Project-sheet beeshoek
1
www.construction.murrob.com BEESHOEK Northern Cape, Postmasburg PROJECT TYPE: OPENCAST MINING CLIENT: Assmang Iron Ore VALUE: R722 Million CONSULTANTS: None PROJECT DURATION: 34 Months DATE OF PROJECT: 1 November 2011 PROJECT DESCRIPTION: 50% Joint Venture with Basil Read for the contract mining of iron ore. Approximate volumes for the project:- Total mining depth will be 190m. • Total over burden 48,000,000 tons • Total iron ore 5,500,000 tons
-
Upload
gert-buitendach -
Category
Business
-
view
18 -
download
5
description
Opencast Contract Mining, Drill, Blast, Load, Haul
Transcript of Project-sheet beeshoek
www.construction.murrob.com
BEESHOEK Northern Cape, Postmasburg
PROJECT TYPE: OPENCAST MINING
CLIENT:
Assmang Iron Ore
VALUE:
R722 Million
CONSULTANTS:
None
PROJECT DURATION:
34 Months
DATE OF PROJECT:
1 November 2011
PROJECT DESCRIPTION:
50% Joint Venture with Basil Read for the
contract mining of iron ore.
Approximate volumes for the project:-
Total mining depth will be 190m.
• Total over burden 48,000,000 tons
• Total iron ore 5,500,000 tons