1. Executive summary
Education is the most valuable treasure any nation can give to its citizens
Ethiopia has been making tremendous efforts to Restructure the educational
system of the country, a new education and training policy has been launched
and implanted all over the country.
The establishment of the TVET institutions has so far contributed a lot in the
country in general and in the regional in particular. In the one of the moderately
big towns in the country, a new TVET college is planned to established and start
operating next academic years. The premise is already completed, what
Remains the necessary facilities for the various work shops. We are now
proposing procuring facilities for the following various workshops. This newly
establishes TVET College has 5 fields of training namely information technology,
masonry, concrete, plumbing, plastering,
The capacity of each workshop well be 25 students the total budget required is
as follows:
Machines, equipment and hand tools birr _______________
Furniture’s Birr________________
Installation of machines, equipment birr_____________
Total project cost Birr __________________
The project will take 6 moths to complete and make it ready for training
The TVET commission management board will implement the project by
assigned the committee and monitoring supervising the project the committee
has 6 member and they are experienced and qualified project manager,
marketing manager, technical manager and department heads that can
implement monitor and evaluate the project effectively. After the completion of
the project the committee hands over the whole TVET workshops for TVET
commission management board and the town education office.
1. Back ground of the project
The establishment of technical and vocational education and training institution
is very crucial of every nation particularly those that are still “developing” such
as Ethiopia. Vocational education is a capital-intensive fields of study because it
is based on skills and practical a lot of tools, equipment, machinery, are the
necessary facilities for various work shops as a result a lot of money is needed to
build and equip laboratories, demonstration farms , workshop, personnel,
recruitment when the TVET college has been adequately invested up on,
intelligently articulated, and properly executive it should be able to meet the
economic needs and expectations of the nations , and it’s citizen. The new TVET
institution equip with necessary tools, equipment and machinery the college be
comes a center of excellence in the area as competent and qualified training
institutions.
2. Project purpose and description
The project envisaged procuring facilities for the various workshops with
standard tools, equipment, and machinery.
Objective the overall objective of this project is to equip and furnish the various
workshops.
To establish standard equipment, tools, machinery for each workshops
To facilitate standard work shops and
Install the machines, the tools the equipment in properly.
4. Significance and value of the project
The implementation of the project shall assist the trainees acquired
necessary skills that make them competent on the labor force market
and this shall be employed and be a responsible citizens.
The project enhances trainees with Wright attitude, skills and aptitudes
to wards work.
The TVET college becomes center of excellence in the area as
competent and qualities training institution
The implementation of this project enabling the individuals to choose
and perfect knowledge, and skills in those they have interests and a
aptitudes
5. Project beneficiaries
The primary beneficiaries of the propose project trainees those are read to join
the TVET college. Their families, the town were the TVET College established the
nations as a whole and the private sector, will benefit form this project by
getting competent and reliable technical manpower capable with right attitudes,
skills and aptitude towards work.
The end of the project implementation will provide. Well organized, equipped
and standard workshops
6. Project implementation and monitoring
The projects are managed by the TVET management board headed by the
director the board. Assigned six member committee with there experienced and
educational qualification.
The project managers carry out all functions and manager with the clear and
transparent participation of all the committee members
- The TVET management board headed shall monitor and evaluated the project
and support (shall also play supervisory role).
Technical
Manager
Department Head
Department Head
Marketing &
Finical Manager
Department
Head
TVET management director
Project manager
7. Project sustainability
The project is being implemented the financing of education is a joint
responsibility of the Federal state and local Government and the private sector.
The government has established strong organizational structure to mange and
administers the various aspects of the project.
8. Project duration
Implementation of the project in most cases might be contingent to the
availability of funds the project shall be accomplished with 6 months this will be
form June 5/2012 to November 5/2012.
9. Budget summary ______________________
Machineries equipment and materials _______________
Installation ___________________________
Please see the detailed budget breakdown in the attached annexes
10. Risk management Plan
Risk contingency planning is the act of preparing a plan, or as series of activities,
should an adverse risk occur. A contingency pan in place forces the project team
to think in advance as to a course of action if a risk event takes place.
The project teams in advance expect the following risks in this project
Cost of materials this impact is usually estimate as dollar amount that has
a direct impact to the project
Schedule delays frequently results may affect the final end date
Quality of the delivery materials is frequently over looked as an impact
category if makes disappointment by the stakeholders Contingency may
also be reflected in the project budget as a line item to cover unexpected
expenses and the above risks. The amount of budget for contingency may
be limited to just the high probability risk.
