Project Scoping. Project Scoping – learning objective Who should complete the Project Initiation...
-
Upload
miles-sullivan -
Category
Documents
-
view
216 -
download
3
Transcript of Project Scoping. Project Scoping – learning objective Who should complete the Project Initiation...
![Page 1: Project Scoping. Project Scoping – learning objective Who should complete the Project Initiation Package (PIP)? How is PDP Path used in scoping? Task.](https://reader031.fdocuments.us/reader031/viewer/2022013101/5697c0061a28abf838cc575d/html5/thumbnails/1.jpg)
Project Scoping
![Page 2: Project Scoping. Project Scoping – learning objective Who should complete the Project Initiation Package (PIP)? How is PDP Path used in scoping? Task.](https://reader031.fdocuments.us/reader031/viewer/2022013101/5697c0061a28abf838cc575d/html5/thumbnails/2.jpg)
Project Scoping – learning objective
• Who should complete the Project Initiation Package (PIP)?
• How is PDP Path used in scoping?• Task List
• What level of Detail is needed in a scope?• Detail needed by ODOT • Detail needed by Consultant• Detail needed for ODOT In-house design
![Page 3: Project Scoping. Project Scoping – learning objective Who should complete the Project Initiation Package (PIP)? How is PDP Path used in scoping? Task.](https://reader031.fdocuments.us/reader031/viewer/2022013101/5697c0061a28abf838cc575d/html5/thumbnails/3.jpg)
Project Scoping – learning objective
• Staged Design?
• Why is Scope important?
![Page 4: Project Scoping. Project Scoping – learning objective Who should complete the Project Initiation Package (PIP)? How is PDP Path used in scoping? Task.](https://reader031.fdocuments.us/reader031/viewer/2022013101/5697c0061a28abf838cc575d/html5/thumbnails/4.jpg)
Who should complete the Project Initiation Package (PIP)?
ODOTThe PIP should be completed prior to development of a scope of services
![Page 5: Project Scoping. Project Scoping – learning objective Who should complete the Project Initiation Package (PIP)? How is PDP Path used in scoping? Task.](https://reader031.fdocuments.us/reader031/viewer/2022013101/5697c0061a28abf838cc575d/html5/thumbnails/5.jpg)
How is PDP Path used in scoping?
By selecting a PDP Path, standard task lists are generated/recommended for scoping
![Page 6: Project Scoping. Project Scoping – learning objective Who should complete the Project Initiation Package (PIP)? How is PDP Path used in scoping? Task.](https://reader031.fdocuments.us/reader031/viewer/2022013101/5697c0061a28abf838cc575d/html5/thumbnails/6.jpg)
Task List and Scoping Document
For PDP projects, Task List and Scoping Document is done thru SAFe
http://pdp.dot.state.oh.us/
![Page 7: Project Scoping. Project Scoping – learning objective Who should complete the Project Initiation Package (PIP)? How is PDP Path used in scoping? Task.](https://reader031.fdocuments.us/reader031/viewer/2022013101/5697c0061a28abf838cc575d/html5/thumbnails/7.jpg)
Task List – for PDP projects
![Page 8: Project Scoping. Project Scoping – learning objective Who should complete the Project Initiation Package (PIP)? How is PDP Path used in scoping? Task.](https://reader031.fdocuments.us/reader031/viewer/2022013101/5697c0061a28abf838cc575d/html5/thumbnails/8.jpg)
Task List -Help
![Page 9: Project Scoping. Project Scoping – learning objective Who should complete the Project Initiation Package (PIP)? How is PDP Path used in scoping? Task.](https://reader031.fdocuments.us/reader031/viewer/2022013101/5697c0061a28abf838cc575d/html5/thumbnails/9.jpg)
Why use a Task List?
• Starting Point! Used to establish Project tasks that need to be completed
• Used to establish Project Scope
• Allows for flexibility based on project type and need
• Format
![Page 10: Project Scoping. Project Scoping – learning objective Who should complete the Project Initiation Package (PIP)? How is PDP Path used in scoping? Task.](https://reader031.fdocuments.us/reader031/viewer/2022013101/5697c0061a28abf838cc575d/html5/thumbnails/10.jpg)
Important points to take away from using Task List
• Task List can be adjusted to build your own scope……
• If you need more or less design on an issue, identify it in the task list and identify when you need it done….
• Used to actively manage the project.
