Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor...

250
From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female Hours Female Pct. BRJP Compliance Data By Project/Contractor/Trade PAGE: 1 Project Name Trade Latest Week PROJECT HOPE $50,000 Amount: Gen Contractor: Est Start Date: Est End Date: 07/10/2016 07/16/2016 ELDER ELECTRICAL & DATA, I 15.5 0.0 0.00% 0.0 0.00% 0.0 0.00% PROJECT HOPE Electrician 07/29/2016 ELDER ELECTRICAL & DATA, I 14.0 0.0 0.00% 9.0 64.29% 0.0 0.00% PROJECT HOPE Laborer 07/29/2016 A PHONE JACK SYSTEM, INC. 210.0 0.0 0.00% 0.0 0.00% 0.0 0.00% PROJECT HOPE Installer/Apt Wirer 07/23/2017 239.5 0.0 0.00% 9.0 3.76% 0.0 0.00% SUB TOTALS: #14-1 TEMPORARY STREET LIGHTHIN $145,714 Amount: Gen Contractor: MARIO SUSI & SON INC, (617)265-4525 36 WESTWOOD STREET DORCHESTER Est Start Date: Est End Date: 05/01/2014 06/30/2014 MARIO SUSI & SON INC, 32.0 0.0 0.00% 16.0 50.00% 0.0 0.00% #14-1 TEMPORARY STREET LIG Equipment Opera 10/25/2014 MARIO SUSI & SON INC, 92.0 36.0 39.13% 32.0 34.78% 8.0 8.70% #14-1 TEMPORARY STREET LIG Laborer 10/25/2014 124.0 36.0 29.03% 48.0 38.71% 8.0 6.45% SUB TOTALS: 1 GURNEY STREET $4,090,000 Amount: Gen Contractor: N E I CONTRACTORS (781)348-5099 27 PACELLA PARK DRIVE RANDOLPH Est Start Date: Est End Date: 07/01/2016 08/31/2016 TARA CONSTRUCTION 12,027.5 3,976.5 33.06% 5,728.0 47.62% 413.5 3.44% 1 GURNEY STREET Carpenter 06/03/2017 HMB CONSTRUCTION CORPO 748.5 0.0 0.00% 0.0 0.00% 0.0 0.00% 1 GURNEY STREET Glazier 08/20/2017 K & K ACOUSTICAL CEILINGS 88.0 64.0 72.73% 64.0 72.73% 0.0 0.00% 1 GURNEY STREET Carpenter 09/17/2017 LIGHTHOUSE MASONRY, INC. 1,478.0 4.0 0.27% 462.0 31.26% 0.0 0.00% 1 GURNEY STREET Bricklayer 08/19/2017 MPS PRODUCTS CORP. 430.5 91.0 21.14% 123.0 28.57% 0.0 0.00% 1 GURNEY STREET Iron Worker 11/19/2016 N E I CONTRACTORS 100.0 0.0 0.00% 20.0 20.00% 0.0 0.00% 1 GURNEY STREET Carpenter 09/16/2017 N E I CONTRACTORS 3,453.5 3,443.5 99.71% 3,443.5 99.71% 1,596.5 46.23% 1 GURNEY STREET Laborer 09/16/2017 RISE & SHINE CLEANING & CO 60.5 60.5 100.00% 45.5 75.21% 45.5 75.21% 1 GURNEY STREET Laborer 09/16/2017 SEAN FARRELL EXCAUTION 1,015.0 0.0 0.00% 0.0 0.00% 0.0 0.00% 1 GURNEY STREET Equipment Opera 08/05/2017 SEAN FARRELL EXCAUTION 10.0 10.0 100.00% 0.0 0.00% 0.0 0.00% 1 GURNEY STREET Field Engineer 08/27/2016 HMB CONSTRUCTION CORPO 2,393.0 560.0 23.40% 2,393.0 100.00% 236.0 9.86% 1 GURNEY STREET Carpenter 09/09/2017 SEAN FARRELL EXCAUTION 113.0 0.0 0.00% 0.0 0.00% 113.0 100.00% 1 GURNEY STREET Surveyor 08/05/2017 KONE ELEVATOR INC. 1,066.0 195.0 18.29% 409.0 38.37% 124.0 11.63% 1 GURNEY STREET Elevator Const(M 08/30/2017 TARA CONSTRUCTION 22.0 8.0 36.36% 22.0 100.00% 0.0 0.00% 1 GURNEY STREET Laborer 03/18/2017 TITAN SERVICES LIMITED, INC 4,597.0 628.0 13.66% 3,869.0 84.16% 56.0 1.22% 1 GURNEY STREET Carpenter 09/16/2017 TITAN SERVICES LIMITED, INC 11,055.0 6,611.0 59.80% 10,905.0 98.64% 1,869.0 16.91% 1 GURNEY STREET Laborer 09/16/2017 TITAN SERVICES LIMITED, INC 93.0 0.0 0.00% 93.0 100.00% 0.0 0.00% 1 GURNEY STREET Taper 01/07/2017 SEAN FARRELL EXCAUTION 902.5 548.5 60.78% 682.5 75.62% 4.5 0.50% 1 GURNEY STREET Laborer 08/05/2017 COMMERCIAL AIR CTL, INC. 3,854.5 1,096.0 28.43% 1,468.0 38.09% 0.0 0.00% 1 GURNEY STREET HVAC 09/08/2017 ATLANTIC CONSTRUCTION SE 2,681.5 2,345.5 87.47% 1,651.0 61.57% 0.0 0.00% 1 GURNEY STREET Laborer 09/02/2017 ATLANTIC CONSTRUCTION SE 4,342.0 127.0 2.92% 0.0 0.00% 0.0 0.00% 1 GURNEY STREET Sheetmetal Work 09/02/2017

Transcript of Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor...

Page 1: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 1

Project Name Trade Latest Week

PROJECT HOPE

$50,000Amount:

Gen Contractor:

Est Start Date:

Est End Date:

07/10/2016

07/16/2016

ELDER ELECTRICAL & DATA, I 15.5 0.0 0.00% 0.0 0.00% 0.0 0.00% PROJECT HOPE Electrician 07/29/2016

ELDER ELECTRICAL & DATA, I 14.0 0.0 0.00% 9.0 64.29% 0.0 0.00% PROJECT HOPE Laborer 07/29/2016

A PHONE JACK SYSTEM, INC. 210.0 0.0 0.00% 0.0 0.00% 0.0 0.00% PROJECT HOPE Installer/Apt Wirer 07/23/2017

239.5 0.0 0.00% 9.0 3.76% 0.0 0.00%SUB TOTALS:

#14-1 TEMPORARY STREET LIGHTHIN

$145,714Amount:

Gen Contractor: MARIO SUSI & SON INC,

(617)265-4525 36 WESTWOOD STREET DORCHESTER

Est Start Date:

Est End Date:

05/01/2014

06/30/2014

MARIO SUSI & SON INC, 32.0 0.0 0.00% 16.0 50.00% 0.0 0.00%#14-1 TEMPORARY STREET LIG Equipment Opera 10/25/2014

MARIO SUSI & SON INC, 92.0 36.0 39.13% 32.0 34.78% 8.0 8.70%#14-1 TEMPORARY STREET LIG Laborer 10/25/2014

124.0 36.0 29.03% 48.0 38.71% 8.0 6.45%SUB TOTALS:

1 GURNEY STREET

$4,090,000Amount:

Gen Contractor: N E I CONTRACTORS

(781)348-5099 27 PACELLA PARK DRIVE RANDOLPH

Est Start Date:

Est End Date:

07/01/2016

08/31/2016

TARA CONSTRUCTION 12,027.5 3,976.5 33.06% 5,728.0 47.62% 413.5 3.44%1 GURNEY STREET Carpenter 06/03/2017

HMB CONSTRUCTION CORPO 748.5 0.0 0.00% 0.0 0.00% 0.0 0.00%1 GURNEY STREET Glazier 08/20/2017

K & K ACOUSTICAL CEILINGS 88.0 64.0 72.73% 64.0 72.73% 0.0 0.00%1 GURNEY STREET Carpenter 09/17/2017

LIGHTHOUSE MASONRY, INC. 1,478.0 4.0 0.27% 462.0 31.26% 0.0 0.00%1 GURNEY STREET Bricklayer 08/19/2017

MPS PRODUCTS CORP. 430.5 91.0 21.14% 123.0 28.57% 0.0 0.00%1 GURNEY STREET Iron Worker 11/19/2016

N E I CONTRACTORS 100.0 0.0 0.00% 20.0 20.00% 0.0 0.00%1 GURNEY STREET Carpenter 09/16/2017

N E I CONTRACTORS 3,453.5 3,443.5 99.71% 3,443.5 99.71% 1,596.5 46.23%1 GURNEY STREET Laborer 09/16/2017

RISE & SHINE CLEANING & CO 60.5 60.5 100.00% 45.5 75.21% 45.5 75.21%1 GURNEY STREET Laborer 09/16/2017

SEAN FARRELL EXCAUTION 1,015.0 0.0 0.00% 0.0 0.00% 0.0 0.00%1 GURNEY STREET Equipment Opera 08/05/2017

SEAN FARRELL EXCAUTION 10.0 10.0 100.00% 0.0 0.00% 0.0 0.00%1 GURNEY STREET Field Engineer 08/27/2016

HMB CONSTRUCTION CORPO 2,393.0 560.0 23.40% 2,393.0 100.00% 236.0 9.86%1 GURNEY STREET Carpenter 09/09/2017

SEAN FARRELL EXCAUTION 113.0 0.0 0.00% 0.0 0.00% 113.0 100.00%1 GURNEY STREET Surveyor 08/05/2017

KONE ELEVATOR INC. 1,066.0 195.0 18.29% 409.0 38.37% 124.0 11.63%1 GURNEY STREET Elevator Const(M 08/30/2017

TARA CONSTRUCTION 22.0 8.0 36.36% 22.0 100.00% 0.0 0.00%1 GURNEY STREET Laborer 03/18/2017

TITAN SERVICES LIMITED, INC 4,597.0 628.0 13.66% 3,869.0 84.16% 56.0 1.22%1 GURNEY STREET Carpenter 09/16/2017

TITAN SERVICES LIMITED, INC 11,055.0 6,611.0 59.80% 10,905.0 98.64% 1,869.0 16.91%1 GURNEY STREET Laborer 09/16/2017

TITAN SERVICES LIMITED, INC 93.0 0.0 0.00% 93.0 100.00% 0.0 0.00%1 GURNEY STREET Taper 01/07/2017

SEAN FARRELL EXCAUTION 902.5 548.5 60.78% 682.5 75.62% 4.5 0.50%1 GURNEY STREET Laborer 08/05/2017

COMMERCIAL AIR CTL, INC. 3,854.5 1,096.0 28.43% 1,468.0 38.09% 0.0 0.00%1 GURNEY STREET HVAC 09/08/2017

ATLANTIC CONSTRUCTION SE 2,681.5 2,345.5 87.47% 1,651.0 61.57% 0.0 0.00%1 GURNEY STREET Laborer 09/02/2017

ATLANTIC CONSTRUCTION SE 4,342.0 127.0 2.92% 0.0 0.00% 0.0 0.00%1 GURNEY STREET Sheetmetal Work 09/02/2017

Page 2: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 2

Project Name Trade Latest Week

LIGHTHOUSE MASONRY, INC. 4,091.5 729.0 17.82% 2,761.0 67.48% 0.0 0.00%1 GURNEY STREET Mason Tender 08/19/2017

CENTRAL GLASS CO. 869.8 0.0 0.00% 0.0 0.00% 0.0 0.00%1 GURNEY STREET Glazier 08/20/2017

HAYWARD BAKER INC. 41.0 8.0 19.51% 0.0 0.00% 0.0 0.00%1 GURNEY STREET Piledriver 09/11/2016

COMMERCIAL AIR CTL, INC. 1,477.5 107.5 7.28% 195.5 13.23% 0.0 0.00%1 GURNEY STREET Pipelayer 06/02/2017

COVENANT FIRE PROTECTION 2,712.5 1,197.0 44.13% 1,390.0 51.24% 0.0 0.00%1 GURNEY STREET Sprinkler Fitter 09/16/2017

DESIGN MECHANICAL INC. 8,624.5 2,924.8 33.91% 3,990.8 46.27% 1,275.5 14.79%1 GURNEY STREET Plumber 09/03/2017

DIAZ CONSTRUCTION CO. INC. 285.5 0.0 0.00% 0.0 0.00% 0.0 0.00%1 GURNEY STREET Carpenter 11/26/2016

DIAZ CONSTRUCTION CO. INC. 1,579.5 792.0 50.14% 1,579.5 100.00% 0.0 0.00%1 GURNEY STREET Cement Laborer 09/16/2017

DIAZ CONSTRUCTION CO. INC. 24.5 24.5 100.00% 24.5 100.00% 0.0 0.00%1 GURNEY STREET Laborer 02/04/2017

G. BROUILLETTE & SON INC. 413.0 222.5 53.87% 226.0 54.72% 0.0 0.00%1 GURNEY STREET Laborer 08/18/2017

G. BROUILLETTE & SON INC. 902.0 0.0 0.00% 202.5 22.45% 0.0 0.00%1 GURNEY STREET Roofer 09/15/2017

HAYWARD BAKER INC. 288.0 136.0 47.22% 0.0 0.00% 136.0 47.22%1 GURNEY STREET Laborer 08/06/2016

GLYNN ELECTRIC INC. 7,202.0 839.0 11.65% 2,221.0 30.84% 475.0 6.60%1 GURNEY STREET Electrician 09/03/2017

CC CONSULT 431.7 277.7 64.32% 384.7 89.11% 5.0 1.16%1 GURNEY STREET Laborer 09/09/2017

HAYWARD BAKER INC. 312.0 0.0 0.00% 0.0 0.00% 0.0 0.00%1 GURNEY STREET Equipment Opera 08/06/2016

DIAZ CONSTRUCTION CO. INC. 220.0 0.0 0.00% 11.5 5.23% 0.0 0.00%1 GURNEY STREET Cement Finisher 09/16/2017

80,005.9 27,026.4 33.78% 44,365.4 55.45% 6,349.5 7.94%SUB TOTALS:

109 MT. PLEASANT AVE.

$1,260,000Amount:

Gen Contractor: CROSSWINDS ENTERPRISES

(617)445-5100 97 HUMBOLDT AVE. DORCHESTER

Est Start Date:

Est End Date:

01/01/2013

09/30/2013

FIRECODE DESIGN, LLC 311.5 168.0 53.93% 168.0 53.93% 40.0 12.84%109 MT. PLEASANT AVE. Sprinkler Fitter 12/28/2013

LI HUI CONSTRUCTION 144.0 64.0 44.44% 144.0 100.00% 0.0 0.00%109 MT. PLEASANT AVE. Carpenter 01/10/2014

ENVIRONMENTAL SYS. ENG. 121.0 63.0 52.07% 63.0 52.07% 0.0 0.00%109 MT. PLEASANT AVE. HVAC 12/07/2013

LOWE PLUMB & HEATING 125.0 74.0 59.20% 109.5 87.60% 0.0 0.00%109 MT. PLEASANT AVE. Plumber 11/30/2013

701.5 369.0 52.60% 484.5 69.07% 40.0 5.70%SUB TOTALS:

11 WALTHAM STREET

$1,536,151Amount:

Gen Contractor:

Est Start Date:

Est End Date:

06/01/2016

12/31/2016

METRO EQUIPMENT CORP. 370.0 69.0 18.65% 272.0 73.51% 8.0 2.16%11 WALTHAM STREET Laborer 12/31/2016

NATIONAL MANAGEMENT TEA 106.0 0.0 0.00% 79.3 74.76% 0.0 0.00%11 WALTHAM STREET Laborer 03/18/2017

TITAN SERVICES LIMITED, INC 704.0 0.0 0.00% 704.0 100.00% 522.0 74.15%11 WALTHAM STREET Taper 02/18/2017

TITAN SERVICES LIMITED, INC 1,290.0 39.0 3.02% 1,226.0 95.04% 0.0 0.00%11 WALTHAM STREET Laborer 03/04/2017

TITAN SERVICES LIMITED, INC 218.0 0.0 0.00% 8.0 3.67% 0.0 0.00%11 WALTHAM STREET Carpenter 02/25/2017

SUPERIOR PLUMBING & HEATI 580.0 0.0 0.00% 580.0 100.00% 0.0 0.00%11 WALTHAM STREET Plumber 03/07/2017

SUPERIOR PLUMBING & HEATI 5.0 5.0 100.00% 5.0 100.00% 0.0 0.00%11 WALTHAM STREET Insulator 12/06/2016

REFORM MASONRY 146.0 92.0 63.01% 146.0 100.00% 0.0 0.00%11 WALTHAM STREET Mason Tender 12/03/2016

Page 3: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 3

Project Name Trade Latest Week

NATIONAL MANAGEMENT TEA 333.0 0.0 0.00% 333.0 100.00% 0.0 0.00%11 WALTHAM STREET Roofer 03/04/2017

ACCOLADE ENVIRONMENTAL 600.0 0.0 0.00% 600.0 100.00% 16.0 2.67%11 WALTHAM STREET Asbestos Worker 01/21/2017

N E I CONTRACTORS 28.0 28.0 100.00% 28.0 100.00% 8.0 28.57%11 WALTHAM STREET Laborer 04/01/2017

MONAHAN TECHNOLOGIES IN 71.0 0.0 0.00% 0.0 0.00% 0.0 0.00%11 WALTHAM STREET Sheetmetal Work 02/17/2017

MONAHAN TECHNOLOGIES IN 416.5 82.0 19.69% 94.0 22.57% 8.0 1.92%11 WALTHAM STREET Pipefitter 03/31/2017

MONAHAN TECHNOLOGIES IN 16.0 16.0 100.00% 16.0 100.00% 0.0 0.00%11 WALTHAM STREET Insulator 12/23/2016

NATIONAL MANAGEMENT TEA 202.0 0.0 0.00% 202.0 100.00% 0.0 0.00%11 WALTHAM STREET Carpenter 03/18/2017

GLYNN ELECTRIC INC. 1,336.0 572.0 42.81% 592.0 44.31% 0.0 0.00%11 WALTHAM STREET Electrician 04/02/2017

COVENANT FIRE PROTECTION 160.0 24.0 15.00% 24.0 15.00% 0.0 0.00%11 WALTHAM STREET Sprinkler Fitter 02/18/2017

6,581.5 927.0 14.08% 4,909.3 74.59% 562.0 8.54%SUB TOTALS:

124 HARVARD STREET

$75,000Amount:

Gen Contractor: COLLABORATIVE CONTRACTORS GROUP

(617)594-6767 16 HANCOCK COURT BOSTON

Est Start Date:

Est End Date:

06/09/2014

08/01/2014

COLLABORATIVE CONTRACTO 80.0 0.0 0.00% 0.0 0.00% 0.0 0.00%124 HARVARD STREET Carpenter 06/13/2014

COLLABORATIVE CONTRACTO 80.0 80.0 100.00% 80.0 100.00% 0.0 0.00%124 HARVARD STREET Laborer 06/13/2014

160.0 80.0 50.00% 80.0 50.00% 0.0 0.00%SUB TOTALS:

124-130 HARVARD STREET

$34,000Amount:

Gen Contractor: COLLABORATIVE CONTRACTORS GROUP

(617)594-6767 16 HANCOCK COURT BOSTON

Est Start Date:

Est End Date:

01/19/2015

12/19/2015

WELD RIGHT IRON WORKS 14.0 14.0 100.00% 0.0 0.00% 0.0 0.00%124-130 HARVARD STREET Welder 04/03/2015

WELD RIGHT IRON WORKS 28.0 28.0 100.00% 14.0 50.00% 0.0 0.00%124-130 HARVARD STREET Laborer 04/03/2015

CAMBRIDGE REPROGRAPHIE 10.0 0.0 0.00% 0.0 0.00% 0.0 0.00%124-130 HARVARD STREET Carpenter 01/23/2015

CAMBRIDGE REPROGRAPHIE 32.0 10.0 31.25% 19.0 59.38% 9.0 28.13%124-130 HARVARD STREET Laborer 12/19/2015

84.0 52.0 61.90% 33.0 39.29% 9.0 10.71%SUB TOTALS:

131 BEVERLY @ LOVE JOY WHARF

$110,000Amount:

Gen Contractor: CONSIGLI CONSTRUCTION

197 MAIN STREET MILFORD

Est Start Date:

Est End Date:

01/05/2015

01/05/2015

OASIS SHOWER DOORS 1,292.0 0.0 0.00% 824.0 63.78% 0.0 0.00%131 BEVERLY @ LOVE JOY WHA Glazier 04/01/2017

PIZZOTTI BROTHERS, INC. 4,184.0 1,040.0 24.86% 2,376.0 56.79% 616.0 14.72%131 BEVERLY @ LOVE JOY WHA Bricklayer 03/28/2017

PAVILION FLOORS, INC. 16.0 0.0 0.00% 0.0 0.00% 0.0 0.00%131 BEVERLY @ LOVE JOY WHA Terrazzo Worker 01/14/2017

PAVILION FLOORS, INC. 5,613.0 876.0 15.61% 5,053.0 90.02% 625.0 11.13%131 BEVERLY @ LOVE JOY WHA Floor Layer 03/25/2017

PAVILION FLOORS, INC. 6,958.5 2,099.0 30.16% 3,266.0 46.94% 32.0 0.46%131 BEVERLY @ LOVE JOY WHA Carpet Layer 03/25/2017

J.C. HIGGINS CORP. 10,491.0 2,398.0 22.86% 2,122.0 20.23% 0.0 0.00%131 BEVERLY @ LOVE JOY WHA Pipefitter 02/26/2017

OTIS ELEVATOR COMPANY 1,918.5 6.0 0.31% 14.0 0.73% 452.0 23.56%131 BEVERLY @ LOVE JOY WHA Elevator Const(M 03/23/2017

MARSHALL ROOFING & SHEET 10,002.0 1,611.0 16.11% 3,549.0 35.48% 266.5 2.66%131 BEVERLY @ LOVE JOY WHA Roofer 03/18/2017

OTIS ELEVATOR COMPANY 1,884.8 0.0 0.00% 0.0 0.00% 0.0 0.00%131 BEVERLY @ LOVE JOY WHA Elev Const Helper 03/16/2017

Page 4: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 4

Project Name Trade Latest Week

NH STEEL FABRICATORS INC 4,802.0 1,125.0 23.43% 628.0 13.08% 144.0 3.00%131 BEVERLY @ LOVE JOY WHA Iron Worker 03/07/2017

MCDONALD ELECTRICAL COR 184.0 0.0 0.00% 0.0 0.00% 0.0 0.00%131 BEVERLY @ LOVE JOY WHA Electrician 05/23/2015

MARSHALL ROOFING & SHEET 327.5 0.0 0.00% 141.0 43.05% 0.0 0.00%131 BEVERLY @ LOVE JOY WHA Sheetmetal Work 03/18/2017

PIZZOTTI BROTHERS, INC. 3,048.0 0.0 0.00% 908.0 29.79% 0.0 0.00%131 BEVERLY @ LOVE JOY WHA Mason Tender 12/20/2016

SPECTRUM INTEGRATED TEC 834.0 269.0 32.25% 380.0 45.56% 0.0 0.00%131 BEVERLY @ LOVE JOY WHA Electrician 03/24/2017

K & K ACOUSTICAL CEILINGS 93.0 0.0 0.00% 0.0 0.00% 0.0 0.00%131 BEVERLY @ LOVE JOY WHA Carpenter 03/05/2017

SPECTRUM INTEGRATED TEC 2,851.0 1,105.0 38.76% 539.0 18.91% 566.0 19.85%131 BEVERLY @ LOVE JOY WHA Technician 03/24/2017

IPSWICH BAY GLASS CO. 2,088.5 730.5 34.98% 509.5 24.40% 260.0 12.45%131 BEVERLY @ LOVE JOY WHA Iron Worker 03/25/2017

J. C. CANNISTRARO INC. 5,093.0 1,014.0 19.91% 1,726.0 33.89% 0.0 0.00%131 BEVERLY @ LOVE JOY WHA Sprinkler Fitter 03/19/2017

XQUISITE LANDSCAPING 428.0 0.0 0.00% 114.0 26.64% 0.0 0.00%131 BEVERLY @ LOVE JOY WHA Mason 03/26/2017

XQUISITE LANDSCAPING 388.0 0.0 0.00% 48.0 12.37% 0.0 0.00%131 BEVERLY @ LOVE JOY WHA Laborer 03/26/2017

WORCESTER AIR CONDITIONI 7,647.0 2,922.0 38.21% 2,158.0 28.22% 0.0 0.00%131 BEVERLY @ LOVE JOY WHA Sheetmetal Work 03/26/2017

S & F CONCRETE 1,097.5 0.0 0.00% 0.0 0.00% 0.0 0.00%131 BEVERLY @ LOVE JOY WHA Equipment Opera 07/23/2016

T & T ELECTRICAL CO. 46,100.5 8,721.0 18.92% 10,059.0 21.82% 0.0 0.00%131 BEVERLY @ LOVE JOY WHA Electrician 03/18/2017

PRIME STEEL ERECTING INC, 809.0 0.0 0.00% 0.0 0.00% 0.0 0.00%131 BEVERLY @ LOVE JOY WHA Bricklayer 05/07/2016

S & F CONCRETE 23,933.0 4,748.5 19.84% 6,404.5 26.76% 0.0 0.00%131 BEVERLY @ LOVE JOY WHA Laborer 07/23/2016

S & F CONCRETE 2,131.5 1,178.5 55.29% 1,195.5 56.09% 0.0 0.00%131 BEVERLY @ LOVE JOY WHA Cement Finisher 05/21/2016

S & F CONCRETE 25,473.0 5,924.5 23.26% 8,463.5 33.23% 2,634.0 10.34%131 BEVERLY @ LOVE JOY WHA Carpenter 07/16/2016

RIGGS CONTRACTING, INC. 10,329.0 7,270.5 70.39% 4,796.0 46.43% 4,315.0 41.78%131 BEVERLY @ LOVE JOY WHA Laborer 04/01/2017

RIGGS CONTRACTING, INC. 2,616.0 86.0 3.29% 676.0 25.84% 1,909.0 72.97%131 BEVERLY @ LOVE JOY WHA Carpenter 02/18/2017

PRIME STEEL ERECTING INC, 4,760.0 2,752.5 57.83% 349.0 7.33% 537.5 11.29%131 BEVERLY @ LOVE JOY WHA Iron Worker 05/14/2016

VERTEX WINDOW DECON INC. 52.5 11.5 21.90% 0.0 0.00% 0.0 0.00%131 BEVERLY @ LOVE JOY WHA Carpenter 03/18/2017

BOWLINE CO. 5,717.5 3,143.5 54.98% 96.0 1.68% 1,633.5 28.57%131 BEVERLY @ LOVE JOY WHA Equipment Opera 03/25/2017

CHARLES CONTRACTING CO. 308.0 0.0 0.00% 0.0 0.00% 0.0 0.00%131 BEVERLY @ LOVE JOY WHA Utility Operator 11/19/2016

CHARLES CONTRACTING CO. 1,232.0 0.0 0.00% 0.0 0.00% 0.0 0.00%131 BEVERLY @ LOVE JOY WHA Laborer 11/19/2016

CENTURY DRYWALL INC, 15,181.0 4,160.0 27.40% 8,176.0 53.86% 766.0 5.05%131 BEVERLY @ LOVE JOY WHA Taper 03/25/2017

CENTURY DRYWALL INC, 7,886.0 1,059.0 13.43% 2,905.5 36.84% 616.5 7.82%131 BEVERLY @ LOVE JOY WHA Laborer 03/18/2017

CENTURY DRYWALL INC, 22,434.5 5,088.0 22.68% 11,020.5 49.12% 469.5 2.09%131 BEVERLY @ LOVE JOY WHA Carpenter 03/25/2017

COMMUNICATION TECHNOLO 486.5 0.0 0.00% 0.0 0.00% 0.0 0.00%131 BEVERLY @ LOVE JOY WHA Telephone/Data I 12/24/2016

BOWLINE CO. 288.5 72.5 25.13% 48.5 16.81% 24.0 8.32%131 BEVERLY @ LOVE JOY WHA Iron Worker 09/24/2016

BOWLINE CO. 142.5 0.0 0.00% 0.0 0.00% 0.0 0.00%131 BEVERLY @ LOVE JOY WHA Elevator Const(M 09/24/2016

BOWLINE CO. 71.0 0.0 0.00% 24.0 33.80% 0.0 0.00%131 BEVERLY @ LOVE JOY WHA Carpenter 09/24/2016

IPSWICH BAY GLASS CO. 8,543.5 2,081.0 24.36% 1,318.0 15.43% 699.0 8.18%131 BEVERLY @ LOVE JOY WHA Glazier 03/25/2017

ANGELINI PLASTERING 44.0 0.0 0.00% 0.0 0.00% 0.0 0.00%131 BEVERLY @ LOVE JOY WHA Plasterer 03/25/2017

Page 5: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 5

Project Name Trade Latest Week

AMQUIP CRANE RENTALL LLC. 5,347.0 8.0 0.15% 48.0 0.90% 0.0 0.00%131 BEVERLY @ LOVE JOY WHA Equipment Opera 07/16/2016

A. A. WILL CORPORATION 200.0 48.0 24.00% 48.0 24.00% 0.0 0.00%131 BEVERLY @ LOVE JOY WHA Piledriver 06/27/2015

A. A. WILL CORPORATION 2,171.5 887.0 40.85% 502.5 23.14% 0.0 0.00%131 BEVERLY @ LOVE JOY WHA Laborer 12/05/2015

BOWLINE CO. 37.0 11.0 29.73% 11.0 29.73% 0.0 0.00%131 BEVERLY @ LOVE JOY WHA Laborer 09/24/2016

HUB FOUNDATION CO. 4,173.5 2,188.0 52.43% 2,416.0 57.89% 0.0 0.00%131 BEVERLY @ LOVE JOY WHA Laborer 05/23/2015

DIVERSIFIED CONSTRUCTION 2,226.0 104.0 4.67% 1,914.0 85.98% 220.0 9.88%131 BEVERLY @ LOVE JOY WHA Laborer 03/25/2017

A. A. WILL CORPORATION 1,706.5 234.0 13.71% 0.0 0.00% 72.0 4.22%131 BEVERLY @ LOVE JOY WHA Equipment Opera 12/05/2015

IPSWICH BAY GLASS CO. 4,619.0 713.0 15.44% 560.0 12.12% 32.0 0.69%131 BEVERLY @ LOVE JOY WHA Carpenter 03/25/2017

J.C. HIGGINS CORP. 20,006.0 2,647.0 13.23% 3,502.0 17.50% 1,165.0 5.82%131 BEVERLY @ LOVE JOY WHA Plumber 03/26/2017

HUB FOUNDATION CO. 725.0 0.0 0.00% 0.0 0.00% 0.0 0.00%131 BEVERLY @ LOVE JOY WHA Piledriver 05/16/2015

AZTEC STEEL INC. 5,339.0 3,214.0 60.20% 2,478.0 46.41% 487.0 9.12%131 BEVERLY @ LOVE JOY WHA Iron Worker 05/21/2016

HUB FOUNDATION CO. 1,378.0 714.0 51.81% 714.0 51.81% 714.0 51.81%131 BEVERLY @ LOVE JOY WHA Oiler 05/23/2015

HUB FOUNDATION CO. 3,993.5 0.0 0.00% 0.0 0.00% 0.0 0.00%131 BEVERLY @ LOVE JOY WHA Equipment Opera 05/23/2015

HITECH INSULATION CO. 5,439.0 978.0 17.98% 1,110.0 20.41% 56.0 1.03%131 BEVERLY @ LOVE JOY WHA Insulator 03/19/2017

HIGH POINT INTERIORS,INC. 12,550.0 2,671.0 21.28% 1,516.0 12.08% 0.0 0.00%131 BEVERLY @ LOVE JOY WHA Marble Tile Work 04/01/2017

HERITAGE RESTORATION INC. 653.5 88.0 13.47% 374.5 57.31% 0.0 0.00%131 BEVERLY @ LOVE JOY WHA Laborer 03/18/2017

HERITAGE RESTORATION INC. 6,721.0 1,684.5 25.06% 2,515.0 37.42% 103.0 1.53%131 BEVERLY @ LOVE JOY WHA Bricklayer 03/25/2017

GREENSCAPE LAND DESIGN 355.5 0.0 0.00% 97.5 27.43% 0.0 0.00%131 BEVERLY @ LOVE JOY WHA Laborer 12/10/2016

GREENSCAPE LAND DESIGN 61.5 0.0 0.00% 0.0 0.00% 0.0 0.00%131 BEVERLY @ LOVE JOY WHA Bricklayer 11/26/2016

EAST COAST INTERIORS CO. 1,384.0 142.0 10.26% 142.0 10.26% 0.0 0.00%131 BEVERLY @ LOVE JOY WHA Carpenter 03/18/2017

328,867.3 77,824.0 23.66% 97,836.0 29.75% 19,414.5 5.90%SUB TOTALS:

14 -16 NORTH AVENUE

$75,000Amount:

Gen Contractor: YOUTH BUILD BOSTON

(617)427-3950 27 CENTRE STREET ROXBURY

Est Start Date:

Est End Date:

08/14/2014

03/31/2015

KEVIN DOHORTY EXCAVATION 40.0 40.0 100.00% 0.0 0.00% 0.0 0.00%14 -16 NORTH AVENUE Field Engineer 09/05/2014

YOUTH BUILD BOSTON 40.0 40.0 100.00% 0.0 0.00% 0.0 0.00%14 -16 NORTH AVENUE Curbsetter/Paver 11/07/2014

YOUTH BUILD BOSTON 32.0 32.0 100.00% 32.0 100.00% 0.0 0.00%14 -16 NORTH AVENUE Cement Finisher 11/07/2014

YOUTH BUILD BOSTON 24.0 24.0 100.00% 24.0 100.00% 0.0 0.00%14 -16 NORTH AVENUE Metal Refinisher 11/07/2014

LOWE PLUMB & HEATING 152.0 56.0 36.84% 152.0 100.00% 0.0 0.00%14 -16 NORTH AVENUE Plumber 06/26/2015

DUANE DRYWALL & PLASTER 40.0 0.0 0.00% 0.0 0.00% 0.0 0.00%14 -16 NORTH AVENUE Plasterer 05/22/2015

YOUTH BUILD BOSTON 9,368.0 7,920.0 84.54% 9,072.0 96.84% 1,144.0 12.21%14 -16 NORTH AVENUE Carpenter 10/23/2015

NHK ELECTRIC 160.0 160.0 100.00% 160.0 100.00% 0.0 0.00%14 -16 NORTH AVENUE Electrician 10/31/2014

9,856.0 8,272.0 83.93% 9,440.0 95.78% 1,144.0 11.61%SUB TOTALS:

14-2 TEMPORARY STREETLIGHTING Y

$868,100Amount:

Gen Contractor: NORTHERN CONTRACTING CORP

(781)821-4200 68 JACKSON STREET P.O. BOX 96 CANTON

Est Start Date:

Est End Date:

09/15/2014

12/31/2014

Page 6: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 6

Project Name Trade Latest Week

FEDERAL CONCRETE 88.0 8.0 9.09% 0.0 0.00% 0.0 0.00%14-2 TEMPORARY STREETLIGHT Iron Worker 12/20/2014

NORTHERN CONTRACTING CO 29.5 29.5 100.00% 0.0 0.00% 0.0 0.00%14-2 TEMPORARY STREETLIGHT Equipment Opera 01/10/2015

NORTHERN CONTRACTING CO 42.0 42.0 100.00% 42.0 100.00% 0.0 0.00%14-2 TEMPORARY STREETLIGHT Carpenter 01/17/2015

MARGUERITE CONCRETE 61.0 0.0 0.00% 7.0 11.48% 0.0 0.00%14-2 TEMPORARY STREETLIGHT Laborer 12/27/2014

MARGUERITE CONCRETE 14.0 0.0 0.00% 0.0 0.00% 0.0 0.00%14-2 TEMPORARY STREETLIGHT Equipment Opera 12/27/2014

MARGUERITE CONCRETE 56.0 0.0 0.00% 0.0 0.00% 0.0 0.00%14-2 TEMPORARY STREETLIGHT Cement Finisher 12/27/2014

FEDERAL CONCRETE 197.0 0.0 0.00% 0.0 0.00% 0.0 0.00%14-2 TEMPORARY STREETLIGHT Laborer 01/03/2015

FEDERAL CONCRETE 572.0 0.0 0.00% 128.0 22.38% 0.0 0.00%14-2 TEMPORARY STREETLIGHT Carpenter 12/27/2014

D'S WELDING 556.0 162.0 29.14% 170.0 30.58% 0.0 0.00%14-2 TEMPORARY STREETLIGHT Iron Worker 12/20/2014

DONNEGAN SYSTEMS, INC. 126.0 0.0 0.00% 14.0 11.11% 0.0 0.00%14-2 TEMPORARY STREETLIGHT Carpenter 03/07/2015

NORTHERN CONTRACTING CO 110.0 65.0 59.09% 16.0 14.55% 0.0 0.00%14-2 TEMPORARY STREETLIGHT Laborer 01/17/2015

LYNNWELL ASSOCIATES INC 248.0 40.0 16.13% 40.0 16.13% 40.0 16.13%14-2 TEMPORARY STREETLIGHT Electrician 01/25/2015

2,099.5 346.5 16.50% 417.0 19.86% 40.0 1.91%SUB TOTALS:

150 RIVER STREET DEMO.

$253,722Amount:

Gen Contractor: MC CONNELL ENTERPRISES

P O BOX 216 ESSES

Est Start Date:

Est End Date:

10/01/2013

12/31/2013

MCCONNELL ENTERPRISES 142.0 16.0 11.27% 142.0 100.00% 0.0 0.00%150 RIVER STREET DEMO. Laborer 06/07/2014

MCCONNELL ENTERPRISES 259.0 0.0 0.00% 0.0 0.00% 0.0 0.00%150 RIVER STREET DEMO. Equipment Opera 05/02/2014

401.0 16.0 3.99% 142.0 35.41% 0.0 0.00%SUB TOTALS:

156-160 HIGHLAND STREET ROXBURY

$60,000Amount:

Gen Contractor:

Est Start Date:

Est End Date:

10/20/2016

07/31/2017

FOLAN PLUMBING AND HEATI 241.0 0.0 0.00% 0.0 0.00% 0.0 0.00%156-160 HIGHLAND STREET ROX Plumber 07/14/2017

MCELHINNEY PLASTERING 390.0 126.0 32.31% 126.0 32.31% 0.0 0.00%156-160 HIGHLAND STREET ROX Plasterer 03/31/2017

NHK ELECTRIC 486.0 267.0 54.94% 381.0 78.40% 0.0 0.00%156-160 HIGHLAND STREET ROX Electrician 07/07/2017

PLACETAILOR INC. 4,657.0 3,596.0 77.22% 2,458.0 52.78% 264.0 5.67%156-160 HIGHLAND STREET ROX Carpenter 07/07/2017

PLACETAILOR INC. 933.0 933.0 100.00% 933.0 100.00% 0.0 0.00%156-160 HIGHLAND STREET ROX Laborer 07/07/2017

6,707.0 4,922.0 73.39% 3,898.0 58.12% 264.0 3.94%SUB TOTALS:

174 WEST SECOND STREET

$220,000Amount:

Gen Contractor: S & R CORPORATION

(978)441-2002 706 BROADWAY STREET LOWELL

Est Start Date:

Est End Date:

04/10/2017

07/10/2017

F & R LEONE INC. 16.0 0.0 0.00% 0.0 0.00% 0.0 0.00%174 WEST SECOND STREET Pipelayer 07/22/2017

VALLETTA MECHANICAL 3.0 0.0 0.00% 0.0 0.00% 0.0 0.00%174 WEST SECOND STREET Plumber 09/02/2017

S & R CORPORATION 16.0 0.0 0.00% 0.0 0.00% 8.0 50.00%174 WEST SECOND STREET Surveyor 08/26/2017

S & R CORPORATION 150.0 26.5 17.67% 55.5 37.00% 26.5 17.67%174 WEST SECOND STREET Laborer 08/12/2017

S & R CORPORATION 71.0 0.0 0.00% 0.0 0.00% 0.0 0.00%174 WEST SECOND STREET Equipment Opera 08/12/2017

Page 7: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 7

Project Name Trade Latest Week

S & R CORPORATION 112.0 0.0 0.00% 32.0 28.57% 0.0 0.00%174 WEST SECOND STREET Asbestos Worker 05/13/2017

FIRST CHOICE FENCE INC. 16.0 0.0 0.00% 0.0 0.00% 0.0 0.00%174 WEST SECOND STREET Laborer 09/02/2017

F & R LEONE INC. 32.0 0.0 0.00% 0.0 0.00% 0.0 0.00%174 WEST SECOND STREET Equipment Opera 07/22/2017

O’LOUGHLIN ELECTRIC LLC 8.0 0.0 0.00% 0.0 0.00% 0.0 0.00%174 WEST SECOND STREET Electrician 07/29/2017

424.0 26.5 6.25% 87.5 20.64% 34.5 8.14%SUB TOTALS:

1921-1925 DOCHESTER AVE. DORCHE

$7,500Amount:

Gen Contractor: MOSHER DYNAMICS LLC.

(617)469-4400 4190 WASHINGTON STREET ROSILINDALE rosilindale

Est Start Date:

Est End Date:

11/10/2014

12/05/2014

THE SIGN POST 29.5 29.5 100.00% 29.5 100.00% 0.0 0.00%1921-1925 DOCHESTER AVE. DO Laborer 12/05/2014

MOSHER DYNAMICS LLC. 29.5 29.5 100.00% 29.5 100.00% 0.0 0.00%1921-1925 DOCHESTER AVE. DO Laborer 12/05/2014

59.0 59.0 100.00% 59.0 100.00% 0.0 0.00%SUB TOTALS:

194-200 BLUE HILL AVE. LLC.

$30,000Amount:

Gen Contractor:

Est Start Date:

Est End Date:

10/24/2016

11/10/2016

WINSTON MARSHALL 184.0 184.0 100.00% 184.0 100.00% 0.0 0.00%194-200 BLUE HILL AVE. LLC. Laborer 11/10/2016

WINSTON MARSHALL 312.0 312.0 100.00% 312.0 100.00% 0.0 0.00%194-200 BLUE HILL AVE. LLC. Carpenter 11/10/2016

496.0 496.0 100.00% 496.0 100.00% 0.0 0.00%SUB TOTALS:

20 SOMERSET STREET

$49,000,000Amount:

Gen Contractor: SUFFOLK CONSTRUCTION CO.

(617)445-3500 64 ALLERTON STREET roxbury

Est Start Date:

Est End Date:

07/01/2013

06/01/2015

MLS SHEET METAL 5,907.0 1,028.0 17.40% 805.0 13.63% 0.0 0.00%20 SOMERSET STREET Sheetmetal Work 02/28/2015

P.J. SPILLANE COMPANY 2,179.0 858.5 39.40% 777.0 35.66% 0.0 0.00%20 SOMERSET STREET Bricklayer 09/05/2015

NEWROADS ENVIRONMENTAL 208.0 0.0 0.00% 208.0 100.00% 0.0 0.00%20 SOMERSET STREET Laborer 10/18/2014

NEW ENGLAND FOUNDATION 306.0 0.0 0.00% 0.0 0.00% 0.0 0.00%20 SOMERSET STREET Piledriver 04/26/2014

G & C CONCRETE CO. 6,789.0 1,157.5 17.05% 1,262.5 18.60% 0.0 0.00%20 SOMERSET STREET Iron Worker 06/27/2015

NEW ENGLAND FOUNDATION 277.5 0.0 0.00% 0.0 0.00% 0.0 0.00%20 SOMERSET STREET Oiler 03/15/2014

NEW ENGLAND FOUNDATION 2,010.0 1,681.5 83.66% 563.5 28.03% 0.0 0.00%20 SOMERSET STREET Laborer 04/26/2014

K & K ACOUSTICAL CEILINGS 2,632.0 268.0 10.18% 503.0 19.11% 0.0 0.00%20 SOMERSET STREET Carpenter 08/23/2015

THE NORTHERN CORP. 242.5 0.0 0.00% 0.0 0.00% 0.0 0.00%20 SOMERSET STREET Elev Const Helper 04/09/2015

MIW CORP 6,020.5 1,521.0 25.26% 869.0 14.43% 0.0 0.00%20 SOMERSET STREET Iron Worker 08/29/2015

M.L. MCDONALD SALES 1,516.0 600.0 39.58% 1,096.0 72.30% 0.0 0.00%20 SOMERSET STREET Painter 08/18/2015

M.L. MCDONALD SALES 40.0 40.0 100.00% 40.0 100.00% 0.0 0.00%20 SOMERSET STREET Laborer 03/31/2015

LIBERTY CONST. SERVICES 8,391.0 3,104.5 37.00% 3,058.0 36.44% 388.0 4.62%20 SOMERSET STREET Laborer 09/13/2015

LIBERTY CONST. SERVICES 154.5 9.0 5.83% 0.0 0.00% 0.0 0.00%20 SOMERSET STREET Carpenter 09/13/2015

P.J. SPILLANE COMPANY 321.5 15.0 4.67% 45.0 14.00% 0.0 0.00%20 SOMERSET STREET Mason Tender 08/01/2015

NEW ENGLAND FOUNDATION 672.0 336.5 50.07% 0.0 0.00% 0.0 0.00%20 SOMERSET STREET Equipment Opera 03/15/2014

Page 8: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 8

Project Name Trade Latest Week

SOEP PAINTING CORP. 740.0 58.0 7.84% 8.0 1.08% 0.0 0.00%20 SOMERSET STREET Carpenter 05/10/2015

JULIAN CRANE & EQUIPMENT 50.0 32.0 64.00% 32.0 64.00% 0.0 0.00%20 SOMERSET STREET Iron Worker 02/22/2015

VER - TEX C.S.I. 429.0 113.5 26.46% 212.5 49.53% 0.0 0.00%20 SOMERSET STREET Carpenter 08/08/2015

URBAN INSULATION 916.0 0.0 0.00% 0.0 0.00% 0.0 0.00%20 SOMERSET STREET Asbestos Worker 06/07/2015

UNITED STONE AND SITE 3,359.5 940.5 28.00% 1,709.5 50.89% 531.5 15.82%20 SOMERSET STREET Mason 09/13/2015

UNITED STONE AND SITE 1,528.5 426.0 27.87% 72.0 4.71% 0.0 0.00%20 SOMERSET STREET Laborer 09/06/2015

SUNRISE ERECTORS INC. 5,484.0 1,629.5 29.71% 618.5 11.28% 0.0 0.00%20 SOMERSET STREET Carpenter 08/16/2015

THE NORTHERN CORP. 185.0 0.0 0.00% 0.0 0.00% 0.0 0.00%20 SOMERSET STREET Carpenter 06/27/2015

PAVILION FLOORS, INC. 1,991.0 368.0 18.48% 1,124.0 56.45% 0.0 0.00%20 SOMERSET STREET Carpet Layer 08/15/2015

SCHNABEL FOUNDATION CO. 438.5 220.0 50.17% 116.0 26.45% 0.0 0.00%20 SOMERSET STREET Laborer 04/01/2014

SCHNABEL FOUNDATION CO. 294.0 0.0 0.00% 0.0 0.00% 0.0 0.00%20 SOMERSET STREET Equipment Opera 03/25/2014

SCHNABEL FOUNDATION CO. 639.5 0.0 0.00% 0.0 0.00% 0.0 0.00%20 SOMERSET STREET Carpenter 04/01/2014

R.S. CONTRACTING CO 226.0 97.0 42.92% 0.0 0.00% 0.0 0.00%20 SOMERSET STREET Mason Tender 09/12/2014

R.S. CONTRACTING CO 208.0 96.0 46.15% 32.0 15.38% 0.0 0.00%20 SOMERSET STREET Mason 09/12/2014

PAVILION FLOORS, INC. 16.0 0.0 0.00% 8.0 50.00% 0.0 0.00%20 SOMERSET STREET Floor Layer 06/27/2015

THE NORTHERN CORP. 528.8 0.0 0.00% 0.0 0.00% 0.0 0.00%20 SOMERSET STREET Elevator Const(M 05/28/2015

COMPONENT ASSEMBLY SYS 5,367.0 475.0 8.85% 2,087.0 38.89% 0.0 0.00%20 SOMERSET STREET Taper 09/08/2015

G & C CONCRETE CO. 15,459.0 4,379.5 28.33% 2,537.0 16.41% 876.0 5.67%20 SOMERSET STREET Carpenter 07/18/2015

FOOD EQUIP. INSTALL INC. 48.0 0.0 0.00% 0.0 0.00% 0.0 0.00%20 SOMERSET STREET Millwright 09/27/2014

E. M. DUGGAN INC. 2,941.0 600.0 20.40% 600.0 20.40% 0.0 0.00%20 SOMERSET STREET Sprinkler Fitter 06/14/2015

DELTA BECKWITH ELEVATOR 2,268.8 0.0 0.00% 0.0 0.00% 0.0 0.00%20 SOMERSET STREET Elevator Const(M 05/28/2015

DELTA BECKWITH ELEVATOR 707.0 0.0 0.00% 20.0 2.83% 0.0 0.00%20 SOMERSET STREET Elev Const Helper 04/09/2015

G & C CONCRETE CO. 3,564.5 9.0 0.25% 334.5 9.38% 0.0 0.00%20 SOMERSET STREET Cement Finisher 07/25/2015

CORPORATE MECHANICAL, IN 7,487.0 981.5 13.11% 893.5 11.93% 0.0 0.00%20 SOMERSET STREET HVAC 06/28/2015

COMPONENT ASSEMBLY SYS 72.0 0.0 0.00% 0.0 0.00% 0.0 0.00%20 SOMERSET STREET Plasterer 04/14/2015

COMPONENT ASSEMBLY SYS 4,774.0 250.0 5.24% 198.0 4.15% 0.0 0.00%20 SOMERSET STREET Laborer 06/09/2015

ATLANTIC CONTRACTING 5,007.5 823.5 16.45% 1,118.0 22.33% 314.0 6.27%20 SOMERSET STREET Insulator 06/28/2015

ARCHER CORPORATION 1,709.0 0.0 0.00% 0.0 0.00% 0.0 0.00%20 SOMERSET STREET Carpenter 09/04/2015

AMERICAN PLUMBING HEATIN 8,423.0 775.0 9.20% 1,937.5 23.00% 114.0 1.35%20 SOMERSET STREET Plumber 06/26/2015

ALDON ELECTRIC INC. 27,773.0 6,490.0 23.37% 5,069.0 18.25% 1,887.0 6.79%20 SOMERSET STREET Electrician 08/12/2015

JULIAN CRANE & EQUIPMENT 2,675.0 0.0 0.00% 43.5 1.63% 0.0 0.00%20 SOMERSET STREET Equipment Opera 07/05/2015

DANIEL MARR & SON CO. 1,078.0 314.0 29.13% 168.0 15.58% 0.0 0.00%20 SOMERSET STREET Iron Worker 03/01/2015

J. K. GLASS CO. INC. 8,293.0 133.0 1.60% 133.0 1.60% 707.5 8.53%20 SOMERSET STREET Glazier 09/06/2015

COMPONENT ASSEMBLY SYS 20,617.0 6,018.0 29.19% 6,623.0 32.12% 144.0 0.70%20 SOMERSET STREET Carpenter 09/08/2015

Page 9: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 9

Project Name Trade Latest Week

G & C CONCRETE CO. 141.0 0.0 0.00% 18.5 13.12% 0.0 0.00%20 SOMERSET STREET Cement Laborer 07/11/2015

JULIAN CRANE & EQUIPMENT 340.0 0.0 0.00% 0.0 0.00% 0.0 0.00%20 SOMERSET STREET Elevator Const(M 02/22/2015

JDC DEMOLITION COMPANY, I 344.0 56.0 16.28% 128.0 37.21% 0.0 0.00%20 SOMERSET STREET Laborer 11/30/2013

J. K. GLASS CO. INC. 3,811.5 1,772.5 46.50% 1,733.5 45.48% 8.0 0.21%20 SOMERSET STREET Iron Worker 06/14/2015

J. K. GLASS CO. INC. 3,316.5 302.5 9.12% 0.0 0.00% 444.5 13.40%20 SOMERSET STREET Carpenter 08/02/2015

J. DERENZO CO. 6,872.5 4,197.0 61.07% 2,955.5 43.00% 0.0 0.00%20 SOMERSET STREET Laborer 08/01/2015

G & C CONCRETE CO. 13,248.0 5,361.0 40.47% 7,050.5 53.22% 0.0 0.00%20 SOMERSET STREET Laborer 08/08/2015

G & C CONCRETE CO. 1,823.5 0.0 0.00% 0.0 0.00% 0.0 0.00%20 SOMERSET STREET Equipment Opera 06/27/2015

JDC DEMOLITION COMPANY, I 56.0 0.0 0.00% 0.0 0.00% 0.0 0.00%20 SOMERSET STREET Equipment Opera 11/23/2013

G & C CONCRETE CO. 1,682.0 1,464.0 87.04% 1,464.0 87.04% 1,464.0 87.04%20 SOMERSET STREET Oiler 11/15/2014

J. DERENZO CO. 3,800.5 103.0 2.71% 103.0 2.71% 0.0 0.00%20 SOMERSET STREET Equipment Opera 08/01/2015

GREENWOOD INDUSTRIES IN 1,810.5 115.0 6.35% 203.3 11.23% 0.0 0.00%20 SOMERSET STREET Roofer 07/25/2015

GREENWOOD INDUSTRIES IN 627.0 3.0 0.48% 312.0 49.76% 0.0 0.00%20 SOMERSET STREET Sheetmetal Work 07/25/2015

INTERBUILD INC. 163.0 0.0 0.00% 0.0 0.00% 0.0 0.00%20 SOMERSET STREET Carpenter 07/18/2015

211,000.0 49,222.5 23.33% 48,889.8 23.17% 6,878.5 3.26%SUB TOTALS:

200-300 FAN PIER 4 BLVD.

$150,000,000Amount:

Gen Contractor: TURNER CONSTRUCTION CO.

(617)247-6400 TWO SEAPORT LANE BOSTON

Est Start Date:

Est End Date:

01/01/2016

03/14/2016

S & F CONCRETE 746.0 0.0 0.00% 0.0 0.00% 0.0 0.00%200-300 FAN PIER 4 BLVD. Equipment Opera 08/19/2017

TURNER CONSTRUCTION CO. 46,232.0 21,084.0 45.60% 9,972.0 21.57% 829.0 1.79%200-300 FAN PIER 4 BLVD. Laborer 09/17/2017

MASSEY'S PLATE GLASS & AL 439.0 0.0 0.00% 0.0 0.00% 0.0 0.00%200-300 FAN PIER 4 BLVD. Equipment Opera 09/16/2017

MASSEY'S PLATE GLASS & AL 4,657.0 2,288.0 49.13% 1,128.0 24.22% 0.0 0.00%200-300 FAN PIER 4 BLVD. Carpenter 09/16/2017

MASSEY'S PLATE GLASS & AL 4,265.0 2,407.0 56.44% 984.0 23.07% 1,540.0 36.11%200-300 FAN PIER 4 BLVD. Iron Worker 09/16/2017

NH STEEL FABRICATORS INC 3,526.0 1,318.0 37.38% 741.0 21.02% 274.0 7.77%200-300 FAN PIER 4 BLVD. Iron Worker 09/19/2017

NORTHSTAR FIRE PROTECTIO 1,403.0 0.0 0.00% 537.0 38.28% 0.0 0.00%200-300 FAN PIER 4 BLVD. Asbestos Worker 05/15/2016

PRIME STEEL ERECTING INC, 34,874.0 14,790.5 42.41% 11,537.0 33.08% 3,187.5 9.14%200-300 FAN PIER 4 BLVD. Iron Worker 09/16/2017

S & F CONCRETE 62.5 27.0 43.20% 38.0 60.80% 0.0 0.00%200-300 FAN PIER 4 BLVD. Cement Finisher 01/07/2017

MASSEY'S PLATE GLASS & AL 5,139.0 1,132.0 22.03% 1,820.0 35.42% 0.0 0.00%200-300 FAN PIER 4 BLVD. Glazier 09/16/2017

S & F CONCRETE 2,203.5 214.0 9.71% 1,010.5 45.86% 0.0 0.00%200-300 FAN PIER 4 BLVD. Laborer 09/16/2017

S & F CONCRETE 2,318.0 847.5 36.56% 1,084.0 46.76% 0.0 0.00%200-300 FAN PIER 4 BLVD. Mason 09/16/2017

SAFWAY SERVICES LLC. 292.0 0.0 0.00% 8.0 2.74% 0.0 0.00%200-300 FAN PIER 4 BLVD. Carpenter 08/05/2017

SAFWAY SERVICES LLC. 1,027.5 0.0 0.00% 0.0 0.00% 519.5 50.56%200-300 FAN PIER 4 BLVD. Elevator Const(M 09/16/2017

SAFWAY SERVICES LLC. 208.0 0.0 0.00% 0.0 0.00% 0.0 0.00%200-300 FAN PIER 4 BLVD. Iron Worker 09/02/2017

SAFWAY SERVICES LLC. 223.0 89.0 39.91% 167.0 74.89% 0.0 0.00%200-300 FAN PIER 4 BLVD. Laborer 08/19/2017

SOUTH COAST STEEL LLC. 1,942.0 913.0 47.01% 703.0 36.20% 104.0 5.36%200-300 FAN PIER 4 BLVD. Iron Worker 07/02/2016

Page 10: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 10

Project Name Trade Latest Week

TURNER CONSTRUCTION CO. 27,436.5 6,351.5 23.15% 3,349.5 12.21% 1,570.5 5.72%200-300 FAN PIER 4 BLVD. Carpenter 09/17/2017

MARSHALL ROOFING & SHEET 20.0 0.0 0.00% 0.0 0.00% 0.0 0.00%200-300 FAN PIER 4 BLVD. Sheetmetal Work 08/12/2017

FRED SALVUCCI CORP. 309.0 0.0 0.00% 0.0 0.00% 0.0 0.00%200-300 FAN PIER 4 BLVD. Bricklayer 09/16/2017

STATE ELECTRIC CO. 15,197.5 3,201.5 21.07% 5,248.5 34.54% 1,470.0 9.67%200-300 FAN PIER 4 BLVD. Electrician 09/17/2017

EAST COAST SLURRY CO. 6,062.0 3,294.5 54.35% 1,628.5 26.86% 0.0 0.00%200-300 FAN PIER 4 BLVD. Laborer 12/26/2016

A. A. WILL CORPORATION 7,911.0 2,539.0 32.09% 2,309.5 29.19% 144.0 1.82%200-300 FAN PIER 4 BLVD. Piledriver 08/07/2017

BEACON WATERPROOFING A 456.0 114.0 25.00% 136.0 29.82% 0.0 0.00%200-300 FAN PIER 4 BLVD. Bricklayer 09/15/2017

BEACON WATERPROOFING A 122.5 0.0 0.00% 60.0 48.98% 0.0 0.00%200-300 FAN PIER 4 BLVD. Laborer 09/01/2017

CENTURY DRYWALL INC, 6,152.5 1,049.0 17.05% 820.5 13.34% 0.0 0.00%200-300 FAN PIER 4 BLVD. Carpenter 09/16/2017

CENTURY DRYWALL INC, 5,725.5 1,523.0 26.60% 827.0 14.44% 8.0 0.14%200-300 FAN PIER 4 BLVD. Laborer 09/16/2017

CENTURY DRYWALL INC, 1,418.0 0.0 0.00% 326.0 22.99% 0.0 0.00%200-300 FAN PIER 4 BLVD. Plasterer 09/16/2017

CENTURY DRYWALL INC, 706.0 32.0 4.53% 352.0 49.86% 32.0 4.53%200-300 FAN PIER 4 BLVD. Taper 09/16/2017

MARSHALL ROOFING & SHEET 2,704.5 571.5 21.13% 1,226.5 45.35% 51.0 1.89%200-300 FAN PIER 4 BLVD. Roofer 09/16/2017

EAST COAST SLURRY CO. 7,278.5 602.0 8.27% 730.5 10.04% 800.0 10.99%200-300 FAN PIER 4 BLVD. Equipment Opera 08/29/2016

A. A. WILL CORPORATION 10,211.0 3,794.0 37.16% 2,727.0 26.71% 0.0 0.00%200-300 FAN PIER 4 BLVD. Laborer 09/18/2017

EAST COAST SLURRY CO. 2,618.5 25.5 0.97% 25.5 0.97% 0.0 0.00%200-300 FAN PIER 4 BLVD. Piledriver 08/15/2016

HARRINGTON AIR. 5,334.5 2,236.0 41.92% 1,392.0 26.09% 136.0 2.55%200-300 FAN PIER 4 BLVD. Sheetmetal Work 09/17/2017

FRED SALVUCCI CORP. 477.8 0.0 0.00% 477.8 100.00% 0.0 0.00%200-300 FAN PIER 4 BLVD. Mason Tender 09/16/2017

A. A. WILL CORPORATION 10,442.0 0.0 0.00% 356.0 3.41% 296.0 2.83%200-300 FAN PIER 4 BLVD. Equipment Opera 09/18/2017

J. C. CANNISTRARO INC. 7,343.0 2,202.0 29.99% 1,927.0 26.24% 0.0 0.00%200-300 FAN PIER 4 BLVD. Pipefitter 09/17/2017

J.C. HIGGINS CORP. 144.0 40.0 27.78% 40.0 27.78% 40.0 27.78%200-300 FAN PIER 4 BLVD. Plumber 04/09/2017

JWP/J C HIGGINS CORP. 7,020.0 1,865.0 26.57% 2,200.0 31.34% 946.0 13.48%200-300 FAN PIER 4 BLVD. Plumber 09/17/2017

LUND REBAR SERVICES, INC. 12,038.0 3,169.0 26.32% 2,553.0 21.21% 257.0 2.13%200-300 FAN PIER 4 BLVD. Iron Worker 09/17/2017

E. M. DUGGAN INC. 2,976.0 1,209.0 40.63% 413.0 13.88% 333.0 11.19%200-300 FAN PIER 4 BLVD. Sprinkler Fitter 09/17/2017

249,661.8 78,928.5 31.61% 58,855.3 23.57% 12,537.5 5.02%SUB TOTALS:

204-208 WASHINGTON STREET DORC

$40,000Amount:

Gen Contractor: WINSTON MARSHALL

(617)680-3339 39 FLOYD STREET dorchester

Est Start Date:

Est End Date:

10/03/2016

10/21/2016

WINSTON MARSHALL 308.0 308.0 100.00% 308.0 100.00% 0.0 0.00%204-208 WASHINGTON STREET Carpenter 10/21/2016

WINSTON MARSHALL 227.0 227.0 100.00% 227.0 100.00% 0.0 0.00%204-208 WASHINGTON STREET Laborer 10/21/2016

535.0 535.0 100.00% 535.0 100.00% 0.0 0.00%SUB TOTALS:

214-218 BOWDOIN STREET INC.

$30,000Amount:

Gen Contractor: VISION RESTORATION

(617)821-0959 6 BLAKEVILLE STREET boston

Est Start Date:

Est End Date:

01/04/2016

03/04/2016

ALLIANCER GLASS CORP. 90.0 0.0 0.00% 0.0 0.00% 0.0 0.00%214-218 BOWDOIN STREET INC. Glazier 03/04/2016

VISION RESTORATION 1,005.0 1,005.0 100.00% 790.0 78.61% 0.0 0.00%214-218 BOWDOIN STREET INC. Laborer 03/18/2016

Page 11: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 11

Project Name Trade Latest Week

1,095.0 1,005.0 91.78% 790.0 72.15% 0.0 0.00%SUB TOTALS:

21491 IMPROVEMENTS TO ALLANDAL

$492,091Amount:

Gen Contractor: SUMCO ECO - CONTRACTING

(978)744-1515 16 FRONT STREET SUITE 209 SALEM

Est Start Date:

Est End Date:

01/20/2016

10/01/2016

SUMCO ECO - CONTRACTING 331.0 0.0 0.00% 32.0 9.67% 0.0 0.00%21491 IMPROVEMENTS TO ALLA Equipment Opera 06/25/2016

SUMCO ECO - CONTRACTING 568.5 0.0 0.00% 129.0 22.69% 0.0 0.00%21491 IMPROVEMENTS TO ALLA Laborer 06/25/2016

SUMCO ECO - CONTRACTING 179.5 0.0 0.00% 0.0 0.00% 0.0 0.00%21491 IMPROVEMENTS TO ALLA Mason 06/04/2016

1,079.0 0.0 0.00% 161.0 14.92% 0.0 0.00%SUB TOTALS:

21491 PUDDING STONE GARDEN

$121,600Amount:

Gen Contractor: FLEMING BROS INC.

(781)843-4071 106 COLUMBIA STREET QUINCY

Est Start Date:

Est End Date:

11/04/2014

12/31/2014

FLEMING BROS INC. 8.0 0.0 0.00% 0.0 0.00% 0.0 0.00%21491 PUDDING STONE GARDE Equipment Opera 05/15/2015

FLEMING BROS INC. 16.0 8.0 50.00% 8.0 50.00% 0.0 0.00%21491 PUDDING STONE GARDE Laborer 05/15/2015

24.0 8.0 33.33% 8.0 33.33% 0.0 0.00%SUB TOTALS:

22 BOSTON WHARF ROAD

$19,100,000Amount:

Gen Contractor: CONSIGLI CONSTRUCTION

197 MAIN STREET MILFORD

Est Start Date:

Est End Date:

11/01/2016

11/01/2018

SUNRISE ERECTORS INC. 62.5 0.0 0.00% 0.0 0.00% 0.0 0.00%22 BOSTON WHARF ROAD Iron Worker 09/17/2017

N.B. KENNEY CO. INC., 680.0 162.0 23.82% 162.0 23.82% 0.0 0.00%22 BOSTON WHARF ROAD Pipefitter 09/17/2017

T & T ELECTRICAL CO. 3,813.0 1,555.0 40.78% 116.0 3.04% 0.0 0.00%22 BOSTON WHARF ROAD Electrician 09/09/2017

N.B. KENNEY CO. INC., 1,402.0 501.0 35.73% 224.0 15.98% 64.0 4.56%22 BOSTON WHARF ROAD Plumber 09/17/2017

MCCUSKER-GILL INC. 1,317.0 195.0 14.81% 438.0 33.26% 0.0 0.00%22 BOSTON WHARF ROAD Sheetmetal Work 09/17/2017

RICMOR CONSTRUCTION INC. 340.0 96.0 28.24% 112.0 32.94% 0.0 0.00%22 BOSTON WHARF ROAD Laborer 09/19/2017

RICMOR CONSTRUCTION INC. 104.0 0.0 0.00% 0.0 0.00% 0.0 0.00%22 BOSTON WHARF ROAD Plasterer 09/19/2017

SOUTH COAST STEEL LLC. 136.0 76.0 55.88% 84.0 61.76% 16.0 11.76%22 BOSTON WHARF ROAD Iron Worker 08/19/2017

SUNRISE ERECTORS INC. 502.5 211.5 42.09% 149.5 29.75% 121.5 24.18%22 BOSTON WHARF ROAD Glazier 09/17/2017

DANIEL KOURY CONSTRUCTI 8,277.0 1,703.0 20.58% 1,134.5 13.71% 0.0 0.00%22 BOSTON WHARF ROAD Iron Worker 09/09/2017

SUNRISE ERECTORS INC. 275.5 20.0 7.26% 0.0 0.00% 0.0 0.00%22 BOSTON WHARF ROAD Carpenter 09/17/2017

J.M. ELECTRICAL CO. INC. 40.0 0.0 0.00% 0.0 0.00% 0.0 0.00%22 BOSTON WHARF ROAD Electrician 09/01/2017

DIVERSIFIED CONSTRUCTION 6,763.0 1,056.0 15.61% 3,844.0 56.84% 0.0 0.00%22 BOSTON WHARF ROAD Laborer 09/02/2017

COMPONENT ASSEMBLY SYS 40.0 0.0 0.00% 0.0 0.00% 0.0 0.00%22 BOSTON WHARF ROAD Taper 09/19/2017

COMPONENT ASSEMBLY SYS 457.0 0.0 0.00% 35.0 7.66% 0.0 0.00%22 BOSTON WHARF ROAD Laborer 09/19/2017

COMPONENT ASSEMBLY SYS 2,336.0 1,304.0 55.82% 96.0 4.11% 0.0 0.00%22 BOSTON WHARF ROAD Carpenter 09/19/2017

BEACON FIRE PROTECTION, I 192.0 0.0 0.00% 0.0 0.00% 0.0 0.00%22 BOSTON WHARF ROAD Sprinkler Fitter 09/08/2017

BACK BAY CONCRETE 315.5 0.0 0.00% 129.0 40.89% 8.0 2.54%22 BOSTON WHARF ROAD Laborer 08/23/2017

BACK BAY CONCRETE 312.5 56.0 17.92% 26.5 8.48% 0.0 0.00%22 BOSTON WHARF ROAD Cement Finisher 08/23/2017

Page 12: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 12

Project Name Trade Latest Week

GREENWOOD INDUSTRIES IN 1,564.0 370.3 23.67% 797.3 50.98% 306.8 19.61%22 BOSTON WHARF ROAD Roofer 09/09/2017

K & K ACOUSTICAL CEILINGS 4.0 0.0 0.00% 0.0 0.00% 0.0 0.00%22 BOSTON WHARF ROAD Carpenter 07/23/2017

28,933.5 7,305.8 25.25% 7,347.8 25.40% 516.3 1.78%SUB TOTALS:

224 BOSTON STREET

$15,000Amount:

Gen Contractor:

Est Start Date:

Est End Date:

07/16/2016

07/29/2016

CUTLER CONSTRUCTION INC. 30.0 30.0 100.00% 0.0 0.00% 0.0 0.00%224 BOSTON STREET Bricklayer 07/29/2016

CUTLER CONSTRUCTION INC. 120.0 0.0 0.00% 0.0 0.00% 0.0 0.00%224 BOSTON STREET Carpenter 07/29/2016

150.0 30.0 20.00% 0.0 0.00% 0.0 0.00%SUB TOTALS:

22955 IMPROVEMENT TO VARIOUS C

$249,000Amount:

Gen Contractor: FLEMING BROS INC.

(781)843-4071 106 COLUMBIA STREET QUINCY

Est Start Date:

Est End Date:

09/12/2016

10/30/2016

FLEMING BROS INC. 96.0 0.0 0.00% 0.0 0.00% 0.0 0.00%22955 IMPROVEMENT TO VARIO Equipment Opera 09/23/2016

FLEMING BROS INC. 152.0 56.0 36.84% 56.0 36.84% 0.0 0.00%22955 IMPROVEMENT TO VARIO Laborer 09/23/2016

E. J. PAVING COMPANY INC. 131.5 0.0 0.00% 108.5 82.51% 0.0 0.00%22955 IMPROVEMENT TO VARIO Laborer 09/17/2016

379.5 56.0 14.76% 164.5 43.35% 0.0 0.00%SUB TOTALS:

22955 IMPROVEMENTS TO GARVEY

$85,000Amount:

Gen Contractor: FLEMING BROS INC.

(781)843-4071 106 COLUMBIA STREET QUINCY

Est Start Date:

Est End Date:

02/03/2015

05/04/2015

E. J. PAVING COMPANY INC. 18.0 0.0 0.00% 15.0 83.33% 0.0 0.00%22955 IMPROVEMENTS TO GAR Laborer 05/02/2015

FLEMING BROS INC. 88.0 56.0 63.64% 0.0 0.00% 0.0 0.00%22955 IMPROVEMENTS TO GAR Equipment Opera 04/17/2015

FLEMING BROS INC. 56.0 24.0 42.86% 24.0 42.86% 0.0 0.00%22955 IMPROVEMENTS TO GAR Laborer 04/17/2015

162.0 80.0 49.38% 39.0 24.07% 0.0 0.00%SUB TOTALS:

22955 IMPROVEMENTS TO RYAN ST H

$287,380Amount:

Gen Contractor: FLEMING BROS INC.

(781)843-4071 106 COLUMBIA STREET QUINCY

Est Start Date:

Est End Date:

10/01/2015

04/01/2016

MASS BAY ELECTRIC CORP. 8.0 8.0 100.00% 0.0 0.00% 8.0 100.00%22955 IMPROVEMENTS TO RYA Groundman 11/01/2015

E. J. PAVING COMPANY INC. 18.0 0.0 0.00% 9.0 50.00% 0.0 0.00%22955 IMPROVEMENTS TO RYA Laborer 10/17/2015

FLEMING BROS INC. 40.0 40.0 100.00% 0.0 0.00% 0.0 0.00%22955 IMPROVEMENTS TO RYA Equipment Opera 11/06/2015

FLEMING BROS INC. 80.0 80.0 100.00% 40.0 50.00% 0.0 0.00%22955 IMPROVEMENTS TO RYA Laborer 11/06/2015

MASS BAY ELECTRIC CORP. 8.0 0.0 0.00% 0.0 0.00% 0.0 0.00%22955 IMPROVEMENTS TO RYA Electrician 11/01/2015

154.0 128.0 83.12% 49.0 31.82% 8.0 5.19%SUB TOTALS:

22955 IMPROVEMENTS TO VARIOUS C

$341,500Amount:

Gen Contractor: FLEMING BROS INC.

(781)843-4071 106 COLUMBIA STREET QUINCY

Est Start Date:

Est End Date:

04/01/2017

06/30/2017

FLEMING BROS INC. 120.0 64.0 53.33% 32.0 26.67% 0.0 0.00%22955 IMPROVEMENTS TO VARI Laborer 05/12/2017

FLEMING BROS INC. 72.0 16.0 22.22% 0.0 0.00% 0.0 0.00%22955 IMPROVEMENTS TO VARI Equipment Opera 05/12/2017

Page 13: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 13

Project Name Trade Latest Week

192.0 80.0 41.67% 32.0 16.67% 0.0 0.00%SUB TOTALS:

22955 VARIOUS COURTS-FALLON, PA

$545,000Amount:

Gen Contractor: FLEMING BROS INC.

(781)843-4071 106 COLUMBIA STREET QUINCY

Est Start Date:

Est End Date:

06/01/2015

12/31/2015

FLEMING BROS INC. 184.0 72.0 39.13% 0.0 0.00% 0.0 0.00%22955 VARIOUS COURTS-FALLO Equipment Opera 05/15/2015

FLEMING BROS INC. 184.0 72.0 39.13% 72.0 39.13% 16.0 8.70%22955 VARIOUS COURTS-FALLO Laborer 05/15/2015

368.0 144.0 39.13% 72.0 19.57% 16.0 4.35%SUB TOTALS:

23077 GEORGE WRIGHT UTILITY CON

$39,574Amount:

Gen Contractor: THE CANNIFF COMPANY

(617) 799-7888 20-28 WASHINGTON STREET QUINCY

Est Start Date:

Est End Date:

12/01/2016

01/15/2017

THE CANNIFF COMPANY 120.0 0.0 0.00% 0.0 0.00% 0.0 0.00%23077 GEORGE WRIGHT UTILIT Laborer 12/25/2016

120.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SUB TOTALS:

23459 EDGERLY ROAD PLAYGROUND

$585,000Amount:

Gen Contractor: METRO EQUIPMENT CORP.

(781)843-1330 20 REX DRIVE STREET BRAINTR

Est Start Date:

Est End Date:

05/01/2014

06/30/2015

METRO EQUIPMENT CORP. 50.0 50.0 100.00% 0.0 0.00% 0.0 0.00%23459 EDGERLY ROAD PLAYGR Equipment Opera 07/12/2014

METRO EQUIPMENT CORP. 2,107.5 1,676.5 79.55% 1,081.5 51.32% 157.0 7.45%23459 EDGERLY ROAD PLAYGR Laborer 04/18/2015

2,157.5 1,726.5 80.02% 1,081.5 50.13% 157.0 7.28%SUB TOTALS:

23475 PATH IMPROVEMENTS FRANKL

$394,000Amount:

Gen Contractor: NELM CORPORATION

781/421-3380 135 INDUSTRIAL WAY ROCKLAND

Est Start Date:

Est End Date:

09/01/2016

01/31/2017

NELM CORPORATION 12.0 0.0 0.00% 0.0 0.00% 0.0 0.00%23475 PATH IMPROVEMENTS FR Equipment Opera 12/17/2016

NELM CORPORATION 1,412.0 438.0 31.02% 543.0 38.46% 0.0 0.00%23475 PATH IMPROVEMENTS FR Laborer 04/22/2017

1,424.0 438.0 30.76% 543.0 38.13% 0.0 0.00%SUB TOTALS:

23476 BOSTON COMMON PATHWAY I

$874,000Amount:

Gen Contractor: ARGUS CONSTRUCTION.

(781)275-7417 5 SHAWSHEEN AVENUE BEDFORD

Est Start Date:

Est End Date:

06/22/2015

11/04/2015

NATIONAL CONSTRUCTION RE 40.0 0.0 0.00% 25.0 62.50% 0.0 0.00%23476 BOSTON COMMON PATH Iron Worker 07/02/2015

SYSTEMS CONTRACTING, INC 91.0 0.0 0.00% 1.0 1.10% 0.0 0.00%23476 BOSTON COMMON PATH Electrician 12/12/2015

ARGUS CONSTRUCTION. 1,923.0 254.0 13.21% 373.0 19.40% 0.0 0.00%23476 BOSTON COMMON PATH Laborer 10/17/2015

ARGUS CONSTRUCTION. 392.0 0.0 0.00% 0.0 0.00% 0.0 0.00%23476 BOSTON COMMON PATH Equipment Opera 10/03/2015

2,446.0 254.0 10.38% 399.0 16.31% 0.0 0.00%SUB TOTALS:

23482 PATHWAY IMP. TO THE PUBLIC

$423,443Amount:

Gen Contractor: E. J. PAVING COMPANY INC.

(978)686-4500 101 LINDBURG AVENUE METHUEN

Est Start Date:

Est End Date:

06/10/2015

08/01/2015

E. J. PAVING COMPANY INC. 576.5 0.0 0.00% 280.5 48.66% 16.0 2.78%23482 PATHWAY IMP. TO THE P Laborer 04/02/2016

576.5 0.0 0.00% 280.5 48.66% 16.0 2.78%SUB TOTALS:

Page 14: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 14

Project Name Trade Latest Week

23571 IMPROVEMENTS TO ELLIOT NO

$955,000Amount:

Gen Contractor: METRO EQUIPMENT CORP.

(781)843-1330 20 REX DRIVE STREET BRAINTR

Est Start Date:

Est End Date:

10/13/2014

06/30/2015

MASS BAY ELECTRIC CORP. 8.0 0.0 0.00% 0.0 0.00% 0.0 0.00%23571 IMPROVEMENTS TO ELLI Electrician 10/12/2014

MASS BAY ELECTRIC CORP. 16.0 0.0 0.00% 0.0 0.00% 0.0 0.00%23571 IMPROVEMENTS TO ELLI Lineman 10/12/2014

METRO EQUIPMENT CORP. 2,272.0 1,835.0 80.77% 1,006.0 44.28% 0.0 0.00%23571 IMPROVEMENTS TO ELLI Laborer 06/20/2015

2,296.0 1,835.0 79.92% 1,006.0 43.82% 0.0 0.00%SUB TOTALS:

23573 MARY HANNON PLAYGROUND

$676,000Amount:

Gen Contractor: TASCO CONSTRUCTION

92 STONY BROOK ROAD belmont

Est Start Date:

Est End Date:

09/25/2015

06/30/2016

PROBUILT DESIGN CONSTRU 192.0 0.0 0.00% 128.0 66.67% 0.0 0.00%23573 MARY HANNON PLAYGRO Laborer 04/16/2016

TASCO CONSTRUCTION 404.0 0.0 0.00% 0.0 0.00% 0.0 0.00%23573 MARY HANNON PLAYGRO Equipment Opera 05/21/2016

TASCO CONSTRUCTION 512.0 328.0 64.06% 196.0 38.28% 0.0 0.00%23573 MARY HANNON PLAYGRO Laborer 05/14/2016

1,108.0 328.0 29.60% 324.0 29.24% 0.0 0.00%SUB TOTALS:

23599 SYMPHONY COMMUNITY PARK.

$562,000Amount:

Gen Contractor: D'ALLESSANDRO CORPORATION

(508)559-6400 41 LEDIN DRIVE AVON

Est Start Date:

Est End Date:

09/08/2014

11/30/2014

D'ALLESSANDRO CORPORATI 1,102.5 389.0 35.28% 428.0 38.82% 8.0 0.73%23599 SYMPHONY COMMUNITY Laborer 05/30/2015

MASS BAY ELECTRIC CORP. 18.0 14.0 77.78% 8.0 44.44% 0.0 0.00%23599 SYMPHONY COMMUNITY Groundman 11/09/2014

MASS BAY ELECTRIC CORP. 24.0 0.0 0.00% 0.0 0.00% 0.0 0.00%23599 SYMPHONY COMMUNITY Lineman 04/05/2015

MASS BAY ELECTRIC CORP. 60.0 8.0 13.33% 8.0 13.33% 0.0 0.00%23599 SYMPHONY COMMUNITY Electrician 04/05/2015

D'ALLESSANDRO CORPORATI 451.0 0.0 0.00% 17.5 3.88% 0.0 0.00%23599 SYMPHONY COMMUNITY Equipment Opera 05/30/2015

D'ALLESSANDRO CORPORATI 56.0 0.0 0.00% 0.0 0.00% 0.0 0.00%23599 SYMPHONY COMMUNITY Carpenter 12/06/2014

D'ALLESSANDRO CORPORATI 2.0 0.0 0.00% 0.0 0.00% 0.0 0.00%23599 SYMPHONY COMMUNITY Iron Worker 11/15/2014

D'ALLESSANDRO CORPORATI 59.5 8.0 13.45% 8.0 13.45% 0.0 0.00%23599 SYMPHONY COMMUNITY Cement Finisher 05/16/2015

1,773.0 419.0 23.63% 469.5 26.48% 8.0 0.45%SUB TOTALS:

23601 PARIS STREET PLAYGROUND

$738,000Amount:

Gen Contractor: FLEMING BROS INC.

(781)843-4071 106 COLUMBIA STREET QUINCY

Est Start Date:

Est End Date:

11/01/2014

08/31/2015

MASS BAY ELECTRIC CORP. 48.0 0.0 0.00% 0.0 0.00% 0.0 0.00%23601 PARIS STREET PLAYGRO Lineman 05/17/2015

E. J. PAVING COMPANY INC. 18.0 0.0 0.00% 15.0 83.33% 0.0 0.00%23601 PARIS STREET PLAYGRO Laborer 05/02/2015

FLEMING BROS INC. 192.0 40.0 20.83% 0.0 0.00% 0.0 0.00%23601 PARIS STREET PLAYGRO Equipment Opera 04/24/2015

FLEMING BROS INC. 176.0 24.0 13.64% 24.0 13.64% 0.0 0.00%23601 PARIS STREET PLAYGRO Laborer 04/24/2015

MASS BAY ELECTRIC CORP. 25.0 0.0 0.00% 4.0 16.00% 0.0 0.00%23601 PARIS STREET PLAYGRO Electrician 05/17/2015

MASS BAY ELECTRIC CORP. 20.0 8.0 40.00% 8.0 40.00% 0.0 0.00%23601 PARIS STREET PLAYGRO Groundman 05/17/2015

479.0 72.0 15.03% 51.0 10.65% 0.0 0.00%SUB TOTALS:

Page 15: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 15

Project Name Trade Latest Week

23602 IACONO PLAYGROUND

$606,435Amount:

Gen Contractor: A & K CONSTRUCTION GROUP INC

781-666-3989 7 SYLVAN CIRCLE LYNNFIELD

Est Start Date:

Est End Date:

05/27/2014

09/12/2014

A & K CONSTRUCTION GROUP 165.0 0.0 0.00% 0.0 0.00% 0.0 0.00%23602 IACONO PLAYGROUND Equipment Opera 07/26/2014

A & K CONSTRUCTION GROUP 1,255.0 632.0 50.36% 981.0 78.17% 103.0 8.21%23602 IACONO PLAYGROUND Laborer 11/08/2014

1,420.0 632.0 44.51% 981.0 69.08% 103.0 7.25%SUB TOTALS:

23603 HORATIO HARRIS PARK IMPRO

$279,000Amount:

Gen Contractor: TASCO CONSTRUCTION

92 STONY BROOK ROAD belmont

Est Start Date:

Est End Date:

06/10/2015

10/27/2015

MASS BAY ELECTRIC CORP. 15.0 4.0 26.67% 0.0 0.00% 0.0 0.00%23603 HORATIO HARRIS PARK I Electrician 11/01/2015

MASS BAY ELECTRIC CORP. 9.0 0.0 0.00% 0.0 0.00% 0.0 0.00%23603 HORATIO HARRIS PARK I Groundman 10/18/2015

MASS BAY ELECTRIC CORP. 9.0 0.0 0.00% 0.0 0.00% 0.0 0.00%23603 HORATIO HARRIS PARK I Lineman 10/18/2015

TASCO CONSTRUCTION 308.0 0.0 0.00% 0.0 0.00% 0.0 0.00%23603 HORATIO HARRIS PARK I Equipment Opera 11/21/2015

TASCO CONSTRUCTION 344.0 280.0 81.40% 156.0 45.35% 0.0 0.00%23603 HORATIO HARRIS PARK I Laborer 11/21/2015

685.0 284.0 41.46% 156.0 22.77% 0.0 0.00%SUB TOTALS:

23604 IMPROVEMENTS TO HEMEWAY

$352,000Amount:

Gen Contractor: FLEMING BROS INC.

(781)843-4071 106 COLUMBIA STREET QUINCY

Est Start Date:

Est End Date:

03/23/2015

08/20/2015

FLEMING BROS INC. 360.0 160.0 44.44% 120.0 33.33% 0.0 0.00%23604 IMPROVEMENTS TO HEM Laborer 08/07/2015

FLEMING BROS INC. 200.0 0.0 0.00% 0.0 0.00% 0.0 0.00%23604 IMPROVEMENTS TO HEM Equipment Opera 08/07/2015

560.0 160.0 28.57% 120.0 21.43% 0.0 0.00%SUB TOTALS:

23630 IMPROVEMENTS TO ADAMS PA

$207,450Amount:

Gen Contractor: SEQUOIA CONSTRUCTION INC.

(781)447-8052 10 BUCKLEY AVE. UNIT 9 WHITMAN

Est Start Date:

Est End Date:

04/01/2014

12/31/2014

SEQUOIA CONSTRUCTION INC 974.5 186.5 19.14% 429.5 44.07% 8.0 0.82%23630 IMPROVEMENTS TO ADA Laborer 11/08/2014

SEQUOIA CONSTRUCTION INC 75.0 0.0 0.00% 0.0 0.00% 0.0 0.00%23630 IMPROVEMENTS TO ADA Equipment Opera 06/21/2014

MASS BAY ELECTRIC CORP. 23.0 12.0 52.17% 0.0 0.00% 0.0 0.00%23630 IMPROVEMENTS TO ADA Electrician 07/20/2014

1,072.5 198.5 18.51% 429.5 40.05% 8.0 0.75%SUB TOTALS:

23744 LITTLE SCOBIE PLAYGROUND I

$498,152Amount:

Gen Contractor: MACKAY CONSTRUCTION

(617)314-6213 84 WINNISIMMET CHELSEA

Est Start Date:

Est End Date:

06/01/2015

09/30/2015

LANDSCAPING ETC., INC. 50.7 0.0 0.00% 50.7 100.00% 0.0 0.00%23744 LITTLE SCOBIE PLAYGRO Laborer 10/10/2015

MACKAY CONSTRUCTION 17.0 0.0 0.00% 12.5 73.53% 0.0 0.00%23744 LITTLE SCOBIE PLAYGRO Carpenter 10/10/2015

MACKAY CONSTRUCTION 36.0 0.0 0.00% 36.0 100.00% 0.0 0.00%23744 LITTLE SCOBIE PLAYGRO Cement Finisher 10/17/2015

MACKAY CONSTRUCTION 457.0 0.0 0.00% 0.0 0.00% 0.0 0.00%23744 LITTLE SCOBIE PLAYGRO Equipment Opera 10/24/2015

MACKAY CONSTRUCTION 836.0 156.0 18.66% 820.0 98.09% 0.0 0.00%23744 LITTLE SCOBIE PLAYGRO Laborer 10/24/2015

1,396.7 156.0 11.17% 919.2 65.81% 0.0 0.00%SUB TOTALS:

Page 16: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 16

Project Name Trade Latest Week

23794 IMPROVEMENTS TO TAI TUNG

$127,740Amount:

Gen Contractor: FLEMING BROS INC.

(781)843-4071 106 COLUMBIA STREET QUINCY

Est Start Date:

Est End Date:

08/01/2016

10/01/2016

FLEMING BROS INC. 120.0 80.0 66.67% 40.0 33.33% 0.0 0.00%23794 IMPROVEMENTS TO TAI T Laborer 08/12/2016

120.0 80.0 66.67% 40.0 33.33% 0.0 0.00%SUB TOTALS:

23861 MCLAUGHLIN PARK

$456,700Amount:

Gen Contractor: SEQUOIA CONSTRUCTION INC.

(781)447-8052 10 BUCKLEY AVE. UNIT 9 WHITMAN

Est Start Date:

Est End Date:

06/01/2015

05/31/2016

SEQUOIA CONSTRUCTION INC 119.5 0.0 0.00% 0.0 0.00% 0.0 0.00%23861 MCLAUGHLIN PARK Equipment Opera 12/12/2015

SEQUOIA CONSTRUCTION INC 1,623.5 647.5 39.88% 826.5 50.91% 0.0 0.00%23861 MCLAUGHLIN PARK Laborer 06/04/2016

1,743.0 647.5 37.15% 826.5 47.42% 0.0 0.00%SUB TOTALS:

23862 IMPROVEMENTS TO SAVIN HILL

$209,000Amount:

Gen Contractor: RONALD A. MARINI CORPORATION

617.964.9605 14 ASPEN AVENUE AUBURNDALE

Est Start Date:

Est End Date:

07/22/2015

10/01/2015

RONALD A. MARINI CORPORA 512.0 152.0 29.69% 0.0 0.00% 0.0 0.00%23862 IMPROVEMENTS TO SAVI Laborer 08/14/2015

RONALD A. MARINI CORPORA 120.0 0.0 0.00% 0.0 0.00% 0.0 0.00%23862 IMPROVEMENTS TO SAVI Equipment Opera 08/07/2015

632.0 152.0 24.05% 0.0 0.00% 0.0 0.00%SUB TOTALS:

23886 DOHERTY-GIBSON PARK

$260,000Amount:

Gen Contractor: NEW ENGLAND DISTINCT PROPERTIES

978-681-5500 101 B LYNDBERG AVE METHUEN

Est Start Date:

Est End Date:

10/15/2014

06/30/2015

NEW ENGLAND DISTINCT PRO 640.5 0.0 0.00% 0.0 0.00% 0.0 0.00%23886 DOHERTY-GIBSON PARK Laborer 11/23/2014

640.5 0.0 0.00% 0.0 0.00% 0.0 0.00%SUB TOTALS:

23894 AMERICAN LEGION PLAYGROU

$433,267Amount:

Gen Contractor: TARGET CONSTRUCTION, LLC

(603)893-2229 14 PINEWOOD ROAD SALEM

Est Start Date:

Est End Date:

09/06/2015

06/30/2016

FORTE LANDSCAPE & CONST. 166.0 62.0 37.35% 90.5 54.52% 0.0 0.00%23894 AMERICAN LEGION PLAY Laborer 04/23/2016

TARGET CONSTRUCTION, LLC 353.0 0.0 0.00% 30.0 8.50% 0.0 0.00%23894 AMERICAN LEGION PLAY Laborer 04/23/2016

519.0 62.0 11.95% 120.5 23.22% 0.0 0.00%SUB TOTALS:

24004 JAMAICA POND OUTFALL PIPE

$127,400Amount:

Gen Contractor: NELM CORPORATION

781/421-3380 135 INDUSTRIAL WAY ROCKLAND

Est Start Date:

Est End Date:

08/15/2016

12/15/2016

NELM CORPORATION 321.0 56.0 17.45% 124.0 38.63% 0.0 0.00%24004 JAMAICA POND OUTFALL Laborer 05/06/2017

321.0 56.0 17.45% 124.0 38.63% 0.0 0.00%SUB TOTALS:

24008 IMPROVEMENTS TO CHILDREN'

$948,000Amount:

Gen Contractor: METRO EQUIPMENT CORP.

(781)843-1330 20 REX DRIVE STREET BRAINTR

Est Start Date:

Est End Date:

06/01/2016

09/28/2016

METRO EQUIPMENT CORP. 56.0 56.0 100.00% 0.0 0.00% 0.0 0.00%24008 IMPROVEMENTS TO CHIL Equipment Opera 06/18/2016

METRO EQUIPMENT CORP. 136.0 136.0 100.00% 136.0 100.00% 0.0 0.00%24008 IMPROVEMENTS TO CHIL Laborer 07/02/2016

192.0 192.0 100.00% 136.0 70.83% 0.0 0.00%SUB TOTALS:

Page 17: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 17

Project Name Trade Latest Week

24009 RACHEL REVERE SQUARE

$352,000Amount:

Gen Contractor: FLEMING BROS INC.

(781)843-4071 106 COLUMBIA STREET QUINCY

Est Start Date:

Est End Date:

06/01/2016

06/30/2017

FLEMING BROS INC. 200.0 0.0 0.00% 0.0 0.00% 0.0 0.00%24009 RACHEL REVERE SQUAR Equipment Opera 12/02/2016

FLEMING BROS INC. 360.0 160.0 44.44% 48.0 13.33% 0.0 0.00%24009 RACHEL REVERE SQUAR Laborer 12/02/2016

560.0 160.0 28.57% 48.0 8.57% 0.0 0.00%SUB TOTALS:

24021 IMPROVEMENTS TO BOSTON C

$2,799Amount:

Gen Contractor: FLEMING BROS INC.

(781)843-4071 106 COLUMBIA STREET QUINCY

Est Start Date:

Est End Date:

04/01/2017

08/31/2017

BRENNAN CONCRETE FINISHI 16.0 0.0 0.00% 0.0 0.00% 0.0 0.00%24021 IMPROVEMENTS TO BOS Cement Finisher 07/28/2017

BRENNAN CONCRETE FINISHI 24.0 0.0 0.00% 0.0 0.00% 0.0 0.00%24021 IMPROVEMENTS TO BOS Cement Laborer 07/28/2017

FLEMING BROS INC. 928.0 816.0 87.93% 0.0 0.00% 0.0 0.00%24021 IMPROVEMENTS TO BOS Equipment Opera 09/08/2017

FLEMING BROS INC. 1,648.0 1,480.0 89.81% 992.0 60.19% 0.0 0.00%24021 IMPROVEMENTS TO BOS Laborer 09/08/2017

GILMAR BASTESTIN MASONRY 88.0 0.0 0.00% 88.0 100.00% 0.0 0.00%24021 IMPROVEMENTS TO BOS Mason 07/28/2017

2,704.0 2,296.0 84.91% 1,080.0 39.94% 0.0 0.00%SUB TOTALS:

24067 PARKMAN PLAYGROUND

$410,500Amount:

Gen Contractor: FLEMING BROS INC.

(781)843-4071 106 COLUMBIA STREET QUINCY

Est Start Date:

Est End Date:

07/01/2016

10/01/2016

FLEMING BROS INC. 184.0 184.0 100.00% 0.0 0.00% 0.0 0.00%24067 PARKMAN PLAYGROUND Equipment Opera 07/29/2016

FLEMING BROS INC. 368.0 368.0 100.00% 184.0 50.00% 0.0 0.00%24067 PARKMAN PLAYGROUND Laborer 07/29/2016

552.0 552.0 100.00% 184.0 33.33% 0.0 0.00%SUB TOTALS:

24214 FIELD RENOVATIONS @ MOAKL

$333,000Amount:

Gen Contractor: NELM CORPORATION

781/421-3380 135 INDUSTRIAL WAY ROCKLAND

Est Start Date:

Est End Date:

09/15/2016

01/13/2017

NELM CORPORATION 72.0 0.0 0.00% 0.0 0.00% 0.0 0.00%24214 FIELD RENOVATIONS @ Equipment Opera 10/01/2016

NELM CORPORATION 333.0 101.0 30.33% 105.0 31.53% 0.0 0.00%24214 FIELD RENOVATIONS @ Laborer 05/20/2017

405.0 101.0 24.94% 105.0 25.93% 0.0 0.00%SUB TOTALS:

24215 IMPROVEMENTS TO RONAN PA

$287,900Amount:

Gen Contractor: RONALD A. MARINI CORPORATION

617.964.9605 14 ASPEN AVENUE AUBURNDALE

Est Start Date:

Est End Date:

10/03/2016

01/31/2017

RONALD A. MARINI CORPORA 438.0 224.0 51.14% 48.0 10.96% 0.0 0.00%24215 IMPROVEMENTS TO RON Laborer 11/23/2016

RONALD A. MARINI CORPORA 28.0 0.0 0.00% 0.0 0.00% 0.0 0.00%24215 IMPROVEMENTS TO RON Mason Tender 11/16/2016

RONALD A. MARINI CORPORA 348.0 0.0 0.00% 0.0 0.00% 0.0 0.00%24215 IMPROVEMENTS TO RON Equipment Opera 11/23/2016

814.0 224.0 27.52% 48.0 5.90% 0.0 0.00%SUB TOTALS:

24220 IMPROVEMENTS TO HEALY PL

$581,500Amount:

Gen Contractor: FLEMING BROS INC.

(781)843-4071 106 COLUMBIA STREET QUINCY

Est Start Date:

Est End Date:

04/01/2017

06/30/2017

FLEMING BROS INC. 200.0 0.0 0.00% 0.0 0.00% 0.0 0.00%24220 IMPROVEMENTS TO HEAL Equipment Opera 07/07/2017

Page 18: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 18

Project Name Trade Latest Week

FLEMING BROS INC. 480.0 280.0 58.33% 120.0 25.00% 0.0 0.00%24220 IMPROVEMENTS TO HEAL Laborer 07/07/2017

680.0 280.0 41.18% 120.0 17.65% 0.0 0.00%SUB TOTALS:

24231 MEDAL OF HONOR PARK PATH

$288,380Amount:

Gen Contractor: E. J. PAVING COMPANY INC.

(978)686-4500 101 LINDBURG AVENUE METHUEN

Est Start Date:

Est End Date:

08/01/2015

12/31/2015

E. J. PAVING COMPANY INC. 124.0 0.0 0.00% 48.0 38.71% 0.0 0.00%24231 MEDAL OF HONOR PARK Laborer 08/22/2015

124.0 0.0 0.00% 48.0 38.71% 0.0 0.00%SUB TOTALS:

24353 HAYDEN STREET STAIRWAY RE

$847,399Amount:

Gen Contractor: TASCO CONSTRUCTION

92 STONY BROOK ROAD belmont

Est Start Date:

Est End Date:

06/05/2017

12/31/2017

MARGUERITE CONCRETE 8.0 0.0 0.00% 0.0 0.00% 0.0 0.00%24353 HAYDEN STREET STAIRW Laborer 09/16/2017

8.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SUB TOTALS:

250 - 252 COLUMBIA ROAD

$200,000Amount:

Gen Contractor: CROSSWINDS ENTERPRISES

(617)445-5100 97 HUMBOLDT AVE. DORCHESTER

Est Start Date:

Est End Date:

10/01/2014

07/31/2015

RISE & SHINE CLEANING & CO 122.3 92.5 75.66% 122.3 100.00% 57.3 46.83%250 - 252 COLUMBIA ROAD Laborer 06/13/2015

N H K ELECTRICAL CONTRACT 1,084.0 668.0 61.62% 844.0 77.86% 0.0 0.00%250 - 252 COLUMBIA ROAD Electrician 03/28/2015

NG ENVIRONMENTAL CO. 232.0 40.0 17.24% 232.0 100.00% 0.0 0.00%250 - 252 COLUMBIA ROAD Laborer 10/18/2014

QINS CONSTRUCTION 2,984.0 1,256.0 42.09% 2,984.0 100.00% 0.0 0.00%250 - 252 COLUMBIA ROAD Carpenter 03/28/2015

4,422.3 2,056.5 46.50% 4,182.3 94.57% 57.3 1.29%SUB TOTALS:

30 DALTON STREET RESIDENCES

$100,000,000Amount:

Gen Contractor: SUFFOLK CONSTRUCTION CO.