Activity June July August September October November Remark
Weeks Weeks Weeks Weeks Weeks Weeks
1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4
Tender announcement and selecting the best supplier make un agreement
Sample taking from the supplier evaluating the equipment based on specification
Setup the basic infrastructure for each of workshop
Delivery time the awarded supplier based on the specification and agreement they
delivery the machine tools, and equipment After complication of delivery the materials the time for installation
Final end date of project
Work plane schedule
Annexes
Detailed cost and list of equipment and materials
1. Information technology
N
o
Item U
ni
t
Qu
ant
Unit
pric
e
Tot
al
prin
ce
Re
mar
k
1 Computer pc
s
25 7,00
0
175,
000
2 Printer HP leaser jet 1320 Pc
s
5 450
0
225
00
3 Scan jet color Pc
s
2 800 160
0
4 Network connection
HUBS Pc
s
10 143
5.00
143
50
RJ pc
s
72
0
1.15
.00
828
Cable Pc
s
47
00
2.07
.00
972
7
Crimping tools Pc
s
6 345.
00
207
0
5 APC smart UPS Pc
s
50 217
3.00
108
650
6 Printer tanner Pc
s
5 100
0
7 Photocopy machine Pc
s
1 450
0
500
0
8 Beamer LCD projector Dell 2400 Pc
s
1 200
00
200
00
9 Blower Pc
s
2 280 560
1
0
Fire Pc
s
1 300
Extinguishers 300
1
1
Tool kit with all accessory Pc
s
1 200
0 200
0
2. Masonry
A. Machinery and equipments specification
S.
N
Item Unit Quant U. price T.prince Remark
1 Bench grinder Pcs 5 685.27 3,426.35
2 Block molding Pcs 2 38,927.9
0
77,855.8
3 Computer Pcs 2 7,821.19 15,642.3
8
4 Concrete mixer Pcs 1 30,000 30,000
5 Electrical bar cutler Pcs 1 24,365,1
6
24,365.1
0
6 Electrical brick Pcs 1 12,119.2
1
12,119.2
1
7 Leveling with all
accessory
Pcs 1 20000
8 Portable disk Pcs 2 675.21 1350.42
9 Reinforcing shear Pcs 1 2000 2000
culture
10 thedoelite pcs 2 35,000 70,000
11 Vibrator pcs 2 12,116.2
7
24232.54
Subtotal=
259,061.42
S
N
Item Unit Quant U.price T.princ
e
Remark
1 Brick hammer pcs 25 200 5000
2 Sledge hammer (5 kg) Pcs 25 250 6250
3 Stone chisel (large
size)
Set 10 500 5000
4 Chisel (medium size) SET 25 400 10000
5 Chisel (small size) SET 25 300 7500
6 Claw hammer Pcs 15 100 1500
7 Shovel pcs 15 150 2250
8 Bucket Pcs 25 100 2500
9 Could chisel Pcs 25 200 5000
10 Plumb bob Pcs 25 100 2500
11 Mason square Pcs 25 200 5000
12 Spirit level (M) Pcs 25 150 3750
13 Tape rule (5m) Pcs 25 50 1250
14 Tape rule (10m) Pcs 5 70 350
15 Tape rule (25 30 m) Pcs 25 250 6250
16 Combination pliers Pcs 10 80 800
17 Zig zag rule Pcs 25 50 1250
18 Crow bar Pcs 15 100 1500
19 Wooden float
(30/40cm)
Pcs 25 100 2500
21 Rubber float Pcs 25 250 6250
22 Hack saw with all
accessory
Pcs 5 300
1500
23 Spade Pcs 10 200 2000
24 Wheel barrow Pcs 5 400 2000
25 Bolster Pcs 25 100 2500
26 Gloves Pcs 25 250 6250
27 Goggles Pcs 25 100 2500
28 Helmet Pcs 25 300 7500
29 Plaster trowel Pcs 25 100 2500
30 Brick Trowel pcs 25 120 3000
31 Try square Pcs 25 100 2500
32 Cube molding with al
accessory
Pcs 1 5000 50000
33 Sieve Pcs 2 600 1200
34 Screw driver SET 5 120 600
Subtotal= 113450
259061.42+113450=372511.42
10% contingency
