management Workshop...Project Stakeholder Management Workshop 10 April 2014 Scope of Presentation Introduction and questions to ponder Purpose of](https://reader035.fdocuments.us/reader035/viewer/2022070903/5f68b7c620a4061831508c34/html5/thumbnails/11.jpg)
Why am I talking about this?Research findings (eThekwini and Hibiscus Coast Municipalities)
• The need for Project Politics Management
• It is not about projects per se. It is politics managed through projects
• Strategic misrepresentation of facts: costs versus benefits
• Making yourself relevant relies on proper stakeholder analyses : Back-Boned Amoeba Mentality
![Page 12: Project Stakeholder 10 April 2014 Management Workshop...Project Stakeholder Management Workshop 10 April 2014 Scope of Presentation Introduction and questions to ponder Purpose of](https://reader035.fdocuments.us/reader035/viewer/2022070903/5f68b7c620a4061831508c34/html5/thumbnails/12.jpg)
Gurus also thought the same…
Communications Management
Integration Management
Scope Management
Time Management
Cost Management
Procurement Management
Human Resource Management
Quality Management
Risk Management POLITICS
STAKEHOLDER MANAGEMENT
CULTURE/ RELIGIONBUSINESS/ STRATEGY
Source: Kerzner (2010)
![Page 13: Project Stakeholder 10 April 2014 Management Workshop...Project Stakeholder Management Workshop 10 April 2014 Scope of Presentation Introduction and questions to ponder Purpose of](https://reader035.fdocuments.us/reader035/viewer/2022070903/5f68b7c620a4061831508c34/html5/thumbnails/13.jpg)
Why PMI added the 10th Knowledge Area?
• Evolution of thinking – PMBOK
• To expand upon and increase the focus on the importance of appropriately engaging project stakeholders in the key decisions and activities associated with the project
Source: PMBOK Guide – Fifth Edition
Forth Edition Fifth Edition
10.1. Identify Stakeholders 13.1. Identify Stakeholders
13.2. Plan Stakeholder Management
10.4. Manage Stakeholder Expectations 13.3. Manage Stakeholder Engagement
13.4. Control Stakeholder Engagement
![Page 14: Project Stakeholder 10 April 2014 Management Workshop...Project Stakeholder Management Workshop 10 April 2014 Scope of Presentation Introduction and questions to ponder Purpose of](https://reader035.fdocuments.us/reader035/viewer/2022070903/5f68b7c620a4061831508c34/html5/thumbnails/14.jpg)
Scope of Presentation
Introduction and questions to ponder
Purpose of today’s presentation
Why Project Stakeholder Management
Theoretical Framework
Real-life projects and issues with Stakeholders
Some challenges triggered by the 10th Knowledge Area
Conclusion
1
2
3
4
5
6
7
![Page 15: Project Stakeholder 10 April 2014 Management Workshop...Project Stakeholder Management Workshop 10 April 2014 Scope of Presentation Introduction and questions to ponder Purpose of](https://reader035.fdocuments.us/reader035/viewer/2022070903/5f68b7c620a4061831508c34/html5/thumbnails/15.jpg)
What is Project Stakeholder Management?
Source: PMBOK Guide – Fifth Edition
An individual, group, or organisation who may affect, be affected by, or perceive itself to be affected by a decision, activity, or
outcome of a projectDefining a
Stakeholder
the processes required to identify the people, groups, or organisations that could impact or be impacted by the project, to analyse stakeholder expectations and their impact on the project
Stakeholder Management
includes…
![Page 16: Project Stakeholder 10 April 2014 Management Workshop...Project Stakeholder Management Workshop 10 April 2014 Scope of Presentation Introduction and questions to ponder Purpose of](https://reader035.fdocuments.us/reader035/viewer/2022070903/5f68b7c620a4061831508c34/html5/thumbnails/16.jpg)
Overview
Project Stakeholder Management
Initiating Processes
Planning Processes
Executing Processes
Monitoring and Controlling Processes
Closing Processes
Identify Stakeholders
Plan Stakeholder Management
Manage Stakeholder Engagement
Control Stakeholder Engagement
Source: PMBOK Guide – Fifth Edition
![Page 17: Project Stakeholder 10 April 2014 Management Workshop...Project Stakeholder Management Workshop 10 April 2014 Scope of Presentation Introduction and questions to ponder Purpose of](https://reader035.fdocuments.us/reader035/viewer/2022070903/5f68b7c620a4061831508c34/html5/thumbnails/17.jpg)
New paradigm for PROJECT SUCCESS
PROJECT AExceeded Time, Budget and did
not meet desired Quality
PROJECT BExceeded Time, Budget BUT met
desired Quality
PROJECT DCompleted on Time, within Budget
and met desired Quality
PROJECT CPerformed better than what was
expected in terms of Time, Budget and Quality
Source: Adapted from Deacon (2010)
SUCCESSOR OR FAILURE?