(617)445-3500 64 ALLERTON STREET roxbury

Est Start Date:

Est End Date:

10/01/2014

04/20/2017

MURPHY SPECIALTIES, INC. 238.0 76.0 31.93% 0.0 0.00% 0.0 0.00%30 DALTON STREET RESIDENC Sheetmetal Work 01/23/2016

STANLEY & SONS INC. 6,825.0 2,840.0 41.61% 3,731.0 54.67% 250.5 3.67%30 DALTON STREET RESIDENC Carpenter 06/04/2016

SPECIALTY INSULATION GRO 294.0 0.0 0.00% 0.0 0.00% 0.0 0.00%30 DALTON STREET RESIDENC Carpenter 07/31/2016

R.S. CONTRACTING CO 789.0 0.0 0.00% 0.0 0.00% 0.0 0.00%30 DALTON STREET RESIDENC Mason Tender 12/04/2015

R.S. CONTRACTING CO 1,776.0 0.0 0.00% 1,672.0 94.14% 0.0 0.00%30 DALTON STREET RESIDENC Mason 12/04/2015

PRO CUT CONCRETE CUTTIN 16.0 0.0 0.00% 0.0 0.00% 0.0 0.00%30 DALTON STREET RESIDENC Laborer 11/01/2014

PAVILION FLOORS, INC. 1,516.0 277.0 18.27% 1,248.0 82.32% 32.0 2.11%30 DALTON STREET RESIDENC Carpet Layer 08/27/2016

OTIS ELEVATOR COMPANY 2,002.5 30.0 1.50% 467.0 23.32% 506.0 25.27%30 DALTON STREET RESIDENC Elev Const Helper 08/11/2016

STANLEY & SONS INC. 326.0 326.0 100.00% 0.0 0.00% 0.0 0.00%30 DALTON STREET RESIDENC Laborer 06/04/2016

MANGANARO NORTHEAST LL 25,057.5 6,057.5 24.17% 4,235.5 16.90% 1,947.0 7.77%30 DALTON STREET RESIDENC Carpenter 09/04/2016

M.L. MCDONALD SALES 11,817.0 5,315.0 44.98% 4,331.0 36.65% 2,796.0 23.66%30 DALTON STREET RESIDENC Painter 09/06/2016

M.L. MCDONALD SALES 128.0 0.0 0.00% 0.0 0.00% 0.0 0.00%30 DALTON STREET RESIDENC Laborer 09/06/2016

LIBERTY CONST. SERVICES 4.0 0.0 0.00% 0.0 0.00% 0.0 0.00%30 DALTON STREET RESIDENC Taper 08/02/2015

VALLEYCREST LANDSCAPE 153.5 0.0 0.00% 0.0 0.00% 0.0 0.00%30 DALTON STREET RESIDENC Equipment Opera 08/28/2016

Page 19: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 19

Project Name Trade Latest Week

OTIS ELEVATOR COMPANY 2,261.3 0.0 0.00% 144.8 6.40% 47.0 2.08%30 DALTON STREET RESIDENC Elevator Const(M 08/25/2016

STRUCTURES DEREK INTERN 733.0 0.0 0.00% 380.0 51.84% 0.0 0.00%30 DALTON STREET RESIDENC Iron Worker 04/16/2016

SUPERIOR RAIL& IRON WORK 3,944.0 1,853.0 46.98% 1,063.0 26.95% 24.0 0.61%30 DALTON STREET RESIDENC Iron Worker 07/19/2016

T & T ELECTRICAL CO. 40,352.5 14,589.5 36.16% 8,744.5 21.67% 0.0 0.00%30 DALTON STREET RESIDENC Electrician 09/03/2016

THE CHEVIOT CORPORATION 18,545.0 3,317.0 17.89% 989.0 5.33% 2,059.0 11.10%30 DALTON STREET RESIDENC Carpenter 09/02/2016

THE CHEVIOT CORPORATION 13,248.0 0.0 0.00% 2,518.0 19.01% 0.0 0.00%30 DALTON STREET RESIDENC Glazier 09/02/2016

THE CHEVIOT CORPORATION 5,470.0 2,964.0 54.19% 5,470.0 100.00% 0.0 0.00%30 DALTON STREET RESIDENC Iron Worker 09/02/2016

THE WELCH CORPORATION 3,349.0 1,055.0 31.50% 194.0 5.79% 0.0 0.00%30 DALTON STREET RESIDENC Equipment Opera 08/20/2016

THE WELCH CORPORATION 5,009.5 997.5 19.91% 396.0 7.90% 258.0 5.15%30 DALTON STREET RESIDENC Laborer 08/20/2016

UNION FLOORING INSTALL 7,565.0 4,388.0 58.00% 4,669.0 61.72% 0.0 0.00%30 DALTON STREET RESIDENC Floor Layer 08/13/2016

LIBERTY CONST. SERVICES 21,610.0 3,252.5 15.05% 6,176.5 28.58% 3,004.5 13.90%30 DALTON STREET RESIDENC Laborer 08/28/2016

VALLEYCREST LANDSCAPE 96.0 0.0 0.00% 40.0 41.67% 0.0 0.00%30 DALTON STREET RESIDENC Bricklayer 08/14/2016

M.L. MCDONALD SALES 1,268.0 44.0 3.47% 0.0 0.00% 0.0 0.00%30 DALTON STREET RESIDENC Taper 08/30/2016

VALLEYCREST LANDSCAPE 503.0 8.0 1.59% 16.0 3.18% 8.0 1.59%30 DALTON STREET RESIDENC Laborer 08/28/2016

VER-TEX CONSTRUCTION SPE 434.0 151.0 34.79% 228.5 52.65% 0.0 0.00%30 DALTON STREET RESIDENC Carpenter 08/20/2016

UNITED H.V.A.C. COMPANY, IN 6,499.5 3,634.0 55.91% 1,022.0 15.72% 224.0 3.45%30 DALTON STREET RESIDENC Sheetmetal Work 08/14/2016

DANIEL MARR & SON CO. 736.0 272.0 36.96% 64.0 8.70% 0.0 0.00%30 DALTON STREET RESIDENC Iron Worker 01/24/2016

LIBERTY CONST. SERVICES 6,090.5 1,848.0 30.34% 0.0 0.00% 1,875.0 30.79%30 DALTON STREET RESIDENC Equipment Opera 08/21/2016

G & C CONCRETE CO. 4,075.5 354.5 8.70% 1,617.5 39.69% 0.0 0.00%30 DALTON STREET RESIDENC Cement Finisher 08/20/2016

G & C CONCRETE CO. 22,264.0 5,404.5 24.27% 5,081.5 22.82% 540.5 2.43%30 DALTON STREET RESIDENC Carpenter 08/20/2016

E. M. DUGGAN INC. 5,654.0 1,885.0 33.34% 2,318.0 41.00% 0.0 0.00%30 DALTON STREET RESIDENC Sprinkler Fitter 08/21/2016

E. M. DUGGAN INC. 17,406.0 2,200.0 12.64% 1,320.0 7.58% 728.0 4.18%30 DALTON STREET RESIDENC Plumber 09/11/2016

G & C CONCRETE CO. 2,260.0 85.5 3.78% 0.0 0.00% 0.0 0.00%30 DALTON STREET RESIDENC Equipment Opera 08/06/2016

DRAPER METAL FABRICATION 42.0 21.0 50.00% 0.0 0.00% 0.0 0.00%30 DALTON STREET RESIDENC Elevator Const(M 04/02/2016

G & C CONCRETE CO. 12,437.5 4,529.0 36.41% 6,069.5 48.80% 0.0 0.00%30 DALTON STREET RESIDENC Iron Worker 08/06/2016

CENTURY DRYWALL INC, 16.0 0.0 0.00% 0.0 0.00% 0.0 0.00%30 DALTON STREET RESIDENC Plasterer 05/21/2016

CENTURY DRYWALL INC, 16.0 16.0 100.00% 0.0 0.00% 0.0 0.00%30 DALTON STREET RESIDENC Laborer 05/21/2016

BLUEGRASS CONCRETE CUTT 700.0 0.0 0.00% 0.0 0.00% 0.0 0.00%30 DALTON STREET RESIDENC Laborer 03/06/2016

BARON INDUSTRIES INC 152.0 0.0 0.00% 0.0 0.00% 0.0 0.00%30 DALTON STREET RESIDENC Iron Worker 04/09/2016

AXION SPECIALTY CONTRACTI 709.0 0.0 0.00% 260.0 36.67% 0.0 0.00%30 DALTON STREET RESIDENC Insulator 08/21/2016

ALLEGHENY CONTRACT FLOO 8,821.0 3,596.5 40.77% 2,272.5 25.76% 633.0 7.18%30 DALTON STREET RESIDENC Floor Layer 09/02/2016

E. M. DUGGAN INC. 4,878.0 1,900.0 38.95% 767.0 15.72% 154.0 3.16%30 DALTON STREET RESIDENC Pipefitter 08/21/2016

HERITAGE RESTORATION INC. 1,833.5 152.5 8.32% 249.0 13.58% 112.5 6.14%30 DALTON STREET RESIDENC Bricklayer 08/20/2016

LIBERTY CONST. SERVICES 685.0 0.0 0.00% 0.0 0.00% 0.0 0.00%30 DALTON STREET RESIDENC Elevator Const(M 04/17/2016

Page 20: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 20

Project Name Trade Latest Week

LIBERTY CONST. SERVICES 4,293.0 669.0 15.58% 8.0 0.19% 0.0 0.00%30 DALTON STREET RESIDENC Carpenter 08/28/2016

J.M. ELECTRICAL CO. INC. 1,190.0 474.0 39.83% 0.0 0.00% 0.0 0.00%30 DALTON STREET RESIDENC Electrician 08/19/2016

J & M BROWN ELECTRICAL 5,498.0 327.0 5.95% 555.0 10.09% 16.0 0.29%30 DALTON STREET RESIDENC Technician 08/26/2016

ABSOLUTE FINISHING SYSTE 16,961.5 5,411.5 31.90% 5,562.0 32.79% 1,311.0 7.73%30 DALTON STREET RESIDENC Taper 08/21/2016

G & C CONCRETE CO. 2,017.0 9.5 0.47% 483.0 23.95% 0.0 0.00%30 DALTON STREET RESIDENC Cement Laborer 08/20/2016

MANGANARO NORTHEAST LL 7,967.0 3,646.0 45.76% 3,286.0 41.25% 746.0 9.36%30 DALTON STREET RESIDENC Laborer 08/28/2016

ALL TIME SERVICE INC. 2,592.0 2,592.0 100.00% 2,592.0 100.00% 896.0 34.57%30 DALTON STREET RESIDENC Laborer 08/20/2016

HAYWARD BAKER INC. 3,548.0 1,382.0 38.95% 1,168.0 32.92% 0.0 0.00%30 DALTON STREET RESIDENC Piledriver 05/10/2015

HAYWARD BAKER INC. 367.5 256.0 69.66% 273.0 74.29% 0.0 0.00%30 DALTON STREET RESIDENC Laborer 04/12/2015

HAYWARD BAKER INC. 1,984.4 416.0 20.96% 416.0 20.96% 0.0 0.00%30 DALTON STREET RESIDENC Equipment Opera 04/12/2015

GREENWOOD INDUSTRIES IN 2,787.0 201.0 7.21% 883.0 31.68% 145.0 5.20%30 DALTON STREET RESIDENC Roofer 09/03/2016

G & C CONCRETE CO. 1,743.0 1,460.0 83.76% 1,244.0 71.37% 0.0 0.00%30 DALTON STREET RESIDENC Oiler 01/30/2016

G & C CONCRETE CO. 17,419.0 4,116.5 23.63% 9,625.5 55.26% 0.0 0.00%30 DALTON STREET RESIDENC Laborer 08/20/2016

HERITAGE RESTORATION INC. 592.5 24.5 4.14% 72.5 12.24% 0.0 0.00%30 DALTON STREET RESIDENC Laborer 07/30/2016

339,566.1 94,424.5 27.81% 93,922.8 27.66% 18,313.0 5.39%SUB TOTALS:

300 SARATOGA CAFÉ, INC.

$3,500Amount:

Gen Contractor:

Est Start Date:

Est End Date:

05/14/2017

05/18/2017

GABRIEL GARCIA 24.0 0.0 0.00% 24.0 100.00% 0.0 0.00%300 SARATOGA CAFÉ, INC. Laborer 05/18/2017

24.0 0.0 0.00% 24.0 100.00% 0.0 0.00%SUB TOTALS:

31-33 WOODVILLE STREET

$378,250Amount:

Gen Contractor: YOUTH BUILD BOSTON

(617)427-3950 27 CENTRE STREET ROXBURY

Est Start Date:

Est End Date:

10/01/2016

11/01/2017

YOUTH BUILD BOSTON 5,184.0 4,184.0 80.71% 5,184.0 100.00% 544.0 10.49%31-33 WOODVILLE STREET Carpenter 09/15/2017

YOUTH BUILD BOSTON 40.0 0.0 0.00% 40.0 100.00% 0.0 0.00%31-33 WOODVILLE STREET Cement Finisher 05/12/2017

YOUTH BUILD BOSTON 80.0 80.0 100.00% 80.0 100.00% 0.0 0.00%31-33 WOODVILLE STREET Curbsetter/Paver 05/12/2017

YOUTH BUILD BOSTON 56.0 0.0 0.00% 56.0 100.00% 0.0 0.00%31-33 WOODVILLE STREET Electrician 05/12/2017

YOUTH BUILD BOSTON 80.0 80.0 100.00% 80.0 100.00% 0.0 0.00%31-33 WOODVILLE STREET Elevator Const(M 05/12/2017

YOUTH BUILD BOSTON 72.0 0.0 0.00% 72.0 100.00% 0.0 0.00%31-33 WOODVILLE STREET Equipment Opera 05/12/2017

YOUTH BUILD BOSTON 80.0 80.0 100.00% 80.0 100.00% 0.0 0.00%31-33 WOODVILLE STREET HVAC 05/12/2017

YOUTH BUILD BOSTON 80.0 80.0 100.00% 80.0 100.00% 0.0 0.00%31-33 WOODVILLE STREET Metal Refinisher 05/12/2017

YOUTH BUILD BOSTON 72.0 0.0 0.00% 72.0 100.00% 0.0 0.00%31-33 WOODVILLE STREET Pipelayer 05/12/2017

5,744.0 4,504.0 78.41% 5,744.0 100.00% 544.0 9.47%SUB TOTALS:

32029 MAINTENANCE OF ELECTRIC S

$2,000,000Amount:

Gen Contractor: MAVERICK CONSTRUCTION

(617)361-6700 ONE WESTINGHOUSE PLAZA BLDG D hyde park

Est Start Date:

Est End Date:

12/01/2011

06/30/2013

Page 21: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 21

Project Name Trade Latest Week

MAVERICK CONSTRUCTION 2,440.0 227.0 9.30% 746.0 30.57% 0.0 0.00%32029 MAINTENANCE OF ELECT Lineman 09/16/2017

MAVERICK CONSTRUCTION 19.0 0.0 0.00% 0.0 0.00% 0.0 0.00%32029 MAINTENANCE OF ELECT Splicer 03/28/2015

2,459.0 227.0 9.23% 746.0 30.34% 0.0 0.00%SUB TOTALS:

33 CONGRESS STREET

$300,000,000Amount:

Gen Contractor: CONSIGLI CONSTRUCTION

197 MAIN STREET MILFORD

Est Start Date:

Est End Date:

01/01/2016

02/28/2018

PRO CUT CONCRETE CUTTIN 5,058.0 0.0 0.00% 16.0 0.32% 0.0 0.00%33 CONGRESS STREET Laborer 09/16/2017

JDC DEMOLITION COMPANY, I 52,116.5 14,297.5 27.43% 13,154.5 25.24% 2,579.0 4.95%33 CONGRESS STREET Laborer 09/16/2017

MARSHALL ROOFING & SHEET 633.0 208.0 32.86% 242.0 38.23% 0.0 0.00%33 CONGRESS STREET Roofer 09/02/2017

SAFWAY SERVICES LLC. 252.0 84.0 33.33% 92.0 36.51% 0.0 0.00%33 CONGRESS STREET Laborer 09/02/2017

MCCUSKER-GILL INC. 464.0 18.0 3.88% 61.0 13.15% 0.0 0.00%33 CONGRESS STREET Sheetmetal Work 09/17/2017

J.C. HIGGINS CORP. 1,351.0 282.0 20.87% 0.0 0.00% 0.0 0.00%33 CONGRESS STREET Pipefitter 09/17/2017

MCDONALD ELECTRICAL COR 3,179.5 1,232.5 38.76% 689.0 21.67% 0.0 0.00%33 CONGRESS STREET Electrician 09/10/2017

NEWROADS ENVIRONMENTAL 41,640.0 6,039.0 14.50% 34,945.0 83.92% 3,112.0 7.47%33 CONGRESS STREET Laborer 09/09/2017

PRIME STEEL ERECTING INC, 16,785.5 6,934.5 41.31% 4,359.5 25.97% 1,089.0 6.49%33 CONGRESS STREET Iron Worker 09/09/2017

JDC DEMOLITION COMPANY, I 4,549.0 200.5 4.41% 200.5 4.41% 0.0 0.00%33 CONGRESS STREET Equipment Opera 09/02/2017

REGIS STEEL CORPORATION 3,527.0 808.5 22.92% 1,124.0 31.87% 58.0 1.64%33 CONGRESS STREET Iron Worker 09/16/2017

RIGGS CONTRACTING, INC. 9,707.0 6,766.5 69.71% 2,063.0 21.25% 1,044.0 10.76%33 CONGRESS STREET Carpenter 09/16/2017

RIGGS CONTRACTING, INC. 11,222.0 4,885.5 43.54% 5,200.0 46.34% 16.0 0.14%33 CONGRESS STREET Laborer 09/16/2017

RIGGS CONTRACTING, INC. 88.0 0.0 0.00% 0.0 0.00% 0.0 0.00%33 CONGRESS STREET Mason 07/02/2016

SAFWAY SERVICES LLC. 585.0 132.0 22.56% 139.0 23.76% 0.0 0.00%33 CONGRESS STREET Iron Worker 09/09/2017

T & T STEEL SERVICE 102.0 38.0 37.25% 102.0 100.00% 0.0 0.00%33 CONGRESS STREET Iron Worker 09/16/2017

THOMAS G GALLAGHER INC. 1,437.0 795.0 55.32% 72.0 5.01% 0.0 0.00%33 CONGRESS STREET Plumber 09/17/2017

BEACON WATERPROOFING A 82.0 50.0 60.98% 11.0 13.41% 0.0 0.00%33 CONGRESS STREET Bricklayer 03/10/2017

J. DERENZO CO. 2,093.5 143.5 6.85% 8.0 0.38% 0.0 0.00%33 CONGRESS STREET Laborer 09/16/2017

SAFWAY SERVICES LLC. 520.0 24.0 4.62% 40.0 7.69% 0.0 0.00%33 CONGRESS STREET Carpenter 08/19/2017

G & C CONCRETE CO. 1,174.5 171.5 14.60% 528.5 45.00% 0.0 0.00%33 CONGRESS STREET Cement Finisher 09/16/2017

BEACON WATERPROOFING A 25.0 0.0 0.00% 25.0 100.00% 0.0 0.00%33 CONGRESS STREET Laborer 03/10/2017

AXION SPECIALTY CONTRACTI 8.0 0.0 0.00% 0.0 0.00% 0.0 0.00%33 CONGRESS STREET Insulator 08/06/2017

CENTURY DRYWALL INC, 155.0 0.0 0.00% 155.0 100.00% 0.0 0.00%33 CONGRESS STREET Plasterer 09/16/2017

COMPONENT ASSEMBLY SYS 470.0 166.0 35.32% 166.0 35.32% 142.0 30.21%33 CONGRESS STREET Carpenter 09/19/2017

COMPONENT ASSEMBLY SYS 24.0 0.0 0.00% 8.0 33.33% 0.0 0.00%33 CONGRESS STREET Laborer 09/19/2017

CYN ENVIRONMENTAL SERVIC 600.0 280.0 46.67% 216.0 36.00% 0.0 0.00%33 CONGRESS STREET Laborer 04/30/2016

DANIEL MARR & SON CO. 8,828.0 2,130.0 24.13% 2,578.0 29.20% 246.0 2.79%33 CONGRESS STREET Iron Worker 05/21/2017

J. DERENZO CO. 1,020.0 88.0 8.63% 16.0 1.57% 0.0 0.00%33 CONGRESS STREET Equipment Opera 09/16/2017

Page 22: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 22

Project Name Trade Latest Week

G & C CONCRETE CO. 4,796.0 967.0 20.16% 881.0 18.37% 0.0 0.00%33 CONGRESS STREET Carpenter 09/16/2017

CENTURY DRYWALL INC, 339.0 0.0 0.00% 107.0 31.56% 0.0 0.00%33 CONGRESS STREET Laborer 09/16/2017

G & C CONCRETE CO. 1,619.0 279.0 17.23% 399.5 24.68% 0.0 0.00%33 CONGRESS STREET Cement Laborer 09/16/2017

G & C CONCRETE CO. 157.5 0.0 0.00% 0.0 0.00% 0.0 0.00%33 CONGRESS STREET Equipment Opera 09/16/2017

G & C CONCRETE CO. 55.0 50.0 90.91% 0.0 0.00% 0.0 0.00%33 CONGRESS STREET Iron Worker 03/25/2017

G & C CONCRETE CO. 3,392.0 1,968.5 58.03% 1,473.5 43.44% 0.0 0.00%33 CONGRESS STREET Laborer 09/16/2017

HUB FOUNDATION CO. 4,029.0 63.0 1.56% 63.0 1.56% 63.0 1.56%33 CONGRESS STREET Equipment Opera 06/18/2017

HUB FOUNDATION CO. 16.0 0.0 0.00% 16.0 100.00% 0.0 0.00%33 CONGRESS STREET Field Engineer 09/24/2016

HUB FOUNDATION CO. 7,964.0 1,962.5 24.64% 2,108.5 26.48% 0.0 0.00%33 CONGRESS STREET Laborer 06/18/2017

HUB FOUNDATION CO. 269.0 33.0 12.27% 0.0 0.00% 0.0 0.00%33 CONGRESS STREET Piledriver 03/05/2017

E. M. DUGGAN INC. 12.0 12.0 100.00% 0.0 0.00% 0.0 0.00%33 CONGRESS STREET Sprinkler Fitter 04/23/2017

190,345.0 51,109.5 26.85% 71,259.5 37.44% 8,349.0 4.39%SUB TOTALS:

33293 REHAB. OF LONG ISLAND BRID

$3,198,380Amount:

Gen Contractor: SPS NEW ENGLAND

978/462-6543 98 ELM STREET SALISBURY

Est Start Date:

Est End Date:

04/01/2012

04/30/2013

PREMIER FENCE LLC. 8.0 0.0 0.00% 0.0 0.00% 0.0 0.00%33293 REHAB. OF LONG ISLAND Laborer 01/18/2014

ATLANTIC BRIDGE & ENGINEE 32.0 0.0 0.00% 0.0 0.00% 0.0 0.00%33293 REHAB. OF LONG ISLAND Iron Worker 11/16/2013

40.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SUB TOTALS:

33550 EMERGENCY REPAIRS TO UND.

$1,350,000Amount:

Gen Contractor: MAVERICK CONSTRUCTION

(617)361-6700 ONE WESTINGHOUSE PLAZA BLDG D hyde park

Est Start Date:

Est End Date:

07/01/2011

06/30/2014

MAVERICK CONSTRUCTION 1,258.0 176.0 13.99% 224.0 17.81% 0.0 0.00%33550 EMERGENCY REPAIRS T Lineman 06/21/2014

1,258.0 176.0 13.99% 224.0 17.81% 0.0 0.00%SUB TOTALS:

338 TALBOT AVE.DORCHESTER MA 0

$30,000Amount:

Gen Contractor: COLLABORATIVE CONTRACTORS GROUP

(617)594-6767 16 HANCOCK COURT BOSTON

Est Start Date:

Est End Date:

05/26/2014

08/15/2014

COLLABORATIVE CONTRACTO 226.0 0.0 0.00% 0.0 0.00% 0.0 0.00%338 TALBOT AVE.DORCHESTER Carpenter 08/15/2014

COLLABORATIVE CONTRACTO 376.0 158.0 42.02% 297.0 78.99% 0.0 0.00%338 TALBOT AVE.DORCHESTER Laborer 08/15/2014

602.0 158.0 26.25% 297.0 49.34% 0.0 0.00%SUB TOTALS:

35240 ASPHALT RESURFACING IN AR

$1,436,320Amount:

Gen Contractor: AGGREGATE INDUSTRIES

(781)941-7200 1715 BROADWAY SAUGUS

Est Start Date:

Est End Date:

08/20/2012

06/30/2013

GARRITY ASPHALT 80.0 0.0 0.00% 0.0 0.00% 0.0 0.00%35240 ASPHALT RESURFACING I Laborer 11/16/2013

HI-WAY SAFETY SYSTEMS,INC 20.0 7.0 35.00% 3.0 15.00% 0.0 0.00%35240 ASPHALT RESURFACING I Laborer 11/24/2013

100.0 7.0 7.00% 3.0 3.00% 0.0 0.00%SUB TOTALS:

Page 23: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 23

Project Name Trade Latest Week

35583 HIGHWAY RECONSTRUCTION D

$1,727,679Amount:

Gen Contractor: FRED DEROMA & SON

(617)327-3030 45 GREW AVENUE ROSLINDALE

Est Start Date:

Est End Date:

08/01/2012

06/30/2013

FRED DEROMA & SON 18.0 18.0 100.00% 0.0 0.00% 0.0 0.00%35583 HIGHWAY RECONSTRUC Equipment Opera 11/23/2013

FRED DEROMA & SON 58.0 39.0 67.24% 19.0 32.76% 9.0 15.52%35583 HIGHWAY RECONSTRUC Laborer 11/23/2013

76.0 57.0 75.00% 19.0 25.00% 9.0 11.84%SUB TOTALS:

36253 MAJOR RDWAY RESTO. INCL.T

$5,818,372Amount:

Gen Contractor: LORUSSO CORPORATION

(508)695-3252 3 BELCHER STREET PLAINVILLE

Est Start Date:

Est End Date:

10/01/2012

12/31/2013

LORUSSO CORPORATION 251.5 83.0 33.00% 83.0 33.00% 0.0 0.00%36253 MAJOR RDWAY RESTO. I Equipment Opera 04/19/2014

LORUSSO CORPORATION 951.3 625.3 65.73% 474.3 49.86% 0.0 0.00%36253 MAJOR RDWAY RESTO. I Laborer 04/26/2014

1,202.8 708.3 58.89% 557.3 46.33% 0.0 0.00%SUB TOTALS:

36919 #12-35 HIGHWAY RECONSTRUC

$3,448,029Amount:

Gen Contractor: MARIO SUSI & SON INC,

(617)265-4525 36 WESTWOOD STREET DORCHESTER

Est Start Date:

Est End Date:

04/15/2013

06/30/2014

MARIO SUSI & SON INC, 735.0 329.5 44.83% 316.5 43.06% 24.0 3.27%36919 #12-35 HIGHWAY RECON Laborer 08/29/2015

MASS BAY ELECTRIC CORP. 421.0 80.0 19.00% 32.0 7.60% 0.0 0.00%36919 #12-35 HIGHWAY RECON Electrician 05/25/2014

MASS BAY ELECTRIC CORP. 131.0 73.0 55.73% 73.0 55.73% 0.0 0.00%36919 #12-35 HIGHWAY RECON Groundman 04/27/2014

MASS BAY ELECTRIC CORP. 32.0 0.0 0.00% 0.0 0.00% 0.0 0.00%36919 #12-35 HIGHWAY RECON Laborer 04/27/2014

MASS BAY ELECTRIC CORP. 429.0 0.0 0.00% 0.0 0.00% 0.0 0.00%36919 #12-35 HIGHWAY RECON Lineman 04/27/2014

MARIO SUSI & SON INC, 117.0 0.0 0.00% 85.0 72.65% 0.0 0.00%36919 #12-35 HIGHWAY RECON Equipment Opera 10/18/2014

1,865.0 482.5 25.87% 506.5 27.16% 24.0 1.29%SUB TOTALS:

37060 #12-21 ROADWAY IMPROVEME

$779,689Amount:

Gen Contractor: CICCONI & SONS CONS. CO.

(617)782-6804 38 EATONIA STREET ALLSTON

Est Start Date:

Est End Date:

05/01/2013

12/31/2013

CICCONI & SONS CONS. CO. 120.0 80.0 66.67% 0.0 0.00% 0.0 0.00%37060 #12-21 ROADWAY IMPRO Equipment Opera 05/24/2014

CICCONI & SONS CONS. CO. 240.0 120.0 50.00% 160.0 66.67% 0.0 0.00%37060 #12-21 ROADWAY IMPRO Laborer 05/24/2014

360.0 200.0 55.56% 160.0 44.44% 0.0 0.00%SUB TOTALS:

37061 SIDEWALK REPAIR IN AREA III

$2,132,765Amount:

Gen Contractor: CICCONI & SONS CONS. CO.

(617)782-6804 38 EATONIA STREET ALLSTON

Est Start Date:

Est End Date:

06/15/2013

06/30/2014

CICCONI & SONS CONS. CO. 32.0 0.0 0.00% 0.0 0.00% 0.0 0.00%37061 SIDEWALK REPAIR IN AR Cement Finisher 09/06/2014

CICCONI & SONS CONS. CO. 480.0 296.0 61.67% 64.0 13.33% 0.0 0.00%37061 SIDEWALK REPAIR IN AR Laborer 09/06/2014

CICCONI & SONS CONS. CO. 96.0 0.0 0.00% 64.0 66.67% 0.0 0.00%37061 SIDEWALK REPAIR IN AR Equipment Opera 06/14/2014

608.0 296.0 48.68% 128.0 21.05% 0.0 0.00%SUB TOTALS:

37062 SIDEWALK REPAIR IN AREA I

$0Amount:

Gen Contractor: CICCONI & SONS CONS. CO.

(617)782-6804 38 EATONIA STREET ALLSTON

Est Start Date:

Est End Date:

06/15/2013

06/30/2014

Page 24: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 24

Project Name Trade Latest Week

CICCONI & SONS CONS. CO. 192.0 0.0 0.00% 192.0 100.00% 0.0 0.00%37062 SIDEWALK REPAIR IN AR Equipment Opera 06/14/2014

CICCONI & SONS CONS. CO. 832.0 512.0 61.54% 160.0 19.23% 0.0 0.00%37062 SIDEWALK REPAIR IN AR Laborer 06/14/2014

1,024.0 512.0 50.00% 352.0 34.38% 0.0 0.00%SUB TOTALS:

37110 SIDEWALK REPAIR IN AREA II

$1,996,832Amount:

Gen Contractor: FRED DEROMA & SON

(617)327-3030 45 GREW AVENUE ROSLINDALE

Est Start Date:

Est End Date:

06/15/2013

03/30/2014

FRED DEROMA & SON 199.0 68.0 34.17% 0.0 0.00% 0.0 0.00%37110 SIDEWALK REPAIR IN AR Equipment Opera 05/10/2014

FRED DEROMA & SON 757.5 586.5 77.43% 238.5 31.49% 109.0 14.39%37110 SIDEWALK REPAIR IN AR Laborer 05/10/2014

956.5 654.5 68.43% 238.5 24.93% 109.0 11.40%SUB TOTALS:

37134 ASPHALT RESURFACING AREA

$1,260,153Amount:

Gen Contractor: D & R GENERAL CONTRACTING

781/321-7772 732 NEWBURYPORT TURNPIKE melrose

Est Start Date:

Est End Date:

06/01/2013

06/30/2014

HI-WAY SAFETY SYSTEMS,INC 328.5 8.5 2.59% 159.8 48.63% 0.0 0.00%37134 ASPHALT RESURFACING Laborer 06/28/2015

AGGREGATE INDUSTRIES 591.0 0.0 0.00% 0.0 0.00% 0.0 0.00%37134 ASPHALT RESURFACING Equipment Opera 06/06/2015

AGGREGATE INDUSTRIES 752.0 0.0 0.00% 56.5 7.51% 0.0 0.00%37134 ASPHALT RESURFACING Laborer 06/06/2015

D & R GENERAL CONTRACTIN 1,455.5 1,063.0 73.03% 1,063.0 73.03% 0.0 0.00%37134 ASPHALT RESURFACING Equipment Opera 07/11/2015

D & R GENERAL CONTRACTIN 2,474.5 1,495.5 60.44% 520.5 21.03% 1,495.5 60.44%37134 ASPHALT RESURFACING Laborer 08/08/2015

DAGLE ELECTRICAL CONSTR 16.0 0.0 0.00% 0.0 0.00% 0.0 0.00%37134 ASPHALT RESURFACING Laborer 04/26/2014

5,617.5 2,567.0 45.70% 1,799.8 32.04% 1,495.5 26.62%SUB TOTALS:

37141 ASPHALT RESURFACING IN AR

$974,665Amount:

Gen Contractor: LORUSSO CORPORATION

(508)695-3252 3 BELCHER STREET PLAINVILLE

Est Start Date:

Est End Date:

07/01/2013

07/31/2014

LORUSSO CORPORATION 11.0 0.0 0.00% 11.0 100.00% 0.0 0.00%37141 ASPHALT RESURFACING I Equipment Opera 08/02/2014

LORUSSO CORPORATION 85.5 40.5 47.37% 40.0 46.78% 0.0 0.00%37141 ASPHALT RESURFACING I Laborer 08/02/2014

96.5 40.5 41.97% 51.0 52.85% 0.0 0.00%SUB TOTALS:

37197 ASPHALT RESURFACING IN AR

$1,149,385Amount:

Gen Contractor: MARIO SUSI & SON INC,

(617)265-4525 36 WESTWOOD STREET DORCHESTER

Est Start Date:

Est End Date:

06/01/2013

06/30/2014

MARIO SUSI & SON INC, 205.0 0.0 0.00% 0.0 0.00% 0.0 0.00%37197 ASPHALT RESURFACING I Asphalt Raker 03/22/2014

MARIO SUSI & SON INC, 327.5 0.0 0.00% 12.0 3.66% 0.0 0.00%37197 ASPHALT RESURFACING I Equipment Opera 03/22/2014

MARIO SUSI & SON INC, 855.5 390.0 45.59% 340.5 39.80% 12.5 1.46%37197 ASPHALT RESURFACING I Laborer 03/22/2014

1,388.0 390.0 28.10% 352.5 25.40% 12.5 0.90%SUB TOTALS:

374 DORCHESTER AVENUE

$2,576,612Amount:

Gen Contractor: SOUTH COAST IMPROVEMENT CO.

(508)748-6545 208 WAREHAM WAREHAM

Est Start Date:

Est End Date:

02/01/2016

07/31/2017

SONTZ 158.0 150.0 94.94% 158.0 100.00% 0.0 0.00%374 DORCHESTER AVENUE Laborer 11/05/2016

THOMPSON WATERPROOFING 134.5 0.0 0.00% 96.5 71.75% 0.0 0.00%374 DORCHESTER AVENUE Bricklayer 04/02/2016

Page 25: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 25

Project Name Trade Latest Week

SOUTH COAST IMPROVEMENT 3,256.5 3,256.5 100.00% 3,256.5 100.00% 0.0 0.00%374 DORCHESTER AVENUE Painter 10/22/2016

FACILLICO 597.0 8.0 1.34% 72.0 12.06% 0.0 0.00%374 DORCHESTER AVENUE Electrician 10/22/2016

SOUTH COAST IMPROVEMENT 396.1 0.0 0.00% 396.1 100.00% 396.1 100.00%374 DORCHESTER AVENUE Laborer 10/08/2016

UNIVERSAL COUNTER TOPS 58.0 0.0 0.00% 58.0 100.00% 0.0 0.00%374 DORCHESTER AVENUE Laborer 09/03/2016

SOUTH COAST IMPROVEMENT 1,803.5 1,803.5 100.00% 1,803.5 100.00% 0.0 0.00%374 DORCHESTER AVENUE Carpenter 10/29/2016

SONTZ 585.0 0.0 0.00% 462.5 79.06% 0.0 0.00%374 DORCHESTER AVENUE Roofer 11/05/2016

SNL MASONRY 169.0 0.0 0.00% 0.0 0.00% 0.0 0.00%374 DORCHESTER AVENUE Mason 11/12/2016

PCS NEW ENGLAND 511.0 0.0 0.00% 0.0 0.00% 0.0 0.00%374 DORCHESTER AVENUE Laborer 08/20/2016

NEW ENGLAND STEEL 44.0 0.0 0.00% 33.0 75.00% 0.0 0.00%374 DORCHESTER AVENUE Iron Worker 04/02/2016

HOMELAND 87.0 0.0 0.00% 0.0 0.00% 0.0 0.00%374 DORCHESTER AVENUE HVAC 07/30/2016

BUSINESS FLOORS 1,124.3 0.0 0.00% 32.0 2.85% 0.0 0.00%374 DORCHESTER AVENUE Floor Layer 10/29/2016

ADI CEILINGS 198.0 0.0 0.00% 0.0 0.00% 0.0 0.00%374 DORCHESTER AVENUE Carpenter 09/10/2016

HOMELAND 1,116.0 0.0 0.00% 135.0 12.10% 0.0 0.00%374 DORCHESTER AVENUE Plumber 10/08/2016

10,237.9 5,218.0 50.97% 6,503.1 63.52% 396.1 3.87%SUB TOTALS:

37444 MAINTAIN OF ELECTRIC STREE

$150,000,000Amount:

Gen Contractor: MAVERICK CONSTRUCTION

(617)361-6700 ONE WESTINGHOUSE PLAZA BLDG D hyde park

Est Start Date:

Est End Date:

07/01/2013

06/30/2016

MAVERICK CONSTRUCTION 738.0 170.0 23.04% 0.0 0.00% 0.0 0.00%37444 MAINTAIN OF ELECTRIC S Equipment Opera 04/23/2016

MAVERICK CONSTRUCTION 582.0 365.0 62.71% 385.0 66.15% 0.0 0.00%37444 MAINTAIN OF ELECTRIC S Groundman 04/23/2016

MAVERICK CONSTRUCTION 1,523.0 128.0 8.40% 0.0 0.00% 0.0 0.00%37444 MAINTAIN OF ELECTRIC S Laborer 04/23/2016

MAVERICK CONSTRUCTION 1,373.0 2.0 0.15% 474.0 34.52% 0.0 0.00%37444 MAINTAIN OF ELECTRIC S Lineman 01/31/2015

4,216.0 665.0 15.77% 859.0 20.37% 0.0 0.00%SUB TOTALS:

37933 CIP #13-21 OLD COLONY PHAS

$1,348,627Amount:

Gen Contractor: NEWPORT CONSTRUCTION CORP.

(603)882 -1700 164 BURKE STREET, SUITE 1A NASHUA

Est Start Date:

Est End Date:

09/30/2013

09/30/2014

DAGLE ELECTRICAL CONSTR 502.0 0.0 0.00% 0.0 0.00% 0.0 0.00%37933 CIP #13-21 OLD COLONY Electrician 04/05/2014

NEWPORT CONSTRUCTION C 2.0 0.0 0.00% 0.0 0.00% 0.0 0.00%37933 CIP #13-21 OLD COLONY Electrician 05/03/2014

NEWPORT CONSTRUCTION C 216.0 0.0 0.00% 26.0 12.04% 0.0 0.00%37933 CIP #13-21 OLD COLONY Equipment Opera 05/04/2014

NEWPORT CONSTRUCTION C 478.5 228.0 47.65% 351.5 73.46% 82.5 17.24%37933 CIP #13-21 OLD COLONY Laborer 05/04/2014

DAGLE ELECTRICAL CONSTR 42.0 42.0 100.00% 42.0 100.00% 0.0 0.00%37933 CIP #13-21 OLD COLONY Laborer 03/15/2014

K. DAPONTE CONSTRUCTION 16.0 0.0 0.00% 0.0 0.00% 0.0 0.00%37933 CIP #13-21 OLD COLONY Equipment Opera 11/16/2013

K. DAPONTE CONSTRUCTION 48.0 0.0 0.00% 0.0 0.00% 0.0 0.00%37933 CIP #13-21 OLD COLONY Laborer 11/16/2013

1,304.5 270.0 20.70% 419.5 32.16% 82.5 6.32%SUB TOTALS:

37975 CIP # 13-31 SIDEWALK RECONS

$1,058,696Amount:

Gen Contractor: CICCONI & SONS CONS. CO.

(617)782-6804 38 EATONIA STREET ALLSTON

Est Start Date:

Est End Date:

04/01/2014

08/31/2014

Page 26: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 26

Project Name Trade Latest Week

CICCONI & SONS CONS. CO. 1,336.0 648.0 48.50% 0.0 0.00% 0.0 0.00%37975 CIP # 13-31 SIDEWALK RE Equipment Opera 06/13/2015

CICCONI & SONS CONS. CO. 2,704.0 1,344.0 49.70% 1,360.0 50.30% 0.0 0.00%37975 CIP # 13-31 SIDEWALK RE Laborer 06/13/2015

4,040.0 1,992.0 49.31% 1,360.0 33.66% 0.0 0.00%SUB TOTALS:

38092 IMPROVEMENTS TO GIBBONS P

$311,000Amount:

Gen Contractor: AQUA LINE UTILITY, INC.

781/ 585-550 268 WASHINGTON STREET east bridgewate

Est Start Date:

Est End Date:

10/01/2013

06/30/2014

AQUA LINE UTILITY, INC. 20.5 0.0 0.00% 0.0 0.00% 0.0 0.00%38092 IMPROVEMENTS TO GIBB Equipment Opera 04/12/2014

AQUA LINE UTILITY, INC. 683.0 305.0 44.66% 50.5 7.39% 2.0 0.29%38092 IMPROVEMENTS TO GIBB Laborer 06/07/2014

703.5 305.0 43.35% 50.5 7.18% 2.0 0.28%SUB TOTALS:

38112 INTERSECTION & TRAFFIC SIG

$1,296,565Amount:

Gen Contractor: MARIO SUSI & SON INC,

(617)265-4525 36 WESTWOOD STREET DORCHESTER

Est Start Date:

Est End Date:

04/01/2014

06/30/2015

MASS BAY ELECTRIC CORP. 123.0 123.0 100.00% 99.0 80.49% 0.0 0.00%38112 INTERSECTION & TRAFFI Groundman 08/03/2014

MASS BAY ELECTRIC CORP. 40.0 0.0 0.00% 0.0 0.00% 0.0 0.00%38112 INTERSECTION & TRAFFI Laborer 03/02/2014

MASS BAY ELECTRIC CORP. 1,059.0 183.0 17.28% 151.0 14.26% 0.0 0.00%38112 INTERSECTION & TRAFFI Electrician 09/20/2015

MARIO SUSI & SON INC, 1,987.0 981.5 49.40% 833.5 41.95% 44.0 2.21%38112 INTERSECTION & TRAFFI Laborer 09/20/2014

MARIO SUSI & SON INC, 778.5 0.0 0.00% 228.0 29.29% 0.0 0.00%38112 INTERSECTION & TRAFFI Equipment Opera 09/20/2014

MARIO SUSI & SON INC, 308.5 0.0 0.00% 0.0 0.00% 0.0 0.00%38112 INTERSECTION & TRAFFI Asphalt Raker 07/12/2014

MASS BAY ELECTRIC CORP. 208.0 0.0 0.00% 0.0 0.00% 0.0 0.00%38112 INTERSECTION & TRAFFI Lineman 07/13/2014

4,504.0 1,287.5 28.59% 1,311.5 29.12% 44.0 0.98%SUB TOTALS:

38258 CIP(#13-23) RDWAY & TRAFFIC

$2,756,977Amount:

Gen Contractor: MARIO SUSI & SON INC,

(617)265-4525 36 WESTWOOD STREET DORCHESTER

Est Start Date:

Est End Date:

11/01/2013

12/30/2014

MARIO SUSI & SON INC, 281.0 0.0 0.00% 0.0 0.00% 0.0 0.00%38258 CIP(#13-23) RDWAY & TRA Asphalt Raker 05/14/2016

MARIO SUSI & SON INC, 1,142.0 0.0 0.00% 518.0 45.36% 0.0 0.00%38258 CIP(#13-23) RDWAY & TRA Equipment Opera 05/14/2016

MARIO SUSI & SON INC, 4,546.0 2,501.5 55.03% 2,017.5 44.38% 248.0 5.46%38258 CIP(#13-23) RDWAY & TRA Laborer 05/14/2016

MASS BAY ELECTRIC CORP. 1,065.5 382.0 35.85% 133.0 12.48% 0.0 0.00%38258 CIP(#13-23) RDWAY & TRA Electrician 06/26/2016

MASS BAY ELECTRIC CORP. 24.0 0.0 0.00% 0.0 0.00% 0.0 0.00%38258 CIP(#13-23) RDWAY & TRA Equipment Opera 01/18/2015

MASS BAY ELECTRIC CORP. 228.5 125.5 54.92% 76.0 33.26% 0.0 0.00%38258 CIP(#13-23) RDWAY & TRA Groundman 06/12/2016

MASS BAY ELECTRIC CORP. 17.5 0.0 0.00% 0.0 0.00% 0.0 0.00%38258 CIP(#13-23) RDWAY & TRA Laborer 04/06/2014

MASS BAY ELECTRIC CORP. 428.5 0.0 0.00% 8.0 1.87% 0.0 0.00%38258 CIP(#13-23) RDWAY & TRA Lineman 06/12/2016

7,733.0 3,009.0 38.91% 2,752.5 35.59% 248.0 3.21%SUB TOTALS:

38339 HGWY RECONSTRUCTION STA

$1,889,275Amount:

Gen Contractor: FRED DEROMA & SON

(617)327-3030 45 GREW AVENUE ROSLINDALE

Est Start Date:

Est End Date:

04/01/2013

06/30/2015

E. J. PAVING COMPANY INC. 212.0 0.0 0.00% 128.0 60.38% 0.0 0.00%38339 HGWY RECONSTRUCTIO Laborer 07/26/2014

M-O-N LANDSCAPING INC, 8.0 0.0 0.00% 0.0 0.00% 0.0 0.00%38339 HGWY RECONSTRUCTIO Equipment Opera 09/27/2014

Page 27: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 27

Project Name Trade Latest Week

M-O-N LANDSCAPING INC, 201.0 0.0 0.00% 0.0 0.00% 0.0 0.00%38339 HGWY RECONSTRUCTIO Laborer 10/04/2014

FRED DEROMA & SON 987.5 411.0 41.62% 0.0 0.00% 0.0 0.00%38339 HGWY RECONSTRUCTIO Equipment Opera 08/23/2014

FRED DEROMA & SON 3,000.5 1,953.0 65.09% 950.5 31.68% 295.0 9.83%38339 HGWY RECONSTRUCTIO Laborer 08/30/2014

4,409.0 2,364.0 53.62% 1,078.5 24.46% 295.0 6.69%SUB TOTALS:

383-395 BOWDOIN AVE.

$12,500Amount:

Gen Contractor: CAMBRIDGE REPROGRAPHIES

(617)623-2838 21 MCGRATH HGWY SOMERVILLE

Est Start Date:

Est End Date:

02/12/2017

02/25/2017

CAMBRIDGE REPROGRAPHIE 22.0 0.0 0.00% 11.0 50.00% 11.0 50.00%383-395 BOWDOIN AVE. Laborer 02/25/2017

22.0 0.0 0.00% 11.0 50.00% 11.0 50.00%SUB TOTALS:

38491 BALLFIELD DRAINAGE IMP @ M

$153,000Amount:

Gen Contractor: FLEMING BROS INC.

(781)843-4071 106 COLUMBIA STREET QUINCY

Est Start Date:

Est End Date:

12/16/2013

08/31/2014

FLEMING BROS INC. 184.0 16.0 8.70% 0.0 0.00% 0.0 0.00%38491 BALLFIELD DRAINAGE IM Equipment Opera 06/13/2014

FLEMING BROS INC. 318.0 118.0 37.11% 78.0 24.53% 0.0 0.00%38491 BALLFIELD DRAINAGE IM Laborer 06/13/2014

502.0 134.0 26.69% 78.0 15.54% 0.0 0.00%SUB TOTALS:

38720 CIP #13-25 HIGHWAY RECONST

$980,741Amount:

Gen Contractor: I.W.HARDING CONSTRUCTION CO.INC.

(508)588-2222 354 PLEASANT STREET W. BRIDGEWATER

Est Start Date:

Est End Date:

04/01/2014

06/30/2015

DON MARTIN CORPORATION 24.0 0.0 0.00% 8.0 33.33% 0.0 0.00%38720 CIP #13-25 HIGHWAY REC Asphalt Raker 10/18/2014

TANGO CONSTRUCTION 69.0 0.0 0.00% 69.0 100.00% 0.0 0.00%38720 CIP #13-25 HIGHWAY REC Laborer 10/25/2014

MARKINGS INCORPORATED 7.0 0.0 0.00% 0.0 0.00% 0.0 0.00%38720 CIP #13-25 HIGHWAY REC Painter 11/02/2014

LIDDELL BROTHERS INC. 41.5 0.0 0.00% 0.0 0.00% 0.0 0.00%38720 CIP #13-25 HIGHWAY REC Laborer 11/01/2014

I.W.HARDING CONSTRUCTION 70.0 0.0 0.00% 0.0 0.00% 0.0 0.00%38720 CIP #13-25 HIGHWAY REC Pipelayer 10/11/2014

I.W.HARDING CONSTRUCTION 313.5 49.0 15.63% 49.0 15.63% 21.0 6.70%38720 CIP #13-25 HIGHWAY REC Laborer 11/01/2014

I.W.HARDING CONSTRUCTION 179.0 0.0 0.00% 0.0 0.00% 0.0 0.00%38720 CIP #13-25 HIGHWAY REC Equipment Opera 10/18/2014

I.W.HARDING CONSTRUCTION 90.5 0.0 0.00% 0.0 0.00% 0.0 0.00%38720 CIP #13-25 HIGHWAY REC Asphalt Raker 10/25/2014

DON MARTIN CORPORATION 24.0 0.0 0.00% 8.0 33.33% 0.0 0.00%38720 CIP #13-25 HIGHWAY REC Equipment Opera 10/18/2014

CULLEN ELECTRICAL CONTRA 31.0 0.0 0.00% 0.0 0.00% 0.0 0.00%38720 CIP #13-25 HIGHWAY REC Laborer 10/11/2014

CULLEN ELECTRICAL CONTRA 108.0 0.0 0.00% 0.0 0.00% 0.0 0.00%38720 CIP #13-25 HIGHWAY REC Electrician 01/03/2015

BTB CONSTRUCTION 724.5 0.0 0.00% 0.0 0.00% 0.0 0.00%38720 CIP #13-25 HIGHWAY REC Laborer 10/11/2014

BELL TRAFFIC SIGNAL MAINTE 21.0 0.0 0.00% 14.0 66.67% 0.0 0.00%38720 CIP #13-25 HIGHWAY REC Laborer 11/01/2014

DON MARTIN CORPORATION 16.0 0.0 0.00% 0.0 0.00% 0.0 0.00%38720 CIP #13-25 HIGHWAY REC Laborer 10/18/2014

1,719.0 49.0 2.85% 148.0 8.61% 21.0 1.22%SUB TOTALS:

38802 LO PRESTI PLAYGROUND

$600,000,000Amount:

Gen Contractor: FLEMING BROS INC.

(781)843-4071 106 COLUMBIA STREET QUINCY

Est Start Date:

Est End Date:

04/01/2014

05/30/2014

MASS BAY ELECTRIC CORP. 28.0 12.0 42.86% 12.0 42.86% 0.0 0.00%38802 LO PRESTI PLAYGROUND Groundman 05/11/2014

Page 28: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 28

Project Name Trade Latest Week

MASS BAY ELECTRIC CORP. 72.0 0.0 0.00% 0.0 0.00% 0.0 0.00%38802 LO PRESTI PLAYGROUND Electrician 05/11/2014

FLEMING BROS INC. 152.0 120.0 78.95% 88.0 57.89% 0.0 0.00%38802 LO PRESTI PLAYGROUND Laborer 05/09/2014

FLEMING BROS INC. 320.0 288.0 90.00% 0.0 0.00% 0.0 0.00%38802 LO PRESTI PLAYGROUND Equipment Opera 05/09/2014

MASS BAY ELECTRIC CORP. 43.0 0.0 0.00% 0.0 0.00% 0.0 0.00%38802 LO PRESTI PLAYGROUND Lineman 05/11/2014

615.0 420.0 68.29% 100.0 16.26% 0.0 0.00%SUB TOTALS:

38880 HIGHWAY RECON AT CALUMET

$1,695,728Amount:

Gen Contractor: FRED DEROMA & SON

(617)327-3030 45 GREW AVENUE ROSLINDALE

Est Start Date:

Est End Date:

06/01/2014

06/30/2015

FRED DEROMA & SON 1,355.0 568.5 41.96% 0.0 0.00% 0.0 0.00%38880 HIGHWAY RECON AT CAL Equipment Opera 10/17/2015

FRED DEROMA & SON 3,473.5 2,031.0 58.47% 1,062.5 30.59% 271.0 7.80%38880 HIGHWAY RECON AT CAL Laborer 10/17/2015

MATHIAS CORPORATION 260.0 124.0 47.69% 62.0 23.85% 0.0 0.00%38880 HIGHWAY RECON AT CAL Equipment Opera 11/01/2014

MATHIAS CORPORATION 126.5 0.0 0.00% 119.0 94.07% 0.0 0.00%38880 HIGHWAY RECON AT CAL Laborer 11/01/2014

VIGIL ELECTRIC COMPANY 167.8 62.0 36.96% 110.8 66.02% 0.0 0.00%38880 HIGHWAY RECON AT CAL Groundman 11/08/2014

VIGIL ELECTRIC COMPANY 77.8 0.0 0.00% 77.8 100.00% 0.0 0.00%38880 HIGHWAY RECON AT CAL Lineman 11/08/2014

5,460.5 2,785.5 51.01% 1,432.0 26.22% 271.0 4.96%SUB TOTALS:

38900 ASPHALT RESURFACING AREA

$1,227,146Amount:

Gen Contractor: MARIO SUSI & SON INC,

(617)265-4525 36 WESTWOOD STREET DORCHESTER

Est Start Date:

Est End Date:

05/01/2014

06/30/2015

MARIO SUSI & SON INC, 606.0 0.0 0.00% 89.0 14.69% 0.0 0.00%38900 ASPHALT RESURFACING Equipment Opera 12/06/2014

MARIO SUSI & SON INC, 2,316.0 1,100.0 47.50% 824.0 35.58% 48.0 2.07%38900 ASPHALT RESURFACING Laborer 12/06/2014

MARIO SUSI & SON INC, 516.0 0.0 0.00% 0.0 0.00% 0.0 0.00%38900 ASPHALT RESURFACING Asphalt Raker 12/06/2014

3,438.0 1,100.0 32.00% 913.0 26.56% 48.0 1.40%SUB TOTALS:

38901 ASPHALT RESURFACING AREA

$1,102,265Amount:

Gen Contractor: MARIO SUSI & SON INC,

(617)265-4525 36 WESTWOOD STREET DORCHESTER

Est Start Date:

Est End Date:

05/01/2014

06/30/2015

MARIO SUSI & SON INC, 933.5 0.0 0.00% 189.0 20.25% 0.0 0.00%38901 ASPHALT RESURFACING Equipment Opera 11/01/2014

MARIO SUSI & SON INC, 3,690.5 1,994.5 54.04% 1,501.5 40.69% 159.0 4.31%38901 ASPHALT RESURFACING Laborer 11/01/2014

MARIO SUSI & SON INC, 625.0 0.0 0.00% 0.0 0.00% 0.0 0.00%38901 ASPHALT RESURFACING Asphalt Raker 11/01/2014

5,249.0 1,994.5 38.00% 1,690.5 32.21% 159.0 3.03%SUB TOTALS:

38902 ASPHALT RESURFACING IN AR

$1,097,101Amount:

Gen Contractor: MARIO SUSI & SON INC,

(617)265-4525 36 WESTWOOD STREET DORCHESTER

Est Start Date:

Est End Date:

05/01/2014

06/30/2015

MARIO SUSI & SON INC, 781.5 0.0 0.00% 0.0 0.00% 0.0 0.00%38902 ASPHALT RESURFACING I Asphalt Raker 05/02/2015

MARIO SUSI & SON INC, 917.0 0.0 0.00% 163.0 17.78% 0.0 0.00%38902 ASPHALT RESURFACING I Equipment Opera 05/02/2015

MARIO SUSI & SON INC, 3,925.0 1,991.0 50.73% 1,599.0 40.74% 164.0 4.18%38902 ASPHALT RESURFACING I Laborer 05/02/2015

5,623.5 1,991.0 35.40% 1,762.0 31.33% 164.0 2.92%SUB TOTALS:

Page 29: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 29

Project Name Trade Latest Week

39164 MAJOR ROADWAY RESTORATI

$6,183,335Amount:

Gen Contractor: LORUSSO CORPORATION

(508)695-3252 3 BELCHER STREET PLAINVILLE

Est Start Date:

Est End Date:

07/01/2014

12/31/2015

LORUSSO CORPORATION 608.0 14.5 2.38% 478.3 78.66% 0.0 0.00%39164 MAJOR ROADWAY RESTO Equipment Opera 11/08/2014

LORUSSO CORPORATION 4,179.0 1,894.3 45.33% 1,692.5 40.50% 0.0 0.00%39164 MAJOR ROADWAY RESTO Laborer 12/20/2014

LORUSSO CORPORATION 253.0 253.0 100.00% 253.0 100.00% 253.0 100.00%39164 MAJOR ROADWAY RESTO Stage Hand 11/15/2014

5,040.0 2,161.8 42.89% 2,423.8 48.09% 253.0 5.02%SUB TOTALS:

39165 UTILITY REPAIR ON VARIOUS S

$3,068,310Amount:

Gen Contractor: LORUSSO CORPORATION

(508)695-3252 3 BELCHER STREET PLAINVILLE

Est Start Date:

Est End Date:

07/01/2014

06/30/2015

LORUSSO CORPORATION 618.5 618.5 100.00% 618.5 100.00% 618.5 100.00%39165 UTILITY REPAIR ON VARI Stage Hand 11/15/2014

VITA'S PAVING INC. 1,940.0 896.0 46.19% 1,940.0 100.00% 0.0 0.00%39165 UTILITY REPAIR ON VARI Laborer 10/11/2014

LORUSSO CORPORATION 4,228.0 2,672.5 63.21% 2,967.0 70.18% 0.0 0.00%39165 UTILITY REPAIR ON VARI Laborer 11/15/2014

LORUSSO CORPORATION 252.0 0.0 0.00% 97.0 38.49% 0.0 0.00%39165 UTILITY REPAIR ON VARI Equipment Opera 10/18/2014

7,038.5 4,187.0 59.49% 5,622.5 79.88% 618.5 8.79%SUB TOTALS:

39170 SIDEWALK REPAIRS IN AREA I

$2,422,659Amount:

Gen Contractor: CICCONI & SONS CONS. CO.

(617)782-6804 38 EATONIA STREET ALLSTON

Est Start Date:

Est End Date:

06/01/2014

06/30/2015

ARCHITECTURAL PAVING & ST 488.5 0.0 0.00% 348.5 71.34% 0.0 0.00%39170 SIDEWALK REPAIRS IN A Mason 11/02/2014

CICCONI & SONS CONS. CO. 672.0 232.0 34.52% 432.0 64.29% 0.0 0.00%39170 SIDEWALK REPAIRS IN A Equipment Opera 06/13/2015

CICCONI & SONS CONS. CO. 2,760.0 1,720.0 62.32% 888.0 32.17% 0.0 0.00%39170 SIDEWALK REPAIRS IN A Laborer 06/13/2015

ARCHITECTURAL PAVING & ST 954.5 0.0 0.00% 926.5 97.07% 0.0 0.00%39170 SIDEWALK REPAIRS IN A Laborer 11/02/2014

4,875.0 1,952.0 40.04% 2,595.0 53.23% 0.0 0.00%SUB TOTALS:

39214 SIDEWALK REPAIRS IN AREA II

Amount:

Gen Contractor: FRED DEROMA & SON

(617)327-3030 45 GREW AVENUE ROSLINDALE

Est Start Date:

Est End Date:

06/01/2014

06/30/2015

FRED DEROMA & SON 1,104.0 192.5 17.44% 0.0 0.00% 0.0 0.00%39214 SIDEWALK REPAIRS IN A Equipment Opera 12/13/2014

FRED DEROMA & SON 4,491.0 2,901.0 64.60% 1,234.5 27.49% 350.0 7.79%39214 SIDEWALK REPAIRS IN A Laborer 12/13/2014

5,595.0 3,093.5 55.29% 1,234.5 22.06% 350.0 6.26%SUB TOTALS:

39313 SIDEWALK REPAIRS IN AREA III

$2,554,543Amount:

Gen Contractor: CICCONI & SONS CONS. CO.

(617)782-6804 38 EATONIA STREET ALLSTON

Est Start Date:

Est End Date:

06/01/2014

06/30/2015

CICCONI & SONS CONS. CO. 2,640.0 1,480.0 56.06% 720.0 27.27% 0.0 0.00%39313 SIDEWALK REPAIRS IN A Laborer 10/04/2014

ARCHITECTURAL PAVING & ST 695.0 0.0 0.00% 688.0 98.99% 0.0 0.00%39313 SIDEWALK REPAIRS IN A Laborer 10/19/2014

ARCHITECTURAL PAVING & ST 434.0 0.0 0.00% 276.0 63.59% 0.0 0.00%39313 SIDEWALK REPAIRS IN A Mason 10/19/2014

CICCONI & SONS CONS. CO. 640.0 200.0 31.25% 440.0 68.75% 0.0 0.00%39313 SIDEWALK REPAIRS IN A Equipment Opera 09/20/2014

4,409.0 1,680.0 38.10% 2,124.0 48.17% 0.0 0.00%SUB TOTALS:

Page 30: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 30

Project Name Trade Latest Week

39720 HEALY PLAYGROUND RENOVA

$609,737Amount:

Gen Contractor: A & K CONSTRUCTION GROUP INC

781-666-3989 7 SYLVAN CIRCLE LYNNFIELD

Est Start Date:

Est End Date:

09/15/2014

11/29/2014

A & K CONSTRUCTION GROUP 176.0 0.0 0.00% 0.0 0.00% 0.0 0.00%39720 HEALY PLAYGROUND RE Equipment Opera 06/27/2015

A & K CONSTRUCTION GROUP 1,971.0 1,281.0 64.99% 1,763.0 89.45% 347.0 17.61%39720 HEALY PLAYGROUND RE Laborer 09/26/2015

2,147.0 1,281.0 59.66% 1,763.0 82.11% 347.0 16.16%SUB TOTALS:

4 STAR DANCE

$2,500Amount:

Gen Contractor: EXCEL SIGNS & DECORATION CORP.

(617)479-8552 259 QUINCY AVE. QUINCY

Est Start Date:

Est End Date:

09/13/2015

09/19/2015

EXCEL SIGNS & DECORATION 6.0 0.0 0.00% 6.0 100.00% 2.0 33.33%4 STAR DANCE Laborer 09/19/2015

6.0 0.0 0.00% 6.0 100.00% 2.0 33.33%SUB TOTALS:

40091 HIGHWAY RECONSTR IN SEAVE

$6,797,594Amount:

Gen Contractor: MARIO SUSI & SON INC,

(617)265-4525 36 WESTWOOD STREET DORCHESTER

Est Start Date:

Est End Date:

11/24/2014

06/30/2015

MARIO SUSI & SON INC, 247.0 0.0 0.00% 0.0 0.00% 0.0 0.00%40091 HIGHWAY RECONSTR IN Asphalt Raker 09/12/2015

MARIO SUSI & SON INC, 997.0 0.0 0.00% 20.0 2.01% 12.0 1.20%40091 HIGHWAY RECONSTR IN Equipment Opera 09/26/2015

MARIO SUSI & SON INC, 6,454.5 3,662.5 56.74% 2,747.0 42.56% 648.0 10.04%40091 HIGHWAY RECONSTR IN Laborer 09/26/2015

MASS BAY ELECTRIC CORP. 1,777.0 666.0 37.48% 257.0 14.46% 0.0 0.00%40091 HIGHWAY RECONSTR IN Electrician 05/07/2017

MASS BAY ELECTRIC CORP. 713.0 355.0 49.79% 172.0 24.12% 170.0 23.84%40091 HIGHWAY RECONSTR IN Groundman 03/20/2016

MASS BAY ELECTRIC CORP. 638.0 0.0 0.00% 0.0 0.00% 0.0 0.00%40091 HIGHWAY RECONSTR IN Lineman 02/05/2017

P. GIOIOSO & SONS 16.0 0.0 0.00% 0.0 0.00% 0.0 0.00%40091 HIGHWAY RECONSTR IN Carpenter 07/04/2015

P. GIOIOSO & SONS 1,003.0 0.0 0.00% 173.0 17.25% 0.0 0.00%40091 HIGHWAY RECONSTR IN Laborer 07/25/2015

P. GIOIOSO & SONS 1,048.0 0.0 0.00% 0.0 0.00% 0.0 0.00%40091 HIGHWAY RECONSTR IN Technician 05/23/2015

12,893.5 4,683.5 36.32% 3,369.0 26.13% 830.0 6.44%SUB TOTALS:

40109 RESTORATION ELIOT BURYING

$138,000Amount:

Gen Contractor: FOLAN WATERPROOF CO.

(508)238-6550 795 WASHINGTON ST. South easton

Est Start Date:

Est End Date:

12/31/2014

03/31/2014

FOLAN WATERPROOF CO. 361.0 0.0 0.00% 179.0 49.58% 0.0 0.00%40109 RESTORATION ELIOT BU Laborer 07/18/2015

FOLAN WATERPROOF CO. 252.0 112.0 44.44% 50.5 20.04% 32.0 12.70%40109 RESTORATION ELIOT BU Mason 07/18/2015

613.0 112.0 18.27% 229.5 37.44% 32.0 5.22%SUB TOTALS:

40213 IMPROVEMENTS TO BUENA VIS

$163,850Amount:

Gen Contractor: PARK LANDSCAPE ASSOCIATES

(617)323-5200 1028 SOUTH STREET ROSLINDALE

Est Start Date:

Est End Date:

12/01/2014

12/01/2014

PARK LANDSCAPE ASSOCIAT 64.0 64.0 100.00% 64.0 100.00% 0.0 0.00%40213 IMPROVEMENTS TO BUE Mason Tender 01/08/2015

PARK LANDSCAPE ASSOCIAT 344.0 344.0 100.00% 288.0 83.72% 0.0 0.00%40213 IMPROVEMENTS TO BUE Laborer 01/08/2015

408.0 408.0 100.00% 352.0 86.27% 0.0 0.00%SUB TOTALS:

Page 31: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 31

Project Name Trade Latest Week

40214 IMPROVEMENTS TO WALNUT S

$120,000Amount:

Gen Contractor: FOLAN WATERPROOF CO.

(508)238-6550 795 WASHINGTON ST. South easton

Est Start Date:

Est End Date:

12/31/2014

03/31/2015

FOLAN WATERPROOF CO. 292.5 0.0 0.00% 32.0 10.94% 0.0 0.00%40214 IMPROVEMENTS TO WAL Laborer 10/03/2015

FOLAN WATERPROOF CO. 545.0 35.0 6.42% 81.5 14.95% 24.0 4.40%40214 IMPROVEMENTS TO WAL Mason 10/10/2015

837.5 35.0 4.18% 113.5 13.55% 24.0 2.87%SUB TOTALS:

40493 IMPROVEMENTS TO CALDWELL

$233,800Amount:

Gen Contractor: FLEMING BROS INC.

(781)843-4071 106 COLUMBIA STREET QUINCY

Est Start Date:

Est End Date:

03/23/2015

08/20/2015

FLEMING BROS INC. 104.0 0.0 0.00% 0.0 0.00% 0.0 0.00%40493 IMPROVEMENTS TO CALD Equipment Opera 06/26/2015

FLEMING BROS INC. 176.0 72.0 40.91% 72.0 40.91% 0.0 0.00%40493 IMPROVEMENTS TO CALD Laborer 06/26/2015

280.0 72.0 25.71% 72.0 25.71% 0.0 0.00%SUB TOTALS:

40558 RESTORATION OF GRANNERY

$265,000Amount:

Gen Contractor: WOVEN STEEL

(617)567-5166 336 BORDER STREET EAST BOSTON

Est Start Date:

Est End Date:

04/20/2015

09/17/2015

SEQUOIA CONSTRUCTION INC 400.3 165.0 41.22% 203.0 50.72% 0.0 0.00%40558 RESTORATION OF GRAN Laborer 08/29/2015

WOVEN STEEL 545.0 463.0 84.95% 500.0 91.74% 0.0 0.00%40558 RESTORATION OF GRAN Laborer 12/11/2015

945.3 628.0 66.44% 703.0 74.37% 0.0 0.00%SUB TOTALS:

40568 MAJOR ROADWAY RESTORATI

$7,474,612Amount:

Gen Contractor: LORUSSO CORPORATION

(508)695-3252 3 BELCHER STREET PLAINVILLE

Est Start Date:

Est End Date:

04/30/2015

06/30/2016

LORUSSO CORPORATION 3,574.8 2,138.5 59.82% 2,197.8 61.48% 0.0 0.00%40568 MAJOR ROADWAY RESTO Laborer 11/14/2015

LORUSSO CORPORATION 337.5 80.0 23.70% 337.5 100.00% 337.5 100.00%40568 MAJOR ROADWAY RESTO Stage Hand 10/17/2015

LORUSSO CORPORATION 19.0 0.0 0.00% 0.0 0.00% 0.0 0.00%40568 MAJOR ROADWAY RESTO Truck Driver 06/13/2015

VITA'S PAVING INC. 192.0 96.0 50.00% 192.0 100.00% 0.0 0.00%40568 MAJOR ROADWAY RESTO Laborer 07/02/2016

LORUSSO CORPORATION 1,184.0 599.0 50.59% 585.0 49.41% 0.0 0.00%40568 MAJOR ROADWAY RESTO Equipment Opera 11/07/2015

5,307.3 2,913.5 54.90% 3,312.3 62.41% 337.5 6.36%SUB TOTALS:

40613 UTILITY REPAIR ON VARIOUS S

$4,288,976Amount:

Gen Contractor: LORUSSO CORPORATION

(508)695-3252 3 BELCHER STREET PLAINVILLE

Est Start Date:

Est End Date:

04/30/2015

06/30/2016

VITA'S PAVING INC. 2,398.0 1,444.0 60.22% 2,398.0 100.00% 0.0 0.00%40613 UTILITY REPAIR ON VARI Laborer 10/03/2015

LORUSSO CORPORATION 162.0 40.5 25.00% 162.0 100.00% 162.0 100.00%40613 UTILITY REPAIR ON VARI Stage Hand 10/17/2015

LORUSSO CORPORATION 730.0 389.5 53.36% 359.5 49.25% 0.0 0.00%40613 UTILITY REPAIR ON VARI Equipment Opera 10/17/2015

LORUSSO CORPORATION 4,583.0 3,047.0 66.48% 3,756.0 81.96% 0.0 0.00%40613 UTILITY REPAIR ON VARI Laborer 10/17/2015

7,873.0 4,921.0 62.50% 6,675.5 84.79% 162.0 2.06%SUB TOTALS:

40615 SIDEWALK REPAIRS IN AREA I

$2,889,562Amount:

Gen Contractor: CICCONI & SONS CONS. CO.

(617)782-6804 38 EATONIA STREET ALLSTON

Est Start Date:

Est End Date:

04/30/2015

06/30/2016

Page 32: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 32

Project Name Trade Latest Week

ARCHITECTURAL PAVING & ST 1,172.5 128.0 10.92% 1,063.0 90.66% 0.0 0.00%40615 SIDEWALK REPAIRS IN A Laborer 08/21/2016

ARCHITECTURAL PAVING & ST 523.0 0.0 0.00% 505.0 96.56% 0.0 0.00%40615 SIDEWALK REPAIRS IN A Mason 08/21/2016

CICCONI & SONS CONS. CO. 656.0 0.0 0.00% 408.0 62.20% 0.0 0.00%40615 SIDEWALK REPAIRS IN A Equipment Opera 08/20/2016

CICCONI & SONS CONS. CO. 4,014.0 2,388.0 59.49% 1,368.0 34.08% 0.0 0.00%40615 SIDEWALK REPAIRS IN A Laborer 08/20/2016

ARCHITECTURAL PAVING & ST 6.0 0.0 0.00% 0.0 0.00% 0.0 0.00%40615 SIDEWALK REPAIRS IN A Bricklayer 10/11/2015

6,371.5 2,516.0 39.49% 3,344.0 52.48% 0.0 0.00%SUB TOTALS:

40623 CIP FOR EAST BOSTON CENTR

$7,406,767Amount:

Gen Contractor: MCCOURT CONSTRUCTION

(617)269-2330 365 DORCHESTER AVE. DORCHESTER

Est Start Date:

Est End Date:

05/01/2015

12/31/2016

MCCOURT CONSTRUCTION 5,682.5 1,243.5 21.88% 1,243.5 21.88% 1,243.5 21.88%40623 CIP FOR EAST BOSTON C Equipment Opera 08/26/2017

MCCOURT CONSTRUCTION 13,817.5 5,752.0 41.63% 5,812.0 42.06% 1,679.5 12.15%40623 CIP FOR EAST BOSTON C Laborer 08/26/2017

M-O-N LANDSCAPING INC, 8.0 0.0 0.00% 0.0 0.00% 0.0 0.00%40623 CIP FOR EAST BOSTON C Equipment Opera 08/12/2017

M-O-N LANDSCAPING INC, 522.0 0.0 0.00% 4.0 0.77% 32.0 6.13%40623 CIP FOR EAST BOSTON C Laborer 09/16/2017

MTK CONSTRUCTION SERVIC 4,084.5 364.5 8.92% 364.5 8.92% 364.5 8.92%40623 CIP FOR EAST BOSTON C Laborer 09/16/2017

STEELCO FENCING 40.0 20.0 50.00% 36.0 90.00% 0.0 0.00%40623 CIP FOR EAST BOSTON C Laborer 08/22/2015

UNITED STONE AND SITE 90.0 0.0 0.00% 61.0 67.78% 0.0 0.00%40623 CIP FOR EAST BOSTON C Laborer 05/28/2017

ALBANESE BROTHERS 48.0 0.0 0.00% 0.0 0.00% 0.0 0.00%40623 CIP FOR EAST BOSTON C Equipment Opera 04/30/2016

UNITED STONE AND SITE 296.0 88.0 29.73% 88.0 29.73% 88.0 29.73%40623 CIP FOR EAST BOSTON C Mason 06/04/2017

MAYER TREE SERVICE, INC. 203.6 0.0 0.00% 0.0 0.00% 0.0 0.00%40623 CIP FOR EAST BOSTON C Laborer 07/12/2015

UNITED STONE AND SITE 64.0 0.0 0.00% 0.0 0.00% 0.0 0.00%40623 CIP FOR EAST BOSTON C Equipment Opera 05/28/2017

MASS BAY ELECTRIC CORP. 437.0 0.0 0.00% 0.0 0.00% 8.0 1.83%40623 CIP FOR EAST BOSTON C Lineman 09/10/2017

MASS BAY ELECTRIC CORP. 37.0 0.0 0.00% 0.0 0.00% 0.0 0.00%40623 CIP FOR EAST BOSTON C Laborer 12/04/2016

MASS BAY ELECTRIC CORP. 328.0 264.0 80.49% 0.0 0.00% 208.0 63.41%40623 CIP FOR EAST BOSTON C Groundman 09/10/2017

MASS BAY ELECTRIC CORP. 64.0 0.0 0.00% 0.0 0.00% 0.0 0.00%40623 CIP FOR EAST BOSTON C Equipment Opera 07/30/2017

MASS BAY ELECTRIC CORP. 1,352.0 707.0 52.29% 330.0 24.41% 24.0 1.78%40623 CIP FOR EAST BOSTON C Electrician 09/17/2017

DON MARTIN CORPORATION 48.0 0.0 0.00% 32.0 66.67% 0.0 0.00%40623 CIP FOR EAST BOSTON C Laborer 12/12/2015

DON MARTIN CORPORATION 56.0 0.0 0.00% 8.0 14.29% 0.0 0.00%40623 CIP FOR EAST BOSTON C Equipment Opera 12/12/2015

DON MARTIN CORPORATION 32.0 0.0 0.00% 16.0 50.00% 0.0 0.00%40623 CIP FOR EAST BOSTON C Asphalt Raker 12/12/2015

ALGAR CONSTRUCTION CORP 833.5 294.0 35.27% 149.5 17.94% 0.0 0.00%40623 CIP FOR EAST BOSTON C Laborer 11/05/2016

ALGAR CONSTRUCTION CORP 955.0 0.0 0.00% 73.0 7.64% 0.0 0.00%40623 CIP FOR EAST BOSTON C Carpenter 11/05/2016

ALGAR CONSTRUCTION CORP 198.0 0.0 0.00% 53.0 26.77% 0.0 0.00%40623 CIP FOR EAST BOSTON C Iron Worker 10/29/2016

29,196.6 8,733.0 29.91% 8,270.5 28.33% 3,647.5 12.49%SUB TOTALS:

40625 OLD COLONY-PHASE 2C HIGH

$667,697Amount:

Gen Contractor: FRED DEROMA & SON

(617)327-3030 45 GREW AVENUE ROSLINDALE

Est Start Date:

Est End Date:

04/30/2015

06/30/2016

FRED DEROMA & SON 424.0 256.0 60.38% 0.0 0.00% 0.0 0.00%40625 OLD COLONY-PHASE 2C Equipment Opera 04/23/2016

Page 33: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 33

Project Name Trade Latest Week

MASS BAY ELECTRIC CORP. 48.0 0.0 0.00% 0.0 0.00% 0.0 0.00%40625 OLD COLONY-PHASE 2C Groundman 06/28/2015

MASS BAY ELECTRIC CORP. 60.0 0.0 0.00% 0.0 0.00% 0.0 0.00%40625 OLD COLONY-PHASE 2C Lineman 07/26/2015

E. J. PAVING COMPANY INC. 68.0 0.0 0.00% 48.0 70.59% 0.0 0.00%40625 OLD COLONY-PHASE 2C Laborer 05/30/2015

FRED DEROMA & SON 1,030.5 522.0 50.66% 260.0 25.23% 72.0 6.99%40625 OLD COLONY-PHASE 2C Laborer 04/23/2016

MASS BAY ELECTRIC CORP. 129.0 22.0 17.05% 16.0 12.40% 0.0 0.00%40625 OLD COLONY-PHASE 2C Electrician 01/31/2016

1,759.5 800.0 45.47% 324.0 18.41% 72.0 4.09%SUB TOTALS:

40634 SIDEWALK REPAIRS IN AREA II

$1,769,479Amount:

Gen Contractor: FRED DEROMA & SON

(617)327-3030 45 GREW AVENUE ROSLINDALE

Est Start Date:

Est End Date:

04/30/2015

06/03/2016

FRED DEROMA & SON 1,521.0 898.0 59.04% 0.0 0.00% 0.0 0.00%40634 SIDEWALK REPAIRS IN A Equipment Opera 05/07/2016

FRED DEROMA & SON 5,012.5 2,645.0 52.77% 1,421.0 28.35% 338.0 6.74%40634 SIDEWALK REPAIRS IN A Laborer 05/07/2016

6,533.5 3,543.0 54.23% 1,421.0 21.75% 338.0 5.17%SUB TOTALS:

40635 SIDEWALK REPAIRS IN AREA III

$2,127,525Amount:

Gen Contractor: FRED DEROMA & SON

(617)327-3030 45 GREW AVENUE ROSLINDALE

Est Start Date:

Est End Date:

04/30/2015

06/30/2016

FRED DEROMA & SON 2,147.0 561.0 26.13% 0.0 0.00% 0.0 0.00%40635 SIDEWALK REPAIRS IN A Equipment Opera 05/14/2016

FRED DEROMA & SON 5,349.5 3,459.0 64.66% 1,551.0 28.99% 415.0 7.76%40635 SIDEWALK REPAIRS IN A Laborer 05/14/2016

7,496.5 4,020.0 53.63% 1,551.0 20.69% 415.0 5.54%SUB TOTALS:

40638 ASPHALT RESURFACING IN AR

$1,895,284Amount:

Gen Contractor: MARIO SUSI & SON INC,

(617)265-4525 36 WESTWOOD STREET DORCHESTER

Est Start Date:

Est End Date:

04/01/2015

06/30/2016

MASS BAY ELECTRIC CORP. 48.0 0.0 0.00% 0.0 0.00% 0.0 0.00%40638 ASPHALT RESURFACING I Groundman 11/15/2015

MARIO SUSI & SON INC, 304.0 0.0 0.00% 0.0 0.00% 0.0 0.00%40638 ASPHALT RESURFACING I Asphalt Raker 04/16/2016

MARIO SUSI & SON INC, 414.0 0.0 0.00% 52.0 12.56% 0.0 0.00%40638 ASPHALT RESURFACING I Equipment Opera 04/16/2016

MARIO SUSI & SON INC, 1,872.5 920.5 49.16% 604.5 32.28% 155.0 8.28%40638 ASPHALT RESURFACING I Laborer 04/16/2016

MASS BAY ELECTRIC CORP. 48.0 48.0 100.00% 0.0 0.00% 0.0 0.00%40638 ASPHALT RESURFACING I Electrician 11/15/2015

2,686.5 968.5 36.05% 656.5 24.44% 155.0 5.77%SUB TOTALS:

40639 ASPHALT RESURFACING IN AR

$1,750,669Amount:

Gen Contractor: MARIO SUSI & SON INC,

(617)265-4525 36 WESTWOOD STREET DORCHESTER

Est Start Date:

Est End Date:

04/01/2015

06/30/2016

MARIO SUSI & SON INC, 1,658.5 807.0 48.66% 576.5 34.76% 118.5 7.15%40639 ASPHALT RESURFACING I Laborer 08/08/2015

MARIO SUSI & SON INC, 272.0 0.0 0.00% 0.0 0.00% 0.0 0.00%40639 ASPHALT RESURFACING I Asphalt Raker 07/25/2015

MARIO SUSI & SON INC, 377.5 0.0 0.00% 62.0 16.42% 0.0 0.00%40639 ASPHALT RESURFACING I Equipment Opera 08/08/2015

2,308.0 807.0 34.97% 638.5 27.66% 118.5 5.13%SUB TOTALS:

40640 ASPHALT RESURFACING IN AR

$1,835,439Amount:

Gen Contractor: MARIO SUSI & SON INC,

(617)265-4525 36 WESTWOOD STREET DORCHESTER

Est Start Date:

Est End Date:

04/01/2015

06/30/2016

Page 34: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 34

Project Name Trade Latest Week

MARIO SUSI & SON INC, 184.0 0.0 0.00% 0.0 0.00% 0.0 0.00%40640 ASPHALT RESURFACING I Asphalt Raker 07/11/2015

MARIO SUSI & SON INC, 280.0 0.0 0.00% 48.0 17.14% 0.0 0.00%40640 ASPHALT RESURFACING I Equipment Opera 08/08/2015

MARIO SUSI & SON INC, 1,126.0 478.0 42.45% 364.0 32.33% 72.0 6.39%40640 ASPHALT RESURFACING I Laborer 08/08/2015

1,590.0 478.0 30.06% 412.0 25.91% 72.0 4.53%SUB TOTALS:

40747 PATHWAY IMP. TO FRANKLIN P

$336,000Amount:

Gen Contractor: FLEMING BROS INC.

(781)843-4071 106 COLUMBIA STREET QUINCY

Est Start Date:

Est End Date:

06/21/2015

09/30/2015

E. J. PAVING COMPANY INC. 85.0 0.0 0.00% 54.0 63.53% 0.0 0.00%40747 PATHWAY IMP. TO FRANK Laborer 06/27/2015

FLEMING BROS INC. 128.0 128.0 100.00% 0.0 0.00% 0.0 0.00%40747 PATHWAY IMP. TO FRANK Equipment Opera 07/03/2015

FLEMING BROS INC. 176.0 176.0 100.00% 80.0 45.45% 0.0 0.00%40747 PATHWAY IMP. TO FRANK Laborer 06/26/2015

389.0 304.0 78.15% 134.0 34.45% 0.0 0.00%SUB TOTALS:

40998 SIDEWALK NEIGHBORHOOD SA

$619,601Amount:

Gen Contractor: CICCONI & SONS CONS. CO.

(617)782-6804 38 EATONIA STREET ALLSTON

Est Start Date:

Est End Date:

07/27/2015

12/31/2015

CICCONI & SONS CONS. CO. 2,381.0 1,397.0 58.67% 984.0 41.33% 0.0 0.00%40998 SIDEWALK NEIGHBORHO Laborer 07/23/2016

MASS BAY ELECTRIC CORP. 12.0 0.0 0.00% 0.0 0.00% 0.0 0.00%40998 SIDEWALK NEIGHBORHO Laborer 11/20/2016

MASS BAY ELECTRIC CORP. 96.0 0.0 0.00% 16.0 16.67% 0.0 0.00%40998 SIDEWALK NEIGHBORHO Lineman 11/27/2016

MASS BAY ELECTRIC CORP. 51.0 16.0 31.37% 0.0 0.00% 16.0 31.37%40998 SIDEWALK NEIGHBORHO Groundman 11/13/2016

CICCONI & SONS CONS. CO. 488.0 0.0 0.00% 0.0 0.00% 0.0 0.00%40998 SIDEWALK NEIGHBORHO Equipment Opera 07/23/2016

MASS BAY ELECTRIC CORP. 8.0 0.0 0.00% 0.0 0.00% 0.0 0.00%40998 SIDEWALK NEIGHBORHO Equipment Opera 11/20/2016

MASS BAY ELECTRIC CORP. 235.0 66.0 28.09% 0.0 0.00% 0.0 0.00%40998 SIDEWALK NEIGHBORHO Electrician 09/10/2017

3,271.0 1,479.0 45.22% 1,000.0 30.57% 16.0 0.49%SUB TOTALS:

41110 SIDEWALK RECONSTRUCTION

$1,259,799Amount:

Gen Contractor: CICCONI & SONS CONS. CO.

(617)782-6804 38 EATONIA STREET ALLSTON

Est Start Date:

Est End Date:

07/20/2015

12/31/2015

CICCONI & SONS CONS. CO. 920.0 0.0 0.00% 400.0 43.48% 0.0 0.00%41110 SIDEWALK RECONSTRUC Equipment Opera 06/18/2016

CICCONI & SONS CONS. CO. 2,849.0 1,961.0 68.83% 888.0 31.17% 0.0 0.00%41110 SIDEWALK RECONSTRUC Laborer 06/18/2016

3,769.0 1,961.0 52.03% 1,288.0 34.17% 0.0 0.00%SUB TOTALS:

41240 IMPROVEMENTS TO JOHN HAR

$1,412,000Amount:

Gen Contractor: MARINI CONSTRUCTION CORP

UNK BOSTON

Est Start Date:

Est End Date:

07/15/2015

08/31/2016

RONALD A. MARINI CORPORA 840.0 408.0 48.57% 0.0 0.00% 0.0 0.00%41240 IMPROVEMENTS TO JOH Mason Tender 10/05/2016

MASS BAY ELECTRIC CORP. 53.0 0.0 0.00% 0.0 0.00% 0.0 0.00%41240 IMPROVEMENTS TO JOH Electrician 01/17/2016

MASS BAY ELECTRIC CORP. 6.0 0.0 0.00% 0.0 0.00% 0.0 0.00%41240 IMPROVEMENTS TO JOH Groundman 09/06/2015

MASS BAY ELECTRIC CORP. 38.0 0.0 0.00% 0.0 0.00% 0.0 0.00%41240 IMPROVEMENTS TO JOH Lineman 01/17/2016

RONALD A. MARINI CORPORA 1,544.0 0.0 0.00% 0.0 0.00% 0.0 0.00%41240 IMPROVEMENTS TO JOH Equipment Opera 10/05/2016

RONALD A. MARINI CORPORA 1,666.0 792.0 47.54% 0.0 0.00% 0.0 0.00%41240 IMPROVEMENTS TO JOH Laborer 06/08/2016

Page 35: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 35

Project Name Trade Latest Week

4,147.0 1,200.0 28.94% 0.0 0.00% 0.0 0.00%SUB TOTALS:

41241 IMPRO. TO MALCOLM X BALLFI

$369,000Amount:

Gen Contractor: NELM CORPORATION

781/421-3380 135 INDUSTRIAL WAY ROCKLAND

Est Start Date:

Est End Date:

07/15/2015

06/30/2016

NELM CORPORATION 472.0 304.0 64.41% 384.0 81.36% 0.0 0.00%41241 IMPRO. TO MALCOLM X B Laborer 11/07/2015

472.0 304.0 64.41% 384.0 81.36% 0.0 0.00%SUB TOTALS:

41385 STONE WALL REPAIRS ON DAN

$90,469Amount:

Gen Contractor: MARIO SUSI & SON INC,

(617)265-4525 36 WESTWOOD STREET DORCHESTER

Est Start Date:

Est End Date:

10/01/2015

12/01/2015

MARIO SUSI & SON INC, 8.0 0.0 0.00% 0.0 0.00% 0.0 0.00%41385 STONE WALL REPAIRS O Equipment Opera 10/31/2015

MARIO SUSI & SON INC, 376.5 204.0 54.18% 120.0 31.87% 35.0 9.30%41385 STONE WALL REPAIRS O Laborer 11/21/2015

MARIO SUSI & SON INC, 8.0 0.0 0.00% 0.0 0.00% 0.0 0.00%41385 STONE WALL REPAIRS O Asphalt Raker 10/31/2015

392.5 204.0 51.97% 120.0 30.57% 35.0 8.92%SUB TOTALS:

41397 INSTALLATION OF PLAYGOUND

$40,060Amount:

Gen Contractor: FLEMING BROS INC.

(781)843-4071 106 COLUMBIA STREET QUINCY

Est Start Date:

Est End Date:

10/01/2015

11/30/2015

FLEMING BROS INC. 16.0 16.0 100.00% 0.0 0.00% 0.0 0.00%41397 INSTALLATION OF PLAYG Equipment Opera 10/02/2015

FLEMING BROS INC. 24.0 24.0 100.00% 8.0 33.33% 0.0 0.00%41397 INSTALLATION OF PLAYG Laborer 10/02/2015

40.0 40.0 100.00% 8.0 20.00% 0.0 0.00%SUB TOTALS:

41426 CONGRESS ST & SLEEPER ST I

$749,704Amount:

Gen Contractor: MARIO SUSI & SON INC,

(617)265-4525 36 WESTWOOD STREET DORCHESTER

Est Start Date:

Est End Date:

10/15/2015

12/31/2015

MASS BAY ELECTRIC CORP. 101.0 0.0 0.00% 0.0 0.00% 0.0 0.00%41426 CONGRESS ST & SLEEPE Lineman 02/28/2016

MARIO SUSI & SON INC, 48.0 0.0 0.00% 0.0 0.00% 0.0 0.00%41426 CONGRESS ST & SLEEPE Asphalt Raker 10/15/2016

MARIO SUSI & SON INC, 176.0 0.0 0.00% 8.0 4.55% 0.0 0.00%41426 CONGRESS ST & SLEEPE Equipment Opera 10/15/2016

MARIO SUSI & SON INC, 1,257.0 631.0 50.20% 463.0 36.83% 84.0 6.68%41426 CONGRESS ST & SLEEPE Laborer 10/15/2016

MARKINGS INCORPORATED 3.5 0.0 0.00% 0.0 0.00% 0.0 0.00%41426 CONGRESS ST & SLEEPE Painter 10/23/2016

MASS BAY ELECTRIC CORP. 284.0 98.0 34.51% 34.0 11.97% 0.0 0.00%41426 CONGRESS ST & SLEEPE Electrician 08/14/2016

MASS BAY ELECTRIC CORP. 72.0 32.0 44.44% 0.0 0.00% 32.0 44.44%41426 CONGRESS ST & SLEEPE Groundman 02/28/2016

1,941.5 761.0 39.20% 505.0 26.01% 116.0 5.97%SUB TOTALS:

415 MCCLELLAN HIGHWAY

$26,000,000Amount:

Gen Contractor: CONSIGLI CONSTRUCTION

197 MAIN STREET MILFORD

Est Start Date:

Est End Date:

04/20/2014

05/31/2015

ROCKWELL ROOFING, INC. 2,021.0 0.0 0.00% 666.3 32.97% 0.0 0.00%415 MCCLELLAN HIGHWAY Roofer 04/11/2015

MP MASONRY, INC. 2,799.5 124.0 4.43% 1,233.5 44.06% 0.0 0.00%415 MCCLELLAN HIGHWAY Mason 07/11/2015

NEW ENGLAND WATERPROFI 1,700.5 0.0 0.00% 629.5 37.02% 236.5 13.91%415 MCCLELLAN HIGHWAY Waterproofer 07/11/2015

NH STEEL FABRICATORS INC 561.0 19.5 3.48% 180.5 32.17% 0.0 0.00%415 MCCLELLAN HIGHWAY Iron Worker 07/04/2015

Page 36: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 36

Project Name Trade Latest Week

R J FORBES PAINTING CONTR 4,997.5 0.0 0.00% 2,411.0 48.24% 484.0 9.68%415 MCCLELLAN HIGHWAY Painter 07/04/2015

RED LINE WALL SYSTEMS, INC 2,332.5 1,260.5 54.04% 854.0 36.61% 0.0 0.00%415 MCCLELLAN HIGHWAY Laborer 05/23/2015

RIGGS CONTRACTING, INC. 12,930.5 1,018.0 7.87% 1,772.0 13.70% 906.0 7.01%415 MCCLELLAN HIGHWAY Carpenter 07/25/2015

RIGGS CONTRACTING, INC. 4,377.0 1,755.5 40.11% 2,122.0 48.48% 186.5 4.26%415 MCCLELLAN HIGHWAY Laborer 07/25/2015

MIDNIGHT IRON CONST. 192.0 90.0 46.88% 192.0 100.00% 0.0 0.00%415 MCCLELLAN HIGHWAY Iron Worker 10/11/2014

RIGGS CONTRACTING, INC. 80.0 0.0 0.00% 80.0 100.00% 0.0 0.00%415 MCCLELLAN HIGHWAY Mason Tender 01/10/2015

RED LINE WALL SYSTEMS, INC 16,770.0 6,183.0 36.87% 4,232.0 25.24% 890.0 5.31%415 MCCLELLAN HIGHWAY Carpenter 07/04/2015

SILVERBACKCONCRETE CON 871.5 50.0 5.74% 159.5 18.30% 8.0 0.92%415 MCCLELLAN HIGHWAY Cement Finisher 07/18/2015

SILVERBACKCONCRETE CON 854.0 0.0 0.00% 297.5 34.84% 0.0 0.00%415 MCCLELLAN HIGHWAY Cement Laborer 07/18/2015

SUBSURFACE CONSTRUCTIO 1,118.5 307.0 27.45% 0.0 0.00% 0.0 0.00%415 MCCLELLAN HIGHWAY Equipment Opera 07/22/2014

SUBSURFACE CONSTRUCTIO 256.0 134.5 52.54% 134.5 52.54% 0.0 0.00%415 MCCLELLAN HIGHWAY Oiler 07/22/2014

T & T ELECTRICAL CO. 18,187.0 8,023.0 44.11% 5,719.0 31.45% 0.0 0.00%415 MCCLELLAN HIGHWAY Electrician 07/18/2015

RIGGS CONTRACTING, INC. 16.0 0.0 0.00% 0.0 0.00% 0.0 0.00%415 MCCLELLAN HIGHWAY Mason 06/27/2015

CONSIGLI CONSTRUCTION 2,337.0 826.0 35.34% 1,161.5 49.70% 0.0 0.00%415 MCCLELLAN HIGHWAY Laborer 12/27/2014

AJAX CONSTRUCTION CO, INC 2,215.5 72.0 3.25% 0.0 0.00% 0.0 0.00%415 MCCLELLAN HIGHWAY Iron Worker 03/07/2015

CAPITAL CARPET&FLOORING 2,042.0 400.0 19.59% 816.0 39.96% 0.0 0.00%415 MCCLELLAN HIGHWAY Floor Layer 07/18/2015

REGAL FLOOR COVERING, INC 3,348.0 852.0 25.45% 0.0 0.00% 0.0 0.00%415 MCCLELLAN HIGHWAY Floor Layer 07/18/2015

CONSIGLI CONSTRUCTION 2,989.5 501.5 16.78% 304.5 10.19% 299.5 10.02%415 MCCLELLAN HIGHWAY Carpenter 12/27/2014

K.R.REZENDES, INC. 21.8 0.0 0.00% 0.0 0.00% 0.0 0.00%415 MCCLELLAN HIGHWAY Truck Driver 06/20/2015

CONSIGLI CONSTRUCTION 166.0 0.0 0.00% 134.0 80.72% 0.0 0.00%415 MCCLELLAN HIGHWAY Mason Tender 12/27/2014

COVENANT FIRE PROTECTION 2,428.0 72.0 2.97% 729.0 30.02% 0.0 0.00%415 MCCLELLAN HIGHWAY Sprinkler Fitter 07/11/2015

EAST COAST INTERIORS CO. 15,545.5 4,237.5 27.26% 2,691.5 17.31% 576.5 3.71%415 MCCLELLAN HIGHWAY Carpenter 05/30/2015

HAROLD BROTHERS MECHANI 2,681.5 878.5 32.76% 1,074.5 40.07% 0.0 0.00%415 MCCLELLAN HIGHWAY HVAC 06/27/2015

ISLAND INTER. INDUSTRIES. 62.0 0.0 0.00% 0.0 0.00% 0.0 0.00%415 MCCLELLAN HIGHWAY Plasterer 10/25/2014

K.R.REZENDES, INC. 8,075.5 2,536.0 31.40% 1,472.5 18.23% 104.0 1.29%415 MCCLELLAN HIGHWAY Laborer 07/18/2015

JEREZ LLC 536.0 448.0 83.58% 536.0 100.00% 208.0 38.81%415 MCCLELLAN HIGHWAY Laborer 07/18/2015

K & G ENTRANCES INC. 32.0 0.0 0.00% 0.0 0.00% 0.0 0.00%415 MCCLELLAN HIGHWAY Carpenter 05/23/2015

K & G ENTRANCES INC. 653.5 58.5 8.95% 158.0 24.18% 0.0 0.00%415 MCCLELLAN HIGHWAY Glazier 07/18/2015

K & K ACOUSTICAL CEILINGS 347.0 238.0 68.59% 0.0 0.00% 24.0 6.92%415 MCCLELLAN HIGHWAY Carpenter 06/20/2015

K.R.REZENDES, INC. 4,122.5 950.0 23.04% 950.0 23.04% 0.0 0.00%415 MCCLELLAN HIGHWAY Equipment Opera 07/18/2015

COMMONWEALTH PLUMBING 9,396.0 3,736.0 39.76% 1,656.0 17.62% 312.0 3.32%415 MCCLELLAN HIGHWAY Plumber 07/18/2015

ISLAND INTER. INDUSTRIES. 130.0 116.0 89.23% 62.0 47.69% 0.0 0.00%415 MCCLELLAN HIGHWAY Laborer 10/25/2014

127,193.8 34,887.0 27.43% 32,428.8 25.50% 4,235.0 3.33%SUB TOTALS:

Page 37: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 37

Project Name Trade Latest Week

41728 HIGHWAY CONSTRUCTION BAN

$2,175,021Amount:

Gen Contractor: MARIO SUSI & SON INC,

(617)265-4525 36 WESTWOOD STREET DORCHESTER

Est Start Date:

Est End Date:

12/31/2015

07/29/2016

MARIO SUSI & SON INC, 1,047.5 0.0 0.00% 10.0 0.95% 0.0 0.00%41728 HIGHWAY CONSTRUCTIO Equipment Opera 06/25/2016

MASS BAY ELECTRIC CORP. 32.0 0.0 0.00% 0.0 0.00% 0.0 0.00%41728 HIGHWAY CONSTRUCTIO Lineman 05/22/2016

MARIO SUSI & SON INC, 4,512.5 2,046.5 45.35% 2,078.0 46.05% 108.5 2.40%41728 HIGHWAY CONSTRUCTIO Laborer 09/24/2016

MARIO SUSI & SON INC, 242.5 0.0 0.00% 0.0 0.00% 0.0 0.00%41728 HIGHWAY CONSTRUCTIO Asphalt Raker 06/25/2016

MASS BAY ELECTRIC CORP. 16.0 0.0 0.00% 0.0 0.00% 0.0 0.00%41728 HIGHWAY CONSTRUCTIO Electrician 05/22/2016

5,850.5 2,046.5 34.98% 2,088.0 35.69% 108.5 1.85%SUB TOTALS:

41840 ASPHATL RESURF. IN PUBLIC A

$426,064Amount:

Gen Contractor: MATHIAS CORPORATION

(617)524-4372 86 RUSSMORE ROAD P.O.366343 BOSTON

Est Start Date:

Est End Date:

04/01/2016

12/01/2016

MATHIAS CORPORATION 340.0 161.0 47.35% 172.0 50.59% 49.0 14.41%41840 ASPHATL RESURF. IN PU Asphalt Raker 12/10/2016

MATHIAS CORPORATION 146.0 79.0 54.11% 0.0 0.00% 0.0 0.00%41840 ASPHATL RESURF. IN PU Equipment Opera 12/10/2016

MATHIAS CORPORATION 140.0 71.0 50.71% 140.0 100.00% 0.0 0.00%41840 ASPHATL RESURF. IN PU Laborer 12/10/2016

626.0 311.0 49.68% 312.0 49.84% 49.0 7.83%SUB TOTALS:

42073 MAJOR ROADWAY TRENCH RE

$4,730,027Amount:

Gen Contractor: LORUSSO CORPORATION

(508)695-3252 3 BELCHER STREET PLAINVILLE

Est Start Date:

Est End Date:

04/01/2016

06/30/2017

LORUSSO CORPORATION 290.5 263.5 90.71% 60.5 20.83% 0.0 0.00%42073 MAJOR ROADWAY TRENC Equipment Opera 09/24/2016

MANNY R PAVING CO. 24.0 0.0 0.00% 24.0 100.00% 0.0 0.00%42073 MAJOR ROADWAY TRENC Laborer 11/19/2016

WELCH WELDING AND TRUCK 19.0 0.0 0.00% 0.0 0.00% 0.0 0.00%42073 MAJOR ROADWAY TRENC Welder 10/29/2016

VITA'S PAVING INC. 160.0 80.0 50.00% 160.0 100.00% 0.0 0.00%42073 MAJOR ROADWAY TRENC Laborer 07/02/2016

MEDEIROS HYDRO SEEDING 153.5 0.0 0.00% 32.0 20.85% 10.5 6.84%42073 MAJOR ROADWAY TRENC Laborer 05/06/2017

MANNY R PAVING CO. 8.0 0.0 0.00% 8.0 100.00% 0.0 0.00%42073 MAJOR ROADWAY TRENC Lather 11/19/2016

D'ALLESSANDRO CORPORATI 5.0 0.0 0.00% 0.0 0.00% 0.0 0.00%42073 MAJOR ROADWAY TRENC Cement Finisher 12/10/2016

LORUSSO CORPORATION 2,661.3 1,544.0 58.02% 1,972.8 74.13% 0.0 0.00%42073 MAJOR ROADWAY TRENC Laborer 09/24/2016

GILBERT ELECTRIC & CONST. 112.5 0.0 0.00% 21.0 18.67% 0.0 0.00%42073 MAJOR ROADWAY TRENC Laborer 06/24/2017

GILBERT ELECTRIC & CONST. 27.0 0.0 0.00% 0.0 0.00% 0.0 0.00%42073 MAJOR ROADWAY TRENC Equipment Opera 04/29/2017

GILBERT ELECTRIC & CONST. 9.0 0.0 0.00% 3.0 33.33% 0.0 0.00%42073 MAJOR ROADWAY TRENC Cement Finisher 11/26/2016

D'ALLESSANDRO CORPORATI 36.0 0.0 0.00% 0.0 0.00% 0.0 0.00%42073 MAJOR ROADWAY TRENC Laborer 07/29/2017

LORUSSO CORPORATION 617.0 317.0 51.38% 617.0 100.00% 617.0 100.00%42073 MAJOR ROADWAY TRENC Stage Hand 07/23/2016

4,122.8 2,204.5 53.47% 2,898.3 70.30% 627.5 15.22%SUB TOTALS:

42074 UTILITY REPAIR MALL AREAS

$2,898,420Amount:

Gen Contractor: LORUSSO CORPORATION

(508)695-3252 3 BELCHER STREET PLAINVILLE

Est Start Date:

Est End Date:

04/01/2016

06/30/2017

LORUSSO CORPORATION 622.0 467.0 75.08% 188.5 30.31% 0.0 0.00%42074 UTILITY REPAIR MALL AR Equipment Opera 08/13/2016

Page 38: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 38

Project Name Trade Latest Week

LORUSSO CORPORATION 2,914.8 1,763.5 60.50% 1,843.8 63.26% 0.0 0.00%42074 UTILITY REPAIR MALL AR Laborer 10/22/2016

LORUSSO CORPORATION 434.5 155.0 35.67% 434.5 100.00% 434.5 100.00%42074 UTILITY REPAIR MALL AR Stage Hand 07/16/2016

3,971.3 2,385.5 60.07% 2,466.8 62.12% 434.5 10.94%SUB TOTALS:

42077 CIP#15-92 RIGHT LANE CLOSUR

$250,384Amount:

Gen Contractor: N. E. L. CORPORATION

1 FARM LANE #101 GEORGETOWN

Est Start Date:

Est End Date:

03/01/2016

04/01/2016

N. E. L. CORPORATION 24.0 0.0 0.00% 0.0 0.00% 0.0 0.00%42077 CIP#15-92 RIGHT LANE CL Equipment Opera 03/26/2016

N. E. L. CORPORATION 64.0 16.0 25.00% 28.0 43.75% 0.0 0.00%42077 CIP#15-92 RIGHT LANE CL Laborer 03/26/2016

N. E. L. CORPORATION 12.0 0.0 0.00% 0.0 0.00% 0.0 0.00%42077 CIP#15-92 RIGHT LANE CL Carpenter 03/05/2016

MARKINGS INCORPORATED 6.0 0.0 0.00% 0.0 0.00% 0.0 0.00%42077 CIP#15-92 RIGHT LANE CL Painter 03/13/2016

NORTHEAST TRAFFIC CONTR 16.0 0.0 0.00% 0.0 0.00% 0.0 0.00%42077 CIP#15-92 RIGHT LANE CL Laborer 02/27/2016

122.0 16.0 13.11% 28.0 22.95% 0.0 0.00%SUB TOTALS:

42108 MONSIGNOR REYNOLDS

$402,000Amount:

Gen Contractor: FLEMING BROS INC.

