Project No. 12-CAN-001€¦ · Surety Company _____ State of incorporation ... 3 01562 Tree and...
Transcript of Project No. 12-CAN-001€¦ · Surety Company _____ State of incorporation ... 3 01562 Tree and...
![Page 1: Project No. 12-CAN-001€¦ · Surety Company _____ State of incorporation ... 3 01562 Tree and Plant Protection LS 1 4 01570 Inlet Protection Barriers, Complete in Place LF 280 5](https://reader034.fdocuments.us/reader034/viewer/2022051917/6008c7eedc937005692147d6/html5/thumbnails/1.jpg)
![Page 2: Project No. 12-CAN-001€¦ · Surety Company _____ State of incorporation ... 3 01562 Tree and Plant Protection LS 1 4 01570 Inlet Protection Barriers, Complete in Place LF 280 5](https://reader034.fdocuments.us/reader034/viewer/2022051917/6008c7eedc937005692147d6/html5/thumbnails/2.jpg)
Improvements to Sidewalks along Canal Street Project No. 12-CAN-001 BID FORM
00410-1 Addendum No. 1 – 15 July 2013
Document 00410
BID FORM
To: Greater East End Management District Work: Improvements to Sidewalks along Canal Street Bidder: ___________________________________________________________ an individual proprietorship, a corporation organized and existing under the laws of
___________________________________________________________
a partnership consisting of _____________________________________
__________________________________________________________,
having an address of __________________________________________
__________________________________________________________. The undersigned bidder has carefully examined the Contract Documents for the work described above and the site of the Work and will provide at its own cost and expense all the materials, supplies, machinery, equipment, tools, superintendent, labor, insurance, maintenance, and other accessories and services necessary to complete the Work upon which it bids, as provided by the Contract Documents, and binds itself on acceptance of its bid to enter into the Contract on the terms proposed by Owner for performing and completing the Work within the Contract Time, for the following prices. The Contract time for Streetscape Improvements: Contractor shall submit, in calendar days, estimated time for total completion of work: ________ days. GRAND TOTAL LUMP SUM BID: $____________________________________ $_____________________________________________________________________
______________________________________________________________________ (bid amount written)
Addendum No. 1 Page 2 of 29
![Page 3: Project No. 12-CAN-001€¦ · Surety Company _____ State of incorporation ... 3 01562 Tree and Plant Protection LS 1 4 01570 Inlet Protection Barriers, Complete in Place LF 280 5](https://reader034.fdocuments.us/reader034/viewer/2022051917/6008c7eedc937005692147d6/html5/thumbnails/3.jpg)
Improvements to Sidewalks along Canal Street Project No. 12-CAN-001 BID FORM
00410-2 Addendum No. 1 – 15 July 2013
Bidder acknowledges receipt of the following Addenda: Addendum Number Date of Addendum ___________________________ ____________________ ___________________________ ____________________ ___________________________ ____________________ _____________________________________ Name of Bidder By ___________________________________ Name ________________________________ Date _________________________________ Surety Company ________________________________________________________ State of incorporation _______________________________________________ Local agent ______________________________________________________ Agent’s telephone _________________________________________________ Insurance Carrier _______________________________________________________ State of incorporation _______________________________________________ Local agent ______________________________________________________ Agent’s telephone _________________________________________________