![Page 18: Project Stakeholder 10 April 2014 Management Workshop...Project Stakeholder Management Workshop 10 April 2014 Scope of Presentation Introduction and questions to ponder Purpose of](https://reader035.fdocuments.us/reader035/viewer/2022070903/5f68b7c620a4061831508c34/html5/thumbnails/18.jpg)
Voting time….PROJECT RESULT SUCCESSFUL × FAILED
A Exceeded Time, Budget and did not meet desired Quality
B Exceeded Time, Budget BUT met desired Quality
C Performed better than what was expected in terms of Time, Budget and Quality
D Completed on Time, within Budget and met desired Quality
Source: Adapted from Deacon (2010)
![Page 19: Project Stakeholder 10 April 2014 Management Workshop...Project Stakeholder Management Workshop 10 April 2014 Scope of Presentation Introduction and questions to ponder Purpose of](https://reader035.fdocuments.us/reader035/viewer/2022070903/5f68b7c620a4061831508c34/html5/thumbnails/19.jpg)
Voting results 1PROJECT RESULT SUCCESSFUL × FAILED
A Exceeded Time, Budget and did not meet desired Quality
×
B Exceeded Time, Budget BUT met desired Quality
×
C Performed better than what was expected in terms of Time, Budget and Quality
D Completed on Time, within Budget and met desired Quality
Source: Adapted from Deacon (2010)
![Page 20: Project Stakeholder 10 April 2014 Management Workshop...Project Stakeholder Management Workshop 10 April 2014 Scope of Presentation Introduction and questions to ponder Purpose of](https://reader035.fdocuments.us/reader035/viewer/2022070903/5f68b7c620a4061831508c34/html5/thumbnails/20.jpg)
New paradigm for PROJECT SUCCESS
PROJECT AExceeded Time, Budget and did
not meet desired Quality
PROJECT BExceeded Time, Budget BUT met
desired Quality
PROJECT DCompleted on Time, within Budget
and met desired Quality
PROJECT CPerformed better than what was
expected in terms of Time, Budget and Quality
Source: Adapted from Deacon (2010)
SUCCESSOR OR FAILURE?