(781)843-4071 106 COLUMBIA STREET QUINCY

Est Start Date:

Est End Date:

04/01/2016

10/27/2016

FLEMING BROS INC. 136.0 0.0 0.00% 0.0 0.00% 0.0 0.00%42108 MONSIGNOR REYNOLDS Equipment Opera 06/17/2016

FLEMING BROS INC. 264.0 128.0 48.48% 104.0 39.39% 0.0 0.00%42108 MONSIGNOR REYNOLDS Laborer 06/17/2016

400.0 128.0 32.00% 104.0 26.00% 0.0 0.00%SUB TOTALS:

42111 MARCELLA PLAYGROUND

$1,894,000Amount:

Gen Contractor: FLEMING BROS INC.

(781)843-4071 106 COLUMBIA STREET QUINCY

Est Start Date:

Est End Date:

04/01/2016

05/29/2017

FLEMING BROS INC. 664.0 480.0 72.29% 0.0 0.00% 0.0 0.00%42111 MARCELLA PLAYGROUND Equipment Opera 08/05/2016

FLEMING BROS INC. 1,056.0 904.0 85.61% 480.0 45.45% 48.0 4.55%42111 MARCELLA PLAYGROUND Laborer 09/02/2016

FRANKLIN CRANE 64.0 0.0 0.00% 0.0 0.00% 0.0 0.00%42111 MARCELLA PLAYGROUND Equipment Opera 03/25/2016

FRANKLIN CRANE 48.0 0.0 0.00% 0.0 0.00% 0.0 0.00%42111 MARCELLA PLAYGROUND Laborer 03/18/2016

GILMAR BASTESTIN MASONRY 20.0 0.0 0.00% 20.0 100.00% 0.0 0.00%42111 MARCELLA PLAYGROUND Mason 06/17/2016

1,852.0 1,384.0 74.73% 500.0 27.00% 48.0 2.59%SUB TOTALS:

42150 REPAIRS TO SIDEWALKS IN AR

$1,788,597Amount:

Gen Contractor: FRED DEROMA & SON

(617)327-3030 45 GREW AVENUE ROSLINDALE

Est Start Date:

Est End Date:

06/01/2016

06/30/2017

FRED DEROMA & SON 1,856.5 1,404.0 75.63% 0.0 0.00% 0.0 0.00%42150 REPAIRS TO SIDEWALKS Equipment Opera 06/03/2017

FRED DEROMA & SON 5,999.0 3,067.0 51.13% 1,323.0 22.05% 304.0 5.07%42150 REPAIRS TO SIDEWALKS Laborer 06/03/2017

7,855.5 4,471.0 56.92% 1,323.0 16.84% 304.0 3.87%SUB TOTALS:

42151 REPAIRS TO SIDEWALKS IN AR

$1,727,176Amount:

Gen Contractor: FRED DEROMA & SON

(617)327-3030 45 GREW AVENUE ROSLINDALE

Est Start Date:

Est End Date:

06/01/2016

06/30/2017

FRED DEROMA & SON 5,130.0 2,714.0 52.90% 1,102.0 21.48% 202.0 3.94%42151 REPAIRS TO SIDEWALKS Laborer 06/17/2017

Page 39: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 39

Project Name Trade Latest Week

FRED DEROMA & SON 1,497.0 581.0 38.81% 0.0 0.00% 0.0 0.00%42151 REPAIRS TO SIDEWALKS Equipment Opera 06/17/2017

6,627.0 3,295.0 49.72% 1,102.0 16.63% 202.0 3.05%SUB TOTALS:

42153 WALKABLE STREETS SIDEWAL

$1,012,953Amount:

Gen Contractor: MARIO SUSI & SON INC,

(617)265-4525 36 WESTWOOD STREET DORCHESTER

Est Start Date:

Est End Date:

06/01/2016

06/30/2017

MARIO SUSI & SON INC, 3,222.0 1,366.5 42.41% 1,222.5 37.94% 151.0 4.69%42153 WALKABLE STREETS SID Laborer 08/26/2017

MARIO SUSI & SON INC, 145.0 0.0 0.00% 0.0 0.00% 0.0 0.00%42153 WALKABLE STREETS SID Equipment Opera 08/19/2017

MARIO SUSI & SON INC, 8.0 0.0 0.00% 0.0 0.00% 0.0 0.00%42153 WALKABLE STREETS SID Asphalt Raker 04/22/2017

3,375.0 1,366.5 40.49% 1,222.5 36.22% 151.0 4.47%SUB TOTALS:

42186 REPAIRS TO SIDEWALKS IN AR

$1,876,822Amount:

Gen Contractor: CICCONI & SONS CONS. CO.

(617)782-6804 38 EATONIA STREET ALLSTON

Est Start Date:

Est End Date:

06/01/2016

06/30/2017

CICCONI & SONS CONS. CO. 1,160.0 0.0 0.00% 0.0 0.00% 0.0 0.00%42186 REPAIRS TO SIDEWALKS Equipment Opera 06/03/2017

CICCONI & SONS CONS. CO. 7,016.0 4,664.0 66.48% 2,352.0 33.52% 0.0 0.00%42186 REPAIRS TO SIDEWALKS Laborer 06/03/2017

8,176.0 4,664.0 57.05% 2,352.0 28.77% 0.0 0.00%SUB TOTALS:

42208 ASPHALT RESURFACING AREA

$1,826,064Amount:

Gen Contractor: ROCHESTER BITUMINOUS PRODUCTS

(508)295-8045 83 KINGS WAY WEST WAREHAM

Est Start Date:

Est End Date:

06/01/2016

06/30/2017

ROCHESTER BITUMINOUS PR 2,526.5 1,742.5 68.97% 1,867.0 73.90% 301.0 11.91%42208 ASPHALT RESURFACING Laborer 06/24/2017

TRAFFIC MARKINGS INC 333.0 0.0 0.00% 149.5 44.89% 0.0 0.00%42208 ASPHALT RESURFACING Laborer 07/22/2017

ROCHESTER BITUMINOUS PR 101.5 0.0 0.00% 50.5 49.75% 0.0 0.00%42208 ASPHALT RESURFACING Equipment Opera 06/24/2017

ROCHESTER BITUMINOUS PR 80.5 0.0 0.00% 19.5 24.22% 0.0 0.00%42208 ASPHALT RESURFACING Asphalt Raker 07/16/2016

GARRITY ASPHALT 32.5 0.0 0.00% 0.0 0.00% 0.0 0.00%42208 ASPHALT RESURFACING Groundman 07/09/2016

DON MARTIN CORPORATION 123.0 0.0 0.00% 17.0 13.82% 0.0 0.00%42208 ASPHALT RESURFACING Laborer 07/30/2016

DON MARTIN CORPORATION 27.5 0.0 0.00% 0.0 0.00% 0.0 0.00%42208 ASPHALT RESURFACING Equipment Opera 07/23/2016

DON MARTIN CORPORATION 464.0 0.0 0.00% 180.0 38.79% 0.0 0.00%42208 ASPHALT RESURFACING Asphalt Raker 07/30/2016

GARRITY ASPHALT 164.0 0.0 0.00% 0.0 0.00% 0.0 0.00%42208 ASPHALT RESURFACING Laborer 07/30/2016

3,852.5 1,742.5 45.23% 2,283.5 59.27% 301.0 7.81%SUB TOTALS:

42221 ASPHALT RESURFACING IN AR

$1,975,257Amount:

Gen Contractor: MARIO SUSI & SON INC,

(617)265-4525 36 WESTWOOD STREET DORCHESTER

Est Start Date:

Est End Date:

06/01/2016

06/30/2017

MARIO SUSI & SON INC, 3,443.5 1,661.0 48.24% 1,198.5 34.80% 170.0 4.94%42221 ASPHALT RESURFACING I Laborer 11/12/2016

MARIO SUSI & SON INC, 764.5 0.0 0.00% 115.5 15.11% 0.0 0.00%42221 ASPHALT RESURFACING I Equipment Opera 11/12/2016

MARIO SUSI & SON INC, 717.0 0.0 0.00% 0.0 0.00% 0.0 0.00%42221 ASPHALT RESURFACING I Asphalt Raker 09/17/2016

4,925.0 1,661.0 33.73% 1,314.0 26.68% 170.0 3.45%SUB TOTALS:

Page 40: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 40

Project Name Trade Latest Week

42222 ASPHALT RESURFACING IN AR

$1,862,270Amount:

Gen Contractor: MARIO SUSI & SON INC,

(617)265-4525 36 WESTWOOD STREET DORCHESTER

Est Start Date:

Est End Date:

06/01/2016

06/30/2017

MARIO SUSI & SON INC, 1,448.5 586.0 40.46% 453.0 31.27% 97.0 6.70%42222 ASPHALT RESURFACING I Laborer 06/17/2017

MARIO SUSI & SON INC, 208.0 0.0 0.00% 0.0 0.00% 0.0 0.00%42222 ASPHALT RESURFACING I Asphalt Raker 06/17/2017

MARIO SUSI & SON INC, 326.0 0.0 0.00% 44.0 13.50% 0.0 0.00%42222 ASPHALT RESURFACING I Equipment Opera 06/17/2017

1,982.5 586.0 29.56% 497.0 25.07% 97.0 4.89%SUB TOTALS:

42415 DEEP ROADWAY MAINTENANC

$575,945Amount:

Gen Contractor: MARIO SUSI & SON INC,

(617)265-4525 36 WESTWOOD STREET DORCHESTER

Est Start Date:

Est End Date:

08/01/2016

06/30/2017

MARIO SUSI & SON INC, 144.0 0.0 0.00% 0.0 0.00% 0.0 0.00%42415 DEEP ROADWAY MAINTE Asphalt Raker 11/19/2016

MARIO SUSI & SON INC, 268.0 0.0 0.00% 32.0 11.94% 0.0 0.00%42415 DEEP ROADWAY MAINTE Equipment Opera 11/19/2016

MARIO SUSI & SON INC, 1,609.0 775.0 48.17% 667.0 41.45% 73.0 4.54%42415 DEEP ROADWAY MAINTE Laborer 11/19/2016

MJM CONSTRUCTION 16.5 0.0 0.00% 0.0 0.00% 0.0 0.00%42415 DEEP ROADWAY MAINTE Equipment Opera 10/08/2016

2,037.5 775.0 38.04% 699.0 34.31% 73.0 3.58%SUB TOTALS:

42470 SAFETY SURFACING REPAIR

$139,000Amount:

Gen Contractor: FLEMING BROS INC.

(781)843-4071 106 COLUMBIA STREET QUINCY

Est Start Date:

Est End Date:

06/20/2016

07/08/2016

FLEMING BROS INC. 32.0 0.0 0.00% 0.0 0.00% 0.0 0.00%42470 SAFETY SURFACING REP Equipment Opera 06/24/2016

FLEMING BROS INC. 64.0 64.0 100.00% 32.0 50.00% 0.0 0.00%42470 SAFETY SURFACING REP Laborer 06/24/2016

AMEX SURFACE INSTALLER LL 96.0 0.0 0.00% 96.0 100.00% 0.0 0.00%42470 SAFETY SURFACING REP Laborer 07/01/2016

192.0 64.0 33.33% 128.0 66.67% 0.0 0.00%SUB TOTALS:

42505 MATTAPAN SQUARE STREETS

$497,748Amount:

Gen Contractor: FRED DEROMA & SON

(617)327-3030 45 GREW AVENUE ROSLINDALE

Est Start Date:

Est End Date:

07/01/2016

09/30/2016

D'ALLESSANDRO CORPORATI 50.0 8.0 16.00% 32.0 64.00% 0.0 0.00%42505 MATTAPAN SQUARE STR Laborer 08/20/2016

FRED DEROMA & SON 287.0 167.0 58.19% 0.0 0.00% 0.0 0.00%42505 MATTAPAN SQUARE STR Equipment Opera 11/12/2016

FRED DEROMA & SON 112.0 0.0 0.00% 0.0 0.00% 0.0 0.00%42505 MATTAPAN SQUARE STR Field Engineer 10/29/2016

FRED DEROMA & SON 1,197.5 598.5 49.98% 269.5 22.51% 7.0 0.58%42505 MATTAPAN SQUARE STR Laborer 11/12/2016

M-O-N LANDSCAPING INC, 16.0 0.0 0.00% 0.0 0.00% 0.0 0.00%42505 MATTAPAN SQUARE STR Equipment Opera 10/08/2016

M-O-N LANDSCAPING INC, 238.0 0.0 0.00% 16.0 6.72% 0.0 0.00%42505 MATTAPAN SQUARE STR Laborer 07/15/2017

VIGIL ELECTRIC COMPANY 22.5 12.3 54.44% 10.3 45.56% 0.0 0.00%42505 MATTAPAN SQUARE STR Groundman 12/10/2016

VIGIL ELECTRIC COMPANY 2.8 0.0 0.00% 2.8 100.00% 0.0 0.00%42505 MATTAPAN SQUARE STR Lineman 10/08/2016

VIGIL ELECTRIC COMPANY 21.8 21.8 100.00% 21.8 100.00% 0.0 0.00%42505 MATTAPAN SQUARE STR Technician 12/10/2016

D'ALLESSANDRO CORPORATI 32.0 0.0 0.00% 0.0 0.00% 0.0 0.00%42505 MATTAPAN SQUARE STR Equipment Opera 08/20/2016

1,979.5 807.5 40.79% 352.3 17.79% 7.0 0.35%SUB TOTALS:

Page 41: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 41

Project Name Trade Latest Week

42624 WALKABLE STREET SIDEWALK

$1,298,094Amount:

Gen Contractor: CICCONI & SONS CONS. CO.

(617)782-6804 38 EATONIA STREET ALLSTON

Est Start Date:

Est End Date:

09/01/2016

06/30/2017

ARCHITECTURAL PAVING & ST 1,203.0 0.0 0.00% 917.0 76.23% 0.0 0.00%42624 WALKABLE STREET SIDE Laborer 12/25/2016

CICCONI & SONS CONS. CO. 1,960.0 1,168.0 59.59% 792.0 40.41% 0.0 0.00%42624 WALKABLE STREET SIDE Laborer 06/17/2017

ARCHITECTURAL PAVING & ST 616.0 0.0 0.00% 544.0 88.31% 0.0 0.00%42624 WALKABLE STREET SIDE Mason 12/25/2016

CICCONI & SONS CONS. CO. 480.0 0.0 0.00% 0.0 0.00% 0.0 0.00%42624 WALKABLE STREET SIDE Equipment Opera 06/17/2017

4,259.0 1,168.0 27.42% 2,253.0 52.90% 0.0 0.00%SUB TOTALS:

42628 ROBERTS PLAYGROUND

$1,331,500Amount:

Gen Contractor: FLEMING BROS INC.

(781)843-4071 106 COLUMBIA STREET QUINCY

Est Start Date:

Est End Date:

07/05/2016

07/30/2017

FLEMING BROS INC. 504.0 400.0 79.37% 0.0 0.00% 0.0 0.00%42628 ROBERTS PLAYGROUND Equipment Opera 11/04/2016

FLEMING BROS INC. 824.0 656.0 79.61% 288.0 34.95% 0.0 0.00%42628 ROBERTS PLAYGROUND Laborer 11/04/2016

GILMAR BASTESTIN MASONRY 32.0 0.0 0.00% 32.0 100.00% 0.0 0.00%42628 ROBERTS PLAYGROUND Mason 08/19/2016

1,360.0 1,056.0 77.65% 320.0 23.53% 0.0 0.00%SUB TOTALS:

42762 PAVEMENT PRESERVATION

$759,727Amount:

Gen Contractor: ALL STATES ASPHALT, INC

325 AMHERST ROAD SUNDERLAND

Est Start Date:

Est End Date:

07/01/2016

06/30/2017

NORTH EAST ROADS, INC 566.0 0.0 0.00% 566.0 100.00% 0.0 0.00%42762 PAVEMENT PRESERVATI Laborer 10/15/2016

ALL STATES ASPHALT, INC 224.0 0.0 0.00% 0.0 0.00% 0.0 0.00%42762 PAVEMENT PRESERVATI Asphalt Raker 10/22/2016

ALL STATES ASPHALT, INC 120.0 0.0 0.00% 0.0 0.00% 0.0 0.00%42762 PAVEMENT PRESERVATI Curbsetter/Paver 10/22/2016

ALL STATES ASPHALT, INC 71.0 0.0 0.00% 0.0 0.00% 0.0 0.00%42762 PAVEMENT PRESERVATI Equipment Opera 10/22/2016

ALL STATES ASPHALT, INC 849.0 0.0 0.00% 116.0 13.66% 0.0 0.00%42762 PAVEMENT PRESERVATI Laborer 10/29/2016

GARRITY ASPHALT 24.5 0.0 0.00% 0.0 0.00% 0.0 0.00%42762 PAVEMENT PRESERVATI Equipment Opera 10/15/2016

MARKINGS INCORPORATED 16.5 0.0 0.00% 11.0 66.67% 0.0 0.00%42762 PAVEMENT PRESERVATI Painter 10/09/2016

1,871.0 0.0 0.00% 693.0 37.04% 0.0 0.00%SUB TOTALS:

42764 MAINTENANCE OF ELECTRIC S

$500,000Amount:

Gen Contractor: MAVERICK CONSTRUCTION

(617)361-6700 ONE WESTINGHOUSE PLAZA BLDG D hyde park

Est Start Date:

Est End Date:

01/01/2017

06/30/2017

MAVERICK CONSTRUCTION 2,153.0 496.0 23.04% 832.0 38.64% 0.0 0.00%42764 MAINTENANCE OF ELECT Lineman 07/22/2017

2,153.0 496.0 23.04% 832.0 38.64% 0.0 0.00%SUB TOTALS:

42771 IMPROVEMENTS TO PETERS P

$65,000Amount:

Gen Contractor: HAVEN CONTRACTING

(617) 710-5109 25 DEEFIELD AVE WESTWOOD

Est Start Date:

Est End Date:

08/15/2016

10/31/2016

HAVEN CONTRACTING 195.0 195.0 100.00% 139.0 71.28% 0.0 0.00%42771 IMPROVEMENTS TO PETE Laborer 10/23/2016

HAVEN CONTRACTING 101.5 101.5 100.00% 0.0 0.00% 0.0 0.00%42771 IMPROVEMENTS TO PETE Utility Operator 10/23/2016

296.5 296.5 100.00% 139.0 46.88% 0.0 0.00%SUB TOTALS:

Page 42: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 42

Project Name Trade Latest Week

43016 IMPROVEMENTS TO MEDAL OF

$1,335,500Amount:

Gen Contractor: HAVEN CONTRACTING

(617) 710-5109 25 DEEFIELD AVE WESTWOOD

Est Start Date:

Est End Date:

10/16/2016

07/15/2017

HAVEN CONTRACTING 4.0 0.0 0.00% 0.0 0.00% 0.0 0.00%43016 IMPROVEMENTS TO MED Electrician 11/20/2016

HAVEN CONTRACTING 1,430.3 1,110.3 77.63% 1,352.3 94.55% 0.0 0.00%43016 IMPROVEMENTS TO MED Laborer 08/20/2017

HAVEN CONTRACTING 6.0 0.0 0.00% 0.0 0.00% 0.0 0.00%43016 IMPROVEMENTS TO MED Lineman 11/20/2016

HAVEN CONTRACTING 767.0 767.0 100.00% 0.0 0.00% 0.0 0.00%43016 IMPROVEMENTS TO MED Utility Operator 08/20/2017

J T CONSTRUCTION, INC. 32.0 32.0 100.00% 0.0 0.00% 0.0 0.00%43016 IMPROVEMENTS TO MED Equipment Opera 12/17/2016

J T CONSTRUCTION, INC. 53.0 0.0 0.00% 0.0 0.00% 0.0 0.00%43016 IMPROVEMENTS TO MED Laborer 12/17/2016

MASS BAY ELECTRIC CORP. 16.0 0.0 0.00% 0.0 0.00% 0.0 0.00%43016 IMPROVEMENTS TO MED Electrician 05/28/2017

WOVEN STEEL 156.0 156.0 100.00% 156.0 100.00% 0.0 0.00%43016 IMPROVEMENTS TO MED Laborer 05/26/2017

2,464.3 2,065.3 83.81% 1,508.3 61.21% 0.0 0.00%SUB TOTALS:

43101 TITUS SPARROW

$85,000Amount:

Gen Contractor: FLEMING BROS INC.

(781)843-4071 106 COLUMBIA STREET QUINCY

Est Start Date:

Est End Date:

10/03/2016

10/07/2016

FLEMING BROS INC. 40.0 0.0 0.00% 0.0 0.00% 0.0 0.00%43101 TITUS SPARROW Equipment Opera 10/07/2016

FLEMING BROS INC. 64.0 24.0 37.50% 24.0 37.50% 0.0 0.00%43101 TITUS SPARROW Laborer 10/07/2016

104.0 24.0 23.08% 24.0 23.08% 0.0 0.00%SUB TOTALS:

43166 HIGHWAY RECONSTRUCTION I

$6,124,788Amount:

Gen Contractor: MARIO SUSI & SON INC,

(617)265-4525 36 WESTWOOD STREET DORCHESTER

Est Start Date:

Est End Date:

11/15/2016

07/01/2018

MARIO SUSI & SON INC, 2,055.0 0.0 0.00% 370.5 18.03% 0.0 0.00%43166 HIGHWAY RECONSTRUC Equipment Opera 09/16/2017

MARIO SUSI & SON INC, 5,117.0 2,946.5 57.58% 2,630.5 51.41% 249.5 4.88%43166 HIGHWAY RECONSTRUC Laborer 09/16/2017

MASS BAY ELECTRIC CORP. 314.0 124.0 39.49% 48.0 15.29% 0.0 0.00%43166 HIGHWAY RECONSTRUC Electrician 08/27/2017

MASS BAY ELECTRIC CORP. 53.0 0.0 0.00% 0.0 0.00% 0.0 0.00%43166 HIGHWAY RECONSTRUC Equipment Opera 03/26/2017

MASS BAY ELECTRIC CORP. 148.5 130.5 87.88% 0.0 0.00% 89.0 59.93%43166 HIGHWAY RECONSTRUC Groundman 08/27/2017

MASS BAY ELECTRIC CORP. 185.5 0.0 0.00% 0.0 0.00% 0.0 0.00%43166 HIGHWAY RECONSTRUC Lineman 08/27/2017

MARIO SUSI & SON INC, 366.5 0.0 0.00% 0.0 0.00% 0.0 0.00%43166 HIGHWAY RECONSTRUC Asphalt Raker 09/16/2017

8,239.5 3,201.0 38.85% 3,049.0 37.00% 338.5 4.11%SUB TOTALS:

43192 ON-CALL ROADWAY RECONST

$912,078Amount:

Gen Contractor: CICCONI & SONS CONS. CO.

(617)782-6804 38 EATONIA STREET ALLSTON

Est Start Date:

Est End Date:

05/01/2017

12/31/2017

CICCONI & SONS CONS. CO. 224.0 0.0 0.00% 0.0 0.00% 0.0 0.00%43192 ON-CALL ROADWAY REC Equipment Opera 09/23/2017

CICCONI & SONS CONS. CO. 1,148.0 764.0 66.55% 604.0 52.61% 220.0 19.16%43192 ON-CALL ROADWAY REC Laborer 09/23/2017

1,372.0 764.0 55.69% 604.0 44.02% 220.0 16.03%SUB TOTALS:

43338 IMPROVEMENT TO MCKINNEY P

$72,300Amount:

Gen Contractor: FLEMING BROS INC.

(781)843-4071 106 COLUMBIA STREET QUINCY

Est Start Date:

Est End Date:

01/01/2017

03/31/2017

Page 43: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 43

Project Name Trade Latest Week

FLEMING BROS INC. 64.0 32.0 50.00% 0.0 0.00% 0.0 0.00%43338 IMPROVEMENT TO MCKIN Equipment Opera 02/24/2017

64.0 32.0 50.00% 0.0 0.00% 0.0 0.00%SUB TOTALS:

43387 TRAFFIC SIGNAL INSTALLATIO

$1,043,575Amount:

Gen Contractor: MARIO SUSI & SON INC,

(617)265-4525 36 WESTWOOD STREET DORCHESTER

Est Start Date:

Est End Date:

05/01/2017

07/01/2018

MASS BAY ELECTRIC CORP. 115.0 64.0 55.65% 0.0 0.00% 64.0 55.65%43387 TRAFFIC SIGNAL INSTAL Groundman 06/25/2017

MASS BAY ELECTRIC CORP. 87.5 0.0 0.00% 0.0 0.00% 0.0 0.00%43387 TRAFFIC SIGNAL INSTAL Equipment Opera 06/25/2017

MASS BAY ELECTRIC CORP. 91.5 0.0 0.00% 0.0 0.00% 0.0 0.00%43387 TRAFFIC SIGNAL INSTAL Lineman 06/25/2017

MARIO SUSI & SON INC, 1,419.5 620.0 43.68% 615.0 43.33% 28.0 1.97%43387 TRAFFIC SIGNAL INSTAL Laborer 05/06/2017

MARIO SUSI & SON INC, 246.0 0.0 0.00% 0.0 0.00% 0.0 0.00%43387 TRAFFIC SIGNAL INSTAL Equipment Opera 05/06/2017

MASS BAY ELECTRIC CORP. 279.5 91.5 32.74% 17.5 6.26% 16.0 5.72%43387 TRAFFIC SIGNAL INSTAL Electrician 09/17/2017

2,239.0 775.5 34.64% 632.5 28.25% 108.0 4.82%SUB TOTALS:

43453 ROCKIES URBAN WILD & ORCH

$134,200Amount:

Gen Contractor: NELM CORPORATION

781/421-3380 135 INDUSTRIAL WAY ROCKLAND

Est Start Date:

Est End Date:

04/24/2017

06/30/2017

NELM CORPORATION 589.0 130.0 22.07% 134.0 22.75% 0.0 0.00%43453 ROCKIES URBAN WILD & Laborer 06/24/2017

589.0 130.0 22.07% 134.0 22.75% 0.0 0.00%SUB TOTALS:

43640 REPAIRS TO SIDEWALKS IN AR

$1,508,372Amount:

Gen Contractor: CICCONI & SONS CONS. CO.

(617)782-6804 38 EATONIA STREET ALLSTON

Est Start Date:

Est End Date:

05/01/2017

06/30/2018

CICCONI & SONS CONS. CO. 464.0 0.0 0.00% 0.0 0.00% 0.0 0.00%43640 REPAIRS TO SIDEWALKS Equipment Opera 09/23/2017

CICCONI & SONS CONS. CO. 3,336.0 2,208.0 66.19% 1,320.0 39.57% 192.0 5.76%43640 REPAIRS TO SIDEWALKS Laborer 09/23/2017

3,800.0 2,208.0 58.11% 1,320.0 34.74% 192.0 5.05%SUB TOTALS:

43698 REPAIRS TO SIDEWALKS IN AR

$1,292,432Amount:

Gen Contractor: FRED DEROMA & SON

(617)327-3030 45 GREW AVENUE ROSLINDALE

Est Start Date:

Est End Date:

05/01/2017

06/30/2018

FRED DEROMA & SON 750.0 552.0 73.60% 0.0 0.00% 0.0 0.00%43698 REPAIRS TO SIDEWALKS Equipment Opera 09/09/2017

FRED DEROMA & SON 2,711.0 1,613.0 59.50% 888.0 32.76% 321.0 11.84%43698 REPAIRS TO SIDEWALKS Laborer 09/09/2017

3,461.0 2,165.0 62.55% 888.0 25.66% 321.0 9.27%SUB TOTALS:

43699 REPAIRS TO SIDEWALKS IN AR

$1,354,272Amount:

Gen Contractor: FRED DEROMA & SON

(617)327-3030 45 GREW AVENUE ROSLINDALE

Est Start Date:

Est End Date:

05/01/2017

06/30/2018

FRED DEROMA & SON 356.0 24.0 6.74% 0.0 0.00% 0.0 0.00%43699 REPAIRS TO SIDEWALKS Equipment Opera 09/16/2017

FRED DEROMA & SON 2,604.0 1,616.0 62.06% 734.0 28.19% 286.0 10.98%43699 REPAIRS TO SIDEWALKS Laborer 09/16/2017

2,960.0 1,640.0 55.41% 734.0 24.80% 286.0 9.66%SUB TOTALS:

43706 UTILITY REPAIRS IN ALL AREA

$3,132,601Amount:

Gen Contractor: MARIO SUSI & SON INC,

(617)265-4525 36 WESTWOOD STREET DORCHESTER

Est Start Date:

Est End Date:

05/01/2017

06/30/2018

Page 44: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 44

Project Name Trade Latest Week

MARIO SUSI & SON INC, 786.5 0.0 0.00% 0.0 0.00% 0.0 0.00%43706 UTILITY REPAIRS IN ALL Asphalt Raker 09/16/2017

MARIO SUSI & SON INC, 866.0 0.0 0.00% 210.0 24.25% 0.0 0.00%43706 UTILITY REPAIRS IN ALL Equipment Opera 09/16/2017

MARIO SUSI & SON INC, 3,258.5 1,849.5 56.76% 852.5 26.16% 184.0 5.65%43706 UTILITY REPAIRS IN ALL Laborer 09/16/2017

4,911.0 1,849.5 37.66% 1,062.5 21.64% 184.0 3.75%SUB TOTALS:

43707 MAJOR ROADWAY RECONSTR

$4,393,316Amount:

Gen Contractor: MARIO SUSI & SON INC,

(617)265-4525 36 WESTWOOD STREET DORCHESTER

Est Start Date:

Est End Date:

05/01/2017

12/31/2018

MARIO SUSI & SON INC, 729.0 0.0 0.00% 0.0 0.00% 0.0 0.00%43707 MAJOR ROADWAY RECO Asphalt Raker 09/09/2017

MARIO SUSI & SON INC, 1,103.0 0.0 0.00% 406.0 36.81% 0.0 0.00%43707 MAJOR ROADWAY RECO Equipment Opera 09/09/2017

MARIO SUSI & SON INC, 4,198.5 2,458.5 58.56% 1,329.0 31.65% 247.5 5.89%43707 MAJOR ROADWAY RECO Laborer 09/09/2017

6,030.5 2,458.5 40.77% 1,735.0 28.77% 247.5 4.10%SUB TOTALS:

43778 CIP #17-31 HIGHWAY RECONST

$2,371,917Amount:

Gen Contractor: FRED DEROMA & SON

(617)327-3030 45 GREW AVENUE ROSLINDALE

Est Start Date:

Est End Date:

07/03/2017

06/30/2018

FRED DEROMA & SON 72.0 0.0 0.00% 0.0 0.00% 0.0 0.00%43778 CIP #17-31 HIGHWAY REC Equipment Opera 09/16/2017

FRED DEROMA & SON 357.0 229.0 64.15% 105.0 29.41% 12.0 3.36%43778 CIP #17-31 HIGHWAY REC Laborer 09/16/2017

429.0 229.0 53.38% 105.0 24.48% 12.0 2.80%SUB TOTALS:

43862 ASPHALT RESURFACING IN AR

$1,675,061Amount:

Gen Contractor: LORUSSO CORPORATION

(508)695-3252 3 BELCHER STREET PLAINVILLE

Est Start Date:

Est End Date:

06/01/2017

06/30/2018

LORUSSO CORPORATION 2.0 2.0 100.00% 2.0 100.00% 0.0 0.00%43862 ASPHALT RESURFACING I Equipment Opera 09/16/2017

LORUSSO CORPORATION 546.5 144.5 26.44% 114.0 20.86% 0.0 0.00%43862 ASPHALT RESURFACING I Laborer 09/16/2017

548.5 146.5 26.71% 116.0 21.15% 0.0 0.00%SUB TOTALS:

43923 ASPHALT RESURFACING IN AR

$2,136,348Amount:

Gen Contractor: ROCHESTER BITUMINOUS PRODUCTS

(508)295-8045 83 KINGS WAY WEST WAREHAM

Est Start Date:

Est End Date:

06/01/2017

06/30/2018

GARRITY ASPHALT 56.0 0.0 0.00% 0.0 0.00% 0.0 0.00%43923 ASPHALT RESURFACING I Equipment Opera 07/29/2017

GARRITY ASPHALT 28.0 0.0 0.00% 0.0 0.00% 0.0 0.00%43923 ASPHALT RESURFACING I Groundman 07/29/2017

GARRITY ASPHALT 28.0 0.0 0.00% 0.0 0.00% 0.0 0.00%43923 ASPHALT RESURFACING I Laborer 07/29/2017

ROCHESTER BITUMINOUS PR 24.0 0.0 0.00% 24.0 100.00% 0.0 0.00%43923 ASPHALT RESURFACING I Equipment Opera 07/15/2017

ROCHESTER BITUMINOUS PR 355.5 155.0 43.60% 250.5 70.46% 44.0 12.38%43923 ASPHALT RESURFACING I Laborer 09/02/2017

TRAFFIC MARKINGS INC 91.5 0.0 0.00% 43.0 46.99% 0.0 0.00%43923 ASPHALT RESURFACING I Laborer 09/09/2017

583.0 155.0 26.59% 317.5 54.46% 44.0 7.55%SUB TOTALS:

43924 ASPHALT RESURFACING IN AR

$1,713,435Amount:

Gen Contractor: ROCHESTER BITUMINOUS PRODUCTS

(508)295-8045 83 KINGS WAY WEST WAREHAM

Est Start Date:

Est End Date:

06/01/2017

06/30/2018

ROCHESTER BITUMINOUS PR 176.0 0.0 0.00% 102.0 57.95% 0.0 0.00%43924 ASPHALT RESURFACING I Equipment Opera 09/02/2017

Page 45: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 45

Project Name Trade Latest Week

ROCHESTER BITUMINOUS PR 3,207.0 1,151.0 35.89% 2,265.5 70.64% 272.0 8.48%43924 ASPHALT RESURFACING I Laborer 09/02/2017

TRAFFIC MARKINGS INC 34.5 0.0 0.00% 14.0 40.58% 0.0 0.00%43924 ASPHALT RESURFACING I Laborer 09/02/2017

GARRITY ASPHALT 120.0 0.0 0.00% 0.0 0.00% 0.0 0.00%43924 ASPHALT RESURFACING I Equipment Opera 08/05/2017

GARRITY ASPHALT 60.0 0.0 0.00% 0.0 0.00% 0.0 0.00%43924 ASPHALT RESURFACING I Laborer 08/05/2017

GARRITY ASPHALT 60.0 0.0 0.00% 0.0 0.00% 0.0 0.00%43924 ASPHALT RESURFACING I Groundman 08/05/2017

3,657.5 1,151.0 31.47% 2,381.5 65.11% 272.0 7.44%SUB TOTALS:

443 WEST BROADWAY

$20,000Amount:

Gen Contractor: CAFCO DEVELOPMENT

(617)325-3517 77 CHARLES STREET SOUTH BOSTON

Est Start Date:

Est End Date:

12/03/2015

12/23/2015

CAFCO DEVELOPMENT 360.0 0.0 0.00% 0.0 0.00% 0.0 0.00%443 WEST BROADWAY Carpenter 12/23/2015

360.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SUB TOTALS:

45 STUART STREET RESIDENCES

$100,000,000Amount:

Gen Contractor: JOHN MORIARTY & ASSOCIATES

(781)729-3900 3 CHURCH STREET WINCHESTER

Est Start Date:

Est End Date:

03/05/2013

07/01/2015

S & F CONCRETE 1,466.0 470.5 32.09% 127.5 8.70% 8.5 0.58%45 STUART STREET RESIDENCE Cement Finisher 10/04/2014

GRANDE MASONRY, LLC 1,587.5 889.0 56.00% 374.0 23.56% 0.0 0.00%45 STUART STREET RESIDENCE Laborer 02/08/2015

HAMEL & MCALISTER, INC. 12,963.0 5,984.0 46.16% 2,112.0 16.29% 354.0 2.73%45 STUART STREET RESIDENCE Pipefitter 05/29/2015

HIGH POINT INTERIORS,INC. 4,436.5 658.0 14.83% 682.0 15.37% 0.0 0.00%45 STUART STREET RESIDENCE Marble Tile Work 05/30/2015

IPSWICH BAY GLASS CO. 6,438.0 97.0 1.51% 17.0 0.26% 0.0 0.00%45 STUART STREET RESIDENCE Carpenter 05/16/2015

IPSWICH BAY GLASS CO. 9,111.0 724.0 7.95% 776.0 8.52% 0.0 0.00%45 STUART STREET RESIDENCE Glazier 05/23/2015

IPSWICH BAY GLASS CO. 5,052.5 2,868.5 56.77% 1,788.0 35.39% 395.0 7.82%45 STUART STREET RESIDENCE Iron Worker 05/16/2015

JOHN MORIARTY & ASSOCIAT 15,933.5 7,659.0 48.07% 749.0 4.70% 2,131.5 13.38%45 STUART STREET RESIDENCE Laborer 06/07/2015

KERR'S WELDING IRON WORK 2,544.0 2,000.0 78.62% 2,294.0 90.17% 0.0 0.00%45 STUART STREET RESIDENCE Welder 08/20/2014

MELO'S RODBUSTERS 7,296.0 2,035.0 27.89% 3,993.0 54.73% 80.0 1.10%45 STUART STREET RESIDENCE Iron Worker 08/16/2014

S & F CONCRETE 11,253.0 1,787.0 15.88% 1,974.0 17.54% 1,446.5 12.85%45 STUART STREET RESIDENCE Carpenter 09/20/2014

S & F CONCRETE 712.5 0.0 0.00% 0.0 0.00% 0.0 0.00%45 STUART STREET RESIDENCE Equipment Opera 10/11/2014

S & F CONCRETE 7,619.0 2,816.5 36.97% 424.0 5.57% 0.0 0.00%45 STUART STREET RESIDENCE Laborer 10/04/2014

S & F CONCRETE 728.0 249.0 34.20% 48.0 6.59% 8.5 1.17%45 STUART STREET RESIDENCE Mason 08/09/2014

STANLEY & SONS INC. 4,228.0 1,731.5 40.95% 1,533.0 36.26% 514.0 12.16%45 STUART STREET RESIDENCE Carpenter 02/07/2015

STANLEY & SONS INC. 499.5 475.5 95.20% 40.0 8.01% 0.0 0.00%45 STUART STREET RESIDENCE Laborer 02/07/2015

WORCESTER AIR CONDITIONI 8,827.0 2,324.0 26.33% 2,577.0 29.19% 0.0 0.00%45 STUART STREET RESIDENCE Sheetmetal Work 04/26/2015

GRANDE MASONRY, LLC 3,070.5 287.0 9.35% 1,022.0 33.28% 0.0 0.00%45 STUART STREET RESIDENCE Bricklayer 02/08/2015

ALLEGHENY CONTRACT FLOO 7,075.0 2,711.0 38.32% 6,676.0 94.36% 336.0 4.75%45 STUART STREET RESIDENCE Floor Layer 08/21/2015

NORTH AMERICAN STEEL 5,431.0 239.0 4.40% 1,567.5 28.86% 816.0 15.02%45 STUART STREET RESIDENCE Iron Worker 05/16/2015

BOSTON LIGHT ELECTRICAL C 56,492.5 12,348.5 21.86% 10,488.0 18.57% 2,571.5 4.55%45 STUART STREET RESIDENCE Electrician 07/26/2015

FUJITEC AMERICA INC. 10,578.5 0.0 0.00% 0.0 0.00% 0.0 0.00%45 STUART STREET RESIDENCE Elevator Const(M 06/24/2015

Page 46: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 46

Project Name Trade Latest Week

A. A. WILL CORPORATION 1,246.0 581.5 46.67% 171.5 13.76% 0.0 0.00%45 STUART STREET RESIDENCE Laborer 03/04/2014

A. A. WILL CORPORATION 25.0 1.0 4.00% 1.0 4.00% 0.0 0.00%45 STUART STREET RESIDENCE Piledriver 12/17/2013

ACCORD STEEL & PRECAST 1,564.0 72.0 4.60% 0.0 0.00% 0.0 0.00%45 STUART STREET RESIDENCE Equipment Opera 10/28/2014

ACCORD STEEL & PRECAST 18,866.5 4,393.0 23.28% 5,560.0 29.47% 763.5 4.05%45 STUART STREET RESIDENCE Iron Worker 10/28/2014

ACCORD STEEL & PRECAST 328.0 32.0 9.76% 32.0 9.76% 0.0 0.00%45 STUART STREET RESIDENCE Mason 10/07/2014

CENTURY DRYWALL INC, 58,633.0 12,035.0 20.53% 11,059.0 18.86% 1,326.0 2.26%45 STUART STREET RESIDENCE Carpenter 08/15/2015

A. A. WILL CORPORATION 646.0 0.0 0.00% 0.0 0.00% 16.0 2.48%45 STUART STREET RESIDENCE Equipment Opera 03/04/2014

E. M. DUGGAN INC. 28,832.0 1,821.5 6.32% 3,235.0 11.22% 148.0 0.51%45 STUART STREET RESIDENCE Plumber 08/16/2015

FUJITEC AMERICA INC. 8,181.0 1,952.0 23.86% 0.0 0.00% 0.0 0.00%45 STUART STREET RESIDENCE Elev Const Helper 06/24/2015

ACCORD STEEL & PRECAST 1,576.0 222.0 14.09% 1,387.5 88.04% 0.0 0.00%45 STUART STREET RESIDENCE Oiler 10/28/2014

E. M. DUGGAN INC. 10,466.5 3,683.5 35.19% 1,748.5 16.71% 0.0 0.00%45 STUART STREET RESIDENCE Sprinkler Fitter 08/09/2015

CENTURY DRYWALL INC, 17,354.5 6,623.5 38.17% 4,762.0 27.44% 1,097.5 6.32%45 STUART STREET RESIDENCE Laborer 08/15/2015

DIVERSIFIED CONSTRUCTION 3,335.5 506.5 15.19% 2,554.5 76.59% 810.5 24.30%45 STUART STREET RESIDENCE Laborer 08/01/2015

CENTURY DRYWALL INC, 18,742.0 4,972.5 26.53% 8,799.0 46.95% 2,021.0 10.78%45 STUART STREET RESIDENCE Taper 08/15/2015

CENTURY DRYWALL INC, 1,998.5 160.0 8.01% 499.5 24.99% 0.0 0.00%45 STUART STREET RESIDENCE Plasterer 08/15/2015

CENTURY DRYWALL INC, 9,702.0 3,722.0 38.36% 3,257.0 33.57% 1,008.0 10.39%45 STUART STREET RESIDENCE Painter 08/15/2015

FRONT LINE INC. 2,157.5 1,807.5 83.78% 1,266.5 58.70% 16.0 0.74%45 STUART STREET RESIDENCE Laborer 05/09/2015

366,996.5 90,939.5 24.78% 83,595.0 22.78% 15,868.0 4.32%SUB TOTALS:

522 RIVER STREET

$60,000Amount:

Gen Contractor: GLASS BY DESIGN

(617)696-1614 64 SHELDON STREET MILTON

Est Start Date:

Est End Date:

03/25/2014

10/29/2014

GLASS BY DESIGN 528.0 264.0 50.00% 0.0 0.00% 0.0 0.00%522 RIVER STREET Glazier 10/29/2014

528.0 264.0 50.00% 0.0 0.00% 0.0 0.00%SUB TOTALS:

556 PARK STREET

$75,000Amount:

Gen Contractor: YOUTH BUILD BOSTON

(617)427-3950 27 CENTRE STREET ROXBURY

Est Start Date:

Est End Date:

11/01/2015

12/31/2016

YOUTH BUILD BOSTON 56.0 0.0 0.00% 56.0 100.00% 0.0 0.00%556 PARK STREET Equipment Opera 06/02/2017

YOUTH BUILD BOSTON 64.0 64.0 100.00% 64.0 100.00% 0.0 0.00%556 PARK STREET Elevator Const(M 06/02/2017

YOUTH BUILD BOSTON 40.0 0.0 0.00% 40.0 100.00% 0.0 0.00%556 PARK STREET Plumber 09/09/2016

YOUTH BUILD BOSTON 56.0 0.0 0.00% 56.0 100.00% 0.0 0.00%556 PARK STREET Pipelayer 06/02/2017

YOUTH BUILD BOSTON 48.0 48.0 100.00% 48.0 100.00% 0.0 0.00%556 PARK STREET Metal Refinisher 06/02/2017

LOWE PLUMB & HEATING 40.0 0.0 0.00% 40.0 100.00% 0.0 0.00%556 PARK STREET Plumber 09/09/2016

YOUTH BUILD BOSTON 64.0 64.0 100.00% 64.0 100.00% 0.0 0.00%556 PARK STREET Curbsetter/Paver 06/02/2017

YOUTH BUILD BOSTON 64.0 64.0 100.00% 64.0 100.00% 0.0 0.00%556 PARK STREET HVAC 06/02/2017

YOUTH BUILD BOSTON 56.0 0.0 0.00% 56.0 100.00% 0.0 0.00%556 PARK STREET Cement Finisher 06/02/2017

YOUTH BUILD BOSTON 11,284.0 9,748.0 86.39% 11,220.0 99.43% 3,304.0 29.28%556 PARK STREET Carpenter 08/11/2017

Page 47: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 47

Project Name Trade Latest Week

NHK ELECTRIC 40.0 40.0 100.00% 40.0 100.00% 0.0 0.00%556 PARK STREET Electrician 09/09/2016

YOUTH BUILD BOSTON 88.0 72.0 81.82% 88.0 100.00% 0.0 0.00%556 PARK STREET Electrician 06/02/2017

11,900.0 10,100.0 84.87% 11,836.0 99.46% 3,304.0 27.76%SUB TOTALS:

65 EAST COTTAGE STREET

$706,000Amount:

Gen Contractor: SRS CONTRACTORS INC

(508)232-7770 700 W. CENTER STREET #2 W.BRIDGEWATER

Est Start Date:

Est End Date:

08/01/2014

12/31/2015

AMERICAN ENVIRONMENTAL, I 688.0 187.5 27.25% 688.0 100.00% 86.5 12.57%65 EAST COTTAGE STREET Laborer 10/25/2014

CYN ENVIRONMENTAL SERVIC 41.0 0.0 0.00% 0.0 0.00% 0.0 0.00%65 EAST COTTAGE STREET Laborer 11/01/2014

E. B. ROTONDI &SON INC 126.5 0.0 0.00% 0.0 0.00% 0.0 0.00%65 EAST COTTAGE STREET Equipment Opera 12/20/2014

E. B. ROTONDI &SON INC 269.0 0.0 0.00% 0.0 0.00% 0.0 0.00%65 EAST COTTAGE STREET Laborer 12/20/2014

S & R CORPORATION 197.0 0.0 0.00% 0.0 0.00% 0.0 0.00%65 EAST COTTAGE STREET Asbestos Worker 03/14/2015

S & R CORPORATION 821.5 0.0 0.00% 0.0 0.00% 0.0 0.00%65 EAST COTTAGE STREET Equipment Opera 04/18/2015

S & R CORPORATION 894.5 446.0 49.86% 208.0 23.25% 112.0 12.52%65 EAST COTTAGE STREET Laborer 04/18/2015

3,037.5 633.5 20.86% 896.0 29.50% 198.5 6.53%SUB TOTALS:

651-663 WARREN STREET DORCHEST

$120,000Amount:

Gen Contractor: COLLABORATIVE CONTRACTORS GROUP

(617)594-6767 16 HANCOCK COURT BOSTON

Est Start Date:

Est End Date:

05/05/2014

10/31/2014

COLLABORATIVE CONTRACTO 250.0 0.0 0.00% 0.0 0.00% 0.0 0.00%651-663 WARREN STREET DOR Carpenter 10/17/2014

COLLABORATIVE CONTRACTO 620.0 338.0 54.52% 492.0 79.35% 0.0 0.00%651-663 WARREN STREET DOR Laborer 10/31/2014

870.0 338.0 38.85% 492.0 56.55% 0.0 0.00%SUB TOTALS:

6674 REPAIRS AND RENOVATIONS

$487,800Amount:

Gen Contractor:

Est Start Date:

Est End Date:

02/29/2004

03/31/2004

BOSTON RUBBER ROOF 240.0 0.0 0.00% 40.0 16.67% 0.0 0.00%6674 REPAIRS AND RENOVATIO Sheetmetal Work 10/18/2015

240.0 0.0 0.00% 40.0 16.67% 0.0 0.00%SUB TOTALS:

6919-B BEETHOVEN SCHOOL ACCESS

$2,317,000Amount:

Gen Contractor: WCI CORP

617-524-9300 555 AMORY STREET, P O BOX 300187 BOSTON

Est Start Date:

Est End Date:

08/01/2013

08/31/2014

MAS BUILDING & BRIDGE INC. 19.0 0.0 0.00% 0.0 0.00% 0.0 0.00%6919-B BEETHOVEN SCHOOL A Equipment Opera 02/15/2014

WCI CORP 312.0 224.0 71.79% 0.0 0.00% 0.0 0.00%6919-B BEETHOVEN SCHOOL A Mason Tender 07/01/2014

WCI CORP 1,544.0 1,536.0 99.48% 0.0 0.00% 0.0 0.00%6919-B BEETHOVEN SCHOOL A Mason 07/15/2014

WCI CORP 1,282.0 786.0 61.31% 1,218.0 95.01% 0.0 0.00%6919-B BEETHOVEN SCHOOL A Laborer 02/10/2015

WCI CORP 21.0 0.0 0.00% 0.0 0.00% 0.0 0.00%6919-B BEETHOVEN SCHOOL A Floor Layer 09/30/2014

CAM HVAC & CONS. INC. 16.0 0.0 0.00% 0.0 0.00% 0.0 0.00%6919-B BEETHOVEN SCHOOL A Electrician 02/14/2014

WCI CORP 40.0 40.0 100.00% 40.0 100.00% 0.0 0.00%6919-B BEETHOVEN SCHOOL A Cement Finisher 06/10/2014

WCI CORP 1,162.5 653.0 56.17% 477.0 41.03% 101.0 8.69%6919-B BEETHOVEN SCHOOL A Carpenter 02/10/2015

V & G IRON WORKS INC. 17.5 0.0 0.00% 0.0 0.00% 0.0 0.00%6919-B BEETHOVEN SCHOOL A Laborer 09/19/2014

Page 48: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 48

Project Name Trade Latest Week

V & G IRON WORKS INC. 59.0 0.0 0.00% 16.0 27.12% 0.0 0.00%6919-B BEETHOVEN SCHOOL A Iron Worker 09/19/2014

UNITED ELEVATOR CO INC 430.0 0.0 0.00% 0.0 0.00% 0.0 0.00%6919-B BEETHOVEN SCHOOL A Elevator Const(M 01/04/2015

UNITED ELEVATOR CO INC 330.0 39.0 11.82% 0.0 0.00% 0.0 0.00%6919-B BEETHOVEN SCHOOL A Elev Const Helper 10/24/2014

MAS BUILDING & BRIDGE INC. 57.0 0.0 0.00% 38.0 66.67% 0.0 0.00%6919-B BEETHOVEN SCHOOL A Iron Worker 02/15/2014

BROTHERS ELECTRIC CO LLC 1,348.5 179.0 13.27% 372.5 27.62% 0.0 0.00%6919-B BEETHOVEN SCHOOL A Electrician 02/07/2015

CAM HVAC & CONS. INC. 552.0 0.0 0.00% 0.0 0.00% 0.0 0.00%6919-B BEETHOVEN SCHOOL A Pipefitter 08/30/2014

MARIA FALLON ELECTRICAL S 8.0 0.0 0.00% 0.0 0.00% 0.0 0.00%6919-B BEETHOVEN SCHOOL A Electrician 06/27/2014

ANDOVER ENGINEERING & DE 16.0 16.0 100.00% 0.0 0.00% 0.0 0.00%6919-B BEETHOVEN SCHOOL A Sprinkler Fitter 07/25/2014

CAM HVAC & CONS. INC. 16.0 0.0 0.00% 0.0 0.00% 0.0 0.00%6919-B BEETHOVEN SCHOOL A Laborer 06/28/2014

CAM HVAC & CONS. INC. 30.0 0.0 0.00% 4.5 15.00% 0.0 0.00%6919-B BEETHOVEN SCHOOL A Sheetmetal Work 08/30/2014

CENTRAL CEILINGS INC. 296.5 0.0 0.00% 0.0 0.00% 0.0 0.00%6919-B BEETHOVEN SCHOOL A Carpenter 09/14/2014

FISCHBACH & MORE ELEC. 6.0 0.0 0.00% 0.0 0.00% 0.0 0.00%6919-B BEETHOVEN SCHOOL A Elevator Const(M 01/04/2015

KPR, INC. 6.5 0.0 0.00% 0.0 0.00% 0.0 0.00%6919-B BEETHOVEN SCHOOL A Roofer 08/30/2014

JOHN W. EGAN CO. 232.0 0.0 0.00% 0.0 0.00% 0.0 0.00%6919-B BEETHOVEN SCHOOL A Painter 07/05/2014

J.M. ELECTRICAL CO. INC. 8.0 0.0 0.00% 0.0 0.00% 0.0 0.00%6919-B BEETHOVEN SCHOOL A Electrician 06/27/2014

CARLYSLE ENGINEERING INC. 297.0 197.0 66.33% 0.0 0.00% 0.0 0.00%6919-B BEETHOVEN SCHOOL A Sprinkler Fitter 06/13/2014

8,106.5 3,670.0 45.27% 2,166.0 26.72% 101.0 1.25%SUB TOTALS:

6920 UPHAMS CORNER MUNICIPAL B

$2,890,000Amount:

Gen Contractor: WES CONSTRUCTION CORP

175 COMMERCIAL CIRCLE DEDHAM

Est Start Date:

Est End Date:

10/01/2012

10/31/2013

TITAN ROOFING INC. 50.0 0.0 0.00% 0.0 0.00% 0.0 0.00%6920 UPHAMS CORNER MUNICI Roofer 11/16/2013

ARCHER CORPORATION 24.0 16.0 66.67% 0.0 0.00% 0.0 0.00%6920 UPHAMS CORNER MUNICI Carpenter 11/22/2013

WES CONSTRUCTION CORP 80.0 80.0 100.00% 0.0 0.00% 0.0 0.00%6920 UPHAMS CORNER MUNICI Laborer 11/23/2013

154.0 96.0 62.34% 0.0 0.00% 0.0 0.00%SUB TOTALS:

6941C BFD STANDBY GENERATORS P

$407,700Amount:

Gen Contractor: ANNESE ELECTRICAL SERVICE

(617)337-6462 280 LIBBEY INDUSTRIAL PARKWAY WEYMOUTH

Est Start Date:

Est End Date:

11/01/2012

07/31/2013

ANNESE TELECOM & UTILITY 21.0 0.0 0.00% 0.0 0.00% 0.0 0.00%6941C BFD STANDBY GENERAT Equipment Opera 12/21/2013

ANNESE TELECOM & UTILITY 10.5 0.0 0.00% 0.0 0.00% 0.0 0.00%6941C BFD STANDBY GENERAT Laborer 12/21/2013

ANNESE ELECTRICAL SERVIC 90.5 74.5 82.32% 74.5 82.32% 0.0 0.00%6941C BFD STANDBY GENERAT Electrician 04/19/2014

122.0 74.5 61.07% 74.5 61.07% 0.0 0.00%SUB TOTALS:

6951 STRAND THEATRE - THEATRICA

$988,000Amount:

Gen Contractor: ANNESE ELECTRICAL SERVICE

(617)337-6462 280 LIBBEY INDUSTRIAL PARKWAY WEYMOUTH

Est Start Date:

Est End Date:

09/01/2013

03/31/2014

ELECTRICAL ENGINEERING & 17.5 0.0 0.00% 0.0 0.00% 0.0 0.00%6951 STRAND THEATRE - THEAT Electrician 02/21/2014

MARK LAHAM 73.5 0.0 0.00% 0.0 0.00% 0.0 0.00%6951 STRAND THEATRE - THEAT Carpenter 04/12/2014

Page 49: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 49

Project Name Trade Latest Week

V & G IRON WORKS INC. 38.0 35.5 93.42% 35.5 93.42% 35.5 93.42%6951 STRAND THEATRE - THEAT Laborer 02/07/2014

HIGH OUTPUT 637.0 389.0 61.07% 319.0 50.08% 76.0 11.93%6951 STRAND THEATRE - THEAT Technician 03/22/2014

ENTERPRISE EQUIPT CO,INC. 24.0 0.0 0.00% 0.0 0.00% 0.0 0.00%6951 STRAND THEATRE - THEAT Pipefitter 01/11/2014

CELCO CONSTRUCTION CORP 12.0 0.0 0.00% 0.0 0.00% 0.0 0.00%6951 STRAND THEATRE - THEAT Laborer 01/04/2014

ANNESE ELECTRICAL SERVIC 1,523.5 472.5 31.01% 480.5 31.54% 239.0 15.69%6951 STRAND THEATRE - THEAT Electrician 05/10/2014

ALL BUILDING CONCEPTS, LLC 168.0 168.0 100.00% 168.0 100.00% 0.0 0.00%6951 STRAND THEATRE - THEAT Laborer 02/07/2014

ALL BUILDING CONCEPTS, LLC 229.0 0.0 0.00% 0.0 0.00% 0.0 0.00%6951 STRAND THEATRE - THEAT Iron Worker 02/28/2014

AETNA FIRE ALARM 14.0 0.0 0.00% 0.0 0.00% 0.0 0.00%6951 STRAND THEATRE - THEAT Electrician 01/12/2014

AETNA FIRE ALARM 7.0 7.0 100.00% 0.0 0.00% 0.0 0.00%6951 STRAND THEATRE - THEAT Technician 12/29/2013

2,743.5 1,072.0 39.07% 1,003.0 36.56% 350.5 12.78%SUB TOTALS:

6959B BFD FA HQ DRAINAGE/SITE IM

$142,000Amount:

Gen Contractor: TASCO CONSTRUCTION

92 STONY BROOK ROAD belmont

Est Start Date:

Est End Date:

11/01/2013

05/30/2014

BIT CON CORP. 14.5 0.0 0.00% 0.0 0.00% 0.0 0.00%6959B BFD FA HQ DRAINAGE/SI Equipment Opera 05/17/2014

BIT CON CORP. 43.5 0.0 0.00% 0.0 0.00% 0.0 0.00%6959B BFD FA HQ DRAINAGE/SI Laborer 05/17/2014

JIMENEZ & SONS CONSTRUCT 69.0 0.0 0.00% 46.0 66.67% 0.0 0.00%6959B BFD FA HQ DRAINAGE/SI Laborer 06/14/2014

TASCO CONSTRUCTION 200.0 0.0 0.00% 0.0 0.00% 0.0 0.00%6959B BFD FA HQ DRAINAGE/SI Laborer 09/20/2014

327.0 0.0 0.00% 46.0 14.07% 0.0 0.00%SUB TOTALS:

6960 NEW EAST BOSTON LIBRARY

$9,678,800Amount:

Gen Contractor: DEIULIS BROTHERS CONSTRUCTION

(781)595-8677 31 COLLINS STREET TERRACE LYNN

Est Start Date:

Est End Date:

03/01/2012

11/30/2013

CAVALIERI CONSTRUCTION C 8.0 0.0 0.00% 0.0 0.00% 0.0 0.00%6960 NEW EAST BOSTON LIBRA Laborer 11/23/2013

PATRICK J. KENNEDY & SONS, 7.0 7.0 100.00% 7.0 100.00% 0.0 0.00%6960 NEW EAST BOSTON LIBRA Pipefitter 11/30/2013

DEIULIS BROTHERS CONSTRU 16.0 0.0 0.00% 0.0 0.00% 0.0 0.00%6960 NEW EAST BOSTON LIBRA Carpenter 11/19/2013

AGGREGATE INDUSTRIES 15.0 0.0 0.00% 0.0 0.00% 0.0 0.00%6960 NEW EAST BOSTON LIBRA Laborer 11/16/2013

AGGREGATE INDUSTRIES 12.0 0.0 0.00% 0.0 0.00% 0.0 0.00%6960 NEW EAST BOSTON LIBRA Equipment Opera 11/16/2013

DEIULIS BROTHERS CONSTRU 15.0 0.0 0.00% 4.0 26.67% 0.0 0.00%6960 NEW EAST BOSTON LIBRA Laborer 11/26/2013

ANNESE ELECTRICAL SERVIC 40.5 18.0 44.44% 40.5 100.00% 0.0 0.00%6960 NEW EAST BOSTON LIBRA Electrician 11/23/2013

113.5 25.0 22.03% 51.5 45.37% 0.0 0.00%SUB TOTALS:

6964 CHARLESTOWN H.S.ENERGY IM

$27,350,000Amount:

Gen Contractor: J.F. WHITE CONTRACTING CO

(508) 879-4700 10 BURR STREET FRAMINGHAM

Est Start Date:

Est End Date:

05/10/2012

05/11/2012

STAFFORD CONST. SERVICES 573.0 98.0 17.10% 235.0 41.01% 0.0 0.00%6964 CHARLESTOWN H.S.ENER Carpenter 08/15/2014

J.F. WHITE CONTRACTING CO 6,329.0 412.5 6.52% 84.0 1.33% 0.0 0.00%6964 CHARLESTOWN H.S.ENER Laborer 07/09/2017

J.F. WHITE CONTRACTING CO 3,596.0 671.0 18.66% 753.5 20.95% 370.0 10.29%6964 CHARLESTOWN H.S.ENER Pipefitter 08/16/2015

J.F. WHITE CONTRACTING CO 100.0 0.0 0.00% 0.0 0.00% 0.0 0.00%6964 CHARLESTOWN H.S.ENER Surveyor 03/02/2014

Page 50: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 50

Project Name Trade Latest Week

JOHN W. EGAN CO. 1,717.0 272.0 15.84% 262.0 15.26% 0.0 0.00%6964 CHARLESTOWN H.S.ENER Painter 09/05/2015

LYNNWELL ASSOCIATES INC 2,646.0 1,964.0 74.23% 648.0 24.49% 464.0 17.54%6964 CHARLESTOWN H.S.ENER Electrician 07/27/2014

QUINN BROTHERS ESSEX INC. 25.0 0.0 0.00% 0.0 0.00% 0.0 0.00%6964 CHARLESTOWN H.S.ENER Laborer 08/16/2014

SAGAMORE PLUMBING & H IN 2,407.0 1,177.0 48.90% 126.0 5.23% 0.0 0.00%6964 CHARLESTOWN H.S.ENER Plumber 08/29/2015

SAGAMORE PLUMBING & H IN 56.0 0.0 0.00% 0.0 0.00% 0.0 0.00%6964 CHARLESTOWN H.S.ENER Welder 08/02/2014

J.F. WHITE CONTRACTING CO 8.0 0.0 0.00% 0.0 0.00% 0.0 0.00%6964 CHARLESTOWN H.S.ENER Equipment Opera 11/17/2013

SALEM GLASS CO. 24.0 0.0 0.00% 0.0 0.00% 0.0 0.00%6964 CHARLESTOWN H.S.ENER Glazier 03/08/2014

K & K ACOUSTICAL CEILINGS 468.0 70.0 14.96% 70.0 14.96% 0.0 0.00%6964 CHARLESTOWN H.S.ENER Carpenter 11/09/2014

STAFFORD CONST. SERVICES 10.0 0.0 0.00% 0.0 0.00% 0.0 0.00%6964 CHARLESTOWN H.S.ENER Laborer 08/08/2014

STAFFORD CONST. SERVICES 8.0 0.0 0.00% 0.0 0.00% 0.0 0.00%6964 CHARLESTOWN H.S.ENER Plasterer 08/15/2014

TITAN ROOFING INC. 182.0 0.0 0.00% 0.0 0.00% 0.0 0.00%6964 CHARLESTOWN H.S.ENER Roofer 11/22/2014

TITAN ROOFING INC. 35.0 17.5 50.00% 0.0 0.00% 0.0 0.00%6964 CHARLESTOWN H.S.ENER Sheetmetal Work 11/30/2013

WEST FLOOR COVERING INC, 1,112.3 248.8 22.36% 156.8 14.09% 64.0 5.75%6964 CHARLESTOWN H.S.ENER Marble Tile Work 08/23/2014

SALEM GLASS CO. 55.0 0.0 0.00% 0.0 0.00% 0.0 0.00%6964 CHARLESTOWN H.S.ENER Carpenter 04/26/2014

CAPEWAY INTERIORS, INC. 6.0 0.0 0.00% 0.0 0.00% 0.0 0.00%6964 CHARLESTOWN H.S.ENER Elev Const Helper 10/11/2014

ATLANTIC COAST DISMANTLIN 112.0 0.0 0.00% 0.0 0.00% 0.0 0.00%6964 CHARLESTOWN H.S.ENER Equipment Opera 07/26/2014

QUINN BROTHERS ESSEX INC. 321.0 0.0 0.00% 89.0 27.73% 0.0 0.00%6964 CHARLESTOWN H.S.ENER Iron Worker 08/30/2014

BOSTON FLOORING CO.INC. 512.0 0.0 0.00% 224.0 43.75% 0.0 0.00%6964 CHARLESTOWN H.S.ENER Laborer 08/09/2014

J.F. WHITE CONTRACTING CO 57.0 0.0 0.00% 0.0 0.00% 0.0 0.00%6964 CHARLESTOWN H.S.ENER Carpenter 08/24/2014

CAPEWAY INTERIORS, INC. 6.0 6.0 100.00% 0.0 0.00% 0.0 0.00%6964 CHARLESTOWN H.S.ENER Elevator Const(M 10/11/2014

CAPITAL CARPET&FLOORING 104.5 0.0 0.00% 52.0 49.76% 0.0 0.00%6964 CHARLESTOWN H.S.ENER Floor Layer 10/26/2014

CARLYSLE ENGINEERING INC. 1,114.0 380.0 34.11% 628.0 56.37% 0.0 0.00%6964 CHARLESTOWN H.S.ENER Sprinkler Fitter 08/29/2014

CONAN FINISHES LLC 136.0 72.0 52.94% 0.0 0.00% 0.0 0.00%6964 CHARLESTOWN H.S.ENER Taper 07/27/2014

DUCT & VENT CLEANING OF A 220.9 0.0 0.00% 109.9 49.72% 0.0 0.00%6964 CHARLESTOWN H.S.ENER Laborer 08/17/2014

EXCEL HVAC INC. 766.5 2.5 0.33% 2.5 0.33% 0.0 0.00%6964 CHARLESTOWN H.S.ENER Sheetmetal Work 08/26/2014

ATLANTIC COAST DISMANTLIN 1,411.0 64.0 4.54% 377.0 26.72% 127.0 9.00%6964 CHARLESTOWN H.S.ENER Laborer 08/16/2014

DUCT & VENT CLEANING OF A 36.8 0.0 0.00% 17.2 46.58% 0.0 0.00%6964 CHARLESTOWN H.S.ENER Sheetmetal Work 08/17/2014

ISLAND INTER. INDUSTRIES. 40.0 40.0 100.00% 40.0 100.00% 0.0 0.00%6964 CHARLESTOWN H.S.ENER Laborer 11/26/2013

ISLAND INTER. INDUSTRIES. 40.0 0.0 0.00% 0.0 0.00% 0.0 0.00%6964 CHARLESTOWN H.S.ENER Plasterer 11/26/2013

ENERGY INSULATION CONSE 564.8 159.0 28.15% 4.0 0.71% 0.0 0.00%6964 CHARLESTOWN H.S.ENER Insulator 11/08/2014

ENE SYSTEMS INC 178.0 0.0 0.00% 0.0 0.00% 0.0 0.00%6964 CHARLESTOWN H.S.ENER Pipefitter 10/18/2014

EAGLE ELEVATOR COMPANY 528.0 23.0 4.36% 0.0 0.00% 0.0 0.00%6964 CHARLESTOWN H.S.ENER Elevator Const(M 10/18/2014

EAGLE ELEVATOR COMPANY 511.0 0.0 0.00% 0.0 0.00% 0.0 0.00%6964 CHARLESTOWN H.S.ENER Elev Const Helper 10/18/2014

26,016.8 5,677.3 21.82% 3,878.8 14.91% 1,025.0 3.94%SUB TOTALS:

Page 51: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 51

Project Name Trade Latest Week

6968 DRAPER POOL RENOVATIONS

$2,648,000Amount:

Gen Contractor: LINWOOD CONSTRUCTION

(781)305-3559 331 MONTVALE AVE SUITE 330 WOBURN

Est Start Date:

Est End Date:

09/01/2013

09/30/2014

LINWOOD CONSTRUCTION 57.0 0.0 0.00% 0.0 0.00% 0.0 0.00%6968 DRAPER POOL RENOVATI Glazier 05/24/2014

KAMCO SUPPLY CORP. OF BO 43.0 0.0 0.00% 0.0 0.00% 0.0 0.00%6968 DRAPER POOL RENOVATI Carpenter 08/02/2014

RELIABLE ROOFING SHEETME 48.0 0.0 0.00% 0.0 0.00% 0.0 0.00%6968 DRAPER POOL RENOVATI Sheetmetal Work 04/13/2014

NATIONAL GRANITE LLC 31.0 0.0 0.00% 0.0 0.00% 0.0 0.00%6968 DRAPER POOL RENOVATI Floor Layer 06/14/2014

RELIABLE ROOFING SHEETME 70.0 0.0 0.00% 0.0 0.00% 0.0 0.00%6968 DRAPER POOL RENOVATI Equipment Opera 04/06/2014

RELIABLE ROOFING SHEETME 860.5 222.5 25.86% 452.0 52.53% 0.0 0.00%6968 DRAPER POOL RENOVATI Roofer 04/20/2014

LINWOOD CONSTRUCTION 216.0 152.0 70.37% 216.0 100.00% 152.0 70.37%6968 DRAPER POOL RENOVATI Laborer 04/12/2014

VILLAGE FORGE INC. 180.0 17.8 9.86% 17.8 9.86% 0.0 0.00%6968 DRAPER POOL RENOVATI Iron Worker 06/21/2014

ROBERT W. IRVINE SONS. 52.0 0.0 0.00% 0.0 0.00% 0.0 0.00%6968 DRAPER POOL RENOVATI Driller 03/14/2014

ROBERT W. IRVINE SONS. 532.0 72.0 13.53% 72.0 13.53% 0.0 0.00%6968 DRAPER POOL RENOVATI Plumber 06/27/2014

SEABOARD SYSTEMS CO, INC. 259.0 0.0 0.00% 40.0 15.44% 0.0 0.00%6968 DRAPER POOL RENOVATI Electrician 07/04/2014

THE PAPPAS COMPANY, INC 97.0 33.0 34.02% 33.0 34.02% 0.0 0.00%6968 DRAPER POOL RENOVATI Carpenter 02/01/2014

D & M CONCRETE FLOOR CO. 16.0 0.0 0.00% 0.0 0.00% 0.0 0.00%6968 DRAPER POOL RENOVATI Carpenter 07/12/2014

HANLON SHEET METAL CONT. 335.0 0.0 0.00% 109.0 32.54% 0.0 0.00%6968 DRAPER POOL RENOVATI Sheetmetal Work 08/09/2014

ROBERT W. IRVINE SONS. 41.0 0.0 0.00% 0.0 0.00% 16.0 39.02%6968 DRAPER POOL RENOVATI Insulator 05/30/2014

CDS CONTRACTING SERVICE 1,205.0 211.0 17.51% 211.0 17.51% 0.0 0.00%6968 DRAPER POOL RENOVATI Electrician 07/26/2014

D & M CONCRETE FLOOR CO. 9.0 0.0 0.00% 0.0 0.00% 0.0 0.00%6968 DRAPER POOL RENOVATI Cement Laborer 07/12/2014

GUARINO'S SWIMMING POOL 25.5 0.0 0.00% 0.0 0.00% 0.0 0.00%6968 DRAPER POOL RENOVATI Plumber 07/12/2014

ALUMINUM & GLASS CONCEP 56.0 0.0 0.00% 0.0 0.00% 0.0 0.00%6968 DRAPER POOL RENOVATI Glazier 08/02/2014

CONTRACTING SPEC INC 228.0 0.0 0.00% 0.0 0.00% 0.0 0.00%6968 DRAPER POOL RENOVATI Bricklayer 03/01/2014

CONTRACTING SPEC INC 188.0 40.0 21.28% 40.0 21.28% 0.0 0.00%6968 DRAPER POOL RENOVATI Laborer 03/01/2014

D & M CONCRETE FLOOR CO. 42.0 0.0 0.00% 0.0 0.00% 0.0 0.00%6968 DRAPER POOL RENOVATI Cement Finisher 09/06/2014

EMC DRYWALL 589.5 0.0 0.00% 219.5 37.23% 0.0 0.00%6968 DRAPER POOL RENOVATI Carpenter 06/28/2014

GUARDIAN INDUSTRIAL PROD 228.0 0.0 0.00% 163.0 71.49% 0.0 0.00%6968 DRAPER POOL RENOVATI Floor Layer 05/25/2014

FOLAN WATERPROOF CO. 16.0 0.0 0.00% 0.0 0.00% 0.0 0.00%6968 DRAPER POOL RENOVATI Laborer 05/10/2014

FOLAN WATERPROOF CO. 23.0 0.0 0.00% 0.0 0.00% 0.0 0.00%6968 DRAPER POOL RENOVATI Mason 09/06/2014

FOLAN WATERPROOF CO. 70.5 0.0 0.00% 0.0 0.00% 0.0 0.00%6968 DRAPER POOL RENOVATI Waterproofer 05/10/2014

GENERAL AIR COND & HEAT 98.0 88.0 89.80% 88.0 89.80% 0.0 0.00%6968 DRAPER POOL RENOVATI Pipefitter 03/01/2014

EMC DRYWALL 74.0 0.0 0.00% 0.0 0.00% 0.0 0.00%6968 DRAPER POOL RENOVATI Taper 07/10/2014

GUARINO'S SWIMMING POOL 49.0 25.5 52.04% 17.5 35.71% 25.5 52.04%6968 DRAPER POOL RENOVATI Laborer 07/12/2014

5,739.0 861.8 15.02% 1,678.8 29.25% 193.5 3.37%SUB TOTALS:

Page 52: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 52

Project Name Trade Latest Week

6969 RENOVATIONS TO FLAHERTY P

$4,150,200Amount:

Gen Contractor: NORTHERN CONTRACTING CORP

(781)821-4200 68 JACKSON STREET P.O. BOX 96 CANTON

Est Start Date:

Est End Date:

11/01/2012

08/31/2013

VILLAGE FORGE INC. 27.0 4.5 16.67% 4.5 16.67% 0.0 0.00%6969 RENOVATIONS TO FLAHER Iron Worker 03/15/2014

27.0 4.5 16.67% 4.5 16.67% 0.0 0.00%SUB TOTALS:

6972-A CENTRAL MAINT FACILITY TR

$6,445,300Amount:

Gen Contractor: NORTHERN CONTRACTING CORP

(781)821-4200 68 JACKSON STREET P.O. BOX 96 CANTON

Est Start Date:

Est End Date:

01/14/2014

01/14/2015

MARGUERITE CONCRETE 102.0 0.0 0.00% 29.0 28.43% 0.0 0.00%6972-A CENTRAL MAINT FACILIT Laborer 01/24/2015

NORTHERN CONTRACTING CO 929.5 585.5 62.99% 449.5 48.36% 0.0 0.00%6972-A CENTRAL MAINT FACILIT Carpenter 10/03/2015

WAYNE J GRIFFIN ELECTRIC 407.8 0.0 0.00% 0.0 0.00% 0.0 0.00%6972-A CENTRAL MAINT FACILIT Telephone/Data I 08/09/2015

NORTHERN CONTRACTING CO 384.8 32.0 8.32% 72.0 18.71% 32.0 8.32%6972-A CENTRAL MAINT FACILIT Bricklayer 11/22/2014

MATHIAS PAVING 4.0 2.0 50.00% 0.0 0.00% 0.0 0.00%6972-A CENTRAL MAINT FACILIT Equipment Opera 06/27/2015

MATHIAS CORPORATION 2.0 2.0 100.00% 2.0 100.00% 0.0 0.00%6972-A CENTRAL MAINT FACILIT Asphalt Raker 04/19/2014

MATHIAS CORPORATION 154.0 70.0 45.45% 34.0 22.08% 0.0 0.00%6972-A CENTRAL MAINT FACILIT Equipment Opera 12/20/2014

NORTHERN CONTRACTING CO 962.0 198.5 20.63% 0.0 0.00% 0.0 0.00%6972-A CENTRAL MAINT FACILIT Equipment Opera 04/11/2015

VYNORIUS PILEDRIVING INC. 90.0 65.5 72.78% 65.5 72.78% 0.0 0.00%6972-A CENTRAL MAINT FACILIT Piledriver 04/12/2014

MATHIAS CORPORATION 122.0 18.0 14.75% 104.0 85.25% 0.0 0.00%6972-A CENTRAL MAINT FACILIT Laborer 12/20/2014

NORTHERN CONTRACTING CO 5,185.0 2,099.5 40.49% 2,494.5 48.11% 0.0 0.00%6972-A CENTRAL MAINT FACILIT Laborer 09/05/2015

NORTHERN CONTRACTING CO 217.0 37.0 17.05% 180.0 82.95% 0.0 0.00%6972-A CENTRAL MAINT FACILIT Mason 11/29/2014

ORBIT CONSTRUCTION 4.0 4.0 100.00% 4.0 100.00% 0.0 0.00%6972-A CENTRAL MAINT FACILIT Electrician 08/30/2015

PATRICK J. KENNEDY & SONS, 896.0 152.0 16.96% 0.0 0.00% 0.0 0.00%6972-A CENTRAL MAINT FACILIT Plumber 03/07/2015

SIGNET ELECTRONIC SYSTEM 25.0 0.0 0.00% 0.0 0.00% 0.0 0.00%6972-A CENTRAL MAINT FACILIT Telephone/Data I 06/07/2015

STEELCO FENCING 208.0 40.0 19.23% 136.0 65.38% 0.0 0.00%6972-A CENTRAL MAINT FACILIT Laborer 06/06/2015

U.S. DRYWALL INC. 1,182.5 294.5 24.90% 64.0 5.41% 0.0 0.00%6972-A CENTRAL MAINT FACILIT Carpenter 01/03/2015

VYNORIUS PILEDRIVING INC. 49.0 0.0 0.00% 0.0 0.00% 0.0 0.00%6972-A CENTRAL MAINT FACILIT Equipment Opera 04/12/2014

WAYNE J GRIFFIN ELECTRIC 2,604.0 226.0 8.68% 194.0 7.45% 40.0 1.54%6972-A CENTRAL MAINT FACILIT Electrician 11/01/2015

FEDERAL CONCRETE 467.0 55.0 11.78% 219.0 46.90% 11.0 2.36%6972-A CENTRAL MAINT FACILIT Laborer 11/15/2014

U.S. DRYWALL INC. 47.0 0.0 0.00% 0.0 0.00% 0.0 0.00%6972-A CENTRAL MAINT FACILIT Taper 01/03/2015

D'S WELDING 2,021.5 214.5 10.61% 214.5 10.61% 0.0 0.00%6972-A CENTRAL MAINT FACILIT Iron Worker 10/18/2014

ITCHY & SCRATCHY INSULATO 157.0 0.0 0.00% 0.0 0.00% 0.0 0.00%6972-A CENTRAL MAINT FACILIT Insulator 09/19/2014

A-BEST ABATEMENT INC 105.0 0.0 0.00% 100.0 95.24% 16.0 15.24%6972-A CENTRAL MAINT FACILIT Asbestos Worker 03/08/2014

APEX CORPORATION 1,253.0 64.0 5.11% 64.0 5.11% 0.0 0.00%6972-A CENTRAL MAINT FACILIT HVAC 06/21/2015

BOSTON FLOORING CO.INC. 896.0 0.0 0.00% 340.0 37.95% 0.0 0.00%6972-A CENTRAL MAINT FACILIT Laborer 05/02/2015

CARLYSLE ENGINEERING INC. 283.0 51.0 18.02% 0.0 0.00% 0.0 0.00%6972-A CENTRAL MAINT FACILIT Sprinkler Fitter 01/23/2015

CHETS WELDING INC 4.0 0.0 0.00% 0.0 0.00% 0.0 0.00%6972-A CENTRAL MAINT FACILIT Equipment Opera 11/22/2014

Page 53: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 53

Project Name Trade Latest Week

CYBER COMMUNICTIONS SAL 7.5 0.0 0.00% 0.0 0.00% 0.0 0.00%6972-A CENTRAL MAINT FACILIT Technician 03/14/2015

DELUCCA FENCE CO. 106.3 0.0 0.00% 0.0 0.00% 0.0 0.00%6972-A CENTRAL MAINT FACILIT Equipment Opera 03/07/2015

MARGUERITE CONCRETE 20.5 0.0 0.00% 0.0 0.00% 0.0 0.00%6972-A CENTRAL MAINT FACILIT Equipment Opera 09/13/2014

DOOR SYSTEMS INC. 32.5 0.0 0.00% 0.0 0.00% 0.0 0.00%6972-A CENTRAL MAINT FACILIT Millwright 03/21/2015

FEDERAL CONCRETE 1,078.0 80.0 7.42% 192.0 17.81% 0.0 0.00%6972-A CENTRAL MAINT FACILIT Carpenter 01/17/2015

FEDERAL CONCRETE 133.0 74.0 55.64% 44.0 33.08% 0.0 0.00%6972-A CENTRAL MAINT FACILIT Iron Worker 08/09/2014

INFRA-RED BUILDING & POWE 17.0 0.0 0.00% 0.0 0.00% 0.0 0.00%6972-A CENTRAL MAINT FACILIT Electrician 02/22/2015

J.M. ELECTRICAL CO. INC. 352.0 56.0 15.91% 0.0 0.00% 0.0 0.00%6972-A CENTRAL MAINT FACILIT Electrician 02/20/2015

JOHN W. EGAN CO. 559.0 72.0 12.88% 44.0 7.87% 72.0 12.88%6972-A CENTRAL MAINT FACILIT Painter 08/08/2015

K & K ACOUSTICAL CEILINGS 13.0 8.0 61.54% 8.0 61.54% 0.0 0.00%6972-A CENTRAL MAINT FACILIT Carpenter 02/15/2015

LARKIN IRON WORKS INC. 235.5 0.0 0.00% 70.5 29.94% 0.0 0.00%6972-A CENTRAL MAINT FACILIT Iron Worker 04/24/2015

MAINTENANCE TECHNOLOGY, 237.5 0.0 0.00% 0.0 0.00% 0.0 0.00%6972-A CENTRAL MAINT FACILIT Laborer 03/21/2015

MARGUERITE CONCRETE 86.0 0.0 0.00% 0.0 0.00% 0.0 0.00%6972-A CENTRAL MAINT FACILIT Cement Finisher 01/24/2015

DELUCCA FENCE CO. 213.8 0.0 0.00% 41.3 19.30% 0.0 0.00%6972-A CENTRAL MAINT FACILIT Laborer 03/07/2015

21,853.5 4,501.0 20.60% 5,165.8 23.64% 171.0 0.78%SUB TOTALS:

6975 COPLEY LIBRARY CHILLER REP

$457,850Amount:

Gen Contractor: TRANE U. S. INC.

(781)932-0423 181 BALLARDVALE STREET WILIMINGTON

Est Start Date:

Est End Date:

07/01/2014

12/31/2014

TRANE U. S. INC. 164.0 0.0 0.00% 0.0 0.00% 0.0 0.00%6975 COPLEY LIBRARY CHILLER Pipefitter 11/30/2014

TRANE U. S. INC. 119.0 0.0 0.00% 0.0 0.00% 0.0 0.00%6975 COPLEY LIBRARY CHILLER Plumber 10/05/2014

283.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SUB TOTALS:

6976A HVAC REPLACEMENT W. END/

$787,630Amount:

Gen Contractor: ENTERPRISE EQUIPT CO,INC.

(617)331-0900 276 LIBBEY PARK E.WEYMOUTH

Est Start Date:

Est End Date:

08/01/2012

04/30/2013

ENTERPRISE EQUIPT CO,INC. 5.0 0.0 0.00% 0.0 0.00% 0.0 0.00%6976A HVAC REPLACEMENT W. Pipefitter 05/17/2014

ENTERPRISE EQUIPT CO,INC. 1.0 0.0 0.00% 0.0 0.00% 0.0 0.00%6976A HVAC REPLACEMENT W. Plumber 01/11/2014

SPINDLE CITY INSULATION 21.5 0.0 0.00% 0.0 0.00% 0.0 0.00%6976A HVAC REPLACEMENT W. Insulator 11/24/2013

ANNESE ELECTRICAL SERVIC 5.0 5.0 100.00% 5.0 100.00% 0.0 0.00%6976A HVAC REPLACEMENT W. Electrician 02/01/2014

32.5 5.0 15.38% 5.0 15.38% 0.0 0.00%SUB TOTALS:

6986 DUDLEY SQUARE MUNICIPAL BU

$96,831,025Amount:

Gen Contractor: SHAWMUT DESIGN CONST.

(617)622-7000 560 HARRISON AVENUE S . BOSTON

Est Start Date:

Est End Date:

04/02/2012

01/31/2014

JOSEPH COHN AND SON TILE 124.0 0.0 0.00% 0.0 0.00% 124.0 100.00%6986 DUDLEY SQUARE MUNICIP Laborer 05/24/2015

MCCUSKER-GILL INC. 5,066.0 3,155.0 62.28% 2,526.0 49.86% 0.0 0.00%6986 DUDLEY SQUARE MUNICIP Sheetmetal Work 10/12/2014

LYNNWELL ASSOCIATES INC 528.0 96.0 18.18% 96.0 18.18% 0.0 0.00%6986 DUDLEY SQUARE MUNICIP Telephone/Data I 12/14/2014

LYNNWELL ASSOCIATES INC 26,266.5 12,061.5 45.92% 6,736.5 25.65% 2,001.0 7.62%6986 DUDLEY SQUARE MUNICIP Electrician 07/26/2015

Page 54: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 54

Project Name Trade Latest Week

LOCKHEED ALUMINUM WINDO 37.3 0.0 0.00% 0.0 0.00% 0.0 0.00%6986 DUDLEY SQUARE MUNICIP Laborer 01/17/2015

LOCKHEED ALUMINUM WINDO 5,034.0 958.5 19.04% 1,735.5 34.48% 0.0 0.00%6986 DUDLEY SQUARE MUNICIP Glazier 07/11/2015

LAN-TEL COMMUNICATION INC 3,670.0 1,821.5 49.63% 1,827.0 49.78% 0.0 0.00%6986 DUDLEY SQUARE MUNICIP Telephone/Data I 03/28/2015

K & K ACOUSTICAL CEILINGS 4,558.5 1,384.5 30.37% 284.0 6.23% 429.0 9.41%6986 DUDLEY SQUARE MUNICIP Carpenter 01/18/2015

JULIAN CRANE & EQUIPMENT 2,499.0 0.0 0.00% 2,324.0 93.00% 0.0 0.00%6986 DUDLEY SQUARE MUNICIP Equipment Opera 01/11/2015

JOSEPH COHN AND SON TILE 3,405.5 1,239.0 36.38% 1,239.0 36.38% 56.0 1.64%6986 DUDLEY SQUARE MUNICIP Marble Tile Work 05/31/2015

JOSEPH COHN AND SON TILE 8.0 0.0 0.00% 0.0 0.00% 0.0 0.00%6986 DUDLEY SQUARE MUNICIP Floor Layer 11/02/2014

JOHN F. SHEA CO. INC. 2,741.5 203.5 7.42% 24.0 0.88% 0.0 0.00%6986 DUDLEY SQUARE MUNICIP Sheetmetal Work 01/10/2015

JOHN F. SHEA CO. INC. 3,985.5 996.0 24.99% 3,107.5 77.97% 0.0 0.00%6986 DUDLEY SQUARE MUNICIP Roofer 04/04/2015

ISLAND INTER. INDUSTRIES. 158.0 0.0 0.00% 0.0 0.00% 0.0 0.00%6986 DUDLEY SQUARE MUNICIP Plasterer 04/22/2014

ISLAND INTER. INDUSTRIES. 84.0 48.0 57.14% 48.0 57.14% 0.0 0.00%6986 DUDLEY SQUARE MUNICIP Laborer 05/06/2014

N.B. KENNEY CO. INC., 25,581.5 6,209.0 24.27% 8,329.5 32.56% 3,346.5 13.08%6986 DUDLEY SQUARE MUNICIP Pipefitter 07/31/2015

JULIAN CRANE & EQUIPMENT 25.0 0.0 0.00% 0.0 0.00% 0.0 0.00%6986 DUDLEY SQUARE MUNICIP Elevator Const(M 03/02/2014

SOEP PAINTING CORP. 7,848.5 2,587.5 32.97% 5,241.0 66.78% 1,040.5 13.26%6986 DUDLEY SQUARE MUNICIP Painter 05/10/2015

XQUISITE LANDSCAPING 1,144.0 0.0 0.00% 0.0 0.00% 0.0 0.00%6986 DUDLEY SQUARE MUNICIP Mason 05/10/2015

XQUISITE LANDSCAPING 2,894.8 1,052.3 36.35% 1,294.3 44.71% 68.0 2.35%6986 DUDLEY SQUARE MUNICIP Laborer 05/10/2015

XQUISITE LANDSCAPING 248.5 0.0 0.00% 0.0 0.00% 0.0 0.00%6986 DUDLEY SQUARE MUNICIP Equipment Opera 11/23/2014

SWEENEY DRYWALL FINISHE 4.0 0.0 0.00% 0.0 0.00% 0.0 0.00%6986 DUDLEY SQUARE MUNICIP Mason 07/11/2015

SWEENEY DRYWALL FINISHE 4,778.0 1,194.0 24.99% 1,724.5 36.09% 0.0 0.00%6986 DUDLEY SQUARE MUNICIP Taper 02/07/2015

IPSWICH BAY GLASS CO. 458.5 434.5 94.77% 106.0 23.12% 0.0 0.00%6986 DUDLEY SQUARE MUNICIP Iron Worker 01/25/2014

SWEENEY DRYWALL FINISHE 3,979.0 2,546.5 64.00% 2,838.5 71.34% 529.0 13.29%6986 DUDLEY SQUARE MUNICIP Laborer 07/11/2015

STRUCTURES DEREK INTERN 36.0 8.0 22.22% 8.0 22.22% 0.0 0.00%6986 DUDLEY SQUARE MUNICIP Iron Worker 04/19/2014

NEW ENGLAND INSTALLATION 85.0 0.0 0.00% 0.0 0.00% 0.0 0.00%6986 DUDLEY SQUARE MUNICIP Carpenter 07/12/2014

SHAWMUT DESIGN CONST. 9,458.0 8,789.5 92.93% 4,547.5 48.08% 639.0 6.76%6986 DUDLEY SQUARE MUNICIP Laborer 07/19/2015

SHAWMUT DESIGN CONST. 818.0 529.0 64.67% 313.0 38.26% 40.0 4.89%6986 DUDLEY SQUARE MUNICIP Carpenter 03/29/2015

S & F CONCRETE 1,106.0 439.5 39.74% 504.5 45.61% 0.0 0.00%6986 DUDLEY SQUARE MUNICIP Laborer 11/08/2014

S & F CONCRETE 77.0 0.0 0.00% 0.0 0.00% 0.0 0.00%6986 DUDLEY SQUARE MUNICIP Equipment Opera 11/08/2014

S & F CONCRETE 58.5 17.0 29.06% 17.0 29.06% 0.0 0.00%6986 DUDLEY SQUARE MUNICIP Cement Finisher 09/27/2014

S & F CONCRETE 410.0 12.0 2.93% 12.0 2.93% 0.0 0.00%6986 DUDLEY SQUARE MUNICIP Carpenter 11/08/2014

PRIME STEEL ERECTING INC, 134.0 0.0 0.00% 30.0 22.39% 0.0 0.00%6986 DUDLEY SQUARE MUNICIP Iron Worker 12/14/2013

SWEENEY DRYWALL FINISHE 17,861.0 8,014.0 44.87% 7,673.0 42.96% 944.0 5.29%6986 DUDLEY SQUARE MUNICIP Carpenter 07/18/2015

CARLYSLE ENGINEERING INC. 2,919.0 1,064.0 36.45% 1,451.0 49.71% 316.0 10.83%6986 DUDLEY SQUARE MUNICIP Sprinkler Fitter 08/15/2014

CHAPMAN WATERPROOFING 2,032.5 1,194.0 58.75% 724.5 35.65% 0.0 0.00%6986 DUDLEY SQUARE MUNICIP Waterproofer 03/23/2015

CHAPMAN WATERPROOFING 7.0 1.0 14.29% 0.0 0.00% 0.0 0.00%6986 DUDLEY SQUARE MUNICIP Laborer 11/10/2014

Page 55: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 55

Project Name Trade Latest Week

CENTAUR CONSTRUCTION SE 8.0 8.0 100.00% 8.0 100.00% 0.0 0.00%6986 DUDLEY SQUARE MUNICIP Laborer 12/10/2013

CENTAUR CONSTRUCTION SE 8.0 4.0 50.00% 4.0 50.00% 0.0 0.00%6986 DUDLEY SQUARE MUNICIP Equipment Opera 12/24/2013

CENTAUR / A A WILL JV 52.0 24.0 46.15% 24.0 46.15% 0.0 0.00%6986 DUDLEY SQUARE MUNICIP Piledriver 03/25/2014

CENTAUR / A A WILL JV 4,267.5 2,579.5 60.45% 2,645.5 61.99% 0.0 0.00%6986 DUDLEY SQUARE MUNICIP Laborer 01/27/2015

CONTRACTING SPEC INC 64.0 0.0 0.00% 0.0 0.00% 0.0 0.00%6986 DUDLEY SQUARE MUNICIP Bricklayer 01/25/2014

CELCO CONSTRUCTION CORP 12.0 0.0 0.00% 0.0 0.00% 0.0 0.00%6986 DUDLEY SQUARE MUNICIP Laborer 03/22/2014

THE BECHT CORPORATION 256.0 93.0 36.33% 171.0 66.80% 0.0 0.00%6986 DUDLEY SQUARE MUNICIP Floor Layer 06/21/2014

CAPITAL CARPET&FLOORING 2,991.0 591.0 19.76% 1,619.0 54.13% 297.0 9.93%6986 DUDLEY SQUARE MUNICIP Floor Layer 05/31/2015

BERLIN STEEL CONST. 4,452.5 1,332.5 29.93% 2,429.5 54.56% 64.0 1.44%6986 DUDLEY SQUARE MUNICIP Iron Worker 01/11/2015

BAY STATE BUILDING SPECIA 472.0 169.0 35.81% 6.0 1.27% 0.0 0.00%6986 DUDLEY SQUARE MUNICIP Carpenter 08/26/2014

IPSWICH BAY GLASS CO. 1,842.0 1,215.0 65.96% 1,215.0 65.96% 0.0 0.00%6986 DUDLEY SQUARE MUNICIP Glazier 05/24/2014

AMQUIP CRANE RENTALL LLC. 222.5 222.5 100.00% 222.5 100.00% 0.0 0.00%6986 DUDLEY SQUARE MUNICIP Oiler 12/19/2013

AMQUIP CRANE RENTALL LLC. 222.5 0.0 0.00% 0.0 0.00% 0.0 0.00%6986 DUDLEY SQUARE MUNICIP Equipment Opera 12/19/2013

A. J. CLEANING 1,351.5 1,061.0 78.51% 1,185.0 87.68% 583.0 43.14%6986 DUDLEY SQUARE MUNICIP Laborer 11/25/2014

CENTAUR / A A WILL JV 1,726.0 127.0 7.36% 109.5 6.34% 0.0 0.00%6986 DUDLEY SQUARE MUNICIP Equipment Opera 01/13/2015

GREAT IN COUNTERS 9.0 0.0 0.00% 0.0 0.00% 0.0 0.00%6986 DUDLEY SQUARE MUNICIP Bricklayer 04/26/2014

ATLANTIC CONTRACTING &SP 8,239.0 3,906.5 47.41% 396.0 4.81% 340.0 4.13%6986 DUDLEY SQUARE MUNICIP Insulator 09/14/2014

CORBIN HUFCOR INC. 65.0 0.0 0.00% 0.0 0.00% 0.0 0.00%6986 DUDLEY SQUARE MUNICIP Carpenter 08/16/2014

IPSWICH BAY GLASS CO. 3,398.5 820.5 24.14% 526.5 15.49% 222.5 6.55%6986 DUDLEY SQUARE MUNICIP Carpenter 07/05/2014

HAROLD BROTHERS MECHANI 144.0 0.0 0.00% 144.0 100.00% 0.0 0.00%6986 DUDLEY SQUARE MUNICIP Roofer 12/07/2013

GRIFFIN INTERIORS, INC. 7,292.0 2,335.0 32.02% 1,842.0 25.26% 399.0 5.47%6986 DUDLEY SQUARE MUNICIP Carpenter 01/10/2015

GRANDE MASONRY, LLC 11,156.0 4,317.0 38.70% 4,381.0 39.27% 0.0 0.00%6986 DUDLEY SQUARE MUNICIP Laborer 07/20/2014

GRANDE MASONRY, LLC 9,188.0 2,262.0 24.62% 2,278.0 24.79% 441.0 4.80%6986 DUDLEY SQUARE MUNICIP Bricklayer 07/20/2014

ENERGY INSULATION CONSE 1,128.0 420.0 37.23% 448.0 39.72% 48.0 4.26%6986 DUDLEY SQUARE MUNICIP Insulator 10/11/2014

DELTA BECKWITH ELEVATOR 3,690.5 0.0 0.00% 0.0 0.00% 0.0 0.00%6986 DUDLEY SQUARE MUNICIP Elevator Const(M 11/13/2014

EASTON CONCRETE CUTTING 132.0 0.0 0.00% 0.0 0.00% 0.0 0.00%6986 DUDLEY SQUARE MUNICIP Laborer 05/10/2014

DEPENDABLE MASONRY 258.0 24.0 9.30% 106.0 41.09% 0.0 0.00%6986 DUDLEY SQUARE MUNICIP Laborer 03/29/2014

DEANGELIS IRON WORK INC. 126.0 92.0 73.02% 64.0 50.79% 24.0 19.05%6986 DUDLEY SQUARE MUNICIP Iron Worker 06/07/2014

DELTA BECKWITH ELEVATOR 2,845.5 1,115.0 39.18% 239.0 8.40% 0.0 0.00%6986 DUDLEY SQUARE MUNICIP Elev Const Helper 09/25/2014

DEPENDABLE MASONRY 368.0 128.0 34.78% 152.0 41.30% 0.0 0.00%6986 DUDLEY SQUARE MUNICIP Bricklayer 05/17/2014

HAROLD BROTHERS MECHANI 7,675.0 1,644.0 21.42% 2,548.0 33.20% 0.0 0.00%6986 DUDLEY SQUARE MUNICIP Plumber 07/25/2015

DEPAOLI MOSAIC COMPANY 3,945.5 536.5 13.60% 536.5 13.60% 406.0 10.29%6986 DUDLEY SQUARE MUNICIP Terrazzo Worker 12/10/2014

EIRE ELECTRICAL CORPORATI 3,823.0 1,859.0 48.63% 172.0 4.50% 0.0 0.00%6986 DUDLEY SQUARE MUNICIP Electrician 10/17/2014

221,560.0 82,941.3 37.44% 78,233.8 35.31% 12,357.5 5.58%SUB TOTALS:

Page 56: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 56

Project Name Trade Latest Week

6988 CENTRAL MAINTENANCE PARKI

$1,961,678Amount:

Gen Contractor: NATIONAL RESTORATION SYSTEMS

1500 HICKS ROAD STE 200 ROLLING MEADOWS

Est Start Date:

Est End Date:

08/01/2011

08/31/2012

JOHN C. AHERN CO., INC. 58.0 0.0 0.00% 2.0 3.45% 0.0 0.00%6988 CENTRAL MAINTENANCE P Plumber 05/31/2014

58.0 0.0 0.00% 2.0 3.45% 0.0 0.00%SUB TOTALS:

6998 RENOVATIONS TO BFD ENGINES

$1,492,000Amount:

Gen Contractor: WCI CORP

617-524-9300 555 AMORY STREET, P O BOX 300187 BOSTON

Est Start Date:

Est End Date:

09/01/2013

09/30/2014

RELIABLE ROOFING SHEETME 12.0 0.0 0.00% 0.0 0.00% 0.0 0.00%6998 RENOVATIONS TO BFD EN Equipment Opera 01/12/2014

WCI CORP 131.0 107.0 81.68% 123.0 93.89% 0.0 0.00%6998 RENOVATIONS TO BFD EN Laborer 07/15/2014

COOGAN CARPENTRY 56.0 0.0 0.00% 0.0 0.00% 0.0 0.00%6998 RENOVATIONS TO BFD EN Carpenter 05/03/2014

WCI CORP 696.0 576.0 82.76% 160.0 22.99% 0.0 0.00%6998 RENOVATIONS TO BFD EN Carpenter 07/15/2014

WCI CORP 488.0 88.0 18.03% 0.0 0.00% 0.0 0.00%6998 RENOVATIONS TO BFD EN Mason Tender 04/15/2014

V & G IRON WORKS INC. 3.0 0.0 0.00% 0.0 0.00% 0.0 0.00%6998 RENOVATIONS TO BFD EN Laborer 12/27/2013

V & G IRON WORKS INC. 16.0 0.0 0.00% 16.0 100.00% 0.0 0.00%6998 RENOVATIONS TO BFD EN Iron Worker 12/20/2013

RELIABLE ROOFING SHEETME 373.5 33.5 8.97% 192.0 51.41% 0.0 0.00%6998 RENOVATIONS TO BFD EN Roofer 02/02/2014

WCI CORP 2,752.0 2,448.0 88.95% 0.0 0.00% 0.0 0.00%6998 RENOVATIONS TO BFD EN Mason 07/01/2014

CHAPMAN WATERPROOFING 199.0 113.5 57.04% 57.0 28.64% 0.0 0.00%6998 RENOVATIONS TO BFD EN Laborer 06/02/2014

MILLENIUM PAINTING 44.0 0.0 0.00% 0.0 0.00% 0.0 0.00%6998 RENOVATIONS TO BFD EN Carpenter 07/19/2014

JOHN W. EGAN CO. 173.0 0.0 0.00% 0.0 0.00% 0.0 0.00%6998 RENOVATIONS TO BFD EN Painter 08/09/2014

GARRY LANDSCAPING & CON 640.0 0.0 0.00% 0.0 0.00% 0.0 0.00%6998 RENOVATIONS TO BFD EN Carpenter 05/28/2014

ENTERPRISE EQUIPT CO,INC. 16.0 0.0 0.00% 0.0 0.00% 0.0 0.00%6998 RENOVATIONS TO BFD EN Pipefitter 11/16/2013

DEDHAM FENCE INC, 18.0 0.0 0.00% 0.0 0.00% 0.0 0.00%6998 RENOVATIONS TO BFD EN Iron Worker 05/02/2014

CHAPMAN WATERPROOFING 483.0 68.0 14.08% 51.5 10.66% 0.0 0.00%6998 RENOVATIONS TO BFD EN Waterproofer 08/18/2014

RELIABLE ROOFING SHEETME 297.0 0.0 0.00% 0.0 0.00% 0.0 0.00%6998 RENOVATIONS TO BFD EN Carpenter 02/02/2014

DEDHAM FENCE INC, 28.0 28.0 100.00% 28.0 100.00% 0.0 0.00%6998 RENOVATIONS TO BFD EN Laborer 05/02/2014

6,425.5 3,462.0 53.88% 627.5 9.77% 0.0 0.00%SUB TOTALS:

6999 BUILDING ENVELOPE REPAIR @

$291,000Amount:

Gen Contractor: FOLAN WATERPROOF CO.