Total cost Estimate, masonry= 409762.60
4.Concert
A/ Machinery and equipments specification
SN
Item Unit Quan
t
Unit
price
Total
prince
Remark
1 Block molding pces 1 31,998.1
6
31,998.1
6
2 Compaction test
apparatus
Pcs 1 48,921.1
6
48,921.1
6
3 Compactor pcs 1 7,821.19 7,821.19
4 Compression test pcs 1 48,410.9 48,410.9
machine 0 0
5 Concrete mixer Pcs 1 16,119.2
7
16,119.2
7
6 Cube molding Pcs 1 23,416.9
0
23,416.9
0
7 Cube balance Pcs 1 985.90 985.90
8 Digital Pcs 1 9,827.90 9,827.90
9 Electrical bar cutter Pcs 1 21,839.1
6
21,839.1
6
10 Electrical portable
circular saw
Pcs 2 1827.90 3655.80
11 Extension cable Pcs 2 668.90 1337.80
12 Portable angle grinder Pcs 1 675.21 675.21
13 Portable drill hammer Pcs 1 3248.90 3248.90
14 Portable electrical drill pcs 1 839.16 839.16
15 Reinforcement bar
shear cutter
pcs 1 898.90 898.90
16 Sand and aggregate
sieves
Pcs 1 21,116.2
7
21,116.2
7
17 Shear cuter /manual/ pcs 1 898.90 898.90
18 Thedolite pcs 1 3500 3500
19 Vibrator Pcs 1 12,116.2
7
12,116.2
7
Subtotal= 284252.81
B. Hand tools specification
S.
N
Item Unit Quant Unit
price
Total
prince
Remark
1 Combination pliers pcs 5 50 250
2 concrete chisel (lager
size )
SET 5 300 1500
3 concrete SET 5 250 1250
4 Concrete Drill bit SET 5 250 1250
5 Pincer Pcs 5 50 250
6 Tape rule (20:50M
long)
Pcs 6 200 1200
7 Water level tube
(100M long)
Pcs 1 5 500
8 Plumb bob pcs 1 5 500
9 Framing square Pcs 25 100 2500
10 Claw hammer Pcs 15 50 750
11 Mason hammer Pcs 25 100 2500
12 Bow saw Pcs 5 100 500
13 Shovel Pcs 15 100 1500
14 Hoe Pcs 8 100 800
15 Spirit level pcs 25 100 2500
16 Wheel barrow Pcs 5 200 1000
17 Hand plane Pcs 10 150 1500
18 Wood chisel Set 3 200 600
19 Screw driver (flat) Set 3 100 300
20 Screw driver (Philips) set 3 100 300
21 Pincer Pcs 8 50 400
22 Hack saw pcs 5 200 1000
23 Work bench with all
accessories
Pcs 6 3000 18000
24 Float pcs 12 100 1200
25 Trowel pcs 25 60 1500
26 Bucket Pcs 25 100 2500
27 Theodilile with all
accessories
Pcs 1 35000 35000
28 Staff rod Pcs 1 1000 1000
29 Rage poll Pcs 8 400 3200
30 Leveling with all
accessories
Pcs 1 20000 20000
Subtotal= 106,000
284252.81+106000=390252.81
10% contingency
Total costs estimate, concrete = 429278.08
5.Plumbing
A. Machineries and equipment specification
S.
N
Item Unit Quan
t
Unit price Total
prince
Remark
1 Bench vice Pcs 5 383.16 1915.8
2 Bidet Pcs 5 816.90 4084.5
3 Die stock with one SET 5 396.16 1980.8
4 Dispenser oil can Pcs 5 227.90 1139.5
5 Flexible plumber
snake
Pcs 5 150 750
6 Grease gun Pcs 5 100 500
7 Griper Pcs 5 1,216.27 6081.35
8 Hand pump oilier Pcs 5 180 900
9 Heating equipment
standard size (boiler)
Pcs 1 1200 1200
10 Hydraulic pipe bender Pcs 2 1,827.90 3655.80
11 Multi wheel pipe
cutter
Pcs 5 800 4000
12 Pastie grip oiler Pcs 5 180 900
13 Pipe ender manual Pcs 5 2,327.90 11639.50
14 Pipe cuter machine Pcs 2 18,891.70 37783.40
15 Hack saw pcs 10 200 200
16 Trowel pcs 8 120 960
17 Plumbers tool box
with all accessory
Pcs 5 7,893.90 39469.50
18 Portable folding pipe Pcs 5 900 4500
19 Pressure testing
pump
pcs 2 27,119.20 54238.42
