PROJECT REVIT VERSION: 2012 Pioneer Park · PIONEER PARK AVIARY RENOVATION ... DIMENSIONS TAKE...
Transcript of PROJECT REVIT VERSION: 2012 Pioneer Park · PIONEER PARK AVIARY RENOVATION ... DIMENSIONS TAKE...
REGISTEREDARCHITECT
GARY THOMAS CONNORSTATE OF WASHINGTON
3188
Date Stamped:
Architecture Engineering Surveying
Project:
Date
Checked
Drawn
Project Mgr.
Sheet Contents:
Sheet No.:
Stantec W.O.
621 West Mallon AvenueSuite 309Spokane, Washington 99201Phone: (509) 328-5139Fax: (509) 328-0423
2 S. 1st AvenueSuite 201Walla Walla, WA 98362Phone (509) 522-4843FAX (509) 522-1902
PRO
JEC
T R
EVIT
VER
SIO
N: 2
012
www.Stantec.com
Planning Environmental Services
Formerly USKH
2/25
/201
5 11
:59:
57 P
MC
:\Use
rs\P
ublic
\Doc
umen
ts\L
ocal
_Rev
it_Fi
les\
2046
0021
2_A_
Avia
ry_C
entra
l_dk
aras
.rvt
G.001
GTC
AHD
TITLE SHEET
204600212
100% SUBMITTAL
PIONEER PARKAVIARYRENOVATION
USKHWALLA WALLA,WA
DJK
2/19/2015
Pioneer ParkWalla Walla AviaryWalla Walla, WA 99632
DRAWING INDEX01 - GENERALG.001 TITLE SHEET
07 - ARCHITECTUREA.001 SYMBOLS, NOTES, ABBREVIATIONSA.100 SITE - DEMO PLANA.101 SITE - OVERALL PLANA.102 NEW AVIARY - PLANA.103 FENCE AND RAILING DETAILSA.104 SIDEWALK DETAILS
08 - STRUCTURALS1 GENERAL STRUCTURAL NOTESS2 FOUNDATION PLANS3 FRAMING PLANS4 FRAMING SECTIONSS5 DETAILSS6 DETAILSS7 DETAILSS8 DETAILSS9 DETAILS
WALLA WALLA
PIONEER PARKAVIARY:WHITMAN ST.WALLA WALLA,WA
PROJECT TEAM
OWNER
City of Walla Walla55 E. Moore StreetWalla Walla, Wa
ContactJim Dumont509-527-4527
ARCHITECT AND STRUCTURAL ENGINEER
STANTEC ARCHITECTURE2 S. First Avenue, Suite 201Walla Walla, Wa
Contact:Daniel Karas, AIA509-524-1911
REV
ISIO
NS
No.
Dat
eD
escr
iptio
nBy
1. THE CONTRACTOR SHALL PROTECT THE EXISTING FACILITIES AND SURROUNDING GROUNDS DURING CONSTRUCTION. ALL AFFECTED AREAS SHALL BE RESTORED TO EXISTING CONDITIONS BY THE CONTRACTOR AT THECONCLUSION OF CONSTRUCTION ACTIVITIES.
2. THE CONTRACTOR SHALL FIELD VERIFY ALL CONDITIONS AND DIMENSIONS PRIOR TO ANY WORK AND SHALL BE RESPONSIBLE FOR ALL WORK AND MATERIALS INCLUDING THOSE FURNISHED BY SUBCONTRACTORS.
3. DIMENSIONS TAKE PRECEDENCE OVER DRAWINGS. DO NOT SCALE DRAWINGS TO DETERMINE ANY LOCATIONS. THE OWNER SHALL BE NOTIFIED IF ANY DISCREPANCY OCCURS PRIOR TO CONTINUING WITH WORK.
4. ALL CONSTRUCTION SHALL COMPLY WITH APPLICABLE CODES & LOCAL RESTRICTIONS.
5. THE CONTRACTOR SHALL REPORT ANY ERRORS, INCONSISTENCIES, OR OMISSIONS THEY MIGHT DISCOVER. THE CONTRACTOR IS RESPONSIBLE FOR CORRECTING ANY ERRORS AFTER THE START OF CONSTRUCTION WHICHHAVE NOT BEEN BROUGHT TO THE ATTENTION OF THE OWNER. METHOD OF CORRECTING ANY ERROR SHALL BE APPROVED BY THE OWNER.
6. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO LOCATE ALL EXISTING UTILITIES WHETHER SHOWN HEREIN OR NOT AND TO PROTECT THEM FROM DAMAGE. THE CONTRACTOR SHALL BEAR ALL EXPENSE OF REPAIROR REPLACEMENT OF UTILITIES OR OTHER PROPERTY DAMAGED BY OPERATIONS IN CONJUNCTION WITH THE PERFORMANCE OF THE WORK.
7. THE CONTRACTOR IS REQUIRED TO LABEL ALL ELECTRICAL PANELS, HVAC EQUIPMENT, ETC.
8. DO NOT OBSTRUCT STREETS, SIDEWALKS, ALLEYS, OR OTHER RIGHT-OF-WAYS WITHOUT FIRST OBTAINING PROPER PERMITS.
9. ALL WORK SHALL BE ACCOMPLISHED WITH QUALITY WORKMANSHIP OF THE HIGHEST INDUSTRY STANDARDS. ALL MATERIALS SHALL BE INSTALLED IN STRICT ACCORDANCE WITH MANUFACTURERS' INSTRUCTIONS ANDRECOMMENDATIONS AND NATIONAL TRADE GROUP STANDARDS.
10. THE OWNER MAY PERFORM ADDITIONAL WORK THAT IS NOT PART OF THIS CONTRACT WITH THEIR OWN FORCES, UNDER SEPARATE CONTRACTS AND/OR WITH OTHER CONTRACTORS. THE CONTRACTOR SHALL COOPERATE WITHTHE OWNER AND OTHER CONTRACTORS AND COORDINATE HIS WORK WITH THE OWNER SO THAT WORK BY OTHERS CAN BE INCORPORATED IN A TIMELY MANNER.
11. AGENCY APPROVED PLANS SHALL BE KEPT IN A PLAN BOX ON SITE AND SHALL NOT BE USED BY WORKMEN. ALL CONSTRUCTION SETS SHALL REFLECT SAME INFORMATION. THE CONTRACTOR SHALL ALSO MAINTAIN IN GOODCONDITION, ONE COMPLETE SET OF PLANS, ADDENDA, AND CHANGE ORDERS, ON PREMISES AT ALL TIMES. THESE ARE TO BE UNDER THE CARE OF THE JOB SUPERINTENDENT AND SHALL BE UPDATED AS THE PROJECT PROGRESSES.
12. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE COMPLETE SECURITY OF THE SITE WHILE JOB IS IN PROGRESS AND IS COMPLETE.
13. ALL DEBRIS SHALL BE REMOVED FROM PREMISES AND ALL AREAS SHALL BE LEFT IN A CLEAN (BROOM) CONDITION AT ALL TIMES. COMBUSTIBLE DEBRIS SHALL NOT BE PERMITTED TO ACCUMULATE. WASTE MATERIAL ORTRASH SHALL NOT BE BURNED ON SITE. ALL PRUDENT MEASURES SHALL BE TAKEN TO SEPARATE WASTE AND DIVERT IT TO APPROVED RECYCLING AREAS.
14. CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO ENSURE THE SAFETY OF THE OCCUPANTS AND WORKERS AT ALL TIMES. CONTRACTOR SHALL MAINTAIN AT LEAST TWO TYPE 2A-10 BC FIRE EXTINGUISHERS ONSITE DURING CONSTRUCTION.
GENERAL NOTESExhaust FanExhaust GrilleExistingExpandExpansion JointExposedExterior
FabricateFace of BrickFace of ConcreteFace of FinishFace of MasonryFace of StudsFace of WallFactory FinishFahrenheitFeetFenceFiberglassFiberglass Reinf.Plast. FieldFigureFinishFinished FloorFire AlarmFire ExtinguisherFire HydrantFire WallFireproofFittingFixtureFlangeFlashingFloorFloor CleanoutFloor DrainFloor LineFloor SinkFlooringFluorescentFootFootcandleFootingForwardFrequencyFresh AirFresh Air IntakeFresh WaterFromFurnished by OthersFurred(ing)Future
Gage (gauge)Gallon Galvanize (Hot Dip)GeneralGeneratorGlassGlass BlockGovernmentGrab BarGravelGroundGround FaceGround Fault Interrupt GroutGypsumGypsum Wallboard
HangerHardHardboardHardwareHardwoodHeaderHeaterHeatingHeating ReturnHeating, Ventilating and Air ConditioningHeavyHeavy-DutyHeightHexagonalHighHigh Density PolyethyleneHigh Intensity DischargeHigh PressureHigh StrengthHigh VoltageHighwayHoistHollow CoreHollow MetalHollow TileHorizontalHorsepowerHose BibHose RackHot WaterHot Water HeaterHot Water ReturnHot Water SupplyHourHousingHydrantHydraulic
IdentifyIlluminateIncandescentInchIncludeIndustryInformationInputInside DiameterInstallInstrumentInsulateInteriorIntersectInvert ElevationIron PipeIrregularIrrigation
JanitorJointJoistJunctionJunction Box
KeywayKitchenKnock Down
LaboratoryLag BoltLaminateLam. Veneer LumberLanding
LargeLateralLatitudeLavatoryLayerLayoutLeakageLeft HandLetterLeverLightLight SwitchLightingLightweightLinear FeetLinear; LinealLintelLiquidLive LoadLoading RelayLocateLockedLongitudinalLouverLowerLumber
MachineMaintenanceMajorManholeManhole CoverManualManufacturerManufacturingMasonryMasonry OpeningMaterialMaterial ListMaximumMeasureMechanicalMedianMediumMembraneMercury VaporMetalMeter (Instrument)MiddleMillworkMinimumMiscellaneousMiterModularMoistureMoldingMinuteMountMountingMullionNationalNational Electrical CodeNational Electrical Mfr. AssociationNational fire Protection AssociationNaturalNear FaceNear SideNecessaryNeutralNoise ReductionNormalNorthNot ApplicableNot in ContactNot to ScaleNumber
On CenterOpen EndOpeningOperateOperationOppositeOriginal OptionalOutletOutside CircumferenceOutside DiameterOutside faceOutside RadiusOverflowOverhead
PackagePaintPairPanelPaper Towel DispenserPaper Towel ReceptorParallelParkingPartialParticle boardPartitionPavementPeakPenetrationPenny (nail size)PercentPerforatePerimeterPermanentPerpendicularPhasePiecePlankPlan viewPlasterPlasticPlastic LaminatePlatePlatformPlumbingPlywoodPneumatic
PointPolyvinyl ChloridePorcelain EnamelPortablePortland CementPost-Tensioned ConcretePotable WaterPotentialPoundPound Per Cubic FootPounds er Square FootPounds per Square InchPowerPower AmplifierPower and LightingPrecastPrefabricatedPreferredPrefinishedPreliminaryPremolded Joint FillerPreparationPressurePressure TreatedPre-stressed ConcretePrimaryProcedureProductProperty Line
QuadrantQualityQuantityQuart
RadialRadiusRailroadRailwayRain LeaderRateRatingRatioReceptacleRecessRecommendRectangleReferenceReference LineRefrigeratorReinforceReinforced ConcreteRelocateRemoteRemove Remove and ReplaceReplaceReproduceRequired ReservoirResilientResistorRetainingReturnReturn AirReturn Air GrilleReverseRevisionRevolution per MinuteRight Right HandRoadRoof Drain Roof hatchRoofingRoof VentRoomRotateRoughRough OpeningRoundRubberRubber Base
Safety GlassSampleSanitarySanitary SewerScheduleSchematicScreenSealantSeamlessSeatingSecondSecondarySectionSelectSensorSeparateSerialSewerSheathingSheetSheet GlassShelf, ShelvingShoulderShowerSidewalkSidingSimilarSingleSinkSleeveSlopeSoundproofSouthSpacing SpeakerSpecialSpecificationsSquareSquare FootSquare InchStainless SteelStairwayStandardStandbyStandoffStandpipeStationSteelStiffenerStorageStorm DrainStraightStreetStructure, structural
SubstituteSupplySupportSurfaceSurveySuspendSwitchSwitchboardSymbolSymmetricalSynchronizeSystem
TackboardTangentTechnicalTelephoneTelevisionTemperatureTemporaryTerminalThermostatThickThicknessThreadThree-PhaseThresholdThroughTimberToiletToilet PartitionTongue and GrooveToppingTotalTotal LoadTowel BarTowerTrackTrafficTransformerTransitionTransverseTreadTreatedTreatmentTubingTypical
UltimateUndercutUndergroundUnderground ConduitUnderwriter LaboratoriesUnfinishedUniformUniform Building CodeUnit HeaterUniversal Upper
VacuumVapor BarrierVapor ProofVariableVeneerVentVentilatorVent PipeVent Through RoofVent to CeilingVerifyVermiculiteVertical VinylVinyl BaseVinyl FabricVinyl TileV-Jointed(ed)Volt, VoltageVolume