(508)238-6550 795 WASHINGTON ST. South easton

Est Start Date:

Est End Date:

04/15/2014

11/30/2014

JOHN F. SHEA CO. INC. 509.5 154.0 30.23% 9.0 1.77% 0.0 0.00%6999 BUILDING ENVELOPE REP Sheetmetal Work 09/27/2014

JOHN F. SHEA CO. INC. 98.0 6.0 6.12% 18.5 18.88% 0.0 0.00%6999 BUILDING ENVELOPE REP Roofer 11/01/2014

FOLAN WATERPROOF CO. 1,432.8 1,084.0 75.66% 392.0 27.36% 245.0 17.10%6999 BUILDING ENVELOPE REP Waterproofer 12/20/2014

FOLAN WATERPROOF CO. 3.0 3.0 100.00% 0.0 0.00% 0.0 0.00%6999 BUILDING ENVELOPE REP Mason 12/13/2014

FOLAN WATERPROOF CO. 272.5 0.0 0.00% 16.0 5.87% 0.0 0.00%6999 BUILDING ENVELOPE REP Laborer 12/13/2014

2,315.8 1,247.0 53.85% 435.5 18.81% 245.0 10.58%SUB TOTALS:

Page 57: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 57

Project Name Trade Latest Week

7000 BFD SITE SECURITY IMPROVEM

Amount:

Gen Contractor: PAUL J. ROGAN CO., INC.

(781)843-1900 25 HAYWARD STREET BRAINTREE

Est Start Date:

Est End Date:

04/01/2015

04/01/2016

STEELCO FENCING 368.0 152.0 41.30% 160.0 43.48% 0.0 0.00%7000 BFD SITE SECURITY IMPR Laborer 07/25/2015

PAUL J. ROGAN CO., INC. 334.0 82.5 24.70% 82.5 24.70% 82.5 24.70%7000 BFD SITE SECURITY IMPR Laborer 10/10/2015

PAUL J. ROGAN CO., INC. 4.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7000 BFD SITE SECURITY IMPR Carpenter 09/05/2015

706.0 234.5 33.22% 242.5 34.35% 82.5 11.69%SUB TOTALS:

7001 BTD COLLECTIONROOM RENOV

$717,000Amount:

Gen Contractor: WCI CORP

617-524-9300 555 AMORY STREET, P O BOX 300187 BOSTON

Est Start Date:

Est End Date:

07/15/2013

12/31/2013

WCI CORP 94.0 62.0 65.96% 3.0 3.19% 0.0 0.00%7001 BTD COLLECTIONROOM R Mason 07/01/2014

WCI CORP 56.0 16.0 28.57% 0.0 0.00% 0.0 0.00%7001 BTD COLLECTIONROOM R Mason Tender 11/26/2013

WCI CORP 191.0 159.0 83.25% 175.0 91.62% 96.0 50.26%7001 BTD COLLECTIONROOM R Laborer 07/01/2014

WCI CORP 397.0 149.0 37.53% 157.0 39.55% 13.0 3.27%7001 BTD COLLECTIONROOM R Carpenter 02/25/2014

V & G IRON WORKS INC. 3.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7001 BTD COLLECTIONROOM R Laborer 12/27/2013

DEDHAM FENCE INC, 15.5 0.0 0.00% 0.0 0.00% 0.0 0.00%7001 BTD COLLECTIONROOM R Iron Worker 12/13/2013

SIGNET ELECTRONIC SYSTEM 17.0 0.0 0.00% 8.0 47.06% 0.0 0.00%7001 BTD COLLECTIONROOM R Telephone/Data I 12/08/2013

FINISHING TOUCHES 208.0 104.0 50.00% 0.0 0.00% 208.0 100.00%7001 BTD COLLECTIONROOM R Painter 12/14/2013

DEDHAM FENCE INC, 21.5 0.0 0.00% 0.0 0.00% 0.0 0.00%7001 BTD COLLECTIONROOM R Welder 12/13/2013

DEDHAM FENCE INC, 28.0 28.0 100.00% 28.0 100.00% 0.0 0.00%7001 BTD COLLECTIONROOM R Laborer 12/13/2013

SYSTEMS CONTRACTING, INC 228.5 0.0 0.00% 0.0 0.00% 0.0 0.00%7001 BTD COLLECTIONROOM R Electrician 02/08/2014

1,259.5 518.0 41.13% 371.0 29.46% 317.0 25.17%SUB TOTALS:

7003 FAMILY JUSTICE CENTER HVAC

$1,635,000Amount:

Gen Contractor: WCI CORP

617-524-9300 555 AMORY STREET, P O BOX 300187 BOSTON

Est Start Date:

Est End Date:

01/01/2014

01/01/2015

MILLENIUM PAINTING 8.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7003 FAMILY JUSTICE CENTER Carpenter 05/03/2014

NG ENVIRONMENTAL CO. 222.0 32.0 14.41% 222.0 100.00% 6.0 2.70%7003 FAMILY JUSTICE CENTER Asbestos Worker 09/20/2014

RELIABLE ROOFING SHEETME 68.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7003 FAMILY JUSTICE CENTER Equipment Opera 10/26/2014

RELIABLE ROOFING SHEETME 1,355.5 319.5 23.57% 617.0 45.52% 0.0 0.00%7003 FAMILY JUSTICE CENTER Roofer 11/23/2014

RELIABLE ROOFING SHEETME 35.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7003 FAMILY JUSTICE CENTER Sheetmetal Work 05/25/2014

WCI CORP 80.0 78.0 97.50% 22.0 27.50% 0.0 0.00%7003 FAMILY JUSTICE CENTER Mason 08/11/2015

WCI CORP 2.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7003 FAMILY JUSTICE CENTER Floor Layer 09/23/2014

J.M. ELECTRICAL CO. INC. 241.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7003 FAMILY JUSTICE CENTER Electrician 09/19/2014

WCI CORP 1,356.0 1,030.5 76.00% 1,136.0 83.78% 716.5 52.84%7003 FAMILY JUSTICE CENTER Laborer 08/04/2015

WCI CORP 566.5 319.0 56.31% 259.0 45.72% 72.0 12.71%7003 FAMILY JUSTICE CENTER Carpenter 12/22/2015

G & C CONCRETE CO. 11.0 11.0 100.00% 0.0 0.00% 0.0 0.00%7003 FAMILY JUSTICE CENTER Laborer 04/19/2014

DEDHAM FENCE INC, 8.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7003 FAMILY JUSTICE CENTER Welder 06/28/2014

Page 58: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 58

Project Name Trade Latest Week

DEDHAM FENCE INC, 8.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7003 FAMILY JUSTICE CENTER Iron Worker 06/28/2014

COOGAN CARPENTRY 40.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7003 FAMILY JUSTICE CENTER Carpenter 06/07/2014

BROTHERS ELECTRIC CO LLC 1,020.0 381.0 37.35% 32.0 3.14% 0.0 0.00%7003 FAMILY JUSTICE CENTER Electrician 09/27/2014

BELLO PAINTING CO. 272.0 0.0 0.00% 272.0 100.00% 0.0 0.00%7003 FAMILY JUSTICE CENTER Painter 10/24/2014

BALLDON FIRE PROTECTION 48.0 24.0 50.00% 0.0 0.00% 0.0 0.00%7003 FAMILY JUSTICE CENTER Sprinkler Fitter 06/23/2015

APEX CORPORATION 607.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7003 FAMILY JUSTICE CENTER HVAC 11/02/2014

APEX CORPORATION 6.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7003 FAMILY JUSTICE CENTER Electrician 01/03/2014

WCI CORP 16.0 8.0 50.00% 0.0 0.00% 0.0 0.00%7003 FAMILY JUSTICE CENTER Mason Tender 08/05/2014

GARRY LANDSCAPING & CON 8.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7003 FAMILY JUSTICE CENTER Carpenter 05/03/2014

5,978.0 2,203.0 36.85% 2,560.0 42.82% 794.5 13.29%SUB TOTALS:

7007 DUDLEY BRANCH LIBRARY ENT

$887,000Amount:

Gen Contractor: PAUL J. ROGAN CO., INC.

(781)843-1900 25 HAYWARD STREET BRAINTREE

Est Start Date:

Est End Date:

09/01/2013

04/30/2014

L & L CONTRACTING 4.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7007 DUDLEY BRANCH LIBRARY Laborer 02/07/2014

PAUL J. ROGAN CO., INC. 46.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7007 DUDLEY BRANCH LIBRARY Carpenter 06/21/2014

DESIGN COMMUNICATIONS LT 443.0 381.5 86.12% 159.8 36.06% 48.0 10.84%7007 DUDLEY BRANCH LIBRARY Installer/Apt Wirer 05/25/2014

ANNESE ELECTRICAL SERVIC 858.5 212.0 24.69% 724.5 84.39% 39.0 4.54%7007 DUDLEY BRANCH LIBRARY Electrician 06/28/2014

PAUL J. ROGAN CO., INC. 31.0 16.0 51.61% 18.0 58.06% 16.0 51.61%7007 DUDLEY BRANCH LIBRARY Laborer 06/21/2014

1,382.5 609.5 44.09% 902.3 65.26% 103.0 7.45%SUB TOTALS:

7009 FENWAY HS ADDITION & RENOV

$9,479,000Amount:

Gen Contractor: O'CONNOR CONSTRUCTORS INC.

45 INDUSTRIAL CANTON

Est Start Date:

Est End Date:

04/01/2014

04/01/2016

STAFFORD CONST. SERVICES 1,095.0 97.0 8.86% 97.0 8.86% 33.0 3.01%7009 FENWAY HS ADDITION & R Plasterer 09/04/2015

RICHARD T LOSORDO ELE. 6,295.0 1,155.0 18.35% 350.0 5.56% 0.0 0.00%7009 FENWAY HS ADDITION & R Electrician 10/04/2015

V & G IRON WORKS INC. 75.5 19.5 25.83% 19.5 25.83% 19.5 25.83%7009 FENWAY HS ADDITION & R Laborer 09/04/2015

O'CONNOR CONSTRUCTORS I 1,508.5 346.5 22.97% 301.5 19.99% 253.5 16.80%7009 FENWAY HS ADDITION & R Carpenter 10/27/2015

O'CONNOR CONSTRUCTORS I 4,753.0 2,484.5 52.27% 1,291.5 27.17% 288.0 6.06%7009 FENWAY HS ADDITION & R Laborer 09/08/2015

O'CONNOR CONSTRUCTORS I 14.0 0.0 0.00% 14.0 100.00% 0.0 0.00%7009 FENWAY HS ADDITION & R Pipefitter 12/30/2014

NEW ENGLAND INTERIOR SPE 130.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7009 FENWAY HS ADDITION & R Carpenter 08/15/2015

QUINN BROTHERS ESSEX INC. 32.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7009 FENWAY HS ADDITION & R Equipment Opera 10/04/2014

QUINN BROTHERS ESSEX INC. 458.0 0.0 0.00% 195.0 42.58% 0.0 0.00%7009 FENWAY HS ADDITION & R Iron Worker 04/25/2015

RELIABLE SERVICES 219.0 75.0 34.25% 219.0 100.00% 0.0 0.00%7009 FENWAY HS ADDITION & R Iron Worker 11/21/2014

REMINGTON STEEL 395.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7009 FENWAY HS ADDITION & R Iron Worker 04/11/2015

REPLACEMENT WINBOW SYS 224.0 136.0 60.71% 192.0 85.71% 104.0 46.43%7009 FENWAY HS ADDITION & R Laborer 08/15/2015

ROBERT W. IRVINE SONS. 13.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7009 FENWAY HS ADDITION & R Carpenter 08/07/2015

ROBERT W. IRVINE SONS. 55.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7009 FENWAY HS ADDITION & R Driller 05/15/2015

Page 59: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 59

Project Name Trade Latest Week

ROBERT W. IRVINE SONS. 200.0 0.0 0.00% 0.0 0.00% 114.0 57.00%7009 FENWAY HS ADDITION & R Insulator 08/21/2015

ROBERT W. IRVINE SONS. 10.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7009 FENWAY HS ADDITION & R Laborer 05/22/2015

ROBERT W. IRVINE SONS. 3,333.0 896.0 26.88% 896.0 26.88% 0.0 0.00%7009 FENWAY HS ADDITION & R Plumber 09/04/2015

SELECT DEMO SERVICES, LLC 2,558.0 616.0 24.08% 767.0 29.98% 16.0 0.63%7009 FENWAY HS ADDITION & R Laborer 04/17/2015

SELECT DEMO SERVICES, LLC 104.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7009 FENWAY HS ADDITION & R Wrecker 05/30/2014

STAFFORD CONST. SERVICES 1,259.0 136.0 10.80% 120.0 9.53% 0.0 0.00%7009 FENWAY HS ADDITION & R Laborer 08/28/2015

THERMO DYNAMICS INTERNA. 969.5 117.5 12.12% 795.0 82.00% 0.0 0.00%7009 FENWAY HS ADDITION & R Insulator 08/29/2015

THOMPSON COMPANY INC. 402.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7009 FENWAY HS ADDITION & R Carpenter 09/05/2015

V & G IRON WORKS INC. 90.0 0.0 0.00% 34.5 38.33% 0.0 0.00%7009 FENWAY HS ADDITION & R Iron Worker 09/18/2015

N.B. KENNEY CO. INC., 1,295.0 40.0 3.09% 0.0 0.00% 0.0 0.00%7009 FENWAY HS ADDITION & R Pipefitter 08/28/2015

STAFFORD CONST. SERVICES 4,579.0 1,056.0 23.06% 1,287.0 28.11% 0.0 0.00%7009 FENWAY HS ADDITION & R Carpenter 08/28/2015

CUTTING EDGE ENVIRONMEN 144.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7009 FENWAY HS ADDITION & R Laborer 10/18/2014

NOR'EASTER INSTALLATIONS 429.0 213.0 49.65% 0.0 0.00% 0.0 0.00%7009 FENWAY HS ADDITION & R Carpenter 08/15/2015

MCCUSKER-GILL INC. 2,088.5 436.0 20.88% 64.0 3.06% 0.0 0.00%7009 FENWAY HS ADDITION & R Sheetmetal Work 07/19/2015

ARCHER CORPORATION 482.5 0.0 0.00% 0.0 0.00% 0.0 0.00%7009 FENWAY HS ADDITION & R Carpenter 10/16/2015

BASS ASSOCIATES INC, 616.0 175.0 28.41% 0.0 0.00% 0.0 0.00%7009 FENWAY HS ADDITION & R Carpenter 08/08/2015

C.M. CONWAY CONSTRUCTIO 1,416.0 604.0 42.66% 0.0 0.00% 0.0 0.00%7009 FENWAY HS ADDITION & R Equipment Opera 09/05/2015

C.M. CONWAY CONSTRUCTIO 2,382.5 362.0 15.19% 921.5 38.68% 0.0 0.00%7009 FENWAY HS ADDITION & R Laborer 09/05/2015

CAPITAL CARPET&FLOORING 649.0 183.0 28.20% 239.0 36.83% 0.0 0.00%7009 FENWAY HS ADDITION & R Floor Layer 09/06/2015

CARLYSLE ENGINEERING INC. 1,054.5 136.0 12.90% 80.0 7.59% 0.0 0.00%7009 FENWAY HS ADDITION & R Sprinkler Fitter 09/04/2015

CHAPMAN WATERPROOFING 1,321.0 1,117.0 84.56% 382.0 28.92% 0.0 0.00%7009 FENWAY HS ADDITION & R Laborer 06/22/2015

CHAPMAN WATERPROOFING 1,018.0 80.0 7.86% 80.0 7.86% 0.0 0.00%7009 FENWAY HS ADDITION & R Waterproofer 06/22/2015

CUTTING EDGE ENVIRONMEN 4,498.0 88.0 1.96% 4,362.0 96.98% 8.0 0.18%7009 FENWAY HS ADDITION & R Asbestos Worker 07/25/2015

FOLAN WATERPROOF CO. 33.0 0.0 0.00% 5.0 15.15% 0.0 0.00%7009 FENWAY HS ADDITION & R Laborer 08/22/2015

K & K ACOUSTICAL CEILINGS 209.0 174.0 83.25% 0.0 0.00% 0.0 0.00%7009 FENWAY HS ADDITION & R Carpenter 09/06/2015

MANSOUR CONSTRUCTION IN 1,757.0 264.0 15.03% 457.5 26.04% 0.0 0.00%7009 FENWAY HS ADDITION & R Laborer 08/29/2015

MANSOUR CONSTRUCTION IN 244.5 0.0 0.00% 244.5 100.00% 0.0 0.00%7009 FENWAY HS ADDITION & R Iron Worker 12/20/2014

MANSOUR CONSTRUCTION IN 2,582.0 104.0 4.03% 213.0 8.25% 104.0 4.03%7009 FENWAY HS ADDITION & R Carpenter 08/29/2015

KONE ELEVATOR INC. 611.0 0.0 0.00% 0.0 0.00% 8.0 1.31%7009 FENWAY HS ADDITION & R Elevator Const(M 08/19/2015

CRS SPECIALTIES, INC. 4.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7009 FENWAY HS ADDITION & R Iron Worker 03/13/2015

KAPILOFF'S GLASS INC 418.0 0.0 0.00% 20.8 4.96% 0.0 0.00%7009 FENWAY HS ADDITION & R Glazier 09/05/2015

FOLAN WATERPROOF CO. 537.0 226.0 42.09% 223.0 41.53% 109.0 20.30%7009 FENWAY HS ADDITION & R Mason 09/05/2015

HOMER CONTRACTING INC 1,382.0 440.0 31.84% 700.0 50.65% 0.0 0.00%7009 FENWAY HS ADDITION & R Painter 09/05/2015

GIBSON ROOFS 669.0 67.5 10.09% 268.0 40.06% 0.0 0.00%7009 FENWAY HS ADDITION & R Roofer 08/26/2015

Page 60: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 60

Project Name Trade Latest Week

GIBSON ROOFS 4.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7009 FENWAY HS ADDITION & R Equipment Opera 01/21/2015

FRONT LINE INC. 650.0 372.0 57.23% 500.0 76.92% 208.0 32.00%7009 FENWAY HS ADDITION & R Laborer 09/05/2015

KONE ELEVATOR INC. 20.0 8.0 40.00% 8.0 40.00% 0.0 0.00%7009 FENWAY HS ADDITION & R Elev Const Helper 08/05/2015

55,286.0 12,224.5 22.11% 15,347.3 27.76% 1,265.0 2.29%SUB TOTALS:

7011 BCH DATA CENTA COOLING TO

$520,000Amount:

Gen Contractor: J.F. WHITE CONTRACTING CO

(508) 879-4700 10 BURR STREET FRAMINGHAM

Est Start Date:

Est End Date:

01/01/2014

05/31/2014

J.F. WHITE CONTRACTING CO 807.0 192.5 23.85% 223.5 27.70% 9.0 1.12%7011 BCH DATA CENTA COOLIN Pipefitter 06/15/2014

BROTHERS ELECTRIC CO LLC 93.0 24.0 25.81% 16.0 17.20% 0.0 0.00%7011 BCH DATA CENTA COOLIN Electrician 05/03/2014

THERMO DYNAMICS INTERNA. 131.0 0.0 0.00% 72.0 54.96% 0.0 0.00%7011 BCH DATA CENTA COOLIN Insulator 06/07/2014

LEMOI ERECTORS 59.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7011 BCH DATA CENTA COOLIN Iron Worker 03/29/2014

HUNTINGTON CONTROLS 4.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7011 BCH DATA CENTA COOLIN Pipefitter 04/12/2014

HUNTINGTON CONTROLS 434.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7011 BCH DATA CENTA COOLIN Electrician 08/02/2014

EXCEL HVAC INC. 119.0 0.0 0.00% 6.0 5.04% 0.0 0.00%7011 BCH DATA CENTA COOLIN Sheetmetal Work 05/06/2014

J.F. WHITE CONTRACTING CO 1.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7011 BCH DATA CENTA COOLIN Laborer 04/20/2014

1,648.0 216.5 13.14% 317.5 19.27% 9.0 0.55%SUB TOTALS:

7012 DEARBORN S.T.E.M. ACADEMY

$60,000,000Amount:

Gen Contractor: GILBANE BLDG. CO.

200 STATE ST. BOSTON

Est Start Date:

Est End Date:

09/15/2015

09/30/2017

MARR EQUIPMENT CORP. 75.0 24.5 32.67% 0.0 0.00% 0.0 0.00%7012 DEARBORN S.T.E.M. ACAD Equipment Opera 01/31/2016

OUTKAST ELECTRICAL CO 136.0 136.0 100.00% 136.0 100.00% 0.0 0.00%7012 DEARBORN S.T.E.M. ACAD Electrician 12/11/2015

WORCESTER AIR CONDITIONI 10,126.0 4,347.0 42.93% 2,171.0 21.44% 0.0 0.00%7012 DEARBORN S.T.E.M. ACAD Sheetmetal Work 09/10/2017

NEW QUALITY FENCE CO 219.5 0.0 0.00% 16.0 7.29% 0.0 0.00%7012 DEARBORN S.T.E.M. ACAD Laborer 02/04/2017

NER CONS MANAGEMENT INC. 32.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7012 DEARBORN S.T.E.M. ACAD Mason Tender 01/31/2016

NER CONS MANAGEMENT INC. 209.0 73.0 34.93% 73.0 34.93% 0.0 0.00%7012 DEARBORN S.T.E.M. ACAD Laborer 01/31/2016

NER CONS MANAGEMENT INC. 200.0 8.0 4.00% 8.0 4.00% 8.0 4.00%7012 DEARBORN S.T.E.M. ACAD Bricklayer 01/31/2016

NASDI, LLC 1,757.0 597.0 33.98% 104.0 5.92% 0.0 0.00%7012 DEARBORN S.T.E.M. ACAD Laborer 03/13/2016

MAIA STEEL 1,560.5 674.5 43.22% 1,115.5 71.48% 40.0 2.56%7012 DEARBORN S.T.E.M. ACAD Iron Worker 12/11/2016

NASDI, LLC 7,468.0 3,503.0 46.91% 6,917.0 92.62% 1,088.0 14.57%7012 DEARBORN S.T.E.M. ACAD Asbestos Worker 03/13/2016

MARGUERITE CONCRETE 1,104.5 0.0 0.00% 306.5 27.75% 0.0 0.00%7012 DEARBORN S.T.E.M. ACAD Laborer 11/19/2016

MARGUERITE CONCRETE 207.5 0.0 0.00% 0.0 0.00% 0.0 0.00%7012 DEARBORN S.T.E.M. ACAD Equipment Opera 11/19/2016

MARGUERITE CONCRETE 1,082.0 88.5 8.18% 101.5 9.38% 10.0 0.92%7012 DEARBORN S.T.E.M. ACAD Cement Finisher 11/19/2016

MANGANARO NORTHEAST LL 5,690.5 4,898.5 86.08% 4,080.5 71.71% 8.0 0.14%7012 DEARBORN S.T.E.M. ACAD Laborer 09/03/2017

MANGANARO NORTHEAST LL 31,172.0 15,312.5 49.12% 12,188.5 39.10% 2,048.0 6.57%7012 DEARBORN S.T.E.M. ACAD Carpenter 09/03/2017

MAINE DRILLING & BLASTING 48.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7012 DEARBORN S.T.E.M. ACAD Driller 02/27/2016

PATRICK J. KENNEDY & SONS, 4,528.0 1,911.0 42.20% 1,911.0 42.20% 362.0 7.99%7012 DEARBORN S.T.E.M. ACAD Pipefitter 08/05/2017

Page 61: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 61

Project Name Trade Latest Week

NASDI, LLC 2,064.0 224.0 10.85% 224.0 10.85% 488.0 23.64%7012 DEARBORN S.T.E.M. ACAD Equipment Opera 03/13/2016

SILKTOWN ROOFING INC 4,348.5 1,241.5 28.55% 1,059.5 24.36% 0.0 0.00%7012 DEARBORN S.T.E.M. ACAD Roofer 09/02/2017

ZICHELLE STEEL ERECTORS 5,737.0 1,865.0 32.51% 2,829.0 49.31% 301.0 5.25%7012 DEARBORN S.T.E.M. ACAD Iron Worker 12/30/2016

RUSTIC FIRE PROTECTION 2,899.5 1,282.0 44.21% 1,482.0 51.11% 0.0 0.00%7012 DEARBORN S.T.E.M. ACAD Sprinkler Fitter 09/16/2017

WEST FLOOR COVERING INC, 672.0 249.5 37.13% 256.0 38.10% 54.5 8.11%7012 DEARBORN S.T.E.M. ACAD Marble Tile Work 08/19/2017

KAPILOFF'S GLASS INC 246.8 33.3 13.48% 33.3 13.48% 0.0 0.00%7012 DEARBORN S.T.E.M. ACAD Glazier 08/18/2017

WAYNE J GRIFFIN ELECTRIC 9,372.5 2,399.5 25.60% 4,234.0 45.17% 690.5 7.37%7012 DEARBORN S.T.E.M. ACAD Electrician 07/30/2017

TOTAL WALL SYSTEMS, INC. C 2,025.5 805.5 39.77% 922.5 45.54% 629.5 31.08%7012 DEARBORN S.T.E.M. ACAD Carpenter 09/02/2017

THE PAPPAS COMPANY, INC 521.5 287.5 55.13% 315.5 60.50% 34.5 6.62%7012 DEARBORN S.T.E.M. ACAD Carpenter 08/06/2017

WAYNE J GRIFFIN ELECTRIC 1,021.0 0.0 0.00% 35.0 3.43% 0.0 0.00%7012 DEARBORN S.T.E.M. ACAD Telephone/Data I 07/30/2017

T & T STEEL ERECTORS 2,417.0 963.0 39.84% 925.0 38.27% 216.0 8.94%7012 DEARBORN S.T.E.M. ACAD Iron Worker 09/17/2016

PATRICK J. KENNEDY & SONS, 28.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7012 DEARBORN S.T.E.M. ACAD Pipelayer 11/19/2016

SAVE-ON-WALL CO, INC. 8.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7012 DEARBORN S.T.E.M. ACAD Laborer 10/24/2015

SAVE-ON-WALL CO, INC. 88.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7012 DEARBORN S.T.E.M. ACAD Carpenter 10/31/2015

S & F CONCRETE 2,935.5 1,586.5 54.05% 1,511.0 51.47% 239.0 8.14%7012 DEARBORN S.T.E.M. ACAD Laborer 12/10/2016

S & F CONCRETE 327.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7012 DEARBORN S.T.E.M. ACAD Equipment Opera 06/17/2017

S & F CONCRETE 3,156.0 2,009.5 63.67% 2,415.0 76.52% 337.5 10.69%7012 DEARBORN S.T.E.M. ACAD Carpenter 12/10/2016

QUINN BROTHERS ESSEX INC. 2,313.0 103.0 4.45% 642.0 27.76% 103.0 4.45%7012 DEARBORN S.T.E.M. ACAD Iron Worker 09/09/2017

PATRICK J. KENNEDY & SONS, 6,380.0 2,133.0 33.43% 2,803.0 43.93% 0.0 0.00%7012 DEARBORN S.T.E.M. ACAD Plumber 08/05/2017

THE CHEVIOT CORPORATION 280.0 0.0 0.00% 170.0 60.71% 0.0 0.00%7012 DEARBORN S.T.E.M. ACAD Carpenter 08/04/2017

CAVALIERI CONSTRUCTION C 32.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7012 DEARBORN S.T.E.M. ACAD Equipment Opera 12/19/2015

CHELMSFORD CRANE SERVIC 616.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7012 DEARBORN S.T.E.M. ACAD Oiler 08/27/2016

CHELMSFORD CRANE SERVIC 627.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7012 DEARBORN S.T.E.M. ACAD Equipment Opera 08/27/2016

CHB EXCAVATING, INC. 56.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7012 DEARBORN S.T.E.M. ACAD Laborer 10/31/2015

CHB EXCAVATING, INC. 128.0 0.0 0.00% 128.0 100.00% 0.0 0.00%7012 DEARBORN S.T.E.M. ACAD Equipment Opera 12/19/2015

CHANDLER ARCHITECTURAL 10,339.0 2,219.5 21.47% 1,831.5 17.71% 1,640.0 15.86%7012 DEARBORN S.T.E.M. ACAD Glazier 09/09/2017

CENTURY DRYWALL INC, 758.0 156.0 20.58% 684.0 90.24% 156.0 20.58%7012 DEARBORN S.T.E.M. ACAD Plasterer 07/08/2017

CENTURY DRYWALL INC, 2,351.0 296.5 12.61% 822.0 34.96% 152.0 6.47%7012 DEARBORN S.T.E.M. ACAD Laborer 08/26/2017

COMPOSITE COMPANY INC. 217.0 77.0 35.48% 109.0 50.23% 0.0 0.00%7012 DEARBORN S.T.E.M. ACAD Iron Worker 09/10/2016

CAVALIERI CONSTRUCTION C 57.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7012 DEARBORN S.T.E.M. ACAD Laborer 12/19/2015

CHANDLER ARCHITECTURAL 3,917.5 1,920.5 49.02% 1,920.5 49.02% 0.0 0.00%7012 DEARBORN S.T.E.M. ACAD Iron Worker 09/09/2017

BELLO PAINTING CO. 352.0 0.0 0.00% 256.0 72.73% 40.0 11.36%7012 DEARBORN S.T.E.M. ACAD Painter 07/28/2017

ATI INCORPORATED 336.0 32.0 9.52% 32.0 9.52% 0.0 0.00%7012 DEARBORN S.T.E.M. ACAD Laborer 06/03/2017

ARCHITECTURAL SHEET MET 319.5 0.0 0.00% 0.0 0.00% 0.0 0.00%7012 DEARBORN S.T.E.M. ACAD Sheetmetal Work 08/26/2017

Page 62: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 62

Project Name Trade Latest Week

APPLIED INSULATIN CONCEPT 439.5 155.0 35.27% 87.5 19.91% 63.5 14.45%7012 DEARBORN S.T.E.M. ACAD Insulator 08/26/2017

AMQUIP CRANE RENTALL LLC. 341.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7012 DEARBORN S.T.E.M. ACAD Equipment Opera 06/11/2016

S & F CONCRETE 124.5 0.0 0.00% 0.0 0.00% 0.0 0.00%7012 DEARBORN S.T.E.M. ACAD Cement Finisher 12/10/2016

JAMES W. FLETT CO. INC. 4,923.0 3,110.0 63.17% 2,067.0 41.99% 857.0 17.41%7012 DEARBORN S.T.E.M. ACAD Laborer 09/03/2017

CENTURY DRYWALL INC, 90.5 8.5 9.39% 8.5 9.39% 0.0 0.00%7012 DEARBORN S.T.E.M. ACAD Carpenter 08/19/2017

HAYWARD BAKER INC. 312.0 48.0 15.38% 144.0 46.15% 16.0 5.13%7012 DEARBORN S.T.E.M. ACAD Laborer 06/19/2016

JAMES W. FLETT CO. INC. 3,633.5 1,214.0 33.41% 1,248.0 34.35% 0.0 0.00%7012 DEARBORN S.T.E.M. ACAD Equipment Opera 09/03/2017

JAMES W. FLETT CO. INC. 11.0 0.0 0.00% 11.0 100.00% 0.0 0.00%7012 DEARBORN S.T.E.M. ACAD Electrician 03/13/2016

CENTURY DRYWALL INC, 341.5 0.0 0.00% 0.0 0.00% 0.0 0.00%7012 DEARBORN S.T.E.M. ACAD Taper 05/27/2017

HAYWARD BAKER INC. 242.0 101.0 41.74% 0.0 0.00% 0.0 0.00%7012 DEARBORN S.T.E.M. ACAD Piledriver 07/10/2016

D & W CONSTRUCTION 2,819.0 664.0 23.55% 1,336.0 47.39% 411.0 14.58%7012 DEARBORN S.T.E.M. ACAD Taper 09/03/2017

HAYWARD BAKER INC. 200.0 96.0 48.00% 96.0 48.00% 96.0 48.00%7012 DEARBORN S.T.E.M. ACAD Equipment Opera 04/03/2016

HALLAMORE CORPORATION 94.5 0.0 0.00% 0.0 0.00% 0.0 0.00%7012 DEARBORN S.T.E.M. ACAD Equipment Opera 04/29/2017

GILBANE BLDG. CO. 7,885.3 7,070.3 89.66% 4,759.3 60.36% 1,518.5 19.26%7012 DEARBORN S.T.E.M. ACAD Laborer 09/10/2017

GILBANE BLDG. CO. 524.0 224.0 42.75% 440.0 83.97% 32.0 6.11%7012 DEARBORN S.T.E.M. ACAD Carpenter 04/02/2017

FOLAN WATERPROOF CO. 1,993.0 1,135.0 56.95% 938.0 47.06% 235.5 11.82%7012 DEARBORN S.T.E.M. ACAD Waterproofer 07/15/2017

FEDERAL CONCRETE 1,941.5 1,026.0 52.85% 1,296.0 66.75% 621.5 32.01%7012 DEARBORN S.T.E.M. ACAD Laborer 11/26/2016

DARDEN'S TREE COMPANY 40.0 30.0 75.00% 30.0 75.00% 0.0 0.00%7012 DEARBORN S.T.E.M. ACAD Tree Surgeon 12/12/2015

FEDERAL CONCRETE 1,119.0 356.0 31.81% 380.0 33.96% 0.0 0.00%7012 DEARBORN S.T.E.M. ACAD Iron Worker 11/05/2016

EMPIRE MASONRY CORP. 3,551.0 1,593.0 44.86% 1,593.0 44.86% 0.0 0.00%7012 DEARBORN S.T.E.M. ACAD Bricklayer 09/03/2017

FEDERAL CONCRETE 1,859.0 641.0 34.48% 641.0 34.48% 304.0 16.35%7012 DEARBORN S.T.E.M. ACAD Carpenter 11/26/2016

ENERGY INSULATION CONSE 1,499.5 376.0 25.08% 900.0 60.02% 8.0 0.53%7012 DEARBORN S.T.E.M. ACAD Insulator 08/05/2017

EMPIRE MASONRY CORP. 3,222.5 1,384.0 42.95% 1,967.0 61.04% 0.0 0.00%7012 DEARBORN S.T.E.M. ACAD Mason Tender 09/03/2017

INDUSTRIAL SURFACE APPLIC 44.0 0.0 0.00% 44.0 100.00% 0.0 0.00%7012 DEARBORN S.T.E.M. ACAD Laborer 07/10/2016

FOLAN WATERPROOF CO. 664.5 0.0 0.00% 18.0 2.71% 0.0 0.00%7012 DEARBORN S.T.E.M. ACAD Laborer 06/24/2017

170,477.5 70,689.5 41.47% 72,772.5 42.69% 12,808.5 7.51%SUB TOTALS:

7013 BOILER REPLACEMENT @ PARIS

$420,670Amount:

Gen Contractor: PATRICK J. KENNEDY & SONS, INC.

(617)265-5535 39 GIBSON STREET DORCHESTER

Est Start Date:

Est End Date:

08/01/2014

12/31/2014

PATRICK J. KENNEDY & SONS, 6.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7013 BOILER REPLACEMENT @ Plumber 11/01/2014

PATRICK J. KENNEDY & SONS, 429.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7013 BOILER REPLACEMENT @ Pipefitter 12/06/2014

435.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SUB TOTALS:

7014 UMANA ACADEMY SCHOOLYAR

Amount:

Gen Contractor:

Est Start Date:

Est End Date:

06/01/2013

04/20/2014

AQUA LINE UTILITY, INC. 24.0 8.0 33.33% 0.0 0.00% 0.0 0.00%7014 UMANA ACADEMY SCHOO Laborer 04/26/2014

Page 63: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 63

Project Name Trade Latest Week

24.0 8.0 33.33% 0.0 0.00% 0.0 0.00%SUB TOTALS:

7017 CENTRAL MAINTENANCE GARA

$3,842,000Amount:

Gen Contractor: COLANTONIO INCORPORATED

(508)429-8666 P.O.BOX 6764 16 EVERETT STREET HOLLISTON

Est Start Date:

Est End Date:

10/01/2013

05/30/2014

TITAN ROOFING INC. 54.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7017 CENTRAL MAINTENANCE G Sheetmetal Work 01/25/2014

THE AULSON COMPANY, LLC 381.5 61.5 16.12% 215.5 56.49% 61.5 16.12%7017 CENTRAL MAINTENANCE G Laborer 01/18/2014

MODERN ARCHITECTURAL GL 198.3 0.0 0.00% 0.0 0.00% 0.0 0.00%7017 CENTRAL MAINTENANCE G Glazier 03/16/2014

MARGUERITE CONCRETE 6.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7017 CENTRAL MAINTENANCE G Metal Refinisher 05/03/2014

MARGUERITE CONCRETE 73.5 0.0 0.00% 0.0 0.00% 0.0 0.00%7017 CENTRAL MAINTENANCE G Equipment Opera 05/03/2014

MARGUERITE CONCRETE 264.5 0.0 0.00% 21.0 7.94% 0.0 0.00%7017 CENTRAL MAINTENANCE G Laborer 05/03/2014

MAGNIFICENT CONCRETE, IN 52.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7017 CENTRAL MAINTENANCE G Iron Worker 01/11/2014

MARGUERITE CONCRETE 5.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7017 CENTRAL MAINTENANCE G Curbsetter/Paver 05/03/2014

MARGUERITE CONCRETE 225.5 0.0 0.00% 21.0 9.31% 0.0 0.00%7017 CENTRAL MAINTENANCE G Cement Finisher 05/03/2014

MAGNIFICENT CONCRETE, IN 334.0 180.0 53.89% 236.0 70.66% 0.0 0.00%7017 CENTRAL MAINTENANCE G Laborer 11/30/2013

TITAN ROOFING INC. 1,489.0 353.0 23.71% 0.0 0.00% 92.0 6.18%7017 CENTRAL MAINTENANCE G Roofer 02/01/2014

COLANTONIO INCORPORATED 152.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7017 CENTRAL MAINTENANCE G Equipment Opera 03/01/2014

MARGUERITE CONCRETE 4.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7017 CENTRAL MAINTENANCE G Mason 04/19/2014

MAGNIFICENT CONCRETE, IN 204.0 82.0 40.20% 175.0 85.78% 82.0 40.20%7017 CENTRAL MAINTENANCE G Carpenter 11/30/2013

COLANTONIO INCORPORATED 1,173.0 232.0 19.78% 0.0 0.00% 0.0 0.00%7017 CENTRAL MAINTENANCE G Carpenter 09/20/2014

AMERICAN ELECTRICAL CONS 244.5 149.0 60.94% 0.0 0.00% 0.0 0.00%7017 CENTRAL MAINTENANCE G Electrician 07/26/2014

COLANTONIO INCORPORATED 544.0 520.0 95.59% 128.0 23.53% 0.0 0.00%7017 CENTRAL MAINTENANCE G Laborer 06/28/2014

FEDERAL CONCRETE 988.0 231.0 23.38% 758.0 76.72% 223.0 22.57%7017 CENTRAL MAINTENANCE G Carpenter 05/17/2014

FEDERAL CONCRETE 313.0 214.0 68.37% 80.0 25.56% 0.0 0.00%7017 CENTRAL MAINTENANCE G Iron Worker 04/26/2014

FEDERAL CONCRETE 1,938.5 690.5 35.62% 1,213.0 62.57% 0.0 0.00%7017 CENTRAL MAINTENANCE G Laborer 06/28/2014

HARDING & SMITH, INC. 610.0 266.0 43.61% 24.0 3.93% 59.0 9.67%7017 CENTRAL MAINTENANCE G Plumber 02/22/2014

KALOUTAS PAINTING 1,019.5 366.0 35.90% 366.0 35.90% 0.0 0.00%7017 CENTRAL MAINTENANCE G Painter 09/13/2014

LUCKERN STEEL SERVICES 1,254.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7017 CENTRAL MAINTENANCE G Welder 05/10/2014

ATLANTIC CONSTRUCTION 1,243.0 468.0 37.65% 177.0 14.24% 177.0 14.24%7017 CENTRAL MAINTENANCE G Laborer 02/07/2014

12,770.8 3,813.0 29.86% 3,414.5 26.74% 694.5 5.44%SUB TOTALS:

7018 BPL- JOHNSON BUILDING IMPRO

$49,500,000Amount:

Gen Contractor: CONSIGLI CONSTRUCTION

197 MAIN STREET MILFORD

Est Start Date:

Est End Date:

12/16/2013

02/28/2016

LEVANGIE ELECTRIC COMPAN 7.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7018 BPL- JOHNSON BUILDING I Laborer 08/16/2014

LEVANGIE ELECTRIC COMPAN 6,341.8 2,313.0 36.47% 2,353.0 37.10% 0.0 0.00%7018 BPL- JOHNSON BUILDING I Electrician 05/09/2015

KAPILOFF'S GLASS INC 791.0 0.0 0.00% 197.5 24.97% 0.0 0.00%7018 BPL- JOHNSON BUILDING I Glazier 07/16/2016

K & K ACOUSTICAL CEILINGS 3,113.5 473.5 15.21% 348.0 11.18% 124.0 3.98%7018 BPL- JOHNSON BUILDING I Carpenter 08/06/2016

Page 64: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 64

Project Name Trade Latest Week

JOHN F. SHEA CO. INC. 176.0 25.5 14.49% 88.5 50.28% 0.0 0.00%7018 BPL- JOHNSON BUILDING I Roofer 04/23/2016

JAMES W. FLETT CO. INC. 1,994.0 403.5 20.24% 44.0 2.21% 638.0 32.00%7018 BPL- JOHNSON BUILDING I Laborer 06/11/2016

JAMES W. FLETT CO. INC. 1,426.5 179.0 12.55% 769.5 53.94% 0.0 0.00%7018 BPL- JOHNSON BUILDING I Equipment Opera 06/11/2016

J.M. ELECTRICAL CO. INC. 1,766.0 8.0 0.45% 630.0 35.67% 0.0 0.00%7018 BPL- JOHNSON BUILDING I Electrician 07/02/2016

LEVANGIE ELECTRIC COMPAN 531.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7018 BPL- JOHNSON BUILDING I Telephone/Data I 05/09/2015

J. C. CANNISTRARO INC. 2,533.5 2,354.0 92.91% 24.5 0.97% 10.0 0.39%7018 BPL- JOHNSON BUILDING I Sprinkler Fitter 04/02/2016

NEWROADS ENVIRONMENTAL 9,263.5 2,488.0 26.86% 7,895.5 85.23% 672.0 7.25%7018 BPL- JOHNSON BUILDING I Laborer 05/07/2016

J.F.SHINE MECHANICAL 1,154.0 184.0 15.94% 184.0 15.94% 0.0 0.00%7018 BPL- JOHNSON BUILDING I Plumber 10/17/2014

M.L. MCDONALD SALES 127.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7018 BPL- JOHNSON BUILDING I Painter 04/07/2015

MARGUERITE CONCRETE 402.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7018 BPL- JOHNSON BUILDING I Carpenter 06/11/2016

MARGUERITE CONCRETE 311.5 24.0 7.70% 24.0 7.70% 0.0 0.00%7018 BPL- JOHNSON BUILDING I Cement Finisher 06/11/2016

MARGUERITE CONCRETE 219.5 0.0 0.00% 0.0 0.00% 0.0 0.00%7018 BPL- JOHNSON BUILDING I Equipment Opera 05/28/2016

J. C. CANNISTRARO INC. 1,417.0 88.0 6.21% 84.0 5.93% 0.0 0.00%7018 BPL- JOHNSON BUILDING I Plumber 06/18/2016

MODERN GLASS & ALUMINUM 772.5 56.0 7.25% 56.0 7.25% 0.0 0.00%7018 BPL- JOHNSON BUILDING I Glazier 12/06/2014

ENTERPRISE EQUIPT CO,INC. 366.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7018 BPL- JOHNSON BUILDING I Laborer 11/21/2015

OSTROW ELECTRIC CO. 709.0 200.0 28.21% 0.0 0.00% 0.0 0.00%7018 BPL- JOHNSON BUILDING I Electrician 03/28/2014

PRIME STEEL ERECTING INC, 13,688.0 7,110.5 51.95% 5,602.0 40.93% 616.0 4.50%7018 BPL- JOHNSON BUILDING I Iron Worker 07/02/2016

RICMOR CONSTRUCTION INC. 431.0 40.0 9.28% 48.0 11.14% 0.0 0.00%7018 BPL- JOHNSON BUILDING I Laborer 04/23/2016

RICMOR CONSTRUCTION INC. 315.0 0.0 0.00% 32.0 10.16% 0.0 0.00%7018 BPL- JOHNSON BUILDING I Plasterer 04/23/2016

RIGGS CONTRACTING, INC. 6,300.5 690.5 10.96% 1,862.5 29.56% 1,049.5 16.66%7018 BPL- JOHNSON BUILDING I Carpenter 07/16/2016

RIGGS CONTRACTING, INC. 14,269.0 8,608.5 60.33% 6,728.5 47.15% 2,110.0 14.79%7018 BPL- JOHNSON BUILDING I Laborer 08/06/2016

MARGUERITE CONCRETE 631.5 0.0 0.00% 96.0 15.20% 0.0 0.00%7018 BPL- JOHNSON BUILDING I Laborer 06/04/2016

CONSIGLI CONSTRUCTION 3,330.0 248.0 7.45% 544.0 16.34% 272.0 8.17%7018 BPL- JOHNSON BUILDING I Carpenter 01/03/2015

RIGGS CONTRACTING, INC. 24.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7018 BPL- JOHNSON BUILDING I Lather 01/31/2015

ALLEGHENY CONTRACT FLOO 88.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7018 BPL- JOHNSON BUILDING I Bricklayer 05/21/2016

ALLEGHENY CONTRACT FLOO 1,125.0 230.0 20.44% 476.0 42.31% 56.0 4.98%7018 BPL- JOHNSON BUILDING I Carpet Layer 07/09/2016

ALLEGHENY CONTRACT FLOO 195.0 0.0 0.00% 4.0 2.05% 0.0 0.00%7018 BPL- JOHNSON BUILDING I Floor Layer 08/29/2014

AMERICAN CONTRACTORS CO 316.0 207.0 65.51% 0.0 0.00% 0.0 0.00%7018 BPL- JOHNSON BUILDING I Carpenter 10/24/2014

APEX CORPORATION 11,688.5 2,326.0 19.90% 420.0 3.59% 0.0 0.00%7018 BPL- JOHNSON BUILDING I Sheetmetal Work 07/23/2016

ATLANTIC COAST DISMANTLIN 379.5 0.0 0.00% 202.0 53.23% 0.0 0.00%7018 BPL- JOHNSON BUILDING I Laborer 11/07/2015

C & D SIGNS, INC. DBA METRO 214.0 0.0 0.00% 100.3 46.87% 0.0 0.00%7018 BPL- JOHNSON BUILDING I Laborer 07/30/2016

CAPITAL CARPET&FLOORING 613.0 56.0 9.14% 152.0 24.80% 8.0 1.31%7018 BPL- JOHNSON BUILDING I Floor Layer 04/19/2015

CARLYSLE ENGINEERING INC. 1,478.0 746.0 50.47% 0.0 0.00% 216.0 14.61%7018 BPL- JOHNSON BUILDING I Sprinkler Fitter 10/31/2014

FEDERAL CONCRETE 8,046.5 256.0 3.18% 1,230.5 15.29% 387.5 4.82%7018 BPL- JOHNSON BUILDING I Carpenter 07/23/2016

Page 65: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 65

Project Name Trade Latest Week

CHAPMAN WATERPROOFING 2,008.0 828.5 41.26% 790.5 39.37% 0.0 0.00%7018 BPL- JOHNSON BUILDING I Waterproofer 07/16/2016

J. C. CANNISTRARO INC. 18.0 0.0 0.00% 18.0 100.00% 0.0 0.00%7018 BPL- JOHNSON BUILDING I Metal Refinisher 01/09/2016

CONSIGLI CONSTRUCTION 2,457.0 2,005.0 81.60% 1,968.5 80.12% 650.5 26.48%7018 BPL- JOHNSON BUILDING I Laborer 01/03/2015

CONSIGLI CONSTRUCTION 52.5 0.0 0.00% 0.0 0.00% 0.0 0.00%7018 BPL- JOHNSON BUILDING I Mason 01/03/2015

DANDIS CONTRACTING 5,808.0 3,878.5 66.78% 1,986.5 34.20% 162.0 2.79%7018 BPL- JOHNSON BUILDING I Painter 05/21/2016

DEANGELIS IRON WORK INC. 1,435.0 387.0 26.97% 29.0 2.02% 0.0 0.00%7018 BPL- JOHNSON BUILDING I Iron Worker 12/20/2014

EAST COAST INTERIORS CO. 1,173.5 241.0 20.54% 0.0 0.00% 0.0 0.00%7018 BPL- JOHNSON BUILDING I Carpenter 12/20/2014

ENTERPRISE EQUIPT CO,INC. 111.5 111.5 100.00% 111.5 100.00% 0.0 0.00%7018 BPL- JOHNSON BUILDING I Electrician 12/19/2015

ENTERPRISE EQUIPT CO,INC. 8,790.0 3,859.0 43.90% 3,859.0 43.90% 0.0 0.00%7018 BPL- JOHNSON BUILDING I Pipefitter 07/30/2016

FEDERAL CONCRETE 45.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7018 BPL- JOHNSON BUILDING I Cement Finisher 06/04/2016

FEDERAL CONCRETE 1,436.0 240.0 16.71% 418.0 29.11% 8.0 0.56%7018 BPL- JOHNSON BUILDING I Iron Worker 07/09/2016

FEDERAL CONCRETE 5,160.5 832.0 16.12% 4,554.5 88.26% 160.5 3.11%7018 BPL- JOHNSON BUILDING I Laborer 07/30/2016

J & M BROWN ELECTRICAL 170.0 0.0 0.00% 0.0 0.00% 36.0 21.18%7018 BPL- JOHNSON BUILDING I Telephone/Data I 10/18/2014

CHAPMAN WATERPROOFING 21.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7018 BPL- JOHNSON BUILDING I Laborer 04/09/2016

XQUISITE LANDSCAPING 1,415.5 0.0 0.00% 350.0 24.73% 0.0 0.00%7018 BPL- JOHNSON BUILDING I Mason 07/23/2016

RIGGS CONTRACTING, INC. 864.0 164.0 18.98% 478.0 55.32% 0.0 0.00%7018 BPL- JOHNSON BUILDING I Marble Refinisher 06/11/2016

XQUISITE LANDSCAPING 1,776.5 482.5 27.16% 622.0 35.01% 0.0 0.00%7018 BPL- JOHNSON BUILDING I Laborer 07/30/2016

XQUISITE LANDSCAPING 171.5 0.0 0.00% 0.0 0.00% 0.0 0.00%7018 BPL- JOHNSON BUILDING I Equipment Opera 06/18/2016

WOOD & WIRE FENCE CO. 6.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7018 BPL- JOHNSON BUILDING I Laborer 02/08/2014

WEST FLOOR COVERING INC, 294.0 80.0 27.21% 80.0 27.21% 0.0 0.00%7018 BPL- JOHNSON BUILDING I Marble Tile Work 12/13/2014

WAYNE J GRIFFIN ELECTRIC 3,020.0 0.0 0.00% 24.0 0.79% 16.0 0.53%7018 BPL- JOHNSON BUILDING I Telephone/Data I 07/23/2016

WAYNE J GRIFFIN ELECTRIC 24,203.8 2,370.5 9.79% 4,197.3 17.34% 1,220.5 5.04%7018 BPL- JOHNSON BUILDING I Electrician 07/23/2016

W.S. KENNEY COMPANY, INC. 64.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7018 BPL- JOHNSON BUILDING I Carpenter 07/09/2016

VER - TEX C.S.I. 100.5 0.0 0.00% 0.0 0.00% 0.0 0.00%7018 BPL- JOHNSON BUILDING I Carpenter 12/27/2014

UNITED ELEVATOR CO INC 5,399.0 42.5 0.79% 0.0 0.00% 0.0 0.00%7018 BPL- JOHNSON BUILDING I Elevator Const(M 08/06/2016

UNITED ELEVATOR CO INC 4,875.0 1,627.0 33.37% 0.0 0.00% 0.0 0.00%7018 BPL- JOHNSON BUILDING I Elev Const Helper 08/06/2016

UNION INSTALLATIONS LLC 80.0 64.0 80.00% 0.0 0.00% 0.0 0.00%7018 BPL- JOHNSON BUILDING I Iron Worker 08/23/2014

UNION INSTALLATIONS LLC 630.0 329.5 52.30% 0.0 0.00% 0.0 0.00%7018 BPL- JOHNSON BUILDING I Glazier 12/06/2014

SMJ METALS CO INC 11,250.5 1,660.5 14.76% 2,459.0 21.86% 511.5 4.55%7018 BPL- JOHNSON BUILDING I Iron Worker 07/23/2016

S.O.S. CORPORATION 25,166.0 4,780.0 18.99% 12,290.0 48.84% 1,349.0 5.36%7018 BPL- JOHNSON BUILDING I Laborer 07/30/2016

UNION INSTALLATIONS LLC 63.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7018 BPL- JOHNSON BUILDING I Carpenter 10/11/2014

SAFESPAN SCAFFOLDING, LL 56.0 56.0 100.00% 56.0 100.00% 16.0 28.57%7018 BPL- JOHNSON BUILDING I Laborer 02/16/2014

RIGGS CONTRACTING, INC. 5,758.5 0.0 0.00% 104.0 1.81% 0.0 0.00%7018 BPL- JOHNSON BUILDING I Mason 08/06/2016

SPINDLE CITY INSULATION 32.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7018 BPL- JOHNSON BUILDING I Installer/Apt Wirer 05/17/2015

Page 66: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 66

Project Name Trade Latest Week

SPINDLE CITY INSULATION 1,510.5 0.0 0.00% 158.5 10.49% 0.0 0.00%7018 BPL- JOHNSON BUILDING I Insulator 07/16/2016

SSESCO, INC 291.0 125.0 42.96% 166.0 57.04% 0.0 0.00%7018 BPL- JOHNSON BUILDING I Laborer 05/17/2015

T. J. MCCARTNEY, INC. 20,037.0 6,041.5 30.15% 4,505.5 22.49% 184.0 0.92%7018 BPL- JOHNSON BUILDING I Carpenter 08/06/2016

T. J. MCCARTNEY, INC. 2,438.0 1,846.0 75.72% 1,382.0 56.69% 230.0 9.43%7018 BPL- JOHNSON BUILDING I Laborer 08/06/2016

T. J. MCCARTNEY, INC. 6,792.0 1,493.0 21.98% 4,163.0 61.29% 767.0 11.29%7018 BPL- JOHNSON BUILDING I Taper 08/06/2016

TCI INSTALLATIONS INC. 769.0 40.0 5.20% 0.0 0.00% 0.0 0.00%7018 BPL- JOHNSON BUILDING I Carpenter 05/14/2016

THE PAPPAS COMPANY, INC 190.0 45.0 23.68% 45.0 23.68% 4.0 2.11%7018 BPL- JOHNSON BUILDING I Carpenter 04/23/2016

SAFESPAN SCAFFOLDING, LL 87.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7018 BPL- JOHNSON BUILDING I Carpenter 02/16/2014

242,581.0 62,944.5 25.95% 75,012.0 30.92% 11,474.0 4.73%SUB TOTALS:

7019 ELIOT UPPER SCHOOL

$18,680,471Amount:

Gen Contractor: COLANTONIO INCORPORATED

(508)429-8666 P.O.BOX 6764 16 EVERETT STREET HOLLISTON

Est Start Date:

Est End Date:

10/01/2014

08/01/2016

P.J. SPILLANE COMPANY 22.5 4.0 17.78% 11.0 48.89% 0.0 0.00%7019 ELIOT UPPER SCHOOL Mason Tender 07/09/2016

NEWROADS ENVIRONMENTAL 1,769.0 288.0 16.28% 1,473.0 83.27% 0.0 0.00%7019 ELIOT UPPER SCHOOL Laborer 11/07/2015

MIW CORP 39.0 0.0 0.00% 39.0 100.00% 0.0 0.00%7019 ELIOT UPPER SCHOOL Laborer 10/24/2015

MIW CORP 9,571.0 3,058.0 31.95% 2,809.0 29.35% 0.0 0.00%7019 ELIOT UPPER SCHOOL Iron Worker 08/13/2016

MARIA'S CLEANING SERVICE 276.0 24.0 8.70% 110.0 39.86% 136.5 49.46%7019 ELIOT UPPER SCHOOL Laborer 03/04/2017

LEVANGIE ELECTRIC COMPAN 1,278.8 0.0 0.00% 0.0 0.00% 0.0 0.00%7019 ELIOT UPPER SCHOOL Telephone/Data I 02/04/2017

LEVANGIE ELECTRIC COMPAN 5,864.6 2,370.5 40.42% 2,163.5 36.89% 6.0 0.10%7019 ELIOT UPPER SCHOOL Electrician 03/18/2017

JOHN W. EGAN CO. 1,250.0 0.0 0.00% 104.0 8.32% 0.0 0.00%7019 ELIOT UPPER SCHOOL Painter 12/10/2016

JDC DEMOLITION COMPANY, I 14,427.0 3,734.0 25.88% 6,831.0 47.35% 309.0 2.14%7019 ELIOT UPPER SCHOOL Laborer 04/02/2016

JDC DEMOLITION COMPANY, I 302.0 134.0 44.37% 134.0 44.37% 0.0 0.00%7019 ELIOT UPPER SCHOOL Equipment Opera 04/02/2016

P.J. SPILLANE COMPANY 888.0 288.0 32.43% 137.0 15.43% 0.0 0.00%7019 ELIOT UPPER SCHOOL Waterproofer 02/25/2017

FEDERAL CONCRETE 136.0 0.0 0.00% 24.0 17.65% 0.0 0.00%7019 ELIOT UPPER SCHOOL Iron Worker 06/18/2016

ROBERT W. IRVINE SONS. 170.0 0.0 0.00% 0.0 0.00% 170.0 100.00%7019 ELIOT UPPER SCHOOL Insulator 12/02/2016

J.M. ELECTRICAL CO. INC. 48.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7019 ELIOT UPPER SCHOOL Electrician 12/09/2016

PA ELECTRICAL SYSTEMS INC 796.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7019 ELIOT UPPER SCHOOL Electrician 12/30/2016

QUINN BROTHERS ESSEX INC. 542.0 0.0 0.00% 75.0 13.84% 0.0 0.00%7019 ELIOT UPPER SCHOOL Iron Worker 11/26/2016

RELIABLE ROOFING SHEETME 52.0 0.0 0.00% 52.0 100.00% 0.0 0.00%7019 ELIOT UPPER SCHOOL Asbestos Worker 07/05/2015

RELIABLE ROOFING SHEETME 6.0 6.0 100.00% 6.0 100.00% 0.0 0.00%7019 ELIOT UPPER SCHOOL Laborer 07/05/2015

RELIABLE ROOFING SHEETME 114.0 40.0 35.09% 31.0 27.19% 0.0 0.00%7019 ELIOT UPPER SCHOOL Roofer 02/28/2016

WEST FLOOR COVERING INC, 1,583.5 0.0 0.00% 251.5 15.88% 0.0 0.00%7019 ELIOT UPPER SCHOOL Floor Layer 02/11/2017

ROBERT W. IRVINE SONS. 144.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7019 ELIOT UPPER SCHOOL Driller 07/29/2016

ROBERT W. IRVINE SONS. 2,165.5 876.0 40.45% 876.0 40.45% 0.0 0.00%7019 ELIOT UPPER SCHOOL Plumber 12/02/2016

STANLEY ROOFING CO,INC. 1,575.5 122.3 7.76% 1,222.3 77.58% 0.0 0.00%7019 ELIOT UPPER SCHOOL Roofer 12/11/2016

Page 67: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 67

Project Name Trade Latest Week

STANLEY ROOFING CO,INC. 635.3 0.0 0.00% 339.3 53.40% 0.0 0.00%7019 ELIOT UPPER SCHOOL Sheetmetal Work 12/11/2016

WEST FLOOR COVERING INC, 924.5 158.0 17.09% 349.0 37.75% 71.0 7.68%7019 ELIOT UPPER SCHOOL Bricklayer 03/18/2017

EAST COAST FIREPROOFING 504.0 8.0 1.59% 320.0 63.49% 0.0 0.00%7019 ELIOT UPPER SCHOOL Laborer 07/05/2016

COLANTONIO INCORPORATED 6,640.5 3,943.5 59.39% 3,943.5 59.39% 639.5 9.63%7019 ELIOT UPPER SCHOOL Laborer 02/04/2017

ROBERT W. IRVINE SONS. 39.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7019 ELIOT UPPER SCHOOL Carpenter 12/02/2016

CAM HVAC & CONS. INC. 373.0 118.0 31.64% 148.5 39.81% 0.0 0.00%7019 ELIOT UPPER SCHOOL Laborer 12/03/2016

AMERICAN CONCRETE CUTTI 175.0 0.0 0.00% 32.0 18.29% 0.0 0.00%7019 ELIOT UPPER SCHOOL Laborer 09/19/2015

AMERICAN PRIDE INSUL. INC. 318.5 0.0 0.00% 0.0 0.00% 0.0 0.00%7019 ELIOT UPPER SCHOOL Insulator 08/13/2016

AMERICAN PRIDE INSUL. INC. 357.0 0.0 0.00% 33.5 9.38% 0.0 0.00%7019 ELIOT UPPER SCHOOL Laborer 12/31/2016

AQUA LINE UTILITY, INC. 209.0 0.0 0.00% 183.0 87.56% 0.0 0.00%7019 ELIOT UPPER SCHOOL Equipment Opera 11/07/2015

AQUA LINE UTILITY, INC. 499.5 167.5 33.53% 147.0 29.43% 147.0 29.43%7019 ELIOT UPPER SCHOOL Laborer 09/10/2016

AQUA LINE UTILITY, INC. 183.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7019 ELIOT UPPER SCHOOL Pipelayer 10/10/2015

BACK BAY CONCRETE 651.5 17.0 2.61% 17.0 2.61% 0.0 0.00%7019 ELIOT UPPER SCHOOL Cement Finisher 12/14/2016

COLONY DRYWALL INC 682.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7019 ELIOT UPPER SCHOOL Laborer 10/22/2016

CAM HVAC & CONS. INC. 395.3 0.0 0.00% 0.0 0.00% 0.0 0.00%7019 ELIOT UPPER SCHOOL HVAC 03/18/2017

DELTA BECKWITH ELEVATOR 353.3 0.0 0.00% 0.0 0.00% 0.0 0.00%7019 ELIOT UPPER SCHOOL Elevator Const(M 01/12/2017

CAM HVAC & CONS. INC. 1,301.5 117.0 8.99% 117.0 8.99% 0.0 0.00%7019 ELIOT UPPER SCHOOL Pipefitter 02/18/2017

CAM HVAC & CONS. INC. 24.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7019 ELIOT UPPER SCHOOL Plumber 08/06/2016

CAM HVAC & CONS. INC. 1,547.0 614.0 39.69% 725.5 46.90% 0.0 0.00%7019 ELIOT UPPER SCHOOL Sheetmetal Work 04/15/2017

COSTA BROTHERS MASONRY 2,515.0 884.0 35.15% 1,498.0 59.56% 112.0 4.45%7019 ELIOT UPPER SCHOOL Laborer 12/17/2016

BACK BAY CONCRETE 572.5 0.0 0.00% 117.5 20.52% 0.0 0.00%7019 ELIOT UPPER SCHOOL Cement Laborer 12/14/2016

CRF INC. INTERIOR SYSTEM 64.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7019 ELIOT UPPER SCHOOL Carpenter 12/28/2016

CAPITAL CARPET&FLOORING 56.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7019 ELIOT UPPER SCHOOL Floor Layer 01/01/2017

COSTA BROTHERS MASONRY 5,394.5 466.5 8.65% 354.5 6.57% 0.0 0.00%7019 ELIOT UPPER SCHOOL Bricklayer 01/21/2017

COLONY DRYWALL INC 1,661.5 0.0 0.00% 354.0 21.31% 216.0 13.00%7019 ELIOT UPPER SCHOOL Taper 10/29/2016

COLONY DRYWALL INC 929.0 0.0 0.00% 90.0 9.69% 0.0 0.00%7019 ELIOT UPPER SCHOOL Painter 03/25/2017

COLONY DRYWALL INC 7,010.0 1,429.5 20.39% 2,696.0 38.46% 218.0 3.11%7019 ELIOT UPPER SCHOOL Carpenter 10/29/2016

COLANTONIO INCORPORATED 5,995.0 1,571.0 26.21% 1,574.0 26.26% 1,400.0 23.35%7019 ELIOT UPPER SCHOOL Equipment Opera 02/04/2017

COLANTONIO INCORPORATED 11,600.0 3,961.5 34.15% 689.0 5.94% 745.0 6.42%7019 ELIOT UPPER SCHOOL Carpenter 04/22/2017

CENTRAL CEILINGS INC. 625.0 178.0 28.48% 0.0 0.00% 0.0 0.00%7019 ELIOT UPPER SCHOOL Carpenter 02/12/2017

CARLYSLE ENGINEERING INC. 1,188.0 0.0 0.00% 100.0 8.42% 4.0 0.34%7019 ELIOT UPPER SCHOOL Sprinkler Fitter 02/17/2017

DELTA BECKWITH ELEVATOR 321.8 0.0 0.00% 0.0 0.00% 0.0 0.00%7019 ELIOT UPPER SCHOOL Elev Const Helper 01/12/2017

96,765.4 24,578.3 25.40% 30,177.5 31.19% 4,174.0 4.31%SUB TOTALS:

Page 68: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 68

Project Name Trade Latest Week

7019B RENOVATION TO ELLIOT SCHO

$1,991,500Amount:

Gen Contractor: R & R BUILDERS

(978)664-8644 350 PARK STREET NORTH READING

Est Start Date:

Est End Date:

05/01/2014

12/31/2014

WEST FLOOR COVERING INC, 191.5 63.5 33.16% 63.5 33.16% 63.5 33.16%7019B RENOVATION TO ELLIOT Marble Tile Work 07/19/2014

SAVE-ON-WALL CO, INC. 88.0 56.0 63.64% 56.0 63.64% 0.0 0.00%7019B RENOVATION TO ELLIOT Carpenter 07/26/2014

SAVE-ON-WALL CO, INC. 18.0 12.0 66.67% 18.0 100.00% 0.0 0.00%7019B RENOVATION TO ELLIOT Laborer 07/26/2014

SAVE-ON-WALL CO, INC. 309.0 79.5 25.73% 79.5 25.73% 0.0 0.00%7019B RENOVATION TO ELLIOT Taper 07/26/2014

TCI INSTALLATIONS INC. 145.0 40.0 27.59% 40.0 27.59% 0.0 0.00%7019B RENOVATION TO ELLIOT Carpenter 08/23/2014

TRADESMEN INTERNATIONAL 31.5 31.5 100.00% 31.5 100.00% 0.0 0.00%7019B RENOVATION TO ELLIOT HVAC 07/06/2014

V & G IRON WORKS INC. 45.5 0.0 0.00% 0.0 0.00% 0.0 0.00%7019B RENOVATION TO ELLIOT Iron Worker 08/01/2014

WEST FLOOR COVERING INC, 44.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7019B RENOVATION TO ELLIOT Laborer 06/28/2014

R & R BUILDERS 176.0 176.0 100.00% 0.0 0.00% 0.0 0.00%7019B RENOVATION TO ELLIOT Laborer 07/04/2014

V & G IRON WORKS INC. 45.5 0.0 0.00% 0.0 0.00% 0.0 0.00%7019B RENOVATION TO ELLIOT Laborer 08/01/2014

VIKING CONTROLS, INC. 142.5 0.0 0.00% 0.0 0.00% 0.0 0.00%7019B RENOVATION TO ELLIOT Electrician 07/26/2014

DYNAMIC INSULATION 88.0 40.0 45.45% 24.0 27.27% 0.0 0.00%7019B RENOVATION TO ELLIOT Insulator 08/03/2014

R & R BUILDERS 192.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7019B RENOVATION TO ELLIOT Carpenter 08/22/2014

BONOCO INC. 32.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7019B RENOVATION TO ELLIOT Carpenter 08/08/2014

CARLYSLE ENGINEERING INC. 395.0 241.0 61.01% 0.0 0.00% 0.0 0.00%7019B RENOVATION TO ELLIOT Sprinkler Fitter 08/08/2014

WEST FLOOR COVERING INC, 197.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7019B RENOVATION TO ELLIOT Floor Layer 08/30/2014

ALL BUILDING CONCEPTS, LLC 16.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7019B RENOVATION TO ELLIOT Iron Worker 08/01/2014

HALL SHEET METAL WORKS 897.5 0.0 0.00% 48.0 5.35% 0.0 0.00%7019B RENOVATION TO ELLIOT HVAC 08/23/2014

INDUSTRIAL PIPING & CERTIFI 89.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7019B RENOVATION TO ELLIOT Pipefitter 07/18/2014

JOHN W. EGAN CO. 338.0 95.0 28.11% 95.0 28.11% 0.0 0.00%7019B RENOVATION TO ELLIOT Painter 08/16/2014

LYNNWELL ASSOCIATES INC 1,584.0 528.0 33.33% 144.0 9.09% 344.0 21.72%7019B RENOVATION TO ELLIOT Electrician 07/27/2014

LYNNWELL ASSOCIATES INC 160.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7019B RENOVATION TO ELLIOT Telephone/Data I 07/27/2014

P.J. DIONNE CO INC. 428.0 0.0 0.00% 97.5 22.78% 0.0 0.00%7019B RENOVATION TO ELLIOT Plumber 08/30/2014

DIVERSIFIED CONSTRUCTION 1,808.0 0.0 0.00% 1,168.0 64.60% 0.0 0.00%7019B RENOVATION TO ELLIOT Laborer 08/16/2014

7,461.0 1,362.5 18.26% 1,865.0 25.00% 407.5 5.46%SUB TOTALS:

7019-C 585 COMMERCIAL STREET PH

$13,146,000Amount:

Gen Contractor: DANIEL O'CONNELL & SONS

480 HAMPDEN ST HOLYOKE

Est Start Date:

Est End Date:

06/02/2017

12/21/2018

AMERICAN ENVIRONMENTAL, I 124.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7019-C 585 COMMERCIAL STRE Equipment Opera 08/27/2017

DANIEL O'CONNELL & SONS 16.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7019-C 585 COMMERCIAL STRE Laborer 07/16/2017

YOUR ELECTRICAL SOLUTION. 108.3 0.0 0.00% 24.0 22.16% 0.0 0.00%7019-C 585 COMMERCIAL STRE Electrician 07/30/2017

EDM CONSTRUCTION INC 48.0 0.0 0.00% 40.0 83.33% 0.0 0.00%7019-C 585 COMMERCIAL STRE Iron Worker 09/16/2017

COGSWELL SPRINKLER CO 110.0 0.0 0.00% 8.0 7.27% 0.0 0.00%7019-C 585 COMMERCIAL STRE Sprinkler Fitter 09/09/2017

Page 69: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 69

Project Name Trade Latest Week

CAM HVAC & CONS. INC. 70.0 48.0 68.57% 70.0 100.00% 0.0 0.00%7019-C 585 COMMERCIAL STRE Sheetmetal Work 09/02/2017

AMERICAN ENVIRONMENTAL, I 844.0 0.0 0.00% 844.0 100.00% 16.0 1.90%7019-C 585 COMMERCIAL STRE Laborer 08/27/2017

CAM HVAC & CONS. INC. 6.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7019-C 585 COMMERCIAL STRE Laborer 09/02/2017

1,326.3 48.0 3.62% 986.0 74.34% 16.0 1.21%SUB TOTALS:

7021 CHAPEL RENOVATIONS & NEW

$1,107,000Amount:

Gen Contractor: J & J CONTRACTORS INC

(978)452-9898 101 BILLERICA AVE, BLDG 5 STE 205 NORTH BILLERICA

Est Start Date:

Est End Date:

02/05/2016

03/31/2017

J & J CONTRACTORS INC 425.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7021 CHAPEL RENOVATIONS & Equipment Opera 03/11/2017

TALTY FLOORS 41.0 0.0 0.00% 15.0 36.59% 0.0 0.00%7021 CHAPEL RENOVATIONS & Marble Tile Work 09/24/2016

TALTY FLOORS 6.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7021 CHAPEL RENOVATIONS & Floor Layer 08/06/2016

SUNRISE ERECTORS INC. 172.5 48.0 27.83% 47.0 27.25% 64.0 37.10%7021 CHAPEL RENOVATIONS & Carpenter 11/27/2016

STANLEY ROOFING CO,INC. 60.3 0.0 0.00% 60.3 100.00% 0.0 0.00%7021 CHAPEL RENOVATIONS & Sheetmetal Work 12/04/2016

STANLEY ROOFING CO,INC. 55.3 0.0 0.00% 55.3 100.00% 0.0 0.00%7021 CHAPEL RENOVATIONS & Roofer 12/04/2016

SILVERBACKCONCRETE CON 41.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7021 CHAPEL RENOVATIONS & Cement Laborer 11/05/2016

SILVERBACKCONCRETE CON 25.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7021 CHAPEL RENOVATIONS & Cement Finisher 07/02/2016

ANDELLA IRON INC. 21.0 0.0 0.00% 21.0 100.00% 0.0 0.00%7021 CHAPEL RENOVATIONS & Iron Worker 06/25/2016

J & J CONTRACTORS INC 1,278.5 1,238.5 96.87% 1,141.0 89.25% 0.0 0.00%7021 CHAPEL RENOVATIONS & Laborer 03/11/2017

J & J CONTRACTORS INC 1,606.0 1,545.0 96.20% 389.0 24.22% 328.0 20.42%7021 CHAPEL RENOVATIONS & Carpenter 11/26/2016

BRITE-LITE ELECTRICAL CO. 233.0 16.0 6.87% 29.0 12.45% 0.0 0.00%7021 CHAPEL RENOVATIONS & Electrician 02/04/2017

BELLO PAINTING CO. 40.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7021 CHAPEL RENOVATIONS & Painter 10/21/2016

APEX CORPORATION 76.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7021 CHAPEL RENOVATIONS & Sheetmetal Work 01/15/2017

P.J. DIONNE CO INC. 103.5 0.0 0.00% 8.0 7.73% 0.0 0.00%7021 CHAPEL RENOVATIONS & Plumber 11/26/2016

S & W PAVING 10.0 0.0 0.00% 10.0 100.00% 0.0 0.00%7021 CHAPEL RENOVATIONS & Laborer 04/28/2017

4,194.0 2,847.5 67.89% 1,775.5 42.33% 392.0 9.35%SUB TOTALS:

7022 L I ADMINISTRATION BLDG ENVE

$1,783,000Amount:

Gen Contractor: WCI CORP

617-524-9300 555 AMORY STREET, P O BOX 300187 BOSTON

Est Start Date:

Est End Date:

04/01/2014

11/30/2014

SPINDLE CITY INSULATION 4.5 0.0 0.00% 0.0 0.00% 0.0 0.00%7022 L I ADMINISTRATION BLDG Insulator 06/29/2014

WCI CORP 1,956.5 1,219.0 62.31% 927.0 47.38% 24.0 1.23%7022 L I ADMINISTRATION BLDG Carpenter 12/09/2014

WCI CORP 40.0 40.0 100.00% 40.0 100.00% 0.0 0.00%7022 L I ADMINISTRATION BLDG Cement Finisher 06/10/2014

ROBERT W. IRVINE SONS. 1,023.5 0.0 0.00% 0.0 0.00% 0.0 0.00%7022 L I ADMINISTRATION BLDG Plumber 11/14/2014

WCI CORP 1,124.0 1,124.0 100.00% 12.0 1.07% 0.0 0.00%7022 L I ADMINISTRATION BLDG Mason 10/07/2014

ENTERPRISE EQUIPT CO,INC. 21.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7022 L I ADMINISTRATION BLDG Laborer 07/05/2014

WCI CORP 80.0 80.0 100.00% 0.0 0.00% 0.0 0.00%7022 L I ADMINISTRATION BLDG Mason Tender 07/01/2014

WCI CORP 2,606.0 1,018.5 39.08% 2,456.0 94.24% 364.0 13.97%7022 L I ADMINISTRATION BLDG Laborer 11/25/2014

ROBERT W. IRVINE SONS. 82.0 0.0 0.00% 0.0 0.00% 82.0 100.00%7022 L I ADMINISTRATION BLDG Insulator 07/25/2014

Page 70: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 70

Project Name Trade Latest Week

NG ENVIRONMENTAL CO. 377.0 62.0 16.45% 377.0 100.00% 0.0 0.00%7022 L I ADMINISTRATION BLDG Asbestos Worker 11/01/2014

ENTERPRISE EQUIPT CO,INC. 206.0 59.0 28.64% 59.0 28.64% 0.0 0.00%7022 L I ADMINISTRATION BLDG Pipefitter 10/04/2014

ENTERPRISE EQUIPT CO,INC. 35.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7022 L I ADMINISTRATION BLDG Electrician 06/28/2014

COOGAN CARPENTRY 232.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7022 L I ADMINISTRATION BLDG Carpenter 05/31/2014

BRITE-LITE ELECTRICAL CO. 434.0 53.0 12.21% 53.0 12.21% 0.0 0.00%7022 L I ADMINISTRATION BLDG Electrician 12/06/2014

GARRY LANDSCAPING & CON 424.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7022 L I ADMINISTRATION BLDG Carpenter 08/16/2014

8,645.5 3,655.5 42.28% 3,924.0 45.39% 470.0 5.44%SUB TOTALS:

7024 EMERGENCY CITY OF BOSTON E

$1,039,000Amount:

Gen Contractor: NORTHERN CONTRACTING CORP

(781)821-4200 68 JACKSON STREET P.O. BOX 96 CANTON

Est Start Date:

Est End Date:

05/01/2013

05/31/2014

NORTHERN CONTRACTING CO 96.0 10.0 10.42% 0.0 0.00% 0.0 0.00%7024 EMERGENCY CITY OF BOS Laborer 01/25/2014

YOUR ELECTRICAL SOLUTION. 58.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7024 EMERGENCY CITY OF BOS Electrician 02/02/2014

ASSOCIATED ELEVATOR CO. 143.5 0.0 0.00% 0.0 0.00% 0.0 0.00%7024 EMERGENCY CITY OF BOS Elevator Const(M 01/30/2014

ASSOCIATED ELEVATOR CO. 119.5 111.5 93.31% 0.0 0.00% 0.0 0.00%7024 EMERGENCY CITY OF BOS Elev Const Helper 12/12/2013

NORTHERN CONTRACTING CO 19.0 19.0 100.00% 0.0 0.00% 0.0 0.00%7024 EMERGENCY CITY OF BOS Carpenter 01/11/2014

436.0 140.5 32.22% 0.0 0.00% 0.0 0.00%SUB TOTALS:

7025A BOSTON POLICE HDQT COOLIN

$259,900Amount:

Gen Contractor: FALITE BROS.

9 BROADWAY STREET WAKEFIELD

Est Start Date:

Est End Date:

04/01/2014

09/30/2014

FALITE BROS. 46.8 0.0 0.00% 0.0 0.00% 0.0 0.00%7025A BOSTON POLICE HDQT C HVAC 07/13/2014

FALITE BROS. 4.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7025A BOSTON POLICE HDQT C Laborer 08/03/2014

FALITE BROS. 433.3 0.0 0.00% 0.0 0.00% 0.0 0.00%7025A BOSTON POLICE HDQT C Pipefitter 06/29/2014

FALITE BROS. 425.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7025A BOSTON POLICE HDQT C Electrician 06/01/2014

909.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SUB TOTALS:

7025-B BP HEADQUARTERS FIRE ALA

$370,000Amount:

Gen Contractor: LEVANGIE ELECTRIC COMPANY

781-331-4900 978 WASHINGTON ST WEYMOUTH

Est Start Date:

Est End Date:

10/15/2014

01/31/2015

LEVANGIE ELECTRIC COMPAN 458.0 68.0 14.85% 0.0 0.00% 0.0 0.00%7025-B BP HEADQUARTERS FIR Electrician 04/25/2015

458.0 68.0 14.85% 0.0 0.00% 0.0 0.00%SUB TOTALS:

7026 COPLEY LIBRARY COOLING TO

$995,185Amount:

Gen Contractor: ENTERPRISE EQUIPT CO,INC.

(617)331-0900 276 LIBBEY PARK E.WEYMOUTH

Est Start Date:

Est End Date:

03/20/2014

09/30/2014

TECTA AMERICA NEW ENGLA 18.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7026 COPLEY LIBRARY COOLIN Sheetmetal Work 03/22/2014

TECTA AMERICA NEW ENGLA 257.5 60.5 23.50% 19.0 7.38% 0.0 0.00%7026 COPLEY LIBRARY COOLIN Roofer 03/29/2014

ENTERPRISE EQUIPT CO,INC. 159.0 103.0 64.78% 0.0 0.00% 0.0 0.00%7026 COPLEY LIBRARY COOLIN Plumber 04/12/2014

ENTERPRISE EQUIPT CO,INC. 686.0 365.0 53.21% 353.0 51.46% 0.0 0.00%7026 COPLEY LIBRARY COOLIN Pipefitter 08/09/2014

ANNESE ELECTRICAL SERVIC 436.0 96.0 22.02% 96.0 22.02% 96.0 22.02%7026 COPLEY LIBRARY COOLIN Electrician 05/17/2014

Page 71: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 71

Project Name Trade Latest Week

ENTERPRISE EQUIPT CO,INC. 5.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7026 COPLEY LIBRARY COOLIN Laborer 05/10/2014

1,561.5 624.5 39.99% 468.0 29.97% 96.0 6.15%SUB TOTALS:

7028 ROOF REPAIRS TO THE SO.HUM

$238,000Amount:

Gen Contractor:

Est Start Date:

Est End Date:

10/01/2013

04/30/2014

RELIABLE ROOFING SHEETME 72.0 0.0 0.00% 72.0 100.00% 0.0 0.00%7028 ROOF REPAIRS TO THE SO Asbestos Worker 11/17/2013

RELIABLE ROOFING SHEETME 947.0 77.5 8.18% 187.0 19.75% 0.0 0.00%7028 ROOF REPAIRS TO THE SO Roofer 03/02/2014

RELIABLE ROOFING SHEETME 53.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7028 ROOF REPAIRS TO THE SO Mason 03/16/2014

RELIABLE ROOFING SHEETME 445.5 0.0 0.00% 0.0 0.00% 0.0 0.00%7028 ROOF REPAIRS TO THE SO Carpenter 03/02/2014

RELIABLE ROOFING SHEETME 16.0 16.0 100.00% 16.0 100.00% 0.0 0.00%7028 ROOF REPAIRS TO THE SO Laborer 11/24/2013

1,533.5 93.5 6.10% 275.0 17.93% 0.0 0.00%SUB TOTALS:

7029 MARTIN LUTHER KING K-8 SCHO

$667,200Amount:

Gen Contractor: J T CONSTRUCTION, INC.

508/846-9423 22 WILLIS ROAD BRIDGEWATER

Est Start Date:

Est End Date:

06/21/2015

05/31/2016

J T CONSTRUCTION, INC. 731.0 652.0 89.19% 0.0 0.00% 0.0 0.00%7029 MARTIN LUTHER KING K-8 Equipment Opera 11/14/2015

J T CONSTRUCTION, INC. 1,463.0 0.0 0.00% 206.0 14.08% 122.0 8.34%7029 MARTIN LUTHER KING K-8 Laborer 11/07/2015

SWEEZEY FENCE ERECTORS 150.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7029 MARTIN LUTHER KING K-8 Laborer 11/20/2015

2,344.0 652.0 27.82% 206.0 8.79% 122.0 5.20%SUB TOTALS:

7030 HAYES SCHOOLYARD IMPROVE

$385,600Amount:

Gen Contractor: J T CONSTRUCTION, INC.

508/846-9423 22 WILLIS ROAD BRIDGEWATER

Est Start Date:

Est End Date:

07/20/2014

07/01/2015

J T CONSTRUCTION, INC. 500.0 452.0 90.40% 0.0 0.00% 0.0 0.00%7030 HAYES SCHOOLYARD IMP Equipment Opera 10/26/2014

J T CONSTRUCTION, INC. 735.0 0.0 0.00% 32.0 4.35% 0.0 0.00%7030 HAYES SCHOOLYARD IMP Laborer 10/26/2014

1,235.0 452.0 36.60% 32.0 2.59% 0.0 0.00%SUB TOTALS:

7033 THE UMANA SCHOOL ENVELOPE

$3,800,000Amount:

Gen Contractor: RELIABLE ROOFING SHEETMETAL, LLC.