but all stakeholders are satisfied with the outcome
by 1 day and by R1000 respectively and stakeholders
are satisfied with the outcome but the end-users are very
dissatisfied with the product
but the ROI turns out to be far below expectations
![Page 21: Project Stakeholder 10 April 2014 Management Workshop...Project Stakeholder Management Workshop 10 April 2014 Scope of Presentation Introduction and questions to ponder Purpose of](https://reader035.fdocuments.us/reader035/viewer/2022070903/5f68b7c620a4061831508c34/html5/thumbnails/21.jpg)
Voting time – Round 2….PROJECT RESULT SUCCESSFUL × FAILED
A Exceeded Time, Budget and did not meet desired Quality but all stakeholders are satisfied with the outcome
B Exceeded Time, Budget BUT met desired Quality by 1 day and by R1000 respectively and stakeholders are satisfied with the outcome
C Performed better than what was expected in terms of Time, Budget and Quality but the end-users are very dissatisfied with the product
D Completed on Time, within Budget and met desired Quality but the ROI turns out to be far below expectations
Source: Adapted from Deacon (2010)
![Page 22: Project Stakeholder 10 April 2014 Management Workshop...Project Stakeholder Management Workshop 10 April 2014 Scope of Presentation Introduction and questions to ponder Purpose of](https://reader035.fdocuments.us/reader035/viewer/2022070903/5f68b7c620a4061831508c34/html5/thumbnails/22.jpg)
Voting results 2PROJECT RESULT SUCCESSFUL × FAILED
A Exceeded Time, Budget and did not meet desired Quality but all stakeholders are satisfied with the outcome
B Exceeded Time, Budget BUT met desired Quality by 1 day and by R1000 respectively and stakeholders are satisfied with the outcome
C Performed better than what was expected in terms of Time, Budget and Quality but the end-users are very dissatisfied with the product
D Completed on Time, within Budget and met desired Quality but the ROI turns out to be far below expectations
Source: Adapted from Deacon (2010)
![Page 23: Project Stakeholder 10 April 2014 Management Workshop...Project Stakeholder Management Workshop 10 April 2014 Scope of Presentation Introduction and questions to ponder Purpose of](https://reader035.fdocuments.us/reader035/viewer/2022070903/5f68b7c620a4061831508c34/html5/thumbnails/23.jpg)
Scope of Presentation
Introduction and questions to ponder
Purpose of today’s presentation
Why Project Stakeholder Management
Theoretical Framework
Real-life projects and issues with Stakeholders
Some challenges triggered by the 10th Knowledge Area
Conclusion
1
2
3
4
5
6
7
![Page 24: Project Stakeholder 10 April 2014 Management Workshop...Project Stakeholder Management Workshop 10 April 2014 Scope of Presentation Introduction and questions to ponder Purpose of](https://reader035.fdocuments.us/reader035/viewer/2022070903/5f68b7c620a4061831508c34/html5/thumbnails/24.jpg)
Applying the Matrix
![Page 25: Project Stakeholder 10 April 2014 Management Workshop...Project Stakeholder Management Workshop 10 April 2014 Scope of Presentation Introduction and questions to ponder Purpose of](https://reader035.fdocuments.us/reader035/viewer/2022070903/5f68b7c620a4061831508c34/html5/thumbnails/25.jpg)
Reflecting on 2 Projects I managed
ProjectStakeholder
PowerInterest
What was happening Management Strategy I used
Project XStakeholder A
HighHigh
Not believing that there is capacity to deliver project deliverables. Adopted attacking mode.
Constantly communicated with herGiving project progress daily
Project X Stakeholder B
HighLow (instead of being high)
Not responsive. Not supportive to project work that is their key competence and mandate.
Forged ‘friendship’ from inside to get things done
Project YStakeholder A
HighLow
Always suspecting political gains in project. Trying by all means to destabilise project work as he came from another political party
Acknowledged his points and made community members aware that I have taken into account what Mr Y believed in
![Page 26: Project Stakeholder 10 April 2014 Management Workshop...Project Stakeholder Management Workshop 10 April 2014 Scope of Presentation Introduction and questions to ponder Purpose of](https://reader035.fdocuments.us/reader035/viewer/2022070903/5f68b7c620a4061831508c34/html5/thumbnails/26.jpg)
Issues – Dube Trade Port
Environmental issues
Need to mega project
![Page 27: Project Stakeholder 10 April 2014 Management Workshop...Project Stakeholder Management Workshop 10 April 2014 Scope of Presentation Introduction and questions to ponder Purpose of](https://reader035.fdocuments.us/reader035/viewer/2022070903/5f68b7c620a4061831508c34/html5/thumbnails/27.jpg)
Why was King Shaka statue removed?