WaferWainscotWall HungWall to WallWall VentWallboardWall CleanoutWarehouseWasherWasteWaterWater ClosetWater HeaterWater MeterWater PumpWaterlineWaterproofWaterstopWatertightWattWeatherproof (insul)WeightWelded SteelWelded Wire FabricWestWhiteWideWidthWire MeshWiringWithWithoutWoodYardYellow
AboveAbove Finish FloorAbove Suspended CeilingAccountAcousticAdditionAdjustableAggregateAlarmAlignmentAlternateAluminumAmerican Wire GageAmountAnchor BoltAngleApproximateAsphaltAssemblyas soon as possibleAutomaticAuxiliary
BackBackgroundBallastBarrierBase LineBasementBeamBearingBelowBench MarkBituminousBlackBlockingBoardBottomBritish Thermal UnitBuildingBuilding LineBulkhead
CabinetCapacityCasementCast-in-PlaceCast IronCatch BasinCaulkingCeilingCenterCeramicCeramic TileChalkboardChamferChange OrderChannelChain LinkChordCircleCircumferenceClassificationCleanoutClosetCombinationCompanyConcreteConcrete Masonry UnitConnectionConstructionConstruction JointContinuousContractorControl PanelCorrugatedCounterclockwiseCountersinkCrossingCubicCubic FootCubic InchCubic YardCylinder
DecreaseDeflectDegree letter DepartmentDetailDevelopmentDiagonalDiameterDifferenceDimensionDirectionDisconnectDistanceDoorDoor CloserDoor GrilleDoor StopDouble-HungDouglas FirDownDownspoutDrainDrain TileDrainboardDrawerDrawingDrinking Fountain
EachEastElectricElevationElevatorEmergencyEnclosureEnergyEngineerEnlargeEntranceEnvironmentalEqualEquipmentEquivalentEscalatorEstimateExceptExhaust
ABVAFFASCACCTACSTADDADJAGGRALMALIGN.ALTNALAWGAMTABLAPPROXASPHASSYASAPAUTO.AUX
BKBKGDBLSTBARRBLBSMTBMBRGBLWBMBITUMBLK, BKBLKGBDBOTBTUBLDGBLBHD
CAB.CAPCSMTCIPCICBCLKGCLGCTRCERCTCHBDCHAMCOCHANCLCHDCIRCRCMFCLASS.COCLOCOMB.COCONCCMUCONNCONSTRCJCONTCONTRCPCORRCCWCSKXINGCUCU FTCU INCU YDCYL
DECRDEFLDEGDEPTDETDEVDIAGDIADIFFDIM.DIRDISC.DISTDRDCLDGDSTDHDFDNDSDRDTDRBDWRDWGDF
EAEELECELELEVEMERENCLENGYENGRENLGENTRENVIREQEQPTEQUIVESCESTEXCEXH
EFEGEXSTEXPEXP JTEXPEXT
FABFBFOCFOFFOMFOSFOWFF0FFTFNFGLFRPFLDFIG.FNSHFFFAFEXTFHYFWFPRFFTGFXTRFLGFLFLRFLCOFDFLFSFLGFLUORFTFCFTGFWDFREQFRAFAIFWFRFBOFURFUT
GAGAL.GALVGENLGENGLGLBGOVTGBGVLGNDGFGFIGTGYP.GWB
HGRHDHBDHDWHDWDHDRHTRHTGHR
HVACHVYHDHGTHEXHI
HDPE
HID.HPHSHVHWYHSTHCHMHTHORIZHPHBHRHWHWHHWRHWSHRHSGHYDHYDR
IDENTILLUMINCANDIN.INCLINDINFOINPIDINSTLINSTRINSULINTINTSCTINVIPIRREGIRRG
JANJTJJCTJB
KWYKIT.KD
LAB.LBLAM.LVLLNDG
LGLATLLATLAVLYRLYTLKGLHLTRLVRLTLTSWLTGLWLFLINLNTLLIQLLLDRLCTLKDLONG.LVRLWRLBR
MACHMAINTMAJMHMCMANMFRMFGMSNRYMOMATMLMAXMEASMECHMDNMDMMEMBMERCMTLMTRMDLMWKMINMISCMIT.MOD.MOISTMLDGMIN.MTMTGMULL.NATLNEC
NEMA
NFPANATNFNSNECNEUTNRNORM.NN/ANICNTSNO.
OCOEOPNGOPROPNOPPORIGOPTOUT.OCODOF.OR.OFOH
PKGPTPRPNLPTDPTRPRLPKPART.PBDPTNPVMTPKPEN.dPCTPERFPERPERMPERPPHPCPLKPVPLASPLSTCPLAMPLPLATFPLMBPLYWDPNEU
PTPVCPEPORTPCPSCPOTWPOT.LBPCFPSFPSIPWRPAP&LPRCSTPREFABPFRDPREFINPRELIMP J FPREP.PRESS.PTPSCPRIPROCPROD.PL
QDRNTQUALQTYQT
RDLRADRRRYRLRTRTGRRCPTRECRECMRECTREFREFLREFRREINFRCRELOCRMTRMVR&RREPLREPROREQDRSVRRESILRESRTNGRTNRARAGRVSREV.RPMRTRHRDRDRFHRFGRVRMROT.RGHRORNDRBRRB
SFGLSASANSSSCHEDSCHEMSCRNSLNTSMLSSTGSSECSECT.SELSNSRSEPSERSEW.SHTHGSHTSGSHSHLDRSHSDWKSDGSIMSGLSKSLVSLPSNDPRFSSPGSPKRSPCLSPECSQSQ FTSQ INSSTSTWYSTDSTBYSTDFSPSTASTLSTIFSTORSDSTRSTSTRUCT
SUBSTSPLYSPRTSURF.SURVSUSPSWSWBDSYMSYMMSYNCSYS
TKBDTAN.TECH.TELTVTEMPTEMPTERM.THERMOTHKTHKNSTHD3PHTHRTHRUTMBRTTPTNT>PGTOT.TLLDTBTWRTRKTRFCXFMRTRSNTRANSVTRDTRTDTRTMTTBGTYP
ULTUCUGUGCULUNFINUNIFUBCUHUNIVUPR
VACVBVAPPRFVARVNRVVENT.VPVTRVTCVRFYVERMVERTVINVBVFVTVJVVOL
WFRWAWHWTWWVWLBWCOWHSEWSHRWWWCWHWMWPWLWTRPRFSWSTPWTRTTWWPWTSWWWFWWHT, WWWDWMWRGW/W/OWDYdYEL
ABBREVIATIONS
SEE 1/ A101
VIEW REFERENCE
101
1A101
SIM
Room name101
1t
1
NORTH
0
VIEW NUMBER
SHEET NUMBER WHEREDRAWN
VIEW TITLEVIEW NUMBER
VIEW NAME
VIEW SCALE
DETAIL CALLOUTVIEW NUMBER
DETAIL IS SIMILAR OR TYPICAL(WHERE SHOWN)
SHEET NUMBER WHERE DRAWN
A-000
1
ELEVATION SYMBOLVIEW NUMBER
ARROW INDICATES DIRECTION OFELEVATION
SHEET NUMBER WHERE DRAWN
SECTION CALLOUTDIRECTION OF SECTION CUT
VIEW NUMBERSHEET NUMBER WHERE DRAWN
DETAIL IS SIMILAR OR TYPICAL(WHERE SHOWN)
LEVEL NAMEELEVATION
LEVEL INDICATORLEVEL LAME
HEIGHT OF LEVEL/DATUM
ROOM SYMBOL
ROOM NAME
ROOM NUMBER
NORTH ARROW
HEAVY LINE INDICATES NORTHDIRECTION
STRUCTURAL GRID TAG
NUMBER/LETTER OF GRID LINE
CENTERLINE OF GRID
RELITE TAG
RELITE LABEL
WINDOW TYPE TAG
WINDOW TYPE LABEL
REVISION TAG AND CLOUD
NUMBER/LETTER OF REVISION
CLOUD INDCATES EXTENT OFREVISION
CENTERLINE TAG
CENTERLINE SYMBOL
DOOR TAG
DOOR NUMBER
CENTERLINE OF LEVEL
X-1
SHEET NOTE
SHEET NOTE LABEL
1t
SIGN/ACCESSORIES TAG
SIGN TYPE/ACCESSORIES LABEL
FDC
FIRE DEPARTMENT CONNECTION
LABEL INDICATING FIRE DEPARTMENTCONNECTION LOCATION
1 View Name1/8" = 1'-0"A101
A1011
SIM
DEMOLITION FLAG NOTE
FLAG NOTE NUMBER - SEEDEMOLITION NOTES FORDESCRIPTION
1i
TRANSLUCENT PANEL TYPE TAG
TRANSLUCENT PANEL TYPE LABEL
1i
WALL TYPE TAG
WALL TYPE LABEL
1i
00000x00x00
CASEWORK TYPECASEWORK DIMENSIONSWIDTH x HEIGHT x DEPTH
CASEWORK TYPE TAG
MATERIAL TAG
MATERIAL TYPE LABEL?