(508)628-5562 105 IRVING STREET FRAMINGHAM

Est Start Date:

Est End Date:

05/07/2014

05/30/2014

RELIABLE ROOFING SHEETME 261.5 0.0 0.00% 0.0 0.00% 0.0 0.00%7033 THE UMANA SCHOOL ENV Carpenter 09/14/2014

RICHMAN CORPORATION 152.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7033 THE UMANA SCHOOL ENV Plumber 09/12/2014

RELIABLE ROOFING SHEETME 1,226.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7033 THE UMANA SCHOOL ENV Sheetmetal Work 12/21/2014

RELIABLE ROOFING SHEETME 7,679.5 1,069.5 13.93% 3,163.5 41.19% 0.0 0.00%7033 THE UMANA SCHOOL ENV Roofer 12/07/2014

RELIABLE ROOFING SHEETME 2,410.0 897.0 37.22% 839.0 34.81% 0.0 0.00%7033 THE UMANA SCHOOL ENV Mason 10/26/2014

SMOKESTACK LIGHTNING, INC 86.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7033 THE UMANA SCHOOL ENV Electrician 12/27/2014

KAPILOFF'S GLASS INC 653.5 49.0 7.50% 49.0 7.50% 49.0 7.50%7033 THE UMANA SCHOOL ENV Glazier 11/01/2014

DAVISON CO,INC. 24.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7033 THE UMANA SCHOOL ENV Pipefitter 09/13/2014

DAVISON CO,INC. 45.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7033 THE UMANA SCHOOL ENV HVAC 09/20/2014

ANNESE ELECTRICAL SERVIC 182.0 40.5 22.25% 40.5 22.25% 0.0 0.00%7033 THE UMANA SCHOOL ENV Electrician 01/10/2015

Page 72: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 72

Project Name Trade Latest Week

RELIABLE ROOFING SHEETME 366.5 366.5 100.00% 366.5 100.00% 0.0 0.00%7033 THE UMANA SCHOOL ENV Laborer 08/17/2014

RELIABLE ROOFING SHEETME 479.5 0.0 0.00% 0.0 0.00% 0.0 0.00%7033 THE UMANA SCHOOL ENV Equipment Opera 12/07/2014

13,565.5 2,422.5 17.86% 4,458.5 32.87% 49.0 0.36%SUB TOTALS:

7035 PARIS STREET COMMUNITY CEN

$8,793,000Amount:

Gen Contractor: BOSTON BUILDING & BRIDGE

(617)333-0342 1094 BLUE HILL AVE MILTON

Est Start Date:

Est End Date:

11/01/2015

11/01/2016

LAL MASONRY INC. 894.5 66.0 7.38% 66.0 7.38% 0.0 0.00%7035 PARIS STREET COMMUNIT Laborer 07/01/2017

PATRICK J. KENNEDY & SONS, 2,123.0 275.0 12.95% 275.0 12.95% 0.0 0.00%7035 PARIS STREET COMMUNIT Plumber 07/15/2017

NEW ENGLAND INTERIOR SPE 247.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7035 PARIS STREET COMMUNIT Carpenter 05/17/2017

MARGUERITE CONCRETE 143.0 0.0 0.00% 28.0 19.58% 0.0 0.00%7035 PARIS STREET COMMUNIT Laborer 07/29/2017

MARGUERITE CONCRETE 73.5 0.0 0.00% 0.0 0.00% 0.0 0.00%7035 PARIS STREET COMMUNIT Equipment Opera 07/29/2017

RUSTIC FIRE PROTECTION 1,434.0 0.0 0.00% 169.0 11.79% 0.0 0.00%7035 PARIS STREET COMMUNIT Sprinkler Fitter 07/08/2017

MARGUERITE CONCRETE 3.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7035 PARIS STREET COMMUNIT Carpenter 03/04/2017

THE AULSON COMPANY, LLC 36.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7035 PARIS STREET COMMUNIT Sandblaster 07/02/2016

LAL MASONRY INC. 1,125.0 334.0 29.69% 0.0 0.00% 0.0 0.00%7035 PARIS STREET COMMUNIT Bricklayer 07/01/2017

I.C.R. DRYWALL INC. 811.0 136.0 16.77% 715.0 88.16% 0.0 0.00%7035 PARIS STREET COMMUNIT Taper 06/17/2017

MARGUERITE CONCRETE 221.5 44.0 19.86% 26.0 11.74% 0.0 0.00%7035 PARIS STREET COMMUNIT Cement Finisher 07/29/2017

TARA CONSTRUCTION 3,234.5 423.5 13.09% 240.5 7.44% 0.0 0.00%7035 PARIS STREET COMMUNIT Carpenter 05/20/2017

THE AULSON COMPANY, LLC 752.0 0.0 0.00% 564.0 75.00% 0.0 0.00%7035 PARIS STREET COMMUNIT Asbestos Worker 01/30/2016

THE AULSON COMPANY, LLC 543.0 21.5 3.96% 146.5 26.98% 109.0 20.07%7035 PARIS STREET COMMUNIT Painter 07/16/2016

THE AULSON COMPANY, LLC 3,250.5 1,248.0 38.39% 3,250.5 100.00% 550.5 16.94%7035 PARIS STREET COMMUNIT Wrecker 04/15/2017

UNITED ELEVATOR CO INC 437.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7035 PARIS STREET COMMUNIT Elev Const Helper 06/25/2017

UNITED ELEVATOR CO INC 634.0 347.0 54.73% 0.0 0.00% 0.0 0.00%7035 PARIS STREET COMMUNIT Elevator Const(M 08/13/2017

V & G IRON WORKS INC. 558.0 0.0 0.00% 258.0 46.24% 0.0 0.00%7035 PARIS STREET COMMUNIT Iron Worker 08/04/2017

V & G IRON WORKS INC. 280.0 213.5 76.25% 54.0 19.29% 60.5 21.61%7035 PARIS STREET COMMUNIT Laborer 08/04/2017

VILLAGE FORGE INC. 139.8 45.5 32.56% 48.8 34.88% 0.0 0.00%7035 PARIS STREET COMMUNIT Iron Worker 05/06/2017

CAPITAL CARPET&FLOORING 142.0 0.0 0.00% 0.0 0.00% 32.0 22.54%7035 PARIS STREET COMMUNIT Marble Tile Work 05/21/2017

I.C.R. DRYWALL INC. 2,977.0 1,620.0 54.42% 2,032.0 68.26% 0.0 0.00%7035 PARIS STREET COMMUNIT Carpenter 06/17/2017

THE AULSON COMPANY, LLC 3,907.5 742.0 18.99% 2,181.0 55.82% 518.0 13.26%7035 PARIS STREET COMMUNIT Laborer 04/01/2017

CENTRAL CEILINGS INC. 286.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7035 PARIS STREET COMMUNIT Carpenter 06/18/2017

APEX CORPORATION 987.0 442.0 44.78% 442.0 44.78% 0.0 0.00%7035 PARIS STREET COMMUNIT HVAC 06/11/2017

AXION SPECIALTY CONTRACTI 170.0 162.0 95.29% 0.0 0.00% 162.0 95.29%7035 PARIS STREET COMMUNIT Insulator 05/14/2017

BELLO PAINTING CO. 512.0 0.0 0.00% 512.0 100.00% 0.0 0.00%7035 PARIS STREET COMMUNIT Painter 05/12/2017

BOSTON BUILDING & BRIDGE 506.0 388.0 76.68% 0.0 0.00% 0.0 0.00%7035 PARIS STREET COMMUNIT Carpenter 06/25/2017

BOSTON BUILDING & BRIDGE 1,156.0 171.0 14.79% 738.0 63.84% 0.0 0.00%7035 PARIS STREET COMMUNIT Laborer 09/17/2017

Page 73: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 73

Project Name Trade Latest Week

BROTHERS ELECTRIC CO LLC 5,998.0 1,427.5 23.80% 1,310.5 21.85% 437.5 7.29%7035 PARIS STREET COMMUNIT Electrician 07/08/2017

BROTHERS ELECTRIC CO LLC 503.0 0.0 0.00% 0.0 0.00% 18.5 3.68%7035 PARIS STREET COMMUNIT Technician 07/08/2017

GREENWOOD INDUSTRIES IN 276.0 0.0 0.00% 69.8 25.27% 0.0 0.00%7035 PARIS STREET COMMUNIT Sheetmetal Work 07/01/2017

CAVALIERI CONSTRUCTION C 18.0 9.0 50.00% 0.0 0.00% 0.0 0.00%7035 PARIS STREET COMMUNIT Cement Finisher 07/15/2017

CAVALIERI CONSTRUCTION C 384.0 0.0 0.00% 120.0 31.25% 0.0 0.00%7035 PARIS STREET COMMUNIT Equipment Opera 07/15/2017

CAVALIERI CONSTRUCTION C 848.5 99.0 11.67% 329.5 38.83% 0.0 0.00%7035 PARIS STREET COMMUNIT Laborer 08/26/2017

A & A WINDOW PRODUCTS IN 521.3 352.5 67.63% 224.0 42.97% 224.0 42.97%7035 PARIS STREET COMMUNIT Glazier 05/26/2017

COMPOSITE COMPANY INC. 432.0 112.0 25.93% 232.0 53.70% 0.0 0.00%7035 PARIS STREET COMMUNIT Iron Worker 01/14/2017

DYNAMIC INSULATION 450.0 0.0 0.00% 442.0 98.22% 0.0 0.00%7035 PARIS STREET COMMUNIT Insulator 04/30/2017

FEDERAL CONCRETE 396.0 0.0 0.00% 29.0 7.32% 0.0 0.00%7035 PARIS STREET COMMUNIT Carpenter 07/29/2017

FEDERAL CONCRETE 121.0 29.5 24.38% 67.0 55.37% 0.0 0.00%7035 PARIS STREET COMMUNIT Iron Worker 05/20/2017

FEDERAL CONCRETE 16.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7035 PARIS STREET COMMUNIT Laborer 03/11/2017

FOLAN WATERPROOF CO. 15.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7035 PARIS STREET COMMUNIT Laborer 05/06/2017

FOLAN WATERPROOF CO. 73.5 14.5 19.73% 14.5 19.73% 7.0 9.52%7035 PARIS STREET COMMUNIT Waterproofer 07/15/2017

GREENWOOD INDUSTRIES IN 8.5 0.0 0.00% 0.0 0.00% 0.0 0.00%7035 PARIS STREET COMMUNIT Equipment Opera 04/29/2017

GREENWOOD INDUSTRIES IN 739.3 0.0 0.00% 41.8 5.65% 15.0 2.03%7035 PARIS STREET COMMUNIT Roofer 07/29/2017

A & A WINDOW PRODUCTS IN 862.0 248.0 28.77% 224.0 25.99% 0.0 0.00%7035 PARIS STREET COMMUNIT Carpenter 04/28/2017

39,245.8 8,971.0 22.86% 14,850.3 37.84% 2,134.0 5.44%SUB TOTALS:

7036 GALLIVAN COMMUNITY CENTER

$2,196,100Amount:

Gen Contractor: NORTHERN CONTRACTING CORP

(781)821-4200 68 JACKSON STREET P.O. BOX 96 CANTON

Est Start Date:

Est End Date:

07/15/2017

07/01/2018

NORTHERN CONTRACTING CO 80.0 64.0 80.00% 0.0 0.00% 0.0 0.00%7036 GALLIVAN COMMUNITY CE Laborer 09/02/2017

CDS CONTRACTING SERVICE 8.0 4.0 50.00% 8.0 100.00% 0.0 0.00%7036 GALLIVAN COMMUNITY CE Electrician 09/09/2017

88.0 68.0 77.27% 8.0 9.09% 0.0 0.00%SUB TOTALS:

7039 GEORGE WRIGHT CLUBHOUSE

$2,769,000Amount:

Gen Contractor: WCI CORP

617-524-9300 555 AMORY STREET, P O BOX 300187 BOSTON

Est Start Date:

Est End Date:

04/01/2015

02/28/2016

WCI CORP 3,863.0 3,556.5 92.07% 306.5 7.93% 0.0 0.00%7039 GEORGE WRIGHT CLUBHO Mason 04/19/2016

YOUR ELECTRICAL SOLUTION. 281.8 0.0 0.00% 68.5 24.31% 0.0 0.00%7039 GEORGE WRIGHT CLUBHO Utility Operator 04/29/2016

YOUR ELECTRICAL SOLUTION. 51.8 20.3 39.13% 34.5 66.67% 0.0 0.00%7039 GEORGE WRIGHT CLUBHO Laborer 04/29/2016

WCI CORP 1,146.0 1,146.0 100.00% 474.0 41.36% 0.0 0.00%7039 GEORGE WRIGHT CLUBHO Mason Tender 04/05/2016

WCI CORP 1,802.5 1,621.0 89.93% 1,802.5 100.00% 474.0 26.30%7039 GEORGE WRIGHT CLUBHO Laborer 06/07/2016

WCI CORP 3,016.5 2,417.5 80.14% 1,754.0 58.15% 0.0 0.00%7039 GEORGE WRIGHT CLUBHO Carpenter 06/14/2016

NG ENVIRONMENTAL CO. 155.0 48.0 30.97% 155.0 100.00% 0.0 0.00%7039 GEORGE WRIGHT CLUBHO Asbestos Worker 06/13/2015

JRF CORPORATION 567.0 161.0 28.40% 288.0 50.79% 0.0 0.00%7039 GEORGE WRIGHT CLUBHO Utility Operator 02/05/2016

JRF CORPORATION 93.3 93.3 100.00% 0.0 0.00% 0.0 0.00%7039 GEORGE WRIGHT CLUBHO Laborer 12/11/2015

Page 74: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 74

Project Name Trade Latest Week

GREENWOOD INDUSTRIES IN 204.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7039 GEORGE WRIGHT CLUBHO Slater 11/07/2015

GREENWOOD INDUSTRIES IN 1,426.0 301.8 21.16% 309.0 21.67% 0.0 0.00%7039 GEORGE WRIGHT CLUBHO Sheetmetal Work 04/30/2016

GREENWOOD INDUSTRIES IN 6,346.5 0.0 0.00% 1,169.3 18.42% 0.0 0.00%7039 GEORGE WRIGHT CLUBHO Roofer 07/02/2016

YOUR ELECTRICAL SOLUTION. 721.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7039 GEORGE WRIGHT CLUBHO Electrician 06/19/2016

19,674.2 9,365.2 47.60% 6,361.2 32.33% 474.0 2.41%SUB TOTALS:

7040 BUILDING DEMOLITION @ 135 D

$559,176Amount:

Gen Contractor: S & R CORPORATION

(978)441-2002 706 BROADWAY STREET LOWELL

Est Start Date:

Est End Date:

07/01/2014

12/31/2014

E. B. ROTONDI &SON INC 100.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7040 BUILDING DEMOLITION @ Laborer 08/09/2014

AQE INC 475.5 96.0 20.19% 459.5 96.64% 48.0 10.09%7040 BUILDING DEMOLITION @ Asbestos Worker 08/16/2014

STEELCO FENCING 16.0 16.0 100.00% 16.0 100.00% 0.0 0.00%7040 BUILDING DEMOLITION @ Laborer 07/19/2014

S & R CORPORATION 1,249.0 711.0 56.93% 470.0 37.63% 233.0 18.65%7040 BUILDING DEMOLITION @ Laborer 12/27/2014

S & R CORPORATION 510.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7040 BUILDING DEMOLITION @ Equipment Opera 12/20/2014

S & R CORPORATION 186.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7040 BUILDING DEMOLITION @ Asbestos Worker 12/27/2014

QUALITY PAVEMENT MARKING 1.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7040 BUILDING DEMOLITION @ Painter 12/20/2014

LIDDELL BROTHERS INC. 3.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7040 BUILDING DEMOLITION @ Laborer 01/17/2015

D. CLIFFIRD CONSTRUCTION 10.5 0.0 0.00% 0.0 0.00% 0.0 0.00%7040 BUILDING DEMOLITION @ Laborer 12/06/2014

D. CLIFFIRD CONSTRUCTION 3.5 0.0 0.00% 0.0 0.00% 0.0 0.00%7040 BUILDING DEMOLITION @ Equipment Opera 12/06/2014

CYN ENVIRONMENTAL SERVIC 96.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7040 BUILDING DEMOLITION @ Laborer 08/16/2014

CYN ENVIRONMENTAL SERVIC 29.5 0.0 0.00% 0.0 0.00% 0.0 0.00%7040 BUILDING DEMOLITION @ Equipment Opera 08/16/2014

CHAPMAN WATERPROOFING 143.0 44.0 30.77% 0.0 0.00% 0.0 0.00%7040 BUILDING DEMOLITION @ Laborer 01/05/2015

CHAPMAN WATERPROOFING 557.0 180.0 32.32% 180.0 32.32% 0.0 0.00%7040 BUILDING DEMOLITION @ Waterproofer 01/26/2015

E. B. ROTONDI &SON INC 28.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7040 BUILDING DEMOLITION @ Equipment Opera 08/02/2014

3,408.0 1,047.0 30.72% 1,125.5 33.03% 281.0 8.25%SUB TOTALS:

7041-A MOON ISLAND GUN RANGE SI

$688,000Amount:

Gen Contractor: MURPHY FAHY CONSTRUCTION

P O BOX 453 MILTON

Est Start Date:

Est End Date:

12/01/2016

07/31/2017

MURPHY FAHY CONSTRUCTIO 1,140.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7041-A MOON ISLAND GUN RAN Laborer 07/22/2017

1,140.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SUB TOTALS:

7042 JAMAICA PLAIN LIBRARY

$7,147,016Amount:

Gen Contractor: COLANTONIO INCORPORATED

(508)429-8666 P.O.BOX 6764 16 EVERETT STREET HOLLISTON

Est Start Date:

Est End Date:

09/15/2015

12/15/2016

KAPILOFF'S GLASS INC 54.0 0.0 0.00% 16.5 30.56% 0.0 0.00%7042 JAMAICA PLAIN LIBRARY Glazier 12/09/2016

PATRICK J. KENNEDY & SONS, 3.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7042 JAMAICA PLAIN LIBRARY Pipefitter 07/02/2016

NG ENVIRONMENTAL CO. 536.0 135.0 25.19% 536.0 100.00% 56.0 10.45%7042 JAMAICA PLAIN LIBRARY Asbestos Worker 10/24/2015

NEWTON BUILDING SPECIALTI 57.0 0.0 0.00% 29.0 50.88% 0.0 0.00%7042 JAMAICA PLAIN LIBRARY Carpenter 02/25/2017

Page 75: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 75

Project Name Trade Latest Week

NEW GENERATION PAINTING 150.0 30.0 20.00% 150.0 100.00% 32.0 21.33%7042 JAMAICA PLAIN LIBRARY Painter 09/23/2016

MODERN GLASS & ALUMINUM 1,017.8 130.0 12.77% 199.3 19.58% 0.0 0.00%7042 JAMAICA PLAIN LIBRARY Glazier 02/04/2017

VALLEY COMMUNICATIONS SY 80.3 71.8 89.41% 0.0 0.00% 0.0 0.00%7042 JAMAICA PLAIN LIBRARY Electrician 03/17/2017

L & L CONCRETE FORMS 627.0 69.0 11.00% 0.0 0.00% 0.0 0.00%7042 JAMAICA PLAIN LIBRARY Carpenter 05/13/2016

REMINGTON STEEL 147.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7042 JAMAICA PLAIN LIBRARY Iron Worker 05/07/2016

K & K ACOUSTICAL CEILINGS 162.0 80.0 49.38% 80.0 49.38% 0.0 0.00%7042 JAMAICA PLAIN LIBRARY Carpenter 01/15/2017

J.R.J. CONSTRUCTION CO. 24.0 8.0 33.33% 8.0 33.33% 8.0 33.33%7042 JAMAICA PLAIN LIBRARY Plasterer 10/28/2016

L & L CONCRETE FORMS 411.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7042 JAMAICA PLAIN LIBRARY Laborer 05/13/2016

RELIABLE ROOFING SHEETME 7.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7042 JAMAICA PLAIN LIBRARY Carpenter 01/22/2017

PATRICK J. KENNEDY & SONS, 1,084.0 531.0 48.99% 248.0 22.88% 0.0 0.00%7042 JAMAICA PLAIN LIBRARY Plumber 04/08/2017

RELIABLE ROOFING SHEETME 859.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7042 JAMAICA PLAIN LIBRARY Sheetmetal Work 02/19/2017

RUSTIC FIRE PROTECTION 931.5 0.0 0.00% 237.0 25.44% 0.0 0.00%7042 JAMAICA PLAIN LIBRARY Sprinkler Fitter 02/04/2017

S.O.S. CORPORATION 1,096.0 32.0 2.92% 624.0 56.93% 0.0 0.00%7042 JAMAICA PLAIN LIBRARY Laborer 01/03/2016

SIGNET ELECTRONIC SYSTEM 338.8 0.0 0.00% 166.0 49.00% 0.0 0.00%7042 JAMAICA PLAIN LIBRARY Telephone/Data I 05/21/2017

UNITED ELEVATOR CO INC 290.0 10.0 3.45% 0.0 0.00% 0.0 0.00%7042 JAMAICA PLAIN LIBRARY Elev Const Helper 11/13/2016

UNITED ELEVATOR CO INC 280.0 8.0 2.86% 0.0 0.00% 0.0 0.00%7042 JAMAICA PLAIN LIBRARY Elevator Const(M 05/21/2017

V & G IRON WORKS INC. 188.5 0.0 0.00% 173.5 92.04% 0.0 0.00%7042 JAMAICA PLAIN LIBRARY Iron Worker 03/17/2017

V & G IRON WORKS INC. 289.0 65.5 22.66% 48.0 16.61% 40.5 14.01%7042 JAMAICA PLAIN LIBRARY Laborer 03/10/2017

J.R.J. CONSTRUCTION CO. 32.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7042 JAMAICA PLAIN LIBRARY Laborer 10/28/2016

RELIABLE ROOFING SHEETME 732.5 28.0 3.82% 463.0 63.21% 0.0 0.00%7042 JAMAICA PLAIN LIBRARY Roofer 03/12/2017

BONOMO TILE CO., INC. 358.0 100.0 27.93% 132.0 36.87% 0.0 0.00%7042 JAMAICA PLAIN LIBRARY Marble Tile Work 12/03/2016

RELIABLE ROOFING SHEETME 5.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7042 JAMAICA PLAIN LIBRARY Equipment Opera 08/14/2016

INNER CITY CONSTRUCTION S 12.0 12.0 100.00% 12.0 100.00% 0.0 0.00%7042 JAMAICA PLAIN LIBRARY Laborer 04/08/2016

A & M WELDING FABRICATION, 8.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7042 JAMAICA PLAIN LIBRARY Laborer 06/11/2016

A & M WELDING FABRICATION, 18.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7042 JAMAICA PLAIN LIBRARY Millwright 06/11/2016

AMERICAN SHEET METAL LLC 1,991.0 0.0 0.00% 824.5 41.41% 0.0 0.00%7042 JAMAICA PLAIN LIBRARY Sheetmetal Work 03/11/2017

ANNESE ELECTRICAL SERVIC 5,085.0 2,177.0 42.81% 4,276.5 84.10% 450.0 8.85%7042 JAMAICA PLAIN LIBRARY Electrician 05/20/2017

ANNESE TELECOM & UTILITY 16.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7042 JAMAICA PLAIN LIBRARY Telephone/Data I 06/11/2016

AQUA LINE UTILITY, INC. 20.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7042 JAMAICA PLAIN LIBRARY Laborer 07/02/2016

CAPITAL CARPET&FLOORING 695.5 0.0 0.00% 116.0 16.68% 0.0 0.00%7042 JAMAICA PLAIN LIBRARY Floor Layer 09/10/2017

CHAPMAN WATERPROOFING 5.0 5.0 100.00% 0.0 0.00% 0.0 0.00%7042 JAMAICA PLAIN LIBRARY Laborer 03/21/2016

CHAPMAN WATERPROOFING 294.5 99.0 33.62% 123.0 41.77% 8.0 2.72%7042 JAMAICA PLAIN LIBRARY Waterproofer 09/05/2016

COLANTONIO INCORPORATED 2,531.5 64.0 2.53% 160.0 6.32% 0.0 0.00%7042 JAMAICA PLAIN LIBRARY Carpenter 04/15/2017

HAROLD BROTHERS MECHANI 2,231.0 1,044.5 46.82% 1,044.5 46.82% 235.5 10.56%7042 JAMAICA PLAIN LIBRARY HVAC 03/04/2017

Page 76: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 76

Project Name Trade Latest Week

I.C.R. DRYWALL INC. 571.0 482.0 84.41% 506.0 88.62% 0.0 0.00%7042 JAMAICA PLAIN LIBRARY Taper 02/04/2017

AQUA LINE UTILITY, INC. 20.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7042 JAMAICA PLAIN LIBRARY Equipment Opera 07/02/2016

I.C.R. DRYWALL INC. 2,905.5 784.5 27.00% 798.0 27.47% 0.0 0.00%7042 JAMAICA PLAIN LIBRARY Carpenter 01/28/2017

COLANTONIO INCORPORATED 3,173.0 156.0 4.92% 156.0 4.92% 156.0 4.92%7042 JAMAICA PLAIN LIBRARY Equipment Opera 04/08/2017

GUARDIAN ENERGY MANAGE 336.1 0.0 0.00% 28.0 8.33% 28.0 8.33%7042 JAMAICA PLAIN LIBRARY Electrician 10/01/2016

GENERAL SANDBLASTING 44.5 0.0 0.00% 0.0 0.00% 0.0 0.00%7042 JAMAICA PLAIN LIBRARY Sandblaster 08/13/2016

COLANTONIO INCORPORATED 2,889.0 312.0 10.80% 312.0 10.80% 104.0 3.60%7042 JAMAICA PLAIN LIBRARY Laborer 04/08/2017

FEDERAL CONCRETE 189.0 42.5 22.49% 32.0 16.93% 0.0 0.00%7042 JAMAICA PLAIN LIBRARY Iron Worker 05/14/2016

COSTA BROTHERS MASONRY 953.0 0.0 0.00% 151.0 15.84% 8.0 0.84%7042 JAMAICA PLAIN LIBRARY Laborer 12/24/2016

COSTA BROTHERS MASONRY 1,025.0 24.0 2.34% 32.0 3.12% 32.0 3.12%7042 JAMAICA PLAIN LIBRARY Bricklayer 04/15/2017

GENERAL SANDBLASTING 29.0 8.0 27.59% 0.0 0.00% 0.0 0.00%7042 JAMAICA PLAIN LIBRARY Laborer 04/08/2017

I.C.R. DRYWALL INC. 128.0 128.0 100.00% 128.0 100.00% 128.0 100.00%7042 JAMAICA PLAIN LIBRARY Laborer 07/30/2016

34,930.8 6,636.8 19.00% 11,809.8 33.81% 1,286.0 3.68%SUB TOTALS:

7044 BOSTON EMS VEHICLE STORAG

$3,469,000Amount:

Gen Contractor: WCI CORP

617-524-9300 555 AMORY STREET, P O BOX 300187 BOSTON

Est Start Date:

Est End Date:

09/30/2014

09/30/2015

NORTH SOUTH IRONWORKS, L 1,010.0 242.0 23.96% 242.0 23.96% 0.0 0.00%7044 BOSTON EMS VEHICLE ST Iron Worker 04/10/2015

NORWOOD CONCRETE FORM 173.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7044 BOSTON EMS VEHICLE ST Laborer 02/07/2015

PATRICK J. KENNEDY & SONS, 714.0 336.0 47.06% 0.0 0.00% 0.0 0.00%7044 BOSTON EMS VEHICLE ST Plumber 01/16/2016

V & G IRON WORKS INC. 66.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7044 BOSTON EMS VEHICLE ST Iron Worker 09/18/2015

V & G IRON WORKS INC. 12.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7044 BOSTON EMS VEHICLE ST Laborer 07/02/2015

WCI CORP 2,950.0 1,849.0 62.68% 2,950.0 100.00% 1,840.0 62.37%7044 BOSTON EMS VEHICLE ST Laborer 02/02/2016

WCI CORP 1,514.5 823.0 54.34% 769.0 50.78% 0.0 0.00%7044 BOSTON EMS VEHICLE ST Mason 01/26/2016

BELLO PAINTING CO. 432.0 16.0 3.70% 408.0 94.44% 0.0 0.00%7044 BOSTON EMS VEHICLE ST Painter 10/23/2015

NG ENVIRONMENTAL CO. 98.0 14.0 14.29% 98.0 100.00% 0.0 0.00%7044 BOSTON EMS VEHICLE ST Asbestos Worker 09/20/2014

WCI CORP 6,662.5 2,395.0 35.95% 2,984.5 44.80% 0.0 0.00%7044 BOSTON EMS VEHICLE ST Carpenter 01/26/2016

MULVEY PLASTERING 304.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7044 BOSTON EMS VEHICLE ST Plasterer 07/24/2015

JRF CORPORATION 1,896.3 258.0 13.61% 1,005.0 53.00% 0.0 0.00%7044 BOSTON EMS VEHICLE ST Utility Operator 10/02/2015

JRF CORPORATION 1,401.0 1,010.5 72.13% 55.0 3.93% 0.0 0.00%7044 BOSTON EMS VEHICLE ST Laborer 10/02/2015

JOHN F. SHEA CO. INC. 27.0 8.0 29.63% 9.0 33.33% 0.0 0.00%7044 BOSTON EMS VEHICLE ST Sheetmetal Work 09/26/2015

JOHN F. SHEA CO. INC. 967.5 152.0 15.71% 252.0 26.05% 8.0 0.83%7044 BOSTON EMS VEHICLE ST Roofer 01/09/2016

HIGHGATE ELECTRIC, LLC 102.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7044 BOSTON EMS VEHICLE ST Electrician 10/24/2015

BROTHERS ELECTRIC CO LLC 1,459.5 703.0 48.17% 1,369.5 93.83% 0.0 0.00%7044 BOSTON EMS VEHICLE ST Electrician 01/23/2016

MURPHY SPECIALTIES, INC. 392.0 200.0 51.02% 0.0 0.00% 0.0 0.00%7044 BOSTON EMS VEHICLE ST Sheetmetal Work 10/17/2015

CARLYSLE ENGINEERING INC. 213.0 64.0 30.05% 96.0 45.07% 0.0 0.00%7044 BOSTON EMS VEHICLE ST Sprinkler Fitter 06/12/2015

Page 77: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 77

Project Name Trade Latest Week

20,394.2 8,070.5 39.57% 10,238.0 50.20% 1,848.0 9.06%SUB TOTALS:

7045 CITY ARCHIVES BUILDING ROOF

$468,621Amount:

Gen Contractor: ENTERPRISE EQUIPT CO,INC.

(617)331-0900 276 LIBBEY PARK E.WEYMOUTH

Est Start Date:

Est End Date:

09/01/2014

09/30/2016

SPINDLE CITY INSULATION 64.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7045 CITY ARCHIVES BUILDING Insulator 11/02/2014

GLOVER SHEET METAL INC 244.8 0.0 0.00% 40.0 16.34% 0.0 0.00%7045 CITY ARCHIVES BUILDING Sheetmetal Work 11/03/2014

ENTERPRISE EQUIPT CO,INC. 24.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7045 CITY ARCHIVES BUILDING Plumber 11/01/2014

ENTERPRISE EQUIPT CO,INC. 721.0 232.0 32.18% 232.0 32.18% 0.0 0.00%7045 CITY ARCHIVES BUILDING Pipefitter 05/02/2015

ENTERPRISE EQUIPT CO,INC. 17.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7045 CITY ARCHIVES BUILDING Laborer 05/02/2015

ANNESE ELECTRICAL SERVIC 89.5 0.0 0.00% 0.0 0.00% 0.0 0.00%7045 CITY ARCHIVES BUILDING Electrician 11/08/2014

ENTERPRISE EQUIPT CO,INC. 10.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7045 CITY ARCHIVES BUILDING Carpenter 10/18/2014

1,170.3 232.0 19.82% 272.0 23.24% 0.0 0.00%SUB TOTALS:

7047 FANEUIL HALL WINDOW REPAIR

$143,200Amount:

Gen Contractor: HOMER CONTRACTING INC

781-648-3372 195 BROADWAY STREET ARLINGTON

Est Start Date:

Est End Date:

01/02/2015

06/30/2015

KARMA ENVIRONMENTAL 16.0 0.0 0.00% 16.0 100.00% 0.0 0.00%7047 FANEUIL HALL WINDOW R Asbestos Worker 06/13/2015

HOMER CONTRACTING INC 104.0 72.0 69.23% 72.0 69.23% 0.0 0.00%7047 FANEUIL HALL WINDOW R Painter 09/19/2015

HOMER CONTRACTING INC 122.0 0.0 0.00% 0.0 0.00% 112.0 91.80%7047 FANEUIL HALL WINDOW R Laborer 08/08/2015

HOMER CONTRACTING INC 126.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7047 FANEUIL HALL WINDOW R Carpenter 07/25/2015

368.0 72.0 19.57% 88.0 23.91% 112.0 30.43%SUB TOTALS:

7048 AREA C-6 BFD STATION ROOF &

$231,000Amount:

Gen Contractor: GIBSON ROOFS

781-826-6344 369 WINTER ST HANOVER

Est Start Date:

Est End Date:

10/31/2015

12/31/2015

CONTRACTING SPEC INC 315.0 0.0 0.00% 312.0 99.05% 143.0 45.40%7048 AREA C-6 BFD STATION R Bricklayer 12/26/2015

GIBSON ROOFS 171.5 8.0 4.66% 39.5 23.03% 0.0 0.00%7048 AREA C-6 BFD STATION R Roofer 02/03/2016

RICHMAN CORPORATION 76.0 38.0 50.00% 0.0 0.00% 0.0 0.00%7048 AREA C-6 BFD STATION R Plumber 12/04/2015

562.5 46.0 8.18% 351.5 62.49% 143.0 25.42%SUB TOTALS:

7049 MCKIM STORMWATER DRAINAG

$375,000Amount:

Gen Contractor: PAUL J. ROGAN CO., INC.

(781)843-1900 25 HAYWARD STREET BRAINTREE

Est Start Date:

Est End Date:

10/26/2015

12/31/2015

ROBERT W. IRVINE SONS. 8.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7049 MCKIM STORMWATER DRA Insulator 01/08/2016

ROBERT W. IRVINE SONS. 47.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7049 MCKIM STORMWATER DRA Plumber 01/08/2016

PAUL J. ROGAN CO., INC. 115.5 16.0 13.85% 16.0 13.85% 16.0 13.85%7049 MCKIM STORMWATER DRA Laborer 01/16/2016

PAUL J. ROGAN CO., INC. 15.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7049 MCKIM STORMWATER DRA Carpenter 01/09/2016

D'ALLESSANDRO CORPORATI 306.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7049 MCKIM STORMWATER DRA Laborer 12/26/2015

D'ALLESSANDRO CORPORATI 215.5 0.0 0.00% 0.0 0.00% 0.0 0.00%7049 MCKIM STORMWATER DRA Equipment Opera 12/19/2015

D'ALLESSANDRO CORPORATI 1.5 0.0 0.00% 1.5 100.00% 0.0 0.00%7049 MCKIM STORMWATER DRA Curbsetter/Paver 12/19/2015

Page 78: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 78

Project Name Trade Latest Week

D'ALLESSANDRO CORPORATI 6.5 0.0 0.00% 0.0 0.00% 0.0 0.00%7049 MCKIM STORMWATER DRA Pipelayer 12/12/2015

715.0 16.0 2.24% 17.5 2.45% 16.0 2.24%SUB TOTALS:

7050 HVAC UPGRADE FINLAND & WO

$3,501,400Amount:

Gen Contractor: GENERAL AIR COND & HEAT

(617)427-7370 7 GASTON STREET BOSTON

Est Start Date:

Est End Date:

07/31/2015

06/30/2015

HUNTINGTON CONTROLS 8.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7050 HVAC UPGRADE FINLAND Pipefitter 07/18/2015

GENERAL AIR COND & HEAT 982.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7050 HVAC UPGRADE FINLAND Insulator 06/18/2016

RICHARD T LOSORDO ELE. 1,987.5 24.0 1.21% 38.5 1.94% 0.0 0.00%7050 HVAC UPGRADE FINLAND Electrician 08/14/2016

HUNTINGTON CONTROLS 823.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7050 HVAC UPGRADE FINLAND Electrician 07/16/2016

GENERAL AIR COND & HEAT 4,772.5 2,014.5 42.21% 2,014.5 42.21% 48.0 1.01%7050 HVAC UPGRADE FINLAND Pipefitter 06/18/2016

8,573.0 2,038.5 23.78% 2,053.0 23.95% 48.0 0.56%SUB TOTALS:

7051 RE- ROOFING 26 COURT STREET

$989,000Amount:

Gen Contractor: COMMERCIAL ROOFING & CONTRACTING INC.

340 KENNEDY DRIVE putnum

Est Start Date:

Est End Date:

05/01/2015

08/31/2015

COMMERCIAL ROOFING & CO 508.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7051 RE- ROOFING 26 COURT S Sheetmetal Work 10/24/2015

FOLAN WATERPROOF CO. 39.5 0.0 0.00% 8.0 20.25% 0.0 0.00%7051 RE- ROOFING 26 COURT S Laborer 06/13/2015

FOLAN WATERPROOF CO. 210.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7051 RE- ROOFING 26 COURT S Mason 06/27/2015

COMMERCIAL ROOFING & CO 1,715.5 0.0 0.00% 599.0 34.92% 0.0 0.00%7051 RE- ROOFING 26 COURT S Roofer 10/24/2015

2,473.0 0.0 0.00% 607.0 24.55% 0.0 0.00%SUB TOTALS:

7053 CITY HALL 708 7TH F1 PARTIAL

$232,400Amount:

Gen Contractor: R & R BUILDERS

(978)664-8644 350 PARK STREET NORTH READING

Est Start Date:

Est End Date:

09/01/2014

12/31/2014

KO STONE 96.0 0.0 0.00% 96.0 100.00% 0.0 0.00%7053 CITY HALL 708 7TH F1 PAR Laborer 09/19/2014

R & R BUILDERS 463.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7053 CITY HALL 708 7TH F1 PAR Carpenter 01/16/2015

R & R BUILDERS 80.0 80.0 100.00% 0.0 0.00% 0.0 0.00%7053 CITY HALL 708 7TH F1 PAR Laborer 11/21/2014

CAPITAL CARPET&FLOORING 156.0 0.0 0.00% 96.0 61.54% 0.0 0.00%7053 CITY HALL 708 7TH F1 PAR Floor Layer 03/15/2015

BROTHERS ELECTRIC CO LLC 89.0 89.0 100.00% 89.0 100.00% 0.0 0.00%7053 CITY HALL 708 7TH F1 PAR Electrician 01/24/2015

PRUDENTIAL DOOR WINDOW 28.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7053 CITY HALL 708 7TH F1 PAR Glazier 02/26/2015

NEW ENGLAND INTERIOR SPE 16.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7053 CITY HALL 708 7TH F1 PAR Carpenter 12/20/2014

928.0 169.0 18.21% 281.0 30.28% 0.0 0.00%SUB TOTALS:

7054 CITY HALL ROOM 806 RENOVATI

$249,000Amount:

Gen Contractor: R & R BUILDERS

(978)664-8644 350 PARK STREET NORTH READING

Est Start Date:

Est End Date:

06/29/2015

09/01/2015

R & R BUILDERS 291.5 0.0 0.00% 0.0 0.00% 0.0 0.00%7054 CITY HALL ROOM 806 REN Carpenter 08/21/2015

THE AULSON COMPANY, LLC 451.0 28.0 6.21% 407.0 90.24% 48.0 10.64%7054 CITY HALL ROOM 806 REN Asbestos Worker 07/18/2015

PRUDENTIAL DOOR WINDOW 13.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7054 CITY HALL ROOM 806 REN Glazier 08/20/2015

NEW ENGLAND INTERIOR SPE 50.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7054 CITY HALL ROOM 806 REN Carpenter 09/12/2015

Page 79: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 79

Project Name Trade Latest Week

DAVISON CO,INC. 16.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7054 CITY HALL ROOM 806 REN Pipefitter 07/04/2015

DAVISON CO,INC. 16.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7054 CITY HALL ROOM 806 REN HVAC 07/04/2015

CAPITAL CARPET&FLOORING 113.0 0.0 0.00% 95.0 84.07% 0.0 0.00%7054 CITY HALL ROOM 806 REN Floor Layer 09/27/2015

ACK PAINTING, LLC 64.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7054 CITY HALL ROOM 806 REN Painter 10/06/2015

MEGCO ELECTRIC 305.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7054 CITY HALL ROOM 806 REN Electrician 09/25/2015

1,319.5 28.0 2.12% 502.0 38.04% 48.0 3.64%SUB TOTALS:

7058 BTD TOW LOT FACILITY BLDG-P

$2,667,100Amount:

Gen Contractor: NORTHERN CONTRACTING CORP

(781)821-4200 68 JACKSON STREET P.O. BOX 96 CANTON

Est Start Date:

Est End Date:

02/15/2017

09/30/2018

V & G IRON WORKS INC. 156.3 0.0 0.00% 0.0 0.00% 0.0 0.00%7058 BTD TOW LOT FACILITY BL Iron Worker 09/01/2017

CONTRACTING SPEC INC 628.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7058 BTD TOW LOT FACILITY BL Bricklayer 06/10/2017

DWC DESIGNS INC. 12.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7058 BTD TOW LOT FACILITY BL Carpenter 09/08/2017

CENTRAL CEILINGS INC. 239.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7058 BTD TOW LOT FACILITY BL Carpenter 08/27/2017

G.V.W. INC. 22.0 4.0 18.18% 20.0 90.91% 0.0 0.00%7058 BTD TOW LOT FACILITY BL Laborer 07/29/2017

KING PAINTING INC. 496.3 230.0 46.35% 418.0 84.23% 0.0 0.00%7058 BTD TOW LOT FACILITY BL Painter 08/26/2017

NORTHERN CONTRACTING CO 334.0 56.0 16.77% 182.0 54.49% 0.0 0.00%7058 BTD TOW LOT FACILITY BL Carpenter 08/26/2017

WEST FLOOR COVERING INC, 22.5 0.0 0.00% 0.0 0.00% 0.0 0.00%7058 BTD TOW LOT FACILITY BL Floor Layer 08/26/2017

NORTHERN CONTRACTING CO 615.0 0.0 0.00% 615.0 100.00% 0.0 0.00%7058 BTD TOW LOT FACILITY BL Utility Operator 08/19/2017

V & G IRON WORKS INC. 2.0 1.0 50.00% 0.0 0.00% 0.0 0.00%7058 BTD TOW LOT FACILITY BL Laborer 08/25/2017

CONTRACTING SPEC INC 154.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7058 BTD TOW LOT FACILITY BL Laborer 06/10/2017

NORTHERN CONTRACTING CO 1,885.5 729.5 38.69% 1,007.0 53.41% 0.0 0.00%7058 BTD TOW LOT FACILITY BL Laborer 09/02/2017

ACME WATERPROOFING CO,I 79.0 71.0 89.87% 71.0 89.87% 0.0 0.00%7058 BTD TOW LOT FACILITY BL Bricklayer 08/05/2017

CAM HVAC & CONS. INC. 75.0 0.0 0.00% 8.5 11.33% 0.0 0.00%7058 BTD TOW LOT FACILITY BL Sheetmetal Work 07/08/2017

CAM HVAC & CONS. INC. 1.5 0.0 0.00% 0.0 0.00% 0.0 0.00%7058 BTD TOW LOT FACILITY BL Pipefitter 07/15/2017

G.V.W. INC. 480.0 56.0 11.67% 96.0 20.00% 0.0 0.00%7058 BTD TOW LOT FACILITY BL Carpenter 09/09/2017

CAM HVAC & CONS. INC. 0.8 0.0 0.00% 0.8 100.00% 0.0 0.00%7058 BTD TOW LOT FACILITY BL Laborer 04/29/2017

C.S.ALLISON CO. 102.0 70.0 68.63% 102.0 100.00% 0.0 0.00%7058 BTD TOW LOT FACILITY BL Laborer 03/31/2017

BAYSTATE RECLAMATION LLC 40.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7058 BTD TOW LOT FACILITY BL Laborer 08/13/2017

BAYSTATE RECLAMATION LLC 72.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7058 BTD TOW LOT FACILITY BL Equipment Opera 08/27/2017

ANNESE TELECOM & UTILITY 105.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7058 BTD TOW LOT FACILITY BL Electrician 07/29/2017

ANNESE ELECTRICAL SERVIC 1,147.0 375.0 32.69% 391.0 34.09% 0.0 0.00%7058 BTD TOW LOT FACILITY BL Electrician 09/02/2017

AMERICAN TEST & BALANCE 3.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7058 BTD TOW LOT FACILITY BL Sheetmetal Work 07/15/2017

AMERICAN PRIDE INSUL. INC. 16.0 0.0 0.00% 10.0 62.50% 0.0 0.00%7058 BTD TOW LOT FACILITY BL Insulator 07/01/2017

ACME WATERPROOFING CO,I 4.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7058 BTD TOW LOT FACILITY BL Laborer 07/15/2017

CARLYSLE ENGINEERING INC. 248.0 132.0 53.23% 8.0 3.23% 0.0 0.00%7058 BTD TOW LOT FACILITY BL Sprinkler Fitter 07/14/2017

Page 80: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 80

Project Name Trade Latest Week

6,939.8 1,724.5 24.85% 2,929.3 42.21% 0.0 0.00%SUB TOTALS:

7058A BTD TOW FACILITY PHASE I

$486,000Amount:

Gen Contractor: RELIABLE ROOFING SHEETMETAL, LLC.

(508)628-5562 105 IRVING STREET FRAMINGHAM

Est Start Date:

Est End Date:

04/01/2016

09/01/2016

RELIABLE ROOFING SHEETME 1,826.0 483.0 26.45% 1,067.0 58.43% 0.0 0.00%7058A BTD TOW FACILITY PHA Roofer 05/22/2016

RELIABLE ROOFING SHEETME 124.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7058A BTD TOW FACILITY PHA Sheetmetal Work 04/03/2016

1,950.0 483.0 24.77% 1,067.0 54.72% 0.0 0.00%SUB TOTALS:

7060 BPD HEADQUARTERS EXTENOR

$838,000Amount:

Gen Contractor: COMMERCIAL CONSTR. CORP.

781-284-0800 60 MERRIMAC ST 912 AMESBURY

Est Start Date:

Est End Date:

10/17/2016

06/30/2017

DIVERSIFIED CONSTRUCTION 266.0 0.0 0.00% 138.0 51.88% 0.0 0.00%7060 BPD HEADQUARTERS EXT Laborer 04/15/2017

266.0 0.0 0.00% 138.0 51.88% 0.0 0.00%SUB TOTALS:

7062 BFD MARINE DOCK

$789,528Amount:

Gen Contractor: COASTAL MARINE CONSTRUCTION

339-502-8669 CANTON

Est Start Date:

Est End Date:

10/15/2015

03/31/2016

COASTAL MARINE CONSTRUC 8.5 0.0 0.00% 0.0 0.00% 0.0 0.00%7062 BFD MARINE DOCK Cement Finisher 04/24/2016

COASTAL MARINE CONSTRUC 71.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7062 BFD MARINE DOCK Laborer 06/05/2016

COASTAL MARINE CONSTRUC 137.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7062 BFD MARINE DOCK Oiler 04/17/2016

COASTAL MARINE CONSTRUC 753.5 265.0 35.17% 97.5 12.94% 0.0 0.00%7062 BFD MARINE DOCK Piledriver 07/03/2016

MASS BAY ELECTRIC CORP. 46.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7062 BFD MARINE DOCK Electrician 05/08/2016

1,016.0 265.0 26.08% 97.5 9.60% 0.0 0.00%SUB TOTALS:

7067 STRAND THEATER ACCESS & LI

$2,658,100Amount:

Gen Contractor: NORTHERN CONTRACTING CORP

(781)821-4200 68 JACKSON STREET P.O. BOX 96 CANTON

Est Start Date:

Est End Date:

02/22/2017

05/01/2017

M.L. MCDONALD SALES 168.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7067 STRAND THEATER ACCES Mason 09/12/2017

ENVIROGREEN LLC 96.0 16.0 16.67% 96.0 100.00% 0.0 0.00%7067 STRAND THEATER ACCES Asbestos Worker 07/15/2017

SIMPLEXGRINNELL 416.0 192.0 46.15% 192.0 46.15% 0.0 0.00%7067 STRAND THEATER ACCES Sprinkler Fitter 08/26/2017

NORTHERN CONTRACTING CO 35.5 0.0 0.00% 35.5 100.00% 0.0 0.00%7067 STRAND THEATER ACCES Utility Operator 06/17/2017

NORTHERN CONTRACTING CO 1,110.0 698.0 62.88% 0.0 0.00% 0.0 0.00%7067 STRAND THEATER ACCES Laborer 09/02/2017

NORTHERN CONTRACTING CO 1,092.0 449.5 41.16% 460.5 42.17% 0.0 0.00%7067 STRAND THEATER ACCES Carpenter 09/02/2017

M.L. MCDONALD SALES 20.0 0.0 0.00% 20.0 100.00% 0.0 0.00%7067 STRAND THEATER ACCES Piledriver 06/20/2017

M.L. MCDONALD SALES 208.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7067 STRAND THEATER ACCES Carpenter 09/05/2017

BRITE-LITE ELECTRICAL CO. 279.5 91.5 32.74% 91.5 32.74% 0.0 0.00%7067 STRAND THEATER ACCES Electrician 09/16/2017

DEPENDABLE MASONRY 264.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7067 STRAND THEATER ACCES Laborer 08/05/2017

DEPENDABLE MASONRY 222.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7067 STRAND THEATER ACCES Bricklayer 08/05/2017

CAM HVAC & CONS. INC. 3.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7067 STRAND THEATER ACCES Sheetmetal Work 05/13/2017

M.L. MCDONALD SALES 179.0 26.0 14.53% 18.0 10.06% 0.0 0.00%7067 STRAND THEATER ACCES Laborer 09/12/2017

Page 81: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 81

Project Name Trade Latest Week

4,093.0 1,473.0 35.99% 913.5 22.32% 0.0 0.00%SUB TOTALS:

7068 CITY HALL SUITES 708,806 MECH

$197,000Amount:

Gen Contractor: PATRICK J. KENNEDY & SONS, INC.

(617)265-5535 39 GIBSON STREET DORCHESTER

Est Start Date:

Est End Date:

11/03/2015

11/03/2016

MEGCO ELECTRIC 52.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7068 CITY HALL SUITES 708,806 Electrician 02/26/2016

PATRICK J. KENNEDY & SONS, 158.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7068 CITY HALL SUITES 708,806 Pipefitter 03/19/2016

210.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SUB TOTALS:

7072 MURPHY SCHOOLYARD IMPROV

$577,400Amount:

Gen Contractor: J T CONSTRUCTION, INC.

508/846-9423 22 WILLIS ROAD BRIDGEWATER

Est Start Date:

Est End Date:

08/10/2016

06/30/2017

SWEEZEY FENCE ERECTORS 115.5 0.0 0.00% 0.0 0.00% 0.0 0.00%7072 MURPHY SCHOOLYARD IM Laborer 09/25/2016

J T CONSTRUCTION, INC. 736.0 572.0 77.72% 0.0 0.00% 0.0 0.00%7072 MURPHY SCHOOLYARD IM Equipment Opera 10/16/2016

J T CONSTRUCTION, INC. 945.0 80.0 8.47% 72.0 7.62% 0.0 0.00%7072 MURPHY SCHOOLYARD IM Laborer 10/16/2016

MILINAZZO PAVING CORPORA 63.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7072 MURPHY SCHOOLYARD IM Asphalt Raker 09/18/2016

MILINAZZO PAVING CORPORA 31.5 0.0 0.00% 0.0 0.00% 0.0 0.00%7072 MURPHY SCHOOLYARD IM Equipment Opera 09/18/2016

1,891.0 652.0 34.48% 72.0 3.81% 0.0 0.00%SUB TOTALS:

7073 TEMPORARY WINDOW REPAIRS

$217,000Amount:

Gen Contractor: WCI CORP

617-524-9300 555 AMORY STREET, P O BOX 300187 BOSTON

Est Start Date:

Est End Date:

01/01/2016

07/29/2016

WCI CORP 16.0 8.0 50.00% 8.0 50.00% 0.0 0.00%7073 TEMPORARY WINDOW RE Mason 02/16/2016

WCI CORP 16.0 0.0 0.00% 16.0 100.00% 0.0 0.00%7073 TEMPORARY WINDOW RE Laborer 02/16/2016

MILLENIUM PAINTING 177.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7073 TEMPORARY WINDOW RE Carpenter 03/08/2016

WCI CORP 767.0 578.0 75.36% 326.0 42.50% 0.0 0.00%7073 TEMPORARY WINDOW RE Carpenter 03/08/2016

976.0 586.0 60.04% 350.0 35.86% 0.0 0.00%SUB TOTALS:

7076 PARKHILL BRANCH LIBRARY EN

$1,569,000Amount:

Gen Contractor: WCI CORP

617-524-9300 555 AMORY STREET, P O BOX 300187 BOSTON

Est Start Date:

Est End Date:

07/15/2017

07/01/2018

WCI CORP 16.0 0.0 0.00% 16.0 100.00% 0.0 0.00%7076 PARKHILL BRANCH LIBRAR Carpenter 09/05/2017

WCI CORP 8.0 0.0 0.00% 8.0 100.00% 0.0 0.00%7076 PARKHILL BRANCH LIBRAR Laborer 09/05/2017

WCI CORP 592.0 560.0 94.59% 0.0 0.00% 0.0 0.00%7076 PARKHILL BRANCH LIBRAR Mason 09/05/2017

WCI CORP 456.0 296.0 64.91% 144.0 31.58% 0.0 0.00%7076 PARKHILL BRANCH LIBRAR Mason Tender 09/05/2017

1,072.0 856.0 79.85% 168.0 15.67% 0.0 0.00%SUB TOTALS:

7079 VERONICA SMITH SENIOR CENT

$452,100Amount:

Gen Contractor: NORTHERN CONTRACTING CORP

(781)821-4200 68 JACKSON STREET P.O. BOX 96 CANTON

Est Start Date:

Est End Date:

05/01/2017

12/31/2017

NORTHERN CONTRACTING CO 337.0 16.0 4.75% 313.0 92.88% 0.0 0.00%7079 VERONICA SMITH SENIOR Carpenter 08/19/2017

P.J. DIONNE CO INC. 118.5 0.0 0.00% 3.0 2.53% 0.0 0.00%7079 VERONICA SMITH SENIOR Plumber 08/26/2017

Page 82: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 82

Project Name Trade Latest Week

WEST FLOOR COVERING INC, 56.0 0.0 0.00% 40.0 71.43% 0.0 0.00%7079 VERONICA SMITH SENIOR Marble Tile Work 07/29/2017

PAVILION FLOORS, INC. 72.0 0.0 0.00% 48.0 66.67% 0.0 0.00%7079 VERONICA SMITH SENIOR Carpet Layer 05/06/2017

NORTHERN CONTRACTING CO 485.0 118.5 24.43% 366.5 75.57% 0.0 0.00%7079 VERONICA SMITH SENIOR Laborer 08/26/2017

DAVISON CO,INC. 8.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7079 VERONICA SMITH SENIOR Sheetmetal Work 06/16/2017

B. WILLIAMS PAINTING CO. 158.0 158.0 100.00% 158.0 100.00% 0.0 0.00%7079 VERONICA SMITH SENIOR Painter 07/22/2017

DAVISON CO,INC. 32.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7079 VERONICA SMITH SENIOR Laborer 08/18/2017

GRANITE STATE SPECIALTIES, 8.5 0.0 0.00% 0.0 0.00% 0.0 0.00%7079 VERONICA SMITH SENIOR Carpenter 06/18/2017

DAVISON CO,INC. 56.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7079 VERONICA SMITH SENIOR HVAC 08/18/2017

SYSTEMS CONTRACTING, INC 166.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7079 VERONICA SMITH SENIOR Electrician 09/02/2017

1,497.0 292.5 19.54% 928.5 62.02% 0.0 0.00%SUB TOTALS:

7081 BOSTON FIRE DEPARTMENT EN

$3,417,000Amount:

Gen Contractor: WCI CORP

617-524-9300 555 AMORY STREET, P O BOX 300187 BOSTON

Est Start Date:

Est End Date:

07/03/2017

06/30/2018

LYNNWELL ASSOCIATES INC 16.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7081 BOSTON FIRE DEPARTME Electrician 08/27/2017

16.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SUB TOTALS:

7082-A CURLEY & ELLIS ELEMENTAR

$7,779,859Amount:

Gen Contractor: G.V.W. INC.

(617)567-6000 1200 BENNINGTON STREET EAST BOSTON

Est Start Date:

Est End Date:

06/01/2017

03/31/2018

FOLAN WATERPROOF CO. 463.5 0.0 0.00% 0.0 0.00% 0.0 0.00%7082-A CURLEY & ELLIS ELEME Laborer 09/09/2017

V & G IRON WORKS INC. 29.0 16.5 56.90% 0.0 0.00% 0.0 0.00%7082-A CURLEY & ELLIS ELEME Laborer 07/21/2017

V & G IRON WORKS INC. 43.5 0.0 0.00% 4.0 9.20% 0.0 0.00%7082-A CURLEY & ELLIS ELEME Iron Worker 07/21/2017

KARMA ENVIRONMENTAL 2,104.0 0.0 0.00% 2,104.0 100.00% 0.0 0.00%7082-A CURLEY & ELLIS ELEME Asbestos Worker 08/26/2017

G.V.W. INC. 1,294.0 686.0 53.01% 1,023.0 79.06% 0.0 0.00%7082-A CURLEY & ELLIS ELEME Waterproofer 09/09/2017

G.V.W. INC. 149.0 149.0 100.00% 0.0 0.00% 0.0 0.00%7082-A CURLEY & ELLIS ELEME Painter 09/09/2017

G.V.W. INC. 1,670.8 1,300.3 77.82% 1,008.5 60.36% 0.0 0.00%7082-A CURLEY & ELLIS ELEME Laborer 09/09/2017

FOLAN WATERPROOF CO. 1,162.0 236.0 20.31% 213.5 18.37% 121.5 10.46%7082-A CURLEY & ELLIS ELEME Waterproofer 09/09/2017

ENTERPRISE EQUIPT CO,INC. 31.0 9.5 30.65% 0.0 0.00% 0.0 0.00%7082-A CURLEY & ELLIS ELEME Sheetmetal Work 09/09/2017

ENTERPRISE EQUIPT CO,INC. 8.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7082-A CURLEY & ELLIS ELEME Plumber 09/02/2017

ENTERPRISE EQUIPT CO,INC. 11.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7082-A CURLEY & ELLIS ELEME Pipefitter 09/02/2017

DUCTS, INC. 12.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7082-A CURLEY & ELLIS ELEME Sheetmetal Work 09/17/2017

CDS CONTRACTING SERVICE 412.0 302.0 73.30% 302.0 73.30% 0.0 0.00%7082-A CURLEY & ELLIS ELEME Electrician 08/19/2017

G.V.W. INC. 13,172.0 3,418.5 25.95% 4,910.0 37.28% 450.5 3.42%7082-A CURLEY & ELLIS ELEME Carpenter 09/09/2017

20,561.8 6,117.8 29.75% 9,565.0 46.52% 572.0 2.78%SUB TOTALS:

7082-B SUMNER & TECH BOSTON SC

$6,443,000Amount:

Gen Contractor: LAMBRIAN CONSTRUCTION

(617)469-5223 341 BELGRADE AVE ROSLINDALE

Est Start Date:

Est End Date:

06/01/2017

06/30/2018

Page 83: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 83

Project Name Trade Latest Week

LAMBRIAN CONSTRUCTION 5,962.0 496.0 8.32% 579.0 9.71% 16.0 0.27%7082-B SUMNER & TECH BOSTO Carpenter 09/16/2017

NG ENVIRONMENTAL CO. 1,512.0 306.0 20.24% 1,512.0 100.00% 32.0 2.12%7082-B SUMNER & TECH BOSTO Asbestos Worker 08/26/2017

P.J. SPILLANE COMPANY 682.0 32.5 4.77% 429.5 62.98% 0.0 0.00%7082-B SUMNER & TECH BOSTO Laborer 09/16/2017

NG ENVIRONMENTAL CO. 16.0 16.0 100.00% 16.0 100.00% 0.0 0.00%7082-B SUMNER & TECH BOSTO Laborer 08/12/2017

SYSTEMS CONTRACTING, INC 160.5 0.0 0.00% 160.5 100.00% 0.0 0.00%7082-B SUMNER & TECH BOSTO Electrician 09/16/2017

LAMBRIAN CONSTRUCTION 3,306.5 2,576.5 77.92% 2,593.5 78.44% 569.0 17.21%7082-B SUMNER & TECH BOSTO Laborer 09/16/2017

ENTERPRISE EQUIPT CO,INC. 2.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7082-B SUMNER & TECH BOSTO Pipefitter 09/02/2017

ENTERPRISE EQUIPT CO,INC. 13.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7082-B SUMNER & TECH BOSTO Laborer 07/08/2017

DUCTS, INC. 36.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7082-B SUMNER & TECH BOSTO Sheetmetal Work 09/10/2017

DANDIS CONTRACTING 88.0 88.0 100.00% 0.0 0.00% 0.0 0.00%7082-B SUMNER & TECH BOSTO Painter 08/25/2017

CHAPMAN WATERPROOFING 585.0 193.0 32.99% 227.0 38.80% 0.0 0.00%7082-B SUMNER & TECH BOSTO Waterproofer 09/18/2017

P.J. SPILLANE COMPANY 2,996.0 818.5 27.32% 881.5 29.42% 0.0 0.00%7082-B SUMNER & TECH BOSTO Bricklayer 09/16/2017

ENTERPRISE EQUIPT CO,INC. 19.0 17.0 89.47% 0.0 0.00% 0.0 0.00%7082-B SUMNER & TECH BOSTO Sheetmetal Work 09/02/2017

15,378.0 4,543.5 29.55% 6,399.0 41.61% 617.0 4.01%SUB TOTALS:

7082-C DONAL MCKAY & COMMUNITY

$5,378,625Amount:

Gen Contractor: PAUL J. ROGAN CO., INC.

(781)843-1900 25 HAYWARD STREET BRAINTREE

Est Start Date:

Est End Date:

06/01/2017

06/30/2018

L & L CONTRACTING 314.5 0.0 0.00% 0.0 0.00% 0.0 0.00%7082-C DONAL MCKAY & COMM Plasterer 08/25/2017

SYSTEMS CONTRACTING, INC 108.0 0.0 0.00% 53.0 49.07% 0.0 0.00%7082-C DONAL MCKAY & COMM Electrician 09/02/2017

PAUL J. ROGAN CO., INC. 170.5 0.0 0.00% 0.0 0.00% 0.0 0.00%7082-C DONAL MCKAY & COMM Laborer 09/09/2017

PAUL J. ROGAN CO., INC. 155.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7082-C DONAL MCKAY & COMM Carpenter 09/02/2017

MODERN GLASS & ALUMINUM 56.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7082-C DONAL MCKAY & COMM Iron Worker 09/02/2017

L & L CONTRACTING 172.5 0.0 0.00% 172.5 100.00% 0.0 0.00%7082-C DONAL MCKAY & COMM Taper 08/25/2017

L & L CONTRACTING 1,004.5 0.0 0.00% 907.5 90.34% 0.0 0.00%7082-C DONAL MCKAY & COMM Laborer 08/25/2017

HOMER CONTRACTING INC 436.0 120.0 27.52% 122.0 27.98% 0.0 0.00%7082-C DONAL MCKAY & COMM Painter 09/16/2017

ENTERPRISE EQUIPT CO,INC. 3.0 1.5 50.00% 0.0 0.00% 0.0 0.00%7082-C DONAL MCKAY & COMM Sheetmetal Work 07/01/2017

ENTERPRISE EQUIPT CO,INC. 2.0 1.0 50.00% 1.0 50.00% 0.0 0.00%7082-C DONAL MCKAY & COMM Pipefitter 07/29/2017

DUCTS, INC. 8.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7082-C DONAL MCKAY & COMM Sheetmetal Work 09/17/2017

CHAPMAN WATERPROOFING 538.0 538.0 100.00% 184.0 34.20% 0.0 0.00%7082-C DONAL MCKAY & COMM Waterproofer 09/18/2017

BIG SHIP DEMOLITION 2,040.5 0.0 0.00% 1,970.5 96.57% 204.0 10.00%7082-C DONAL MCKAY & COMM Asbestos Worker 08/05/2017

ACME WATERPROOFING CO,I 300.0 58.0 19.33% 56.0 18.67% 0.0 0.00%7082-C DONAL MCKAY & COMM Bricklayer 09/02/2017

L & L CONTRACTING 2,736.5 837.5 30.60% 318.5 11.64% 0.0 0.00%7082-C DONAL MCKAY & COMM Carpenter 08/25/2017

MODERN GLASS & ALUMINUM 3,346.0 379.0 11.33% 466.0 13.93% 149.0 4.45%7082-C DONAL MCKAY & COMM Glazier 09/02/2017

11,391.0 1,935.0 16.99% 4,251.0 37.32% 353.0 3.10%SUB TOTALS:

Page 84: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 84

Project Name Trade Latest Week

7082-D YOUNG ACHIEVERS SCHOOL

$4,597,000Amount:

Gen Contractor: LOCKHEED ALUMINUM WINDOW

(401)568-3061 ROUTE 100, P.O.BOX 166 PASCOAG

Est Start Date:

Est End Date:

06/01/2017

06/30/2018

DUCTS, INC. 32.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7082-D YOUNG ACHIEVERS SCH Sheetmetal Work 09/03/2017

LOCKHEED ALUMINUM WINDO 1,086.0 1,029.0 94.75% 1,029.0 94.75% 323.0 29.74%7082-D YOUNG ACHIEVERS SCH Laborer 09/16/2017

LOCKHEED ALUMINUM WINDO 7,085.0 0.0 0.00% 2,832.5 39.98% 0.0 0.00%7082-D YOUNG ACHIEVERS SCH Carpenter 09/16/2017

ENTERPRISE EQUIPT CO,INC. 25.0 19.0 76.00% 0.0 0.00% 0.0 0.00%7082-D YOUNG ACHIEVERS SCH Sheetmetal Work 09/09/2017

ENTERPRISE EQUIPT CO,INC. 13.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7082-D YOUNG ACHIEVERS SCH Laborer 07/01/2017

ENTERPRISE EQUIPT CO,INC. 105.0 37.0 35.24% 37.0 35.24% 0.0 0.00%7082-D YOUNG ACHIEVERS SCH Pipefitter 09/09/2017

8,346.0 1,085.0 13.00% 3,898.5 46.71% 323.0 3.87%SUB TOTALS:

7088 BOSTON CITY HALL EXTERIOR L

$1,140,000Amount:

Gen Contractor: SULLIVAN & MCLAUGHLIN CO.

(617)474-0500 74 LAWLEY STREET BOSTON

Est Start Date:

Est End Date:

06/01/2016

03/31/2017

SULLIVAN & MCLAUGHLIN CO. 96.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7088 BOSTON CITY HALL EXTER Bricklayer 10/23/2016

SULLIVAN & MCLAUGHLIN CO. 2,896.0 1,502.0 51.86% 846.0 29.21% 0.0 0.00%7088 BOSTON CITY HALL EXTER Electrician 11/06/2016

SULLIVAN & MCLAUGHLIN CO. 96.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7088 BOSTON CITY HALL EXTER Laborer 10/23/2016

3,088.0 1,502.0 48.64% 846.0 27.40% 0.0 0.00%SUB TOTALS:

7089 BCH - 1ST FLOOR WOMEN'S RO

$100Amount:

Gen Contractor: RELIABLE ROOFING SHEETMETAL, LLC.

(508)628-5562 105 IRVING STREET FRAMINGHAM

Est Start Date:

Est End Date:

07/03/2017

06/30/2018

RELIABLE ROOFING SHEETME 204.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7089 BCH - 1ST FLOOR WOMEN' Laborer 09/17/2017

LYNNWELL ASSOCIATES INC 46.0 14.0 30.43% 14.0 30.43% 0.0 0.00%7089 BCH - 1ST FLOOR WOMEN' Electrician 08/20/2017

RELIABLE ROOFING SHEETME 60.0 0.0 0.00% 60.0 100.00% 0.0 0.00%7089 BCH - 1ST FLOOR WOMEN' Asbestos Worker 07/02/2017

RELIABLE ROOFING SHEETME 231.0 231.0 100.00% 0.0 0.00% 0.0 0.00%7089 BCH - 1ST FLOOR WOMEN' Carpenter 09/17/2017

541.0 245.0 45.29% 74.0 13.68% 0.0 0.00%SUB TOTALS:

7094 MADISON PK HIGH SCH RENOVA

$1,310,100Amount:

Gen Contractor: NORTHERN CONTRACTING CORP

(781)821-4200 68 JACKSON STREET P.O. BOX 96 CANTON

Est Start Date:

Est End Date:

08/15/2016

02/28/2017

ENTERPRISE EQUIPT CO,INC. 10.0 5.0 50.00% 0.0 0.00% 0.0 0.00%7094 MADISON PK HIGH SCH RE Plumber 10/22/2016

ROBERT W. IRVINE SONS. 31.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7094 MADISON PK HIGH SCH RE Plumber 11/04/2016

RICHARD T LOSORDO ELE. 844.0 72.0 8.53% 48.0 5.69% 0.0 0.00%7094 MADISON PK HIGH SCH RE Electrician 12/31/2016

NORTHERN CONTRACTING CO 422.0 104.0 24.64% 110.0 26.07% 0.0 0.00%7094 MADISON PK HIGH SCH RE Laborer 01/21/2017

NORTHERN CONTRACTING CO 123.0 86.0 69.92% 123.0 100.00% 0.0 0.00%7094 MADISON PK HIGH SCH RE Carpenter 12/31/2016

LYNNWELL ASSOCIATES INC 64.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7094 MADISON PK HIGH SCH RE Electrician 06/11/2017

JACKSON GLASS 16.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7094 MADISON PK HIGH SCH RE Glazier 11/05/2016

SKINNER DEMOLITION 159.0 0.0 0.00% 159.0 100.00% 0.0 0.00%7094 MADISON PK HIGH SCH RE Wrecker 08/20/2016

ENTERPRISE EQUIPT CO,INC. 129.0 28.0 21.71% 28.0 21.71% 0.0 0.00%7094 MADISON PK HIGH SCH RE Pipefitter 12/17/2016

Page 85: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 85

Project Name Trade Latest Week

DUCTS, INC. 340.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7094 MADISON PK HIGH SCH RE Sheetmetal Work 12/04/2016

DEPENDABLE MASONRY 168.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7094 MADISON PK HIGH SCH RE Mason Tender 09/10/2016

DEPENDABLE MASONRY 168.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7094 MADISON PK HIGH SCH RE Bricklayer 09/10/2016

DANDIS CONTRACTING 515.0 112.0 21.75% 14.0 2.72% 0.0 0.00%7094 MADISON PK HIGH SCH RE Painter 12/16/2016

CARLYSLE ENGINEERING INC. 17.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7094 MADISON PK HIGH SCH RE Sprinkler Fitter 10/14/2016

AMERICAN TEST & BALANCE 7.5 0.0 0.00% 0.0 0.00% 0.0 0.00%7094 MADISON PK HIGH SCH RE Sheetmetal Work 11/26/2016

LARKIN IRON WORKS INC. 24.0 0.0 0.00% 11.0 45.83% 0.0 0.00%7094 MADISON PK HIGH SCH RE Iron Worker 10/21/2016

3,037.5 407.0 13.40% 493.0 16.23% 0.0 0.00%SUB TOTALS:

7097 BOSTON CITY HALL LOBBY UPG

$947,100Amount:

Gen Contractor: NORTHERN CONTRACTING CORP

(781)821-4200 68 JACKSON STREET P.O. BOX 96 CANTON

Est Start Date:

Est End Date:

12/14/2016

04/30/2017

P.J. DIONNE CO INC. 116.0 0.0 0.00% 66.0 56.90% 0.0 0.00%7097 BOSTON CITY HALL LOBBY Plumber 06/17/2017

YOUR ELECTRICAL SOLUTION. 1,292.8 269.0 20.81% 0.0 0.00% 0.0 0.00%7097 BOSTON CITY HALL LOBBY Electrician 07/30/2017

NORTHERN CONTRACTING CO 156.0 0.0 0.00% 156.0 100.00% 0.0 0.00%7097 BOSTON CITY HALL LOBBY Carpenter 04/29/2017

BLUEBIRD GRAPHIC SOLUTIO 19.0 3.5 18.42% 1.5 7.89% 0.0 0.00%7097 BOSTON CITY HALL LOBBY Laborer 05/07/2017

NORTHERN CONTRACTING CO 94.5 86.5 91.53% 0.0 0.00% 0.0 0.00%7097 BOSTON CITY HALL LOBBY Laborer 04/22/2017

1,678.3 359.0 21.39% 223.5 13.32% 0.0 0.00%SUB TOTALS:

7100 PWD SALT STORAGE SHED REP

$147,000Amount:

Gen Contractor: WCI CORP

617-524-9300 555 AMORY STREET, P O BOX 300187 BOSTON

Est Start Date:

Est End Date:

10/03/2016

11/30/2016

WCI CORP 250.0 0.0 0.00% 80.0 32.00% 0.0 0.00%7100 PWD SALT STORAGE SHE Carpenter 11/15/2016

WCI CORP 275.0 1.0 0.36% 275.0 100.00% 0.0 0.00%7100 PWD SALT STORAGE SHE Laborer 11/15/2016

525.0 1.0 0.19% 355.0 67.62% 0.0 0.00%SUB TOTALS:

7102 EMERGENCY BOILER REPLACE

$758,000Amount:

Gen Contractor: PATRICK J. KENNEDY & SONS, INC.

(617)265-5535 39 GIBSON STREET DORCHESTER

Est Start Date:

Est End Date:

10/01/2016

12/31/2016

PATRICK J. KENNEDY & SONS, 989.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7102 EMERGENCY BOILER REP Pipefitter 01/14/2017

PATRICK J. KENNEDY & SONS, 131.0 48.0 36.64% 0.0 0.00% 0.0 0.00%7102 EMERGENCY BOILER REP Plumber 11/26/2016

LARKIN HATHAWAY INC. 232.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7102 EMERGENCY BOILER REP Sheetmetal Work 11/12/2016

CDS CONTRACTING SERVICE 362.0 184.0 50.83% 184.0 50.83% 0.0 0.00%7102 EMERGENCY BOILER REP Electrician 12/10/2016

1,714.0 232.0 13.54% 184.0 10.74% 0.0 0.00%SUB TOTALS:

7105 TOBIN COMMUNITY CENTER SIT

$652,000Amount:

Gen Contractor: NELM CORPORATION

781/421-3380 135 INDUSTRIAL WAY ROCKLAND

Est Start Date:

Est End Date:

06/26/2017

12/31/2017

NELM CORPORATION 858.0 288.0 33.57% 392.0 45.69% 0.0 0.00%7105 TOBIN COMMUNITY CENTE Laborer 09/09/2017

858.0 288.0 33.57% 392.0 45.69% 0.0 0.00%SUB TOTALS:

Page 86: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 86

Project Name Trade Latest Week

7114 MSBA ARP BOILER REPLACEME

$3,914,000Amount:

Gen Contractor: N.B. KENNEY CO. INC.,

(978)849-5200 68 BARNUM ROAD DEVENS

Est Start Date:

Est End Date:

07/03/2017

12/31/2017

N.B. KENNEY CO. INC., 1,239.0 16.0 1.29% 48.0 3.87% 0.0 0.00%7114 MSBA ARP BOILER REPLA Pipefitter 09/17/2017

N.B. KENNEY CO. INC., 477.0 96.0 20.13% 8.0 1.68% 0.0 0.00%7114 MSBA ARP BOILER REPLA Plumber 09/17/2017

1,716.0 112.0 6.53% 56.0 3.26% 0.0 0.00%SUB TOTALS:

7114-A MSBA ARP ROOF REPLACEME

$3,227,000Amount:

Gen Contractor: GIBSON ROOFS

781-826-6344 369 WINTER ST HANOVER

Est Start Date:

Est End Date:

06/26/2017

10/01/2017

GIBSON ROOFS 151.0 151.0 100.00% 151.0 100.00% 151.0 100.00%7114-A MSBA ARP ROOF REPLA Laborer 08/16/2017

CAM HVAC & CONS. INC. 0.8 0.0 0.00% 0.0 0.00% 0.0 0.00%7114-A MSBA ARP ROOF REPLA Sheetmetal Work 08/19/2017

PATRICK J. KENNEDY & SONS, 296.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7114-A MSBA ARP ROOF REPLA Plumber 08/12/2017

GIBSON ROOFS 159.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7114-A MSBA ARP ROOF REPLA Sheetmetal Work 09/13/2017

GIBSON ROOFS 7,242.5 135.5 1.87% 2,860.5 39.50% 0.0 0.00%7114-A MSBA ARP ROOF REPLA Roofer 09/13/2017

CHAPMAN WATERPROOFING 624.0 48.0 7.69% 310.0 49.68% 0.0 0.00%7114-A MSBA ARP ROOF REPLA Waterproofer 08/21/2017

CHAPMAN WATERPROOFING 681.0 512.0 75.18% 104.0 15.27% 0.0 0.00%7114-A MSBA ARP ROOF REPLA Laborer 08/21/2017

CDS CONTRACTING SERVICE 42.0 26.0 61.90% 26.0 61.90% 0.0 0.00%7114-A MSBA ARP ROOF REPLA Electrician 08/12/2017

GIBSON ROOFS 168.5 0.0 0.00% 0.0 0.00% 0.0 0.00%7114-A MSBA ARP ROOF REPLA Equipment Opera 07/12/2017

9,364.8 872.5 9.32% 3,451.5 36.86% 151.0 1.61%SUB TOTALS:

7115 ELECTRICAL MODIFICATION TO

$159,000Amount:

Gen Contractor: SYSTEMS CONTRACTING, INC

508-746-7000 7 SCOBEE CIRCLE PLYMOUTH

Est Start Date:

Est End Date:

05/01/2017

10/30/2017

SYSTEMS CONTRACTING, INC 366.0 0.0 0.00% 271.0 74.04% 0.0 0.00%7115 ELECTRICAL MODIFICATIO Electrician 08/12/2017

366.0 0.0 0.00% 271.0 74.04% 0.0 0.00%SUB TOTALS:

7116 BOSTON CITY HALL-COUNCIL C

$1,094,000Amount:

Gen Contractor: N.B. KENNEY CO. INC.,

(978)849-5200 68 BARNUM ROAD DEVENS

Est Start Date:

Est End Date:

07/03/2017

02/28/2018

LYNNWELL ASSOCIATES INC 516.0 256.0 49.61% 446.0 86.43% 0.0 0.00%7116 BOSTON CITY HALL-COUN Electrician 09/10/2017

RELIABLE ROOFING SHEETME 242.0 242.0 100.00% 0.0 0.00% 0.0 0.00%7116 BOSTON CITY HALL-COUN Carpenter 09/17/2017

RELIABLE ROOFING SHEETME 240.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7116 BOSTON CITY HALL-COUN Laborer 09/17/2017

RELIABLE ROOFING SHEETME 42.0 0.0 0.00% 0.0 0.00% 0.0 0.00%7116 BOSTON CITY HALL-COUN Roofer 09/03/2017

1,040.0 498.0 47.88% 446.0 42.88% 0.0 0.00%SUB TOTALS:

71-79 INTERVALE STREET

$129,000Amount:

Gen Contractor: FLEMING BROS INC.

(781)843-4071 106 COLUMBIA STREET QUINCY

Est Start Date:

Est End Date:

05/01/2015

07/31/2015

FLEMING BROS INC. 136.0 0.0 0.00% 0.0 0.00% 0.0 0.00%71-79 INTERVALE STREET Equipment Opera 11/20/2015

FLEMING BROS INC. 136.0 120.0 88.24% 112.0 82.35% 96.0 70.59%71-79 INTERVALE STREET Laborer 11/20/2015

FLEMING BROS INC. 120.0 0.0 0.00% 0.0 0.00% 0.0 0.00%71-79 INTERVALE STREET Lather 10/16/2015

Page 87: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 87

Project Name Trade Latest Week

392.0 120.0 30.61% 112.0 28.57% 96.0 24.49%SUB TOTALS:

7311-97 CAPITAL ROADWAY

$3,692,233Amount:

Gen Contractor:

Est Start Date:

Est End Date:

10/29/1996

11/30/1997

HAROLD BROTHERS MECHANI 46.0 32.0 69.57% 32.0 69.57% 0.0 0.00%7311-97 CAPITAL ROADWAY HVAC 01/30/2016

46.0 32.0 69.57% 32.0 69.57% 0.0 0.00%SUB TOTALS:

75 AMORY AVE. RESIDENCE

$9,902,850Amount:

Gen Contractor: N E I CONTRACTORS

(781)348-5099 27 PACELLA PARK DRIVE RANDOLPH

Est Start Date:

Est End Date:

08/01/2015

12/01/2016

AWL SPECIAL PROJECTS LLC 2,310.0 0.0 0.00% 2,310.0 100.00% 0.0 0.00%75 AMORY AVE. RESIDENCE Carpenter 10/22/2016

YOUNG ELECTRICAL SERVICE 4,705.5 560.5 11.91% 911.5 19.37% 0.0 0.00%75 AMORY AVE. RESIDENCE Electrician 10/23/2016

KONE ELEVATOR INC. 459.0 171.0 37.25% 0.0 0.00% 20.0 4.36%75 AMORY AVE. RESIDENCE Elevator Const(M 10/26/2016

INSITUFORM TECHNOLOGIES, 60.0 0.0 0.00% 0.0 0.00% 0.0 0.00%75 AMORY AVE. RESIDENCE Technician 10/10/2015

MONAHAN TECHNOLOGIES IN 30.0 0.0 0.00% 12.0 40.00% 0.0 0.00%75 AMORY AVE. RESIDENCE Laborer 10/21/2016

MONAHAN TECHNOLOGIES IN 836.5 371.0 44.35% 379.0 45.31% 0.0 0.00%75 AMORY AVE. RESIDENCE Pipefitter 10/21/2016

MONAHAN TECHNOLOGIES IN 166.5 0.0 0.00% 0.0 0.00% 0.0 0.00%75 AMORY AVE. RESIDENCE Sheetmetal Work 06/17/2016

N E I CONTRACTORS 417.0 417.0 100.00% 417.0 100.00% 32.0 7.67%75 AMORY AVE. RESIDENCE Laborer 08/20/2016

PAINT & COATING 327.0 200.0 61.16% 327.0 100.00% 0.0 0.00%75 AMORY AVE. RESIDENCE Painter 10/15/2016

PAVILION FLOORS, INC. 304.0 24.0 7.89% 156.0 51.32% 0.0 0.00%75 AMORY AVE. RESIDENCE Carpet Layer 12/03/2016

PAVILION FLOORS, INC. 227.0 0.0 0.00% 187.0 82.38% 0.0 0.00%75 AMORY AVE. RESIDENCE Terrazzo Worker 12/03/2016

ROCKWELL ROOFING, INC. 654.0 0.0 0.00% 113.0 17.28% 0.0 0.00%75 AMORY AVE. RESIDENCE Roofer 10/08/2016

ROCKWELL ROOFING, INC. 13.0 0.0 0.00% 0.0 0.00% 0.0 0.00%75 AMORY AVE. RESIDENCE Sheetmetal Work 10/01/2016

TARA CONSTRUCTION 425.5 421.5 99.06% 425.5 100.00% 0.0 0.00%75 AMORY AVE. RESIDENCE Laborer 12/03/2016

INSITUFORM TECHNOLOGIES, 60.0 0.0 0.00% 0.0 0.00% 0.0 0.00%75 AMORY AVE. RESIDENCE Laborer 10/10/2015

TARA CONSTRUCTION 6,208.2 2,356.5 37.96% 2,681.5 43.19% 451.0 7.26%75 AMORY AVE. RESIDENCE Carpenter 12/03/2016

ATLANTIC CONSTRUCTION SE 407.0 14.0 3.44% 169.0 41.52% 0.0 0.00%75 AMORY AVE. RESIDENCE Sheetmetal Work 10/01/2016

AWL SPECIAL PROJECTS LLC 1,039.5 0.0 0.00% 1,039.5 100.00% 1,007.5 96.92%75 AMORY AVE. RESIDENCE Taper 12/03/2016

ANTHONY C. SCOLARO & SON 452.0 0.0 0.00% 266.0 58.85% 0.0 0.00%75 AMORY AVE. RESIDENCE Bricklayer 08/06/2016

ANTHONY C. SCOLARO & SON 48.0 0.0 0.00% 48.0 100.00% 0.0 0.00%75 AMORY AVE. RESIDENCE Equipment Opera 01/30/2016

HAYWARD BAKER INC. 39.0 0.0 0.00% 39.0 100.00% 0.0 0.00%75 AMORY AVE. RESIDENCE Laborer 12/20/2015

ATLANTIC CONSTRUCTION SE 261.0 261.0 100.00% 261.0 100.00% 0.0 0.00%75 AMORY AVE. RESIDENCE Laborer 10/01/2016

ANCHOR INSULATION 234.2 0.0 0.00% 153.9 65.73% 0.0 0.00%75 AMORY AVE. RESIDENCE Insulator 07/23/2016

AWL SPECIAL PROJECTS LLC 2,558.0 2,001.0 78.23% 2,558.0 100.00% 113.0 4.42%75 AMORY AVE. RESIDENCE Laborer 12/03/2016

CARL-LOUIS & CO INC. 18.0 8.0 44.44% 2.0 11.11% 0.0 0.00%75 AMORY AVE. RESIDENCE HVAC 09/03/2016

CARL-LOUIS & CO INC. 1,744.0 532.0 30.50% 648.0 37.16% 0.0 0.00%75 AMORY AVE. RESIDENCE Plumber 10/22/2016

DIAZ CONSTRUCTION CO. INC. 200.0 0.0 0.00% 0.0 0.00% 0.0 0.00%75 AMORY AVE. RESIDENCE Carpenter 01/16/2016

Page 88: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 88

Project Name Trade Latest Week

DIAZ CONSTRUCTION CO. INC. 118.0 0.0 0.00% 0.0 0.00% 0.0 0.00%75 AMORY AVE. RESIDENCE Cement Laborer 01/16/2016

DIAZ CONSTRUCTION CO. INC. 1,418.3 492.5 34.73% 492.5 34.73% 0.0 0.00%75 AMORY AVE. RESIDENCE Equipment Opera 06/18/2016

DIAZ CONSTRUCTION CO. INC. 1,670.3 1,034.0 61.91% 1,347.3 80.66% 0.0 0.00%75 AMORY AVE. RESIDENCE Laborer 06/18/2016

HAYWARD BAKER INC. 200.0 0.0 0.00% 39.0 19.50% 0.0 0.00%75 AMORY AVE. RESIDENCE Equipment Opera 12/27/2015

ANTHONY C. SCOLARO & SON 501.5 65.0 12.96% 424.5 84.65% 0.0 0.00%75 AMORY AVE. RESIDENCE Laborer 08/06/2016

28,111.9 8,929.0 31.76% 15,407.2 54.81% 1,623.5 5.78%SUB TOTALS:

80-82 FENWOOD

$4,600,000Amount:

Gen Contractor: CONSIGLI CONSTRUCTION

197 MAIN STREET MILFORD

Est Start Date:

Est End Date:

01/01/2015

06/30/2016

PRIME STEEL ERECTING INC, 12,161.0 6,966.0 57.28% 1,856.0 15.26% 636.0 5.23%80-82 FENWOOD Iron Worker 12/19/2015

PRIME STEEL ERECTING INC, 256.0 0.0 0.00% 0.0 0.00% 0.0 0.00%80-82 FENWOOD Bricklayer 12/12/2015

OTIS ELEVATOR COMPANY 1,027.8 0.0 0.00% 62.0 6.03% 330.5 32.16%80-82 FENWOOD Elevator Const(M 08/18/2016

OTIS ELEVATOR COMPANY 437.3 32.0 7.32% 0.0 0.00% 32.0 7.32%80-82 FENWOOD Elev Const Helper 08/18/2016

NORTH EAST FOAM SOLUTION 232.0 80.0 34.48% 88.0 37.93% 0.0 0.00%80-82 FENWOOD Laborer 05/07/2016

NORTH EAST FOAM SOLUTION 866.0 170.0 19.63% 160.0 18.48% 0.0 0.00%80-82 FENWOOD Carpenter 05/07/2016

MARMELO BROS. CONS, CO. 507.0 0.0 0.00% 188.0 37.08% 55.0 10.85%80-82 FENWOOD Mason Tender 09/03/2016

MARMELO BROS. CONS, CO. 28.0 0.0 0.00% 0.0 0.00% 0.0 0.00%80-82 FENWOOD Equipment Opera 06/25/2016

MARMELO BROS. CONS, CO. 533.0 74.5 13.98% 74.5 13.98% 66.5 12.48%80-82 FENWOOD Bricklayer 09/03/2016

M.L. MCDONALD SALES 7,826.0 4,363.0 55.75% 5,909.0 75.50% 1,059.5 13.54%80-82 FENWOOD Painter 09/17/2016

LYNNWELL ASSOCIATES INC 3,518.0 718.0 20.41% 742.0 21.09% 200.0 5.69%80-82 FENWOOD Technician 09/10/2016

RICMOR CONSTRUCTION INC. 1,468.0 294.0 20.03% 398.0 27.11% 160.0 10.90%80-82 FENWOOD Laborer 03/12/2016

LUND REBAR SERVICES, INC. 1,268.0 564.0 44.48% 445.0 35.09% 8.0 0.63%80-82 FENWOOD Iron Worker 05/07/2016

T. J. MCCARTNEY, INC. 28,397.0 9,165.0 32.27% 8,380.5 29.51% 1,090.0 3.84%80-82 FENWOOD Carpenter 08/27/2016

K & K ACOUSTICAL CEILINGS 443.0 4.0 0.90% 4.0 0.90% 176.0 39.73%80-82 FENWOOD Carpenter 09/03/2016

LYNNWELL ASSOCIATES INC 20,904.0 10,308.0 49.31% 4,048.0 19.36% 1,809.0 8.65%80-82 FENWOOD Electrician 09/17/2016

T. J. MCCARTNEY, INC. 6,916.5 4,793.0 69.30% 2,132.0 30.82% 0.0 0.00%80-82 FENWOOD Laborer 07/16/2016

JEREZ LLC 1,535.0 815.5 53.13% 1,535.0 100.00% 459.5 29.93%80-82 FENWOOD Laborer 09/17/2016

AXION SPECIALTY CONTRACTI 818.0 48.0 5.87% 0.0 0.00% 392.0 47.92%80-82 FENWOOD Insulator 09/10/2016

W. L. FRENCH EXCAVATING 3,598.5 625.5 17.38% 73.0 2.03% 65.0 1.81%80-82 FENWOOD Laborer 09/03/2016

WILLCO SALES SERVICE INC. 48.0 24.0 50.00% 24.0 50.00% 0.0 0.00%80-82 FENWOOD Sheetmetal Work 11/14/2015

W. L. FRENCH EXCAVATING 2,680.5 72.0 2.69% 229.5 8.56% 0.0 0.00%80-82 FENWOOD Equipment Opera 09/03/2016

SILVERBACKCONCRETE CON 1,012.5 0.0 0.00% 114.5 11.31% 114.5 11.31%80-82 FENWOOD Cement Laborer 08/13/2016

T. J. MCCARTNEY, INC. 9,480.0 1,510.0 15.93% 3,379.0 35.64% 928.0 9.79%80-82 FENWOOD Taper 09/03/2016

RICMOR CONSTRUCTION INC. 395.0 0.0 0.00% 120.0 30.38% 0.0 0.00%80-82 FENWOOD Plasterer 03/12/2016

STEELCO FENCING 496.0 176.0 35.48% 344.0 69.35% 112.0 22.58%80-82 FENWOOD Laborer 09/03/2016

Page 89: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 89

Project Name Trade Latest Week

SILVERBACKCONCRETE CON 950.0 165.5 17.42% 156.0 16.42% 0.0 0.00%80-82 FENWOOD Cement Finisher 08/13/2016

SHILOH STEEL ERECTORS, IN 2,643.0 987.0 37.34% 672.0 25.43% 0.0 0.00%80-82 FENWOOD Iron Worker 08/27/2016

RIGGS CONTRACTING, INC. 248.0 0.0 0.00% 0.0 0.00% 0.0 0.00%80-82 FENWOOD Mason 06/18/2016

RIGGS CONTRACTING, INC. 12,381.0 709.0 5.73% 1,897.5 15.33% 1,484.5 11.99%80-82 FENWOOD Laborer 09/17/2016

RIGGS CONTRACTING, INC. 26,065.5 10,737.0 41.19% 6,067.5 23.28% 2,037.5 7.82%80-82 FENWOOD Carpenter 09/17/2016

URBAN INSULATION 1,319.5 116.0 8.79% 839.5 63.62% 48.0 3.64%80-82 FENWOOD Insulator 07/16/2016

BOWLINE CO. 238.0 160.0 67.23% 152.0 63.87% 0.0 0.00%80-82 FENWOOD Laborer 07/16/2016

FRANNY'S LANDSCAPE CO,IN 196.0 0.0 0.00% 96.0 48.98% 0.0 0.00%80-82 FENWOOD Laborer 08/13/2016

EIRE ELECTRICAL CORPORATI 720.0 0.0 0.00% 0.0 0.00% 0.0 0.00%80-82 FENWOOD Electrician 07/23/2016

CRF INC. INTERIOR SYSTEM 56.0 0.0 0.00% 0.0 0.00% 0.0 0.00%80-82 FENWOOD Carpenter 06/18/2016

COMPOSITE COMPANY INC. 200.0 34.0 17.00% 172.0 86.00% 0.0 0.00%80-82 FENWOOD Iron Worker 10/31/2015

BUSINESS INTERIORS FCOVE 3,330.0 159.0 4.77% 159.0 4.77% 0.0 0.00%80-82 FENWOOD Marble Tile Work 09/10/2016

G & C CONCRETE CO. 1,539.0 325.5 21.15% 129.0 8.38% 0.0 0.00%80-82 FENWOOD Carpenter 10/24/2015

BUSINESS INTERIORS FCOVE 4,520.0 698.0 15.44% 2,833.0 62.68% 0.0 0.00%80-82 FENWOOD Carpet Layer 09/03/2016

BRIGHT WINDOW CO. 401.0 24.0 5.99% 24.0 5.99% 32.0 7.98%80-82 FENWOOD Carpenter 08/13/2016

BOWLINE CO. 2,036.0 0.0 0.00% 0.0 0.00% 36.0 1.77%80-82 FENWOOD Equipment Opera 07/30/2016

BOWLINE CO. 43.5 0.0 0.00% 0.0 0.00% 0.0 0.00%80-82 FENWOOD Elevator Const(M 02/06/2016

BOWLINE CO. 281.0 16.0 5.69% 41.0 14.59% 0.0 0.00%80-82 FENWOOD Carpenter 07/16/2016

BEACON WATERPROOFING A 2,625.5 774.0 29.48% 1,026.0 39.08% 0.0 0.00%80-82 FENWOOD Bricklayer 08/06/2016

J. K. GLASS CO. INC. 971.5 288.0 29.64% 566.5 58.31% 0.0 0.00%80-82 FENWOOD Iron Worker 02/27/2016

BEACON WATERPROOFING A 12.0 0.0 0.00% 0.0 0.00% 0.0 0.00%80-82 FENWOOD Laborer 08/15/2015

BUSINESS INTERIORS FCOVE 1,724.0 0.0 0.00% 188.0 10.90% 0.0 0.00%80-82 FENWOOD Marble Refinisher 08/06/2016

J. C. CANNISTRARO INC. 177.5 0.0 0.00% 177.5 100.00% 0.0 0.00%80-82 FENWOOD Metal Refinisher 01/09/2016

J. K. GLASS CO. INC. 1,622.0 496.0 30.58% 0.0 0.00% 223.0 13.75%80-82 FENWOOD Glazier 09/17/2016

BOWLINE CO. 202.0 24.0 11.88% 24.0 11.88% 0.0 0.00%80-82 FENWOOD Iron Worker 01/23/2016

G & C CONCRETE CO. 27.0 0.0 0.00% 18.0 66.67% 0.0 0.00%80-82 FENWOOD Cement Finisher 01/02/2016

J. C. CANNISTRARO INC. 4,992.0 3,042.0 60.94% 370.0 7.41% 304.0 6.09%80-82 FENWOOD Sprinkler Fitter 08/20/2016

J. K. GLASS CO. INC. 3,668.0 566.5 15.44% 558.5 15.23% 230.5 6.28%80-82 FENWOOD Carpenter 09/03/2016

J. C. CANNISTRARO INC. 5,723.5 2,975.0 51.98% 1,732.0 30.26% 67.0 1.17%80-82 FENWOOD Pipefitter 09/17/2016

HAYWARD BAKER INC. 1,100.5 198.5 18.04% 198.5 18.04% 0.0 0.00%80-82 FENWOOD Equipment Opera 04/04/2015

G & C CONCRETE CO. 584.0 96.0 16.44% 56.0 9.59% 0.0 0.00%80-82 FENWOOD Iron Worker 05/23/2015

HARRINGTON AIR. 4,561.0 1,188.0 26.05% 1,258.0 27.58% 0.0 0.00%80-82 FENWOOD Sheetmetal Work 09/17/2016

G & C CONCRETE CO. 18.0 0.0 0.00% 0.0 0.00% 0.0 0.00%80-82 FENWOOD Cement Laborer 04/18/2015

GRANITE STATE SPECIALTIES, 46.3 0.0 0.00% 0.0 0.00% 0.0 0.00%80-82 FENWOOD Carpenter 09/03/2016

Page 90: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 90

Project Name Trade Latest Week

GENERAL SAFETY SERVICES 104.0 50.0 48.08% 16.0 15.38% 0.0 0.00%80-82 FENWOOD Iron Worker 12/05/2015

G & C CONCRETE CO. 979.5 153.5 15.67% 719.0 73.40% 0.0 0.00%80-82 FENWOOD Laborer 12/19/2015

J. C. CANNISTRARO INC. 11,744.0 4,132.5 35.19% 2,558.5 21.79% 394.0 3.35%80-82 FENWOOD Plumber 08/27/2016

G & C CONCRETE CO. 119.5 0.0 0.00% 0.0 0.00% 0.0 0.00%80-82 FENWOOD Equipment Opera 05/23/2015

205,021.3 68,917.5 33.61% 53,011.0 25.86% 12,550.0 6.12%SUB TOTALS:

888 BOYLSTON STREET

$135,000,000Amount:

Gen Contractor: TURNER CONSTRUCTION CO.

(617)247-6400 TWO SEAPORT LANE BOSTON

Est Start Date:

Est End Date:

08/25/2014

05/13/2016

MARR EQUIPMENT CORP. 6,251.5 328.0 5.25% 249.0 3.98% 50.5 0.81%888 BOYLSTON STREET Equipment Opera 07/03/2016

MASSEY'S PLATE GLASS & AL 131.0 0.0 0.00% 0.0 0.00% 0.0 0.00%888 BOYLSTON STREET Bricklayer 06/25/2016

MASSEY'S PLATE GLASS & AL 3,770.0 1,945.0 51.59% 857.0 22.73% 268.0 7.11%888 BOYLSTON STREET Carpenter 06/18/2016

MASSEY'S PLATE GLASS & AL 28,134.0 9,431.0 33.52% 6,155.0 21.88% 1,526.0 5.42%888 BOYLSTON STREET Glazier 10/01/2016

MASSEY'S PLATE GLASS & AL 97.0 0.0 0.00% 0.0 0.00% 0.0 0.00%888 BOYLSTON STREET Waterproofer 06/25/2016

KENNETH CASTELLUCCI ASSO 8.0 0.0 0.00% 0.0 0.00% 0.0 0.00%888 BOYLSTON STREET Laborer 01/22/2016

MASSEY'S PLATE GLASS & AL 13,380.0 5,972.0 44.63% 2,965.0 22.16% 2,261.0 16.90%888 BOYLSTON STREET Iron Worker 07/02/2016

MASSEY'S PLATE GLASS & AL 1,299.0 0.0 0.00% 0.0 0.00% 0.0 0.00%888 BOYLSTON STREET Equipment Opera 01/23/2016

MANGANARO NORTHEAST LL 6,749.5 1,347.5 19.96% 5,009.0 74.21% 1,335.0 19.78%888 BOYLSTON STREET Laborer 08/28/2016

MANGANARO NORTHEAST LL 37,396.5 13,167.0 35.21% 6,253.0 16.72% 1,646.5 4.40%888 BOYLSTON STREET Carpenter 09/11/2016

MANGANARO CORPORATION 290.0 0.0 0.00% 202.0 69.66% 56.0 19.31%888 BOYLSTON STREET Laborer 02/14/2016

MANGANARO CORPORATION 1,898.0 549.0 28.93% 332.0 17.49% 27.0 1.42%888 BOYLSTON STREET Carpenter 02/14/2016

LUND REBAR SERVICES, INC. 7,479.0 3,429.0 45.85% 3,186.0 42.60% 298.0 3.98%888 BOYLSTON STREET Iron Worker 05/15/2016

KERR'S WELDING IRON WORK 3,329.0 2,324.0 69.81% 2,431.0 73.02% 0.0 0.00%888 BOYLSTON STREET Welder 01/06/2016

KENNETH CASTELLUCCI ASSO 2,502.0 879.0 35.13% 1,087.0 43.45% 0.0 0.00%888 BOYLSTON STREET Marble Tile Work 06/24/2016

JOHN A . PENNEY ELECTRIC 51,249.0 20,900.0 40.78% 11,501.0 22.44% 4,213.0 8.22%888 BOYLSTON STREET Electrician 10/02/2016

MCCUSKER-GILL INC. 19,373.5 4,905.0 25.32% 5,603.0 28.92% 0.0 0.00%888 BOYLSTON STREET Sheetmetal Work 10/02/2016

VALLEYCREST LANDSCAPE 427.5 0.0 0.00% 0.0 0.00% 0.0 0.00%888 BOYLSTON STREET Equipment Opera 09/11/2016

KENNETH CASTELLUCCI ASSO 2,749.5 0.0 0.00% 232.5 8.46% 0.0 0.00%888 BOYLSTON STREET Mason 06/24/2016

THE WELCH CORPORATION 1,010.5 611.5 60.51% 237.0 23.45% 0.0 0.00%888 BOYLSTON STREET Equipment Opera 08/27/2016

WALTER A FURMAN CO 2,154.5 986.0 45.76% 432.5 20.07% 122.0 5.66%888 BOYLSTON STREET Carpenter 06/25/2016

VISCOM SYSTEM 1,010.0 0.0 0.00% 0.0 0.00% 0.0 0.00%888 BOYLSTON STREET Technician 08/27/2016

VISCOM SYSTEM 803.0 729.0 90.78% 0.0 0.00% 729.0 90.78%888 BOYLSTON STREET Electrician 08/27/2016

VALLEYCREST LANDSCAPE 4,189.0 849.5 20.28% 446.0 10.65% 557.5 13.31%888 BOYLSTON STREET Laborer 10/02/2016

MARR EQUIPMENT CORP. 612.5 247.0 40.33% 88.0 14.37% 0.0 0.00%888 BOYLSTON STREET Elevator Const(M 03/13/2016

VALLEYCREST LANDSCAPE 2,067.0 0.0 0.00% 467.0 22.59% 0.0 0.00%888 BOYLSTON STREET Bricklayer 10/02/2016

JEREZ LLC 3,165.5 1,710.0 54.02% 3,160.5 99.84% 96.0 3.03%888 BOYLSTON STREET Laborer 10/01/2016

Page 91: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 91

Project Name Trade Latest Week

TURNER CONSTRUCTION CO. 40,886.5 14,426.0 35.28% 14,095.0 34.47% 5,131.5 12.55%888 BOYLSTON STREET Laborer 10/02/2016

UNION STEEL ERECTORS COR 12,133.5 3,961.0 32.65% 1,950.0 16.07% 1,053.5 8.68%888 BOYLSTON STREET Iron Worker 10/01/2016

THE WELCH CORPORATION 1,814.5 340.5 18.77% 8.0 0.44% 340.5 18.77%888 BOYLSTON STREET Laborer 08/27/2016

NEW ENGLAND FINISH SYS. 2,318.0 844.0 36.41% 1,494.0 64.45% 258.0 11.13%888 BOYLSTON STREET Carpenter 09/23/2016

SOEP PAINTING CORP. 6,742.0 2,218.0 32.90% 717.0 10.63% 481.0 7.13%888 BOYLSTON STREET Painter 10/02/2016

S & F CONCRETE 17,784.0 2,655.0 14.93% 2,756.5 15.50% 1,518.5 8.54%888 BOYLSTON STREET Laborer 09/24/2016

S & F CONCRETE 446.5 0.0 0.00% 0.0 0.00% 0.0 0.00%888 BOYLSTON STREET Equipment Opera 08/06/2016

S & F CONCRETE 1,747.0 606.0 34.69% 853.5 48.86% 55.0 3.15%888 BOYLSTON STREET Cement Finisher 09/24/2016

S & F CONCRETE 11,781.0 3,681.0 31.25% 5,227.0 44.37% 1,154.5 9.80%888 BOYLSTON STREET Carpenter 09/24/2016

OTIS ELEVATOR COMPANY 16,837.9 3,598.8 21.37% 2,361.5 14.02% 234.5 1.39%888 BOYLSTON STREET Elevator Const(M 09/22/2016

OTIS ELEVATOR COMPANY 13,487.7 1,150.5 8.53% 11.0 0.08% 578.0 4.29%888 BOYLSTON STREET Elev Const Helper 09/22/2016

NEW ENGLAND FINISH SYS. 46.5 13.0 27.96% 13.0 27.96% 0.0 0.00%888 BOYLSTON STREET Laborer 06/17/2016

TURNER CONSTRUCTION CO. 22,838.5 5,720.5 25.05% 5,555.5 24.33% 2,793.0 12.23%888 BOYLSTON STREET Carpenter 10/02/2016

BAY STATE BUILDING SPECIA 2,003.0 519.0 25.91% 1,014.0 50.62% 288.0 14.38%888 BOYLSTON STREET Carpenter 09/22/2016

D & W CONSTRUCTION 7,989.0 1,561.0 19.54% 3,918.0 49.04% 463.0 5.80%888 BOYLSTON STREET Taper 09/18/2016

COSTA BROTHERS MASONRY 2,182.5 765.5 35.07% 532.0 24.38% 0.0 0.00%888 BOYLSTON STREET Bricklayer 09/10/2016

JDC DEMOLITION COMPANY, I 20,778.0 7,167.5 34.50% 13,691.5 65.89% 610.0 2.94%888 BOYLSTON STREET Laborer 05/14/2016

COMMONWEALTH BUILDING S 629.0 59.0 9.38% 0.0 0.00% 0.0 0.00%888 BOYLSTON STREET Sheetmetal Work 09/17/2016

COMMONWEALTH BUILDING S 11,388.5 3,622.0 31.80% 6,595.5 57.91% 732.5 6.43%888 BOYLSTON STREET Roofer 09/17/2016

CITY POINT FIRE PROTEC. 9,082.0 1,137.0 12.52% 53.0 0.58% 0.0 0.00%888 BOYLSTON STREET Sprinkler Fitter 09/23/2016

BUSINESS INTERIORS FCOVE 2,008.0 344.0 17.13% 732.0 36.45% 0.0 0.00%888 BOYLSTON STREET Marble Tile Work 09/17/2016

DANIEL MARR & SON CO. 372.0 38.0 10.22% 38.0 10.22% 0.0 0.00%888 BOYLSTON STREET Iron Worker 03/13/2016

BUSINESS INTERIORS FCOVE 561.0 32.0 5.70% 379.0 67.56% 0.0 0.00%888 BOYLSTON STREET Carpet Layer 08/06/2016

COSTA BROTHERS MASONRY 4,110.0 1,169.5 28.45% 1,214.0 29.54% 189.5 4.61%888 BOYLSTON STREET Laborer 08/20/2016

ATLANTIC CONTRACTING &SP 7,413.0 2,384.5 32.17% 682.0 9.20% 372.0 5.02%888 BOYLSTON STREET Insulator 07/03/2016

AMERICAN CONTRACTORS CO 1,024.0 165.0 16.11% 40.0 3.91% 63.0 6.15%888 BOYLSTON STREET Carpenter 06/24/2016

ALL PANEL SYSTEMS, LLC. 1,929.5 0.0 0.00% 0.0 0.00% 0.0 0.00%888 BOYLSTON STREET Iron Worker 08/27/2016

ALL PANEL SYSTEMS, LLC. 29,755.0 6,692.0 22.49% 3,252.0 10.93% 1,224.0 4.11%888 BOYLSTON STREET Carpenter 09/24/2016

ACCORD STEEL & PRECAST 3,129.5 0.0 0.00% 269.0 8.60% 0.0 0.00%888 BOYLSTON STREET Oiler 01/19/2016

ACCORD STEEL & PRECAST 25,300.0 7,387.0 29.20% 5,413.0 21.40% 1,716.0 6.78%888 BOYLSTON STREET Iron Worker 03/29/2016

ACCORD STEEL & PRECAST 3,040.5 0.0 0.00% 0.0 0.00% 0.0 0.00%888 BOYLSTON STREET Equipment Opera 01/19/2016

MARR EQUIPMENT CORP. 95.0 0.0 0.00% 0.0 0.00% 0.0 0.00%888 BOYLSTON STREET Iron Worker 08/23/2015

BUSINESS INTERIORS FCOVE 959.5 183.5 19.12% 0.0 0.00% 0.0 0.00%888 BOYLSTON STREET Marble Refinisher 06/11/2016

HUB FOUNDATION CO. 882.0 299.0 33.90% 239.5 27.15% 0.0 0.00%888 BOYLSTON STREET Laborer 01/25/2015

Page 92: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 92

Project Name Trade Latest Week

JDC DEMOLITION COMPANY, I 2,266.5 610.5 26.94% 806.5 35.58% 0.0 0.00%888 BOYLSTON STREET Equipment Opera 03/26/2016

J.M. ELECTRICAL CO. INC. 5,036.0 568.0 11.28% 772.0 15.33% 282.0 5.60%888 BOYLSTON STREET Electrician 09/30/2016

J.C. HIGGINS CORP. 17,188.0 5,202.0 30.27% 3,263.0 18.98% 1,265.0 7.36%888 BOYLSTON STREET Plumber 10/02/2016

J.C. HIGGINS CORP. 19,861.0 4,204.0 21.17% 4,477.0 22.54% 1,372.0 6.91%888 BOYLSTON STREET Pipefitter 10/02/2016

J & M BROWN ELECTRICAL 9,399.0 4,899.0 52.12% 3,180.0 33.83% 1,165.0 12.39%888 BOYLSTON STREET Electrician 09/23/2016

COMPOSITE COMPANY INC. 882.0 240.0 27.21% 608.0 68.93% 0.0 0.00%888 BOYLSTON STREET Iron Worker 11/28/2015

HUB FOUNDATION CO. 83.0 0.0 0.00% 0.0 0.00% 0.0 0.00%888 BOYLSTON STREET Oiler 01/25/2015

EAST COAST SLURRY CO. 9,118.0 456.0 5.00% 445.0 4.88% 1,300.0 14.26%888 BOYLSTON STREET Equipment Opera 04/07/2015

HUB FOUNDATION CO. 521.0 0.0 0.00% 0.0 0.00% 0.0 0.00%888 BOYLSTON STREET Equipment Opera 01/25/2015

HITECH INSULATION CO. 2,330.5 328.0 14.07% 424.5 18.21% 323.0 13.86%888 BOYLSTON STREET Insulator 07/03/2016

EAST COAST SLURRY CO. 622.5 296.5 47.63% 296.5 47.63% 236.5 37.99%888 BOYLSTON STREET Oiler 04/07/2015

HUB FOUNDATION CO. 89.0 0.0 0.00% 0.0 0.00% 0.0 0.00%888 BOYLSTON STREET Piledriver 01/25/2015

EAST COAST SLURRY CO. 4,751.5 1,299.0 27.34% 1,163.5 24.49% 0.0 0.00%888 BOYLSTON STREET Laborer 04/14/2015

HERITAGE RESTORATION INC. 2,291.5 1,335.0 58.26% 1,675.5 73.12% 0.0 0.00%888 BOYLSTON STREET Laborer 09/24/2016

EAST COAST SLURRY CO. 265.5 0.0 0.00% 0.0 0.00% 0.0 0.00%888 BOYLSTON STREET Piledriver 03/31/2015

GENERAL SAFETY SERVICES 1,011.0 515.0 50.94% 236.0 23.34% 0.0 0.00%888 BOYLSTON STREET Iron Worker 08/26/2016

H. CARR & SONS INC. 3,408.5 412.0 12.09% 876.0 25.70% 0.0 0.00%888 BOYLSTON STREET Laborer 06/03/2016

H. CARR & SONS INC. 2,500.0 498.0 19.92% 1,624.0 64.96% 0.0 0.00%888 BOYLSTON STREET Plasterer 06/10/2016

H. CARR & SONS INC. 73.0 0.0 0.00% 0.0 0.00% 0.0 0.00%888 BOYLSTON STREET Taper 01/08/2016

HERITAGE RESTORATION INC. 5,752.5 967.5 16.82% 1,002.5 17.43% 556.5 9.67%888 BOYLSTON STREET Bricklayer 10/01/2016

572,470.6 164,879.8 28.80% 144,848.0 25.30% 38,941.5 6.80%SUB TOTALS:

91-101 WALDECK ST. AND 25, 31 AND

$7,505,482Amount:

Gen Contractor: J & S INSTALLATIONS CORP.

(617)749-5227 38 JACKSON ROAD SCITUATE

Est Start Date:

Est End Date:

08/01/2017

09/01/2017

J&S BUILDING EXTERIORS, IN 44.0 44.0 100.00% 44.0 100.00% 0.0 0.00%91-101 WALDECK ST. AND 25, 31 Laborer 09/09/2017

J&S BUILDING EXTERIORS, IN 1,114.0 640.0 57.45% 857.5 76.97% 0.0 0.00%91-101 WALDECK ST. AND 25, 31 Roofer 09/09/2017

1,158.0 684.0 59.07% 901.5 77.85% 0.0 0.00%SUB TOTALS:

961-969 DORCHESTER AVE.

$7,500Amount:

Gen Contractor: EXCEL SIGNS & DECORATION CORP.

(617)479-8552 259 QUINCY AVE. QUINCY

Est Start Date:

Est End Date:

02/01/2014

02/28/2014

EXCEL SIGNS & DECORATION 24.0 0.0 0.00% 24.0 100.00% 8.0 33.33%961-969 DORCHESTER AVE. Laborer 02/22/2014

24.0 0.0 0.00% 24.0 100.00% 8.0 33.33%SUB TOTALS:

ABCD CHILD DEVELOPMENT CENTER

$30,000Amount:

Gen Contractor: ALPHA BUILDING CONSTRUCTION AND DEVELOP.

(617)314-9812 272 WASHINGTON STREET DORCHESTER

Est Start Date:

Est End Date:

06/07/2015

07/20/2015

ALPHA BUILDING CONSTRUCT 177.0 59.0 33.33% 177.0 100.00% 0.0 0.00%ABCD CHILD DEVELOPMENT CE Bricklayer 07/11/2015

Page 93: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 93

Project Name Trade Latest Week

ALPHA BUILDING CONSTRUCT 134.0 30.0 22.39% 134.0 100.00% 0.0 0.00%ABCD CHILD DEVELOPMENT CE Laborer 07/11/2015

ALPHA BUILDING CONSTRUCT 88.0 88.0 100.00% 88.0 100.00% 0.0 0.00%ABCD CHILD DEVELOPMENT CE Mason 06/20/2015

ALPHA BUILDING CONSTRUCT 16.0 0.0 0.00% 16.0 100.00% 0.0 0.00%ABCD CHILD DEVELOPMENT CE Waterproofer 06/27/2015

415.0 177.0 42.65% 415.0 100.00% 0.0 0.00%SUB TOTALS:

ACORN YOGA

$3,000Amount:

Gen Contractor: HUNTER SIGNS

(617)360-9710 120 BUSINESS STREET HYDE PARK

Est Start Date:

Est End Date:

08/28/2016

09/02/2016

HUNTER SIGNS 6.0 6.0 100.00% 6.0 100.00% 0.0 0.00%ACORN YOGA Laborer 09/03/2016

6.0 6.0 100.00% 6.0 100.00% 0.0 0.00%SUB TOTALS:

ALLURING BEAUTY SALON

$5,000Amount:

Gen Contractor: HUNTER SIGNS

(617)360-9710 120 BUSINESS STREET HYDE PARK

Est Start Date:

Est End Date:

05/07/2017

05/13/2017

HUNTER SIGNS 4.0 4.0 100.00% 4.0 100.00% 0.0 0.00%ALLURING BEAUTY SALON Laborer 05/13/2017

4.0 4.0 100.00% 4.0 100.00% 0.0 0.00%SUB TOTALS:

ALVAH KITTREDGE HOME

$510,000Amount:

Gen Contractor: METRIC CONSTRUCTION CORP.