Addendum No. 1 Page 3 of 29
![Page 4: Project No. 12-CAN-001€¦ · Surety Company _____ State of incorporation ... 3 01562 Tree and Plant Protection LS 1 4 01570 Inlet Protection Barriers, Complete in Place LF 280 5](https://reader034.fdocuments.us/reader034/viewer/2022051917/6008c7eedc937005692147d6/html5/thumbnails/4.jpg)
GEEMD - Improvements to Sidewalks along Canal StreetProject Number 12-CAN-001
BID FORM
Item no. Section no. Item description Unit Unit qty. Unit price Total price
1 01502 Mobilization, Bonds, and Permitting LS 1
2 01555Traffic Control and Regulation, Complete in Place LS 1
3 01562 Tree and Plant Protection LS 1
4 01570Inlet Protection Barriers, Complete in Place LF 280
502081/ 02087
Type "C" Manhole for 42-inch Diameter and Smaller Sewers Built Over Existing Storm Sewer, Complete in Place EA 3
6 02086
Adjust Existing Manhole Frame and Cover to New Grade, Complete in Place EA 3
7 02086
Adjust Existing Meter, Valve, or Pull Box to New Grade, Complete in Place EA 50
8 02221
Remove Concrete Sidewalk, Asphalt Sidewalk, Curb Ramps, Driveways, Steps (All Thicknesses), Drain Pipes, Trench Drains SY 4,100
9 02221
Remove and Dispose of Concrete Curb/Concrete Curb and Gutter, All Types, All Sizes LF 4,320
10 02221
Remove and Dispose of Asphaltic Concrete Pavement, Including Full-Depth Saw Cutting and Surface and Base, All Thicknesses SY 5,010
11 02221Remove and Dispose of Storm Sewer Inlet, All Types EA 14
12 02221Remove and Dispose of Storm Sewer Lead, All Sizes LF 85
13 02221Remove and Salvage Concrete Unit Pavers for Reuse SF 50
14 02221Remove and Salvage GEEMD Medallions for Reuse EA 2
15 02221Remove and Salvage Cast Stone Street Name Plates for Reuse EA 2
16 02233
Clearing and Grubbing (Remove Gravel, Grass and/or Soil to Below New Sidewalk Grade) AC 0.20
17 02260Trench Safety System for Construction of Storm Sewer LF 24
18 02336 6" Lime Stabilized Subgrade SY 2,300
19 02336 Lime TON 35
All Bidders shall provide unit prices for all items included in the work. In the event a greater or lesser amount of work is done, the following unit prices will apply. Unit prices cover the cost of work and materials complete in place, including materials, equipment, labor, installation, delivery, taxes, overhead, profit, maintenance, and guarantee required to render the same complete.
00410 - 3Addendum No. 1 - 15 July 2013 Bidder to Initial Here: ________
Addendum No. 1 Page 4 of 29
![Page 5: Project No. 12-CAN-001€¦ · Surety Company _____ State of incorporation ... 3 01562 Tree and Plant Protection LS 1 4 01570 Inlet Protection Barriers, Complete in Place LF 280 5](https://reader034.fdocuments.us/reader034/viewer/2022051917/6008c7eedc937005692147d6/html5/thumbnails/5.jpg)
GEEMD - Improvements to Sidewalks along Canal StreetProject Number 12-CAN-001
BID FORM
Item no. Section no. Item description Unit Unit qty. Unit price Total price
20 02631
24-inch Diameter RCP Storm Sewer Leads by Open-Cut, Complete in Place LF 12
21 02631
18-inch x 29-inch Concrete Arch Storm Sewer Leads by Open-Cut, Complete in Place LF 12
2202632/ 02633
Type "B-B" Curb Inlet, Complete in Place EA 5
2302632/ 02633
Type "B-B" Grate Inlet, Complete in Place EA 1
24 02711
Type "A" Hot Mix Asphaltic Flexible Base Course, Including Proof Rolling of Existing Subgrade, All Thicknesses, Complete in Place SY 2,100
25 027412" Type "D" Hot Mix Asphaltic Concrete Overlay, Complete in Place SY 2,200
26 027547" Thick Concrete Driveway, Complete in Place SF 15,820
27 02762Blast Cleaning of Existing 4" Pavement Markings LF 8,800
