Project Proposal for Development of Chu River Basin ......S 1 Project Proposal for Development of...

26
Copyright © 2012 Grontmij A/S 1 Project Proposal for Development of Chu River Basin Management Plan SC meeting for the EUWI NPD on IWRM in Kyrgyzstan Presentation by Leif Iversen, Consultant, October 2012 Copyright © 2012 Grontmij A/S

Transcript of Project Proposal for Development of Chu River Basin ......S 1 Project Proposal for Development of...

  • Copyrig

    ht

    © 2

    012 G

    rontm

    ij A

    /S

    1

    Project Proposal for Development of

    Chu River Basin Management Plan

    SC meeting for the EUWI NPD on IWRM in Kyrgyzstan

    Presentation by Leif Iversen, Consultant, October 2012

    Copyrig

    ht

    © 2

    012 G

    rontm

    ij A

    /S

  • Copyrig

    ht

    © 2

    012 G

    rontm

    ij A

    /S

    2

    This document is a Project Proposal

    • Presentation at the Steering

    Committee Meeting

    • Modification as necessary

    • Presentation to potential

    funding agencies

    • Preparation of detailed Terms

    of Reference

    • Funding

    • Implementation

  • Copyrig

    ht

    © 2

    012 G

    rontm

    ij A

    /S

    3

    Overall Objectives

    • Improve livelihood of

    population through

    sustainable utilisation of

    water resources

    • Improve water quality of the

    Chu River Basin

  • Copyrig

    ht

    © 2

    012 G

    rontm

    ij A

    /S

    4

    Reaching the Objectives

    Improving livelihood, improving water quality

    1. Development of River Basin Management Plan, including a

    River Basin Action Plan.

    2. Establishment of organisational framework.

    3. Establish an on-going process with stakeholder involvement.

  • Copyrig

    ht

    © 2

    012 G

    rontm

    ij A

    /S

    5

    Project Strategy - 4 elements

    1. Stakeholders are involved through a consultative process;

    • National and local.

    • Development, implementation and continuous operation.

    • Participation ensures cooperation and ownership.

    2. Implement through a three-phased approach;

    • Several activities are implemented in parallel.

    • Mobilisation of stakeholders at an early stage.

    3. Launch a number of pilot projects;

    • Provides guidance on implementation on large scale.

    • Allows for flexible adjustments to the Action Plan.

    4. Capacity building of local institutions

    • All activities have in-built elements of knowledge transfer

  • Copyrig

    ht

    © 2

    012 G

    rontm

    ij A

    /S

    6

    3 Phase Project Implementation

    1. Analysis of the Basin

    2. Development of Scenarios and Basin Plans

    3. Implementation Measures

    Chu RBMP

  • Copyrig

    ht

    © 2

    012 G

    rontm

    ij A

    /S

    7

    3 Phase Project Implementation

    1. Analysis of the Basin

    2. Development of Scenarios and Basin Plans

    3. Implementation Measures

    Chu RBMP

  • Copyrig

    ht

    © 2

    012 G

    rontm

    ij A

    /S

    Stakeholder involvement

    • Government Bodies,

    • Industries, Agriculture,

    • Population,

    • Downstream (Kazakh) users.

    Dynamics:

    • Conflicts and synergies.

    Participation mechanisms:

    • Meetings, hearings, boards.

    8

    PHASE 1. - Analysis of Basin (1) - Stakeholders

  • Copyrig

    ht

    © 2

    012 G

    rontm

    ij A

    /S

    Will guide the wider

    implementation

    Examples:

    • Small scale baseline

    studies

    • Sub-basin Modelling

    • Capacity building at local

    level

    • Development scenarios

    for sub-basin

    • Involve CDWU’s in water

    management

    9

    PHASE 1. - Analysis of Basin (2) – Pilot Projects

  • Copyrig

    ht

    © 2

    012 G

    rontm

    ij A

    /S

    Description of natural resources:

    • Basin boundaries, water quality and quantity, weather conditions,

    soil, vegetation, wildlife, mineral resources, etc.

    Description of trends and developments:

    • Water ecology, pollution, deforestation, exploitation.