(617)787-1158 55 HENSHAW ST. BOSTON

Est Start Date:

Est End Date:

05/01/2013

02/28/2014

NOVA RESTORATIONS, INC. 142.0 77.5 54.58% 0.0 0.00% 0.0 0.00%ALVAH KITTREDGE HOME Laborer 07/04/2014

QUALITY CONST /MAINT INC. 16.0 16.0 100.00% 16.0 100.00% 0.0 0.00%ALVAH KITTREDGE HOME Laborer 05/16/2014

OUTKAST ELECTRICAL CO 1,808.0 1,808.0 100.00% 1,808.0 100.00% 0.0 0.00%ALVAH KITTREDGE HOME Electrician 07/25/2014

NOVA RESTORATIONS, INC. 71.0 0.0 0.00% 0.0 0.00% 0.0 0.00%ALVAH KITTREDGE HOME Roofer 07/04/2014

MJM MASONRY INC. 1,023.0 819.5 80.11% 879.5 85.97% 0.0 0.00%ALVAH KITTREDGE HOME Mason Tender 06/07/2014

MJM MASONRY INC. 1,067.5 0.0 0.00% 0.0 0.00% 0.0 0.00%ALVAH KITTREDGE HOME Mason 06/07/2014

ALPINE ENVIRONMENTAL INC. 106.9 0.0 0.00% 106.9 100.00% 0.0 0.00%ALVAH KITTREDGE HOME Asbestos Worker 12/21/2013

GREENSTAMP 296.0 0.0 0.00% 0.0 0.00% 0.0 0.00%ALVAH KITTREDGE HOME Insulator 04/12/2014

CUNNINGHAM PLUMBING 336.0 20.0 5.95% 0.0 0.00% 0.0 0.00%ALVAH KITTREDGE HOME Plumber 05/17/2014

NOVA RESTORATIONS, INC. 120.0 0.0 0.00% 0.0 0.00% 0.0 0.00%ALVAH KITTREDGE HOME Sheetmetal Work 06/20/2014

BRENCO CONSTRUCTION, CO. 1,134.0 835.0 73.63% 0.0 0.00% 0.0 0.00%ALVAH KITTREDGE HOME Laborer 04/19/2014

BRENCO CONSTRUCTION, CO. 2,209.0 1,961.0 88.77% 803.0 36.35% 0.0 0.00%ALVAH KITTREDGE HOME Carpenter 05/03/2014

ARGUETA PLASTERING 820.0 400.0 48.78% 820.0 100.00% 0.0 0.00%ALVAH KITTREDGE HOME Plasterer 05/18/2014

HURST LANDSCAPING INC. 249.8 179.8 71.97% 249.8 100.00% 0.0 0.00%ALVAH KITTREDGE HOME Laborer 07/26/2014

9,399.2 6,116.8 65.08% 4,683.2 49.83% 0.0 0.00%SUB TOTALS:

AMANDA'S FLOWERS

$2,500Amount:

Gen Contractor: HUNTER SIGNS

(617)360-9710 120 BUSINESS STREET HYDE PARK

Est Start Date:

Est End Date:

05/15/2016

05/21/2016

HUNTER SIGNS 2.0 2.0 100.00% 2.0 100.00% 0.0 0.00%AMANDA'S FLOWERS Laborer 05/21/2016

Page 94: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 94

Project Name Trade Latest Week

2.0 2.0 100.00% 2.0 100.00% 0.0 0.00%SUB TOTALS:

AMERI DREAM REALTY

$2,500Amount:

Gen Contractor: EXCEL SIGNS & DECORATION CORP.

(617)479-8552 259 QUINCY AVE. QUINCY

Est Start Date:

Est End Date:

01/01/2014

03/31/2014

EXCEL SIGNS & DECORATION 12.0 0.0 0.00% 12.0 100.00% 4.0 33.33%AMERI DREAM REALTY Laborer 02/22/2014

12.0 0.0 0.00% 12.0 100.00% 4.0 33.33%SUB TOTALS:

AMERICAN EXPRESSO

$2,500Amount:

Gen Contractor: ATLANTIC AWNING

(781)665-4040 270 FRANKLIN STREET

Est Start Date:

Est End Date:

01/01/2014

02/28/2014

ATLANTIC AWNING 4.0 0.0 0.00% 0.0 0.00% 0.0 0.00%AMERICAN EXPRESSO Laborer 01/31/2014

4.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SUB TOTALS:

AMERICAN LEGION PLAYGROUND

$2,400,000Amount:

Gen Contractor: FLEMING BROS INC.

(781)843-4071 106 COLUMBIA STREET QUINCY

Est Start Date:

Est End Date:

10/01/2012

03/12/2014

FLEMING BROS INC. 320.0 288.0 90.00% 0.0 0.00% 0.0 0.00%AMERICAN LEGION PLAYGROU Equipment Opera 06/20/2014

FLEMING BROS INC. 560.0 528.0 94.29% 280.0 50.00% 0.0 0.00%AMERICAN LEGION PLAYGROU Laborer 06/20/2014

880.0 816.0 92.73% 280.0 31.82% 0.0 0.00%SUB TOTALS:

AMERICAS FOOD BASKET

$7,500Amount:

Gen Contractor: EXCEL SIGNS & DECORATION CORP.

(617)479-8552 259 QUINCY AVE. QUINCY

Est Start Date:

Est End Date:

11/16/2014

12/20/2014

EXCEL SIGNS & DECORATION 24.0 0.0 0.00% 24.0 100.00% 8.0 33.33%AMERICAS FOOD BASKET Laborer 12/20/2014

24.0 0.0 0.00% 24.0 100.00% 8.0 33.33%SUB TOTALS:

AMERICA'S FOOD BASKET

$37,000Amount:

Gen Contractor: COLLABORATIVE CONTRACTORS GROUP

(617)594-6767 16 HANCOCK COURT BOSTON

Est Start Date:

Est End Date:

03/01/2014

04/30/2014

COLLABORATIVE CONTRACTO 80.0 0.0 0.00% 0.0 0.00% 0.0 0.00%AMERICA'S FOOD BASKET Carpenter 04/11/2014

EXCEL SIGNS & DECORATION 17.0 0.0 0.00% 17.0 100.00% 5.0 29.41%AMERICA'S FOOD BASKET Laborer 03/14/2015

COLLABORATIVE CONTRACTO 80.0 0.0 0.00% 0.0 0.00% 0.0 0.00%AMERICA'S FOOD BASKET Carpenter 12/13/2013

COLLABORATIVE CONTRACTO 80.0 80.0 100.00% 80.0 100.00% 0.0 0.00%AMERICA'S FOOD BASKET Laborer 12/13/2013

COLLABORATIVE CONTRACTO 160.0 160.0 100.00% 80.0 50.00% 0.0 0.00%AMERICA'S FOOD BASKET Laborer 04/11/2014

417.0 240.0 57.55% 177.0 42.45% 5.0 1.20%SUB TOTALS:

ANITAKURL HAIR SALON

$2,500Amount:

Gen Contractor: CAMBRIDGE REPROGRAPHIES

(617)623-2838 21 MCGRATH HGWY SOMERVILLE

Est Start Date:

Est End Date:

05/22/2016

06/09/2016

CAMBRIDGE REPROGRAPHIE 14.0 0.0 0.00% 7.0 50.00% 7.0 50.00%ANITAKURL HAIR SALON Laborer 05/28/2016

14.0 0.0 0.00% 7.0 50.00% 7.0 50.00%SUB TOTALS:

ANTONIO'S PIZZERIA

$7,000Amount:

Gen Contractor:

Est Start Date:

Est End Date:

07/06/2015

07/10/2015

Page 95: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 95

Project Name Trade Latest Week

NEW CC SIGN CO. 10.0 10.0 100.00% 10.0 100.00% 0.0 0.00%ANTONIO'S PIZZERIA Insulator 07/10/2015

NEW CC SIGN CO. 10.0 0.0 0.00% 10.0 100.00% 10.0 100.00%ANTONIO'S PIZZERIA Laborer 07/10/2015

20.0 10.0 50.00% 20.0 100.00% 10.0 50.00%SUB TOTALS:

ARAUJO LAUNDROMAT

$3,500Amount:

Gen Contractor: HUNTER SIGNS

(617)360-9710 120 BUSINESS STREET HYDE PARK

Est Start Date:

Est End Date:

12/18/2016

12/24/2016

HUNTER SIGNS 4.0 2.0 50.00% 2.0 50.00% 0.0 0.00%ARAUJO LAUNDROMAT Laborer 12/24/2016

4.0 2.0 50.00% 2.0 50.00% 0.0 0.00%SUB TOTALS:

ASHMONT TOD II

$4,039,695Amount:

Gen Contractor:

Est Start Date:

Est End Date:

12/01/2015

05/31/2017

ATLAS DRILLING, INC. 72.0 40.0 55.56% 40.0 55.56% 0.0 0.00%ASHMONT TOD II Piledriver 05/14/2016

CUMAR MARBLE AND GRANIT 70.0 0.0 0.00% 70.0 100.00% 0.0 0.00%ASHMONT TOD II Installer/Apt Wirer 04/24/2017

CUMAR MARBLE AND GRANIT 220.0 0.0 0.00% 220.0 100.00% 0.0 0.00%ASHMONT TOD II Carpenter 05/27/2017

CHARLES LEONARD STEEL SE 764.3 0.0 0.00% 0.0 0.00% 0.0 0.00%ASHMONT TOD II Iron Worker 06/17/2017

CENTURY DRYWALL INC, 3,422.5 288.0 8.41% 1,781.5 52.05% 0.0 0.00%ASHMONT TOD II Taper 06/17/2017

CENTURY DRYWALL INC, 1,534.0 882.0 57.50% 544.0 35.46% 416.0 27.12%ASHMONT TOD II Painter 06/17/2017

CENTURY DRYWALL INC, 2,775.5 1,494.5 53.85% 1,504.5 54.21% 410.0 14.77%ASHMONT TOD II Laborer 06/17/2017

CENTURY DRYWALL INC, 11,908.5 2,926.0 24.57% 7,325.5 61.51% 511.0 4.29%ASHMONT TOD II Carpenter 06/17/2017

BAY STATE GYPSUM FLOORS 269.8 0.0 0.00% 41.5 15.38% 0.0 0.00%ASHMONT TOD II Laborer 04/22/2017

BAY STATE GYPSUM FLOORS 32.5 0.0 0.00% 0.0 0.00% 0.0 0.00%ASHMONT TOD II Equipment Opera 04/22/2017

BAY STATE GYPSUM FLOORS 35.0 0.0 0.00% 0.0 0.00% 0.0 0.00%ASHMONT TOD II Cement Finisher 04/22/2017

ATLAS DRILLING, INC. 128.0 0.0 0.00% 48.0 37.50% 0.0 0.00%ASHMONT TOD II Laborer 05/14/2016

ATLAS DRILLING, INC. 160.0 0.0 0.00% 0.0 0.00% 0.0 0.00%ASHMONT TOD II Equipment Opera 05/14/2016

ALLEGHENY CONTRACT FLOO 1,518.0 583.0 38.41% 1,470.0 96.84% 0.0 0.00%ASHMONT TOD II Floor Layer 06/30/2017

ALLEGHENY CONTRACT FLOO 610.0 8.0 1.31% 32.0 5.25% 96.0 15.74%ASHMONT TOD II Bricklayer 05/26/2017

E. M. DUGGAN INC. 5,248.0 2,072.0 39.48% 398.0 7.58% 88.0 1.68%ASHMONT TOD II Plumber 07/02/2017

BAY STATE GYPSUM FLOORS 156.5 0.0 0.00% 47.0 30.03% 0.0 0.00%ASHMONT TOD II Cement Laborer 04/22/2017

STREAMLINE WATERPROOFIN 2,174.0 0.0 0.00% 403.0 18.54% 0.0 0.00%ASHMONT TOD II Waterproofer 07/01/2017

OUTKAST ELECTRICAL CO 10,720.0 9,720.0 90.67% 10,720.0 100.00% 0.0 0.00%ASHMONT TOD II Electrician 06/23/2017

PEREIRA ELECTRIC CORP. 421.0 0.0 0.00% 0.0 0.00% 0.0 0.00%ASHMONT TOD II Electrician 05/20/2017

S & F CONCRETE 7,355.5 2,599.5 35.34% 4,218.5 57.35% 629.0 8.55%ASHMONT TOD II Carpenter 12/10/2016

S & F CONCRETE 311.5 73.0 23.43% 59.5 19.10% 0.0 0.00%ASHMONT TOD II Cement Finisher 07/01/2017

S & F CONCRETE 413.5 0.0 0.00% 0.0 0.00% 0.0 0.00%ASHMONT TOD II Equipment Opera 07/01/2017

S & F CONCRETE 5,334.5 3,656.0 68.54% 870.5 16.32% 0.0 0.00%ASHMONT TOD II Laborer 07/01/2017

MELO'S RODBUSTERS 2,128.0 1,111.0 52.21% 1,634.0 76.79% 0.0 0.00%ASHMONT TOD II Iron Worker 11/05/2016

Page 96: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 96

Project Name Trade Latest Week

SIGNET ELECTRONIC SYSTEM 82.5 0.0 0.00% 8.0 9.70% 0.0 0.00%ASHMONT TOD II Telephone/Data I 05/21/2017

VICTORY HEATING AND AIR C 9.0 0.0 0.00% 0.0 0.00% 0.0 0.00%ASHMONT TOD II Installer/Apt Wirer 03/04/2017

SUPERHEAT STILL 3,216.0 0.0 0.00% 1,088.0 33.83% 0.0 0.00%ASHMONT TOD II Pipefitter 06/24/2017

UNION INSTALLATIONS LLC 357.5 0.0 0.00% 0.0 0.00% 0.0 0.00%ASHMONT TOD II Carpenter 06/17/2017

UNION INSTALLATIONS LLC 503.5 95.0 18.87% 109.0 21.65% 18.0 3.57%ASHMONT TOD II Glazier 06/24/2017

VICTORY HEATING AND AIR C 430.0 0.0 0.00% 0.0 0.00% 0.0 0.00%ASHMONT TOD II Electrician 07/01/2017

VICTORY HEATING AND AIR C 5,300.5 0.0 0.00% 1,707.0 32.20% 0.0 0.00%ASHMONT TOD II Sheetmetal Work 07/01/2017

DUCTWORKS 460.0 0.0 0.00% 140.0 30.43% 0.0 0.00%ASHMONT TOD II Sheetmetal Work 01/14/2017

SIGNET ELECTRONIC SYSTEM 541.5 0.0 0.00% 8.0 1.48% 0.0 0.00%ASHMONT TOD II Technician 06/25/2017

GREENWOOD INDUSTRIES IN 4.0 0.0 0.00% 0.0 0.00% 0.0 0.00%ASHMONT TOD II Sheetmetal Work 07/01/2017

VICTORY HEATING AND AIR C 369.0 0.0 0.00% 0.0 0.00% 0.0 0.00%ASHMONT TOD II Technician 07/01/2017

EAST COAST INTERIORS CO. 11,720.5 3,712.0 31.67% 5,502.5 46.95% 707.5 6.04%ASHMONT TOD II Carpenter 06/03/2017

CUTTING EDGE ENVIRONMEN 132.0 0.0 0.00% 68.0 51.52% 0.0 0.00%ASHMONT TOD II Asbestos Worker 03/05/2016

FRONT LINE INC. 7,909.0 5,205.0 65.81% 5,842.0 73.87% 2,145.0 27.12%ASHMONT TOD II Laborer 07/01/2017

MARMELO BROS. CONS, CO. 2,069.0 201.5 9.74% 1,089.0 52.63% 288.0 13.92%ASHMONT TOD II Mason Tender 07/01/2017

GREENWOOD INDUSTRIES IN 1,834.8 476.8 25.98% 592.3 32.28% 0.0 0.00%ASHMONT TOD II Roofer 07/01/2017

INNER CITY FIRE PROTECTIO 3,980.5 2,070.0 52.00% 2,070.0 52.00% 0.0 0.00%ASHMONT TOD II Sprinkler Fitter 06/17/2017

JDC DEMOLITION COMPANY, I 120.0 0.0 0.00% 0.0 0.00% 0.0 0.00%ASHMONT TOD II Equipment Opera 04/30/2016

JDC DEMOLITION COMPANY, I 246.0 0.0 0.00% 174.0 70.73% 0.0 0.00%ASHMONT TOD II Laborer 04/30/2016

KONE ELEVATOR INC. 1,161.5 0.0 0.00% 9.0 0.77% 8.0 0.69%ASHMONT TOD II Elevator Const(M 06/28/2017

LM HEAVY CIVIL 1,858.0 0.0 0.00% 426.0 22.93% 0.0 0.00%ASHMONT TOD II Equipment Opera 03/18/2017

LM HEAVY CIVIL 4,343.0 1,340.0 30.85% 594.0 13.68% 264.5 6.09%ASHMONT TOD II Laborer 02/18/2017

LM HEAVY CIVIL 610.0 96.0 15.74% 160.0 26.23% 0.0 0.00%ASHMONT TOD II Piledriver 07/16/2016

LYMO CONSTRUCTION CO. 5,216.5 2,752.5 52.77% 2,319.5 44.46% 790.0 15.14%ASHMONT TOD II Carpenter 07/02/2017

MARMELO BROS. CONS, CO. 2,060.5 657.0 31.89% 415.0 20.14% 34.0 1.65%ASHMONT TOD II Bricklayer 07/01/2017

MARMELO BROS. CONS, CO. 437.0 0.0 0.00% 0.0 0.00% 0.0 0.00%ASHMONT TOD II Equipment Opera 04/08/2017

GLEESON POWERS INC. 72.0 0.0 0.00% 56.0 77.78% 0.0 0.00%ASHMONT TOD II Carpenter 02/18/2017

112,826.3 42,058.8 37.28% 53,804.8 47.69% 6,405.0 5.68%SUB TOTALS:

ASIAN AMERICAN

$10,000Amount:

Gen Contractor: PORTMOUTH FLOORING CO.

(603)436-3422 2040 LAFAYETTE RD. PORTMOUTH PORTMOUTH

Est Start Date:

Est End Date:

04/01/2014

05/31/2014

PORTMOUTH FLOORING CO. 52.0 0.0 0.00% 0.0 0.00% 0.0 0.00%ASIAN AMERICAN Floor Layer 04/16/2014

52.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SUB TOTALS:

ASIAN AMERICAN CIVIC ASSOC

$20,000Amount:

Gen Contractor: C.W.C. BUILDERS INC.

(617)965-2800 7 WELLS AVENUE NEWTON

Est Start Date:

Est End Date:

10/04/2015

10/10/2015

Page 97: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 97

Project Name Trade Latest Week

C.W.C. BUILDERS INC. 178.3 0.0 0.00% 53.0 29.73% 0.0 0.00%ASIAN AMERICAN CIVIC ASSOC Floor Layer 10/10/2015

178.3 0.0 0.00% 53.0 29.73% 0.0 0.00%SUB TOTALS:

ASIAN GARDEN

$3,000Amount:

Gen Contractor: STATEWIDE SIGN

(617)472-8828 541-543 WASHINGHTON STREET QUINCY

Est Start Date:

Est End Date:

09/09/2014

09/12/2014

STATEWIDE SIGN 16.0 0.0 0.00% 16.0 100.00% 0.0 0.00%ASIAN GARDEN Laborer 09/09/2014

16.0 0.0 0.00% 16.0 100.00% 0.0 0.00%SUB TOTALS:

ASIAN TASK FACE

$20,000Amount:

Gen Contractor: ARCAY REMODELING INC.

(781)726-0962 35 HAWARD STREET DEDHAM

Est Start Date:

Est End Date:

09/14/2015

10/16/2015

ARCAY REMODELING INC. 250.0 0.0 0.00% 250.0 100.00% 0.0 0.00%ASIAN TASK FACE Carpenter 10/16/2015

250.0 0.0 0.00% 250.0 100.00% 0.0 0.00%SUB TOTALS:

ASIAN TASK FORCE

$20,000Amount:

Gen Contractor: ARCAY REMODELING INC.

(781)726-0962 35 HAWARD STREET DEDHAM

Est Start Date:

Est End Date:

05/30/2016

07/08/2016

ARCAY REMODELING INC. 8.0 8.0 100.00% 8.0 100.00% 0.0 0.00%ASIAN TASK FORCE Electrician 07/08/2016

ARCAY REMODELING INC. 40.0 0.0 0.00% 40.0 100.00% 0.0 0.00%ASIAN TASK FORCE Piledriver 06/12/2016

ARCAY REMODELING INC. 200.0 0.0 0.00% 200.0 100.00% 0.0 0.00%ASIAN TASK FORCE Carpenter 07/08/2016

ARCAY REMODELING INC. 9.5 9.5 100.00% 9.5 100.00% 0.0 0.00%ASIAN TASK FORCE Plumber 07/08/2016

257.5 17.5 6.80% 257.5 100.00% 0.0 0.00%SUB TOTALS:

AVALON EXETER RESIDENCES

$75,000,000Amount:

Gen Contractor: JOHN MORIARTY & ASSOCIATES

(781)729-3900 3 CHURCH STREET WINCHESTER

Est Start Date:

Est End Date:

01/31/2012

07/01/2014

S & F CONCRETE 69.5 47.5 68.35% 47.5 68.35% 9.0 12.95%AVALON EXETER RESIDENCES Carpenter 05/24/2014

JULIAN CRANE & EQUIPMENT 23.0 6.0 26.09% 0.0 0.00% 0.0 0.00%AVALON EXETER RESIDENCES Iron Worker 07/13/2014

KENNETH CASTELLUCCI ASSO 222.0 0.0 0.00% 0.0 0.00% 0.0 0.00%AVALON EXETER RESIDENCES Laborer 05/16/2014

KENNETH CASTELLUCCI ASSO 236.0 0.0 0.00% 0.0 0.00% 0.0 0.00%AVALON EXETER RESIDENCES Mason 05/16/2014

MANGANARO NORTHEAST LL 24,142.5 7,927.5 32.84% 5,474.5 22.68% 754.0 3.12%AVALON EXETER RESIDENCES Carpenter 06/08/2014

MANGANARO NORTHEAST LL 4,221.0 1,348.5 31.95% 1,366.5 32.37% 184.0 4.36%AVALON EXETER RESIDENCES Laborer 06/15/2014

NORTHBOROUGH CONTRACTI 104.0 0.0 0.00% 0.0 0.00% 0.0 0.00%AVALON EXETER RESIDENCES Carpenter 01/25/2014

OTIS ELEVATOR COMPANY 268.0 116.5 43.47% 0.0 0.00% 40.0 14.93%AVALON EXETER RESIDENCES Elev Const Helper 05/28/2014

OTIS ELEVATOR COMPANY 1,680.0 269.0 16.01% 261.0 15.54% 7.8 0.46%AVALON EXETER RESIDENCES Elevator Const(M 05/28/2014

P.J. SPILLANE COMPANY 1,411.5 0.0 0.00% 212.5 15.05% 0.0 0.00%AVALON EXETER RESIDENCES Bricklayer 04/05/2014

P.J. SPILLANE COMPANY 72.5 0.0 0.00% 0.0 0.00% 0.0 0.00%AVALON EXETER RESIDENCES Mason Tender 04/05/2014

PAVILION FLOORS, INC. 2,862.0 0.0 0.00% 1,892.0 66.11% 0.0 0.00%AVALON EXETER RESIDENCES Floor Layer 08/16/2014

S & F CONCRETE 5.0 0.0 0.00% 0.0 0.00% 0.0 0.00%AVALON EXETER RESIDENCES Cement Finisher 04/12/2014

S & F CONCRETE 7.0 0.0 0.00% 0.0 0.00% 0.0 0.00%AVALON EXETER RESIDENCES Equipment Opera 05/24/2014

Page 98: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 98

Project Name Trade Latest Week

S & F CONCRETE 1,041.5 50.0 4.80% 255.5 24.53% 184.0 17.67%AVALON EXETER RESIDENCES Laborer 05/24/2014

S & F CONCRETE 3.0 0.0 0.00% 0.0 0.00% 0.0 0.00%AVALON EXETER RESIDENCES Mason 05/24/2014

SULLIVAN & MCLAUGHLIN CO. 584.0 112.0 19.18% 112.0 19.18% 88.0 15.07%AVALON EXETER RESIDENCES Electrician 02/23/2014

VALLEYCREST LANDSCAPE 82.0 0.0 0.00% 82.0 100.00% 0.0 0.00%AVALON EXETER RESIDENCES Bricklayer 06/22/2014

VALLEYCREST LANDSCAPE 156.0 0.0 0.00% 72.0 46.15% 0.0 0.00%AVALON EXETER RESIDENCES Laborer 06/29/2014

WILLIAM M. COLLINS COMPAN 3,979.0 474.0 11.91% 368.0 9.25% 0.0 0.00%AVALON EXETER RESIDENCES Sprinkler Fitter 03/30/2014

COMMONWEALTH BUILDING S 7.0 0.0 0.00% 0.0 0.00% 0.0 0.00%AVALON EXETER RESIDENCES Sheetmetal Work 03/29/2014

JULIAN CRANE & EQUIPMENT 2,472.5 0.0 0.00% 2,468.5 99.84% 2,468.5 99.84%AVALON EXETER RESIDENCES Equipment Opera 07/13/2014

PAVILION FLOORS, INC. 88.0 0.0 0.00% 88.0 100.00% 0.0 0.00%AVALON EXETER RESIDENCES Carpet Layer 03/08/2014

COMMONWEALTH BUILDING S 2,075.0 604.0 29.11% 1,111.0 53.54% 388.0 18.70%AVALON EXETER RESIDENCES Roofer 04/12/2014

ACCORD STEEL & PRECAST 16.0 0.0 0.00% 0.0 0.00% 0.0 0.00%AVALON EXETER RESIDENCES Iron Worker 11/19/2013

BOSTON LIGHT ELECTRICAL C 14,857.5 2,762.0 18.59% 2,779.0 18.70% 98.0 0.66%AVALON EXETER RESIDENCES Electrician 08/10/2014

BOSTON REBAR CORP. 178.5 0.0 0.00% 32.0 17.93% 0.0 0.00%AVALON EXETER RESIDENCES Marble Tile Work 07/12/2014

BWI STEEL & PRECAST EREC 766.0 534.0 69.71% 192.0 25.07% 0.0 0.00%AVALON EXETER RESIDENCES Iron Worker 03/30/2014

DIVERSIFIED CONSTRUCTION 1,136.0 48.0 4.23% 984.0 86.62% 184.0 16.20%AVALON EXETER RESIDENCES Laborer 06/07/2014

CIRCLE FLOORS INC. 1,653.0 88.0 5.32% 1,236.0 74.77% 0.0 0.00%AVALON EXETER RESIDENCES Floor Layer 08/03/2014

JULIAN CRANE & EQUIPMENT 171.5 0.0 0.00% 0.0 0.00% 0.0 0.00%AVALON EXETER RESIDENCES Elevator Const(M 07/13/2014

D & W CONSTRUCTION 8,763.0 1,890.0 21.57% 4,044.0 46.15% 1,041.5 11.89%AVALON EXETER RESIDENCES Taper 06/29/2014

EMC PAINTING 4,382.0 2,276.0 51.94% 2,680.0 61.16% 672.0 15.34%AVALON EXETER RESIDENCES Painter 07/05/2014

FRED SALVUCCI CORP. 80.0 0.0 0.00% 16.0 20.00% 0.0 0.00%AVALON EXETER RESIDENCES Mason 02/08/2014

J. DERENZO CO. 243.0 53.0 21.81% 53.0 21.81% 0.0 0.00%AVALON EXETER RESIDENCES Laborer 03/22/2014

HAMEL & MCALISTER, INC. 9,133.0 2,192.0 24.00% 1,902.0 20.83% 64.0 0.70%AVALON EXETER RESIDENCES Pipefitter 07/04/2014

HAMEL & MCALISTER, INC. 9,621.0 2,823.0 29.34% 2,171.0 22.57% 0.0 0.00%AVALON EXETER RESIDENCES Plumber 07/04/2014

HIGH POINT INTERIORS,INC. 4,565.5 559.5 12.25% 736.5 16.13% 95.5 2.09%AVALON EXETER RESIDENCES Marble Tile Work 07/05/2014

IPSWICH BAY GLASS CO. 1,556.5 0.0 0.00% 0.0 0.00% 0.0 0.00%AVALON EXETER RESIDENCES Carpenter 03/29/2014

IPSWICH BAY GLASS CO. 2,527.0 296.0 11.71% 240.0 9.50% 469.5 18.58%AVALON EXETER RESIDENCES Glazier 03/29/2014

IPSWICH BAY GLASS CO. 204.0 132.0 64.71% 132.0 64.71% 0.0 0.00%AVALON EXETER RESIDENCES Iron Worker 12/14/2013

ISLAND INTER. INDUSTRIES. 24.0 0.0 0.00% 0.0 0.00% 0.0 0.00%AVALON EXETER RESIDENCES Laborer 12/24/2013

ISLAND INTER. INDUSTRIES. 56.0 0.0 0.00% 0.0 0.00% 0.0 0.00%AVALON EXETER RESIDENCES Plasterer 12/24/2013

J. DERENZO CO. 59.0 16.0 27.12% 16.0 27.12% 0.0 0.00%AVALON EXETER RESIDENCES Equipment Opera 03/22/2014

FRED SALVUCCI CORP. 97.0 0.0 0.00% 24.5 25.26% 0.0 0.00%AVALON EXETER RESIDENCES Mason Tender 02/15/2014

105,901.5 24,624.5 23.25% 31,049.0 29.32% 6,747.8 6.37%SUB TOTALS:

BACARO ITALIAN RESTAURANT

$15,000Amount:

Gen Contractor:

Est Start Date:

Est End Date:

08/09/2015

10/24/2015

Page 99: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 99

Project Name Trade Latest Week

G& S CONSTRUCTION INC. 64.0 40.0 62.50% 0.0 0.00% 0.0 0.00%BACARO ITALIAN RESTAURANT Glazier 10/24/2015

G& S CONSTRUCTION INC. 64.0 40.0 62.50% 0.0 0.00% 24.0 37.50%BACARO ITALIAN RESTAURANT Laborer 10/24/2015

128.0 80.0 62.50% 0.0 0.00% 24.0 18.75%SUB TOTALS:

BARTLETT B.

$23,633,667Amount:

Gen Contractor: BILT-RITE CONSTRUCTION

(617)541-9777 150 SHIRLEY STREET BOSTON

Est Start Date:

Est End Date:

01/03/2017

09/13/2018

HAYWARD BAKER INC. 16.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BARTLETT B. Piledriver 04/23/2017

PAN ELECTRIC COMPANY INC. 273.0 178.0 65.20% 273.0 100.00% 16.0 5.86%BARTLETT B. Electrician 09/09/2017

TARA CONSTRUCTION 77.0 77.0 100.00% 77.0 100.00% 0.0 0.00%BARTLETT B. Laborer 09/02/2017

TARA CONSTRUCTION 2,841.5 1,754.0 61.73% 1,693.0 59.58% 170.0 5.98%BARTLETT B. Carpenter 09/16/2017

SEA & SHORE CONTRACTING 85.3 0.0 0.00% 0.0 0.00% 0.0 0.00%BARTLETT B. Equipment Opera 04/08/2017

MPS PRODUCTS CORP. 851.5 0.0 0.00% 394.5 46.33% 0.0 0.00%BARTLETT B. Iron Worker 08/12/2017

METRO EQUIPMENT CORP. 2,866.5 1,645.5 57.40% 1,913.5 66.75% 485.5 16.94%BARTLETT B. Laborer 09/09/2017

METRO EQUIPMENT CORP. 965.0 965.0 100.00% 484.0 50.16% 0.0 0.00%BARTLETT B. Equipment Opera 09/09/2017

MARGUERITE CONCRETE 259.5 0.0 0.00% 58.0 22.35% 0.0 0.00%BARTLETT B. Laborer 08/19/2017

MARGUERITE CONCRETE 84.5 0.0 0.00% 0.0 0.00% 0.0 0.00%BARTLETT B. Equipment Opera 08/12/2017

MARGUERITE CONCRETE 178.0 29.0 16.29% 29.0 16.29% 21.0 11.80%BARTLETT B. Cement Finisher 08/19/2017

HAYWARD BAKER INC. 10.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BARTLETT B. Laborer 04/16/2017

HAYWARD BAKER INC. 64.0 0.0 0.00% 64.0 100.00% 0.0 0.00%BARTLETT B. Field Engineer 04/30/2017

HAYWARD BAKER INC. 338.5 0.0 0.00% 0.0 0.00% 0.0 0.00%BARTLETT B. Equipment Opera 04/30/2017

FEDERAL CONCRETE 1,568.0 800.5 51.05% 1,458.0 92.98% 243.5 15.53%BARTLETT B. Laborer 09/02/2017

FEDERAL CONCRETE 1,006.0 789.0 78.43% 797.0 79.22% 0.0 0.00%BARTLETT B. Iron Worker 08/05/2017

FEDERAL CONCRETE 3,742.4 1,839.0 49.14% 1,990.5 53.19% 949.5 25.37%BARTLETT B. Carpenter 08/26/2017

CHAPMAN WATERPROOFING 107.0 63.0 58.88% 53.0 49.53% 19.0 17.76%BARTLETT B. Waterproofer 08/05/2017

D J PLUMBING & HEATING 212.0 104.0 49.06% 120.0 56.60% 0.0 0.00%BARTLETT B. Plumber 09/09/2017

SEA & SHORE CONTRACTING 174.5 66.0 37.82% 40.5 23.21% 0.0 0.00%BARTLETT B. Piledriver 04/15/2017

COMMUNITY RESTORATION 1,040.0 989.5 95.14% 1,040.0 100.00% 0.0 0.00%BARTLETT B. Mason 09/02/2017

COMMUNITY RESTORATION 1,780.0 1,780.0 100.00% 1,780.0 100.00% 164.5 9.24%BARTLETT B. Laborer 09/02/2017

HAYWARD BAKER INC. 113.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BARTLETT B. Oiler 04/30/2017

18,653.2 11,079.5 59.40% 12,265.0 65.75% 2,069.0 11.09%SUB TOTALS:

BETA BURGER

$3,000Amount:

Gen Contractor: ARDON VINYL GRAPHICS & SIGNAGE

(617)782-7366 61 NORTH BEACON STREET ALLSTON

Est Start Date:

Est End Date:

10/12/2015

10/16/2015

ARDON VINYL GRAPHICS & SI 8.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BETA BURGER Laborer 10/16/2015

8.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SUB TOTALS:

Page 100: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 100

Project Name Trade Latest Week

BIBIM RESTAURANT

$10,000Amount:

Gen Contractor: EXCEL SIGNS & DECORATION CORP.

(617)479-8552 259 QUINCY AVE. QUINCY

Est Start Date:

Est End Date:

04/01/2014

06/30/2014

EXCEL SIGNS & DECORATION 48.0 0.0 0.00% 48.0 100.00% 16.0 33.33%BIBIM RESTAURANT Laborer 04/19/2014

ARNOLD'S CONSTRACTON 72.0 0.0 0.00% 72.0 100.00% 0.0 0.00%BIBIM RESTAURANT Carpenter 06/14/2014

120.0 0.0 0.00% 120.0 100.00% 16.0 13.33%SUB TOTALS:

BILLINGS FIELD PLAYGROUND

$434,000Amount:

Gen Contractor: A & K CONSTRUCTION GROUP INC

781-666-3989 7 SYLVAN CIRCLE LYNNFIELD

Est Start Date:

Est End Date:

09/18/2013

12/31/2013

A & K CONSTRUCTION GROUP 205.0 114.0 55.61% 205.0 100.00% 11.0 5.37%BILLINGS FIELD PLAYGROUND Laborer 12/07/2013

205.0 114.0 55.61% 205.0 100.00% 11.0 5.37%SUB TOTALS:

BMC MOAKLEY ADDITION

$19,000,000Amount:

Gen Contractor: SHAWMUT DESIGN CONST.

(617)622-7000 560 HARRISON AVENUE S . BOSTON

Est Start Date:

Est End Date:

04/23/2014

06/24/2015

SILVERBACKCONCRETE CON 420.0 41.5 9.88% 50.5 12.02% 0.0 0.00%BMC MOAKLEY ADDITION Cement Finisher 10/03/2015

LANCO SCAFFOLDING INC. 372.0 96.0 25.81% 372.0 100.00% 0.0 0.00%BMC MOAKLEY ADDITION Laborer 07/05/2015

MAIURI ELECTRICAL CORPOR 2,504.0 1,090.0 43.53% 679.0 27.12% 0.0 0.00%BMC MOAKLEY ADDITION Electrician 09/25/2015

MAIURI ELECTRICAL CORPOR 37.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BMC MOAKLEY ADDITION Technician 07/17/2015

MANSOUR CONSTRUCTION IN 2,113.0 64.0 3.03% 184.0 8.71% 64.0 3.03%BMC MOAKLEY ADDITION Carpenter 09/19/2015

MANSOUR CONSTRUCTION IN 1,441.5 32.0 2.22% 426.5 29.59% 0.0 0.00%BMC MOAKLEY ADDITION Laborer 09/19/2015

MCCUSKER-GILL INC. 3,084.0 452.0 14.66% 1,200.0 38.91% 0.0 0.00%BMC MOAKLEY ADDITION Sheetmetal Work 10/11/2015

OTIS ELEVATOR COMPANY 173.0 8.0 4.62% 0.0 0.00% 0.0 0.00%BMC MOAKLEY ADDITION Elev Const Helper 09/24/2015

OTIS ELEVATOR COMPANY 177.0 0.0 0.00% 0.0 0.00% 21.0 11.86%BMC MOAKLEY ADDITION Elevator Const(M 10/01/2015

THE WATERPROOFING COMP 1,022.5 463.0 45.28% 366.0 35.79% 86.0 8.41%BMC MOAKLEY ADDITION Waterproofer 10/03/2015

SHAWMUT DESIGN CONST. 1,147.0 94.0 8.20% 201.0 17.52% 481.0 41.94%BMC MOAKLEY ADDITION Carpenter 10/04/2015

KO STONE 378.0 220.0 58.20% 268.0 70.90% 110.0 29.10%BMC MOAKLEY ADDITION Laborer 09/19/2015

SHAWMUT DESIGN CONST. 4.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BMC MOAKLEY ADDITION Pipefitter 05/17/2015

LANCO SCAFFOLDING INC. 120.0 44.0 36.67% 120.0 100.00% 0.0 0.00%BMC MOAKLEY ADDITION Carpenter 07/05/2015

THE PAPPAS COMPANY, INC 125.0 17.0 13.60% 17.0 13.60% 0.0 0.00%BMC MOAKLEY ADDITION Carpenter 09/27/2015

WATERTOWN IRON WORKS IN 32.0 0.0 0.00% 16.0 50.00% 0.0 0.00%BMC MOAKLEY ADDITION Iron Worker 08/22/2015

VISCOM SYSTEM 292.0 0.0 0.00% 208.0 71.23% 0.0 0.00%BMC MOAKLEY ADDITION Technician 09/11/2015

VISCOM SYSTEM 122.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BMC MOAKLEY ADDITION Electrician 09/11/2015

VALLEYCREST LANDSCAPE 407.0 85.0 20.88% 85.0 20.88% 0.0 0.00%BMC MOAKLEY ADDITION Laborer 10/11/2015

VALLEYCREST LANDSCAPE 86.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BMC MOAKLEY ADDITION Equipment Opera 10/11/2015

VALLEYCREST LANDSCAPE 59.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BMC MOAKLEY ADDITION Bricklayer 09/20/2015

THE CHEVIOT CORPORATION 533.0 371.0 69.61% 32.0 6.00% 148.0 27.77%BMC MOAKLEY ADDITION Carpenter 10/09/2015

SANFORD CONTRACTING, INC 1,472.5 301.0 20.44% 301.0 20.44% 0.0 0.00%BMC MOAKLEY ADDITION Carpenter 07/19/2015

Page 101: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 101

Project Name Trade Latest Week

SILVERBACKCONCRETE CON 365.0 0.0 0.00% 115.0 31.51% 40.0 10.96%BMC MOAKLEY ADDITION Cement Laborer 10/03/2015

JAMES W. FLETT CO. INC. 4,901.0 1,481.0 30.22% 456.0 9.30% 442.5 9.03%BMC MOAKLEY ADDITION Laborer 09/27/2015

SWEENEY DRYWALL FINISHE 2,475.0 150.0 6.06% 539.0 21.78% 0.0 0.00%BMC MOAKLEY ADDITION Taper 10/03/2015

SWEENEY DRYWALL FINISHE 2,460.0 242.0 9.84% 1,375.5 55.91% 0.0 0.00%BMC MOAKLEY ADDITION Laborer 10/03/2015

SWEENEY DRYWALL FINISHE 10,874.0 2,656.5 24.43% 2,939.0 27.03% 476.5 4.38%BMC MOAKLEY ADDITION Carpenter 10/03/2015

SULLIVAN & MCLAUGHLIN CO. 16,851.5 3,427.0 20.34% 4,800.5 28.49% 40.0 0.24%BMC MOAKLEY ADDITION Electrician 10/04/2015

SOEP PAINTING CORP. 1,084.0 0.0 0.00% 85.0 7.84% 0.0 0.00%BMC MOAKLEY ADDITION Painter 10/04/2015

UNION STEEL ERECTORS COR 540.0 206.0 38.15% 169.0 31.30% 30.0 5.56%BMC MOAKLEY ADDITION Iron Worker 09/19/2015

CARLYSLE ENGINEERING INC. 1,441.0 697.0 48.37% 24.0 1.67% 0.0 0.00%BMC MOAKLEY ADDITION Sprinkler Fitter 09/18/2015

ENERGY INSULATION CONSE 530.0 214.0 40.38% 214.0 40.38% 0.0 0.00%BMC MOAKLEY ADDITION Insulator 08/29/2015

EAST COAST FIREPROOFING 688.0 188.0 27.33% 220.0 31.98% 0.0 0.00%BMC MOAKLEY ADDITION Laborer 05/05/2015

DIVERSIFIED CONSTRUCTION 2,904.0 383.0 13.19% 1,980.0 68.18% 0.0 0.00%BMC MOAKLEY ADDITION Laborer 09/26/2015

COMTRONICS 23.3 3.8 16.13% 0.0 0.00% 0.0 0.00%BMC MOAKLEY ADDITION Technician 09/20/2015

COMMONWEALTH SCAFFOLD, 76.0 0.0 0.00% 17.0 22.37% 0.0 0.00%BMC MOAKLEY ADDITION Laborer 05/03/2015

EXCEL HVAC INC. 1,392.0 372.0 26.72% 540.0 38.79% 0.0 0.00%BMC MOAKLEY ADDITION Sheetmetal Work 08/25/2015

COMMONWEALTH BUILDING S 1,184.0 275.5 23.27% 553.0 46.71% 157.5 13.30%BMC MOAKLEY ADDITION Roofer 10/03/2015

CIRCLE FLOORS INC. 2,731.0 244.0 8.93% 2,310.0 84.58% 244.0 8.93%BMC MOAKLEY ADDITION Floor Layer 09/27/2015

ANDELLA INC. 751.0 7.0 0.93% 500.0 66.58% 0.0 0.00%BMC MOAKLEY ADDITION Iron Worker 03/28/2015

AMQUIP CRANE RENTALL LLC. 38.5 0.0 0.00% 0.0 0.00% 0.0 0.00%BMC MOAKLEY ADDITION Equipment Opera 06/06/2015

AMERICAN PLUMBING HEATIN 6,775.0 1,152.0 17.00% 1,228.0 18.13% 0.0 0.00%BMC MOAKLEY ADDITION Plumber 10/09/2015

AMERICAN ACOUSTICAL 429.0 5.0 1.17% 56.0 13.05% 0.0 0.00%BMC MOAKLEY ADDITION Carpenter 09/11/2015

JAMES W. FLETT CO. INC. 2,528.5 648.0 25.63% 1,344.0 53.15% 0.0 0.00%BMC MOAKLEY ADDITION Equipment Opera 09/27/2015

SHAWMUT DESIGN CONST. 11,294.5 3,266.5 28.92% 2,550.5 22.58% 0.0 0.00%BMC MOAKLEY ADDITION Laborer 10/11/2015

COMMONWEALTH BUILDING S 267.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BMC MOAKLEY ADDITION Sheetmetal Work 10/10/2015

IPSWICH BAY GLASS CO. 1,229.0 247.0 20.10% 247.0 20.10% 0.0 0.00%BMC MOAKLEY ADDITION Glazier 09/26/2015

J.M. ELECTRICAL CO. INC. 966.0 388.0 40.17% 0.0 0.00% 0.0 0.00%BMC MOAKLEY ADDITION Electrician 10/09/2015

BEACON PIPING 1,473.0 389.0 26.41% 405.0 27.49% 0.0 0.00%BMC MOAKLEY ADDITION Pipefitter 06/16/2015

FRED SALVUCCI CORP. 819.0 248.0 30.28% 232.5 28.39% 0.0 0.00%BMC MOAKLEY ADDITION Bricklayer 08/22/2015

J. C. CANNISTRARO INC. 546.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BMC MOAKLEY ADDITION Pipefitter 07/19/2015

IPSWICH BAY GLASS CO. 239.0 219.0 91.63% 15.0 6.28% 196.0 82.01%BMC MOAKLEY ADDITION Iron Worker 08/15/2015

J.C. HIGGINS CORP. 5,838.0 350.0 6.00% 845.0 14.47% 488.0 8.36%BMC MOAKLEY ADDITION Pipefitter 10/11/2015

IPSWICH BAY GLASS CO. 462.0 229.0 49.57% 233.0 50.43% 0.0 0.00%BMC MOAKLEY ADDITION Carpenter 09/26/2015

HAYWARD BAKER INC. 554.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BMC MOAKLEY ADDITION Equipment Opera 12/07/2014

HITECH INSULATION CO. 1,971.0 0.0 0.00% 410.0 20.80% 168.0 8.52%BMC MOAKLEY ADDITION Insulator 09/20/2015

Page 102: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 102

Project Name Trade Latest Week

HB WELDING 2,328.8 921.5 39.57% 830.5 35.66% 63.5 2.73%BMC MOAKLEY ADDITION Iron Worker 06/13/2015

HAYWARD BAKER INC. 1,303.0 283.0 21.72% 283.0 21.72% 0.0 0.00%BMC MOAKLEY ADDITION Piledriver 12/14/2014

HAYWARD BAKER INC. 1,031.5 360.5 34.95% 0.0 0.00% 0.0 0.00%BMC MOAKLEY ADDITION Laborer 09/28/2014

FRED SALVUCCI CORP. 1,128.0 0.0 0.00% 231.0 20.48% 0.0 0.00%BMC MOAKLEY ADDITION Mason Tender 09/26/2015

J. C. CANNISTRARO INC. 20.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BMC MOAKLEY ADDITION HVAC 03/22/2015

GLEESON POWERS INC. 822.0 60.0 7.30% 355.0 43.19% 31.0 3.77%BMC MOAKLEY ADDITION Carpenter 10/10/2015

109,455.1 22,691.8 20.73% 30,628.5 27.98% 3,287.0 3.00%SUB TOTALS:

BMC YAWKEY RENO ADDITION

$55,000,000Amount:

Gen Contractor: SHAWMUT DESIGN CONST.

(617)622-7000 560 HARRISON AVENUE S . BOSTON

Est Start Date:

Est End Date:

08/11/2014

12/01/2016

S & F CONCRETE 76.5 8.5 11.11% 8.5 11.11% 0.0 0.00%BMC YAWKEY RENO ADDITION Cement Finisher 12/05/2015

S & F CONCRETE 24.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BMC YAWKEY RENO ADDITION Equipment Opera 11/07/2015

S & F CONCRETE 566.5 0.0 0.00% 98.5 17.39% 0.0 0.00%BMC YAWKEY RENO ADDITION Laborer 02/06/2016

SAFWAY SERVICES LLC. 2,918.0 576.0 19.74% 626.0 21.45% 0.0 0.00%BMC YAWKEY RENO ADDITION Carpenter 04/16/2016

SAFWAY SERVICES LLC. 1,451.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BMC YAWKEY RENO ADDITION Equipment Opera 12/19/2015

SAFWAY SERVICES LLC. 2,616.0 1,221.0 46.67% 1,063.0 40.63% 228.0 8.72%BMC YAWKEY RENO ADDITION Laborer 04/16/2016

ROADSAFE TRAFFIC SYSTEM, 192.0 0.0 0.00% 0.0 0.00% 96.0 50.00%BMC YAWKEY RENO ADDITION Laborer 05/09/2015

SAFWAY SERVICES LLC. 1,532.5 792.0 51.68% 976.0 63.69% 382.5 24.96%BMC YAWKEY RENO ADDITION Iron Worker 10/31/2015

SAFWAY SERVICES LLC. 302.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BMC YAWKEY RENO ADDITION Elevator Const(M 12/03/2014

PRECISION STEEL PLACERS 85.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BMC YAWKEY RENO ADDITION Iron Worker 11/07/2015

PLATINUM TERRAZZO 2,847.0 0.0 0.00% 1,073.0 37.69% 0.0 0.00%BMC YAWKEY RENO ADDITION Terrazzo Worker 03/19/2016

MORETRENCH 175.0 77.5 44.29% 77.5 44.29% 0.0 0.00%BMC YAWKEY RENO ADDITION Piledriver 07/18/2015

MORETRENCH 214.5 100.5 46.85% 100.5 46.85% 0.0 0.00%BMC YAWKEY RENO ADDITION Laborer 07/18/2015

MORETRENCH 46.0 0.0 0.00% 46.0 100.00% 0.0 0.00%BMC YAWKEY RENO ADDITION Driller 05/30/2015

M.L. MCDONALD SALES 489.0 8.0 1.64% 8.0 1.64% 0.0 0.00%BMC YAWKEY RENO ADDITION Painter 09/13/2016

M.L. MCDONALD SALES 48.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BMC YAWKEY RENO ADDITION Mason 03/08/2016

SAFWAY SERVICES LLC. 44.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BMC YAWKEY RENO ADDITION Utility Operator 05/23/2015

URBAN INSULATION 448.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BMC YAWKEY RENO ADDITION Insulator 11/01/2015

M.L. MCDONALD SALES 359.0 220.0 61.28% 220.0 61.28% 0.0 0.00%BMC YAWKEY RENO ADDITION Taper 03/22/2016

SWEENEY DRYWALL FINISHE 10,173.0 2,599.0 25.55% 3,473.0 34.14% 391.0 3.84%BMC YAWKEY RENO ADDITION Carpenter 03/12/2016

M.L. MCDONALD SALES 722.0 135.0 18.70% 135.0 18.70% 0.0 0.00%BMC YAWKEY RENO ADDITION Laborer 07/12/2016

FIBER-FIT INSULATION. 153.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BMC YAWKEY RENO ADDITION Insulator 04/02/2016

W.H. GLANCY & SONS, INC/GL 92.5 0.0 0.00% 0.0 0.00% 0.0 0.00%BMC YAWKEY RENO ADDITION Millwright 04/18/2015

URBAN INSULATION 29.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BMC YAWKEY RENO ADDITION Asbestos Worker 05/17/2015

THE WELCH CORPORATION 514.0 75.0 14.59% 56.0 10.89% 0.0 0.00%BMC YAWKEY RENO ADDITION Laborer 11/21/2015

Page 103: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 103

Project Name Trade Latest Week

THE WELCH CORPORATION 333.0 177.0 53.15% 174.0 52.25% 0.0 0.00%BMC YAWKEY RENO ADDITION Equipment Opera 11/07/2015

THE PAPPAS COMPANY, INC 361.0 148.0 41.00% 148.0 41.00% 55.0 15.24%BMC YAWKEY RENO ADDITION Carpenter 05/29/2016

UNION STEEL ERECTORS COR 12,354.0 4,801.5 38.87% 3,578.0 28.96% 567.0 4.59%BMC YAWKEY RENO ADDITION Iron Worker 05/21/2016

SWEENEY DRYWALL FINISHE 1,821.5 448.0 24.60% 842.0 46.23% 0.0 0.00%BMC YAWKEY RENO ADDITION Laborer 01/16/2016

SALEM GLASS CO. 4,352.0 204.5 4.70% 208.5 4.79% 0.0 0.00%BMC YAWKEY RENO ADDITION Glazier 05/21/2016

SULLIVAN & MCLAUGHLIN CO. 42,014.0 11,038.5 26.27% 9,611.5 22.88% 2,739.0 6.52%BMC YAWKEY RENO ADDITION Electrician 08/14/2016

STEELCO FENCING 128.0 44.0 34.38% 20.0 15.63% 8.0 6.25%BMC YAWKEY RENO ADDITION Laborer 02/07/2015

STANLEY ACCESS TECHNOLO 198.6 0.0 0.00% 0.0 0.00% 0.0 0.00%BMC YAWKEY RENO ADDITION Carpenter 01/23/2016

SOEP PAINTING CORP. 2,304.5 46.0 2.00% 280.0 12.15% 38.0 1.65%BMC YAWKEY RENO ADDITION Painter 06/19/2016

SHAWMUT DESIGN CONST. 297.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BMC YAWKEY RENO ADDITION Pipefitter 02/07/2016

SHAWMUT DESIGN CONST. 27,316.0 10,409.0 38.11% 3,074.0 11.25% 0.0 0.00%BMC YAWKEY RENO ADDITION Laborer 10/16/2016

SHAWMUT DESIGN CONST. 10,746.0 4,321.0 40.21% 3,014.0 28.05% 177.0 1.65%BMC YAWKEY RENO ADDITION Carpenter 06/26/2016

SALEM GLASS CO. 1,622.5 0.0 0.00% 0.0 0.00% 0.0 0.00%BMC YAWKEY RENO ADDITION Iron Worker 04/09/2016

SWEENEY DRYWALL FINISHE 2,312.5 115.0 4.97% 729.0 31.52% 0.0 0.00%BMC YAWKEY RENO ADDITION Taper 02/20/2016

AXION SPECIALTY CONTRACTI 4,191.5 100.0 2.39% 304.0 7.25% 120.0 2.86%BMC YAWKEY RENO ADDITION Insulator 05/15/2016

CUTTING EDGE ENVIRONMEN 11,624.1 210.0 1.81% 7,280.0 62.63% 0.0 0.00%BMC YAWKEY RENO ADDITION Asbestos Worker 04/30/2016

COX ENGINEERING CO. 20,444.5 2,355.5 11.52% 3,149.5 15.41% 0.0 0.00%BMC YAWKEY RENO ADDITION Sheetmetal Work 10/16/2016

COX ENGINEERING CO. 20,153.5 3,959.5 19.65% 2,779.5 13.79% 330.0 1.64%BMC YAWKEY RENO ADDITION Pipefitter 08/14/2016

COMMONWEALTH BUILDING S 4.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BMC YAWKEY RENO ADDITION Sheetmetal Work 01/16/2016

CIRCLE FLOORS INC. 208.0 0.0 0.00% 202.0 97.12% 0.0 0.00%BMC YAWKEY RENO ADDITION Floor Layer 10/11/2015

CHAPMAN WATERPROOFING 29.0 26.0 89.66% 0.0 0.00% 0.0 0.00%BMC YAWKEY RENO ADDITION Laborer 05/09/2016

CARLYSLE ENGINEERING INC. 5,906.0 2,904.0 49.17% 819.5 13.88% 0.0 0.00%BMC YAWKEY RENO ADDITION Sprinkler Fitter 04/22/2016

D.R. HOWARD 4,405.0 645.0 14.64% 1,794.0 40.73% 0.0 0.00%BMC YAWKEY RENO ADDITION Plumber 05/20/2016

BAY STATE BUILDING SPECIA 1,753.0 775.0 44.21% 391.0 22.30% 363.0 20.71%BMC YAWKEY RENO ADDITION Carpenter 06/07/2016

COMMONWEALTH BUILDING S 1,169.5 393.0 33.60% 409.0 34.97% 6.0 0.51%BMC YAWKEY RENO ADDITION Roofer 03/19/2016

ATI INCORPORATED 121.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BMC YAWKEY RENO ADDITION Laborer 03/19/2016

AMERICAN PLUMBING HEATIN 397.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BMC YAWKEY RENO ADDITION Plumber 05/20/2016

AMERICAN ARCHITECTURAL 746.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BMC YAWKEY RENO ADDITION Carpenter 05/15/2016

AMERICAN ACOUSTICAL 36.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BMC YAWKEY RENO ADDITION Carpenter 10/31/2014

ALLEGHENY CONTRACT FLOO 4,373.0 848.0 19.39% 1,564.0 35.76% 392.0 8.96%BMC YAWKEY RENO ADDITION Floor Layer 08/19/2016

ACCURATE TEMPERATURE C 80.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BMC YAWKEY RENO ADDITION Pipefitter 08/09/2015

M.L. MCDONALD SALES 80.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BMC YAWKEY RENO ADDITION Insulator 05/24/2016

BOSTON AIR SYSTEMS, INC. 601.0 225.5 37.52% 0.0 0.00% 0.0 0.00%BMC YAWKEY RENO ADDITION Sheetmetal Work 04/03/2016

J.M. ELECTRICAL CO. INC. 2,143.0 793.0 37.00% 5.0 0.23% 0.0 0.00%BMC YAWKEY RENO ADDITION Electrician 07/22/2016

Page 104: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 104

Project Name Trade Latest Week

M.L. MCDONALD SALES 3,587.0 160.0 4.46% 502.0 13.99% 0.0 0.00%BMC YAWKEY RENO ADDITION Carpenter 08/09/2016

K & K ACOUSTICAL CEILINGS 1,854.0 0.0 0.00% 8.0 0.43% 0.0 0.00%BMC YAWKEY RENO ADDITION Carpenter 01/24/2016

JF COFFEY ASSOCIATES, INC. 474.5 44.0 9.27% 0.0 0.00% 0.0 0.00%BMC YAWKEY RENO ADDITION HVAC 09/18/2016

CHAPMAN WATERPROOFING 264.0 80.5 30.49% 62.0 23.48% 35.0 13.26%BMC YAWKEY RENO ADDITION Waterproofer 07/11/2016

JAMES W. FLETT CO. INC. 26.0 0.0 0.00% 11.0 42.31% 0.0 0.00%BMC YAWKEY RENO ADDITION Equipment Opera 04/26/2015

DIVERSIFIED CONSTRUCTION 15,543.0 1,030.0 6.63% 11,231.0 72.26% 8.0 0.05%BMC YAWKEY RENO ADDITION Laborer 04/09/2016

J.C. HIGGINS CORP. 1,529.0 12.0 0.78% 336.0 21.98% 32.0 2.09%BMC YAWKEY RENO ADDITION Pipefitter 10/04/2015

J. C. CANNISTRARO INC. 22,409.0 5,658.0 25.25% 4,758.0 21.23% 156.0 0.70%BMC YAWKEY RENO ADDITION Plumber 02/07/2016

IPSWICH BAY GLASS CO. 39.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BMC YAWKEY RENO ADDITION Glazier 02/20/2016

ABSOLUTE ENVIRONMENTAL, 80.0 16.0 20.00% 80.0 100.00% 16.0 20.00%BMC YAWKEY RENO ADDITION Asbestos Worker 08/01/2015

GASTON ELECTRICAL CO, INC 1,156.0 0.0 0.00% 40.0 3.46% 0.0 0.00%BMC YAWKEY RENO ADDITION Electrician 05/01/2016

EAST COAST INTERIORS CO. 4,440.5 876.0 19.73% 374.0 8.42% 263.0 5.92%BMC YAWKEY RENO ADDITION Carpenter 01/16/2016

GLEESON POWERS INC. 2,082.0 190.0 9.13% 986.0 47.36% 29.0 1.39%BMC YAWKEY RENO ADDITION Carpenter 05/14/2016

JAMES W. FLETT CO. INC. 50.0 12.0 24.00% 8.0 16.00% 0.0 0.00%BMC YAWKEY RENO ADDITION Laborer 04/26/2015

EXCEL HVAC INC. 793.0 204.0 25.73% 290.0 36.57% 0.0 0.00%BMC YAWKEY RENO ADDITION Sheetmetal Work 11/10/2015

EMCOR SERVICES 411.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BMC YAWKEY RENO ADDITION Pipefitter 02/21/2016

EMCOR SERVICES 45.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BMC YAWKEY RENO ADDITION HVAC 02/14/2016

HITECH INSULATION CO. 958.0 0.0 0.00% 382.0 39.87% 0.0 0.00%BMC YAWKEY RENO ADDITION Insulator 11/22/2015

266,484.1 59,082.0 22.17% 67,405.5 25.29% 6,431.5 2.41%SUB TOTALS:

BOSTON ASIAN YOUTH

$5,000Amount:

Gen Contractor: AMERICAN TEST & BALANCE

(781) 987-1047 335R WASHINGTON STREET NORWELL

Est Start Date:

Est End Date:

04/01/2014

05/31/2014

AMERICAN TEST & BALANCE 24.5 0.0 0.00% 0.0 0.00% 0.0 0.00%BOSTON ASIAN YOUTH Plumber 04/19/2014

J.M. SERVICE CO.LLC, 13.5 0.0 0.00% 0.0 0.00% 0.0 0.00%BOSTON ASIAN YOUTH HVAC 01/24/2015

OTIS ELEVATOR COMPANY 4.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BOSTON ASIAN YOUTH Elevator Const(M 06/19/2014

42.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SUB TOTALS:

BOSTON AUTO TECH

$10,000Amount:

Gen Contractor: TEED REMODELING

(781)389-8416 21 ALICE ROAD randolph

Est Start Date:

Est End Date:

06/16/2016

06/18/2016

TEED REMODELING 89.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BOSTON AUTO TECH Carpenter 07/01/2016

TEED REMODELING 89.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BOSTON AUTO TECH Laborer 07/01/2016

178.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SUB TOTALS:

BOSTON CHILDREN'S HOSPITAL CLIN

$550,000,000Amount:

Gen Contractor: SUFFOLK CONSTRUCTION CO.

(617)445-3500 64 ALLERTON STREET roxbury

Est Start Date:

Est End Date:

06/15/2017

04/30/2021

JDC DEMOLITION COMPANY, I 162.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BOSTON CHILDREN'S HOSPITAL Equipment Opera 09/09/2017

Page 105: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 105

Project Name Trade Latest Week

J.F. WHITE CONTRACTING CO 2,511.5 1,223.5 48.72% 872.5 34.74% 0.0 0.00%BOSTON CHILDREN'S HOSPITAL Laborer 09/17/2017

S & F CONCRETE 6.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BOSTON CHILDREN'S HOSPITAL Pumpman 09/02/2017

S & F CONCRETE 195.5 71.5 36.57% 71.5 36.57% 0.0 0.00%BOSTON CHILDREN'S HOSPITAL Laborer 09/02/2017

S & F CONCRETE 90.5 18.0 19.89% 13.5 14.92% 0.0 0.00%BOSTON CHILDREN'S HOSPITAL Equipment Opera 08/26/2017

JDC DEMOLITION COMPANY, I 276.0 136.0 49.28% 160.0 57.97% 24.0 8.70%BOSTON CHILDREN'S HOSPITAL Laborer 09/09/2017

J.F. WHITE CONTRACTING CO 988.5 168.0 17.00% 176.0 17.80% 0.0 0.00%BOSTON CHILDREN'S HOSPITAL Piledriver 09/10/2017

HAYWARD BAKER INC. 648.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BOSTON CHILDREN'S HOSPITAL Laborer 07/23/2017

J.F. WHITE CONTRACTING CO 8.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BOSTON CHILDREN'S HOSPITAL Field Engineer 08/06/2017

HAYWARD BAKER INC. 356.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BOSTON CHILDREN'S HOSPITAL Equipment Opera 07/23/2017

HAYWARD BAKER INC. 285.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BOSTON CHILDREN'S HOSPITAL Piledriver 09/17/2017

S & F CONCRETE 22.0 8.0 36.36% 8.0 36.36% 0.0 0.00%BOSTON CHILDREN'S HOSPITAL Carpenter 09/02/2017

J.F. WHITE CONTRACTING CO 40.0 40.0 100.00% 40.0 100.00% 0.0 0.00%BOSTON CHILDREN'S HOSPITAL Carpenter 07/16/2017

BAY CRANE NORTHEAST 76.0 38.0 50.00% 38.0 50.00% 38.0 50.00%BOSTON CHILDREN'S HOSPITAL Equipment Opera 08/17/2017

J.F. WHITE CONTRACTING CO 16.0 0.0 0.00% 8.0 50.00% 0.0 0.00%BOSTON CHILDREN'S HOSPITAL Electrician 08/13/2017

J.F. WHITE CONTRACTING CO 693.5 0.0 0.00% 8.0 1.15% 0.0 0.00%BOSTON CHILDREN'S HOSPITAL Equipment Opera 09/17/2017

6,374.5 1,703.0 26.72% 1,395.5 21.89% 62.0 0.97%SUB TOTALS:

BOSTON CHINATOWN NGHBRD CTR.

$20,000Amount:

Gen Contractor: AMERICAN TEST & BALANCE

(781) 987-1047 335R WASHINGTON STREET NORWELL

Est Start Date:

Est End Date:

03/01/2013

05/31/2013

MASS BAY ELECTRIC CORP. 12.0 4.0 33.33% 0.0 0.00% 0.0 0.00%BOSTON CHINATOWN NGHBRD Electrician 12/01/2013

12.0 4.0 33.33% 0.0 0.00% 0.0 0.00%SUB TOTALS:

BOSTON COLLEGE FIELD HOUSE

$50,000,000Amount:

Gen Contractor: SUFFOLK CONSTRUCTION CO.

(617)445-3500 64 ALLERTON STREET roxbury

Est Start Date:

Est End Date:

03/23/2017

07/23/2018

HUB FOUNDATION CO. 279.0 0.0 0.00% 8.0 2.87% 0.0 0.00%BOSTON COLLEGE FIELD HOUS Piledriver 08/27/2017

LIBERTY CONST. SERVICES 85.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BOSTON COLLEGE FIELD HOUS Carpenter 08/20/2017

THE DOW COMPANY INC. 40.0 40.0 100.00% 40.0 100.00% 0.0 0.00%BOSTON COLLEGE FIELD HOUS Pipelayer 06/10/2017

THE DOW COMPANY INC. 4,962.0 1,074.5 21.65% 1,117.0 22.51% 368.5 7.43%BOSTON COLLEGE FIELD HOUS Laborer 09/02/2017

THE DOW COMPANY INC. 2,635.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BOSTON COLLEGE FIELD HOUS Equipment Opera 09/02/2017

T & T ELECTRICAL CO. 784.0 144.0 18.37% 112.0 14.29% 0.0 0.00%BOSTON COLLEGE FIELD HOUS Electrician 09/09/2017

PRO CUT CONCRETE CUTTIN 80.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BOSTON COLLEGE FIELD HOUS Laborer 08/26/2017

HUB FOUNDATION CO. 814.5 75.5 9.27% 75.5 9.27% 0.0 0.00%BOSTON COLLEGE FIELD HOUS Laborer 08/27/2017

HUB FOUNDATION CO. 126.0 0.0 0.00% 126.0 100.00% 0.0 0.00%BOSTON COLLEGE FIELD HOUS Field Engineer 08/20/2017

HUB FOUNDATION CO. 460.5 0.0 0.00% 0.0 0.00% 0.0 0.00%BOSTON COLLEGE FIELD HOUS Equipment Opera 08/27/2017

HAYWARD BAKER INC. 1,661.0 709.5 42.72% 1,013.5 61.02% 0.0 0.00%BOSTON COLLEGE FIELD HOUS Piledriver 08/27/2017

HAYWARD BAKER INC. 590.5 0.0 0.00% 0.0 0.00% 0.0 0.00%BOSTON COLLEGE FIELD HOUS Equipment Opera 08/27/2017

Page 106: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 106

Project Name Trade Latest Week

LIBERTY CONST. SERVICES 1,525.5 339.0 22.22% 420.0 27.53% 0.0 0.00%BOSTON COLLEGE FIELD HOUS Laborer 09/03/2017

E. M. DUGGAN INC. 104.0 0.0 0.00% 0.0 0.00% 72.0 69.23%BOSTON COLLEGE FIELD HOUS Plumber 09/24/2017

14,147.0 2,382.5 16.84% 2,912.0 20.58% 440.5 3.11%SUB TOTALS:

BOSTON COLLEGE PHASE 1&2

$17,709,000Amount:

Gen Contractor:

Est Start Date:

Est End Date:

06/04/1986

10/01/1987

COSTA BROTHERS MASONRY 873.0 182.5 20.90% 398.5 45.65% 174.0 19.93%BOSTON COLLEGE PHASE 1&2 Laborer 11/07/2015

COSTA BROTHERS MASONRY 700.5 72.0 10.28% 72.0 10.28% 0.0 0.00%BOSTON COLLEGE PHASE 1&2 Bricklayer 11/07/2015

1,573.5 254.5 16.17% 470.5 29.90% 174.0 11.06%SUB TOTALS:

BOSTON COLLEGE RECREATION CEN

$0Amount:

Gen Contractor:

Est Start Date:

Est End Date:

03/01/2017

05/31/2019

NEW ENGLAND FOUNDATION 985.5 0.0 0.00% 0.0 0.00% 0.0 0.00%BOSTON COLLEGE RECREATIO Equipment Opera 07/22/2017

NEW ENGLAND FOUNDATION 1,456.5 936.5 64.30% 0.0 0.00% 0.0 0.00%BOSTON COLLEGE RECREATIO Laborer 09/02/2017

NEW ENGLAND FOUNDATION 1,006.5 582.0 57.82% 582.0 57.82% 0.0 0.00%BOSTON COLLEGE RECREATIO Oiler 07/22/2017

THOMAS G GALLAGHER INC. 122.0 0.0 0.00% 72.0 59.02% 72.0 59.02%BOSTON COLLEGE RECREATIO Plumber 09/03/2017

NEW ENGLAND FOUNDATION 5,072.5 2,195.0 43.27% 981.0 19.34% 0.0 0.00%BOSTON COLLEGE RECREATIO Piledriver 09/16/2017

STATE ELECTRIC CO. 2,587.0 927.0 35.83% 400.0 15.46% 0.0 0.00%BOSTON COLLEGE RECREATIO Electrician 09/10/2017

HERITAGE RESTORATION INC. 498.0 154.5 31.02% 162.5 32.63% 0.0 0.00%BOSTON COLLEGE RECREATIO Bricklayer 09/16/2017

J.L. MARSHALL & SONS,INC 3,483.0 16.0 0.46% 630.0 18.09% 0.0 0.00%BOSTON COLLEGE RECREATIO Laborer 09/17/2017

PRIME STEEL ERECTING INC, 698.5 498.0 71.30% 0.0 0.00% 0.0 0.00%BOSTON COLLEGE RECREATIO Iron Worker 09/16/2017

FRED SALVUCCI CORP. 56.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BOSTON COLLEGE RECREATIO Bricklayer 08/19/2017

J.L. MARSHALL & SONS,INC 728.0 489.0 67.17% 0.0 0.00% 0.0 0.00%BOSTON COLLEGE RECREATIO Equipment Opera 09/17/2017

J.L. MARSHALL & SONS,INC 225.5 0.0 0.00% 74.5 33.04% 0.0 0.00%BOSTON COLLEGE RECREATIO Cement Finisher 09/17/2017

J.L. MARSHALL & SONS,INC 4,563.5 2,037.5 44.65% 1,972.5 43.22% 762.5 16.71%BOSTON COLLEGE RECREATIO Carpenter 09/17/2017

J. DERENZO CO. 6,388.5 2,421.5 37.90% 2,741.5 42.91% 1,000.5 15.66%BOSTON COLLEGE RECREATIO Laborer 09/16/2017

HERITAGE RESTORATION INC. 226.0 64.5 28.54% 64.5 28.54% 0.0 0.00%BOSTON COLLEGE RECREATIO Laborer 09/16/2017

FRED SALVUCCI CORP. 52.0 0.0 0.00% 52.0 100.00% 0.0 0.00%BOSTON COLLEGE RECREATIO Mason Tender 07/15/2017

J. DERENZO CO. 4,399.0 0.0 0.00% 322.0 7.32% 0.0 0.00%BOSTON COLLEGE RECREATIO Equipment Opera 09/16/2017

J.L. MARSHALL & SONS,INC 3,058.0 720.0 23.54% 1,159.0 37.90% 0.0 0.00%BOSTON COLLEGE RECREATIO Iron Worker 09/17/2017

35,606.0 11,041.5 31.01% 9,213.5 25.88% 1,835.0 5.15%SUB TOTALS:

BOSTON GARDEN PODIUM

$205,234,268Amount:

Gen Contractor: JOHN MORIARTY & ASSOCIATES

(781)729-3900 3 CHURCH STREET WINCHESTER

Est Start Date:

Est End Date:

03/15/2016

06/30/2018

HUB FOUNDATION CO. 634.5 8.0 1.26% 0.0 0.00% 0.0 0.00%BOSTON GARDEN PODIUM Piledriver 01/15/2017

HUB FOUNDATION CO. 615.5 615.5 100.00% 615.5 100.00% 0.0 0.00%BOSTON GARDEN PODIUM Oiler 08/28/2016

Page 107: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 107

Project Name Trade Latest Week

HUB FOUNDATION CO. 1,213.5 604.5 49.81% 604.5 49.81% 0.0 0.00%BOSTON GARDEN PODIUM Laborer 01/08/2017

JDC DEMOLITION COMPANY, I 240.0 72.0 30.00% 72.0 30.00% 0.0 0.00%BOSTON GARDEN PODIUM Equipment Opera 05/13/2017

G & C CONCRETE CO. 381.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BOSTON GARDEN PODIUM Oiler 07/08/2017

A. A. WILL CORPORATION 10,173.5 3,767.5 37.03% 5,119.0 50.32% 0.0 0.00%BOSTON GARDEN PODIUM Laborer 09/11/2017

HUB FOUNDATION CO. 2,128.0 594.5 27.94% 885.0 41.59% 594.5 27.94%BOSTON GARDEN PODIUM Equipment Opera 09/04/2016

JDC DEMOLITION COMPANY, I 1,884.0 629.0 33.39% 339.0 17.99% 0.0 0.00%BOSTON GARDEN PODIUM Laborer 05/13/2017

JOHN MORIARTY & ASSOCIAT 2,009.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BOSTON GARDEN PODIUM Carpenter 09/17/2017

JOHN MORIARTY & ASSOCIAT 13,622.0 8,666.0 63.62% 3,065.5 22.50% 3,895.5 28.60%BOSTON GARDEN PODIUM Laborer 09/17/2017

KERR'S WELDING IRON WORK 1,414.0 817.0 57.78% 937.0 66.27% 0.0 0.00%BOSTON GARDEN PODIUM Welder 09/13/2017

PRO CUT CONCRETE CUTTIN 96.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BOSTON GARDEN PODIUM Laborer 06/04/2016

G & C CONCRETE CO. 5,694.5 1,313.0 23.06% 3,083.5 54.15% 0.0 0.00%BOSTON GARDEN PODIUM Laborer 09/16/2017

SOUTH COAST STEEL LLC. 1,664.0 921.5 55.38% 588.0 35.34% 204.0 12.26%BOSTON GARDEN PODIUM Iron Worker 08/20/2016

A. A. WILL CORPORATION 15,592.5 114.5 0.73% 73.0 0.47% 1,007.5 6.46%BOSTON GARDEN PODIUM Equipment Opera 09/11/2017

G & C CONCRETE CO. 1,179.5 0.0 0.00% 58.5 4.96% 0.0 0.00%BOSTON GARDEN PODIUM Equipment Opera 09/02/2017

G & C CONCRETE CO. 1,026.5 90.0 8.77% 228.0 22.21% 0.0 0.00%BOSTON GARDEN PODIUM Cement Laborer 09/16/2017

G & C CONCRETE CO. 232.5 8.0 3.44% 60.0 25.81% 0.0 0.00%BOSTON GARDEN PODIUM Cement Finisher 07/15/2017

G & C CONCRETE CO. 7,157.5 2,541.0 35.50% 1,173.0 16.39% 0.0 0.00%BOSTON GARDEN PODIUM Carpenter 09/16/2017

EAST COAST SLURRY CO. 1,633.0 473.5 29.00% 522.5 32.00% 455.5 27.89%BOSTON GARDEN PODIUM Piledriver 07/18/2016

EAST COAST SLURRY CO. 5,501.5 852.0 15.49% 4,008.5 72.86% 0.0 0.00%BOSTON GARDEN PODIUM Laborer 02/20/2017

EAST COAST SLURRY CO. 8,778.5 1,470.0 16.75% 1,462.0 16.65% 605.5 6.90%BOSTON GARDEN PODIUM Equipment Opera 11/28/2016

ACCORD STEEL & PRECAST 368.5 0.0 0.00% 0.0 0.00% 0.0 0.00%BOSTON GARDEN PODIUM Oiler 09/19/2017

ACCORD STEEL & PRECAST 7,063.0 2,280.0 32.28% 1,232.5 17.45% 373.0 5.28%BOSTON GARDEN PODIUM Iron Worker 09/19/2017

A. A. WILL CORPORATION 10,048.0 3,861.0 38.43% 3,884.0 38.65% 1,048.0 10.43%BOSTON GARDEN PODIUM Piledriver 09/18/2017

ACCORD STEEL & PRECAST 370.5 0.0 0.00% 0.0 0.00% 0.0 0.00%BOSTON GARDEN PODIUM Equipment Opera 09/19/2017

G & C CONCRETE CO. 5,550.5 1,183.5 21.32% 2,311.5 41.64% 0.0 0.00%BOSTON GARDEN PODIUM Iron Worker 09/16/2017

106,271.5 30,882.0 29.06% 30,322.5 28.53% 8,183.5 7.70%SUB TOTALS:

BOSTON HAMILTON HOUSE

$10,000Amount:

Gen Contractor: ATLANTIC ELEVATOR SERVICE.

(781)261-9901 180 BODWELL STREET AVON

Est Start Date:

Est End Date:

01/01/2014

02/28/2014

ATLANTIC ELEVATOR SERVIC 22.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BOSTON HAMILTON HOUSE Elevator Const(M 02/02/2014

22.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SUB TOTALS:

BOSTON HOME SHOPPE

$3,000Amount:

Gen Contractor: HUNTER SIGNS

(617)360-9710 120 BUSINESS STREET HYDE PARK

Est Start Date:

Est End Date:

09/20/2015

09/26/2015

HUNTER SIGNS 1.0 1.0 100.00% 1.0 100.00% 0.0 0.00%BOSTON HOME SHOPPE Laborer 09/26/2015

Page 108: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 108

Project Name Trade Latest Week

1.0 1.0 100.00% 1.0 100.00% 0.0 0.00%SUB TOTALS:

BOSTON LANDING

$118,000,000Amount:

Gen Contractor: JOHN MORIARTY & ASSOCIATES

(781)729-3900 3 CHURCH STREET WINCHESTER

Est Start Date:

Est End Date:

09/01/2013

11/01/2015

SALVUCCI MASONRY COMPAN 1,552.0 1,192.0 76.80% 702.0 45.23% 0.0 0.00%BOSTON LANDING Bricklayer 12/13/2014

PRECISION STEEL PLACERS 4,086.0 1,566.0 38.33% 1,566.0 38.33% 0.0 0.00%BOSTON LANDING Iron Worker 12/06/2014

VALANTE MECHANICAL 11,141.0 2,427.0 21.78% 1,628.0 14.61% 0.0 0.00%BOSTON LANDING Plumber 06/14/2015

PRIME STEEL ERECTING INC, 16.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BOSTON LANDING Oiler 05/10/2014

S & F CONCRETE 5,210.0 2,631.5 50.51% 1,375.5 26.40% 0.0 0.00%BOSTON LANDING Carpenter 01/03/2015

S & F CONCRETE 1,628.5 37.5 2.30% 126.0 7.74% 0.0 0.00%BOSTON LANDING Cement Finisher 01/03/2015

S & F CONCRETE 893.5 0.0 0.00% 0.0 0.00% 0.0 0.00%BOSTON LANDING Equipment Opera 02/14/2015

S & F CONCRETE 5,891.0 8.5 0.14% 1,280.5 21.74% 1,140.0 19.35%BOSTON LANDING Laborer 02/28/2015

S & F CONCRETE 199.5 0.0 0.00% 21.0 10.53% 0.0 0.00%BOSTON LANDING Mason 06/21/2014

OTIS ELEVATOR COMPANY 2,715.0 37.0 1.36% 0.0 0.00% 0.0 0.00%BOSTON LANDING Elev Const Helper 09/03/2015

SALVUCCI MASONRY COMPAN 1,476.0 0.0 0.00% 559.0 37.87% 0.0 0.00%BOSTON LANDING Laborer 12/06/2014

STATE ELECTRIC CO. 45,710.0 11,784.0 25.78% 9,244.0 20.22% 3,781.0 8.27%BOSTON LANDING Electrician 08/30/2015

T & T STEEL ERECTORS 7,459.0 2,698.0 36.17% 3,584.0 48.05% 0.0 0.00%BOSTON LANDING Iron Worker 08/08/2015

T. J. MCCARTNEY, INC. 26,390.5 9,102.0 34.49% 9,513.0 36.05% 1,714.5 6.50%BOSTON LANDING Carpenter 08/14/2015

T. J. MCCARTNEY, INC. 48.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BOSTON LANDING Carpet Layer 02/20/2015

MCCUSKER-GILL INC. 5,164.5 523.0 10.13% 545.0 10.55% 0.0 0.00%BOSTON LANDING Sheetmetal Work 08/09/2015

T. J. MCCARTNEY, INC. 3,180.5 1,051.0 33.05% 835.0 26.25% 0.0 0.00%BOSTON LANDING Taper 07/17/2015

OTIS ELEVATOR COMPANY 3,475.6 0.0 0.00% 1,067.0 30.70% 154.0 4.43%BOSTON LANDING Elevator Const(M 09/03/2015

VALLEYCREST LANDSCAPE 118.0 0.0 0.00% 84.0 71.19% 0.0 0.00%BOSTON LANDING Bricklayer 08/23/2015

VALLEYCREST LANDSCAPE 214.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BOSTON LANDING Equipment Opera 08/30/2015

VALLEYCREST LANDSCAPE 1,743.0 291.0 16.70% 582.0 33.39% 291.0 16.70%BOSTON LANDING Laborer 08/30/2015

WILLIAM M. COLLINS COMPAN 10,532.0 2,100.0 19.94% 2,764.0 26.24% 0.0 0.00%BOSTON LANDING Sprinkler Fitter 08/23/2015

T. J. MCCARTNEY, INC. 3,936.5 503.5 12.79% 1,082.5 27.50% 0.0 0.00%BOSTON LANDING Laborer 08/14/2015

BEACON WATERPROOFING A 2,250.0 626.0 27.82% 626.0 27.82% 0.0 0.00%BOSTON LANDING Bricklayer 07/24/2015

PRIME STEEL ERECTING INC, 22,054.0 12,946.5 58.70% 4,344.0 19.70% 1,007.0 4.57%BOSTON LANDING Iron Worker 10/18/2014

AMQUIP CRANE RENTALL LLC. 1,468.5 48.0 3.27% 265.0 18.05% 48.0 3.27%BOSTON LANDING Equipment Opera 11/22/2014

MCADAM PAINTING CO, INC. 3,867.0 1,129.0 29.20% 489.0 12.65% 194.0 5.02%BOSTON LANDING Painter 09/04/2015

BEACON WATERPROOFING A 311.5 0.0 0.00% 0.0 0.00% 0.0 0.00%BOSTON LANDING Laborer 07/24/2015

BEACON WATERPROOFING A 45.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BOSTON LANDING Waterproofer 07/17/2015

EAST COAST FIREPROOFING 4,432.5 345.5 7.79% 1,887.5 42.58% 0.0 0.00%BOSTON LANDING Laborer 01/20/2015

FRONT LINE INC. 3,992.0 1,092.0 27.35% 3,281.0 82.19% 1,802.0 45.14%BOSTON LANDING Laborer 09/05/2015

Page 109: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 109

Project Name Trade Latest Week

GREENWOOD INDUSTRIES IN 2,734.0 252.3 9.23% 486.0 17.78% 225.8 8.26%BOSTON LANDING Roofer 08/01/2015

GREENWOOD INDUSTRIES IN 862.0 321.5 37.30% 202.0 23.43% 0.0 0.00%BOSTON LANDING Sheetmetal Work 08/01/2015

HAMEL & MCALISTER, INC. 15,426.0 2,220.0 14.39% 4,376.0 28.37% 3,271.0 21.20%BOSTON LANDING Pipefitter 06/19/2015

HAMEL & MCALISTER, INC. 12.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BOSTON LANDING Plumber 02/27/2015

HAYWARD BAKER INC. 78.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BOSTON LANDING Equipment Opera 11/24/2013

KIVA SYSTEMS INC. 347.0 347.0 100.00% 0.0 0.00% 0.0 0.00%BOSTON LANDING Sheetmetal Work 08/16/2015

HAYWARD BAKER INC. 129.0 16.0 12.40% 8.0 6.20% 0.0 0.00%BOSTON LANDING Piledriver 12/01/2013

LONGDEN COMPANY INC. 3,164.0 724.0 22.88% 144.0 4.55% 144.0 4.55%BOSTON LANDING Carpenter 04/11/2015

KIVA SYSTEMS INC. 7,972.5 3,643.0 45.69% 1,358.5 17.04% 1,154.5 14.48%BOSTON LANDING Iron Worker 08/23/2015

KIVA SYSTEMS INC. 14,251.5 3,767.0 26.43% 3,406.5 23.90% 508.0 3.56%BOSTON LANDING Glazier 09/06/2015

KIVA SYSTEMS INC. 15,127.0 4,176.5 27.61% 0.0 0.00% 0.0 0.00%BOSTON LANDING Carpenter 09/06/2015

KENNETH CASTELLUCCI ASSO 638.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BOSTON LANDING Mason 04/03/2015

JOHN MORIARTY & ASSOCIAT 15,716.0 7,570.0 48.17% 10,944.0 69.64% 2,807.0 17.86%BOSTON LANDING Laborer 09/06/2015

JOHN MORIARTY & ASSOCIAT 7,677.0 4,056.0 52.83% 1,620.0 21.10% 0.0 0.00%BOSTON LANDING Carpenter 08/30/2015

J. DERENZO CO. 21,329.5 5,483.5 25.71% 5,780.5 27.10% 1,918.0 8.99%BOSTON LANDING Laborer 08/22/2015

KENNETH CASTELLUCCI ASSO 576.0 124.0 21.53% 258.0 44.79% 0.0 0.00%BOSTON LANDING Mason Tender 11/28/2014

J. DERENZO CO. 15,135.5 4,599.5 30.39% 1,686.5 11.14% 0.0 0.00%BOSTON LANDING Equipment Opera 08/22/2015

302,375.6 89,439.3 29.58% 77,721.0 25.70% 20,159.8 6.67%SUB TOTALS:

BOSTON LANDING BRUINS HOCKEY B

$116,128,227Amount:

Gen Contractor: JOHN MORIARTY & ASSOCIATES

(781)729-3900 3 CHURCH STREET WINCHESTER

Est Start Date:

Est End Date:

12/01/2014

09/02/2016

PRECISION STEEL PLACERS 1,395.0 248.0 17.78% 640.0 45.88% 0.0 0.00%BOSTON LANDING BRUINS HOC Iron Worker 04/16/2016

SALVUCCI MASONRY COMPAN 1,495.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BOSTON LANDING BRUINS HOC Laborer 04/30/2016

SALVUCCI MASONRY COMPAN 1,480.5 538.5 36.37% 610.5 41.24% 0.0 0.00%BOSTON LANDING BRUINS HOC Bricklayer 04/30/2016

S & F CONCRETE 8,660.0 920.5 10.63% 1,509.5 17.43% 0.0 0.00%BOSTON LANDING BRUINS HOC Laborer 07/30/2016

S & F CONCRETE 1,073.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BOSTON LANDING BRUINS HOC Equipment Opera 07/30/2016

S & F CONCRETE 2,180.5 186.0 8.53% 297.0 13.62% 8.5 0.39%BOSTON LANDING BRUINS HOC Cement Finisher 07/30/2016

OTIS ELEVATOR COMPANY 3,152.8 0.0 0.00% 172.0 5.46% 581.0 18.43%BOSTON LANDING BRUINS HOC Elevator Const(M 08/04/2016

PRIME STEEL ERECTING INC, 22,715.5 9,406.5 41.41% 4,217.5 18.57% 913.0 4.02%BOSTON LANDING BRUINS HOC Iron Worker 12/12/2015

STATE ELECTRIC CO. 50,324.5 12,966.5 25.77% 10,224.0 20.32% 4,905.5 9.75%BOSTON LANDING BRUINS HOC Electrician 10/02/2016

VALLEYCREST LANDSCAPE 703.0 98.0 13.94% 281.0 39.97% 0.0 0.00%BOSTON LANDING BRUINS HOC Bricklayer 08/07/2016

S & F CONCRETE 5,959.5 1,991.0 33.41% 2,048.5 34.37% 957.0 16.06%BOSTON LANDING BRUINS HOC Carpenter 07/30/2016

T & T STEEL ERECTORS 8,220.5 2,500.0 30.41% 5,457.5 66.39% 0.0 0.00%BOSTON LANDING BRUINS HOC Iron Worker 10/08/2016

T. J. MCCARTNEY, INC. 29,836.0 7,220.0 24.20% 8,642.5 28.97% 1,199.0 4.02%BOSTON LANDING BRUINS HOC Carpenter 09/02/2016

T. J. MCCARTNEY, INC. 4,042.5 947.5 23.44% 1,348.0 33.35% 0.0 0.00%BOSTON LANDING BRUINS HOC Laborer 09/02/2016

Page 110: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 110

Project Name Trade Latest Week

T. J. MCCARTNEY, INC. 5,197.0 1,134.0 21.82% 1,657.5 31.89% 80.0 1.54%BOSTON LANDING BRUINS HOC Taper 09/02/2016

BEACON WATERPROOFING A 277.5 0.0 0.00% 8.0 2.88% 0.0 0.00%BOSTON LANDING BRUINS HOC Laborer 07/08/2016

WILLIAM M. COLLINS COMPAN 9,351.0 3,036.0 32.47% 2,789.0 29.83% 0.0 0.00%BOSTON LANDING BRUINS HOC Sprinkler Fitter 08/21/2016

OTIS ELEVATOR COMPANY 2,761.3 0.0 0.00% 0.0 0.00% 0.0 0.00%BOSTON LANDING BRUINS HOC Elev Const Helper 07/28/2016

VALLEYCREST LANDSCAPE 163.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BOSTON LANDING BRUINS HOC Equipment Opera 09/04/2016

VALLEYCREST LANDSCAPE 2,129.0 196.0 9.21% 417.0 19.59% 136.0 6.39%BOSTON LANDING BRUINS HOC Laborer 09/04/2016

VOLT SERVICES GROUP 276.0 138.0 50.00% 276.0 100.00% 159.0 57.61%BOSTON LANDING BRUINS HOC Laborer 06/25/2016

VALANTE MECHANICAL 16,535.0 5,623.0 34.01% 3,359.0 20.31% 0.0 0.00%BOSTON LANDING BRUINS HOC Plumber 07/16/2016

ALLIED PILE DRIVING INC. 834.5 527.0 63.15% 282.5 33.85% 129.5 15.52%BOSTON LANDING BRUINS HOC Piledriver 01/03/2015

MCADAM PAINTING CO, INC. 5,033.0 1,445.0 28.71% 653.0 12.97% 393.0 7.81%BOSTON LANDING BRUINS HOC Painter 09/16/2016

ALLIED PILE DRIVING INC. 438.5 0.0 0.00% 144.5 32.95% 0.0 0.00%BOSTON LANDING BRUINS HOC Equipment Opera 01/03/2015

BEACON WATERPROOFING A 1,872.0 1,084.5 57.93% 719.5 38.43% 14.0 0.75%BOSTON LANDING BRUINS HOC Bricklayer 07/08/2016

DIAMOND INSULTION LLC 2,489.0 835.0 33.55% 0.0 0.00% 459.0 18.44%BOSTON LANDING BRUINS HOC Insulator 07/08/2016

FRONT LINE INC. 3,211.0 1,421.0 44.25% 3,195.0 99.50% 1,823.0 56.77%BOSTON LANDING BRUINS HOC Laborer 10/01/2016

HAMEL & MCALISTER, INC. 11,174.8 3,105.8 27.79% 4,053.3 36.27% 590.0 5.28%BOSTON LANDING BRUINS HOC Pipefitter 07/15/2016

J. DERENZO CO. 8,032.5 1,876.0 23.36% 518.0 6.45% 0.0 0.00%BOSTON LANDING BRUINS HOC Equipment Opera 07/16/2016

J. DERENZO CO. 8,801.5 3,961.0 45.00% 4,481.5 50.92% 1,983.5 22.54%BOSTON LANDING BRUINS HOC Laborer 07/16/2016

JOHN MORIARTY & ASSOCIAT 6,217.0 3,395.0 54.61% 1,103.0 17.74% 0.0 0.00%BOSTON LANDING BRUINS HOC Carpenter 10/02/2016

MARSHALL ROOFING & SHEET 8,874.5 2,465.5 27.78% 3,455.0 38.93% 59.5 0.67%BOSTON LANDING BRUINS HOC Roofer 07/30/2016

EAST COAST FIREPROOFING 1,469.0 0.0 0.00% 456.0 31.04% 0.0 0.00%BOSTON LANDING BRUINS HOC Laborer 01/26/2016

JOHN MORIARTY & ASSOCIAT 12,478.0 6,291.0 50.42% 8,568.0 68.66% 1,940.0 15.55%BOSTON LANDING BRUINS HOC Laborer 10/09/2016

MARSHALL ROOFING & SHEET 209.5 0.0 0.00% 72.0 34.37% 0.0 0.00%BOSTON LANDING BRUINS HOC Sheetmetal Work 07/30/2016

KIVA SYSTEMS INC. 248.0 66.0 26.61% 0.0 0.00% 0.0 0.00%BOSTON LANDING BRUINS HOC Sheetmetal Work 07/31/2016

KIVA SYSTEMS INC. 5,484.5 3,145.0 57.34% 1,411.0 25.73% 0.0 0.00%BOSTON LANDING BRUINS HOC Iron Worker 08/21/2016

KIVA SYSTEMS INC. 6,269.0 1,688.5 26.93% 1,797.0 28.66% 265.5 4.24%BOSTON LANDING BRUINS HOC Glazier 08/21/2016

KIVA SYSTEMS INC. 11,719.0 3,549.0 30.28% 0.0 0.00% 0.0 0.00%BOSTON LANDING BRUINS HOC Carpenter 08/21/2016

JULIAN CRANE & EQUIPMENT 157.0 13.0 8.28% 0.0 0.00% 0.0 0.00%BOSTON LANDING BRUINS HOC Iron Worker 04/10/2016

JULIAN CRANE & EQUIPMENT 2,934.0 0.0 0.00% 2,910.0 99.18% 2,910.0 99.18%BOSTON LANDING BRUINS HOC Equipment Opera 08/14/2016

JULIAN CRANE & EQUIPMENT 195.0 0.0 0.00% 5.5 2.82% 5.5 2.82%BOSTON LANDING BRUINS HOC Elevator Const(M 04/10/2016

276,069.3 82,017.8 29.71% 77,779.3 28.17% 19,511.5 7.07%SUB TOTALS:

BOSTON MEDICAL CENTER MENINO A

$130,000,000Amount:

Gen Contractor: SUFFOLK CONSTRUCTION CO.

(617)445-3500 64 ALLERTON STREET roxbury

Est Start Date:

Est End Date:

05/04/2015

12/01/2017

SULLIVAN & MCLAUGHLIN CO. 115,788.0 44,670.5 38.58% 37,927.0 32.76% 6,441.5 5.56%BOSTON MEDICAL CENTER ME Electrician 09/17/2017

MORETRENCH 1,707.5 544.5 31.89% 544.5 31.89% 0.0 0.00%BOSTON MEDICAL CENTER ME Carpenter 09/26/2015

Page 111: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 111

Project Name Trade Latest Week

PAVILION FLOORS, INC. 14,334.5 2,035.5 14.20% 12,027.5 83.91% 1,818.5 12.69%BOSTON MEDICAL CENTER ME Carpet Layer 09/09/2017

SOEP PAINTING CORP. 68.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BOSTON MEDICAL CENTER ME Painter 02/08/2015

S.O.S. CORPORATION 432.0 128.0 29.63% 112.0 25.93% 0.0 0.00%BOSTON MEDICAL CENTER ME Laborer 01/24/2016

PRO CUT CONCRETE CUTTIN 2,643.0 322.0 12.18% 568.0 21.49% 42.0 1.59%BOSTON MEDICAL CENTER ME Laborer 07/01/2017

PAVILION FLOORS, INC. 1,352.0 0.0 0.00% 807.0 59.69% 0.0 0.00%BOSTON MEDICAL CENTER ME Terrazzo Worker 09/09/2017

PAVILION FLOORS, INC. 20.0 0.0 0.00% 16.0 80.00% 16.0 80.00%BOSTON MEDICAL CENTER ME Floor Layer 05/14/2016

STRUCTURES DEREK INTERN 12,360.5 2,438.5 19.73% 5,757.5 46.58% 701.5 5.68%BOSTON MEDICAL CENTER ME Iron Worker 12/26/2015

OTIS ELEVATOR COMPANY 2,664.0 0.0 0.00% 140.8 5.28% 390.3 14.65%BOSTON MEDICAL CENTER ME Elevator Const(M 09/14/2017

OTIS ELEVATOR COMPANY 1,854.0 40.0 2.16% 0.0 0.00% 42.0 2.27%BOSTON MEDICAL CENTER ME Elev Const Helper 09/14/2017

NEWROADS ENVIRONMENTAL 2,236.0 144.0 6.44% 1,924.0 86.05% 16.0 0.72%BOSTON MEDICAL CENTER ME Laborer 05/14/2016

NEWROADS ENVIRONMENTAL 512.0 0.0 0.00% 512.0 100.00% 0.0 0.00%BOSTON MEDICAL CENTER ME Asbestos Worker 10/04/2014

MORETRENCH 2,935.8 0.0 0.00% 2,160.3 73.58% 0.0 0.00%BOSTON MEDICAL CENTER ME Equipment Opera 10/22/2016

MIDNIGHT IRON CONST. 3,504.0 1,719.5 49.07% 1,991.5 56.84% 0.0 0.00%BOSTON MEDICAL CENTER ME Iron Worker 02/27/2016

SULLIVAN & MCLAUGHLIN CO. 14,467.0 1,420.0 9.82% 5,054.5 34.94% 820.0 5.67%BOSTON MEDICAL CENTER ME Installer/Apt Wirer 09/17/2017

THE WELCH CORPORATION 9,559.0 1,812.0 18.96% 555.0 5.81% 0.0 0.00%BOSTON MEDICAL CENTER ME Equipment Opera 09/02/2017

MORETRENCH 7,624.0 2,326.0 30.51% 2,310.0 30.30% 0.0 0.00%BOSTON MEDICAL CENTER ME Laborer 10/22/2016

SWEENEY DRYWALL FINISHE 15,838.0 7,749.5 48.93% 10,366.0 65.45% 4.0 0.03%BOSTON MEDICAL CENTER ME Laborer 09/16/2017

XQUISITE LANDSCAPING 152.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BOSTON MEDICAL CENTER ME Mason 10/23/2016

XQUISITE LANDSCAPING 575.0 48.0 8.35% 131.0 22.78% 48.0 8.35%BOSTON MEDICAL CENTER ME Laborer 12/11/2016

XQUISITE LANDSCAPING 61.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BOSTON MEDICAL CENTER ME Equipment Opera 11/06/2016

URBAN INSULATION 2,070.5 194.0 9.37% 292.5 14.13% 127.0 6.13%BOSTON MEDICAL CENTER ME Insulator 09/17/2017

UNISTRUT CONSTRUCTION 2,494.0 454.0 18.20% 598.0 23.98% 112.0 4.49%BOSTON MEDICAL CENTER ME Carpenter 08/06/2017

THE WELCH CORPORATION 18,735.5 4,590.5 24.50% 6,543.5 34.93% 483.0 2.58%BOSTON MEDICAL CENTER ME Laborer 09/02/2017

JDC DEMOLITION COMPANY, I 936.0 16.0 1.71% 48.0 5.13% 0.0 0.00%BOSTON MEDICAL CENTER ME Equipment Opera 11/26/2016

SWEENEY DRYWALL FINISHE 13,958.5 4,267.0 30.57% 5,260.0 37.68% 556.0 3.98%BOSTON MEDICAL CENTER ME Taper 09/16/2017

M.L. MCDONALD SALES 64.0 56.0 87.50% 0.0 0.00% 0.0 0.00%BOSTON MEDICAL CENTER ME Taper 03/28/2017

SULLIVAN & MCLAUGHLIN CO. 40.0 0.0 0.00% 40.0 100.00% 0.0 0.00%BOSTON MEDICAL CENTER ME Laborer 09/13/2014

SWEENEY DRYWALL FINISHE 98,707.5 38,040.0 38.54% 32,914.5 33.35% 3,203.5 3.25%BOSTON MEDICAL CENTER ME Carpenter 09/16/2017

SUNRISE ERECTORS INC. 902.5 460.0 50.97% 0.0 0.00% 0.0 0.00%BOSTON MEDICAL CENTER ME Sheetmetal Work 06/26/2016

SUNRISE ERECTORS INC. 628.0 0.0 0.00% 8.0 1.27% 0.0 0.00%BOSTON MEDICAL CENTER ME Laborer 04/30/2017

SUNRISE ERECTORS INC. 3,005.0 585.5 19.48% 1,068.5 35.56% 0.0 0.00%BOSTON MEDICAL CENTER ME Iron Worker 03/12/2017

SUNRISE ERECTORS INC. 5,203.0 1,229.0 23.62% 2,033.5 39.08% 0.0 0.00%BOSTON MEDICAL CENTER ME Glazier 09/10/2017

SUNRISE ERECTORS INC. 11,709.0 3,152.5 26.92% 2,265.0 19.34% 839.5 7.17%BOSTON MEDICAL CENTER ME Carpenter 09/10/2017

SULLIVAN & MCLAUGHLIN CO. 16.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BOSTON MEDICAL CENTER ME Telephone/Data I 12/20/2015

Page 112: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 112

Project Name Trade Latest Week

THE PAPPAS COMPANY, INC 83.0 59.0 71.08% 44.0 53.01% 21.0 25.30%BOSTON MEDICAL CENTER ME Carpenter 09/17/2017

COMPONENT ASSEMBLY SYS 1,869.0 918.0 49.12% 213.0 11.40% 0.0 0.00%BOSTON MEDICAL CENTER ME Carpenter 07/04/2017

JOHN F. SHEA CO. INC. 6,909.9 1,482.1 21.45% 2,622.1 37.95% 524.9 7.60%BOSTON MEDICAL CENTER ME Roofer 07/15/2017

GRANITE STATE SPECIALTIES, 8.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BOSTON MEDICAL CENTER ME Carpenter 03/27/2016

EAST COAST FIREPROOFING 16.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BOSTON MEDICAL CENTER ME Mason 09/15/2015

EAST COAST FIREPROOFING 3,610.0 654.0 18.12% 1,286.0 35.62% 0.0 0.00%BOSTON MEDICAL CENTER ME Laborer 08/09/2016

DIVERSIFIED CONSTRUCTION 26,169.0 5,635.0 21.53% 14,673.0 56.07% 653.0 2.50%BOSTON MEDICAL CENTER ME Laborer 05/06/2017

COX ENGINEERING CO. 37,702.5 6,323.5 16.77% 9,353.5 24.81% 0.0 0.00%BOSTON MEDICAL CENTER ME Sheetmetal Work 09/17/2017

COX ENGINEERING CO. 10.8 0.0 0.00% 0.0 0.00% 0.0 0.00%BOSTON MEDICAL CENTER ME Laborer 09/17/2017

J. C. CANNISTRARO INC. 78,522.5 14,195.5 18.08% 18,904.5 24.08% 3,006.0 3.83%BOSTON MEDICAL CENTER ME Plumber 09/17/2017

COSTA BROTHERS MASONRY 2,089.5 72.0 3.45% 218.0 10.43% 16.0 0.77%BOSTON MEDICAL CENTER ME Bricklayer 07/01/2017

J. C. CANNISTRARO INC. 13,630.0 6,137.0 45.03% 4,662.5 34.21% 237.5 1.74%BOSTON MEDICAL CENTER ME Sprinkler Fitter 09/10/2017

CHAPMAN WATERPROOFING 478.0 196.0 41.00% 192.0 40.17% 86.0 17.99%BOSTON MEDICAL CENTER ME Waterproofer 05/30/2016

CHAPMAN WATERPROOFING 180.0 60.0 33.33% 24.0 13.33% 0.0 0.00%BOSTON MEDICAL CENTER ME Laborer 05/30/2016

CAPCO STEEL ERECTORS 8,024.0 1,708.0 21.29% 1,460.0 18.20% 0.0 0.00%BOSTON MEDICAL CENTER ME Iron Worker 08/27/2017

AXION SPECIALTY CONTRACTI 10,401.0 1,812.0 17.42% 1,118.0 10.75% 661.0 6.36%BOSTON MEDICAL CENTER ME Insulator 09/17/2017

AUTOMATION SOLUTIONS INC. 27.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BOSTON MEDICAL CENTER ME Sheetmetal Work 01/28/2017

AUTOMATION SOLUTIONS INC. 2,814.0 242.0 8.60% 1,180.0 41.93% 0.0 0.00%BOSTON MEDICAL CENTER ME Carpenter 02/24/2017

ARCHER CORPORATION 2,156.0 0.0 0.00% 586.0 27.18% 0.0 0.00%BOSTON MEDICAL CENTER ME Carpenter 09/01/2017

COSTA BROTHERS MASONRY 2,433.0 287.5 11.82% 956.5 39.31% 339.0 13.93%BOSTON MEDICAL CENTER ME Laborer 07/01/2017

JACKSON GLASS 719.0 361.5 50.28% 104.0 14.46% 0.0 0.00%BOSTON MEDICAL CENTER ME Glazier 09/16/2017

LIBERTY CONST. SERVICES 102,698.0 54,743.5 53.31% 20,110.0 19.58% 1,689.5 1.65%BOSTON MEDICAL CENTER ME Laborer 08/06/2017

LIBERTY CONST. SERVICES 1,566.0 0.0 0.00% 1,487.0 94.96% 0.0 0.00%BOSTON MEDICAL CENTER ME Equipment Opera 07/10/2016

LIBERTY CONST. SERVICES 1,850.0 16.0 0.86% 0.0 0.00% 0.0 0.00%BOSTON MEDICAL CENTER ME Carpenter 08/06/2017

K & K ACOUSTICAL CEILINGS 2,574.0 541.0 21.02% 537.0 20.86% 32.0 1.24%BOSTON MEDICAL CENTER ME Carpenter 09/17/2017

JOHN F. SHEA CO. INC. 626.9 96.8 15.44% 0.0 0.00% 0.0 0.00%BOSTON MEDICAL CENTER ME Sheetmetal Work 04/29/2017

J. C. CANNISTRARO INC. 177.0 0.0 0.00% 80.0 45.20% 0.0 0.00%BOSTON MEDICAL CENTER ME Metal Refinisher 05/08/2016

LIDDEL BROTHER INC. 10.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BOSTON MEDICAL CENTER ME Laborer 10/11/2014

M.L. MCDONALD SALES 9,462.0 4,300.0 45.44% 2,592.0 27.39% 1,265.0 13.37%BOSTON MEDICAL CENTER ME Painter 09/12/2017

JDC DEMOLITION COMPANY, I 15,202.5 5,478.0 36.03% 6,093.5 40.08% 547.5 3.60%BOSTON MEDICAL CENTER ME Laborer 04/08/2017

J.M. ELECTRICAL CO. INC. 4,198.0 1,767.0 42.09% 666.0 15.86% 0.0 0.00%BOSTON MEDICAL CENTER ME Electrician 09/08/2017

J.L. MARSHALL & SONS,INC 9,386.0 994.5 10.60% 2,506.5 26.70% 111.0 1.18%BOSTON MEDICAL CENTER ME Laborer 09/10/2017

J.L. MARSHALL & SONS,INC 113.0 16.0 14.16% 58.0 51.33% 0.0 0.00%BOSTON MEDICAL CENTER ME Iron Worker 06/11/2017

J.L. MARSHALL & SONS,INC 600.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BOSTON MEDICAL CENTER ME Equipment Opera 04/16/2017

Page 113: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 113

Project Name Trade Latest Week

J.L. MARSHALL & SONS,INC 1,955.5 120.5 6.16% 322.0 16.47% 72.0 3.68%BOSTON MEDICAL CENTER ME Cement Finisher 09/10/2017

J.L. MARSHALL & SONS,INC 6,870.0 1,566.0 22.79% 3,693.0 53.76% 526.5 7.66%BOSTON MEDICAL CENTER ME Carpenter 09/10/2017

LIMBACH CO. 42,991.0 8,001.5 18.61% 2,913.0 6.78% 3,644.0 8.48%BOSTON MEDICAL CENTER ME Pipefitter 09/19/2017

767,288.8 236,226.4 30.79% 232,631.1 30.32% 29,092.7 3.79%SUB TOTALS:

BOSTON PIZZA & GRILL

$50,000Amount:

Gen Contractor: CARDOSO CONSTRUCTION

(617)459-0154 15 GREENBRIER STREET dorchester

Est Start Date:

Est End Date:

12/15/2014

04/04/2015

BOSTON GLASS & BOARDING 22.0 11.0 50.00% 0.0 0.00% 0.0 0.00%BOSTON PIZZA & GRILL Glazier 04/04/2015

CARDOSO CONSTRUCTION 64.0 49.0 76.56% 64.0 100.00% 0.0 0.00%BOSTON PIZZA & GRILL Laborer 03/28/2015

ARDON VINYL GRAPHICS & SI 13.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BOSTON PIZZA & GRILL Laborer 07/24/2015

OVERHEAD DOOR CO 33.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BOSTON PIZZA & GRILL Laborer 03/01/2015

132.0 60.0 45.45% 64.0 48.48% 0.0 0.00%SUB TOTALS:

BOSTON STONE GIFT SHOP

$2,500Amount:

Gen Contractor: INSIGNIA INC.DBA INSTANT SIGN CENTER

(781)258-0150 508 BOSTON PROVIDENCE TPK. norwood

Est Start Date:

Est End Date:

01/25/2015

01/30/2015

INSIGNIA INC.DBA INSTANT SI 3.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BOSTON STONE GIFT SHOP Laborer 01/31/2015

3.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SUB TOTALS:

BOSTON UNIVERSITY I.L.S.E. CENTER

$119,134,368Amount:

Gen Contractor: TURNER CONSTRUCTION CO.