STANDARD SYMBOLS
REGISTEREDARCHITECT
GARY THOMAS CONNORSTATE OF WASHINGTON
3188
Date Stamped:
Architecture Engineering Surveying
Project:
Date
Checked
Drawn
Project Mgr.
Sheet Contents:
Sheet No.:
Stantec W.O.
621 West Mallon AvenueSuite 309Spokane, Washington 99201Phone: (509) 328-5139Fax: (509) 328-0423
2 S. 1st AvenueSuite 201Walla Walla, WA 98362Phone (509) 522-4843FAX (509) 522-1902
PRO
JEC
T R
EVIT
VER
SIO
N: 2
012
www.Stantec.com
Planning Environmental Services
Formerly USKH
2/25
/201
5 11
:55:
30 P
MC
:\Use
rs\P
ublic
\Doc
umen
ts\L
ocal
_Rev
it_Fi
les\
2046
0021
2_A_
Avia
ry_C
entra
l_dk
aras
.rvt
A.001
GTC
AHD
SYMBOLS,NOTES,ABBREVIATIONS
204600212
100% SUBMITTAL
PIONEER PARKAVIARYRENOVATION
USKHWALLA WALLA,WA
DJK
2/19/2015
REV
ISIO
NS
No.
Dat
eD
escr
iptio
nBy
WHITMAN STREET
(E) CONCRETE CURB AROUND SMALL POND TO REMAIN
(E) TREE TO REMAIN -PROTECT IN PLACE, TYP.
REMOVE (E) NETTING, STRUCTURE AND FENCING.
ALTERNATE #1-REMOVE NETTING MASTSTRUCTURE IN POND.MAST FOUNDATION TOREMAIN.BASE BID - REMOVALBY OWNER
(E) SIDEWALK TO REMAIN
(E) PLAQUE AND FOUNTAIN TOREMAIN - PROTECT IN PLACE
(E) TREE TO REMAIN -PROTECT IN PLACE
REMOVE NETTING MASTAND FOUNDATION
REMOVE LARGE TREE
(E) BRIDGE TO REMAIN
FENCE FOOTING AND SITEWALL TO REMAIN- MODIFY ASREQUIRED TO ACCOMMODATENEW STRUCTURE
(E) ASPHALT PATH TO BE REMOVED
REMOVE (E) WEIR BOX
(E) CONCRETE SITE WALLAND FENCE TO REMAIN
(E) WEIR BOX TO REMAIN
REMOVE (E) ASPHALT PATH
(E) ASPHALT PATH TO REMAIN.PATCH AT INTERFACE WITHNEW CONSTRUCTION
REMOVE BRIDGE DECKINGAND RAILING. BRIDGESTRUCTURE TO REMAIN
(E) TREE TO REMAIN -PROTECT IN PLACE
(E) AVIARY COLUMNS. USE EXISTING LOCATION ASBENCHMARK FOR LAYOUT OF NEW STRUCTURE, REFERTO STRUCTURAL DRAWINGS. REMOVE COLUMNS PRIORTO COMPLETION OF CONSTRUCTION
EXTENT OF SIDEWALKDEMOLITION, REFER TOCONSTRUCTION PLANS
PROTECT EXISTING LANDSCAPE ASINDICATED IN THE SPECIFICATIONS. FILLAND FINISH GRADE BY CONTRACTOR.LANDSCAPING BY OWNER.
(E) TREE TO REMAIN - PROTECT IN PLACE, TYP. UNO.
APPROXIMATE LINE OF CREEKRUNNING UNDER (E) PATH
(E) PATH TO REMAIN,PROTECT IN PLACE
DIV
ISIO
N S
TREE
T
(E) REARING PENS TOREMAIN - NO WORK
(E) SIDEWALK TO REMAIN
(E) OFFICE TO REMAIN -NO WORK
(E) "GREENHOUSE"TO REMAIN - NO
WORK
(E) PARKINGLOT TO REMAIN
EXTENT OF SIDEWALKDEMOLITION, REFER TOCONSTRUCTION PLANS
EXTENT OF SIDEWALKDEMOLITION, REFER TOCONSTRUCTION PLANS
EXTENT OF SIDEWALKDEMOLITION, REFER TOCONSTRUCTION PLANS
(E) ROSE GARDEN TOREMAIN, PROTECT IN PLACE
SALVAGE (E) BENCH AND RETURN TO OWNER
ALTERNATE #1REMOVE (E) SMALL POND AVIARY ENCLOSURE INCLUDINGNETTING, STRUCTURE, FENCING AND CONCRETE PERIMETERCURB. CONCRETE FOOTINGS FOR POSTS IN SMALL POND TOREMAIN.BASE BID - REMOVAL BY OWNER
ALTERNATE #1-LINE OF FENCING TO REMAINALONG STREET SIDE OF POND,REMOVE REMAINING PORTION OFSMALL POND FENCE.BASE BID - SMALL POND FENCEMODIFICATIONS BY OWNER
+- 16' - 0"
FENCING TO REMAIN FOR TWO POSTS PAST SITE WALL
+- 16
' - 0"
HATCH PATTERNSHOWS AREA OF (E)NETTING ENCLOSURE
REGISTEREDARCHITECT
GARY THOMAS CONNORSTATE OF WASHINGTON
3188
Date Stamped:
Architecture Engineering Surveying
Project:
Date
Checked
Drawn
Project Mgr.
Sheet Contents:
Sheet No.:
Stantec W.O.
621 West Mallon AvenueSuite 309Spokane, Washington 99201Phone: (509) 328-5139Fax: (509) 328-0423
2 S. 1st AvenueSuite 201Walla Walla, WA 98362Phone (509) 522-4843FAX (509) 522-1902
PRO
JEC
T R
EVIT
VER
SIO
N: 2
012
www.Stantec.com
Planning Environmental Services
Formerly USKH
2/26
/201
5 12
:02:
06 A
MC
:\Use
rs\P
ublic
\Doc
umen
ts\L
ocal
_Rev
it_Fi
les\
2046
0021
2_A_
Avia
ry_C
entra
l_dk
aras
.rvt
A.100
GTC
AHD
SITE - DEMOPLAN
204600212
100% SUBMITTAL
PIONEER PARKAVIARYRENOVATION
USKHWALLA WALLA,WA
DJK
2/19/2015
1" = 30'-0"A.100
1 DEMO PLAN
NORTH
REV
ISIO
NS
No.