    Monitoring system for natural resources:

    • Monitoring condition of natural resources,

    • Institutional structure for monitoring and reporting

    10

    PHASE 1. - Analysis of Basin (3) – Baseline Study

  • Copyrig

    ht

    © 2

    012 G

    rontm

    ij A

    /S

    1. Inventory of Land Use

    2. Assessment of vulnerability - present + future activities

    3. Impact of climate changes

    11 11

    PHASE 1. - Analysis of Basin (4) –

    Pressures on water resources

  • Copyrig

    ht

    © 2

    012 G

    rontm

    ij A

    /S

    12

    3 Phase Project Implementation

    1. Analysis of the Basin

    2. Development of Scenarios and Basin Plans

    3. Implementation Measures

    Chu RBMP

  • Copyrig

    ht

    © 2

    012 G

    rontm

    ij A

    /S

    13

    PHASE 2 - Scenarios and Basin Plans (1)

    1. Priorities and objectives

    2. Long-term goals

    3. Short-term goals

    4. Water allocation

    5. Scenarios

    Action Plans

    From priorities and objectives to action plans:

  • Copyrig

    ht

    © 2

    012 G

    rontm

    ij A

    /S

    14

    PHASE 2 - Scenarios and Basin Plans (2)

    Planning and

    management

    Resolving conflicts Communication

    •Forecasting scenarios

    •Models

    •GIS

    •Location of personnel

    •Supervison

    •Committees

    •etc

    •Intergroup communication

    •Special committees

    •Transboundary water

    agreements

    •Village meetings

    •Etc

    •Information procedures

    •Databases

    •Newsletters

    •Meetings

    •Website

    •etc

    Overall Basin Action Plan

    • Strategy, measures to achieve goals, implementation guidelines, ”who does what”

    Sub-Basin Action Plans

    • Detailed description of action and responsibilities

  • Copyrig

    ht

    © 2

    012 G

    rontm

    ij A

    /S

    15

    3 Phase Project Implementation

    1. Analysis of the Basin

    2. Development of Scenarios and Basin Plans

    3. Implementation Measures

    Chu RBMP

  • Copyrig

    ht

    © 2

    012 G

    rontm

    ij A

    /S

    16

    PHASE 3- Implementation Measures (1)

    Financing Measures for water use and management

    • Economic instruments, cost recovery basis

    • Financing of institutions for water management

  • Copyrig

    ht

    © 2

    012 G

    rontm

    ij A

    /S

    17

    PHASE 3- Implementation Measures (2)

    Responsibilities and Schedules for Implementation

    • Plan of implementation (5 years and 20-years)

    • Basin Management Organisation

    • Information Processes and Feedback Mechanisms

  • Copyrig

    ht

    © 2

    012 G

    rontm

    ij A

    /S

    PHASE 3 - Implementation Measures (3)

    Co-ordination tools for basin organisations

    Planning and

    management

    Resolving conflicts Communication

    •Forecasting scenarios

    •Models

    •GIS

    •Location of personnel

    •Supervision

    •Committees

    •etc

    •Intergroup communication

    •Special committees

    •Transboundary water

    agreements

    •Village meetings

    •etc

    •Information procedures

    •Databases

    •Newsletters

    •Meetings

    •Website

    •etc

    18

  • Copyrig

    ht

    © 2

    012 G

    rontm

    ij A

    /S

    PHASE 3 - Implementation Measures (4) - matrix

    Chu River Basin Management Plan. Matrix for development of plan

    Basin natural resources

    Inventories Assessments of needs and vulnerability

    Stakeholder analysis

    Analyses of priorities

    Basin and sub-basin goals

    Objectives for water allocation and quality

    Development scenarios

    Action Plans Financing arrangements

    Responsibilities and schedules for implementation

    Monitoring programme

    Description of natural resources (water, soil, vegetation, mineral resources, etc.

    Inventories of land use (agriculture, pastures, urban, industries, mining, etc.)

    Assessment of needs of aquatic ecosystems (water quality and quantity, reduced impact).

    Analysis of stakeholders’ needs (communities, agriculture, industries, utilities, etc.)

    Analysis of key priorities for communities and government (economic development, agriculture, protection of an ecosystem, etc.)

    Define long term goals (10-20 years) with regard to aquatic environment, economic development and stakeholders’ management.

    Set objectives for water allocations to users (ecosystems, agriculture, human consumption, industries, fisheries, energy, tourism, etc.).

    Prepare scenarios for economic development, increased population and settlements. Forecast water demand

    Describe Objectives and strategy for the Basin Action Plan including implementation measures (“who does what and when”) to achieve the goals.

    Determine financing arrangements for water use and management (tariffs, penalties, incentives, etc.

    Decide on plan of implementation, including activities, time line, milestones, monitoring events and reporting. Simplify in Gantt chart.