(617)247-6400 TWO SEAPORT LANE BOSTON

Est Start Date:

Est End Date:

05/28/2015

03/01/2016

MCDONALD ELECTRICAL COR 298.0 8.0 2.68% 64.0 21.48% 104.0 34.90%BOSTON UNIVERSITY I.L.S.E. C Electrician 10/16/2016

SILVERBACKCONCRETE CON 1,655.0 0.0 0.00% 12.5 0.76% 0.0 0.00%BOSTON UNIVERSITY I.L.S.E. C Cement Laborer 01/22/2017

SILVERBACKCONCRETE CON 1,227.5 197.0 16.05% 213.5 17.39% 38.0 3.10%BOSTON UNIVERSITY I.L.S.E. C Cement Finisher 01/22/2017

RICHWOOD, INC. 1,759.0 184.0 10.46% 184.0 10.46% 0.0 0.00%BOSTON UNIVERSITY I.L.S.E. C Carpenter 03/19/2017

PIZZOTTI BROTHERS, INC. 208.0 0.0 0.00% 168.0 80.77% 0.0 0.00%BOSTON UNIVERSITY I.L.S.E. C Mason Tender 03/12/2017

PIZZOTTI BROTHERS, INC. 240.0 48.0 20.00% 104.0 43.33% 0.0 0.00%BOSTON UNIVERSITY I.L.S.E. C Bricklayer 03/12/2017

PAVILION FLOORS, INC. 1,122.0 0.0 0.00% 220.0 19.61% 0.0 0.00%BOSTON UNIVERSITY I.L.S.E. C Terrazzo Worker 03/05/2017

LAB SPECIALTIES CO. 204.0 17.0 8.33% 41.0 20.10% 0.0 0.00%BOSTON UNIVERSITY I.L.S.E. C Carpenter 12/18/2016

OTIS ELEVATOR COMPANY 1,509.0 322.3 21.36% 0.0 0.00% 314.5 20.84%BOSTON UNIVERSITY I.L.S.E. C Elev Const Helper 03/05/2017

MCCUSKER-GILL INC. 14,974.5 5,038.5 33.65% 4,636.5 30.96% 0.0 0.00%BOSTON UNIVERSITY I.L.S.E. C Sheetmetal Work 03/12/2017

MARR EQUIPMENT CORP. 3,367.5 52.5 1.56% 0.0 0.00% 2,843.0 84.42%BOSTON UNIVERSITY I.L.S.E. C Equipment Opera 03/05/2017

MARR EQUIPMENT CORP. 144.5 0.0 0.00% 0.0 0.00% 0.0 0.00%BOSTON UNIVERSITY I.L.S.E. C Elevator Const(M 09/04/2016

MARR EQUIPMENT CORP. 81.5 0.0 0.00% 0.0 0.00% 0.0 0.00%BOSTON UNIVERSITY I.L.S.E. C Elev Const Helper 09/04/2016

OTIS ELEVATOR COMPANY 1,961.8 364.8 18.59% 550.0 28.04% 596.0 30.38%BOSTON UNIVERSITY I.L.S.E. C Elevator Const(M 03/05/2017

SUPERIOR RAIL& IRON WORK 5,919.0 1,434.5 24.24% 1,004.0 16.96% 172.5 2.91%BOSTON UNIVERSITY I.L.S.E. C Iron Worker 03/19/2017

SOEP PAINTING CORP. 7,422.0 488.0 6.58% 1,728.0 23.28% 601.0 8.10%BOSTON UNIVERSITY I.L.S.E. C Painter 03/19/2017

Page 114: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 114

Project Name Trade Latest Week

TCI INSTALLATIONS INC. 1,789.5 50.5 2.82% 357.0 19.95% 0.0 0.00%BOSTON UNIVERSITY I.L.S.E. C Carpenter 02/19/2017

THE WATERPROOFING COMP 70.0 0.0 0.00% 70.0 100.00% 0.0 0.00%BOSTON UNIVERSITY I.L.S.E. C Laborer 12/25/2016

THE WATERPROOFING COMP 607.0 289.5 47.69% 265.5 43.74% 8.0 1.32%BOSTON UNIVERSITY I.L.S.E. C Waterproofer 03/18/2017

THE WELCH CORPORATION 3,265.0 488.0 14.95% 332.0 10.17% 0.0 0.00%BOSTON UNIVERSITY I.L.S.E. C Equipment Opera 03/18/2017

THE WELCH CORPORATION 6,534.0 1,692.0 25.90% 1,477.0 22.60% 323.0 4.94%BOSTON UNIVERSITY I.L.S.E. C Laborer 03/18/2017

THOMAS G GALLAGHER INC. 27,100.5 8,994.0 33.19% 4,274.0 15.77% 2,890.0 10.66%BOSTON UNIVERSITY I.L.S.E. C Pipefitter 03/19/2017

TURNER CONSTRUCTION CO. 13,883.0 4,048.0 29.16% 4,355.0 31.37% 1,864.0 13.43%BOSTON UNIVERSITY I.L.S.E. C Carpenter 03/19/2017

TURNER CONSTRUCTION CO. 41,509.0 23,364.0 56.29% 18,616.5 44.85% 3,190.5 7.69%BOSTON UNIVERSITY I.L.S.E. C Laborer 03/19/2017

URBAN INSULATION 1,972.0 814.0 41.28% 870.0 44.12% 814.0 41.28%BOSTON UNIVERSITY I.L.S.E. C Insulator 12/04/2016

VALLEYCREST LANDSCAPE 93.5 0.0 0.00% 0.0 0.00% 0.0 0.00%BOSTON UNIVERSITY I.L.S.E. C Bricklayer 11/27/2016

VALLEYCREST LANDSCAPE 85.5 0.0 0.00% 0.0 0.00% 0.0 0.00%BOSTON UNIVERSITY I.L.S.E. C Equipment Opera 11/27/2016

VALLEYCREST LANDSCAPE 199.5 0.0 0.00% 2.0 1.00% 0.0 0.00%BOSTON UNIVERSITY I.L.S.E. C Laborer 11/27/2016

SULLIVAN & MCLAUGHLIN CO. 59,573.5 25,051.0 42.05% 16,671.5 27.98% 5,440.0 9.13%BOSTON UNIVERSITY I.L.S.E. C Electrician 03/19/2017

ARCHER CORPORATION 4,835.5 414.0 8.56% 610.0 12.62% 329.0 6.80%BOSTON UNIVERSITY I.L.S.E. C Carpenter 03/12/2017

ELECTROMAGNETIC SHIELDIN 691.0 478.0 69.18% 322.0 46.60% 0.0 0.00%BOSTON UNIVERSITY I.L.S.E. C Iron Worker 04/10/2016

DEPAOLI MOSAIC COMPANY 929.0 14.0 1.51% 14.0 1.51% 0.0 0.00%BOSTON UNIVERSITY I.L.S.E. C Terrazzo Worker 03/12/2017

DEANGELIS IRON WORK INC. 6,601.0 2,678.0 40.57% 3,184.0 48.24% 0.0 0.00%BOSTON UNIVERSITY I.L.S.E. C Iron Worker 07/23/2016

COMMONWEALTH SCAFFOLD, 1,063.0 323.0 30.39% 323.0 30.39% 0.0 0.00%BOSTON UNIVERSITY I.L.S.E. C Laborer 02/28/2016

COMMONWEALTH SCAFFOLD, 388.0 8.0 2.06% 8.0 2.06% 8.0 2.06%BOSTON UNIVERSITY I.L.S.E. C Carpenter 02/28/2016

H. CARR & SONS INC. 49,818.5 11,549.0 23.18% 26,600.0 53.39% 1,707.0 3.43%BOSTON UNIVERSITY I.L.S.E. C Carpenter 03/19/2017

BAY STATE BUILDING SPECIA 836.0 298.0 35.65% 96.0 11.48% 0.0 0.00%BOSTON UNIVERSITY I.L.S.E. C Carpenter 03/19/2017

BEACON WATERPROOFING A 666.0 405.0 60.81% 410.0 61.56% 0.0 0.00%BOSTON UNIVERSITY I.L.S.E. C Bricklayer 10/02/2016

AMERICAN PLUMBING HEATIN 13,946.0 3,955.0 28.36% 2,591.5 18.58% 683.5 4.90%BOSTON UNIVERSITY I.L.S.E. C Plumber 03/19/2017

ALLEGHENY CONTRACT FLOO 5,376.0 1,660.0 30.88% 4,122.0 76.67% 260.0 4.84%BOSTON UNIVERSITY I.L.S.E. C Floor Layer 03/12/2017

ALLEGHENY CONTRACT FLOO 26.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BOSTON UNIVERSITY I.L.S.E. C Equipment Opera 02/05/2017

ACCORD STEEL & PRECAST 14,355.5 4,278.5 29.80% 4,525.0 31.52% 335.0 2.33%BOSTON UNIVERSITY I.L.S.E. C Iron Worker 05/22/2016

KO STONE 825.0 338.0 40.97% 761.0 92.24% 347.0 42.06%BOSTON UNIVERSITY I.L.S.E. C Laborer 03/19/2017

SULLIVAN & MCLAUGHLIN CO. 19.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BOSTON UNIVERSITY I.L.S.E. C Installer/Apt Wirer 01/24/2016

CARLYSLE ENGINEERING INC. 6,526.5 346.0 5.30% 176.0 2.70% 1,101.0 16.87%BOSTON UNIVERSITY I.L.S.E. C Sprinkler Fitter 02/26/2017

JOHN F. SHEA CO. INC. 394.5 0.0 0.00% 0.0 0.00% 0.0 0.00%BOSTON UNIVERSITY I.L.S.E. C Sheetmetal Work 03/12/2017

AXION SPECIALTY CONTRACTI 7,496.0 1,164.0 15.53% 58.0 0.77% 664.0 8.86%BOSTON UNIVERSITY I.L.S.E. C Insulator 02/19/2017

KERR'S WELDING IRON WORK 1,546.0 722.0 46.70% 755.0 48.84% 0.0 0.00%BOSTON UNIVERSITY I.L.S.E. C Welder 03/13/2016

JOHN F. SHEA CO. INC. 4,534.0 996.9 21.99% 2,310.0 50.95% 77.3 1.70%BOSTON UNIVERSITY I.L.S.E. C Roofer 03/19/2017

J.M. ELECTRICAL CO. INC. 8,329.0 1,307.0 15.69% 2,781.0 33.39% 0.0 0.00%BOSTON UNIVERSITY I.L.S.E. C Electrician 03/12/2017

Page 115: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 115

Project Name Trade Latest Week

ISLAND INTER. INDUSTRIES. 1,499.0 0.0 0.00% 167.0 11.14% 0.0 0.00%BOSTON UNIVERSITY I.L.S.E. C Plasterer 06/05/2016

ISLAND INTER. INDUSTRIES. 1,772.0 1,285.0 72.52% 1,349.0 76.13% 683.0 38.54%BOSTON UNIVERSITY I.L.S.E. C Laborer 06/05/2016

IPSWICH BAY GLASS CO. 9,902.5 4,049.0 40.89% 3,771.0 38.08% 2,094.0 21.15%BOSTON UNIVERSITY I.L.S.E. C Iron Worker 03/19/2017

IPSWICH BAY GLASS CO. 8,585.0 4,092.0 47.66% 1,377.5 16.05% 1,315.0 15.32%BOSTON UNIVERSITY I.L.S.E. C Carpenter 03/19/2017

HAYWARD BAKER INC. 1,349.0 285.0 21.13% 257.0 19.05% 0.0 0.00%BOSTON UNIVERSITY I.L.S.E. C Piledriver 08/16/2015

HAYWARD BAKER INC. 640.0 447.0 69.84% 197.0 30.78% 0.0 0.00%BOSTON UNIVERSITY I.L.S.E. C Laborer 08/16/2015

HAYWARD BAKER INC. 857.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BOSTON UNIVERSITY I.L.S.E. C Equipment Opera 08/16/2015

H. CARR & SONS INC. 8,598.0 3,781.0 43.98% 3,464.5 40.29% 1,416.5 16.47%BOSTON UNIVERSITY I.L.S.E. C Taper 03/19/2017

H. CARR & SONS INC. 9,657.5 3,536.0 36.61% 5,620.5 58.20% 965.5 10.00%BOSTON UNIVERSITY I.L.S.E. C Laborer 03/12/2017

IPSWICH BAY GLASS CO. 19,560.0 5,982.5 30.59% 1,796.0 9.18% 2,943.0 15.05%BOSTON UNIVERSITY I.L.S.E. C Glazier 03/19/2017

390,396.8 127,337.4 32.62% 123,862.0 31.73% 34,127.3 8.74%SUB TOTALS:

BOSTON UNIVERSITY LAW SCHOOL L

$133,000,000Amount:

Gen Contractor: SKANSKA CO.

(617)574-1400 253 SUMMER STREET BOSTON

Est Start Date:

Est End Date:

04/01/2013

01/01/2015

MARSHALL ROOFING & SHEET 7,673.0 2,507.5 32.68% 2,619.5 34.14% 0.0 0.00%BOSTON UNIVERSITY LAW SCH Roofer 11/07/2015

SKANSKA CO. 11,394.0 5,777.0 50.70% 2,381.0 20.90% 0.0 0.00%BOSTON UNIVERSITY LAW SCH Laborer 11/15/2015

RYAN IRON WORKS INC, 6,354.0 2,963.0 46.63% 1,036.0 16.30% 348.0 5.48%BOSTON UNIVERSITY LAW SCH Iron Worker 07/05/2015

P.J. SPILLANE COMPANY 197.0 152.0 77.16% 168.0 85.28% 0.0 0.00%BOSTON UNIVERSITY LAW SCH Mason Tender 06/21/2014

P.J. SPILLANE COMPANY 1,414.5 62.0 4.38% 67.0 4.74% 0.0 0.00%BOSTON UNIVERSITY LAW SCH Bricklayer 12/13/2014

OTIS ELEVATOR COMPANY 1,581.0 397.3 25.13% 421.3 26.64% 0.0 0.00%BOSTON UNIVERSITY LAW SCH Elevator Const(M 08/07/2014

OTIS ELEVATOR COMPANY 1,230.5 47.5 3.86% 0.0 0.00% 0.0 0.00%BOSTON UNIVERSITY LAW SCH Elev Const Helper 08/07/2014

NORTH EAST FOAM SOLUTION 412.0 24.0 5.83% 24.0 5.83% 0.0 0.00%BOSTON UNIVERSITY LAW SCH Laborer 05/12/2015

NORTH EAST FOAM SOLUTION 774.0 443.0 57.24% 331.0 42.76% 0.0 0.00%BOSTON UNIVERSITY LAW SCH Carpenter 06/16/2015

NEWTECH INS. USA INC. 6,360.5 344.0 5.41% 401.0 6.30% 56.0 0.88%BOSTON UNIVERSITY LAW SCH Carpenter 09/05/2015

MANAFORT BROTHERS INC. 671.5 0.0 0.00% 0.0 0.00% 0.0 0.00%BOSTON UNIVERSITY LAW SCH Mason 05/16/2015

MANAFORT BROTHERS INC. 458.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BOSTON UNIVERSITY LAW SCH Iron Worker 05/09/2015

XQUISITE LANDSCAPING 1,208.0 76.0 6.29% 76.0 6.29% 0.0 0.00%BOSTON UNIVERSITY LAW SCH Mason 09/20/2015

MANAFORT BROTHERS INC. 2,672.0 1,092.5 40.89% 1,449.0 54.23% 0.0 0.00%BOSTON UNIVERSITY LAW SCH Laborer 05/16/2015

XQUISITE LANDSCAPING 4,544.5 301.5 6.63% 954.5 21.00% 545.5 12.00%BOSTON UNIVERSITY LAW SCH Laborer 09/27/2015

SOEP PAINTING CORP. 9,048.0 3,303.0 36.51% 2,622.0 28.98% 334.0 3.69%BOSTON UNIVERSITY LAW SCH Painter 10/25/2015

MARSHALL ROOFING & SHEET 524.5 0.0 0.00% 12.0 2.29% 0.0 0.00%BOSTON UNIVERSITY LAW SCH Sheetmetal Work 10/31/2015

T. J. MCCARTNEY, INC. 11,890.0 2,773.0 23.32% 3,458.0 29.08% 2,894.0 24.34%BOSTON UNIVERSITY LAW SCH Taper 10/16/2015

JULIAN CRANE & EQUIPMENT 149.5 17.0 11.37% 0.0 0.00% 0.0 0.00%BOSTON UNIVERSITY LAW SCH Iron Worker 03/22/2015

XQUISITE LANDSCAPING 16.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BOSTON UNIVERSITY LAW SCH Equipment Opera 06/21/2015

THYSSEN KRUPP ELEVATOR 2,989.3 0.0 0.00% 0.0 0.00% 0.0 0.00%BOSTON UNIVERSITY LAW SCH Elevator Const(M 09/17/2015

Page 116: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 116

Project Name Trade Latest Week

THYSSEN KRUPP ELEVATOR 2,272.0 425.0 18.71% 0.0 0.00% 608.0 26.76%BOSTON UNIVERSITY LAW SCH Elev Const Helper 08/13/2015

THOMAS G GALLAGHER INC. 32,034.5 5,602.5 17.49% 2,845.0 8.88% 2,049.0 6.40%BOSTON UNIVERSITY LAW SCH Pipefitter 09/27/2015

THE CHEVIOT CORPORATION 3,524.5 247.0 7.01% 24.0 0.68% 0.0 0.00%BOSTON UNIVERSITY LAW SCH Iron Worker 05/29/2015

WORCESTER AIR CONDITIONI 14,260.0 3,468.5 24.32% 2,486.0 17.43% 120.5 0.85%BOSTON UNIVERSITY LAW SCH Sheetmetal Work 11/08/2015

THE CHEVIOT CORPORATION 11,173.0 946.0 8.47% 4,354.5 38.97% 0.0 0.00%BOSTON UNIVERSITY LAW SCH Carpenter 07/17/2015

STATE ELECTRIC CO. 73,659.5 21,154.5 28.72% 13,721.5 18.63% 5,014.0 6.81%BOSTON UNIVERSITY LAW SCH Electrician 11/15/2015

T. J. MCCARTNEY, INC. 7,118.5 1,218.5 17.12% 3,961.5 55.65% 120.0 1.69%BOSTON UNIVERSITY LAW SCH Laborer 09/04/2015

T. J. MCCARTNEY, INC. 36,357.0 11,252.5 30.95% 14,454.0 39.76% 448.0 1.23%BOSTON UNIVERSITY LAW SCH Carpenter 10/16/2015

SUNRISE ERECTORS INC. 2.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BOSTON UNIVERSITY LAW SCH Glazier 02/01/2015

SUNRISE ERECTORS INC. 27,864.5 5,419.0 19.45% 7,174.5 25.75% 3,391.0 12.17%BOSTON UNIVERSITY LAW SCH Carpenter 11/08/2015

SULLIVAN & MCLAUGHLIN CO. 16.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BOSTON UNIVERSITY LAW SCH Technician 06/22/2014

SULLIVAN & MCLAUGHLIN CO. 5,873.5 943.0 16.06% 1,672.5 28.48% 586.0 9.98%BOSTON UNIVERSITY LAW SCH Electrician 07/19/2015

THE CHEVIOT CORPORATION 10,688.0 1,604.0 15.01% 1,553.5 14.53% 0.0 0.00%BOSTON UNIVERSITY LAW SCH Glazier 07/31/2015

CORBIN HUFCOR INC. 37.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BOSTON UNIVERSITY LAW SCH Carpenter 08/09/2014

FRED SALVUCCI CORP. 2,519.5 0.0 0.00% 233.0 9.25% 0.0 0.00%BOSTON UNIVERSITY LAW SCH Mason Tender 06/07/2014

FRED SALVUCCI CORP. 2,573.0 144.0 5.60% 0.0 0.00% 0.0 0.00%BOSTON UNIVERSITY LAW SCH Mason 05/31/2014

FRED SALVUCCI CORP. 8.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BOSTON UNIVERSITY LAW SCH Equipment Opera 11/16/2013

ESSEX NEWBURY NORTH CO 42,461.5 15,333.5 36.11% 22,423.5 52.81% 1,377.0 3.24%BOSTON UNIVERSITY LAW SCH Laborer 10/16/2015

ESSEX NEWBURY NORTH CO 6,408.5 930.0 14.51% 1,052.5 16.42% 80.0 1.25%BOSTON UNIVERSITY LAW SCH Carpenter 07/03/2015

FRONT LINE INC. 2,148.5 910.5 42.38% 1,677.0 78.05% 896.5 41.73%BOSTON UNIVERSITY LAW SCH Laborer 08/22/2015

CORBIN HUFCOR INC. 23.5 0.0 0.00% 0.0 0.00% 0.0 0.00%BOSTON UNIVERSITY LAW SCH Laborer 03/22/2014

AMERICAN PLUMBING HEATIN 9,401.0 2,437.0 25.92% 1,070.0 11.38% 703.0 7.48%BOSTON UNIVERSITY LAW SCH Plumber 08/14/2015

CALHESS & WEATHERPROOFI 22,983.0 5,233.0 22.77% 7,732.5 33.64% 532.0 2.31%BOSTON UNIVERSITY LAW SCH Mason 11/02/2015

CALHESS & WEATHERPROOFI 4,237.5 1,779.5 41.99% 3,204.0 75.61% 0.0 0.00%BOSTON UNIVERSITY LAW SCH Laborer 09/21/2015

BROADWAY ELEC.SYS.CO. 8,654.0 3,723.0 43.02% 3,027.0 34.98% 549.0 6.34%BOSTON UNIVERSITY LAW SCH Electrician 01/26/2014

BAY STATE BUILDING SPECIA 1,430.0 344.0 24.06% 200.0 13.99% 8.0 0.56%BOSTON UNIVERSITY LAW SCH Carpenter 08/25/2015

ALLEGHENY CONTRACT FLOO 3,920.0 1,101.0 28.09% 3,735.0 95.28% 152.0 3.88%BOSTON UNIVERSITY LAW SCH Floor Layer 08/28/2015

LAN-TEL COMMUNICATION INC 766.0 0.0 0.00% 0.0 0.00% 334.0 43.60%BOSTON UNIVERSITY LAW SCH Stage Hand 10/03/2015

ESSEX NEWBURY NORTH CO 21,936.5 5,231.5 23.85% 20,512.5 93.51% 548.0 2.50%BOSTON UNIVERSITY LAW SCH Asbestos Worker 08/28/2015

JAJ COMPANY INC. 4,320.5 0.0 0.00% 772.0 17.87% 0.0 0.00%BOSTON UNIVERSITY LAW SCH Mason Tender 08/23/2015

MANAFORT BROTHERS INC. 1,685.5 231.5 13.73% 8.0 0.47% 0.0 0.00%BOSTON UNIVERSITY LAW SCH Carpenter 05/16/2015

LONGDEN COMPANY INC. 1,692.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BOSTON UNIVERSITY LAW SCH Carpenter 06/20/2015

K & K ACOUSTICAL CEILINGS 5,326.0 1,054.0 19.79% 1,038.0 19.49% 34.0 0.64%BOSTON UNIVERSITY LAW SCH Carpenter 08/23/2015

JULIAN CRANE & EQUIPMENT 7,831.0 3,056.5 39.03% 2,556.5 32.65% 5,215.0 66.59%BOSTON UNIVERSITY LAW SCH Equipment Opera 07/12/2015

Page 117: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 117

Project Name Trade Latest Week

JULIAN CRANE & EQUIPMENT 628.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BOSTON UNIVERSITY LAW SCH Elevator Const(M 03/22/2015

JAMES W. FLETT CO. INC. 3,261.5 897.5 27.52% 105.0 3.22% 573.0 17.57%BOSTON UNIVERSITY LAW SCH Laborer 09/20/2015

H. CARR & SONS INC. 1,280.0 0.0 0.00% 336.0 26.25% 0.0 0.00%BOSTON UNIVERSITY LAW SCH Carpenter 12/19/2014

JAJ COMPANY INC. 239.0 0.0 0.00% 239.0 100.00% 0.0 0.00%BOSTON UNIVERSITY LAW SCH Terrazzo Worker 05/18/2014

LAN-TEL COMMUNICATION INC 4,919.0 475.0 9.66% 1,304.0 26.51% 0.0 0.00%BOSTON UNIVERSITY LAW SCH Telephone/Data I 10/03/2015

JAJ COMPANY INC. 3,440.0 584.0 16.98% 112.0 3.26% 0.0 0.00%BOSTON UNIVERSITY LAW SCH Marble Tile Work 10/04/2015

JAJ COMPANY INC. 912.0 779.0 85.42% 0.0 0.00% 0.0 0.00%BOSTON UNIVERSITY LAW SCH Laborer 10/04/2015

J. C. CANNISTRARO INC. 14,497.0 4,476.0 30.88% 2,558.5 17.65% 2,269.0 15.65%BOSTON UNIVERSITY LAW SCH Sprinkler Fitter 07/05/2015

H. CARR & SONS INC. 51.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BOSTON UNIVERSITY LAW SCH Taper 04/11/2014

H. CARR & SONS INC. 1,211.0 0.0 0.00% 669.0 55.24% 0.0 0.00%BOSTON UNIVERSITY LAW SCH Plasterer 05/15/2015

H. CARR & SONS INC. 1,900.5 177.0 9.31% 239.0 12.58% 0.0 0.00%BOSTON UNIVERSITY LAW SCH Laborer 05/15/2015

JAMES W. FLETT CO. INC. 1,902.5 757.0 39.79% 373.5 19.63% 0.0 0.00%BOSTON UNIVERSITY LAW SCH Equipment Opera 09/20/2015

481,008.8 122,215.3 25.41% 143,444.8 29.82% 29,784.5 6.19%SUB TOTALS:

BOTANICA 21 DIVISION

$3,100Amount:

Gen Contractor: EXCEL SIGNS & DECORATION CORP.

(617)479-8552 259 QUINCY AVE. QUINCY

Est Start Date:

Est End Date:

06/08/2014

06/14/2014

EXCEL SIGNS & DECORATION 6.0 0.0 0.00% 6.0 100.00% 2.0 33.33%BOTANICA 21 DIVISION Laborer 06/14/2014

6.0 0.0 0.00% 6.0 100.00% 2.0 33.33%SUB TOTALS:

BOTANICAL SAN SANTIAGO

$2,000Amount:

Gen Contractor: HUNTER SIGNS

(617)360-9710 120 BUSINESS STREET HYDE PARK

Est Start Date:

Est End Date:

12/24/2016

12/28/2016

HUNTER SIGNS 2.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BOTANICAL SAN SANTIAGO Laborer 12/24/2016

2.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SUB TOTALS:

BOTTOM LINE - NEW LOCATION EXTE

$2,500Amount:

Gen Contractor: SIGN DESIGN INC.

(508)580-0094 170 LIBERTY STREET BROCKTON

Est Start Date:

Est End Date:

02/01/2014

03/31/2014

SIGN DESIGN INC. 3.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BOTTOM LINE - NEW LOCATION Laborer 02/21/2014

3.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SUB TOTALS:

BOYLSTON WEST

$180,000,000Amount:

Gen Contractor: JOHN MORIARTY & ASSOCIATES

(781)729-3900 3 CHURCH STREET WINCHESTER

Est Start Date:

Est End Date:

01/01/2013

07/01/2015

VALLEYCREST LANDSCAPE 591.5 0.0 0.00% 0.0 0.00% 0.0 0.00%BOYLSTON WEST Equipment Opera 08/16/2015

JOHN A . PENNEY ELECTRIC 32.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BOYLSTON WEST Pipelayer 10/26/2014

OTIS ELEVATOR COMPANY 13,507.9 0.0 0.00% 1,289.5 9.55% 1,145.0 8.48%BOYLSTON WEST Elev Const Helper 07/02/2015

MCADAM PAINTING CO, INC. 11,637.0 2,395.0 20.58% 2,470.0 21.23% 1,699.0 14.60%BOYLSTON WEST Painter 07/17/2015

MARSHALL ROOFING & SHEET 312.5 0.0 0.00% 59.0 18.88% 0.0 0.00%BOYLSTON WEST Sheetmetal Work 06/20/2015

MARSHALL ROOFING & SHEET 10,867.0 2,319.0 21.34% 4,852.5 44.65% 33.5 0.31%BOYLSTON WEST Roofer 07/11/2015

Page 118: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 118

Project Name Trade Latest Week

JOHN MORIARTY & ASSOCIAT 21,208.0 13,122.5 61.88% 8,202.0 38.67% 4,500.5 21.22%BOYLSTON WEST Laborer 07/12/2015

KERR'S WELDING IRON WORK 2,444.0 1,099.0 44.97% 1,965.0 80.40% 0.0 0.00%BOYLSTON WEST Welder 07/30/2014

OTIS ELEVATOR COMPANY 14,725.0 1,365.8 9.28% 2,178.5 14.79% 1,315.5 8.93%BOYLSTON WEST Elevator Const(M 07/02/2015

JULIAN CRANE & EQUIPMENT 264.5 43.0 16.26% 0.0 0.00% 0.0 0.00%BOYLSTON WEST Iron Worker 03/29/2015

JULIAN CRANE & EQUIPMENT 6,212.0 5,654.0 91.02% 0.0 0.00% 120.5 1.94%BOYLSTON WEST Equipment Opera 06/14/2015

JULIAN CRANE & EQUIPMENT 906.0 105.0 11.59% 0.0 0.00% 0.0 0.00%BOYLSTON WEST Elevator Const(M 03/29/2015

LUND REBAR SERVICES, INC. 7,280.0 2,688.0 36.92% 1,342.0 18.43% 0.0 0.00%BOYLSTON WEST Iron Worker 08/17/2014

REPLACEMENT WINBOW SYS 1,808.0 720.0 39.82% 1,434.0 79.31% 608.0 33.63%BOYLSTON WEST Laborer 07/04/2015

S & F CONCRETE 12,039.0 3,691.5 30.66% 3,943.5 32.76% 645.0 5.36%BOYLSTON WEST Carpenter 09/06/2014

S & F CONCRETE 2,593.0 576.5 22.23% 399.0 15.39% 0.0 0.00%BOYLSTON WEST Cement Finisher 10/04/2014

S & F CONCRETE 906.0 66.0 7.28% 0.0 0.00% 0.0 0.00%BOYLSTON WEST Equipment Opera 08/30/2014

S & F CONCRETE 21,426.0 3,818.0 17.82% 4,995.5 23.32% 845.0 3.94%BOYLSTON WEST Laborer 10/18/2014

S & F CONCRETE 603.0 60.0 9.95% 106.5 17.66% 8.5 1.41%BOYLSTON WEST Mason 06/21/2014

SANFORD CONTRACTING, INC 4,186.5 573.0 13.69% 331.0 7.91% 0.0 0.00%BOYLSTON WEST Carpenter 10/19/2014

SWEENEY DRYWALL FINISHE 48.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BOYLSTON WEST Carpenter 01/10/2015

VALLEYCREST LANDSCAPE 565.0 0.0 0.00% 450.0 79.65% 0.0 0.00%BOYLSTON WEST Bricklayer 08/16/2015

VALLEYCREST LANDSCAPE 5,913.5 589.5 9.97% 1,925.5 32.56% 581.5 9.83%BOYLSTON WEST Laborer 08/16/2015

WILLIAM M. COLLINS COMPAN 15,416.0 5,244.5 34.02% 2,517.5 16.33% 0.0 0.00%BOYLSTON WEST Sprinkler Fitter 05/03/2015

JOHN A . PENNEY ELECTRIC 63,824.5 21,271.5 33.33% 10,420.0 16.33% 3,585.0 5.62%BOYLSTON WEST Electrician 07/19/2015

CENTURY DRYWALL INC, 48.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BOYLSTON WEST Painter 12/06/2014

T & T STEEL ERECTORS 10,093.0 2,468.5 24.46% 3,120.5 30.92% 644.0 6.38%BOYLSTON WEST Iron Worker 05/09/2015

CHAPMAN WATERPROOFING 8,235.5 3,373.5 40.96% 3,354.0 40.73% 438.0 5.32%BOYLSTON WEST Waterproofer 05/18/2015

ACCORD STEEL & PRECAST 2,228.5 0.0 0.00% 0.0 0.00% 0.0 0.00%BOYLSTON WEST Equipment Opera 08/12/2014

ACCORD STEEL & PRECAST 25,108.0 11,693.5 46.57% 7,941.5 31.63% 790.5 3.15%BOYLSTON WEST Iron Worker 09/16/2014

ACCORD STEEL & PRECAST 2,221.5 0.0 0.00% 0.0 0.00% 0.0 0.00%BOYLSTON WEST Oiler 08/12/2014

ALLAN CONSTRUCTION INC. 567.0 8.0 1.41% 107.0 18.87% 0.0 0.00%BOYLSTON WEST Carpenter 04/24/2015

ALLEGHENY CONTRACT FLOO 5,015.0 1,166.0 23.25% 690.0 13.76% 303.0 6.04%BOYLSTON WEST Floor Layer 05/22/2015

AMERICAN PLUMBING HEATIN 31,606.0 12,087.5 38.24% 8,812.0 27.88% 881.0 2.79%BOYLSTON WEST Plumber 05/29/2015

ATLANTIC CONTRACTING &SP 5,640.5 72.0 1.28% 1,350.0 23.93% 744.0 13.19%BOYLSTON WEST Insulator 05/31/2015

CENTURY DRYWALL INC, 48,948.0 17,894.0 36.56% 17,268.0 35.28% 1,270.0 2.59%BOYLSTON WEST Carpenter 05/23/2015

CENTURY DRYWALL INC, 15,432.5 4,846.0 31.40% 8,675.0 56.21% 1,356.0 8.79%BOYLSTON WEST Laborer 05/23/2015

CENTURY DRYWALL INC, 9,254.5 2,665.0 28.80% 4,856.0 52.47% 460.0 4.97%BOYLSTON WEST Taper 05/23/2015

CHAPMAN WATERPROOFING 1,396.5 759.5 54.39% 59.5 4.26% 0.0 0.00%BOYLSTON WEST Laborer 05/18/2015

J. DERENZO CO. 8,672.0 4,044.5 46.64% 4,197.0 48.40% 48.0 0.55%BOYLSTON WEST Laborer 08/15/2015

Page 119: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 119

Project Name Trade Latest Week

IPSWICH BAY GLASS CO. 28,813.0 618.0 2.14% 1,415.5 4.91% 747.0 2.59%BOYLSTON WEST Glazier 06/20/2015

J. DERENZO CO. 5,320.0 371.0 6.97% 48.0 0.90% 0.0 0.00%BOYLSTON WEST Equipment Opera 08/15/2015

J. C. CANNISTRARO INC. 17,615.0 4,472.5 25.39% 5,709.5 32.41% 1,934.0 10.98%BOYLSTON WEST Pipefitter 07/05/2015

J & M BROWN ELECTRICAL 40.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BOYLSTON WEST Technician 06/26/2015

CENTURY DRYWALL INC, 2,687.5 76.0 2.83% 337.0 12.54% 0.0 0.00%BOYLSTON WEST Plasterer 04/11/2015

IPSWICH BAY GLASS CO. 19,075.0 9,321.5 48.87% 8,823.5 46.26% 1,371.0 7.19%BOYLSTON WEST Iron Worker 06/20/2015

CIRCLE FLOORS INC. 5,241.0 1,086.0 20.72% 2,240.0 42.74% 63.0 1.20%BOYLSTON WEST Floor Layer 08/09/2015

IPSWICH BAY GLASS CO. 24,832.0 12,130.0 48.85% 8,165.0 32.88% 1,296.5 5.22%BOYLSTON WEST Carpenter 06/20/2015

FRONT LINE INC. 112.0 88.0 78.57% 104.0 92.86% 48.0 42.86%BOYLSTON WEST Laborer 08/15/2015

FRED SALVUCCI CORP. 2,240.5 33.5 1.50% 279.0 12.45% 0.0 0.00%BOYLSTON WEST Mason Tender 01/24/2015

FRED SALVUCCI CORP. 3,483.5 419.0 12.03% 31.0 0.89% 0.0 0.00%BOYLSTON WEST Bricklayer 01/24/2015

EAST COAST INTERIORS CO. 3,337.5 1,120.5 33.57% 345.5 10.35% 0.0 0.00%BOYLSTON WEST Carpenter 05/02/2015

J & M BROWN ELECTRICAL 10,759.0 6,863.0 63.79% 1,527.0 14.19% 549.0 5.10%BOYLSTON WEST Electrician 07/10/2015

517,338.4 163,078.8 31.52% 138,336.5 26.74% 28,030.0 5.42%SUB TOTALS:

BOYS & GIRLS CLUB

$9,500Amount:

Gen Contractor:

Est Start Date:

Est End Date:

05/24/2016

06/12/2016

ZONE MECHANICAL,INC. 64.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BOYS & GIRLS CLUB HVAC 06/12/2016

64.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SUB TOTALS:

BOYS & GIRLS CLUB BOSTON

$15,000Amount:

Gen Contractor: TELSA SYSTEMS

(978)352-5232 36 JACKMAN STREET SUITE 4 GEORGETOWN

Est Start Date:

Est End Date:

02/01/2014

04/01/2014

CROCKER ELECTRICAL CO. 50.0 0.0 0.00% 25.5 51.00% 0.0 0.00%BOYS & GIRLS CLUB BOSTON Electrician 03/25/2014

TELSA SYSTEMS 11.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BOYS & GIRLS CLUB BOSTON Electrician 03/15/2014

GLEN THOMPSON 38.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BOYS & GIRLS CLUB BOSTON Laborer 03/21/2014

GLEN THOMPSON 24.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BOYS & GIRLS CLUB BOSTON Carpenter 03/21/2014

123.0 0.0 0.00% 25.5 20.73% 0.0 0.00%SUB TOTALS:

BOYS & GIRLS CLUB DORCHESTER

$20,000Amount:

Gen Contractor:

Est Start Date:

Est End Date:

10/12/2015

10/23/2015

BEST RENOVATION AND CON 56.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BOYS & GIRLS CLUB DORCHES Carpenter 10/23/2015

BEST RENOVATION AND CON 56.0 0.0 0.00% 56.0 100.00% 0.0 0.00%BOYS & GIRLS CLUB DORCHES Laborer 10/23/2015

112.0 0.0 0.00% 56.0 50.00% 0.0 0.00%SUB TOTALS:

BOYS & GIRLS CLUB OF BOSTON

$10,000Amount:

Gen Contractor: CROCKER ELECTRICAL CO.

115 SAGAMORE STREET N QUINCY

Est Start Date:

Est End Date:

03/01/2014

05/31/2014

MAL FIFMAN 102.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BOYS & GIRLS CLUB OF BOSTO Floor Layer 03/14/2014

Page 120: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 120

Project Name Trade Latest Week

102.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SUB TOTALS:

BOYS AND GIRLS CHARLESTOWN

$20,000Amount:

Gen Contractor:

Est Start Date:

Est End Date:

08/03/2015

08/07/2015

NP MASONRY 80.0 80.0 100.00% 0.0 0.00% 0.0 0.00%BOYS AND GIRLS CHARLESTO Bricklayer 08/07/2015

NP MASONRY 40.0 40.0 100.00% 0.0 0.00% 0.0 0.00%BOYS AND GIRLS CHARLESTO Laborer 08/07/2015

120.0 120.0 100.00% 0.0 0.00% 0.0 0.00%SUB TOTALS:

BOYS AND GIRLS CLUB

$20,000Amount:

Gen Contractor: BOSTON RENOVATION & CONTRUCTION

(781)806-5639 71 GILDERE ROAD SHARON

Est Start Date:

Est End Date:

03/01/2014

04/30/2014

BOSTON RENOVATION & CON 264.0 0.0 0.00% 120.0 45.45% 0.0 0.00%BOYS AND GIRLS CLUB Laborer 03/28/2014

264.0 0.0 0.00% 120.0 45.45% 0.0 0.00%SUB TOTALS:

BOYS AND GIRLS OF BOSTON

$15,000Amount:

Gen Contractor: GLEN THOMPSON

(617)212-8781 20 LONG BOW ROAD danver

Est Start Date:

Est End Date:

03/01/2014

05/31/2014

MAL FIFMAN 48.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BOYS AND GIRLS OF BOSTON Floor Layer 03/21/2014

MAL FIFMAN 48.0 0.0 0.00% 48.0 100.00% 0.0 0.00%BOYS AND GIRLS OF BOSTON Laborer 03/21/2014

GLEN THOMPSON 65.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BOYS AND GIRLS OF BOSTON Laborer 03/13/2014

GLEN THOMPSON 36.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BOYS AND GIRLS OF BOSTON Carpenter 03/13/2014

197.0 0.0 0.00% 48.0 24.37% 0.0 0.00%SUB TOTALS:

BRED

$3,000Amount:

Gen Contractor: FAST SIGNS

(781)444-4889 11 B SECOND AVE. NEEDHAM

Est Start Date:

Est End Date:

01/01/2015

01/03/2015

FAST SIGNS 7.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BRED Laborer 01/03/2015

7.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SUB TOTALS:

BRIAR ROSE

$30,000Amount:

Gen Contractor: GARRY LANDSCAPING & CONSTRUCTION CO.

(508)962-9283 5 COUNTRY SIDE LANE WALPOLE

Est Start Date:

Est End Date:

06/16/2014

07/27/2014

GARRY LANDSCAPING & CON 133.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BRIAR ROSE Carpenter 08/03/2014

GARRY LANDSCAPING & CON 133.0 133.0 100.00% 0.0 0.00% 0.0 0.00%BRIAR ROSE Laborer 08/03/2014

GARRY LANDSCAPING & CON 80.0 80.0 100.00% 0.0 0.00% 0.0 0.00%BRIAR ROSE Painter 07/27/2014

MARTINI ELECTRIC INC. 80.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BRIAR ROSE Electrician 07/18/2014

XCEL FIRE PROTECTION, 18.0 0.0 0.00% 18.0 100.00% 0.0 0.00%BRIAR ROSE Laborer 01/06/2015

XCEL FIRE PROTECTION, 710.5 0.0 0.00% 279.0 39.27% 0.0 0.00%BRIAR ROSE Pipefitter 02/09/2016

1,154.5 213.0 18.45% 297.0 25.73% 0.0 0.00%SUB TOTALS:

BRIDGE OVER TROUBLED WATERS

$3,000,000Amount:

Gen Contractor: CROSSWINDS ENTERPRISES

(617)445-5100 97 HUMBOLDT AVE. DORCHESTER

Est Start Date:

Est End Date:

10/01/2016

11/30/2017

Page 121: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 121

Project Name Trade Latest Week

LOWE PLUMB & HEATING 38.5 29.0 75.32% 38.5 100.00% 0.0 0.00%BRIDGE OVER TROUBLED WAT Plumber 01/07/2017

NG ENVIRONMENTAL CO. 608.0 168.0 27.63% 608.0 100.00% 48.0 7.89%BRIDGE OVER TROUBLED WAT Laborer 12/10/2016

T & P CONTRACTING, INC. 272.0 272.0 100.00% 272.0 100.00% 0.0 0.00%BRIDGE OVER TROUBLED WAT Cement Laborer 05/13/2017

T & P CONTRACTING, INC. 496.0 200.0 40.32% 256.0 51.61% 0.0 0.00%BRIDGE OVER TROUBLED WAT Cement Finisher 05/13/2017

GEO'S ELECTRIC SERVICE 1,062.0 387.0 36.44% 1,062.0 100.00% 0.0 0.00%BRIDGE OVER TROUBLED WAT Electrician 08/26/2017

ATLANTIC EXCAVATION & UTIL 96.0 96.0 100.00% 48.0 50.00% 0.0 0.00%BRIDGE OVER TROUBLED WAT Equipment Opera 02/18/2017

ANDERSON INSULATION 284.5 0.0 0.00% 266.3 93.59% 0.0 0.00%BRIDGE OVER TROUBLED WAT Insulator 08/12/2017

ANDERSON INSULATION 26.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BRIDGE OVER TROUBLED WAT Carpenter 08/05/2017

QINS CONSTRUCTION 1,056.0 528.0 50.00% 1,056.0 100.00% 0.0 0.00%BRIDGE OVER TROUBLED WAT Carpenter 01/28/2017

3,939.0 1,680.0 42.65% 3,606.8 91.57% 48.0 1.22%SUB TOTALS:

BRIDGEVIEW CENTER

$1,750,000Amount:

Gen Contractor: METRIC CONSTRUCTION CORP.

(617)787-1158 55 HENSHAW ST. BOSTON

Est Start Date:

Est End Date:

12/15/2014

12/31/2015

SECURITY FENCE CO 28.8 0.0 0.00% 0.0 0.00% 0.0 0.00%BRIDGEVIEW CENTER Laborer 10/08/2016

WENDY'S DRYWALL 6,792.0 2,032.0 29.92% 6,792.0 100.00% 0.0 0.00%BRIDGEVIEW CENTER Carpenter 09/11/2016

KLS CONCRETE INC. 337.0 96.0 28.49% 215.5 63.95% 0.0 0.00%BRIDGEVIEW CENTER Laborer 06/04/2016

MC COOLE ASSOCIATES, LLC. 173.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BRIDGEVIEW CENTER Laborer 05/01/2016

MC COOLE ASSOCIATES, LLC. 484.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BRIDGEVIEW CENTER Plasterer 05/01/2016

NESC INC 371.0 18.0 4.85% 100.5 27.09% 0.0 0.00%BRIDGEVIEW CENTER Laborer 06/04/2016

NESC INC 4.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BRIDGEVIEW CENTER Mason 06/04/2016

NOVA RESTORATIONS, INC. 135.5 81.0 59.78% 81.0 59.78% 0.0 0.00%BRIDGEVIEW CENTER Laborer 06/25/2016

NOVA RESTORATIONS, INC. 1,005.5 543.0 54.00% 0.0 0.00% 0.0 0.00%BRIDGEVIEW CENTER Roofer 08/27/2016

NOVA RESTORATIONS, INC. 107.5 0.0 0.00% 0.0 0.00% 0.0 0.00%BRIDGEVIEW CENTER Sheetmetal Work 06/25/2016

RENEWABLE ENERGY INC. 4,385.4 0.0 0.00% 3,936.1 89.76% 0.0 0.00%BRIDGEVIEW CENTER HVAC 10/22/2016

IGS GLASS INC. 174.8 0.0 0.00% 0.0 0.00% 0.0 0.00%BRIDGEVIEW CENTER Glazier 09/03/2016

SHEPARDVILLE CO, LLC. 1,973.5 0.0 0.00% 1,091.0 55.28% 0.0 0.00%BRIDGEVIEW CENTER Carpenter 10/28/2016

STREAMLINE WATERPROOFIN 553.0 0.0 0.00% 27.5 4.97% 0.0 0.00%BRIDGEVIEW CENTER Waterproofer 05/21/2016

SUBURBAN ELECTRICAL CON 8,163.8 1,914.0 23.45% 1,342.5 16.44% 0.0 0.00%BRIDGEVIEW CENTER Electrician 10/21/2016

TF ANDREW CARPET ONE FLO 4,272.0 3,336.0 78.09% 4,272.0 100.00% 1,952.0 45.69%BRIDGEVIEW CENTER Floor Layer 10/07/2016

THYSSEN KRUPP ELEVATOR 224.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BRIDGEVIEW CENTER Elev Const Helper 07/07/2016

THYSSEN KRUPP ELEVATOR 235.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BRIDGEVIEW CENTER Elevator Const(M 07/07/2016

KLS CONCRETE INC. 108.5 0.0 0.00% 95.0 87.56% 0.0 0.00%BRIDGEVIEW CENTER Cement Finisher 06/04/2016

PLATINUM FIRE PROTECTION 1,930.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BRIDGEVIEW CENTER Sprinkler Fitter 10/08/2016

DESHENES ACOUSTICS 189.5 0.0 0.00% 0.0 0.00% 0.0 0.00%BRIDGEVIEW CENTER Carpenter 07/21/2016

J. MARCHESE & SONS 871.0 32.0 3.67% 32.0 3.67% 0.0 0.00%BRIDGEVIEW CENTER Equipment Opera 10/22/2016

Page 122: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 122

Project Name Trade Latest Week

KLS CONCRETE INC. 75.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BRIDGEVIEW CENTER Carpenter 11/07/2015

ANCHOR INSULATION 1,237.3 0.0 0.00% 1,196.8 96.73% 0.0 0.00%BRIDGEVIEW CENTER Insulator 09/03/2016

CEDRO CONTRACTORS 4,406.0 1,034.0 23.47% 4,406.0 100.00% 0.0 0.00%BRIDGEVIEW CENTER Painter 10/29/2016

DANIEL KOURY CONSTRUCTI 1,190.0 240.0 20.17% 382.5 32.14% 0.0 0.00%BRIDGEVIEW CENTER Iron Worker 12/26/2015

EAST COAST INTERIORS CO. 12,305.0 3,145.5 25.56% 4,600.5 37.39% 20.0 0.16%BRIDGEVIEW CENTER Carpenter 06/11/2016

EVOLUTION IRONWORKS 520.0 0.0 0.00% 520.0 100.00% 0.0 0.00%BRIDGEVIEW CENTER Welder 09/16/2016

FERREIRA CONCRETE 339.8 0.0 0.00% 0.0 0.00% 0.0 0.00%BRIDGEVIEW CENTER Carpenter 02/27/2016

FERREIRA CONCRETE 1,351.8 0.0 0.00% 239.0 17.68% 0.0 0.00%BRIDGEVIEW CENTER Laborer 02/27/2016

J S CONSTRUCTION. 2,779.0 195.0 7.02% 2,779.0 100.00% 0.0 0.00%BRIDGEVIEW CENTER Carpenter 09/03/2016

GC FODERA 2,618.5 350.5 13.39% 1,627.0 62.13% 0.0 0.00%BRIDGEVIEW CENTER Bricklayer 07/02/2016

GC FODERA 553.5 553.5 100.00% 553.5 100.00% 0.0 0.00%BRIDGEVIEW CENTER Equipment Opera 07/02/2016

GC FODERA 1,390.5 647.0 46.53% 1,383.0 99.46% 0.0 0.00%BRIDGEVIEW CENTER Laborer 07/02/2016

GC FODERA 160.0 80.0 50.00% 160.0 100.00% 0.0 0.00%BRIDGEVIEW CENTER Mason Tender 12/13/2015

HELICAL DRILLING INC 67.5 0.0 0.00% 0.0 0.00% 0.0 0.00%BRIDGEVIEW CENTER Equipment Opera 06/13/2015

HELICAL DRILLING INC 223.0 42.0 18.83% 42.0 18.83% 0.0 0.00%BRIDGEVIEW CENTER Laborer 06/13/2015

FORGE INDUSTRIES COMPAN 274.0 0.0 0.00% 274.0 100.00% 0.0 0.00%BRIDGEVIEW CENTER Laborer 03/26/2016

CMP PLUMBING HEATING. 8,863.0 2,071.0 23.37% 1,266.0 14.28% 0.0 0.00%BRIDGEVIEW CENTER Plumber 09/09/2016

J. MARCHESE & SONS 1,491.5 366.5 24.57% 586.0 39.29% 0.0 0.00%BRIDGEVIEW CENTER Laborer 10/22/2016

72,363.9 16,777.0 23.18% 38,000.4 52.51% 1,972.0 2.73%SUB TOTALS:

BRIGHAM GREEN PATIENT PARKING

$39,220,000Amount:

Gen Contractor: WALSH BROTHERS INC.

(617)878-4800 210 COMMERCIAL STREET BOSTON

Est Start Date:

Est End Date:

04/16/2012

06/03/2014

XQUISITE LANDSCAPING 116.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BRIGHAM GREEN PATIENT PAR Mason 08/10/2014

SALEM GLASS CO. 150.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BRIGHAM GREEN PATIENT PAR Carpenter 09/13/2014

XQUISITE LANDSCAPING 5,534.9 1,488.0 26.88% 2,939.0 53.10% 462.0 8.35%BRIGHAM GREEN PATIENT PAR Laborer 09/21/2014

XQUISITE LANDSCAPING 346.5 0.0 0.00% 0.0 0.00% 0.0 0.00%BRIGHAM GREEN PATIENT PAR Equipment Opera 09/21/2014

THOMAS G GALLAGHER INC. 1,570.0 80.0 5.10% 80.0 5.10% 0.0 0.00%BRIGHAM GREEN PATIENT PAR Pipefitter 09/21/2014

SCHNABEL FOUNDATION CO. 167.5 0.0 0.00% 0.0 0.00% 0.0 0.00%BRIGHAM GREEN PATIENT PAR Laborer 05/27/2014

SCHNABEL FOUNDATION CO. 64.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BRIGHAM GREEN PATIENT PAR Equipment Opera 04/01/2014

SCHNABEL FOUNDATION CO. 562.5 16.0 2.84% 16.0 2.84% 0.0 0.00%BRIGHAM GREEN PATIENT PAR Carpenter 05/27/2014

SALEM GLASS CO. 997.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BRIGHAM GREEN PATIENT PAR Glazier 09/13/2014

SULLIVAN & MCLAUGHLIN CO. 10,534.0 4,136.0 39.26% 3,842.0 36.47% 221.0 2.10%BRIGHAM GREEN PATIENT PAR Electrician 09/21/2014

J. DERENZO CO. 1,607.5 10.0 0.62% 0.0 0.00% 0.0 0.00%BRIGHAM GREEN PATIENT PAR Equipment Opera 09/20/2014

J. DERENZO CO. 2,839.0 210.0 7.40% 597.0 21.03% 0.0 0.00%BRIGHAM GREEN PATIENT PAR Laborer 09/20/2014

JOHN F. SHEA CO. INC. 142.5 25.5 17.89% 82.5 57.89% 0.0 0.00%BRIGHAM GREEN PATIENT PAR Roofer 09/20/2014

Page 123: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 123

Project Name Trade Latest Week

JOHN F. SHEA CO. INC. 73.0 10.0 13.70% 0.0 0.00% 0.0 0.00%BRIGHAM GREEN PATIENT PAR Sheetmetal Work 09/20/2014

OTIS ELEVATOR COMPANY 314.3 0.0 0.00% 0.0 0.00% 0.0 0.00%BRIGHAM GREEN PATIENT PAR Elev Const Helper 08/21/2014

OTIS ELEVATOR COMPANY 775.0 40.8 5.26% 49.8 6.42% 8.0 1.03%BRIGHAM GREEN PATIENT PAR Elevator Const(M 09/11/2014

PIZZOTTI BROTHERS, INC. 296.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BRIGHAM GREEN PATIENT PAR Laborer 05/06/2014

PIZZOTTI BROTHERS, INC. 575.0 150.0 26.09% 310.0 53.91% 0.0 0.00%BRIGHAM GREEN PATIENT PAR Mason Tender 09/23/2014

HERITAGE RESTORATION INC. 408.5 95.0 23.26% 140.0 34.27% 0.0 0.00%BRIGHAM GREEN PATIENT PAR Laborer 09/20/2014

AMERICAN PLUMBING HEATIN 1,817.0 312.0 17.17% 0.0 0.00% 552.0 30.38%BRIGHAM GREEN PATIENT PAR Plumber 09/12/2014

PIZZOTTI BROTHERS, INC. 1,185.0 202.0 17.05% 795.0 67.09% 202.0 17.05%BRIGHAM GREEN PATIENT PAR Mason 09/23/2014

HERITAGE RESTORATION INC. 789.0 32.0 4.06% 37.0 4.69% 0.0 0.00%BRIGHAM GREEN PATIENT PAR Bricklayer 09/20/2014

G & C CONCRETE CO. 52.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BRIGHAM GREEN PATIENT PAR Metal Refinisher 05/31/2014

G & C CONCRETE CO. 13,776.0 4,076.0 29.59% 10,240.0 74.33% 0.0 0.00%BRIGHAM GREEN PATIENT PAR Laborer 09/20/2014

G & C CONCRETE CO. 5,846.5 2,574.5 44.03% 3,262.5 55.80% 0.0 0.00%BRIGHAM GREEN PATIENT PAR Iron Worker 09/20/2014

G & C CONCRETE CO. 1,373.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BRIGHAM GREEN PATIENT PAR Equipment Opera 09/20/2014

G & C CONCRETE CO. 2,815.5 302.0 10.73% 274.0 9.73% 0.0 0.00%BRIGHAM GREEN PATIENT PAR Cement Finisher 09/20/2014

G & C CONCRETE CO. 13,352.5 3,655.0 27.37% 3,374.0 25.27% 843.5 6.32%BRIGHAM GREEN PATIENT PAR Carpenter 09/20/2014

CHAPMAN WATERPROOFING 2,384.0 878.0 36.83% 839.0 35.19% 0.0 0.00%BRIGHAM GREEN PATIENT PAR Waterproofer 09/22/2014

CHAPMAN WATERPROOFING 587.0 364.0 62.01% 37.0 6.30% 0.0 0.00%BRIGHAM GREEN PATIENT PAR Laborer 09/22/2014

AMERICAN PLUMBING HEATIN 2,696.0 1,418.0 52.60% 1,322.0 49.04% 0.0 0.00%BRIGHAM GREEN PATIENT PAR Sprinkler Fitter 09/12/2014

RYAN IRON WORKS INC, 1,064.0 108.0 10.15% 8.0 0.75% 0.0 0.00%BRIGHAM GREEN PATIENT PAR Iron Worker 09/21/2014

BOSTON AIR SYSTEMS, INC. 460.0 0.0 0.00% 144.0 31.30% 0.0 0.00%BRIGHAM GREEN PATIENT PAR Sheetmetal Work 09/21/2014

75,270.6 20,182.8 26.81% 28,388.8 37.72% 2,288.5 3.04%SUB TOTALS:

BRIGHAM'S BUILDING FOR THE FUTU

$315,000,000Amount:

Gen Contractor: SUFFOLK CONSTRUCTION CO.

(617)445-3500 64 ALLERTON STREET roxbury

Est Start Date:

Est End Date:

06/01/2013

02/01/2016

NEW HAMP. STEEL ERECT. 14,721.0 4,086.0 27.76% 3,415.0 23.20% 2,008.0 13.64%BRIGHAM'S BUILDING FOR THE Iron Worker 05/10/2016

MASSEY'S PLATE GLASS & AL 5,662.0 4,919.0 86.88% 3,062.0 54.08% 0.0 0.00%BRIGHAM'S BUILDING FOR THE Carpenter 02/27/2016

MASSEY'S PLATE GLASS & AL 1,242.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BRIGHAM'S BUILDING FOR THE Equipment Opera 11/07/2015

MASSEY'S PLATE GLASS & AL 24,942.0 3,299.0 13.23% 10,687.0 42.85% 2,188.0 8.77%BRIGHAM'S BUILDING FOR THE Glazier 05/07/2016

MASSEY'S PLATE GLASS & AL 15,302.5 11,411.0 74.57% 7,389.0 48.29% 1,375.5 8.99%BRIGHAM'S BUILDING FOR THE Iron Worker 02/27/2016

MASSEY'S PLATE GLASS & AL 80.0 80.0 100.00% 80.0 100.00% 0.0 0.00%BRIGHAM'S BUILDING FOR THE Mason 01/16/2016

PAVILION FLOORS, INC. 16,869.5 1,139.0 6.75% 10,578.5 62.71% 2,389.5 14.16%BRIGHAM'S BUILDING FOR THE Carpet Layer 05/07/2016

MCCUSKER-GILL INC. 45,177.0 10,580.0 23.42% 8,199.0 18.15% 0.0 0.00%BRIGHAM'S BUILDING FOR THE Sheetmetal Work 05/08/2016

MASSEY'S PLATE GLASS & AL 1,173.0 0.0 0.00% 8.0 0.68% 0.0 0.00%BRIGHAM'S BUILDING FOR THE Bricklayer 12/26/2015

LIBERTY CONST. SERVICES 111.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BRIGHAM'S BUILDING FOR THE Elevator Const(M 11/22/2015

MASSEY'S PLATE GLASS & AL 865.0 551.0 63.70% 0.0 0.00% 0.0 0.00%BRIGHAM'S BUILDING FOR THE Sheetmetal Work 05/07/2016

Page 124: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 124

Project Name Trade Latest Week

MASS BAY ELECTRIC CORP. 29.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BRIGHAM'S BUILDING FOR THE Lineman 02/23/2014

MASS BAY ELECTRIC CORP. 21.0 10.0 47.62% 10.0 47.62% 0.0 0.00%BRIGHAM'S BUILDING FOR THE Groundman 02/23/2014

MASS BAY ELECTRIC CORP. 135.0 11.0 8.15% 11.0 8.15% 0.0 0.00%BRIGHAM'S BUILDING FOR THE Electrician 03/09/2014

LUND REBAR SERVICES, INC. 9,818.0 3,131.0 31.89% 3,734.0 38.03% 0.0 0.00%BRIGHAM'S BUILDING FOR THE Iron Worker 02/28/2016

PAVILION FLOORS, INC. 5,705.5 0.0 0.00% 138.0 2.42% 0.0 0.00%BRIGHAM'S BUILDING FOR THE Marble Tile Work 04/30/2016

LIBERTY CONST. SERVICES 6,116.5 1,682.0 27.50% 0.0 0.00% 67.0 1.10%BRIGHAM'S BUILDING FOR THE Equipment Opera 05/01/2016

S.O.S. CORPORATION 619.0 80.0 12.92% 504.0 81.42% 48.0 7.75%BRIGHAM'S BUILDING FOR THE Laborer 05/08/2016

LIBERTY CONST. SERVICES 37,202.5 16,539.0 44.46% 15,191.0 40.83% 1,589.0 4.27%BRIGHAM'S BUILDING FOR THE Carpenter 05/01/2016

LAN-TEL COMMUNICATION INC 3,176.0 512.5 16.14% 605.5 19.06% 501.5 15.79%BRIGHAM'S BUILDING FOR THE Telephone/Data I 05/07/2016

LAN-TEL COMMUNICATION INC 83.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BRIGHAM'S BUILDING FOR THE Stage Hand 04/16/2016

LAB SPECIALTIES CO. 548.0 122.0 22.26% 238.0 43.43% 78.0 14.23%BRIGHAM'S BUILDING FOR THE Carpenter 04/08/2016

LIBERTY CONST. SERVICES 105,029.5 32,628.5 31.07% 30,864.5 29.39% 7,114.0 6.77%BRIGHAM'S BUILDING FOR THE Laborer 05/01/2016

SWEENEY DRYWALL FINISHE 2,658.0 320.0 12.04% 0.0 0.00% 0.0 0.00%BRIGHAM'S BUILDING FOR THE Carpenter 05/07/2016

VER-TEX CONSTRUCTION SPE 613.0 71.5 11.66% 224.0 36.54% 0.0 0.00%BRIGHAM'S BUILDING FOR THE Carpenter 04/30/2016

VALLEYCREST LANDSCAPE 2,617.5 0.0 0.00% 224.0 8.56% 0.0 0.00%BRIGHAM'S BUILDING FOR THE Laborer 05/08/2016

VALLEYCREST LANDSCAPE 204.5 0.0 0.00% 12.0 5.87% 0.0 0.00%BRIGHAM'S BUILDING FOR THE Bricklayer 04/10/2016

THYSSEN KRUPP ELEVATOR 5,394.0 0.0 0.00% 0.0 0.00% 1,638.3 30.37%BRIGHAM'S BUILDING FOR THE Elev Const Helper 05/12/2016

THOMPSON COMPANY INC. 6,060.0 2,559.0 42.23% 1,467.0 24.21% 458.0 7.56%BRIGHAM'S BUILDING FOR THE Carpenter 05/07/2016

THE PAPPAS COMPANY, INC 6.0 6.0 100.00% 6.0 100.00% 0.0 0.00%BRIGHAM'S BUILDING FOR THE Carpet Layer 02/28/2016

THE PAPPAS COMPANY, INC 358.5 188.5 52.58% 188.5 52.58% 85.5 23.85%BRIGHAM'S BUILDING FOR THE Carpenter 04/17/2016

THE CHEVIOT CORPORATION 144.0 144.0 100.00% 144.0 100.00% 0.0 0.00%BRIGHAM'S BUILDING FOR THE Iron Worker 12/18/2015

THE CHEVIOT CORPORATION 3,708.0 504.0 13.59% 206.0 5.56% 322.0 8.68%BRIGHAM'S BUILDING FOR THE Glazier 05/06/2016

S & F CONCRETE 1,447.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BRIGHAM'S BUILDING FOR THE Equipment Opera 03/12/2016

SWEENEY DRYWALL FINISHE 34.0 8.0 23.53% 8.0 23.53% 0.0 0.00%BRIGHAM'S BUILDING FOR THE Laborer 04/09/2016

PAVILION FLOORS, INC. 8.0 0.0 0.00% 8.0 100.00% 0.0 0.00%BRIGHAM'S BUILDING FOR THE Terrazzo Worker 01/02/2016

SULLIVAN & MCLAUGHLIN CO. 32.0 0.0 0.00% 16.0 50.00% 8.0 25.00%BRIGHAM'S BUILDING FOR THE Installer/Apt Wirer 04/03/2016

SULLIVAN & MCLAUGHLIN CO. 192,973.0 52,497.5 27.20% 35,169.5 18.23% 9,841.5 5.10%BRIGHAM'S BUILDING FOR THE Electrician 05/15/2016

SPECTRUM INTEGRATED TEC 19,706.0 4,759.0 24.15% 3,812.0 19.34% 1,698.0 8.62%BRIGHAM'S BUILDING FOR THE Technician 05/06/2016

SPECTRUM INTEGRATED TEC 24.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BRIGHAM'S BUILDING FOR THE Electrician 10/16/2015

THYSSEN KRUPP ELEVATOR 10,919.8 0.0 0.00% 178.5 1.63% 0.0 0.00%BRIGHAM'S BUILDING FOR THE Elevator Const(M 05/05/2016

S & F CONCRETE 31,199.0 4,689.0 15.03% 6,306.5 20.21% 1,770.5 5.67%BRIGHAM'S BUILDING FOR THE Laborer 05/07/2016

JOHN F. SHEA CO. INC. 214.0 34.0 15.89% 16.0 7.48% 0.0 0.00%BRIGHAM'S BUILDING FOR THE Sheetmetal Work 04/16/2016

S & F CONCRETE 3,990.0 856.0 21.45% 1,278.0 32.03% 0.0 0.00%BRIGHAM'S BUILDING FOR THE Cement Finisher 04/30/2016

S & F CONCRETE 16,407.0 7,128.5 43.45% 6,206.0 37.83% 2,502.0 15.25%BRIGHAM'S BUILDING FOR THE Carpenter 04/30/2016

Page 125: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 125

Project Name Trade Latest Week

REGIS STEEL CORPORATION 579.0 102.0 17.62% 244.0 42.14% 0.0 0.00%BRIGHAM'S BUILDING FOR THE Iron Worker 01/11/2014

THE CHEVIOT CORPORATION 3,430.0 0.0 0.00% 1,078.0 31.43% 184.0 5.36%BRIGHAM'S BUILDING FOR THE Carpenter 05/06/2016

ATLANTIC CONTRACTING &SP 5,000.0 88.0 1.76% 349.5 6.99% 248.0 4.96%BRIGHAM'S BUILDING FOR THE Insulator 05/08/2016

COMPOSITE COMPANY INC. 1,234.0 526.0 42.63% 1,034.0 83.79% 0.0 0.00%BRIGHAM'S BUILDING FOR THE Iron Worker 04/04/2015

COMPONENT ASSEMBLY SYS 25,715.0 8,165.0 31.75% 9,299.0 36.16% 1,493.0 5.81%BRIGHAM'S BUILDING FOR THE Taper 05/11/2016

COMPONENT ASSEMBLY SYS 18,275.0 4,221.0 23.10% 9,103.0 49.81% 1,910.0 10.45%BRIGHAM'S BUILDING FOR THE Laborer 05/11/2016

COMPONENT ASSEMBLY SYS 92,393.0 27,550.0 29.82% 34,149.0 36.96% 2,205.0 2.39%BRIGHAM'S BUILDING FOR THE Carpenter 05/11/2016

CITY POINT FIRE PROTEC. 17,065.0 3,210.0 18.81% 80.0 0.47% 0.0 0.00%BRIGHAM'S BUILDING FOR THE Sprinkler Fitter 05/06/2016

CENTURY DRYWALL INC, 3,604.5 142.0 3.94% 1,073.0 29.77% 0.0 0.00%BRIGHAM'S BUILDING FOR THE Plasterer 05/07/2016

CENTURY DRYWALL INC, 9,316.0 4,226.0 45.36% 3,900.0 41.86% 976.0 10.48%BRIGHAM'S BUILDING FOR THE Painter 05/07/2016

CENTURY DRYWALL INC, 6,842.5 3,356.5 49.05% 2,341.5 34.22% 194.0 2.84%BRIGHAM'S BUILDING FOR THE Laborer 05/07/2016

AUTOMATION SOLUTIONS INC. 130.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BRIGHAM'S BUILDING FOR THE Sheetmetal Work 04/30/2016

DANIEL MARR & SON CO. 55,226.0 16,317.5 29.55% 11,704.5 21.19% 1,861.5 3.37%BRIGHAM'S BUILDING FOR THE Iron Worker 10/04/2015

ATLANTIC CONTRACTING &SP 48.0 48.0 100.00% 32.0 66.67% 0.0 0.00%BRIGHAM'S BUILDING FOR THE Plasterer 03/05/2016

ARCHER CORPORATION 7,496.0 1,248.0 16.65% 1,248.0 16.65% 321.0 4.28%BRIGHAM'S BUILDING FOR THE Carpenter 04/29/2016

AMERICAN PLUMBING HEATIN 73,102.5 19,752.5 27.02% 17,622.5 24.11% 3,669.0 5.02%BRIGHAM'S BUILDING FOR THE Plumber 05/06/2016

ALLEGHENY CONTRACT FLOO 3,494.0 1,003.0 28.71% 2,474.0 70.81% 115.0 3.29%BRIGHAM'S BUILDING FOR THE Floor Layer 03/04/2016

ALL PANEL SYSTEMS, LLC. 67.5 0.0 0.00% 0.0 0.00% 0.0 0.00%BRIGHAM'S BUILDING FOR THE Iron Worker 12/05/2015

ALL PANEL SYSTEMS, LLC. 12,406.5 3,373.3 27.19% 5,088.3 41.01% 458.5 3.70%BRIGHAM'S BUILDING FOR THE Carpenter 04/30/2016

A. A. WILL CORPORATION 14,470.5 1,701.5 11.76% 1,607.0 11.11% 813.0 5.62%BRIGHAM'S BUILDING FOR THE Equipment Opera 06/16/2015

A. A. WILL CORPORATION 12,072.5 4,416.0 36.58% 3,991.5 33.06% 0.0 0.00%BRIGHAM'S BUILDING FOR THE Piledriver 06/02/2015

A. A. WILL CORPORATION 154.5 129.5 83.82% 154.5 100.00% 0.0 0.00%BRIGHAM'S BUILDING FOR THE Oiler 06/24/2014

A. A. WILL CORPORATION 13,214.5 2,210.0 16.72% 5,277.0 39.93% 134.0 1.01%BRIGHAM'S BUILDING FOR THE Laborer 06/16/2015

JOHN F. SHEA CO. INC. 6,084.7 1,535.0 25.23% 3,797.2 62.41% 8.0 0.13%BRIGHAM'S BUILDING FOR THE Roofer 05/07/2016

VALLEYCREST LANDSCAPE 411.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BRIGHAM'S BUILDING FOR THE Equipment Opera 05/08/2016

AUTOMATION SOLUTIONS INC. 2,866.0 561.0 19.57% 1,016.0 35.45% 0.0 0.00%BRIGHAM'S BUILDING FOR THE Carpenter 04/23/2016

HERITAGE RESTORATION INC. 32.0 0.0 0.00% 32.0 100.00% 0.0 0.00%BRIGHAM'S BUILDING FOR THE Cement Finisher 02/06/2016

J.C. HIGGINS CORP. 64,557.5 13,053.0 20.22% 12,740.5 19.74% 4,101.5 6.35%BRIGHAM'S BUILDING FOR THE Pipefitter 05/08/2016

J. C. CANNISTRARO INC. 53,093.0 14,269.0 26.88% 13,205.0 24.87% 3,149.0 5.93%BRIGHAM'S BUILDING FOR THE Pipefitter 05/15/2016

AMERICAN CONTRACTORS CO 17,995.0 2,403.0 13.35% 6,494.0 36.09% 2,531.0 14.07%BRIGHAM'S BUILDING FOR THE Carpenter 04/22/2016

IPC LYDON 487.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BRIGHAM'S BUILDING FOR THE Pipefitter 04/30/2016

IPC LYDON 975.0 212.0 21.74% 0.0 0.00% 0.0 0.00%BRIGHAM'S BUILDING FOR THE Millwright 05/07/2016

IPC LYDON 644.5 196.0 30.41% 66.0 10.24% 0.0 0.00%BRIGHAM'S BUILDING FOR THE Iron Worker 02/20/2016

IPC LYDON 3,042.5 18.0 0.59% 91.0 2.99% 0.0 0.00%BRIGHAM'S BUILDING FOR THE Boilmaker 02/20/2016

Page 126: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 126

Project Name Trade Latest Week

INTEGRATED INTERIORS 1,664.5 361.0 21.69% 867.5 52.12% 0.0 0.00%BRIGHAM'S BUILDING FOR THE Glazier 02/06/2016

JAMES W. FLETT CO. INC. 2,630.0 948.0 36.05% 260.5 9.90% 0.0 0.00%BRIGHAM'S BUILDING FOR THE Equipment Opera 05/08/2016

INTEGRATED INTERIORS 938.5 642.0 68.41% 666.0 70.96% 296.5 31.59%BRIGHAM'S BUILDING FOR THE Carpenter 02/06/2016

DEPAOLI MOSAIC COMPANY 1,368.0 111.0 8.11% 0.0 0.00% 45.5 3.33%BRIGHAM'S BUILDING FOR THE Bricklayer 04/06/2016

HERITAGE RESTORATION INC. 10,975.5 756.0 6.89% 3,705.5 33.76% 0.0 0.00%BRIGHAM'S BUILDING FOR THE Laborer 05/07/2016

HERITAGE RESTORATION INC. 674.0 0.0 0.00% 171.0 25.37% 0.0 0.00%BRIGHAM'S BUILDING FOR THE Carpenter 04/16/2016

HERITAGE RESTORATION INC. 18,603.5 4,991.0 26.83% 3,719.0 19.99% 476.0 2.56%BRIGHAM'S BUILDING FOR THE Bricklayer 05/07/2016

HARRINGTON AIR. 29,310.0 10,100.0 34.46% 8,660.0 29.55% 0.0 0.00%BRIGHAM'S BUILDING FOR THE Sheetmetal Work 05/08/2016

GAVEN INDUSTRIES 3,869.0 2,190.8 56.62% 1,484.0 38.36% 652.5 16.86%BRIGHAM'S BUILDING FOR THE Carpenter 02/27/2016

FIBER-FIT INSULATION. 26,878.0 5,513.0 20.51% 12,266.0 45.64% 2,557.0 9.51%BRIGHAM'S BUILDING FOR THE Insulator 05/07/2016

ENERGY INSULATION CONSE 8,517.8 3,207.0 37.65% 3,438.0 40.36% 566.0 6.64%BRIGHAM'S BUILDING FOR THE Insulator 05/07/2016

EAST COAST SLURRY CO. 24.0 8.0 33.33% 8.0 33.33% 0.0 0.00%BRIGHAM'S BUILDING FOR THE Piledriver 11/19/2013

EAST COAST SLURRY CO. 98.5 90.5 91.88% 90.5 91.88% 0.0 0.00%BRIGHAM'S BUILDING FOR THE Oiler 11/26/2013

EAST COAST SLURRY CO. 2,220.0 40.0 1.80% 1,509.5 68.00% 0.0 0.00%BRIGHAM'S BUILDING FOR THE Laborer 02/23/2016

EAST COAST SLURRY CO. 367.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BRIGHAM'S BUILDING FOR THE Equipment Opera 06/30/2015

EAST COAST INTERIORS CO. 5,427.5 2,203.0 40.59% 335.0 6.17% 0.0 0.00%BRIGHAM'S BUILDING FOR THE Carpenter 05/07/2016

JAMES W. FLETT CO. INC. 3,664.5 1,620.5 44.22% 1,164.5 31.78% 849.5 23.18%BRIGHAM'S BUILDING FOR THE Laborer 05/08/2016

1,236,100.2 331,360.5 26.81% 337,821.4 27.33% 65,496.8 5.30%SUB TOTALS:

BRIGHTON GOURMET

$4,000Amount:

Gen Contractor: CAMBRIDGE REPROGRAPHIES

(617)623-2838 21 MCGRATH HGWY SOMERVILLE

Est Start Date:

Est End Date:

10/23/2014

10/27/2014

CAMBRIDGE REPROGRAPHIE 6.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BRIGHTON GOURMET Laborer 10/23/2014

6.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SUB TOTALS:

BRIGHTON PHARMACY

$2,500Amount:

Gen Contractor: EXCEL SIGNS & DECORATION CORP.

(617)479-8552 259 QUINCY AVE. QUINCY

Est Start Date:

Est End Date:

04/01/2014

05/01/2014

EXCEL SIGNS & DECORATION 18.0 0.0 0.00% 18.0 100.00% 6.0 33.33%BRIGHTON PHARMACY Laborer 04/12/2014

18.0 0.0 0.00% 18.0 100.00% 6.0 33.33%SUB TOTALS:

BROTHERS DELI & RESTAURANT

$5,000Amount:

Gen Contractor: EXCEL SIGNS & DECORATION CORP.

(617)479-8552 259 QUINCY AVE. QUINCY

Est Start Date:

Est End Date:

10/12/2014

10/14/2014

EXCEL SIGNS & DECORATION 12.0 0.0 0.00% 12.0 100.00% 4.0 33.33%BROTHERS DELI & RESTAURAN Laborer 10/18/2014

12.0 0.0 0.00% 12.0 100.00% 4.0 33.33%SUB TOTALS:

BROTHER'S LIGUOR'S

$10,000Amount:

Gen Contractor: EXCEL SIGNS & DECORATION CORP.

(617)479-8552 259 QUINCY AVE. QUINCY

Est Start Date:

Est End Date:

02/14/2014

03/30/2014

EXCEL SIGNS & DECORATION 15.0 0.0 0.00% 15.0 100.00% 5.0 33.33%BROTHER'S LIGUOR'S Laborer 02/22/2014

Page 127: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 127

Project Name Trade Latest Week

15.0 0.0 0.00% 15.0 100.00% 5.0 33.33%SUB TOTALS:

BUNKER HILL BARBERSHOP

$2,500Amount:

Gen Contractor: BACK BAY SIGN LLC.

(781)475-1001 425 RIVERS AVE. MEDFORD

Est Start Date:

Est End Date:

05/31/2015

06/04/2015

BACK BAY SIGN LLC. 4.8 0.0 0.00% 0.0 0.00% 0.0 0.00%BUNKER HILL BARBERSHOP Laborer 06/06/2015

4.8 0.0 0.00% 0.0 0.00% 0.0 0.00%SUB TOTALS:

BUNKER HILL DLORIST

$2,500Amount:

Gen Contractor: CAMBRIDGE REPROGRAPHIES

(617)623-2838 21 MCGRATH HGWY SOMERVILLE

Est Start Date:

Est End Date:

09/13/2015

09/27/2015

CAMBRIDGE REPROGRAPHIE 11.0 0.0 0.00% 5.0 45.45% 5.0 45.45%BUNKER HILL DLORIST Laborer 10/03/2015

11.0 0.0 0.00% 5.0 45.45% 5.0 45.45%SUB TOTALS:

BURNHAM BUILDING RENOVATIONS

$56,000,000Amount:

Gen Contractor: SUFFOLK CONSTRUCTION CO.

(617)445-3500 64 ALLERTON STREET roxbury

Est Start Date:

Est End Date:

04/24/2013

09/01/2014

SOEP PAINTING CORP. 4,126.0 623.0 15.10% 1,543.0 37.40% 48.0 1.16%BURNHAM BUILDING RENOVATI Painter 09/21/2014

NER CONS MANAGEMENT INC. 2,043.0 553.0 27.07% 952.5 46.62% 0.0 0.00%BURNHAM BUILDING RENOVATI Laborer 08/31/2014

NER CONS MANAGEMENT INC. 4,807.0 1,984.5 41.28% 0.0 0.00% 0.0 0.00%BURNHAM BUILDING RENOVATI Mason Tender 08/31/2014

JDC DEMOLITION COMPANY, I 16.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BURNHAM BUILDING RENOVATI Equipment Opera 11/23/2013

PRO CUT CONCRETE CUTTIN 40.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BURNHAM BUILDING RENOVATI Laborer 11/01/2014

NER CONS MANAGEMENT INC. 9,347.0 822.5 8.80% 2,655.0 28.40% 252.5 2.70%BURNHAM BUILDING RENOVATI Bricklayer 09/07/2014

RYAN IRON WORKS INC, 8,258.0 3,710.5 44.93% 3,260.5 39.48% 563.0 6.82%BURNHAM BUILDING RENOVATI Iron Worker 09/28/2014

S & F CONCRETE 2,963.5 1,532.0 51.70% 1,374.0 46.36% 677.5 22.86%BURNHAM BUILDING RENOVATI Carpenter 08/16/2014

S & F CONCRETE 1,258.5 188.0 14.94% 297.0 23.60% 0.0 0.00%BURNHAM BUILDING RENOVATI Cement Finisher 08/16/2014

S & F CONCRETE 295.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BURNHAM BUILDING RENOVATI Equipment Opera 07/26/2014

S & F CONCRETE 4,728.5 1,984.5 41.97% 1,392.5 29.45% 71.0 1.50%BURNHAM BUILDING RENOVATI Laborer 08/23/2014

S & F CONCRETE 76.0 33.5 44.08% 45.5 59.87% 12.0 15.79%BURNHAM BUILDING RENOVATI Mason 06/28/2014

SCHINDLER ELEVATOR CORP. 4,582.5 0.0 0.00% 0.0 0.00% 0.0 0.00%BURNHAM BUILDING RENOVATI Elevator Const(M 09/10/2014

SWEENEY DRYWALL FINISHE 301.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BURNHAM BUILDING RENOVATI Carpenter 05/24/2014

SWEENEY DRYWALL FINISHE 8.0 0.0 0.00% 8.0 100.00% 0.0 0.00%BURNHAM BUILDING RENOVATI Laborer 01/04/2014

THE AULSON COMPANY, INC. 178.0 12.0 6.74% 132.0 74.16% 0.0 0.00%BURNHAM BUILDING RENOVATI Asbestos Worker 05/24/2014

THE AULSON COMPANY, INC. 100.0 8.0 8.00% 60.0 60.00% 8.0 8.00%BURNHAM BUILDING RENOVATI Laborer 05/24/2014

THE AULSON COMPANY, INC. 96.0 16.0 16.67% 32.0 33.33% 0.0 0.00%BURNHAM BUILDING RENOVATI Painter 03/01/2014

THE CHEVIOT CORPORATION 16,266.0 2,077.0 12.77% 2,283.0 14.04% 1,452.0 8.93%BURNHAM BUILDING RENOVATI Carpenter 09/19/2014

THE CHEVIOT CORPORATION 6,418.5 1,379.5 21.49% 1,351.5 21.06% 473.5 7.38%BURNHAM BUILDING RENOVATI Glazier 09/19/2014

THE CHEVIOT CORPORATION 2,456.0 564.5 22.98% 11.0 0.45% 0.0 0.00%BURNHAM BUILDING RENOVATI Iron Worker 09/05/2014

URBAN INSULATION 614.0 0.0 0.00% 222.0 36.16% 0.0 0.00%BURNHAM BUILDING RENOVATI Asbestos Worker 09/14/2014

Page 128: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 128

Project Name Trade Latest Week

SCHINDLER ELEVATOR CORP. 2,575.5 0.0 0.00% 0.0 0.00% 0.0 0.00%BURNHAM BUILDING RENOVATI Elev Const Helper 09/03/2014

GREENWOOD INDUSTRIES IN 975.5 130.0 13.33% 95.0 9.74% 0.0 0.00%BURNHAM BUILDING RENOVATI Sheetmetal Work 08/30/2014

LIBERTY CONST. SERVICES 2,114.1 8.0 0.38% 8.0 0.38% 0.0 0.00%BURNHAM BUILDING RENOVATI Carpenter 09/07/2014

AXION SPECIALTY CONTRACTI 1,176.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BURNHAM BUILDING RENOVATI Insulator 09/21/2014

CARLYSLE ENGINEERING INC. 4,739.5 1,483.5 31.30% 1,264.5 26.68% 1,136.0 23.97%BURNHAM BUILDING RENOVATI Sprinkler Fitter 08/15/2014

COMPONENT ASSEMBLY SYS 14,168.0 3,303.0 23.31% 972.0 6.86% 3.0 0.02%BURNHAM BUILDING RENOVATI Carpenter 09/09/2014

COMPONENT ASSEMBLY SYS 4,345.0 2,655.0 61.10% 1,222.0 28.12% 0.0 0.00%BURNHAM BUILDING RENOVATI Laborer 09/09/2014

COMPONENT ASSEMBLY SYS 4,487.0 856.0 19.08% 1,136.0 25.32% 456.0 10.16%BURNHAM BUILDING RENOVATI Taper 09/09/2014

DANIEL MARR & SON CO. 19,216.0 7,671.0 39.92% 6,832.5 35.56% 1,235.0 6.43%BURNHAM BUILDING RENOVATI Iron Worker 08/17/2014

E. M. DUGGAN INC. 10,497.0 5,268.0 50.19% 1,421.0 13.54% 280.0 2.67%BURNHAM BUILDING RENOVATI Pipefitter 09/21/2014

EAST COAST FIREPROOFING 5,998.0 484.0 8.07% 577.0 9.62% 0.0 0.00%BURNHAM BUILDING RENOVATI Laborer 09/09/2014

MCDONALD ELECTRICAL COR 22,031.5 8,539.5 38.76% 3,544.0 16.09% 1,667.0 7.57%BURNHAM BUILDING RENOVATI Electrician 09/14/2014

GREENWOOD INDUSTRIES IN 2,533.5 195.5 7.72% 261.8 10.33% 0.0 0.00%BURNHAM BUILDING RENOVATI Roofer 08/30/2014

AMERICAN PLUMBING HEATIN 6,245.0 1,687.0 27.01% 1,596.0 25.56% 298.0 4.77%BURNHAM BUILDING RENOVATI Plumber 09/12/2014

HIGH POINT INTERIORS,INC. 1,343.0 84.0 6.25% 160.0 11.91% 0.0 0.00%BURNHAM BUILDING RENOVATI Marble Tile Work 09/13/2014

J. DERENZO CO. 730.0 24.0 3.29% 24.0 3.29% 0.0 0.00%BURNHAM BUILDING RENOVATI Equipment Opera 08/09/2014

J. DERENZO CO. 1,413.5 381.0 26.95% 380.0 26.88% 0.0 0.00%BURNHAM BUILDING RENOVATI Laborer 08/09/2014

J.C. FLOOR COVERING INC. 205.0 0.0 0.00% 145.0 70.73% 0.0 0.00%BURNHAM BUILDING RENOVATI Carpet Layer 08/08/2014

J.M. ELECTRICAL CO. INC. 1,130.0 666.0 58.94% 336.0 29.73% 0.0 0.00%BURNHAM BUILDING RENOVATI Electrician 06/20/2014

JDC DEMOLITION COMPANY, I 4,168.5 1,360.5 32.64% 620.0 14.87% 56.0 1.34%BURNHAM BUILDING RENOVATI Laborer 05/17/2014

LIBERTY CONST. SERVICES 20,384.3 7,450.2 36.55% 4,803.5 23.56% 1,174.8 5.76%BURNHAM BUILDING RENOVATI Laborer 09/14/2014

M.L. MCDONALD SALES 698.0 112.0 16.05% 112.0 16.05% 48.0 6.88%BURNHAM BUILDING RENOVATI Painter 07/22/2014

MARIA FALLON ELECTRICAL S 378.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BURNHAM BUILDING RENOVATI Electrician 07/11/2014

GREENWOOD INDUSTRIES IN 1.0 0.0 0.00% 0.0 0.00% 0.0 0.00%BURNHAM BUILDING RENOVATI Equipment Opera 04/05/2014

200,531.4 57,846.7 28.85% 41,129.8 20.51% 9,911.3 4.94%SUB TOTALS:

CAFÉ QUATTRO

$3,000Amount:

Gen Contractor: BOSTON SIGN CO. INC.

(617)338-2114 40 PLYMPTON STREET BOSTON

Est Start Date:

Est End Date:

03/23/2015

03/27/2015

BOSTON SIGN CO. INC. 12.0 6.0 50.00% 0.0 0.00% 0.0 0.00%CAFÉ QUATTRO Laborer 03/27/2015

12.0 6.0 50.00% 0.0 0.00% 0.0 0.00%SUB TOTALS:

CAKE POPS BOSTON

$2,500Amount:

Gen Contractor: HUNTER SIGNS

(617)360-9710 120 BUSINESS STREET HYDE PARK

Est Start Date:

Est End Date:

12/06/2015

12/12/2015

HUNTER SIGNS 2.0 2.0 100.00% 2.0 100.00% 0.0 0.00%CAKE POPS BOSTON Laborer 12/12/2015

2.0 2.0 100.00% 2.0 100.00% 0.0 0.00%SUB TOTALS:

Page 129: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 129

Project Name Trade Latest Week

CARAMELO CLOTHING CO.

$2,000Amount:

Gen Contractor: JIM DID IT SIGN CO.

(781)933-1865 465 CAMBRIDGE STREET 10 DRAPER STREET #11 WOBURN

Est Start Date:

Est End Date:

02/01/2014

04/30/2014

JIM DID IT SIGN CO. 24.0 0.0 0.00% 0.0 0.00% 0.0 0.00%CARAMELO CLOTHING CO. Laborer 03/28/2014

24.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SUB TOTALS:

CASTILLO WINE & SPIRITS

$75,000Amount:

Gen Contractor:

Est Start Date:

Est End Date:

04/27/2015

10/31/2015

CAMBRIDGE REPROGRAPHIE 7.0 0.0 0.00% 0.0 0.00% 0.0 0.00%CASTILLO WINE & SPIRITS Electrician 10/31/2015

CAMBRIDGE REPROGRAPHIE 15.0 0.0 0.00% 6.0 40.00% 4.0 26.67%CASTILLO WINE & SPIRITS Laborer 09/12/2015

VISION RESTORATION 24.0 24.0 100.00% 0.0 0.00% 0.0 0.00%CASTILLO WINE & SPIRITS Glazier 05/09/2015

VISION RESTORATION 80.0 80.0 100.00% 80.0 100.00% 0.0 0.00%CASTILLO WINE & SPIRITS Laborer 10/23/2015

126.0 104.0 82.54% 86.0 68.25% 4.0 3.17%SUB TOTALS:

CELTIC - BOSTON LANDING

$125,000,000Amount:

Gen Contractor: JOHN MORIARTY & ASSOCIATES

(781)729-3900 3 CHURCH STREET WINCHESTER

Est Start Date:

Est End Date:

08/01/2016

08/01/2018

S & F CONCRETE 2,112.5 1,122.0 53.11% 679.5 32.17% 0.0 0.00%CELTIC - BOSTON LANDING Carpenter 09/16/2017

S & F CONCRETE 705.0 133.5 18.94% 200.0 28.37% 0.0 0.00%CELTIC - BOSTON LANDING Cement Finisher 09/16/2017

S & F CONCRETE 256.5 0.0 0.00% 0.0 0.00% 0.0 0.00%CELTIC - BOSTON LANDING Equipment Opera 09/16/2017

S & F CONCRETE 3,078.0 598.0 19.43% 1,331.5 43.26% 598.0 19.43%CELTIC - BOSTON LANDING Laborer 09/16/2017

SALVUCCI MASONRY COMPAN 634.5 186.5 29.39% 120.0 18.91% 0.0 0.00%CELTIC - BOSTON LANDING Bricklayer 09/16/2017

SALVUCCI MASONRY COMPAN 438.0 88.5 20.21% 0.0 0.00% 0.0 0.00%CELTIC - BOSTON LANDING Laborer 09/16/2017

T & T STEEL ERECTORS 1,094.0 216.0 19.74% 1,012.0 92.50% 0.0 0.00%CELTIC - BOSTON LANDING Iron Worker 09/16/2017

GASTON ELECTRICAL CO, INC 4,114.0 803.0 19.52% 1,341.0 32.60% 0.0 0.00%CELTIC - BOSTON LANDING Electrician 09/17/2017

WILLIAM M. COLLINS COMPAN 1,196.0 408.0 34.11% 288.0 24.08% 0.0 0.00%CELTIC - BOSTON LANDING Sprinkler Fitter 09/10/2017

T. J. MCCARTNEY, INC. 199.0 95.0 47.74% 95.0 47.74% 0.0 0.00%CELTIC - BOSTON LANDING Laborer 09/15/2017

PRIME STEEL ERECTING INC, 13,053.0 5,650.5 43.29% 4,028.0 30.86% 588.0 4.50%CELTIC - BOSTON LANDING Iron Worker 09/16/2017

T. J. MCCARTNEY, INC. 24.0 24.0 100.00% 24.0 100.00% 0.0 0.00%CELTIC - BOSTON LANDING Taper 09/08/2017

VALANTE MECHANICAL 3,346.0 1,884.0 56.31% 746.0 22.30% 792.0 23.67%CELTIC - BOSTON LANDING Plumber 09/23/2017

T. J. MCCARTNEY, INC. 1,137.0 169.0 14.86% 425.0 37.38% 64.0 5.63%CELTIC - BOSTON LANDING Carpenter 09/15/2017

BEACON WATERPROOFING A 20.0 0.0 0.00% 20.0 100.00% 0.0 0.00%CELTIC - BOSTON LANDING Laborer 03/24/2017

IPSWICH BAY GLASS CO. 40.0 0.0 0.00% 0.0 0.00% 0.0 0.00%CELTIC - BOSTON LANDING Carpenter 09/16/2017

BEACON WATERPROOFING A 438.0 222.0 50.68% 125.5 28.65% 0.0 0.00%CELTIC - BOSTON LANDING Bricklayer 09/08/2017

PRECISION STEEL PLACERS 968.0 82.0 8.47% 40.0 4.13% 0.0 0.00%CELTIC - BOSTON LANDING Iron Worker 08/12/2017

EAST COAST FIREPROOFING 1,307.0 0.0 0.00% 917.0 70.16% 16.0 1.22%CELTIC - BOSTON LANDING Laborer 09/05/2017

HAMEL & MCALISTER, INC. 1,918.0 272.0 14.18% 272.0 14.18% 0.0 0.00%CELTIC - BOSTON LANDING Pipefitter 09/22/2017

IPSWICH BAY GLASS CO. 144.0 16.0 11.11% 0.0 0.00% 0.0 0.00%CELTIC - BOSTON LANDING Glazier 09/16/2017

Page 130: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 130

Project Name Trade Latest Week

J. DERENZO CO. 4,281.0 0.0 0.00% 1,079.0 25.20% 0.0 0.00%CELTIC - BOSTON LANDING Equipment Opera 07/29/2017

J. DERENZO CO. 5,240.0 1,533.0 29.26% 1,559.0 29.75% 785.5 14.99%CELTIC - BOSTON LANDING Laborer 07/29/2017

J. DERENZO CO. 48.0 0.0 0.00% 0.0 0.00% 0.0 0.00%CELTIC - BOSTON LANDING Lather 01/14/2017

JOHN MORIARTY & ASSOCIAT 795.0 795.0 100.00% 356.0 44.78% 52.0 6.54%CELTIC - BOSTON LANDING Carpenter 09/17/2017

JOHN MORIARTY & ASSOCIAT 1,795.0 571.0 31.81% 0.0 0.00% 571.0 31.81%CELTIC - BOSTON LANDING Laborer 09/17/2017

MCCUSKER-GILL INC. 635.0 235.0 37.01% 325.0 51.18% 0.0 0.00%CELTIC - BOSTON LANDING Sheetmetal Work 09/03/2017

IPSWICH BAY GLASS CO. 317.0 138.5 43.69% 178.5 56.31% 0.0 0.00%CELTIC - BOSTON LANDING Iron Worker 09/16/2017

49,333.5 15,242.5 30.90% 15,162.0 30.73% 3,466.5 7.03%SUB TOTALS:

CHAELESTOWN RECOVERY HOUSE

$20,000Amount:

Gen Contractor: JOSHUA LEVIN

(617)509-6558 29 HODGDON TERRACE WEST ROXBURY

Est Start Date:

Est End Date:

05/09/2016

05/27/2016

JOSHUA LEVIN 270.0 270.0 100.00% 120.0 44.44% 0.0 0.00%CHAELESTOWN RECOVERY HO Carpenter 05/27/2016

270.0 270.0 100.00% 120.0 44.44% 0.0 0.00%SUB TOTALS:

CHANCE LIQUORS

$2,500Amount:

Gen Contractor: EXCEL SIGNS & DECORATION CORP.