• Zulu Royal Household raised concerns that it was not a true reflection of the Zulu warrior king
• R3m – fruitless and wasteful expenditure
Source: The Witness, 3 June 2010
![Page 28: Project Stakeholder 10 April 2014 Management Workshop...Project Stakeholder Management Workshop 10 April 2014 Scope of Presentation Introduction and questions to ponder Purpose of](https://reader035.fdocuments.us/reader035/viewer/2022070903/5f68b7c620a4061831508c34/html5/thumbnails/28.jpg)
Business Sector played a crucial role in Margate Airport Project Success
Co-ordinating role
Marketing
Forging partnerships
Getting airline and mobilising hotels
![Page 29: Project Stakeholder 10 April 2014 Management Workshop...Project Stakeholder Management Workshop 10 April 2014 Scope of Presentation Introduction and questions to ponder Purpose of](https://reader035.fdocuments.us/reader035/viewer/2022070903/5f68b7c620a4061831508c34/html5/thumbnails/29.jpg)
Scope of Presentation
Introduction and questions to ponder
Purpose of today’s presentation
Why Project Stakeholder Management
Theoretical Framework
Real-life projects and issues with Stakeholders
Some challenges triggered by the 10th Knowledge Area
Conclusion
1
2
3
4
5
6
7
![Page 30: Project Stakeholder 10 April 2014 Management Workshop...Project Stakeholder Management Workshop 10 April 2014 Scope of Presentation Introduction and questions to ponder Purpose of](https://reader035.fdocuments.us/reader035/viewer/2022070903/5f68b7c620a4061831508c34/html5/thumbnails/30.jpg)
Challenges
• Soft skills augmentation for Project Managers
• Managing a new tier of stakeholders is not easy• Tier 1: Primary Stakeholders - contractual obligation to the project• Tier 2: Secondary Stakeholders - affected by the project• Tier 3: Tertiary Stakeholders - perceive themselves to the affected (unknown
unknowns)
• New definition of PROJECT SUCCESS needed
![Page 31: Project Stakeholder 10 April 2014 Management Workshop...Project Stakeholder Management Workshop 10 April 2014 Scope of Presentation Introduction and questions to ponder Purpose of](https://reader035.fdocuments.us/reader035/viewer/2022070903/5f68b7c620a4061831508c34/html5/thumbnails/31.jpg)
Scope of Presentation
Introduction and questions to ponder
Purpose of today’s presentation
Why Project Stakeholder Management
Theoretical Framework
Real-life projects and issues with Stakeholders
Some challenges triggered by the 10th Knowledge Area
Conclusion
1
2
3
4
5
6
7
![Page 32: Project Stakeholder 10 April 2014 Management Workshop...Project Stakeholder Management Workshop 10 April 2014 Scope of Presentation Introduction and questions to ponder Purpose of](https://reader035.fdocuments.us/reader035/viewer/2022070903/5f68b7c620a4061831508c34/html5/thumbnails/32.jpg)
Questions to ponder
Was there a need for the 10th Project Management Knowledge Area?
Can we control stakeholders?
Relationship between project social facilitators and project managers?
Proj
ect S
take
hold
er M
anag
emen
t
![Page 33: Project Stakeholder 10 April 2014 Management Workshop...Project Stakeholder Management Workshop 10 April 2014 Scope of Presentation Introduction and questions to ponder Purpose of](https://reader035.fdocuments.us/reader035/viewer/2022070903/5f68b7c620a4061831508c34/html5/thumbnails/33.jpg)
Concluding Remarks
There is a need for the 10th Project Management Knowledge Area
You cannot control stakeholders, but you can control their level of engagement. You can control was is caused by the uncontrollable!
Social facilitation NOW belongs to Project Managers as the key and fundamental competence
Proj
ect S
take
hold
er M
anag
emen
t
![Page 34: Project Stakeholder 10 April 2014 Management Workshop...Project Stakeholder Management Workshop 10 April 2014 Scope of Presentation Introduction and questions to ponder Purpose of](https://reader035.fdocuments.us/reader035/viewer/2022070903/5f68b7c620a4061831508c34/html5/thumbnails/34.jpg)
Concluding Remarks…
• Because of dynamism of stakeholders, managing them cannot be a one-size-fits all approach
• Project Manager – as a Situational Leader comes in
• Strategic handling – becomes useful
![Page 35: Project Stakeholder 10 April 2014 Management Workshop...Project Stakeholder Management Workshop 10 April 2014 Scope of Presentation Introduction and questions to ponder Purpose of](https://reader035.fdocuments.us/reader035/viewer/2022070903/5f68b7c620a4061831508c34/html5/thumbnails/35.jpg)
QUESTIONS AND COMMENTS