28 02762Blast Cleaning of Existing 8"/12" Pavement Markings LF 1,500
29 02762Blast Cleaning of Existing 24" Pavement Markings LF 700
30 02762Blast Cleaning of Existing Symbols and Legends Pavement Markings SF 600
31 02767Permanent Durable 4" Wide (White) Thermoplastic Pavement Markings LF 3,400
32 02767Permanent Durable 4" Wide (Yellow) Thermoplastic Pavement Markings LF 6,750
33 02767Permanent Durable 12" Wide (White) Thermoplastic Pavement Markings LF 3,270
34 02767Permanent Durable 24" Wide (White) Thermoplastic Pavement Markings LF 760
35 02767Permanent Durable Word/Symbol Thermoplastic Pavement Markings EA 8
36 02767
Permanent Durable Railroad Crossing Thermoplastic Pavement Markings EA 2
37 02771
6" Hand Poured Monolithic Concrete Curb and Gutter, All Heights, Complete in Place LF 4,830
38 027716" Dowelled-On Concrete Curb, Complete in Place LF 25
39 02775
4 1/2" Thick Concrete Sidewalk with Light Broom Finish, Complete in Place SF 32,340
40 027754 1/2" Thick Curb Ramp, Complete in Place SF 2,580
00410 - 4Addendum No. 1 - 15 July 2013 Bidder to Initial Here: ________
Addendum No. 1 Page 5 of 29
![Page 6: Project No. 12-CAN-001€¦ · Surety Company _____ State of incorporation ... 3 01562 Tree and Plant Protection LS 1 4 01570 Inlet Protection Barriers, Complete in Place LF 280 5](https://reader034.fdocuments.us/reader034/viewer/2022051917/6008c7eedc937005692147d6/html5/thumbnails/6.jpg)
GEEMD - Improvements to Sidewalks along Canal StreetProject Number 12-CAN-001
BID FORM
Item no. Section no. Item description Unit Unit qty. Unit price Total price
41 02922 Sodding SY 2,000
42 See Plans Install Bollard, Complete in Place EA 6
43 See Plans
Remove Wrought Iron Fence Within Right-of-Way and Reinstall Fence at Right-of-Way at Direction of Owner, Complete in Place LF 45
44 See PlansInstall Retaining Wall, All Heights, Complete in Place LF 32
45 See PlansInstall Concrete Stairs, Complete in Place EA 1
46 See Plans6" Thick METRO Concrete Bus Stop Pad, Complete in Place EA 3
47 See Plans
Concrete Unit Pavers on 4 1/2" Concrete Subslab, All Sizes, Colors, and Patterns, Complete in Place SF 1,480
48 See PlansFurnish and Install Truncated Dome Detectable Warning Pavers SF 600
49 See PlansInstall Owner Provided/Salvaged GEEMD Medallions EA 60
50 See PlansInstall Owner Provided/Salvaged Cast Stone Street Name Plates EA 60
51 See Plans
Remove and Re-Install Pole Mounted Traffic Sign in New Concrete Footing, Complete in Place EA 21
52 See Plans
Furnish and Install Pole Mounted Parking Sign in Concrete Footing, Complete in Place EA 2
53 See Plans
Install Owner-Provided Pedestrian Pole, Including Foundation, Complete in Place EA 18
54 See Plans
Electrical Service Entrance Pole Including Pole, Weatherhead, Conduit, Meter Socket, 12 Circuit 60A Main Circuit Breaker Paneloard, Ground Rod, and Wire Complete in Place EA 2
55 See Plans24"x36"x24" Inground Electrical Pullbox EA 19
56 See PlansHorizontal Boring for Electrical Conduit LF 650
57 See PlansTrench and Backfill for Electrical Conduits (8" wide, 24" deep) LF 1,900
58 See Plans Schedule 40 PVC Conduit 1" LF 1,900
59 See Plans Schedule 40 PVC Conduit 2" LF 275
60 See Plans Schedule 80 PVC Conduit 2" LF 375
00410 - 5Addendum No. 1 - 15 July 2013 Bidder to Initial Here: ________
Addendum No. 1 Page 6 of 29
![Page 7: Project No. 12-CAN-001€¦ · Surety Company _____ State of incorporation ... 3 01562 Tree and Plant Protection LS 1 4 01570 Inlet Protection Barriers, Complete in Place LF 280 5](https://reader034.fdocuments.us/reader034/viewer/2022051917/6008c7eedc937005692147d6/html5/thumbnails/7.jpg)
GEEMD - Improvements to Sidewalks along Canal StreetProject Number 12-CAN-001