Dat
eD
escr
iptio
nBy
(E) REARING PENS TOREMAIN - NO WORK
(E) SIDEWALK TO REMAIN
WHITMAN STREET
(E) LOWER PONDTO REMAIN
(E) OFFICE TO REMAIN -NO WORK
(E) "GREENHOUSE"TO REMAIN - NO
WORK
A.1021
ALTERNATE #1AT AREAS OF REMOVEDSTRUCTURE, GRADE SURFACETO MATCH ADJACENTTOPOGRAPHY(BASE BID - WORK BY OWNER)
(E) TREE TO REMAINPROTECT IN PLACE, TYP.
DIV
ISIO
N S
TREE
T
NEW AVIARY STRUCTURE ANDPERIMETER PATH - REFER TOENLARGED PLAN ANDSTRUCTURAL DRAWINGS
(E) PARKINGLOT TO REMAIN
(E) TREE TO REMAIN -PROTECT IN PLACE, TYP.
(E) SIDEWALK TO REMAIN
(E) CONCRETE SITE WALL TO REMAIN
APPROXIMATE LINE OF CREEKRUNNING UNDER (E) PATH
(E) PATH TO REMAIN,PROTECT IN PLACE
(E) ROSE GARDEN TOREMAIN, PROTECT IN PLACE
(E) UPPER POND TOREMAIN
LINE OF (E) CHAIN LINK FENCEASSEMBLY TO REMAIN
CONTRACTOR STAGING AREA
CONT
RACT
OR
PARK
ING
ARE
ANO
MAT
ERIA
L ST
ORA
GE
ALLO
WED
APPROXIMATE LINE OF BASE BID WORK AREA / LINE OFTEMPORARY CONSTRUCTION FENCING
APPROXIMATE LINE OFALTERNATE #1 WORK AREA /LINE OF TEMPORARYCONSTRUCTION FENCING
BUILDING TO REMAINOCCUPIED DURINGCONSTRUCTION - MAINTAINACCESS & EGRESS
CONCEPTUAL LINE OF PIPE TO DIVERT WATER FROMLARGE POND DURING CONSTRUCTION AS REQUIREDTO DEWATER POND. INTERCEPT CREEK UPSTREAMFROM POND, AND CONVEY WATER PAST LARGE PONDWORK AREA TO LOWER POND. MAINTAIN NATURALWATER TURBIDITY LEVEL AT DISCHARGE ANDCOMPLY WITH FISH & WILDLIFE PERMITTINGREQUIREMENTS FOR HYDRAULIC PROJECTS. REFERTO SPECIFICATIONS FOR FURTHER INFORMATION.REMOVE UPON COMPLETION OF WORK.
EXISTING ASPHALT PATH MAY BE USED FORTEMPORARY CONTRACTOR ACCESS TO NORTHSIDE OF POND SITE. REPAIR ANY DAMAGE TOPATH AND ADJOINING SURFACES AS RESULT OFCONTRACTOR USE. PATH TO REMAIN OPEN TOOWNER AND PUBLIC USE THROUGHOUT THEDURATION OF CONSTRUCTION.
REGISTEREDARCHITECT
GARY THOMAS CONNORSTATE OF WASHINGTON
3188
Date Stamped:
Architecture Engineering Surveying
Project:
Date
Checked
Drawn
Project Mgr.
Sheet Contents:
Sheet No.:
Stantec W.O.
621 West Mallon AvenueSuite 309Spokane, Washington 99201Phone: (509) 328-5139Fax: (509) 328-0423
2 S. 1st AvenueSuite 201Walla Walla, WA 98362Phone (509) 522-4843FAX (509) 522-1902
PRO
JEC
T R
EVIT
VER
SIO
N: 2
012
www.Stantec.com
Planning Environmental Services
Formerly USKH
2/25
/201
5 11
:57:
55 P
MC
:\Use
rs\P
ublic
\Doc
umen
ts\L
ocal
_Rev
it_Fi
les\
2046
0021
2_A_
Avia
ry_C
entra
l_dk
aras
.rvt
A.101
GTC
AHD
SITE - OVERALLPLAN
204600212
100% SUBMITTAL
PIONEER PARKAVIARYRENOVATION
USKHWALLA WALLA,WA
DJK
2/19/2015
1" = 30'-0"A.101
1 SITE PLAN
NORTH
REV
ISIO
NS
No.
Dat
eD
escr
iptio
nBy
GENERAL SITE CONDITION NOTES:
1. WORK SHALL CONFORM TO STATE AND LOCAL CODES.
2. THE CONTRACTOR SHALL INVESTIGATE ON SITE AND VERIFY ALL CONDITIONS AND DIMENSIONS OF THE PROJECT AND SHALL NOTIFY THE OWNEROF ANY DISCREPANCY IN THE CONTRACT DOCUMENTS REQUIRING MODIFICATION PRIOR TO PROCEEDING.
3. THE CONTRACTOR SHALL TAKE NECESSARY PREVENTATIVE MEASURES TO PROTECT EXISTING IMPROVEMENTS. THE CONTRACTOR SHALL, ATNO ADDITIONAL COST TO THE OWNER, REPLACE ANY IMPROVEMENTS SO DAMAGED.
4. THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR THE LOCATION AND PROTECTION OF ALL EXISTING UTILITIES. THE CONTRACTOR SHALLVERIFY ALL UTILITY LOCATIONS PRIOR TO CONSTRUCTION BY CALLING THE UNDERGROUND LOCATE LINE AT 1-800-424-5555 A MINIMUM OF 2 WORKINGDAYS PRIOR TO ANY EXCAVATION. IF THE CONTRACTOR DISCOVERS ANY DISCREPANCIES BETWEEN THE PLANS AND EXISTING CONDITIONSENCOUNTERED, THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE ENGINEER.
5. THE CONTRACTOR SHALL HAVE A RESPONSIBLE PARTY WHO SHALL HAVE THE AUTHORITY TO REPRESENT AND ACT FOR THE CONTRACTOR ATTHE JOB SITE DURING ALL WORKING HOURS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO HAVE A COPY OF THESE APPROVED PLANSSTAMPED "FOR CONSTRUCTION" ON CONSTRUCTION SITE AT ALL TIMES.
6. THE OWNER AND CONTRACTOR SHALL COMPLY WITH THE NPDES GCP (NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM GENERALCONSTRUCTION PERMIT). THIS INCLUDES USING BEST MANAGEMENT PRACTICES TO PREVENT DISCHARGE OF STORM WATER AND SEDIMENTATION FROMTHIS SITE DURING CONSTRUCTION. THE IMPLEMENTATION, CONSTRUCTION, MAINTENANCE, REPLACEMENT, AND UPGRADING OF THESE BMP'S ARE THERESPONSIBILITY OF THE CONTRACTOR UNTIL ALL CONSTRUCTION IS COMPLETED AND APPROVED.