![Page 11: Project Scoping. Project Scoping – learning objective Who should complete the Project Initiation Package (PIP)? How is PDP Path used in scoping? Task.](https://reader031.fdocuments.us/reader031/viewer/2022013101/5697c0061a28abf838cc575d/html5/thumbnails/11.jpg)
What level of Detail is needed in a scope?
Developing the detail to the level necessary to make the right decision.
Scope what you know (reasonably)
![Page 12: Project Scoping. Project Scoping – learning objective Who should complete the Project Initiation Package (PIP)? How is PDP Path used in scoping? Task.](https://reader031.fdocuments.us/reader031/viewer/2022013101/5697c0061a28abf838cc575d/html5/thumbnails/12.jpg)
What level of Detail is needed in a scope?
• Focus on an understanding of the issues that will need addressed by the project
• Crash Analysis• Planning/Certified Traffic
• Coordinate with local governments• Localized understanding of issues• Project support• Public Involvement
![Page 13: Project Scoping. Project Scoping – learning objective Who should complete the Project Initiation Package (PIP)? How is PDP Path used in scoping? Task.](https://reader031.fdocuments.us/reader031/viewer/2022013101/5697c0061a28abf838cc575d/html5/thumbnails/13.jpg)
What level of Detail is needed in a scope?
• Ensure studies are in place to support a P&N
• Identify critical information needed to make a decision on the Preferred Alternative.
• Identify critical path elements
• Establish schedule/budget
![Page 14: Project Scoping. Project Scoping – learning objective Who should complete the Project Initiation Package (PIP)? How is PDP Path used in scoping? Task.](https://reader031.fdocuments.us/reader031/viewer/2022013101/5697c0061a28abf838cc575d/html5/thumbnails/14.jpg)
Detail needed by ODOT
• Using the PIP ODOT should develop preliminary scope and set expectations for project
• Include all existing reports and studies
• Milestones in Ellis
![Page 15: Project Scoping. Project Scoping – learning objective Who should complete the Project Initiation Package (PIP)? How is PDP Path used in scoping? Task.](https://reader031.fdocuments.us/reader031/viewer/2022013101/5697c0061a28abf838cc575d/html5/thumbnails/15.jpg)
Detail needed by Consultant
• Provide information to support proposal $’s (number of meetings, number of alternatives ……)
• Further develop/refine Scope from preliminary scope provided by ODOT
• Establish Schedule (based on Ellis Milestones)/ Budget. Allow time for anticipated “Future Modifications”
![Page 16: Project Scoping. Project Scoping – learning objective Who should complete the Project Initiation Package (PIP)? How is PDP Path used in scoping? Task.](https://reader031.fdocuments.us/reader031/viewer/2022013101/5697c0061a28abf838cc575d/html5/thumbnails/16.jpg)
Detail needed for ODOT In-house design
• In-house design should use the PDP task list as a basis of scoping in-house work.
• Ellis Milestones need updated
![Page 17: Project Scoping. Project Scoping – learning objective Who should complete the Project Initiation Package (PIP)? How is PDP Path used in scoping? Task.](https://reader031.fdocuments.us/reader031/viewer/2022013101/5697c0061a28abf838cc575d/html5/thumbnails/17.jpg)
Final Scope
Final Scope becomes a contract document.
![Page 18: Project Scoping. Project Scoping – learning objective Who should complete the Project Initiation Package (PIP)? How is PDP Path used in scoping? Task.](https://reader031.fdocuments.us/reader031/viewer/2022013101/5697c0061a28abf838cc575d/html5/thumbnails/18.jpg)
Staged Design?
The Development of Construction plans, in compliance with NEPA requirements, in a sequence that minimizes rework and documents design decisions.
![Page 19: Project Scoping. Project Scoping – learning objective Who should complete the Project Initiation Package (PIP)? How is PDP Path used in scoping? Task.](https://reader031.fdocuments.us/reader031/viewer/2022013101/5697c0061a28abf838cc575d/html5/thumbnails/19.jpg)
Staged Design?
Scope for what you know. The PDP allows for a logical progression thru Design and Engineering (Staged Design)
![Page 20: Project Scoping. Project Scoping – learning objective Who should complete the Project Initiation Package (PIP)? How is PDP Path used in scoping? Task.](https://reader031.fdocuments.us/reader031/viewer/2022013101/5697c0061a28abf838cc575d/html5/thumbnails/20.jpg)
PDP Phases & Staged Design
• Preliminary Engineering includes Feasibility Study, Alternative Evaluation Report and Stage 1.