BID FORM
Item no. Section no. Item description Unit Unit qty. Unit price Total price
61 See Plans #8 AWG Wire LF 5,800
62 See Plans #8 AWG Ground Wire LF 2,900
63 N/A Owner's Contingency Allowance LS 1 $ 25,000.00 $ 25,000.00
64 N/A Cash Allowance for Permits LS 1 $ 750.00 $ 750.00
65 02085Concrete Residential Water Meter Box EA 1
66 02751Extra High Early Strength Concrete for Driveways, Complete in Place SY 250
TOTAL BASE BID
Item no. Section no. Item description Unit Unit qty. Unit price Total price
1 02221Remove Concrete Sidewalk within Existing Directional Island SY 29
2 See Plans
60 mm 4"x8" Concrete Unit Pavers on 4 1/2" Concrete Subslab, Complete in Place SF 255
TOTAL ALTERNATE NO. 1
TOTAL BASE BID PLUS ALTERNATE NO. 1
END OF DOCUMENT
*EXTRA WORK ITEMS
ALTERNATE NO. 1: SUNBURST PATTERN IN EXISTING DIRECTIONAL ISLANDS
00410 - 6Addendum No. 1 - 15 July 2013 Bidder to Initial Here: ________
Addendum No. 1 Page 7 of 29
![Page 8: Project No. 12-CAN-001€¦ · Surety Company _____ State of incorporation ... 3 01562 Tree and Plant Protection LS 1 4 01570 Inlet Protection Barriers, Complete in Place LF 280 5](https://reader034.fdocuments.us/reader034/viewer/2022051917/6008c7eedc937005692147d6/html5/thumbnails/8.jpg)
Addendum No. 1 Page 8 of 29
![Page 9: Project No. 12-CAN-001€¦ · Surety Company _____ State of incorporation ... 3 01562 Tree and Plant Protection LS 1 4 01570 Inlet Protection Barriers, Complete in Place LF 280 5](https://reader034.fdocuments.us/reader034/viewer/2022051917/6008c7eedc937005692147d6/html5/thumbnails/9.jpg)
Addendum No. 1 Page 9 of 29
![Page 10: Project No. 12-CAN-001€¦ · Surety Company _____ State of incorporation ... 3 01562 Tree and Plant Protection LS 1 4 01570 Inlet Protection Barriers, Complete in Place LF 280 5](https://reader034.fdocuments.us/reader034/viewer/2022051917/6008c7eedc937005692147d6/html5/thumbnails/10.jpg)
Addendum No. 1 Page 10 of 29
![Page 11: Project No. 12-CAN-001€¦ · Surety Company _____ State of incorporation ... 3 01562 Tree and Plant Protection LS 1 4 01570 Inlet Protection Barriers, Complete in Place LF 280 5](https://reader034.fdocuments.us/reader034/viewer/2022051917/6008c7eedc937005692147d6/html5/thumbnails/11.jpg)
Addendum No. 1 Page 11 of 29
![Page 12: Project No. 12-CAN-001€¦ · Surety Company _____ State of incorporation ... 3 01562 Tree and Plant Protection LS 1 4 01570 Inlet Protection Barriers, Complete in Place LF 280 5](https://reader034.fdocuments.us/reader034/viewer/2022051917/6008c7eedc937005692147d6/html5/thumbnails/12.jpg)
Addendum No. 1 Page 12 of 29
![Page 13: Project No. 12-CAN-001€¦ · Surety Company _____ State of incorporation ... 3 01562 Tree and Plant Protection LS 1 4 01570 Inlet Protection Barriers, Complete in Place LF 280 5](https://reader034.fdocuments.us/reader034/viewer/2022051917/6008c7eedc937005692147d6/html5/thumbnails/13.jpg)
Addendum No. 1 Page 13 of 29
![Page 14: Project No. 12-CAN-001€¦ · Surety Company _____ State of incorporation ... 3 01562 Tree and Plant Protection LS 1 4 01570 Inlet Protection Barriers, Complete in Place LF 280 5](https://reader034.fdocuments.us/reader034/viewer/2022051917/6008c7eedc937005692147d6/html5/thumbnails/14.jpg)
Addendum No. 1 Page 14 of 29
![Page 15: Project No. 12-CAN-001€¦ · Surety Company _____ State of incorporation ... 3 01562 Tree and Plant Protection LS 1 4 01570 Inlet Protection Barriers, Complete in Place LF 280 5](https://reader034.fdocuments.us/reader034/viewer/2022051917/6008c7eedc937005692147d6/html5/thumbnails/15.jpg)
Addendum No. 1 Page 15 of 29