7. ANY CHANGES TO THE DESIGN SHALL FIRST BE REVIEWED AND APPROVED BY THE OWNER.
TESTING & INSPECTION NOTES:
1. ALL TESTING IS THE RESPONSIBILITY OF THE CONTRACTOR, RESULTS SHALL BE PROVIDED TO THE OWNER
2. CONTRACTOR TO HIRE THIRD-PARTY GEOTECHNICAL LABORATORY TO CONDUCT GRADATION TESTS. GRADATION TESTING SHALL CONSISTOF AT LEAST ONE SOIL SAMPLE FROM THE TOP 12" OF NATIVE SUBGRADE MATERIAL FOR EVERY CONTIGUOUS AREA OF REPLACEMENT PAVEMENT,OR ONE SOIL SAMPLE FROM EVERY 1,000 SQUARE YARDS OF PAVEMENT AREA, WHICHEVER IS GREATER. IN ADDITION, SOILS THAT APPEAR TO BEDIFFERENT FROM THE SOIL OF THE FIRST SAMPLE SHALL BE SAMPLED AT LEAST ONCE WITHIN EACH CONTINUOUS PAVEMENT AREA. TESTINGSHALL BE PERCENT PASSING THE NO. 200 STANDARD SIEVE.
3. SPECIAL INSPECTION AND CERTIFICATION OF ADEQUACY SHALL BE IN ACCORDANCE WITH CITY OF WALLA WALLA STANDARDS.
EROSION CONTROL NOTES:
1. THE CONTRACTOR SHALL USE BEST MANAGEMENT PRACTICES CONFORMING TO THE "STORMWATER MANAGEMENT MANUAL FOR EASTERN WASHINGTON" (SWMMEW) TOPREVENT DISCHARGE OF STORM WATER AND SEDIMENTATION FROM THIS SITE DURING CONSTRUCTION. THESE MEASURES INCLUDE BUT ARE NOT LIMITED TO THE FOLLOWING.
BMP-C105 STABILIZATION OF CONSTRUCTION ENTRANCE AND ROADS: THE CONTRACTOR SHALL USE EXISTING PAVED ACCESS ONTO CITY ROADS. TRACKING OF SEDIMENT ONTO THESTREET WILL BE CLEANED UP BY THE CONTRACTOR.
BMP-C140 DUST CONTROL: THE CONTRACTOR SHALL PREVENT THE GENERATION OF DUST.
BMP-C220 INLET PROTECTION: THE CONTRACTOR SHALL INSTALL INLET PROTECTION AS REQUIRED PRIOR TO CONSTRUCTION.
BMP-C162 SCHEDULING: THE CONTRACTOR SHALL LIMIT WORK DURING AND FOLLOWING STORM EVENTS TO PREVENT MOBILIZATION OF SEDIMENTS OFF THIS SITE.
BMP-C101 PRESERVING NATURAL VEGETATION: WHEREVER POSSIBLE, THE CONTRACTOR SHALL MAINTAIN EXISTING VEGETATION TO REDUCE RUNOFF VOLUME AND SEDIMENTATIONMOBILIZATION.
BMP-C152 SAW CUTTING AND SURFACING POLLUTION PREVENTION: PREVENT SLURRY AND PROCESS WATER FROM ENTERING THE WATERS OF THE STATE.
BMP-C160 CONTRACTOR EROSION AND SPILL CONTROL LEAD: THE CONTRACTOR SHALL DESIGNATE A CONTRACTOR EROSION AND SPILL CONTROL LEAD (CESCL) WHO IS RESPONSIBLEFOR ENSURING COMPLIANCE WITH ALL LOCAL, STATE, AND FEDERAL EROSION AND SEDIMENT CONTROL REQUIREMENTS.
BMP-C230 STRAW BALE BARRIER: DECREASE THE VELOCITY OF FLOWS AND INTERCEPT AND DETAIN SMALL AMOUNTS OF SEDIMENT WITH STRAW BALE BARRIERS.
BMP-C233 SILT FENCE: REDUCE THE TRANSPORT OF SEDIMENT FROM A CONSTRUCTION SITE BY PROVIDING A TEMPORARY PHYSICAL BARRIER.
2. DETAILS FOR THE CONSTRUCTION, USE, AND MAINTENANCE OF THESE AND OTHER BMP'S ARE CONTAINED IN THE "STORMWATER MANAGEMENT MANUAL FOR EASTERNWASHINGTON". SHOULD SPECIFIC STORM EVENTS CAUSE MOBILIZATION OF SEDIMENT, THE CONTRACTOR SHALL FURNISH OTHER BMP's AS REQUIRED.
STANDARD NOTES:
1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING A CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN (SWPPP) CONFORMING TO SWMMEW CHAPTER 7.
2. THE IMPLEMENTATION OF THESE EROSION/SEDIMENTATION CONTROL PLANS AND THE CONSTRUCTION, MAINTENANCE, REPLACEMENT, AND UPGRADING OF THESEEROSION/SEDIMENTATION CONTROL FACILITIES IS THE RESPONSIBILITY OF THE APPLICANT/CONTRACTOR UNTIL ALL CONSTRUCTION IS COMPLETED AND APPROVED ANDVEGETATION/LANDSCAPING IS ESTABLISHED.
3. THE BOUNDARIES OF THE CLEARING LIMITS SHOWN ON THIS PLAN SHALL BE CLEARLY FLAGGED IN THE FIELD PRIOR TO CONSTRUCTION. DURING THE CONSTRUCTION PERIOD, NODISTURBANCE BEYOND THE FLAGGED CLEARING LIMITS SHALL BE PERMITTED. THE FLAGGING SHALL BE MAINTAINED BY THE APPLICANT/CONTRACTOR FOR THE DURATION OFCONSTRUCTION.
4. THE EROSION/SEDIMENTATION CONTROL FACILITIES SHOWN ON THIS PLAN MUST BE CONSTRUCTED IN CONJUNCTION WITH ALL CLEARING AND GRADING ACTIVITIES, AND IN SUCHA MANNER AS TO INSURE THAT SEDIMENT AND SEDIMENT LADEN WATER DO NOT ENTER THE DRAINAGE SYSTEM, ROADWAYS, OR VIOLATE APPLICABLE WATER STANDARDS.
5. THE EROSION/SEDIMENTATION CONTROL FACILITIES SHALL BE INSPECTED DAILY BY THE APPLICANT/CONTRACTOR AND MAINTAINED AS NECESSARY TO ENSURE THEIR CONTINUEDFUNCTIONING.
6. THE EROSION/SEDIMENTATION CONTROL FACILITIES ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED A MINIMUM OF ONCE A MONTH OR WITHIN THE 48 HOURSFOLLOWING A MAJOR STORM EVENT.
7. AT NO TIME SHALL MORE THAN ONE FOOT OF SEDIMENT BE ALLOWED TO ACCUMULATE WITHIN A TRAPPED CATCH BASIN.
8. STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINNING OF CONSTRUCTION AND MAINTAINED FOR THE DURATION OF THE PROJECT. ADDITIONALMEASURES MAY BE REQUIRED TO INSURE THAT ALL PAVED AREAS ARE KEPT CLEAN FOR THE DURATION OF THE PROJECT.