• Environmental Engineering includes completion of Stage 1 Design and completion of Stage 2 Design.
Preliminary and Environmental Engineering are considered Preliminary Development as it relates to FHWA Preliminary Engineering (PE) Environmental Federal Authorization
![Page 21: Project Scoping. Project Scoping – learning objective Who should complete the Project Initiation Package (PIP)? How is PDP Path used in scoping? Task.](https://reader031.fdocuments.us/reader031/viewer/2022013101/5697c0061a28abf838cc575d/html5/thumbnails/21.jpg)
PDP Phases & Staged Design
• Final Engineering includes completion of Stage 3 Design, Final Plans.
Final Engineering has a separate FHWA Final Engineering (Detail Design) Federal Authorization
![Page 22: Project Scoping. Project Scoping – learning objective Who should complete the Project Initiation Package (PIP)? How is PDP Path used in scoping? Task.](https://reader031.fdocuments.us/reader031/viewer/2022013101/5697c0061a28abf838cc575d/html5/thumbnails/22.jpg)
Can Tasks be moved from PDP phase to PDP phase to aid in Staged Design?
YES!
![Page 23: Project Scoping. Project Scoping – learning objective Who should complete the Project Initiation Package (PIP)? How is PDP Path used in scoping? Task.](https://reader031.fdocuments.us/reader031/viewer/2022013101/5697c0061a28abf838cc575d/html5/thumbnails/23.jpg)
Staged Design – moving tasks
Knowing that thru Stage 2 is considered under one Federal Authorization, tasks can be moved forward or back within the PDP Phases (Preliminary Engineering and Environmental Engineering) to accommodate the needs for project development.
![Page 24: Project Scoping. Project Scoping – learning objective Who should complete the Project Initiation Package (PIP)? How is PDP Path used in scoping? Task.](https://reader031.fdocuments.us/reader031/viewer/2022013101/5697c0061a28abf838cc575d/html5/thumbnails/24.jpg)
Staged Design – Risk Management
CAUTION!The risk of moving tasks forward is the chance for rework. Risk Management/Scoping
![Page 25: Project Scoping. Project Scoping – learning objective Who should complete the Project Initiation Package (PIP)? How is PDP Path used in scoping? Task.](https://reader031.fdocuments.us/reader031/viewer/2022013101/5697c0061a28abf838cc575d/html5/thumbnails/25.jpg)
Staged Design – moving task forward
When moving forward be aware of Federal Authorization split between Environmental subphase and Detail Design subphase (Stage 3 design…)
![Page 26: Project Scoping. Project Scoping – learning objective Who should complete the Project Initiation Package (PIP)? How is PDP Path used in scoping? Task.](https://reader031.fdocuments.us/reader031/viewer/2022013101/5697c0061a28abf838cc575d/html5/thumbnails/26.jpg)
Staged Design – moving task forward example
• An example of moving a task forward would be to bring design level survey tasks forward in the Planning or Environmental Engineering Phase.
This can have many benefits including: One trip to site for crew and provide detail base map for AER. This approach may be appropriate for single well defined alternative.
![Page 27: Project Scoping. Project Scoping – learning objective Who should complete the Project Initiation Package (PIP)? How is PDP Path used in scoping? Task.](https://reader031.fdocuments.us/reader031/viewer/2022013101/5697c0061a28abf838cc575d/html5/thumbnails/27.jpg)
Staged Design – moving task back example
• An example of moving a task back would be to defer alternative design level within Feasibility Study and or AER to Stage 1.
When evaluating alternatives in the Preliminary Engineering Phase, the design level needed should be considered when scoping. This could include not scoping a Feasibility Study or even and AER
![Page 28: Project Scoping. Project Scoping – learning objective Who should complete the Project Initiation Package (PIP)? How is PDP Path used in scoping? Task.](https://reader031.fdocuments.us/reader031/viewer/2022013101/5697c0061a28abf838cc575d/html5/thumbnails/28.jpg)
Why is Scope important?
• Establishes expectations – meeting of the minds
• Assures project approach for NEPA compliance
• Basis of Contract between the Department and Consultant
![Page 29: Project Scoping. Project Scoping – learning objective Who should complete the Project Initiation Package (PIP)? How is PDP Path used in scoping? Task.](https://reader031.fdocuments.us/reader031/viewer/2022013101/5697c0061a28abf838cc575d/html5/thumbnails/29.jpg)
Project Scoping
Roadmap for SUCCESS!