![Page 16: Project No. 12-CAN-001€¦ · Surety Company _____ State of incorporation ... 3 01562 Tree and Plant Protection LS 1 4 01570 Inlet Protection Barriers, Complete in Place LF 280 5](https://reader034.fdocuments.us/reader034/viewer/2022051917/6008c7eedc937005692147d6/html5/thumbnails/16.jpg)
Addendum No. 1 Page 16 of 29
![Page 17: Project No. 12-CAN-001€¦ · Surety Company _____ State of incorporation ... 3 01562 Tree and Plant Protection LS 1 4 01570 Inlet Protection Barriers, Complete in Place LF 280 5](https://reader034.fdocuments.us/reader034/viewer/2022051917/6008c7eedc937005692147d6/html5/thumbnails/17.jpg)
Addendum No. 1 Page 17 of 29
![Page 18: Project No. 12-CAN-001€¦ · Surety Company _____ State of incorporation ... 3 01562 Tree and Plant Protection LS 1 4 01570 Inlet Protection Barriers, Complete in Place LF 280 5](https://reader034.fdocuments.us/reader034/viewer/2022051917/6008c7eedc937005692147d6/html5/thumbnails/18.jpg)
Addendum No. 1 Page 18 of 29
![Page 19: Project No. 12-CAN-001€¦ · Surety Company _____ State of incorporation ... 3 01562 Tree and Plant Protection LS 1 4 01570 Inlet Protection Barriers, Complete in Place LF 280 5](https://reader034.fdocuments.us/reader034/viewer/2022051917/6008c7eedc937005692147d6/html5/thumbnails/19.jpg)
Addendum No. 1 Page 19 of 29
![Page 20: Project No. 12-CAN-001€¦ · Surety Company _____ State of incorporation ... 3 01562 Tree and Plant Protection LS 1 4 01570 Inlet Protection Barriers, Complete in Place LF 280 5](https://reader034.fdocuments.us/reader034/viewer/2022051917/6008c7eedc937005692147d6/html5/thumbnails/20.jpg)
AEC PROJECT NO.:
G153-12
AVILES ENGINEERING CORPORATION
APPROX. SCALE:
N.T.S.
DATE:
DRAFTED BY: PLATE NO.:
PLATE A-1
SITE
VICINITY MAP
11-27-12
BpJ
GEEMD IMPROVEMENTS OF CANAL STREET SIDEWALKSHOUSTON, TEXAS
Addendum No. 1 Page 20 of 29
![Page 21: Project No. 12-CAN-001€¦ · Surety Company _____ State of incorporation ... 3 01562 Tree and Plant Protection LS 1 4 01570 Inlet Protection Barriers, Complete in Place LF 280 5](https://reader034.fdocuments.us/reader034/viewer/2022051917/6008c7eedc937005692147d6/html5/thumbnails/21.jpg)
AEC PROJECT NO.:
G153-12
AVILES ENGINEERING CORPORATION
BORING LOCATION PLAN
GEEMD IMPROVEMENTS OF CANAL STREET SIDEWALKSHOUSTON, TEXAS
APPROX. SCALE:
1” = 100’
DATE:
11-27-12DRAFTED BY:
BpJPLATE NO.:
PLATE A-2
SOURCE DRAWING PROVIDED BY:
GOOGLE EARTH PRO
C-1
B-2 (5’)
C-3
B-4 (5’)
C-5 B-6 (5’)
C-7
B-8 (5’)
C-9
MATC
H LI
NE (1
) THI
S SH
EET
MATC
H LI
NE (2
) THI
S SH
EET
MATC
H LI
NE (1
) THI
S SH
EET
MATC
H LI
NE (2
) THI
S SH
EET
END PROJECT
BEGIN PROJECT CO
LBY
ST
ST C
HA
RLE
S ST
LIVE
OA
K S
T
DEL
AN
O S
T
ENN
IS S
T
PALM
ER S
T
< R
R T
RA
CK
S >
< R
R T
RA
CK
S >
NO
LAN
ST
SAM
PSO
N S
T
YOR
K S
T
C-#
LEGEND
B-# (X’) BORING NO. AND (DEPTH IN FEET)APPROXIMATE BORING LOCATION
PAVEMENT CORE NO. APPROXIMATE CORING LOCATION
Addendum No. 1 Page 21 of 29
![Page 22: Project No. 12-CAN-001€¦ · Surety Company _____ State of incorporation ... 3 01562 Tree and Plant Protection LS 1 4 01570 Inlet Protection Barriers, Complete in Place LF 280 5](https://reader034.fdocuments.us/reader034/viewer/2022051917/6008c7eedc937005692147d6/html5/thumbnails/22.jpg)
0
3
6
9
12
15
18
Pavement: 4" Asphalt + 8" Concrete
Stiff to very stiff dark gray Fat Clay (CH),with ferrous nodules, -with sand seams 1'-2'
-gray and tan, with calcareous nodules andsilt seams 4'-5'
Termination depth = 5 feet
20
22
24
93 53 20 33
PROJECT: GEEMD Improvements of Canal Street Sidewalks BORING B-2
DATE 11/26/2012 TYPE 4" Dry Auger LOCATION See Boring Location Plan
BORING DRILLED TO 5 FEET WITHOUT DRILLING FLUIDWATER ENCOUNTERED AT N/A FEET WHILE DRILLINGWATER LEVEL AT N/A FEET AFTER N/ADRILLED BY JH Drilling CHECKED BY LOGGED BY JH
PLATE A-3
DE
PT
H IN
FE
ET
SY
MB
OL
SA
MP
LE
INT
ER
VA
L
DESCRIPTION
.
