Project Scope Management [email protected] Knowledger Co., Ltd Work Breakdown Structure (WBS) •Created in Planning Process -> Scope Area •Benefits of Work Breakdown Structure • Organizes and defines the total scope of the project • Helps prevent work from slipping through cracks • Provide the big picture to the project team and where their works fit in • Gets team buy-in and builds the team • Facilitates communication and cooperation • Is the foundation of the project

Transcript of Project Scope Management - ENLIGHTENenlighten.co.th/wp-content/uploads/2016/05/Project... · 2016....

Page 1: Project Scope Management - ENLIGHTENenlighten.co.th/wp-content/uploads/2016/05/Project... · 2016. 5. 12. · Project Time Management Knowledger Co., Ltd instructor@knowledgertraining.com

Project Scope Management

[email protected] Co., Ltd

Work Breakdown Structure (WBS)

•Created in Planning Process -> Scope Area

•Benefits of Work Breakdown Structure

• Organizes and defines the total scope of the project

• Helps prevent work from slipping through cracks

• Provide the big picture to the project team and where their works fit in

• Gets team buy-in and builds the team

• Facilitates communication and cooperation

• Is the foundation of the project

Page 2: Project Scope Management - ENLIGHTENenlighten.co.th/wp-content/uploads/2016/05/Project... · 2016. 5. 12. · Project Time Management Knowledger Co., Ltd instructor@knowledgertraining.com

[email protected] Co., Ltd

Work Breakdown Structure (WBS)

[email protected] Co., Ltd

Work Breakdown Structure (WBS)

•Breaks the project into smaller and more manageablepieces called “Work Package”

•Work not in the WBS is outside the scope of the project

•Decomposition approach:

• Functional

• Lifecycle/ Phase

• Product component/ Deliverable

Page 3: Project Scope Management - ENLIGHTENenlighten.co.th/wp-content/uploads/2016/05/Project... · 2016. 5. 12. · Project Time Management Knowledger Co., Ltd instructor@knowledgertraining.com

[email protected] Co., Ltd

Work Breakdown Structure (WBS)

•Functional Approach

[email protected] Co., Ltd

Work Breakdown Structure (WBS)

•Lifecycle/ Phase Approach

Page 4: Project Scope Management - ENLIGHTENenlighten.co.th/wp-content/uploads/2016/05/Project... · 2016. 5. 12. · Project Time Management Knowledger Co., Ltd instructor@knowledgertraining.com

[email protected] Co., Ltd

Work Breakdown Structure (WBS)

•Product Component Approach

[email protected] Co., Ltd

Work Breakdown Structure (WBS)

Page 5: Project Scope Management - ENLIGHTENenlighten.co.th/wp-content/uploads/2016/05/Project... · 2016. 5. 12. · Project Time Management Knowledger Co., Ltd instructor@knowledgertraining.com

[email protected] Co., Ltd

Work Breakdown Structure (WBS)

Level 0

Level 3

Level 2

Level 1

[email protected] Co., Ltd

Work Breakdown Structure (WBS)

Two ways of presentation:

Tree- structured Tabular

Project Name

1.0________________________

1.1_____________________

1.2_____________________

2.0________________________

3.0________________________

3.1_____________________

3.2_____________________

3.3_____________________

Page 6: Project Scope Management - ENLIGHTENenlighten.co.th/wp-content/uploads/2016/05/Project... · 2016. 5. 12. · Project Time Management Knowledger Co., Ltd instructor@knowledgertraining.com

[email protected] Co., Ltd

Work Breakdown Structure Example

WBS for House Building Project

[email protected] Co., Ltd

WBS Example

House BuildingProject

1.Concrete 2. Framing 3. Plumbing 4. Electrical 5. Interior 6. Roofing

1.1Pour

Foundation

1.2Install Patio

1.3 Stairway

2.1 Frame Exterior

Walls

2.2 Frame Interior

Walls

2.3 Install Roofing

Trusses

3.1Install Water

Lines

3.2Install Gas

Lines

3.1Install Bath &

Kitchen Fixtures

4.1Install Wiring

4.2Install Outlets& Switches

4.3Install

Fixtures

5.1Install Drywalls

5.2Install Carpets

5.3Painting

6.1Install Felt

6.2Install

Shingles

6.3InstallVents

Level 0

Level 1

Level 2

Page 7: Project Scope Management - ENLIGHTENenlighten.co.th/wp-content/uploads/2016/05/Project... · 2016. 5. 12. · Project Time Management Knowledger Co., Ltd instructor@knowledgertraining.com