20 Retachet type stock
and die with two
handle
Set 2 800 4000
21 Shower mixer Pcs 5 400 2000
22 Shower tray Pcs 5 488.24 2441.2
23 Sink with all
accessories
Pcs 2 1500 3000
24 Turkish seat Pcs 2 325.16 650.32
25 Universal pip bender Pcs 5 1,6221.99 8109.95
26 Urinals Pcs 5 627.19 3135.95
27 Wash basin Pcs 5 679.19 3135.95
28 Pipe wrench
(adjustable)
Pcs 4 500 2000
29 Screw driver (flat) SET 3 100 3000
30 File (flat) Set 5 120 600
31 File (round) Set 5 120 600
32 Set squares (made of
metal)
Pcs 25 100 2500
33 Reimer Pcs 5 300 1500
34 Spirit level Pcs 5 120 600
35 Plum bob Pcs 10 120 1200
36 Theodilite with all
accessories
Pcs 1 35000 3500
37 Staff rod Pcs 1 1000 1000
38 Range oil Pcs 8 400 3200
39 Adjustable
spanner /wrench/
Pcs 5 400 3200
40 Allen wrench Pcs 5 130 650
41 Basin wrench Pces 5 185.21 926.05
42 Center punches Pcs 5 98.27 491.35
43 Chain wrench Pcs 5 162.78 813.9
44 Crease gun Pcs 5 89.90 449.5
45 Hand auger Pcs 5 427.16 2135.80
46 Oil can Pcs 5 80 400
47 Open and closed
spanner
Pcs 5 263.16 1315.80
48 Pipe cutters Pcs 5 196.27 981.35
49 Pipe
threaded/manual/
SET 5 398.16 1990.8
50 Pipe threaded ratchet SET 5 567.60 2839.5
type
51 Pipe wrench Set 5 167.91 839.55
52 Plunger Pcs 5 68.20 344.50
53 Pump pliers Pcs 5 90 450
54 Rotary pump Pcs 5 4381.16 21905.8
55 Secretary Pcs 5 123.16 615.80
56 Socket wrench Pcs 5 228.16 21905.80
57 Straight jaw grip
pliers
Pcs 5 150 750
58 Venire caliper Pcs 5 165.16 825.8
59 Wire brush Pcs 5 25 125
Subtotal= 291464.69
10% contingency
Total costs estimate for plumbing= 320,611.19
S.N Item Unit Quant Unit
price
Total
prince
Remark
1 Air compressor Pcs 1 3,119.27 3,119.27
2 Jig saw (saber saw) Pcs 1 1200 1200
3 Portable Angle grinder Pcs 1 1300 1300
4 Portable hammer drill Pcs 1 3,248.90 3,248.90
5 Projection machine Pcs 1 69,916.7
0
69,916.7
0
6 Dust absorber machine Pcs 1 73,112.2
4
73,112.2
4
7 Mortar mixer Pcs 1 59,719.7
5
59,719.7
5
B. Hand tools specification
S.N Item Unit Quant Unit
price
Total
prince
Remark
1 Adhesive tooth trowel Pcs 5 130 650
2 Brick hammer pcs 10 130 1300
3 Extension cable Pcs 2 668.90 1300
4 External trowel Pcs 5 125 625
5 Flote (plastic) Pcs 20 186.90 3738
6 Goggles Pcs 20 100 2000
7 Hand gloves Pcs 20 200 4000
8 Helmet Pcs 20 300 6000
9 Mason trowel Pcs 20 120 2400
10 Masons hammer Pcs 20 100 2000
11 Pincer Pcs 5 50 250
12 Protractor Pcs 20 168.90 3378
13 Smoothing trowel Pcs 20 140 2800
14 Sprit level Pcs 20 120 2400
15 Square pattern trowel Pcs 20 180 3600
16 Wire brush Pcs 20 50 1000
17 Chisel Set 6 120 720
18 Shovel Pcs 20 200 4000
19 Plumb bob Pcs 25 50 1250
20 Framing square Pcs 25 100 2500
21 Claw hammer Pcs 15 50 750
22 Bow saw Pcs 5 100 500
23 Hoe Pcs 8 100 800
24 Wheel barrow Pcs 5 200 1000
25 Wood chisel Set 3 200 600
26 Screw driver (flat) Set 3 100 300
27 Screw driver (Philips) set 3 100 300
28 Pincer Pcs 8 50 400
29 Hack saw Pcs 5 200 1000
30 Work bench with all
accessories
Pcs 3 3000 9000
31 Bucket Pcs 25 100 2500
Subtotal= 63061
10% contingency
Total cost estimate, plastering=
69367