S.P
.T. B
LO
WS
/ F
T.
MO
IST
UR
E C
ON
TE
NT
, %
DR
Y D
EN
SIT
Y, P
CF
SHEAR STRENGTH, TSF
0.5 1 1.5 2TorvanePocket PenetrometerUnconfined CompressionConfined Compression
-2
00
ME
SH
LIQ
UID
LIM
IT
PL
AS
TIC
LIM
IT
PL
AS
TIC
ITY
IND
EX
PROJECT NO. G153-12
Addendum No. 1 Page 22 of 29
![Page 23: Project No. 12-CAN-001€¦ · Surety Company _____ State of incorporation ... 3 01562 Tree and Plant Protection LS 1 4 01570 Inlet Protection Barriers, Complete in Place LF 280 5](https://reader034.fdocuments.us/reader034/viewer/2022051917/6008c7eedc937005692147d6/html5/thumbnails/23.jpg)
0
3
6
9
12
15
18
Pavement: 4.5" Asphalt + 14" Concrete + 3"Crushed Limestone Base and Timber + 4"Concrete
Very stiff dark gray and tan Lean Clay (CL),with ferrous nodules and sand pockets
-gray and tan 4'-5'
Termination depth = 5 feet
19
22
1793 42 16 26
PROJECT: GEEMD Improvements of Canal Street Sidewalks BORING B-4
DATE 11/26/2012 TYPE 4" Dry Auger LOCATION See Boring Location Plan
BORING DRILLED TO 5 FEET WITHOUT DRILLING FLUIDWATER ENCOUNTERED AT N/A FEET WHILE DRILLINGWATER LEVEL AT N/A FEET AFTER N/ADRILLED BY JH Drilling CHECKED BY LOGGED BY JH
PLATE A-4
DE
PT
H IN
FE
ET
SY
MB
OL
SA
MP
LE
INT
ER
VA
L
DESCRIPTION
.
S.P
.T. B
LO
WS
/ F
T.
MO
IST
UR
E C
ON
TE
NT
, %
DR
Y D
EN
SIT
Y, P
CF
SHEAR STRENGTH, TSF
0.5 1 1.5 2TorvanePocket PenetrometerUnconfined CompressionConfined Compression
-2
00
ME
SH
LIQ
UID
LIM
IT
PL
AS
TIC
LIM
IT
PL
AS
TIC
ITY
IND
EX
PROJECT NO. G153-12
Addendum No. 1 Page 23 of 29
![Page 24: Project No. 12-CAN-001€¦ · Surety Company _____ State of incorporation ... 3 01562 Tree and Plant Protection LS 1 4 01570 Inlet Protection Barriers, Complete in Place LF 280 5](https://reader034.fdocuments.us/reader034/viewer/2022051917/6008c7eedc937005692147d6/html5/thumbnails/24.jpg)
0
3
6
9
12
15
18
Pavement: 6.25" Asphalt + 7.25" Concrete
Stiff to very stiff dark gray Lean Clay (CL),with ferrous nodules-gray and tan, with clay pockets 2'-4'
-tan and light gray 4'-5'
Termination depth = 5 feet
19
2086 42 15 27
PROJECT: GEEMD Improvements of Canal Street Sidewalks BORING B-6
DATE 11/26/2012 TYPE 4" Dry Auger LOCATION See Boring Location Plan
BORING DRILLED TO 5 FEET WITHOUT DRILLING FLUIDWATER ENCOUNTERED AT N/A FEET WHILE DRILLINGWATER LEVEL AT N/A FEET AFTER N/ADRILLED BY JH Drilling CHECKED BY LOGGED BY JH
PLATE A-5
DE
PT
H IN
FE
ET
SY
MB
OL
SA
MP
LE
INT
ER
VA
L
DESCRIPTION
.
S.P
.T. B
LO
WS
/ F
T.