AVIARY STRUCTURE,REFER TO STRUCTURALDRAWINGS
EXISTING WOOD BRIDGE TOREMAIN
NEW FOOT BRIDGE AND RAILING
6'-0"
6'-0"
6'-0"
A.1041
A.1032
TYP.
6'-0"
A.1034
MATCH ELEVATION ANDGRADE AT (E) PAVING
MATCH ELEVATION ANDGRADE AT (E) PAVING
2
A.103
Sim
1
A.103
Sim
TYP.
6'-0"
6'-0"
7'-6"
(E) FOUNTAIN AND PLAQUE TOREMAIN. PROTECT IN PLACE
SEE CITY OF WALLA WALLASTANDARD PLAN 2-7 FOR CONCRETESIDE WALK SPECIFICATION
PROTECT EXISTING LANDSCAPE TO THEFULLEST EXTENT WHERE POSSIBLE.
2'-0"
6'-0"
24'-6"
TYP.5'-0" TYP.
5'-0"
TYP.
7'-6"
6'-0"
11'-8"
11'-8"
5'-0"
7'-6"
7'-6"
5'-0"
42'-0
"
28'-0
"
10'-0
"
8'-0"
LINE OF NEW AVIARY FENCE. PREPAREGRADE AS NECESSARY TO ACCOMMODATENEW STRUCTURE. MINIMIZE DISTURBANCE TOHABITAT, LANDSCAPE AND SURROUNDINGAREAS. REFER TO SECTIONS AND DETAILSFOR MORE INFORMATION
(E) ASPHALT PATH TO REMAIN.PATCH AT INTERFACE WITHNEW CONSTRUCTION
(E) REARING PENS TOREMAIN - NO WORK
(E) SIDEWALK TO REMAIN
(E) OFFICE TO REMAIN -NO WORK
EXIST.
10 '-8 " + /-
3'-6 1/4"
(E) AVIARY COLUMNS. USE EXISTINGLOCATION AS BENCHMARK FOR LAYOUT OFNEW STRUCTURE, REFER TO STRUCTURALDRAWINGS. REMOVE COLUMNS PRIOR TOCOMPLETION OF CONSTRUCTION. SEEDRAWRING S2.
NOTE:PROTECT IN PLACE (E) IRRIGATION BRANCHLINES TO REMAIN IN (E) NET PEN. REPAIR ANYLINES DAMAGED DURING CONSTRUCTION.
A.1043
x
x
x
A.1044
7'-6"
(E) LOWER POND TO REMAIN,REFER TO SITE PLAN
(E) TREE TO REMAIN.PROTECT IN PLACE
3A.103
REGISTEREDARCHITECT
GARY THOMAS CONNORSTATE OF WASHINGTON
3188
Date Stamped:
Architecture Engineering Surveying
Project:
Date
Checked
Drawn
Project Mgr.
Sheet Contents:
Sheet No.:
Stantec W.O.
621 West Mallon AvenueSuite 309Spokane, Washington 99201Phone: (509) 328-5139Fax: (509) 328-0423
2 S. 1st AvenueSuite 201Walla Walla, WA 98362Phone (509) 522-4843FAX (509) 522-1902
PRO
JEC
T R
EVIT
VER
SIO
N: 2
012
www.Stantec.com
Planning Environmental Services
Formerly USKH
2/26
/201
5 12
:02:
34 A
MC
:\Use
rs\P
ublic
\Doc
umen
ts\L
ocal
_Rev
it_Fi
les\
2046
0021
2_A_
Avia
ry_C
entra
l_dk
aras
.rvt
A.102
GTC
AHD
NEW AVIARY -PLAN
204600212
100% SUBMITTAL
PIONEER PARKAVIARYRENOVATION
USKHWALLA WALLA,WA
DJK
2/19/2015
1/16" = 1'-0"A.102
1 ENLARGED PLAN - PENNORTH
REV
ISIO
NS
No.
Dat
eD
escr
iptio
nBy
4"8"
EQ EQ
WHERE FENCE MEETS STRUCTURAL COLUMN
SIDEWALK AVIARY
9'-0
"
1/4" SLOPE
COLUMN CAP
2" CHAIN LINK
FENCE TENSION BAND
1" CHAIN LINK
BOTTOM RAIL
CENTER RAIL
BRACE END TYP.
TOP RAIL
HSS COLUMN,PILASTER, ANDFOOTING - SEE S7
HSS COLUMN,PILASTER, ANDFOOTING - SEE S7
FENCE TENSION BAR
#3 CONT.
PIPE
4" 2 1/
2"3'
-0"
1'-0"
1'-0
"
2'-6
"
4"
1'-0"
TYPICAL POST SPACING
8'-0"
CAP
POST
TOP RAIL
FENCE TENSION BAND
BOTTOM RAIL
BRACE END TYP.
8"
8" CURB
1 1/
2"
3"
1 1/
2"
POST FOUNDATION AND CURB PLAN
12" CONCRETE POST FOUNDATION8" X 12" CURB
#3 CONT. (2) TOP AND BOTTOM#3 (4)
POST SECTION
#3 CONT.
1'-0
"
8" CURB
POST FOUNDATION
2" CENTER RAIL
2" CHAIN LINK
1" CHAIN LINK
2'-1
0"
#3 CONT.
(4) #3 LOOPS, REFERTO PLAN DETAIL
CENTER RAIL
BOTTOM RAIL
TOP RAIL
CAP
CABLE - SEESTRUCTURAL
NETTING - SEESTRUCTURAL
2" CHAIN LINK FENCE
1" CHAIN LINK FENCE
+- 7
"NETTINGATTACHED TO RAILWITH WIRE TIES
STRUCTURAL AVIARY COLUMN ANDFOUNDATION - SEE STRUCTURAL
WALKWAY AVIARY
8'-0
"
8'-0
"
CABLE - LOCATIONWILL VARY - SEESTRUCTURAL
NETTING ATTACHED TO TOP RAILWITH ROPE LACED THROUGHNETTING EVERY 3" TYP. REFER TONETTING SPECIFICATIONS.
POSTFOUNDATIONBEYOND
SEE CITY OF WALLA WALLASTANDARD PLAN 2-7 FOR SIDEWALK / CURB SPECIFICATION
FENCE TENSION BAR
FENCE TENSION BAR
2" 2"
3"
2 1/
2"2
1/2"
2 1/
2"
3'-0
"
8'-0
"
4"
TYPICAL POST SPACING
8'-0"
CAP
POST
TOP RAIL
BRACE END
6'-8
"1'
-4"
SINGLE GATE
NETTING
DROP PIN
FENCE LOCK
2" CHAIN LINK FENCE
1" CHAIN LINK FENCE
3'-0
"
8'-0
"
4"
TYPICAL POST SPACING
8'-0"
CAP
POST
TOP RAIL
BRACE END
HINGE
HINGE
6'-8
"1'
-4"
DOUBLE GATE
NETTING
DROP PIN
DOUBLE GATELATCH W/ LOCK
2" CHAIN LINKFENCE
1" CHAINLINK FENCE
2" CHAIN LINKFENCE
REGISTEREDARCHITECT
GARY THOMAS CONNORSTATE OF WASHINGTON
3188
Date Stamped:
Architecture Engineering Surveying
Project:
Date
Checked
Drawn
Project Mgr.