    Establish a monitoring programme for all elements in the Basin Management Plan (ecosystem, economic development, population, pollution, management features, etc.).

    Description of trends (depletion, climate changes, pollution. Deforestation, etc).

    Inventory of water availability (amount of water, demand from sectors, etc.)

    Assessment of vulnerability to climate changes, extreme events, droughts and flooding.

    Analysis of mechanisms for stakeholders’ participation (committees, hearing, information, advisory boards, etc.)

    Define short term goals (5 years) with regards to environment, economic development, management and monitoring mechanisms.

    Set objectives for water quality and according to legislation (ecosystems, agriculture, human consumption, industries, fisheries, energy, tourism, etc.).

    Prepare scenarios for development in agriculture, industry, energy, etc. Forecast water demand

    Describe Objectives and management plans for sub-basins. Describe guidelines for implementation.

    Determine mechanisms for financing management of basin action plan and details of cost sharing arrangements for projects and other actions.

    Decide on key organisations and individuals responsible for implementation of plan of implementation.

    Establish key criteria and milestones in the monitoring programme. Determine criteria for critical intervention.

    Description of monitoring programme for state of natural resources.

    Inventory of ecosystems (forests, pastures, aquatic systems, no of species, etc.)

    Assessment of impact of changing land use and human activity

    Prepare risks assessments related to different scenarios of development

    Establish Basin Management organization and define tasks and responsibilities.

    Inventory of pollution sources (industries, wastewater, agriculture)

    (DRAFT Jan 2012, Leif Iversen)

    19

  • Copyrig

    ht

    © 2

    012 G

    rontm

    ij A

    /S

    20

    3 Phase Project Implementation

    1. Analysis of the Basin

    2. Development of Scenarios and Basin Plans

    3. Implementation Measures

    Chu RBMP

  • Copyrig

    ht

    © 2

    012 G

    rontm

    ij A

    /S

    21

    Chu River Basin Management Plan

    River Basin Management Plan, incl. River Basin Action Plan.

    Organisational framework.

    On-going process with stakeholder involvement.

  • Copyrig

    ht

    © 2

    012 G

    rontm

    ij A

    /S

    22

    Project Management

    Steering Committee

    PMU

    Teams Teams

    PMC

    Teams Teams

    Stakeholders

  • Copyrig

    ht

    © 2

    012 G

    rontm

    ij A

    /S

    23

    Timetable for development of RBMP Activity Stakeholders Time

    Steering Committee Ministry of Agriculture

    and Amelioration

    1st quarter 2013

    Establish PMU Ministry 1-2nd quarter 2013

    Financing Steering Committee

    UNECE, OECD, PMU

    1-2nd quarter 2013

    Revised Proposal Steering Committee

    PMU, PMC

    2nd quarter 2013

    Project preparation with

    IFI

    Ministry Ministry of

    Finance

    IFI’s

    3-4rd quarter 2013

    Identify international

    consultants

    Steering Committee

    Working Group

    3-4rd quarter 2013

    RBMP Phase 1

    Analysis

    PMU

    River Basin Council

    PMC

    2014

    Phase 2

    Scenarios and Basin Plan

    PMU

    River Basin Council

    PMC

    2015

    Phase 3

    Implementation Measures

    PMU

    River Basin Council

    PMC

    2016

  • Copyrig

    ht

    © 2

    012 G

    rontm

    ij A

    /S

    24

    Resources needed

    Government of Kyrgyzstan

    • Staff resources

    • Working Groups

    • Provision of data

    • PMU

    River Basin Council and local Administrations

    • Staff resources, involvement in activities

    Budget: Euro 1,750,000

    Project Management Consultant

    • International Consultants

    • National consultants

    • Support staff

    Resources for

    • Data collection and modelling

    • Stakeholder activities

    • Training and capacity building

    • Awareness and information dissemination

    • Equipment for River Basin Council and administrations

  • Copyrig

    ht

    © 2

    012 G

    rontm

    ij A

    /S

    25

    Next steps:

    Step 1: Comments from IWRM Steering Committtee

    • Contents

    • Further work

    Step 2: Consultant discuss with International Financing Institutions

    • Scope of proposal

    • Budget

    • Revise Proposal

    Step 3: Ministry can send proposal to IFI’s

    Budget: Euro 1,750,000

  • Copyrig

    ht

    © 2

    012 G

    rontm

    ij A

    /S

    26

    Thank you for your attention

    Leif Iversen, Consultant, [email protected]