MO
IST
UR
E C
ON
TE
NT
, %
DR
Y D
EN
SIT
Y, P
CF
SHEAR STRENGTH, TSF
0.5 1 1.5 2TorvanePocket PenetrometerUnconfined CompressionConfined Compression
-2
00
ME
SH
LIQ
UID
LIM
IT
PL
AS
TIC
LIM
IT
PL
AS
TIC
ITY
IND
EX
PROJECT NO. G153-12
Addendum No. 1 Page 24 of 29
![Page 25: Project No. 12-CAN-001€¦ · Surety Company _____ State of incorporation ... 3 01562 Tree and Plant Protection LS 1 4 01570 Inlet Protection Barriers, Complete in Place LF 280 5](https://reader034.fdocuments.us/reader034/viewer/2022051917/6008c7eedc937005692147d6/html5/thumbnails/25.jpg)
0
3
6
9
12
15
18
Pavement: 6.25" Asphalt + 5.25" Concrete
Stiff to very stiff dark gray Fat Clay (CH),with ferrous nodules-dark gray and tan, with calcareous nodules2'-4'
-tan and gray, with silt stone 4'-5'
Termination depth = 5 feet
27
25
25
88 65 20 45
PROJECT: GEEMD Improvements of Canal Street Sidewalks BORING B-8
DATE 11/26/2012 TYPE 4" Dry Auger LOCATION See Boring Location Plan
BORING DRILLED TO 5 FEET WITHOUT DRILLING FLUIDWATER ENCOUNTERED AT N/A FEET WHILE DRILLINGWATER LEVEL AT N/A FEET AFTER N/ADRILLED BY JH Drilling CHECKED BY LOGGED BY JH
PLATE A-6
DE
PT
H IN
FE
ET
SY
MB
OL
SA
MP
LE
INT
ER
VA
L
DESCRIPTION
.
S.P
.T. B
LO
WS
/ F
T.
MO
IST
UR
E C
ON
TE
NT
, %
DR
Y D
EN
SIT
Y, P
CF
SHEAR STRENGTH, TSF
0.5 1 1.5 2TorvanePocket PenetrometerUnconfined CompressionConfined Compression
-2
00
ME
SH
LIQ
UID
LIM
IT
PL
AS
TIC
LIM
IT
PL
AS
TIC
ITY
IND
EX
PROJECT NO. G153-12
Addendum No. 1 Page 25 of 29
![Page 26: Project No. 12-CAN-001€¦ · Surety Company _____ State of incorporation ... 3 01562 Tree and Plant Protection LS 1 4 01570 Inlet Protection Barriers, Complete in Place LF 280 5](https://reader034.fdocuments.us/reader034/viewer/2022051917/6008c7eedc937005692147d6/html5/thumbnails/26.jpg)
Symbol Description
Strata symbols
Paving
High plasticityclay
Low plasticityclay
Misc. Symbols
Pocket Penetrometer
Unconfined Compression
Soil Samplers
Auger
Undisturbed thin wallShelby tube
KEY TO SYMBOLS
PLATE A-7Addendum No. 1 Page 26 of 29
![Page 27: Project No. 12-CAN-001€¦ · Surety Company _____ State of incorporation ... 3 01562 Tree and Plant Protection LS 1 4 01570 Inlet Protection Barriers, Complete in Place LF 280 5](https://reader034.fdocuments.us/reader034/viewer/2022051917/6008c7eedc937005692147d6/html5/thumbnails/27.jpg)
PLATE A-8
Addendum No. 1 Page 27 of 29
![Page 28: Project No. 12-CAN-001€¦ · Surety Company _____ State of incorporation ... 3 01562 Tree and Plant Protection LS 1 4 01570 Inlet Protection Barriers, Complete in Place LF 280 5](https://reader034.fdocuments.us/reader034/viewer/2022051917/6008c7eedc937005692147d6/html5/thumbnails/28.jpg)
PLATE A-9Addendum No. 1 Page 28 of 29
![Page 29: Project No. 12-CAN-001€¦ · Surety Company _____ State of incorporation ... 3 01562 Tree and Plant Protection LS 1 4 01570 Inlet Protection Barriers, Complete in Place LF 280 5](https://reader034.fdocuments.us/reader034/viewer/2022051917/6008c7eedc937005692147d6/html5/thumbnails/29.jpg)
PLATE A-10
Addendum No. 1 Page 29 of 29