Project Time Management

[email protected] Co., Ltd

Activity Sequencing

Identifies and documents dependencies among schedule activities

4 Types of dependencies/ relationships

• SS – Start-to-Start

• SF – Start-to-Finish

• FS – Finish-to-Start

• FF – Finish-to-Finish

Dependency Determination

• Mandatory dependencies

• Discretionary dependencies

• External dependencies

Lead and Lag i.e. SSCD = -5d, FSAB = 3d

Uses Network Diagram – AON, AOA

Page 8: Project Scope Management - ENLIGHTENenlighten.co.th/wp-content/uploads/2016/05/Project... · 2016. 5. 12. · Project Time Management Knowledger Co., Ltd instructor@knowledgertraining.com

[email protected] Co., Ltd

Project Scheduling

Critical Path Method (CPM)

• Is a project network analysis technique used to predict total project duration

• Calculates the shortest time necessary to complete a project

• Uses “Most likely duration”

• Identified by calculating the earliest and latest start and end dates for every task

• The “Critical Path” is the route with zero float (slack)

[email protected] Co., Ltd

Project Scheduling

Float (Slack) – the amount of time you can delay the activity with no affect to other parts

• Total Float (TF) = the amount of time you can delay the earliest start of a task without delaying the ending of the project (Formula: TF = LS-ES)

• Free Float (FF)

• Project Float

Forward Pass - ES, EF; Backward Pass – LS, LF

Forward Pass

Backward Pass

Page 9: Project Scope Management - ENLIGHTENenlighten.co.th/wp-content/uploads/2016/05/Project... · 2016. 5. 12. · Project Time Management Knowledger Co., Ltd instructor@knowledgertraining.com

[email protected] Co., Ltd

Project Scheduling – Exercise 1

[email protected] Co., Ltd

Project Scheduling – Key 1

In details - Forward Pass

Page 10: Project Scope Management - ENLIGHTENenlighten.co.th/wp-content/uploads/2016/05/Project... · 2016. 5. 12. · Project Time Management Knowledger Co., Ltd instructor@knowledgertraining.com

[email protected] Co., Ltd

Project Scheduling – Key 1

Forward Pass

[email protected] Co., Ltd

Project Scheduling – Key 1

Forward Pass

Page 11: Project Scope Management - ENLIGHTENenlighten.co.th/wp-content/uploads/2016/05/Project... · 2016. 5. 12. · Project Time Management Knowledger Co., Ltd instructor@knowledgertraining.com

[email protected] Co., Ltd

Project Scheduling – Key 1

Forward Pass

[email protected] Co., Ltd

Project Scheduling – Key 1

Forward Pass

Page 12: Project Scope Management - ENLIGHTENenlighten.co.th/wp-content/uploads/2016/05/Project... · 2016. 5. 12. · Project Time Management Knowledger Co., Ltd instructor@knowledgertraining.com

[email protected] Co., Ltd

Project Scheduling – Key 1

Backward Pass

[email protected] Co., Ltd

Project Scheduling – Key 1

Total Float and Critical Path

Page 13: Project Scope Management - ENLIGHTENenlighten.co.th/wp-content/uploads/2016/05/Project... · 2016. 5. 12. · Project Time Management Knowledger Co., Ltd instructor@knowledgertraining.com

[email protected] Co., Ltd

Project Scheduling – Quiz

A project has three critical paths. Which of the following BEST described how this affects the project?

a. It makes it easier to manage.

b. It increases the project risk.

c. It requires more people.

d. It makes it more expensive.

[email protected] Co., Ltd

Effort Estimation