Project of construction work Church of the Nazarene
“CUTERVO – CAJAMARCA -PERU”
Geographic Location
Cutervo, province of the departament of Cajamarca , has a
population of about 138 thousand people.
CURRENT STATE OF THE TEMPLE
The temple has 3 floors of rustic material, that is, adobe and stone. It is
45 years old.DECLARED
IN EMERGENCY BY CIVILDEFENSE
DESIGN OF CONSTRUCTIÓN
Construction ProjectCost S/. 800 000 40 % self- finacing nature60 % national & international help.
FINAL CONSTRUCTION
TEMPLE3 floors of 15 x 30 metersFirst floor: a public funeral awake.Second floor: A mini auditorium and clasrooms for workshops.Third floor:Temple, Pastoral and administrative house.
THANKS
With your help, we will get our dream
and getting souls for the
Kingdom of Christ .