Sheet Contents:
Sheet No.:
Stantec W.O.
621 West Mallon AvenueSuite 309Spokane, Washington 99201Phone: (509) 328-5139Fax: (509) 328-0423
2 S. 1st AvenueSuite 201Walla Walla, WA 98362Phone (509) 522-4843FAX (509) 522-1902
PRO
JEC
T R
EVIT
VER
SIO
N: 2
012
www.Stantec.com
Planning Environmental Services
Formerly USKH
2/25
/201
5 11
:58:
50 P
MC
:\Use
rs\P
ublic
\Doc
umen
ts\L
ocal
_Rev
it_Fi
les\
2046
0021
2_A_
Avia
ry_C
entra
l_dk
aras
.rvt
A.103
GTC
AHD
FENCE ANDRAILING DETAILS
204600212
100% SUBMITTAL
PIONEER PARKAVIARYRENOVATION
USKHWALLA WALLA,WA
DJK
2/19/2015
1/2" = 1'-0"A.103
2 FENCE AT COLUMN 1/2" = 1'-0"A.103
1 TYPICAL FENCE DETAIL
1/2" = 1'-0"A.103
3 SINGLE GATE 1/2" = 1'-0"A.103
4 DOUBLE GATE
REV
ISIO
NS
No.
Dat
eD
escr
iptio
nBy
COLUMN FOUNDATIONAND FOOTING - SEESTRUCTURAL
7'-6
" 5'-0"
CONTROL JOINT AROUNDFOUNDATION
2
A.104
Sim
CONTROL JOINT
SEE CITY OF WALLA WALLASTANDARD PLAN 2-7 FOR SIDEWALKSPECIFICATION
FILL WITH GRAVEL
MIN
1 FOOT
VARIES, REFER TO PLAN
SLOPE CONCRETE 1/4" PER FOOTAWAY FROM AVIARY ENCLOSURE
PAINTED STEEL STRUCTURE ANDCONCRETE FOUNDATION ANDFOOTING - SEE STRUCTURAL
CONTROL JOINT
CONTROL JOINT
4"4"
SEE CITY OF WALLA WALLASTANDARD PLAN 2-7 FORSIDEWALK SPECIFICATION
+- 3'-0"
1"
COLD JOINT
4" CONCRETE SIDEWALK
NEW CONCRETEFOUNDATION
EXPANSIONJOINT
EXPANSION JOINT
VERIFY
+- 10"
4" M
AX.
3'-6
"
5
A.104
Sim
2" Ø PTD. STEEL PIPE POST,TOP AND BOTTOM RAIL
3/4" Ø PTD. STEEL PIPE PICKET
+- 2
'-0"
(E) STONE /CONCRETE TRENCH(2) #5 TOP AND BOTTOM
5"
(4) #4 18"X18", 12" O.C.
(3) 1/2" X 12" L SMOOTHGREASED DOWELS EACHEND OF BRIDGE
1 1/2" 16GA COMPOSITESTEEL DECK
10"
2'-0
"
5"
4" MAX.
4'-9" +/- V.I.F.
7'-6" +/- V.I.F.
90.00
°
4'-0"
EXPANSION JOINT4
A.104
Sim
5
A.104
Sim
EXPANSION JOINT
FENCE POST
RETURN BRIDGERAILING TO NEWFENCE POST
16
F
3'-0"
(E) WEIR
NEW FENCE
NEW SIDEWALK
NEW CONCRETE DECKBRIDGE
FLOW OF
STREAM
1'-8"
1'-8"
10"
10"
STREAM3'-0" V.I.F.
SIDEWALK
SIDEWALK
DEC
K SPAN
(E) STREAMEMBANKMENT TOREMAIN
5"
5"
CENTERLINE OFGUARDRAIL POST
2"
2"
PTD. STEEL GUARDRAILASSEMBLY, REFER TOSECTIONS
2" Ø TOP ANDBOTTOM RAIL
(E) WEIR TO REMAIN
EXTEND NEW FENCEDOWN TO (E) WEIR
NEW FENCE CURBBEYOND
(E) STONE WALLBEYOND
REPLACE (E) FENCEBELOW WEIR
NEW FOOTINGBEYOND
1 1/2" 16GA VERCO PLBCOMPOSITE GALVANIZEDDECK OR EQUAL.
4" CONCRETESIDEWALK
4
A.104
Sim
4" CONCRETESIDEWALK BEYOND
(E) STONE WALLBEYOND
AVIARY SIDE
#4 REBAR @ 12" O.C. EACHWAY IN TOP THIRD OF SLAB
4"A.104
6
3'-6
"
4"
3 1/2"
5"
PTD STEEL GUARDRAIL POST BRACKET, REFERTO SPECIFICATION SECTION 055213 FORMATERIAL AND PERFORMANCE CRITERIA
2" Ø PTD STEEL GUARDRAIL PIPE POST, TOPAND BOTTOM RAIL, REFER TO SPECIFICATIONSECTION 055213
REGISTEREDARCHITECT
GARY THOMAS CONNORSTATE OF WASHINGTON
3188
Date Stamped:
Architecture Engineering Surveying
Project:
Date
Checked
Drawn
Project Mgr.
Sheet Contents:
Sheet No.:
Stantec W.O.
621 West Mallon AvenueSuite 309Spokane, Washington 99201Phone: (509) 328-5139Fax: (509) 328-0423
2 S. 1st AvenueSuite 201Walla Walla, WA 98362Phone (509) 522-4843FAX (509) 522-1902
PRO
JEC
T R
EVIT
VER
SIO
N: 2
012
www.Stantec.com
Planning Environmental Services
Formerly USKH
2/25
/201
5 11
:59:
30 P
MC
:\Use
rs\P
ublic
\Doc
umen
ts\L
ocal
_Rev
it_Fi
les\
2046
0021
2_A_
Avia
ry_C
entra
l_dk
aras
.rvt
A.104
GTC
AHD
SIDEWALKDETAILS
204600212
100% SUBMITTAL
PIONEER PARKAVIARYRENOVATION
USKHWALLA WALLA,WA
DJK
2/19/2015
1/2" = 1'-0"A.104
1 SIDEWALK AT TYPICAL COLUMN BASE 1/2" = 1'-0"A.104
2 SECTION - TYPICAL COLUMN BASE
3/4" = 1'-0"A.104
4 NEW BRIDGE / STREAM SECTION
1/2" = 1'-0"A.104
3 NEW FOOT BRIDGE - PLAN
3/4" = 1'-0"A.104
5 FOOT BRIDGE SECTION 3" = 1'-0"A.104
6 PIPE RAILING FLANGE
REV
ISIO
NS
No.
Dat
eD
escr
iptio
nBy