(617)479-8552 259 QUINCY AVE. QUINCY

Est Start Date:

Est End Date:

06/12/2016

06/18/2016

EXCEL SIGNS & DECORATION 9.0 0.0 0.00% 9.0 100.00% 3.0 33.33%CHANCE LIQUORS Laborer 06/18/2016

9.0 0.0 0.00% 9.0 100.00% 3.0 33.33%SUB TOTALS:

CHAO CENTER

$85,000,000Amount:

Gen Contractor: SKANSKA CO.

(617)574-1400 253 SUMMER STREET BOSTON

Est Start Date:

Est End Date:

03/01/2014

05/01/2016

S & F CONCRETE 4.0 0.0 0.00% 0.0 0.00% 0.0 0.00%CHAO CENTER Equipment Opera 05/24/2014

S & F CONCRETE 8.0 0.0 0.00% 0.0 0.00% 0.0 0.00%CHAO CENTER Mason 05/24/2014

STATE ELECTRIC CO. 130.0 0.0 0.00% 0.0 0.00% 0.0 0.00%CHAO CENTER Electrician 04/13/2014

THE AULSON COMPANY, LLC 5,253.5 1,739.0 33.10% 5,253.5 100.00% 280.0 5.33%CHAO CENTER Asbestos Worker 05/03/2014

THE WELCH CORPORATION 158.0 142.0 89.87% 104.0 65.82% 0.0 0.00%CHAO CENTER Equipment Opera 08/16/2014

THE WELCH CORPORATION 45.0 8.0 17.78% 36.0 80.00% 0.0 0.00%CHAO CENTER Laborer 08/23/2014

NORTHEASTERN STEEL 4.0 0.0 0.00% 4.0 100.00% 0.0 0.00%CHAO CENTER Iron Worker 10/25/2014

S & F CONCRETE 52.0 0.0 0.00% 0.0 0.00% 0.0 0.00%CHAO CENTER Carpenter 05/24/2014

VALLEYCREST LANDSCAPE 76.5 0.0 0.00% 76.5 100.00% 0.0 0.00%CHAO CENTER Tree Surgeon 03/09/2014

J.F. WHITE CONTRACTING CO 2.5 0.0 0.00% 0.0 0.00% 0.0 0.00%CHAO CENTER Laborer 08/03/2014

S & F CONCRETE 28.0 0.0 0.00% 0.0 0.00% 0.0 0.00%CHAO CENTER Laborer 05/24/2014

J.F. WHITE CONTRACTING CO 1,157.5 274.5 23.71% 278.5 24.06% 297.5 25.70%CHAO CENTER Equipment Opera 08/24/2014

J.F. WHITE CONTRACTING CO 1,767.0 42.5 2.41% 250.0 14.15% 0.0 0.00%CHAO CENTER Piledriver 08/24/2014

J.F. WHITE CONTRACTING CO 10.0 0.0 0.00% 0.0 0.00% 0.0 0.00%CHAO CENTER Surveyor 08/03/2014

JDC DEMOLITION COMPANY, I 2,304.5 85.0 3.69% 654.0 28.38% 0.0 0.00%CHAO CENTER Equipment Opera 07/05/2014

Page 131: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 131

Project Name Trade Latest Week

NEW QUALITY FENCE CO 48.0 0.0 0.00% 0.0 0.00% 0.0 0.00%CHAO CENTER Laborer 03/08/2014

JDC DEMOLITION COMPANY, I 5,919.0 2,381.0 40.23% 1,930.5 32.62% 379.0 6.40%CHAO CENTER Laborer 07/05/2014

ALLIED PILE DRIVING INC. 282.0 0.0 0.00% 114.5 40.60% 0.0 0.00%CHAO CENTER Equipment Opera 07/12/2014

ALLIED PILE DRIVING INC. 620.0 336.5 54.27% 142.5 22.98% 73.0 11.77%CHAO CENTER Piledriver 07/12/2014

17,869.5 5,008.5 28.03% 8,844.0 49.49% 1,029.5 5.76%SUB TOTALS:

CHAO CENTER PHASE II

$52,000,000Amount:

Gen Contractor: LEE KENNEDY

825-6930 1792 DORCHESTER AVE BOSTON

Est Start Date:

Est End Date:

08/25/2014

04/25/2016

KO STONE 754.5 80.0 10.60% 722.5 95.76% 350.5 46.45%CHAO CENTER PHASE II Laborer 05/21/2016

OTIS ELEVATOR COMPANY 1,798.0 0.0 0.00% 297.0 16.52% 278.8 15.50%CHAO CENTER PHASE II Elevator Const(M 04/28/2016

SWEENEY DRYWALL FINISHE 25,041.0 6,210.0 24.80% 9,843.0 39.31% 515.0 2.06%CHAO CENTER PHASE II Carpenter 05/14/2016

STATE ELECTRIC CO. 33,085.0 8,576.0 25.92% 8,896.0 26.89% 2,802.0 8.47%CHAO CENTER PHASE II Electrician 05/29/2016

SOEP PAINTING CORP. 3,352.0 2,590.0 77.27% 832.0 24.82% 2,042.0 60.92%CHAO CENTER PHASE II Painter 05/29/2016

PIZZOTTI BROTHERS, INC. 4,116.0 1,104.0 26.82% 1,160.0 28.18% 0.0 0.00%CHAO CENTER PHASE II Mason Tender 02/02/2016

PIZZOTTI BROTHERS, INC. 8,150.0 2,824.0 34.65% 3,296.0 40.44% 168.0 2.06%CHAO CENTER PHASE II Bricklayer 04/05/2016

OTIS ELEVATOR COMPANY 780.5 0.0 0.00% 0.0 0.00% 0.0 0.00%CHAO CENTER PHASE II Elev Const Helper 04/21/2016

NORTHEASTERN STEEL 3,075.5 788.0 25.62% 2,183.0 70.98% 118.0 3.84%CHAO CENTER PHASE II Iron Worker 07/04/2015

NEW ENGLAND DECKS&FLOO 903.0 213.0 23.59% 225.0 24.92% 0.0 0.00%CHAO CENTER PHASE II Laborer 04/16/2016

LONGDEN COMPANY INC. 30.0 0.0 0.00% 0.0 0.00% 0.0 0.00%CHAO CENTER PHASE II Carpenter 03/12/2016

SWEENEY DRYWALL FINISHE 4,526.0 1,795.5 39.67% 1,173.5 25.93% 967.5 21.38%CHAO CENTER PHASE II Laborer 05/14/2016

LEE KENNEDY 3,103.0 2,456.0 79.15% 719.0 23.17% 0.0 0.00%CHAO CENTER PHASE II Carpenter 05/17/2016

THOMAS G GALLAGHER INC. 6,405.0 1,864.0 29.10% 3,399.0 53.07% 816.0 12.74%CHAO CENTER PHASE II Plumber 04/03/2016

LEE KENNEDY 14,744.5 5,005.0 33.94% 6,443.0 43.70% 3,228.0 21.89%CHAO CENTER PHASE II Laborer 05/24/2016

THOMAS G GALLAGHER INC. 4,591.5 340.0 7.40% 0.0 0.00% 260.0 5.66%CHAO CENTER PHASE II Sprinkler Fitter 05/08/2016

ZICHELLE STEEL ERECTORS 5,329.5 793.0 14.88% 1,259.0 23.62% 0.0 0.00%CHAO CENTER PHASE II Iron Worker 08/14/2015

XQUISITE LANDSCAPING 766.0 0.0 0.00% 0.0 0.00% 0.0 0.00%CHAO CENTER PHASE II Mason 05/22/2016

XQUISITE LANDSCAPING 4,361.7 772.5 17.71% 1,276.5 29.27% 542.5 12.44%CHAO CENTER PHASE II Laborer 05/29/2016

XQUISITE LANDSCAPING 650.5 0.0 0.00% 0.0 0.00% 0.0 0.00%CHAO CENTER PHASE II Equipment Opera 05/29/2016

WATCH CITY DOOR SPECIALIS 1,762.0 394.0 22.36% 394.0 22.36% 394.0 22.36%CHAO CENTER PHASE II Carpenter 04/23/2016

THE WELCH CORPORATION 9,387.0 1,576.0 16.79% 2,746.0 29.25% 948.5 10.10%CHAO CENTER PHASE II Laborer 05/28/2016

VER-TEX CONSTRUCTION SPE 576.3 59.5 10.33% 123.5 21.43% 0.0 0.00%CHAO CENTER PHASE II Carpenter 05/14/2016

SWEENEY DRYWALL FINISHE 5,811.5 368.0 6.33% 764.0 13.15% 240.0 4.13%CHAO CENTER PHASE II Taper 05/14/2016

MCCUSKER-GILL INC. 10,466.5 4,601.0 43.96% 2,742.0 26.20% 0.0 0.00%CHAO CENTER PHASE II Sheetmetal Work 04/24/2016

THOMAS G GALLAGHER INC. 10,800.0 3,093.0 28.64% 2,969.0 27.49% 0.0 0.00%CHAO CENTER PHASE II Pipefitter 05/15/2016

K & K ACOUSTICAL CEILINGS 3,012.0 338.0 11.22% 684.0 22.71% 349.0 11.59%CHAO CENTER PHASE II Carpenter 05/29/2016

Page 132: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 132

Project Name Trade Latest Week

THE WELCH CORPORATION 6,683.0 1,814.0 27.14% 565.0 8.45% 0.0 0.00%CHAO CENTER PHASE II Equipment Opera 05/28/2016

THE WATERPROOFING COMP 4,932.0 1,869.0 37.90% 1,949.5 39.53% 138.0 2.80%CHAO CENTER PHASE II Waterproofer 05/07/2016

THE PAPPAS COMPANY, INC 283.0 122.0 43.11% 122.0 43.11% 29.0 10.25%CHAO CENTER PHASE II Carpenter 05/22/2016

WALTER A FURMAN CO 2,748.5 901.0 32.78% 604.0 21.98% 243.5 8.86%CHAO CENTER PHASE II Carpenter 05/28/2016

J.M. ELECTRICAL CO. INC. 3,040.0 1,040.0 34.21% 256.0 8.42% 240.0 7.89%CHAO CENTER PHASE II Electrician 05/20/2016

GILBERT & BECKER CO. 6,749.0 2,472.5 36.64% 1,947.0 28.85% 139.0 2.06%CHAO CENTER PHASE II Roofer 05/01/2016

ENERGY INSULATION CONSE 5,496.0 1,008.5 18.35% 2,506.5 45.61% 670.0 12.19%CHAO CENTER PHASE II Insulator 03/19/2016

DEPAOLI MOSAIC COMPANY 560.5 0.0 0.00% 0.0 0.00% 0.0 0.00%CHAO CENTER PHASE II Terrazzo Worker 06/01/2016

COMPOSITE COMPANY INC. 184.0 48.0 26.09% 48.0 26.09% 0.0 0.00%CHAO CENTER PHASE II Iron Worker 05/09/2015

COLLINS CRANE & RIGGING S 4,348.3 0.0 0.00% 0.0 0.00% 0.0 0.00%CHAO CENTER PHASE II Utility Operator 05/28/2016

CHANDLER ARCHITECTURAL 1,740.5 1,131.0 64.98% 1,131.0 64.98% 1,014.0 58.26%CHAO CENTER PHASE II Iron Worker 12/12/2015

GILBERT & BECKER CO. 1,019.0 0.0 0.00% 0.0 0.00% 0.0 0.00%CHAO CENTER PHASE II Sheetmetal Work 04/24/2016

CHANDLER ARCHITECTURAL 2,809.5 108.0 3.84% 787.5 28.03% 0.0 0.00%CHAO CENTER PHASE II Carpenter 03/05/2016

CAPCO STEEL ERECTORS 32.0 32.0 100.00% 32.0 100.00% 0.0 0.00%CHAO CENTER PHASE II Plumber 12/27/2015

CAPCO STEEL ERECTORS 4,752.0 786.0 16.54% 962.0 20.24% 0.0 0.00%CHAO CENTER PHASE II Iron Worker 05/22/2016

NEW ENGLAND DECKS&FLOO 697.0 0.0 0.00% 0.0 0.00% 0.0 0.00%CHAO CENTER PHASE II Mason 05/14/2016

ALLIED PILE DRIVING INC. 1,144.0 604.5 52.84% 401.0 35.05% 120.5 10.53%CHAO CENTER PHASE II Piledriver 01/10/2015

ALLIED PILE DRIVING INC. 371.0 0.0 0.00% 168.5 45.42% 0.0 0.00%CHAO CENTER PHASE II Equipment Opera 01/10/2015

ALLEGHENY CONTRACT FLOO 3,074.0 1,036.0 33.70% 1,518.0 49.38% 0.0 0.00%CHAO CENTER PHASE II Floor Layer 05/27/2016

ALLEGHENY CONTRACT FLOO 8.0 0.0 0.00% 0.0 0.00% 0.0 0.00%CHAO CENTER PHASE II Blaster 01/15/2016

CHANDLER ARCHITECTURAL 12,294.5 134.0 1.09% 2,871.0 23.35% 139.0 1.13%CHAO CENTER PHASE II Glazier 05/21/2016

J.L. MARSHALL & SONS,INC 1,671.0 108.5 6.49% 337.0 20.17% 244.0 14.60%CHAO CENTER PHASE II Cement Finisher 05/08/2016

BARON INDUSTRIES INC 304.0 0.0 0.00% 0.0 0.00% 0.0 0.00%CHAO CENTER PHASE II Iron Worker 04/23/2016

HALLAMORE CORPORATION 513.5 0.0 0.00% 0.0 0.00% 0.0 0.00%CHAO CENTER PHASE II Equipment Opera 05/02/2015

J.L. MARSHALL & SONS,INC 188.0 0.0 0.00% 0.0 0.00% 0.0 0.00%CHAO CENTER PHASE II Iron Worker 05/08/2016

J.L. MARSHALL & SONS,INC 5,599.5 1,591.0 28.41% 738.5 13.19% 0.0 0.00%CHAO CENTER PHASE II Laborer 05/15/2016

J.L. MARSHALL & SONS,INC 1,131.5 0.0 0.00% 56.0 4.95% 0.0 0.00%CHAO CENTER PHASE II Equipment Opera 05/08/2016

J.L. MARSHALL & SONS,INC 6,884.5 2,010.0 29.20% 2,897.5 42.09% 499.0 7.25%CHAO CENTER PHASE II Carpenter 05/15/2016

J.F. WHITE CONTRACTING CO 16.0 0.0 0.00% 0.0 0.00% 0.0 0.00%CHAO CENTER PHASE II Surveyor 11/23/2014

INTERIOR STONE 68.0 30.5 44.85% 37.0 54.41% 0.0 0.00%CHAO CENTER PHASE II Marble Tile Work 04/22/2016

J.F. WHITE CONTRACTING CO 50.5 0.0 0.00% 0.0 0.00% 0.0 0.00%CHAO CENTER PHASE II Laborer 01/18/2015

J.F. WHITE CONTRACTING CO 249.5 0.0 0.00% 0.0 0.00% 32.0 12.83%CHAO CENTER PHASE II Equipment Opera 11/23/2014

ISLAND INTER. INDUSTRIES. 1,427.0 0.0 0.00% 630.0 44.15% 0.0 0.00%CHAO CENTER PHASE II Plasterer 01/26/2016

ISLAND INTER. INDUSTRIES. 700.0 8.0 1.14% 181.0 25.86% 0.0 0.00%CHAO CENTER PHASE II Laborer 01/26/2016

Page 133: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 133

Project Name Trade Latest Week

J.F. WHITE CONTRACTING CO 735.0 79.0 10.75% 0.0 0.00% 0.0 0.00%CHAO CENTER PHASE II Piledriver 05/24/2015

HALLAMORE CORPORATION 298.0 137.0 45.97% 137.0 45.97% 0.0 0.00%CHAO CENTER PHASE II Oiler 05/02/2015

250,180.2 62,911.0 25.15% 73,030.0 29.19% 17,527.8 7.01%SUB TOTALS:

CHARING CROSS

$500,000Amount:

Gen Contractor: METRIC CONSTRUCTION CORP.

(617)787-1158 55 HENSHAW ST. BOSTON

Est Start Date:

Est End Date:

10/01/2013

10/01/2015

MACCORMACK PLUMBING 208.0 16.0 7.69% 16.0 7.69% 0.0 0.00%CHARING CROSS HVAC 02/28/2015

WENDY'S DRYWALL 2,350.0 0.0 0.00% 2,350.0 100.00% 400.0 17.02%CHARING CROSS Taper 08/28/2015

KONE ELEVATOR INC. 5.0 0.0 0.00% 0.0 0.00% 5.0 100.00%CHARING CROSS Elev Const Helper 09/16/2015

JAMES T. LYNCH CONSTRUCTI 1,974.0 0.0 0.00% 249.0 12.61% 0.0 0.00%CHARING CROSS Laborer 01/10/2015

JAMES T. LYNCH CONSTRUCTI 2,166.5 334.0 15.42% 0.0 0.00% 0.0 0.00%CHARING CROSS Equipment Opera 01/10/2015

J & R GLASS INC 106.0 0.0 0.00% 7.5 7.08% 0.0 0.00%CHARING CROSS Glazier 05/15/2015

J P I CONSTRUCTION, INC. 13,359.5 0.0 0.00% 10,289.5 77.02% 0.0 0.00%CHARING CROSS Carpenter 03/07/2015

TF ANDREW CARPET ONE FLO 4,800.0 960.0 20.00% 4,800.0 100.00% 0.0 0.00%CHARING CROSS Floor Layer 08/22/2015

HAKALA FOUNDATIONS 1,427.0 0.0 0.00% 0.0 0.00% 0.0 0.00%CHARING CROSS Carpenter 08/23/2014

J P I CONSTRUCTION, INC. 5,512.5 822.5 14.92% 3,839.5 69.65% 832.0 15.09%CHARING CROSS Laborer 03/07/2015

MACCORMACK PLUMBING 8.0 0.0 0.00% 8.0 100.00% 0.0 0.00%CHARING CROSS Sheetmetal Work 02/14/2015

MASS PLASTERING. 528.0 240.0 45.45% 48.0 9.09% 0.0 0.00%CHARING CROSS Laborer 01/31/2015

MASS PLASTERING. 184.0 0.0 0.00% 0.0 0.00% 0.0 0.00%CHARING CROSS Plasterer 01/31/2015

METRIC CONSTRUCTION COR 949.0 949.0 100.00% 949.0 100.00% 949.0 100.00%CHARING CROSS Laborer 07/10/2015

NATIONAL ELECTRIC CONTRA 390.0 0.0 0.00% 0.0 0.00% 0.0 0.00%CHARING CROSS Electrician 10/02/2015

NESC INC 368.0 0.0 0.00% 91.0 24.73% 0.0 0.00%CHARING CROSS Laborer 07/25/2015

RAY HACHEY INC. 3,368.0 392.0 11.64% 392.0 11.64% 0.0 0.00%CHARING CROSS Carpenter 09/12/2015

VPS DRYWALL LLC. 848.5 0.0 0.00% 650.5 76.66% 0.0 0.00%CHARING CROSS Carpenter 05/02/2015

VPS DRYWALL LLC. 243.5 0.0 0.00% 63.0 25.87% 0.0 0.00%CHARING CROSS Laborer 05/02/2015

KONE ELEVATOR INC. 617.0 0.0 0.00% 0.0 0.00% 40.0 6.48%CHARING CROSS Elevator Const(M 09/30/2015

GC FODERA 1,747.5 0.0 0.00% 1,179.5 67.50% 0.0 0.00%CHARING CROSS Mason Tender 07/12/2015

NORMAN DAY 10,131.0 1,096.8 10.83% 3,472.5 34.28% 868.3 8.57%CHARING CROSS Electrician 10/01/2015

CHM WELDING. 713.0 0.0 0.00% 231.0 32.40% 0.0 0.00%CHARING CROSS Iron Worker 08/26/2014

GC FODERA 1,463.5 897.0 61.29% 971.0 66.35% 0.0 0.00%CHARING CROSS Laborer 08/30/2015

ACOUSTICAL THERMAL INSUL 303.5 0.0 0.00% 0.0 0.00% 0.0 0.00%CHARING CROSS Laborer 08/15/2015

ANDERSON INSULATION 305.3 10.8 3.52% 287.3 94.10% 0.0 0.00%CHARING CROSS Insulator 07/25/2015

ASSOCIATED CONCRETE COA 316.0 0.0 0.00% 26.5 8.39% 0.0 0.00%CHARING CROSS Waterproofer 08/22/2015

ATLANTIS COMFORT SYSTEM 8,034.5 2,028.5 25.25% 3,991.0 49.67% 0.0 0.00%CHARING CROSS HVAC 09/01/2015

BAY CRANE NORTHEAST 400.0 0.0 0.00% 0.0 0.00% 0.0 0.00%CHARING CROSS Equipment Opera 01/09/2015

Page 134: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 134

Project Name Trade Latest Week

BRANDON RYAN CONSTRUCTI 655.0 0.0 0.00% 113.0 17.25% 0.0 0.00%CHARING CROSS Carpenter 07/25/2015

MACCORMACK PLUMBING 9,663.5 936.0 9.69% 1,678.5 17.37% 0.0 0.00%CHARING CROSS Plumber 09/26/2015

BRENCO CONSTRUCTION, CO. 38.0 38.0 100.00% 19.0 50.00% 0.0 0.00%CHARING CROSS Carpenter 11/02/2014

CHM WELDING. 72.0 0.0 0.00% 0.0 0.00% 0.0 0.00%CHARING CROSS Utility Operator 07/15/2014

DEX BY TERRA 240.0 0.0 0.00% 156.0 65.00% 0.0 0.00%CHARING CROSS Cement Laborer 10/18/2014

GC FODERA 1,213.5 1,213.5 100.00% 1,213.5 100.00% 0.0 0.00%CHARING CROSS Equipment Opera 08/02/2015

GC FODERA 4,825.0 259.5 5.38% 2,691.5 55.78% 0.0 0.00%CHARING CROSS Bricklayer 08/30/2015

BRANDON RYAN CONSTRUCTI 634.0 0.0 0.00% 88.0 13.88% 0.0 0.00%CHARING CROSS Laborer 09/26/2015

DEX BY TERRA 263.0 0.0 0.00% 234.5 89.16% 0.0 0.00%CHARING CROSS Laborer 10/18/2014

COLONIAL SYSTEMS, INC. 1,999.0 151.5 7.58% 10.0 0.50% 0.0 0.00%CHARING CROSS Carpenter 07/05/2015

DEX BY TERRA 232.0 0.0 0.00% 18.0 7.76% 0.0 0.00%CHARING CROSS Cement Finisher 10/18/2014

DEX BY TERRA 211.5 0.0 0.00% 19.5 9.22% 0.0 0.00%CHARING CROSS Carpenter 10/18/2014

COVENANT FIRE PROTECTION 2,225.5 225.0 10.11% 361.0 16.22% 0.0 0.00%CHARING CROSS Sprinkler Fitter 09/19/2015

COLONIAL SYSTEMS, INC. 34.5 0.0 0.00% 9.5 27.54% 0.0 0.00%CHARING CROSS Laborer 07/05/2015

COLONIAL SYSTEMS, INC. 468.5 73.0 15.58% 0.0 0.00% 0.0 0.00%CHARING CROSS Glazier 07/05/2015

DONALD P. ROBERTO CONST. 1,974.0 928.0 47.01% 300.0 15.20% 110.0 5.57%CHARING CROSS Roofer 09/26/2015

87,575.8 11,571.0 13.21% 40,823.8 46.62% 3,204.3 3.66%SUB TOTALS:

CHILDREN'S SERVICES OF ROXBURY

$20,000Amount:

Gen Contractor:

Est Start Date:

Est End Date:

07/25/2016

08/19/2016

ELM GENERAL CONTRACTOR, 30.0 30.0 100.00% 30.0 100.00% 0.0 0.00%CHILDREN'S SERVICES OF ROX Carpenter 07/31/2016

MD SECURITY/STANLEY SECU 40.0 0.0 0.00% 0.0 0.00% 0.0 0.00%CHILDREN'S SERVICES OF ROX Telephone/Data I 08/19/2016

70.0 30.0 42.86% 30.0 42.86% 0.0 0.00%SUB TOTALS:

CHILDS HASSAM, IMP. TO

$319,600Amount:

Gen Contractor: NELM CORPORATION

781/421-3380 135 INDUSTRIAL WAY ROCKLAND

Est Start Date:

Est End Date:

07/01/2013

10/01/2013

NELM CORPORATION 135.0 11.0 8.15% 45.0 33.33% 0.0 0.00%CHILDS HASSAM, IMP. TO Laborer 04/05/2014

WOVEN STEEL 94.0 80.0 85.11% 54.0 57.45% 0.0 0.00%CHILDS HASSAM, IMP. TO Laborer 04/25/2014

229.0 91.0 39.74% 99.0 43.23% 0.0 0.00%SUB TOTALS:

CHILL ON PARK

$3,500Amount:

Gen Contractor: HONAN SIGN CO, LLC

(617)846-5972 66 CREST AVE. winthrup

Est Start Date:

Est End Date:

05/18/2015

05/22/2015

HONAN SIGN CO, LLC 3.0 0.0 0.00% 0.0 0.00% 0.0 0.00%CHILL ON PARK Laborer 05/22/2015

3.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SUB TOTALS:

CINQUECENTO

$15,500Amount:

Gen Contractor: SHARP WOODWORKING

(781)828-6119 105 CHAPMAN STREET CANTON

Est Start Date:

Est End Date:

02/01/2013

04/30/2013

Page 135: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 135

Project Name Trade Latest Week

VALLEYCREST LANDSCAPE 448.0 24.0 5.36% 74.0 16.52% 24.0 5.36%CINQUECENTO Laborer 07/19/2015

VALLEYCREST LANDSCAPE 57.0 0.0 0.00% 0.0 0.00% 0.0 0.00%CINQUECENTO Equipment Opera 07/19/2015

505.0 24.0 4.75% 74.0 14.65% 24.0 4.75%SUB TOTALS:

CIP 17-21 ROADWAY RECONSTRUCTI

Amount:

Gen Contractor: MARIO SUSI & SON INC,

(617)265-4525 36 WESTWOOD STREET DORCHESTER

Est Start Date:

Est End Date:

05/01/2017

06/30/2018

MARIO SUSI & SON INC, 56.5 0.0 0.00% 32.5 57.52% 0.0 0.00%CIP 17-21 ROADWAY RECONST Equipment Opera 09/16/2017

MARIO SUSI & SON INC, 529.0 241.0 45.56% 172.0 32.51% 26.5 5.01%CIP 17-21 ROADWAY RECONST Laborer 09/16/2017

585.5 241.0 41.16% 204.5 34.93% 26.5 4.53%SUB TOTALS:

CIRCLE CHANGE FOUNDATION

$10,000Amount:

Gen Contractor: NICK MATHA

(617)271-3971 30 PARKSIDE PLACE #418 MALDEN

Est Start Date:

Est End Date:

02/01/2013

03/31/2013

METRO EQUIPMENT CORP. 16.0 16.0 100.00% 0.0 0.00% 0.0 0.00%CIRCLE CHANGE FOUNDATION Equipment Opera 06/28/2014

METRO EQUIPMENT CORP. 64.0 64.0 100.00% 32.0 50.00% 0.0 0.00%CIRCLE CHANGE FOUNDATION Laborer 06/28/2014

80.0 80.0 100.00% 32.0 40.00% 0.0 0.00%SUB TOTALS:

CITY LEGENDS BARBERSHOP

$2,500Amount:

Gen Contractor: SIGNS BY J. INC.

(617)825-9855 100 TENEAN STREET DORCHESTER

Est Start Date:

Est End Date:

04/01/2014

05/31/2014

J J WILLIAMS PLUMBING 535.0 235.0 43.93% 535.0 100.00% 110.5 20.65%CITY LEGENDS BARBERSHOP Plumber 03/06/2015

535.0 235.0 43.93% 535.0 100.00% 110.5 20.65%SUB TOTALS:

CKT CHIROPRACTIC

$27,500Amount:

Gen Contractor: COLLABORATIVE CONTRACTORS GROUP

(617)594-6767 16 HANCOCK COURT BOSTON

Est Start Date:

Est End Date:

06/17/2014

09/06/2014

COLLABORATIVE CONTRACTO 322.0 0.0 0.00% 322.0 100.00% 0.0 0.00%CKT CHIROPRACTIC Laborer 09/12/2014

EXCEL SIGNS & DECORATION 15.0 0.0 0.00% 15.0 100.00% 5.0 33.33%CKT CHIROPRACTIC Laborer 09/06/2014

COLLABORATIVE CONTRACTO 156.0 0.0 0.00% 0.0 0.00% 0.0 0.00%CKT CHIROPRACTIC Carpenter 09/12/2014

493.0 0.0 0.00% 337.0 68.36% 5.0 1.01%SUB TOTALS:

CLASSIC BOUTIQUE

$2,500Amount:

Gen Contractor: EXCEL SIGNS & DECORATION CORP.

(617)479-8552 259 QUINCY AVE. QUINCY

Est Start Date:

Est End Date:

03/01/2015

03/06/2015

EXCEL SIGNS & DECORATION 6.0 0.0 0.00% 6.0 100.00% 3.0 50.00%CLASSIC BOUTIQUE Laborer 03/07/2015

6.0 0.0 0.00% 6.0 100.00% 3.0 50.00%SUB TOTALS:

CLEARY SQUARE EYECARE

$2,500Amount:

Gen Contractor: HUNTER SIGNS

(617)360-9710 120 BUSINESS STREET HYDE PARK

Est Start Date:

Est End Date:

06/12/2014

06/13/2014

HUNTER SIGNS 2.0 2.0 100.00% 2.0 100.00% 0.0 0.00%CLEARY SQUARE EYECARE Laborer 06/13/2014

2.0 2.0 100.00% 2.0 100.00% 0.0 0.00%SUB TOTALS:

Page 136: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 136

Project Name Trade Latest Week

CODMAN SQ. APTS.

$21,000,000Amount:

Gen Contractor: VERTEC CORP.

(508)230-2600 180 MAIN STREET NORTH EASTON

Est Start Date:

Est End Date:

04/01/2012

01/31/2013

COVENANT FIRE PROTECTION 12.0 0.0 0.00% 0.0 0.00% 0.0 0.00%CODMAN SQ. APTS. Sprinkler Fitter 11/30/2013

HANNAH ENVIRONMENTAL EN 10.0 10.0 100.00% 10.0 100.00% 10.0 100.00%CODMAN SQ. APTS. Laborer 12/07/2013

SHEPARDVILLE CO, LLC. 144.0 0.0 0.00% 0.0 0.00% 0.0 0.00%CODMAN SQ. APTS. Carpenter 12/13/2013

LOWE PLUMB & HEATING 82.3 72.5 88.09% 52.3 63.55% 0.0 0.00%CODMAN SQ. APTS. Plumber 12/07/2013

VERTEC CORP. 496.0 270.0 54.44% 350.0 70.56% 70.0 14.11%CODMAN SQ. APTS. Laborer 12/27/2013

HANNAH ENVIRONMENTAL EN 60.0 0.0 0.00% 52.0 86.67% 0.0 0.00%CODMAN SQ. APTS. Painter 12/07/2013

GY CONSTRUCTION INC. 56.0 0.0 0.00% 56.0 100.00% 0.0 0.00%CODMAN SQ. APTS. Carpenter 11/22/2013

G & O INC. 192.0 24.0 12.50% 136.0 70.83% 0.0 0.00%CODMAN SQ. APTS. Electrician 11/30/2013

FIRST NICK PAINTING CO. 48.0 0.0 0.00% 0.0 0.00% 0.0 0.00%CODMAN SQ. APTS. Painter 11/24/2013

ESPAILLAT CONSTRUCTION L 2.0 0.0 0.00% 0.0 0.00% 0.0 0.00%CODMAN SQ. APTS. Carpenter 11/24/2013

BARNES CONSTRUCTION 352.0 352.0 100.00% 352.0 100.00% 112.0 31.82%CODMAN SQ. APTS. Painter 12/20/2013

ESPAILLAT CONSTRUCTION L 1.0 0.0 0.00% 1.0 100.00% 0.0 0.00%CODMAN SQ. APTS. Taper 11/24/2013

1,455.3 728.5 50.06% 1,009.3 69.35% 192.0 13.19%SUB TOTALS:

CODMAN SQUARE HEALTH CTR.

$15,000Amount:

Gen Contractor: ABM BUILDING SILUTIONS

(781)939-9100 14E GILL STREET WOBURN

Est Start Date:

Est End Date:

01/01/2014

02/28/2014

ABM BUILDING SILUTIONS 28.0 0.0 0.00% 0.0 0.00% 0.0 0.00%CODMAN SQUARE HEALTH CTR. Pipefitter 01/28/2014

28.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SUB TOTALS:

COLEMAN CONSTRUCTION (ELIZABE

$14,000Amount:

Gen Contractor: COLEMAN'S CONSTRUCTION

(617 696-1274 136 HILLTOP STREET MILTON

Est Start Date:

Est End Date:

02/01/2014

09/30/2014

GREENWOOD INDUSTRIES IN 110.4 0.0 0.00% 17.8 16.09% 0.0 0.00%COLEMAN CONSTRUCTION (ELI Roofer 06/14/2014

COLEMAN'S CONSTRUCTION 6.0 0.0 0.00% 0.0 0.00% 0.0 0.00%COLEMAN CONSTRUCTION (ELI Laborer 02/11/2014

ELIZABETH STONE HOUSE 10.5 0.0 0.00% 0.0 0.00% 0.0 0.00%COLEMAN CONSTRUCTION (ELI Plumber 03/29/2014

126.9 0.0 0.00% 17.8 13.99% 0.0 0.00%SUB TOTALS:

COLLEGE BOUND

$2,000Amount:

Gen Contractor:

Est Start Date:

Est End Date:

02/01/2014

03/31/2014

MARTIGNETTI ELECTRIC INC. 107.0 0.0 0.00% 0.0 0.00% 0.0 0.00%COLLEGE BOUND Electrician 03/01/2014

KENNETH ALLEW KINGSLEY P 181.5 0.0 0.00% 181.5 100.00% 0.0 0.00%COLLEGE BOUND Carpenter 09/19/2015

KENNETH ALLEW KINGSLEY P 51.0 51.0 100.00% 51.0 100.00% 0.0 0.00%COLLEGE BOUND Electrician 09/19/2015

339.5 51.0 15.02% 232.5 68.48% 0.0 0.00%SUB TOTALS:

CONDOR - HARVE APTS

$600,000Amount:

Gen Contractor: WESS CONTRACTING COMPANY

617-594-4541 80 PRINCETON STREET EAST BOSTON

Est Start Date:

Est End Date:

12/01/2012

12/31/2013

Page 137: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 137

Project Name Trade Latest Week

PLACIDO PAINTING CO. 368.0 368.0 100.00% 368.0 100.00% 0.0 0.00%CONDOR - HARVE APTS Painter 07/18/2014

SEAN FARRELL EXCAUTION 24.0 0.0 0.00% 0.0 0.00% 0.0 0.00%CONDOR - HARVE APTS Equipment Opera 06/27/2014

SEAN FARRELL EXCAUTION 48.0 0.0 0.00% 0.0 0.00% 0.0 0.00%CONDOR - HARVE APTS Laborer 06/27/2014

WESS CONTRACTING COMPA 4,620.0 4,620.0 100.00% 3,784.0 81.90% 0.0 0.00%CONDOR - HARVE APTS Carpenter 06/05/2015

WESS CONTRACTING COMPA 2,816.0 2,816.0 100.00% 2,816.0 100.00% 1,560.0 55.40%CONDOR - HARVE APTS Laborer 06/05/2015

7,876.0 7,804.0 99.09% 6,968.0 88.47% 1,560.0 19.81%SUB TOTALS:

COPLEY PLACE

$21,000,000Amount:

Gen Contractor: DIMEO CONSTRUCTION CO.

(401)781-9800 75 CHAPMAN ST. PROVIDENCE

Est Start Date:

Est End Date:

02/15/2016

06/01/2017

SCHINDLER ELEVATOR CORP. 1,959.0 198.0 10.11% 147.0 7.50% 0.0 0.00%COPLEY PLACE Elev Const Helper 06/21/2017

J & M BROWN ELECTRICAL 37.5 0.0 0.00% 0.0 0.00% 0.0 0.00%COPLEY PLACE Technician 12/02/2016

M.L. MCDONALD SALES 1,128.0 0.0 0.00% 0.0 0.00% 0.0 0.00%COPLEY PLACE Painter 06/20/2017

MANAFORT-PRECISION 25.5 0.0 0.00% 0.0 0.00% 0.0 0.00%COPLEY PLACE Carpenter 04/01/2017

MANAFORT-PRECISION 48.0 40.0 83.33% 40.0 83.33% 0.0 0.00%COPLEY PLACE Iron Worker 04/01/2017

MANAFORT-PRECISION 130.0 0.0 0.00% 0.0 0.00% 0.0 0.00%COPLEY PLACE Mason 04/29/2017

PAVILION FLOORS, INC. 32.0 16.0 50.00% 32.0 100.00% 0.0 0.00%COPLEY PLACE Terrazzo Worker 07/23/2016

J & M BROWN ELECTRICAL 4,926.0 1,969.0 39.97% 1,994.0 40.48% 0.0 0.00%COPLEY PLACE Electrician 08/04/2017

QUINN BROTHERS ESSEX INC. 288.0 0.0 0.00% 56.0 19.44% 0.0 0.00%COPLEY PLACE Iron Worker 07/15/2017

MANAFORT-PRECISION 362.0 0.0 0.00% 60.0 16.57% 0.0 0.00%COPLEY PLACE Laborer 05/06/2017

SCHINDLER ELEVATOR CORP. 2,630.0 0.0 0.00% 0.0 0.00% 0.0 0.00%COPLEY PLACE Elevator Const(M 06/21/2017

SELECT DEMO SERVICES, LLC 2,890.5 363.0 12.56% 1,298.5 44.92% 0.0 0.00%COPLEY PLACE Laborer 12/09/2016

SIMPLEXGRINNELL 619.0 8.0 1.29% 8.0 1.29% 0.0 0.00%COPLEY PLACE Sprinkler Fitter 07/14/2016

UNITED H.V.A.C. COMPANY, IN 2,058.0 226.0 10.98% 50.0 2.43% 0.0 0.00%COPLEY PLACE Sheetmetal Work 08/13/2017

PORT MORRIS TILE & MARBLE 13,573.0 1,231.0 9.07% 1,196.5 8.82% 0.0 0.00%COPLEY PLACE Marble Tile Work 09/10/2017

CENTURY DRYWALL INC, 542.0 8.0 1.48% 378.0 69.74% 0.0 0.00%COPLEY PLACE Taper 08/26/2017

PAVILION FLOORS, INC. 68.0 0.0 0.00% 60.0 88.24% 0.0 0.00%COPLEY PLACE Carpet Layer 11/19/2016

GREAT IN COUNTERS 13.0 6.5 50.00% 0.0 0.00% 0.0 0.00%COPLEY PLACE Bricklayer 07/03/2016

ACME WATERPROOFING CO,I 22.0 12.0 54.55% 12.0 54.55% 0.0 0.00%COPLEY PLACE Bricklayer 06/24/2017

ALLAN CONSTRUCTION INC. 93.0 0.0 0.00% 0.0 0.00% 0.0 0.00%COPLEY PLACE Carpenter 12/02/2016

CENTURY DRYWALL INC, 1,498.0 74.0 4.94% 420.0 28.04% 0.0 0.00%COPLEY PLACE Carpenter 09/09/2017

CENTURY DRYWALL INC, 80.0 0.0 0.00% 65.0 81.25% 0.0 0.00%COPLEY PLACE Plasterer 05/13/2017

DANIEL MARR & SON CO. 2,833.0 892.0 31.49% 310.0 10.94% 54.0 1.91%COPLEY PLACE Iron Worker 05/14/2017

DIMEO CONSTRUCTION CO. 13,777.5 7,140.5 51.83% 4,699.5 34.11% 0.0 0.00%COPLEY PLACE Carpenter 09/17/2017

DIMEO CONSTRUCTION CO. 12,437.0 3,163.5 25.44% 8,636.0 69.44% 1,159.0 9.32%COPLEY PLACE Laborer 09/17/2017

E. M. DUGGAN INC. 331.0 0.0 0.00% 0.0 0.00% 0.0 0.00%COPLEY PLACE Pipefitter 02/26/2017

Page 138: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 138

Project Name Trade Latest Week

E. M. DUGGAN INC. 947.0 76.0 8.03% 0.0 0.00% 0.0 0.00%COPLEY PLACE Plumber 05/28/2017

EAST COAST INTERIORS CO. 246.0 0.0 0.00% 0.0 0.00% 0.0 0.00%COPLEY PLACE Carpenter 05/13/2017

GRANDE MASONRY, LLC 304.0 72.0 23.68% 0.0 0.00% 0.0 0.00%COPLEY PLACE Bricklayer 02/26/2017

GRANDE MASONRY, LLC 438.0 96.0 21.92% 0.0 0.00% 0.0 0.00%COPLEY PLACE Laborer 02/26/2017

CENTURY DRYWALL INC, 216.0 41.0 18.98% 72.0 33.33% 0.0 0.00%COPLEY PLACE Laborer 06/10/2017

64,552.0 15,632.5 24.22% 19,534.5 30.26% 1,213.0 1.88%SUB TOTALS:

COPPERSMITH VILLAGE RENTAL PHA

$16,064,061Amount:

Gen Contractor:

Est Start Date:

Est End Date:

06/12/2017

06/12/2018

GC FODERA 1,323.5 0.0 0.00% 1,323.5 100.00% 0.0 0.00%COPPERSMITH VILLAGE RENTA Bricklayer 09/09/2017

LANDMARK UTILITIE & SITE 548.0 0.0 0.00% 0.0 0.00% 0.0 0.00%COPPERSMITH VILLAGE RENTA Equipment Opera 08/26/2017

REGIS STEEL CORPORATION 884.0 164.0 18.55% 268.0 30.32% 184.0 20.81%COPPERSMITH VILLAGE RENTA Iron Worker 09/16/2017

LAWTON WELDING CO, INC. 667.3 0.0 0.00% 0.0 0.00% 0.0 0.00%COPPERSMITH VILLAGE RENTA Iron Worker 09/16/2017

LANDMARK UTILITIE & SITE 1,784.0 648.5 36.35% 879.5 49.30% 93.5 5.24%COPPERSMITH VILLAGE RENTA Laborer 09/16/2017

LANDMARK UTILITIE & SITE 1,827.0 321.0 17.57% 837.5 45.84% 56.0 3.07%COPPERSMITH VILLAGE RENTA Carpenter 09/16/2017

GC FODERA 132.5 132.5 100.00% 132.5 100.00% 0.0 0.00%COPPERSMITH VILLAGE RENTA Mason Tender 07/29/2017

GC FODERA 288.0 288.0 100.00% 288.0 100.00% 0.0 0.00%COPPERSMITH VILLAGE RENTA Equipment Opera 09/09/2017

GC FODERA 498.5 433.5 86.96% 498.5 100.00% 0.0 0.00%COPPERSMITH VILLAGE RENTA Laborer 09/09/2017

7,952.8 1,987.5 24.99% 4,227.5 53.16% 333.5 4.19%SUB TOTALS:

CORTES II.

$999,740Amount:

Gen Contractor: BILT-RITE CONSTRUCTION

(617)541-9777 150 SHIRLEY STREET BOSTON

Est Start Date:

Est End Date:

12/01/2014

12/31/2015

LVR CORPORATION 64.0 0.0 0.00% 0.0 0.00% 0.0 0.00%CORTES II. Sprinkler Fitter 04/11/2015

V.FRANCIS MECHANICAL INC. 2,496.0 1,940.0 77.72% 2,496.0 100.00% 420.0 16.83%CORTES II. Pipefitter 05/28/2016

TWOMEY PLUMBING & HEATIN 828.0 432.0 52.17% 0.0 0.00% 0.0 0.00%CORTES II. Plumber 03/20/2016

ROCKWELL ROOFING, INC. 19.8 0.0 0.00% 0.0 0.00% 0.0 0.00%CORTES II. Sheetmetal Work 06/04/2016

ROCKWELL ROOFING, INC. 275.0 0.0 0.00% 0.0 0.00% 0.0 0.00%CORTES II. Roofer 02/06/2016

PARAGON GLOBAL PARTNERS 1,131.0 1,011.0 89.39% 1,131.0 100.00% 0.0 0.00%CORTES II. Laborer 06/20/2015

RISE & SHINE CLEANING & CO 526.1 482.8 91.78% 495.3 94.15% 193.1 36.70%CORTES II. Laborer 08/06/2016

METRO EQUIPMENT CORP. 208.0 160.0 76.92% 112.0 53.85% 0.0 0.00%CORTES II. Laborer 08/15/2015

MC STARR COMPANIES, LLC. 648.0 323.0 49.85% 648.0 100.00% 35.0 5.40%CORTES II. Carpenter 05/07/2016

ALPHA BUILDING CONSTRUCT 1,039.8 735.8 70.76% 1,039.8 100.00% 168.8 16.23%CORTES II. Laborer 06/11/2016

LVR CORPORATION 464.0 0.0 0.00% 0.0 0.00% 0.0 0.00%CORTES II. Pipefitter 08/27/2016

ALPHA BUILDING CONSTRUCT 408.5 408.5 100.00% 408.5 100.00% 0.0 0.00%CORTES II. Bricklayer 06/11/2016

ALPHA BUILDING CONSTRUCT 48.0 48.0 100.00% 48.0 100.00% 0.0 0.00%CORTES II. Waterproofer 08/29/2015

BALLYHEANE CONSTRUCTION 3,045.0 1,892.0 62.13% 1,565.0 51.40% 0.0 0.00%CORTES II. Carpenter 07/30/2016

Page 139: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 139

Project Name Trade Latest Week

FLETCHER'S INSTALLATION 716.5 183.0 25.54% 217.0 30.29% 0.0 0.00%CORTES II. Sheetmetal Work 06/24/2016

J.C. FLOOR COVERING INC. 546.0 0.0 0.00% 8.0 1.47% 0.0 0.00%CORTES II. Floor Layer 09/02/2016

ROCKWELL ROOFING, INC. 17.0 0.0 0.00% 0.0 0.00% 0.0 0.00%CORTES II. Equipment Opera 09/05/2015

JOHNSON HARDWOOD FLOOR 1,200.0 800.0 66.67% 1,200.0 100.00% 0.0 0.00%CORTES II. Floor Layer 11/01/2015

KARE'S PAINTING. 2,487.5 2,279.5 91.64% 2,343.5 94.21% 922.0 37.07%CORTES II. Painter 06/25/2016

LOTTO ELECTRIC 2,570.0 1,342.0 52.22% 1,342.0 52.22% 0.0 0.00%CORTES II. Electrician 05/27/2016

18,738.1 12,037.6 64.24% 13,054.1 69.67% 1,738.8 9.28%SUB TOTALS:

CROSSROADS FAMILY CENTER

$20,000Amount:

Gen Contractor: JOHN BARRESI

(617)818-4977 P.O.2032 PEABODY

Est Start Date:

Est End Date:

09/05/2016

09/09/2016

JOHN BARRESI 48.0 24.0 50.00% 24.0 50.00% 0.0 0.00%CROSSROADS FAMILY CENTER Carpenter 09/09/2016

48.0 24.0 50.00% 24.0 50.00% 0.0 0.00%SUB TOTALS:

D STREET HOTELS

$0Amount:

Gen Contractor: SUFFOLK CONSTRUCTION CO.

(617)445-3500 64 ALLERTON STREET roxbury

Est Start Date:

Est End Date:

05/19/2014

01/31/2016

LIBERTY CONST. SERVICES 39,000.0 21,985.0 56.37% 2,466.0 6.32% 1,554.0 3.98%D STREET HOTELS Laborer 03/20/2016

NORTH EAST FOAM SOLUTION 696.0 160.0 22.99% 112.0 16.09% 0.0 0.00%D STREET HOTELS Carpenter 10/20/2015

STANLEY & SONS INC. 3,912.0 1,680.0 42.94% 1,200.0 30.67% 556.0 14.21%D STREET HOTELS Carpenter 01/02/2016

SOEP PAINTING CORP. 358.0 0.0 0.00% 137.0 38.27% 0.0 0.00%D STREET HOTELS Painter 02/07/2016

SERA DESIGNS. 322.5 141.3 43.80% 31.5 9.77% 0.0 0.00%D STREET HOTELS Bricklayer 01/10/2016

SENICES ENTERPRISES INC 8,398.0 3,580.5 42.64% 4,963.5 59.10% 271.0 3.23%D STREET HOTELS Painter 11/28/2015

RYAN IRON WORKS INC, 3,323.0 1,621.0 48.78% 1,053.0 31.69% 273.0 8.22%D STREET HOTELS Iron Worker 01/24/2016

PACIFIC DRYWALL 256.0 8.0 3.13% 40.0 15.63% 0.0 0.00%D STREET HOTELS Carpenter 01/11/2015

NORTH EAST FOAM SOLUTION 584.0 528.0 90.41% 528.0 90.41% 0.0 0.00%D STREET HOTELS Laborer 10/20/2015

MORETRENCH 451.0 0.0 0.00% 0.0 0.00% 0.0 0.00%D STREET HOTELS Laborer 08/09/2014

MORETRENCH 302.5 0.0 0.00% 293.5 97.02% 0.0 0.00%D STREET HOTELS Equipment Opera 08/09/2014

MORETRENCH 37.0 0.0 0.00% 0.0 0.00% 0.0 0.00%D STREET HOTELS Carpenter 07/26/2014

MCDONALD ELECTRICAL COR 58,273.0 20,693.0 35.51% 8,616.0 14.79% 2,714.0 4.66%D STREET HOTELS Electrician 01/03/2016

STANLEY & SONS INC. 328.0 328.0 100.00% 0.0 0.00% 0.0 0.00%D STREET HOTELS Laborer 01/02/2016

LYMO CONSTRUCTION CO. 19,247.0 6,949.0 36.10% 6,074.5 31.56% 1,219.5 6.34%D STREET HOTELS Carpenter 03/27/2016

THE CHEVIOT CORPORATION 12,028.0 1,157.0 9.62% 675.0 5.61% 0.0 0.00%D STREET HOTELS Glazier 02/19/2016

LIBERTY CONST. SERVICES 1,946.0 0.0 0.00% 0.0 0.00% 201.5 10.35%D STREET HOTELS Equipment Opera 01/17/2016

MCCUSKER-GILL INC. 8,844.5 4,080.5 46.14% 1,239.5 14.01% 0.0 0.00%D STREET HOTELS Sheetmetal Work 12/27/2015

THE PAPPAS COMPANY, INC 353.0 113.0 32.01% 113.0 32.01% 52.0 14.73%D STREET HOTELS Carpenter 01/10/2016

VYNORIUS PILEDRIVING INC. 1,569.5 614.5 39.15% 614.5 39.15% 0.0 0.00%D STREET HOTELS Piledriver 10/11/2014

VYNORIUS PILEDRIVING INC. 1,032.0 305.5 29.60% 0.0 0.00% 0.0 0.00%D STREET HOTELS Equipment Opera 10/11/2014

Page 140: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 140

Project Name Trade Latest Week

VALLEYCREST LANDSCAPE 112.0 0.0 0.00% 0.0 0.00% 0.0 0.00%D STREET HOTELS Laborer 09/20/2015

VALLEYCREST LANDSCAPE 56.0 0.0 0.00% 0.0 0.00% 0.0 0.00%D STREET HOTELS Equipment Opera 09/20/2015

UNITED H.V.A.C. COMPANY, IN 5,742.0 2,299.5 40.05% 1,706.5 29.72% 264.0 4.60%D STREET HOTELS Sheetmetal Work 11/15/2015

TITAN ROOFING INC. 596.0 0.0 0.00% 0.0 0.00% 0.0 0.00%D STREET HOTELS Sheetmetal Work 02/13/2016

TAVARES, LLC 3,909.0 1,451.0 37.12% 2,921.0 74.72% 0.0 0.00%D STREET HOTELS Taper 12/26/2015

THERMO DYNAMICS INTERNA. 3,579.5 8.0 0.22% 987.5 27.59% 139.0 3.88%D STREET HOTELS Insulator 02/27/2016

STRUCTURES DEREK INTERN 373.0 373.0 100.00% 373.0 100.00% 0.0 0.00%D STREET HOTELS Bricklayer 05/02/2015

THE CHEVIOT CORPORATION 2,748.5 828.0 30.13% 0.0 0.00% 0.0 0.00%D STREET HOTELS Iron Worker 11/06/2015

KONE ELEVATOR INC. 5,923.0 368.0 6.21% 851.5 14.38% 643.0 10.86%D STREET HOTELS Elevator Const(M 03/16/2016

THE CHEVIOT CORPORATION 16,022.0 1,618.5 10.10% 5,692.0 35.53% 1,165.5 7.27%D STREET HOTELS Carpenter 03/18/2016

LIBERTY CONST. SERVICES 3,158.0 1,402.0 44.40% 296.0 9.37% 0.0 0.00%D STREET HOTELS Carpenter 03/20/2016

TAVARES, LLC 69.0 0.0 0.00% 69.0 100.00% 0.0 0.00%D STREET HOTELS Laborer 11/07/2015

TAVARES, LLC 2,087.0 775.0 37.13% 1,401.0 67.13% 72.0 3.45%D STREET HOTELS Carpenter 12/19/2015

STRUCTURES DEREK INTERN 4,103.0 589.0 14.36% 938.0 22.86% 0.0 0.00%D STREET HOTELS Iron Worker 09/26/2015

TITAN ROOFING INC. 6,837.0 602.0 8.81% 941.0 13.76% 263.0 3.85%D STREET HOTELS Roofer 02/13/2016

COMPONENT ASSEMBLY SYS 18,433.0 3,232.0 17.53% 3,390.0 18.39% 1,213.0 6.58%D STREET HOTELS Taper 12/29/2015

G & C CONCRETE CO. 2,743.0 8.0 0.29% 47.0 1.71% 0.0 0.00%D STREET HOTELS Equipment Opera 11/07/2015

G & C CONCRETE CO. 970.0 24.0 2.47% 62.0 6.39% 0.0 0.00%D STREET HOTELS Cement Laborer 12/26/2015

G & C CONCRETE CO. 5,003.5 8.5 0.17% 1,337.0 26.72% 0.0 0.00%D STREET HOTELS Cement Finisher 01/23/2016

EM DUGGAN/GIBBS MCALISTE 8,066.0 3,822.0 47.38% 4,036.0 50.04% 1,074.0 13.32%D STREET HOTELS Sprinkler Fitter 12/13/2015

LIBERTY CONST. SERVICES 8.0 0.0 0.00% 0.0 0.00% 0.0 0.00%D STREET HOTELS Elevator Const(M 09/27/2015

EM DUGGAN/GIBBS MCALISTE 5,931.0 2,574.0 43.40% 800.0 13.49% 217.0 3.66%D STREET HOTELS Pipefitter 12/27/2015

G & C CONCRETE CO. 9,311.0 1,857.0 19.94% 2,877.0 30.90% 0.0 0.00%D STREET HOTELS Iron Worker 12/26/2015

EAST COAST FIREPROOFING 1,102.0 112.0 10.16% 342.0 31.03% 0.0 0.00%D STREET HOTELS Laborer 05/26/2015

G & C CONCRETE CO. 21,439.5 6,228.5 29.05% 3,247.0 15.14% 730.5 3.41%D STREET HOTELS Carpenter 01/16/2016

COMPONENT ASSEMBLY SYS 14,347.0 6,756.0 47.09% 2,578.0 17.97% 0.0 0.00%D STREET HOTELS Laborer 12/29/2015

COMPONENT ASSEMBLY SYS 58,978.0 14,223.0 24.12% 12,815.0 21.73% 1,270.0 2.15%D STREET HOTELS Carpenter 12/29/2015

BWI STEEL & PRECAST EREC 5,170.0 1,205.0 23.31% 859.0 16.62% 290.0 5.61%D STREET HOTELS Iron Worker 07/12/2015

BUSINESS INTERIORS FCOVE 3,398.0 441.0 12.98% 638.0 18.78% 0.0 0.00%D STREET HOTELS Carpet Layer 10/17/2015

AXION SPECIALTY CONTRACTI 2,859.0 1,133.0 39.63% 1,573.0 55.02% 0.0 0.00%D STREET HOTELS Insulator 02/07/2016

ALLEGHENY CONTRACT FLOO 10,355.0 2,944.5 28.44% 2,096.5 20.25% 669.0 6.46%D STREET HOTELS Floor Layer 01/29/2016

ALL TIME SERVICE INC. 4,688.0 4,656.0 99.32% 4,688.0 100.00% 688.0 14.68%D STREET HOTELS Laborer 02/20/2016

EAST COAST INTERIORS CO. 14,462.5 5,149.5 35.61% 5,158.5 35.67% 322.0 2.23%D STREET HOTELS Carpenter 08/15/2015

J. DERENZO CO. 8,691.5 3,599.0 41.41% 2,681.5 30.85% 205.5 2.36%D STREET HOTELS Laborer 04/02/2016

Page 141: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 141

Project Name Trade Latest Week

KONE ELEVATOR INC. 176.0 0.0 0.00% 0.0 0.00% 0.0 0.00%D STREET HOTELS Elev Const Helper 11/25/2015

EM DUGGAN/GIBBS MCALISTE 25,943.0 5,377.0 20.73% 1,971.0 7.60% 494.0 1.90%D STREET HOTELS Plumber 01/31/2016

J.M. ELECTRICAL CO. INC. 1,530.0 0.0 0.00% 504.0 32.94% 0.0 0.00%D STREET HOTELS Electrician 02/26/2016

G & C CONCRETE CO. 15,553.5 3,790.5 24.37% 6,498.5 41.78% 0.0 0.00%D STREET HOTELS Laborer 01/30/2016

J. DERENZO CO. 6,830.0 2,451.5 35.89% 1,014.0 14.85% 698.0 10.22%D STREET HOTELS Equipment Opera 01/23/2016

J&J CONSTRUCTION 471.0 185.0 39.28% 14.0 2.97% 0.0 0.00%D STREET HOTELS Carpenter 08/29/2015

HERITAGE RESTORATION INC. 3,101.0 543.0 17.51% 555.0 17.90% 0.0 0.00%D STREET HOTELS Laborer 01/30/2016

HERITAGE RESTORATION INC. 10,004.0 4,027.0 40.25% 3,518.0 35.17% 163.0 1.63%D STREET HOTELS Bricklayer 02/13/2016

HAYWARD BAKER INC. 85.0 0.0 0.00% 0.0 0.00% 0.0 0.00%D STREET HOTELS Laborer 08/10/2014

HAYWARD BAKER INC. 42.5 0.0 0.00% 0.0 0.00% 0.0 0.00%D STREET HOTELS Equipment Opera 08/10/2014

GENERAL SAFETY SERVICES 249.0 102.0 40.96% 0.0 0.00% 0.0 0.00%D STREET HOTELS Iron Worker 05/15/2015

GENERAL AIR COND & HEAT 37.0 0.0 0.00% 0.0 0.00% 0.0 0.00%D STREET HOTELS Sheetmetal Work 12/20/2014

GENERAL AIR COND & HEAT 5,445.5 2,222.0 40.80% 1,346.0 24.72% 784.0 14.40%D STREET HOTELS Pipefitter 01/02/2016

GENERAL AIR COND & HEAT 48.0 48.0 100.00% 48.0 100.00% 0.0 0.00%D STREET HOTELS Electrician 12/26/2015

G & C CONCRETE CO. 1,682.0 0.0 0.00% 1,682.0 100.00% 0.0 0.00%D STREET HOTELS Oiler 04/18/2015

HAYWARD BAKER INC. 8.0 0.0 0.00% 0.0 0.00% 0.0 0.00%D STREET HOTELS Piledriver 08/24/2014

K & K ACOUSTICAL CEILINGS 1,358.5 161.5 11.89% 255.5 18.81% 32.0 2.36%D STREET HOTELS Carpenter 01/31/2016

485,096.0 151,138.8 31.16% 110,965.0 22.87% 18,237.5 3.76%SUB TOTALS:

DARLINGTON STREET

$430,000Amount:

Gen Contractor: LANDMARK STRUCTURES CORP.

(781)376-1801 282 MONTVALE AVE. WOBURN

Est Start Date:

Est End Date:

01/01/2016

03/31/2017

T & P CONTRACTING, INC. 414.0 328.0 79.23% 0.0 0.00% 0.0 0.00%DARLINGTON STREET Carpenter 12/24/2016

L & M DRYWALL 1,453.0 0.0 0.00% 1,453.0 100.00% 0.0 0.00%DARLINGTON STREET Carpenter 10/29/2016

L & M DRYWALL 1,785.0 0.0 0.00% 1,785.0 100.00% 0.0 0.00%DARLINGTON STREET Taper 11/12/2016

LANDMARK STRUCTURES CO 1,226.0 1,226.0 100.00% 1,226.0 100.00% 0.0 0.00%DARLINGTON STREET Laborer 02/18/2017

LGT RESTORATION AND WAT 232.0 0.0 0.00% 0.0 0.00% 0.0 0.00%DARLINGTON STREET Mason 01/01/2017

LGT RESTORATION AND WAT 235.0 111.0 47.23% 235.0 100.00% 0.0 0.00%DARLINGTON STREET Mason Tender 01/01/2017

MASS FIRE PREVENTION INC. 661.0 276.0 41.75% 0.0 0.00% 0.0 0.00%DARLINGTON STREET Sprinkler Fitter 01/07/2017

KCC EXCAVATION. 2,855.5 1,064.0 37.26% 1,405.0 49.20% 0.0 0.00%DARLINGTON STREET Laborer 02/02/2017

PAN ELECTRIC COMPANY INC. 2,538.0 1,716.0 67.61% 2,538.0 100.00% 261.0 10.28%DARLINGTON STREET Electrician 01/14/2017

RISE & SHINE CLEANING & CO 193.5 186.5 96.38% 193.5 100.00% 187.0 96.64%DARLINGTON STREET Laborer 03/04/2017

T & P CONTRACTING, INC. 719.0 651.0 90.54% 671.0 93.32% 0.0 0.00%DARLINGTON STREET Cement Laborer 12/24/2016

MARR AIR SYSTEMS 516.0 0.0 0.00% 80.0 15.50% 0.0 0.00%DARLINGTON STREET HVAC 09/24/2016

QUALITY INSULATION 360.0 0.0 0.00% 0.0 0.00% 0.0 0.00%DARLINGTON STREET Insulator 10/01/2016

BAY STATE GYPSUM FLOORS 10.8 0.0 0.00% 0.0 0.00% 0.0 0.00%DARLINGTON STREET Cement Finisher 09/03/2016

Page 142: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 142

Project Name Trade Latest Week

JKA CONSTRUCTION 1,152.0 995.0 86.37% 995.0 86.37% 157.0 13.63%DARLINGTON STREET Laborer 10/17/2016

JKA CONSTRUCTION 4,522.0 2,812.0 62.18% 3,696.0 81.73% 0.0 0.00%DARLINGTON STREET Carpenter 11/11/2016

HMB CONSTRUCTION CORPO 2,850.0 1,440.0 50.53% 2,634.0 92.42% 0.0 0.00%DARLINGTON STREET Painter 02/24/2017

HMB CONSTRUCTION CORPO 1,120.0 0.0 0.00% 544.0 48.57% 0.0 0.00%DARLINGTON STREET Cement Finisher 12/30/2016

HMB CONSTRUCTION CORPO 128.0 0.0 0.00% 128.0 100.00% 0.0 0.00%DARLINGTON STREET Carpenter 08/26/2016

GRIFFIN REMODELING INC. 66.0 18.0 27.27% 26.0 39.39% 0.0 0.00%DARLINGTON STREET Glazier 01/21/2017

NEW ENGLAND MECHNICAL 2,576.0 2,200.0 85.40% 2,576.0 100.00% 0.0 0.00%DARLINGTON STREET HVAC 03/18/2017

DWC DESIGNS INC. 36.0 0.0 0.00% 0.0 0.00% 0.0 0.00%DARLINGTON STREET Carpenter 02/18/2017

DEVON PLUMBING HEATING 3,184.0 3,016.0 94.72% 3,184.0 100.00% 0.0 0.00%DARLINGTON STREET Plumber 12/31/2016

CICCONI & SONS CONS. CO. 56.0 32.0 57.14% 24.0 42.86% 0.0 0.00%DARLINGTON STREET Laborer 11/19/2016

CICCONI & SONS CONS. CO. 8.0 0.0 0.00% 0.0 0.00% 0.0 0.00%DARLINGTON STREET Equipment Opera 11/19/2016

BAY STATE GYPSUM FLOORS 22.3 0.0 0.00% 0.0 0.00% 0.0 0.00%DARLINGTON STREET Equipment Opera 09/03/2016

BAY STATE GYPSUM FLOORS 26.5 0.0 0.00% 3.5 13.21% 0.0 0.00%DARLINGTON STREET Cement Laborer 09/03/2016

KCC EXCAVATION. 1,180.1 0.0 0.00% 0.0 0.00% 0.0 0.00%DARLINGTON STREET Equipment Opera 12/01/2016

30,125.6 16,071.5 53.35% 23,397.0 77.66% 605.0 2.01%SUB TOTALS:

DATES AND OLIVES

$1,700Amount:

Gen Contractor: HUNTER SIGNS

(617)360-9710 120 BUSINESS STREET HYDE PARK

Est Start Date:

Est End Date:

03/20/2016

03/26/2016

HUNTER SIGNS 2.0 2.0 100.00% 2.0 100.00% 0.0 0.00%DATES AND OLIVES Laborer 03/26/2016

2.0 2.0 100.00% 2.0 100.00% 0.0 0.00%SUB TOTALS:

D'DREAM UNISEX BEAUTY SALON

$3,000Amount:

Gen Contractor: EXCEL SIGNS & DECORATION CORP.

(617)479-8552 259 QUINCY AVE. QUINCY

Est Start Date:

Est End Date:

06/01/2014

07/31/2014

EXCEL SIGNS & DECORATION 6.0 0.0 0.00% 6.0 100.00% 2.0 33.33%D'DREAM UNISEX BEAUTY SALO Laborer 06/14/2014

6.0 0.0 0.00% 6.0 100.00% 2.0 33.33%SUB TOTALS:

DELECTABLE DESIRES PASTRIES

$2,500Amount:

Gen Contractor: THE SIGN CENTER INC.

(978)372-3721 40 DORCHESTER STREET haver hill

Est Start Date:

Est End Date:

06/19/2016

06/24/2016

THE SIGN CENTER INC. 1.5 0.0 0.00% 1.5 100.00% 0.0 0.00%DELECTABLE DESIRES PASTRIE Laborer 06/24/2016

1.5 0.0 0.00% 1.5 100.00% 0.0 0.00%SUB TOTALS:

DELICIOUS YOGURT

$2,500Amount:

Gen Contractor:

Est Start Date:

Est End Date:

04/27/2015

04/29/2015

MOSHER DYNAMICS LLC. 4.0 4.0 100.00% 0.0 0.00% 0.0 0.00%DELICIOUS YOGURT Laborer 04/29/2015

4.0 4.0 100.00% 0.0 0.00% 0.0 0.00%SUB TOTALS:

Page 143: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 143

Project Name Trade Latest Week

DIALLO'S HALAL MEAT & GROCERY

$3,000Amount:

Gen Contractor: EXCEL SIGNS & DECORATION CORP.

(617)479-8552 259 QUINCY AVE. QUINCY

Est Start Date:

Est End Date:

06/01/2014

07/31/2014

EXCEL SIGNS & DECORATION 6.0 0.0 0.00% 6.0 100.00% 2.0 33.33%DIALLO'S HALAL MEAT & GROC Laborer 06/14/2014

6.0 0.0 0.00% 6.0 100.00% 2.0 33.33%SUB TOTALS:

DIVA 4EVA

$5,000Amount:

Gen Contractor: EXCEL SIGNS & DECORATION CORP.

(617)479-8552 259 QUINCY AVE. QUINCY

Est Start Date:

Est End Date:

04/05/2015

04/18/2015

EXCEL SIGNS & DECORATION 18.0 0.0 0.00% 18.0 100.00% 0.0 0.00%DIVA 4EVA Laborer 04/18/2015

18.0 0.0 0.00% 18.0 100.00% 0.0 0.00%SUB TOTALS:

DJADY'S HAIR SALON

$6,000Amount:

Gen Contractor: CAMBRIDGE REPROGRAPHIES

(617)623-2838 21 MCGRATH HGWY SOMERVILLE

Est Start Date:

Est End Date:

01/22/2017

01/28/2017

CAMBRIDGE REPROGRAPHIE 5.0 0.0 0.00% 0.0 0.00% 5.0 100.00%DJADY'S HAIR SALON Laborer 01/28/2017

CAMBRIDGE REPROGRAPHIE 7.0 0.0 0.00% 0.0 0.00% 0.0 0.00%DJADY'S HAIR SALON Electrician 01/28/2017

12.0 0.0 0.00% 0.0 0.00% 5.0 41.67%SUB TOTALS:

DOMENYK'S UNISEX SALON

$2,500Amount:

Gen Contractor: EXCEL SIGNS & DECORATION CORP.

(617)479-8552 259 QUINCY AVE. QUINCY

Est Start Date:

Est End Date:

05/01/2014

06/30/2014

EXCEL SIGNS & DECORATION 6.0 0.0 0.00% 6.0 100.00% 0.0 0.00%DOMENYK'S UNISEX SALON Laborer 05/10/2014

6.0 0.0 0.00% 6.0 100.00% 0.0 0.00%SUB TOTALS:

DORCHESTER ART COLLABORATIVE

$3,500Amount:

Gen Contractor: EXCEL SIGNS & DECORATION CORP.

(617)479-8552 259 QUINCY AVE. QUINCY

Est Start Date:

Est End Date:

12/01/2013

01/31/2014

EXCEL SIGNS & DECORATION 10.0 0.0 0.00% 10.0 100.00% 5.0 50.00%DORCHESTER ART COLLABORA Laborer 12/21/2013

10.0 0.0 0.00% 10.0 100.00% 5.0 50.00%SUB TOTALS:

DORCHESTER BOY & GIRL CLUB

$2,500Amount:

Gen Contractor: WILLIAM CHRISTOPHER

(617)594-0740 88 TATTLE STREET DORCHESTER

Est Start Date:

Est End Date:

10/01/2012

12/31/2012

SIGNET ELECTRONIC SYSTEM 7.0 0.0 0.00% 0.0 0.00% 0.0 0.00%DORCHESTER BOY & GIRL CLU Technician 05/07/2017

SIGNET ELECTRONIC SYSTEM 43.0 0.0 0.00% 0.0 0.00% 0.0 0.00%DORCHESTER BOY & GIRL CLU Telephone/Data I 05/14/2017

50.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SUB TOTALS:

DORCHESTER BOY'S & GIRL'S CLUB

$20,000Amount:

Gen Contractor: P. STONE CONTRATING

(617)592-0850 156 HAYWARD STREET BRAINTREE

Est Start Date:

Est End Date:

08/08/2016

08/26/2016

P. STONE CONTRATING 120.0 0.0 0.00% 120.0 100.00% 0.0 0.00%DORCHESTER BOY'S & GIRL'S C Laborer 08/26/2016

P. STONE CONTRATING 120.0 0.0 0.00% 0.0 0.00% 0.0 0.00%DORCHESTER BOY'S & GIRL'S C Mason 08/26/2016

240.0 0.0 0.00% 120.0 50.00% 0.0 0.00%SUB TOTALS:

Page 144: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 144

Project Name Trade Latest Week

DORCHESTER BREWING COMPANY

$45,000Amount:

Gen Contractor:

Est Start Date:

Est End Date:

03/20/2016

06/03/2016

SALMON STUDIOS LLC 61.2 0.0 0.00% 0.0 0.00% 0.0 0.00%DORCHESTER BREWING COMP Laborer 06/03/2016

PELLETIER MILLWRIGHTS LLC 37.0 0.0 0.00% 0.0 0.00% 0.0 0.00%DORCHESTER BREWING COMP Sheetmetal Work 04/16/2016

PELLETIER MILLWRIGHTS LLC 74.0 0.0 0.00% 18.0 24.32% 0.0 0.00%DORCHESTER BREWING COMP Laborer 04/16/2016

172.2 0.0 0.00% 18.0 10.45% 0.0 0.00%SUB TOTALS:

DRESS WITH CONFIDENCE

$2,500Amount:

Gen Contractor: HUNTER SIGNS

(617)360-9710 120 BUSINESS STREET HYDE PARK

Est Start Date:

Est End Date:

10/25/2015

10/28/2015

HUNTER SIGNS 2.0 2.0 100.00% 2.0 100.00% 0.0 0.00%DRESS WITH CONFIDENCE Laborer 10/31/2015

2.0 2.0 100.00% 2.0 100.00% 0.0 0.00%SUB TOTALS:

DUDLEY CAFÉ

$4,000Amount:

Gen Contractor:

Est Start Date:

Est End Date:

06/04/2016

06/04/2016

NEW ENGLAND SIGN & DESIG 2.0 2.0 100.00% 2.0 100.00% 0.0 0.00%DUDLEY CAFÉ Laborer 06/04/2016

2.0 2.0 100.00% 2.0 100.00% 0.0 0.00%SUB TOTALS:

DUDLEY DOUGH

$5,000Amount:

Gen Contractor: SRP SIGN CORP.

(617)623-6222 236 PEARL STREET SOMERVILLE

Est Start Date:

Est End Date:

01/30/2016

02/07/2016

SRP SIGN CORP. 17.0 0.0 0.00% 10.0 58.82% 0.0 0.00%DUDLEY DOUGH Laborer 02/07/2016

17.0 0.0 0.00% 10.0 58.82% 0.0 0.00%SUB TOTALS:

DUDLEY GREENVILLE

$1,000,000Amount:

Gen Contractor: LANDMARK STRUCTURES CORP.

(781)376-1801 282 MONTVALE AVE. WOBURN

Est Start Date:

Est End Date:

12/01/2012

12/31/2013

MID - STATE WELDING INC., 663.0 0.0 0.00% 0.0 0.00% 0.0 0.00%DUDLEY GREENVILLE Iron Worker 08/16/2014

MCCOY & ANDERSEN FENCE, I 542.5 325.5 60.00% 542.5 100.00% 108.5 20.00%DUDLEY GREENVILLE Laborer 07/05/2014

MASS PLASTERING. 96.0 48.0 50.00% 32.0 33.33% 0.0 0.00%DUDLEY GREENVILLE Plasterer 11/16/2013

MARMELO BROS. CONS, CO. 2,190.0 906.5 41.39% 1,038.5 47.42% 312.0 14.25%DUDLEY GREENVILLE Mason Tender 07/12/2014

MARMELO BROS. CONS, CO. 1,547.5 0.0 0.00% 92.5 5.98% 0.0 0.00%DUDLEY GREENVILLE Mason 07/12/2014

MARMELO BROS. CONS, CO. 710.5 0.0 0.00% 0.0 0.00% 0.0 0.00%DUDLEY GREENVILLE Equipment Opera 06/07/2014

LANDMARK STRUCTURES CO 2,694.0 2,694.0 100.00% 2,694.0 100.00% 0.0 0.00%DUDLEY GREENVILLE Laborer 08/30/2014

OVERHEAD DOOR CO 27.0 0.0 0.00% 0.0 0.00% 0.0 0.00%DUDLEY GREENVILLE Iron Worker 06/01/2014

V.FRANCIS MECHANICAL INC. 2,322.0 432.0 18.60% 432.0 18.60% 0.0 0.00%DUDLEY GREENVILLE Sheetmetal Work 06/27/2014

L & M DRYWALL 4,582.5 539.0 11.76% 4,125.0 90.02% 0.0 0.00%DUDLEY GREENVILLE Taper 07/12/2014

L & M DRYWALL 919.0 919.0 100.00% 919.0 100.00% 0.0 0.00%DUDLEY GREENVILLE Laborer 06/07/2014

L & M DRYWALL 13,161.0 3,765.0 28.61% 5,048.0 38.36% 0.0 0.00%DUDLEY GREENVILLE Carpenter 07/12/2014

MARK CHEEVER PLUM HEATIN 5,242.0 1,058.0 20.18% 1,514.0 28.88% 0.0 0.00%DUDLEY GREENVILLE Plumber 07/25/2014

Page 145: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 145

Project Name Trade Latest Week

NEW ENGLAND FLOORS & WA 460.0 460.0 100.00% 460.0 100.00% 0.0 0.00%DUDLEY GREENVILLE Laborer 06/27/2014

FLETCHER'S INSTALLATION 258.5 0.0 0.00% 0.0 0.00% 0.0 0.00%DUDLEY GREENVILLE Sheetmetal Work 06/20/2014

PAN ELECTRIC COMPANY INC. 2,010.0 1,035.0 51.49% 2,010.0 100.00% 209.0 10.40%DUDLEY GREENVILLE Electrician 08/09/2014

RISE & SHINE CLEANING & CO 592.0 500.0 84.46% 592.0 100.00% 384.6 64.97%DUDLEY GREENVILLE Laborer 08/02/2014

SCOTT ROOFING SERVICES IN 210.8 0.0 0.00% 48.3 22.89% 0.0 0.00%DUDLEY GREENVILLE Laborer 02/26/2014

SCOTT ROOFING SERVICES IN 2,205.5 365.3 16.56% 606.8 27.51% 0.0 0.00%DUDLEY GREENVILLE Roofer 06/11/2014

SCOTT ROOFING SERVICES IN 322.8 0.0 0.00% 0.0 0.00% 0.0 0.00%DUDLEY GREENVILLE Sheetmetal Work 06/11/2014

STREAMLINE WATERPROOFIN 154.0 0.0 0.00% 0.0 0.00% 0.0 0.00%DUDLEY GREENVILLE Glazier 08/23/2014

T & P CONTRACTING, INC. 104.0 0.0 0.00% 0.0 0.00% 0.0 0.00%DUDLEY GREENVILLE Carpenter 01/11/2014

T & P CONTRACTING, INC. 200.0 200.0 100.00% 104.0 52.00% 0.0 0.00%DUDLEY GREENVILLE Cement Laborer 01/11/2014

V.FRANCIS MECHANICAL INC. 470.0 442.0 94.04% 470.0 100.00% 358.0 76.17%DUDLEY GREENVILLE Laborer 07/26/2014

V.FRANCIS MECHANICAL INC. 1,300.0 1,300.0 100.00% 1,300.0 100.00% 0.0 0.00%DUDLEY GREENVILLE Pipefitter 07/26/2014

KLS CONCRETE INC. 126.0 0.0 0.00% 105.5 83.73% 0.0 0.00%DUDLEY GREENVILLE Laborer 08/02/2014

NEW ENGLAND FLOORS & WA 389.0 144.0 37.02% 389.0 100.00% 0.0 0.00%DUDLEY GREENVILLE Floor Layer 06/27/2014

A & E FLOORING 317.0 317.0 100.00% 317.0 100.00% 0.0 0.00%DUDLEY GREENVILLE Laborer 05/16/2014

HMB CONSTRUCTION CORPO 4,744.0 1,226.0 25.84% 4,744.0 100.00% 0.0 0.00%DUDLEY GREENVILLE Carpenter 09/06/2014

A & E FLOORING 864.0 0.0 0.00% 864.0 100.00% 0.0 0.00%DUDLEY GREENVILLE Floor Layer 08/01/2014

KLS CONCRETE INC. 32.0 0.0 0.00% 24.0 75.00% 0.0 0.00%DUDLEY GREENVILLE Cement Finisher 08/02/2014

ANDERSON INSULATION 343.8 0.0 0.00% 254.0 73.89% 0.0 0.00%DUDLEY GREENVILLE Carpenter 04/19/2014

ANDERSON INSULATION 878.5 216.8 24.67% 709.3 80.73% 0.0 0.00%DUDLEY GREENVILLE Laborer 05/31/2014

BUILDING ENVELOPE SYSTEM 342.0 342.0 100.00% 342.0 100.00% 0.0 0.00%DUDLEY GREENVILLE Laborer 08/08/2014

BUILDING ENVELOPE SYSTEM 1,510.0 0.0 0.00% 29.0 1.92% 0.0 0.00%DUDLEY GREENVILLE Sheetmetal Work 09/12/2014

CENTAUR CONSTRUCTION SE 458.0 20.0 4.37% 296.0 64.63% 0.0 0.00%DUDLEY GREENVILLE Equipment Opera 01/07/2014

CENTAUR CONSTRUCTION SE 373.0 89.0 23.86% 309.0 82.84% 0.0 0.00%DUDLEY GREENVILLE Laborer 01/07/2014

CHM WELDING. 8.0 0.0 0.00% 0.0 0.00% 0.0 0.00%DUDLEY GREENVILLE Iron Worker 01/21/2014

COULTER CONSTRUCTION, IN 2,323.0 0.0 0.00% 0.0 0.00% 0.0 0.00%DUDLEY GREENVILLE Carpenter 07/18/2014

COULTER CONSTRUCTION, IN 4,603.5 2,857.5 62.07% 3,289.5 71.46% 0.0 0.00%DUDLEY GREENVILLE Laborer 07/18/2014

DELTA BECKWITH ELEVATOR 399.8 16.0 4.00% 0.0 0.00% 0.0 0.00%DUDLEY GREENVILLE Elev Const Helper 08/14/2014

GLIDEWELL THERRIEN CONSI 1,549.0 970.0 62.62% 1,042.0 67.27% 0.0 0.00%DUDLEY GREENVILLE Carpenter 05/06/2014

DELTA BECKWITH ELEVATOR 415.3 0.0 0.00% 0.0 0.00% 0.0 0.00%DUDLEY GREENVILLE Elevator Const(M 08/14/2014

KLS CONCRETE INC. 104.5 0.0 0.00% 0.0 0.00% 0.0 0.00%DUDLEY GREENVILLE Carpenter 08/02/2014

K & J INTEGRATED SYSTEMS 62.5 0.0 0.00% 0.0 0.00% 0.0 0.00%DUDLEY GREENVILLE Technician 06/08/2014

HMB CONSTRUCTION CORPO 2,490.0 2,482.0 99.68% 2,490.0 100.00% 0.0 0.00%DUDLEY GREENVILLE Painter 09/27/2014

FIRE INSPECTIONAL SER. 3,297.0 611.5 18.55% 611.5 18.55% 721.0 21.87%DUDLEY GREENVILLE Sprinkler Fitter 07/12/2014

Page 146: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 146

Project Name Trade Latest Week

EXPOSE SIGNS 8.0 0.0 0.00% 0.0 0.00% 0.0 0.00%DUDLEY GREENVILLE Laborer 06/28/2014

ELITE DRYWALL 144.0 0.0 0.00% 144.0 100.00% 0.0 0.00%DUDLEY GREENVILLE Taper 12/08/2013

ELITE DRYWALL 240.0 0.0 0.00% 240.0 100.00% 0.0 0.00%DUDLEY GREENVILLE Plasterer 12/08/2013

ELITE DRYWALL 108.0 108.0 100.00% 108.0 100.00% 108.0 100.00%DUDLEY GREENVILLE Laborer 12/08/2013

EASTERN SPECIALTY CONCR 150.0 0.0 0.00% 0.0 0.00% 0.0 0.00%DUDLEY GREENVILLE Laborer 02/15/2014

DWC DESIGNS INC. 48.0 0.0 0.00% 0.0 0.00% 0.0 0.00%DUDLEY GREENVILLE Laborer 07/26/2014

HURST LANDSCAPING INC. 1,839.5 1,223.8 66.53% 1,839.5 100.00% 0.0 0.00%DUDLEY GREENVILLE Laborer 09/20/2014

71,151.7 25,612.7 36.00% 40,175.7 56.46% 2,201.1 3.09%SUB TOTALS:

DUDLEY SEAFOOD MARKET

$3,000Amount:

Gen Contractor:

Est Start Date:

Est End Date:

08/29/2016

08/29/2016

DORCHESTER AWNING CO. 12.0 0.0 0.00% 0.0 0.00% 0.0 0.00%DUDLEY SEAFOOD MARKET Laborer 08/29/2016

12.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SUB TOTALS:

EAST BOSTON SOCIAL CENTER

$20,000Amount:

Gen Contractor: CAPPUCCIO CONSTRUCTION CO.

(781)289-2759 100 DALE STREET REVERE

Est Start Date:

Est End Date:

10/11/2015

10/24/2015

CAPPUCCIO CONSTRUCTION 100.0 0.0 0.00% 0.0 0.00% 0.0 0.00%EAST BOSTON SOCIAL CENTER Carpenter 10/24/2015

100.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SUB TOTALS:

EAST BOSTON SOCIALCENTER

$20,000Amount:

Gen Contractor:

Est Start Date:

Est End Date:

05/01/2016

05/12/2016

J L PLUMBING & HEATING 96.0 0.0 0.00% 96.0 100.00% 0.0 0.00%EAST BOSTON SOCIALCENTER Pipefitter 05/12/2016

96.0 0.0 0.00% 96.0 100.00% 0.0 0.00%SUB TOTALS:

EAST BOSTON STADIUM TURF REPLA

$1,222Amount:

Gen Contractor: ARGUS CONSTRUCTION.

(781)275-7417 5 SHAWSHEEN AVENUE BEDFORD

Est Start Date:

Est End Date:

04/01/2014

08/15/2014

ARGUS CONSTRUCTION. 396.0 136.0 34.34% 265.0 66.92% 0.0 0.00%EAST BOSTON STADIUM TURF Laborer 09/13/2014

FRAZIER'S LANDSCAPES, INC. 282.3 0.0 0.00% 0.0 0.00% 0.0 0.00%EAST BOSTON STADIUM TURF Laborer 06/22/2014

SIEBOLD FENCE 96.0 0.0 0.00% 0.0 0.00% 0.0 0.00%EAST BOSTON STADIUM TURF Laborer 08/29/2014

CAPE & ISLAND CORP. 1,835.5 0.0 0.00% 1,519.0 82.76% 0.0 0.00%EAST BOSTON STADIUM TURF Laborer 08/23/2014

ARGUS CONSTRUCTION. 240.0 16.0 6.67% 0.0 0.00% 0.0 0.00%EAST BOSTON STADIUM TURF Equipment Opera 09/06/2014

E. J. PAVING COMPANY INC. 26.0 0.0 0.00% 26.0 100.00% 0.0 0.00%EAST BOSTON STADIUM TURF Laborer 07/12/2014

2,875.8 152.0 5.29% 1,810.0 62.94% 0.0 0.00%SUB TOTALS:

ECONOMY HARDWARE

Amount:

Gen Contractor: UNITED SIGN CO., INC.

(978)927-9346 33 TOZER ROAD BEVERLY

Est Start Date:

Est End Date:

01/13/2014

01/17/2014

UNITED SIGN CO., INC. 6.0 0.0 0.00% 0.0 0.00% 0.0 0.00%ECONOMY HARDWARE Laborer 01/17/2014

Page 147: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 147

Project Name Trade Latest Week

6.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SUB TOTALS:

EDSON PEACEVALE

$644,973Amount:

Gen Contractor:

Est Start Date:

Est End Date:

11/01/2016

12/31/2017

JJRG PLUMBING AND HEATIN 89.0 39.0 43.82% 89.0 100.00% 89.0 100.00%EDSON PEACEVALE Laborer 06/03/2017

T & P CONTRACTING, INC. 232.0 232.0 100.00% 232.0 100.00% 0.0 0.00%EDSON PEACEVALE Cement Laborer 06/10/2017

T & P CONTRACTING, INC. 432.0 216.0 50.00% 224.0 51.85% 0.0 0.00%EDSON PEACEVALE Cement Finisher 06/10/2017

JJRG PLUMBING AND HEATIN 1,125.0 273.0 24.27% 1,085.0 96.44% 110.0 9.78%EDSON PEACEVALE Plumber 09/08/2017

CLIMATECH 800.0 646.5 80.81% 667.5 83.44% 0.0 0.00%EDSON PEACEVALE HVAC 09/08/2017

CAPE CONTRACTOR'S 4,526.0 3,938.0 87.01% 4,526.0 100.00% 0.0 0.00%EDSON PEACEVALE Carpenter 09/08/2017

BOSTONIAN EXCAVATION 1,036.0 1,036.0 100.00% 0.0 0.00% 0.0 0.00%EDSON PEACEVALE Equipment Opera 09/08/2017

ALWAYS ELECTRIC 883.0 879.0 99.55% 883.0 100.00% 2.0 0.23%EDSON PEACEVALE Electrician 09/08/2017

MASS WOODS 564.0 0.0 0.00% 564.0 100.00% 0.0 0.00%EDSON PEACEVALE Carpenter 06/10/2017

9,687.0 7,259.5 74.94% 8,270.5 85.38% 201.0 2.07%SUB TOTALS:

EL PAISA RESTAURANT-FRONT STRO

$12,500Amount:

Gen Contractor: LOGAN GLASS

(617)567-7859 340 CHELSEA STREET EAST BOSTON

Est Start Date:

Est End Date:

08/25/2014

09/14/2014

SOFISTECH INC. 64.0 0.0 0.00% 64.0 100.00% 0.0 0.00%EL PAISA RESTAURANT-FRONT Laborer 09/14/2014

64.0 0.0 0.00% 64.0 100.00% 0.0 0.00%SUB TOTALS:

EL RECREO COFFEE ROASTERIE

$2,500Amount:

Gen Contractor: EXCEL SIGNS & DECORATION CORP.

(617)479-8552 259 QUINCY AVE. QUINCY

Est Start Date:

Est End Date:

03/08/2015

03/14/2015

EXCEL SIGNS & DECORATION 6.0 0.0 0.00% 6.0 100.00% 3.0 50.00%EL RECREO COFFEE ROASTERI Laborer 03/14/2015

6.0 0.0 0.00% 6.0 100.00% 3.0 50.00%SUB TOTALS:

ELEPHANT WALK

$5,000Amount:

Gen Contractor: BOSTON SIGN CO. INC.

(617)338-2114 40 PLYMPTON STREET BOSTON

Est Start Date:

Est End Date:

10/27/2014

10/31/2014

BOSTON SIGN CO. INC. 12.0 6.0 50.00% 0.0 0.00% 0.0 0.00%ELEPHANT WALK Laborer 10/31/2014

12.0 6.0 50.00% 0.0 0.00% 0.0 0.00%SUB TOTALS:

ELIZABETH STONE HOUSE

$20,000Amount:

Gen Contractor: NORFOLK HARDWARE & HOME CENTER

981 MORTON STREET MATTAPAN

Est Start Date:

Est End Date:

06/14/2016

06/15/2016

NORFOLK HARDWARE & HOM 32.0 0.0 0.00% 0.0 0.00% 0.0 0.00%ELIZABETH STONE HOUSE Carpenter 06/15/2016

THE ROOF KINGS 16.0 0.0 0.00% 0.0 0.00% 16.0 100.00%ELIZABETH STONE HOUSE Laborer 07/02/2015

LANCO SCAFFOLDING INC. 16.0 0.0 0.00% 16.0 100.00% 0.0 0.00%ELIZABETH STONE HOUSE Laborer 03/15/2015

MAGUIRE COMPANY INC 5.0 5.0 100.00% 0.0 0.00% 0.0 0.00%ELIZABETH STONE HOUSE Plumber 01/18/2014

THE ROOF KINGS 100.0 0.0 0.00% 0.0 0.00% 0.0 0.00%ELIZABETH STONE HOUSE Roofer 07/02/2015

Page 148: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 148

Project Name Trade Latest Week

169.0 5.0 2.96% 16.0 9.47% 16.0 9.47%SUB TOTALS:

EMERGENCY STAIRS

$5,000Amount:

Gen Contractor: JEAN CLODOMIR

(617)335-7495 271 EDMANDS ROAD FRAMINGHAM

Est Start Date:

Est End Date:

03/01/2014

04/30/2014

JEAN CLODOMIR 40.0 0.0 0.00% 40.0 100.00% 0.0 0.00%EMERGENCY STAIRS Carpenter 03/07/2014

JEAN CLODOMIR 80.0 0.0 0.00% 80.0 100.00% 0.0 0.00%EMERGENCY STAIRS Roofer 03/14/2014

120.0 0.0 0.00% 120.0 100.00% 0.0 0.00%SUB TOTALS:

ENERGIZE LLC

$3,500Amount:

Gen Contractor:

Est Start Date:

Est End Date:

04/24/2016

04/30/2016

MODERN METAL DESIGNS 4.0 0.0 0.00% 0.0 0.00% 0.0 0.00%ENERGIZE LLC Laborer 04/30/2016

4.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SUB TOTALS:

ESTER RESTAURANT

$7,500Amount:

Gen Contractor: BOSTON SIGN CO. INC.

(617)338-2114 40 PLYMPTON STREET BOSTON

Est Start Date:

Est End Date:

06/01/2014

06/07/2014

BOSTON SIGN CO. INC. 12.0 6.0 50.00% 0.0 0.00% 0.0 0.00%ESTER RESTAURANT Laborer 06/07/2014

12.0 6.0 50.00% 0.0 0.00% 0.0 0.00%SUB TOTALS:

FALLON FIELD PLAY AREA

$679,172Amount:

Gen Contractor: D'ALLESSANDRO CORPORATION

(508)559-6400 41 LEDIN DRIVE AVON

Est Start Date:

Est End Date:

04/01/2016

09/30/2016

GILBERT ELECTRIC & CONST. 33.0 0.0 0.00% 0.0 0.00% 0.0 0.00%FALLON FIELD PLAY AREA Cement Laborer 07/16/2016

GILBERT ELECTRIC & CONST. 24.0 0.0 0.00% 0.0 0.00% 0.0 0.00%FALLON FIELD PLAY AREA Equipment Opera 07/16/2016

GILBERT ELECTRIC & CONST. 25.0 0.0 0.00% 0.0 0.00% 0.0 0.00%FALLON FIELD PLAY AREA Carpenter 07/16/2016

D'ALLESSANDRO CORPORATI 1,708.0 572.0 33.49% 590.0 34.54% 381.0 22.31%FALLON FIELD PLAY AREA Laborer 11/12/2016

D'ALLESSANDRO CORPORATI 48.0 31.0 64.58% 31.0 64.58% 0.0 0.00%FALLON FIELD PLAY AREA Iron Worker 07/30/2016

D'ALLESSANDRO CORPORATI 94.0 20.5 21.81% 20.5 21.81% 0.0 0.00%FALLON FIELD PLAY AREA Cement Laborer 09/17/2016

D'ALLESSANDRO CORPORATI 2.0 0.0 0.00% 0.0 0.00% 0.0 0.00%FALLON FIELD PLAY AREA Cement Finisher 10/15/2016

D'ALLESSANDRO CORPORATI 241.5 75.5 31.26% 59.5 24.64% 0.0 0.00%FALLON FIELD PLAY AREA Carpenter 10/08/2016

D'ALLESSANDRO CORPORATI 9.0 3.0 33.33% 3.0 33.33% 0.0 0.00%FALLON FIELD PLAY AREA Asphalt Raker 09/03/2016

D'ALLESSANDRO CORPORATI 743.5 8.0 1.08% 16.0 2.15% 0.0 0.00%FALLON FIELD PLAY AREA Equipment Opera 11/05/2016

GILBERT ELECTRIC & CONST. 135.0 62.0 45.93% 62.0 45.93% 32.0 23.70%FALLON FIELD PLAY AREA Laborer 07/16/2016

3,063.0 772.0 25.20% 782.0 25.53% 413.0 13.48%SUB TOTALS:

FAN PIER A AND B

$350,000,000Amount:

Gen Contractor: TURNER CONSTRUCTION CO.

(617)247-6400 TWO SEAPORT LANE BOSTON

Est Start Date:

Est End Date:

07/01/2011

12/01/2013

TURNER CONSTRUCTION CO. 1,292.0 553.0 42.80% 718.0 55.57% 447.0 34.60%FAN PIER A AND B Laborer 12/22/2013

M.L. MCDONALD SALES 8.0 0.0 0.00% 0.0 0.00% 0.0 0.00%FAN PIER A AND B Plasterer 11/26/2013

Page 149: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 149

Project Name Trade Latest Week

MARR EQUIPMENT CORP. 481.5 118.0 24.51% 0.0 0.00% 0.0 0.00%FAN PIER A AND B Equipment Opera 12/22/2013

OTIS ELEVATOR COMPANY 73.8 55.8 75.59% 0.0 0.00% 18.0 24.41%FAN PIER A AND B Elev Const Helper 12/19/2013

OTIS ELEVATOR COMPANY 1,061.3 0.0 0.00% 10.0 0.94% 194.5 18.33%FAN PIER A AND B Elevator Const(M 12/19/2013

P.J. SPILLANE COMPANY 528.0 0.0 0.00% 208.0 39.39% 0.0 0.00%FAN PIER A AND B Bricklayer 12/21/2013

P.J. SPILLANE COMPANY 2.5 0.0 0.00% 0.0 0.00% 0.0 0.00%FAN PIER A AND B Mason Tender 12/14/2013

S & F CONCRETE 24.0 0.0 0.00% 0.0 0.00% 0.0 0.00%FAN PIER A AND B Laborer 11/23/2013

TCI INSTALLATIONS INC. 175.0 0.0 0.00% 0.0 0.00% 0.0 0.00%FAN PIER A AND B Carpenter 12/14/2013

UNION STEEL ERECTORS COR 32.0 0.0 0.00% 0.0 0.00% 0.0 0.00%FAN PIER A AND B Iron Worker 11/17/2013

VER - TEX C.S.I. 284.0 8.0 2.82% 8.0 2.82% 0.0 0.00%FAN PIER A AND B Carpenter 12/07/2013

M.L. MCDONALD SALES 8.0 0.0 0.00% 0.0 0.00% 0.0 0.00%FAN PIER A AND B Laborer 11/26/2013

SULLIVAN & MCLAUGHLIN CO. 265.0 0.0 0.00% 0.0 0.00% 0.0 0.00%FAN PIER A AND B Electrician 12/22/2013

SOEP PAINTING CORP. 532.0 146.0 27.44% 220.0 41.35% 0.0 0.00%FAN PIER A AND B Painter 12/22/2013

CENTURY DRYWALL INC, 16.0 0.0 0.00% 0.0 0.00% 0.0 0.00%FAN PIER A AND B Laborer 12/14/2013

KIVA SYSTEMS INC. 408.0 0.0 0.00% 0.0 0.00% 0.0 0.00%FAN PIER A AND B Glazier 12/22/2013

TURNER CONSTRUCTION CO. 673.0 186.0 27.64% 186.0 27.64% 186.0 27.64%FAN PIER A AND B Carpenter 12/22/2013

ATLANTIC INSULATION CORP 186.0 0.0 0.00% 0.0 0.00% 0.0 0.00%FAN PIER A AND B Asbestos Worker 12/22/2013

BROADWAY ELEC.SYS.CO. 684.0 235.0 34.36% 308.0 45.03% 0.0 0.00%FAN PIER A AND B Electrician 12/22/2013

BUSINESS INTERIORS FCOVE 9.0 0.0 0.00% 0.0 0.00% 0.0 0.00%FAN PIER A AND B Carpenter 12/14/2013

BUSINESS INTERIORS FCOVE 30.0 0.0 0.00% 22.0 73.33% 0.0 0.00%FAN PIER A AND B Carpet Layer 12/21/2013

E. M. DUGGAN INC. 48.0 0.0 0.00% 0.0 0.00% 0.0 0.00%FAN PIER A AND B Plumber 12/15/2013

FRONT LINE INC. 5,483.5 2,002.5 36.52% 4,276.0 77.98% 2,806.5 51.18%FAN PIER A AND B Laborer 12/21/2013

GREENWOOD INDUSTRIES IN 1,236.3 165.5 13.39% 165.5 13.39% 0.0 0.00%FAN PIER A AND B Roofer 12/14/2013

HIGH POINT INTERIORS,INC. 24.0 0.0 0.00% 0.0 0.00% 0.0 0.00%FAN PIER A AND B Marble Tile Work 12/07/2013

J. C. CANNISTRARO INC. 1,184.0 280.0 23.65% 280.0 23.65% 32.0 2.70%FAN PIER A AND B Pipefitter 12/22/2013

J.C. HIGGINS CORP. 795.0 282.0 35.47% 161.0 20.25% 0.0 0.00%FAN PIER A AND B Pipefitter 12/22/2013

J.M. ELECTRICAL CO. INC. 244.0 0.0 0.00% 0.0 0.00% 0.0 0.00%FAN PIER A AND B Electrician 12/20/2013

KIVA SYSTEMS INC. 120.0 0.0 0.00% 0.0 0.00% 0.0 0.00%FAN PIER A AND B Carpenter 12/15/2013

15,907.8 4,031.8 25.34% 6,562.5 41.25% 3,684.0 23.16%SUB TOTALS:

FAN PIER C

$96,000,000Amount:

Gen Contractor: TURNER CONSTRUCTION CO.

(617)247-6400 TWO SEAPORT LANE BOSTON

Est Start Date:

Est End Date:

11/01/2013

10/01/2015

MORETRENCH 4,126.5 869.5 21.07% 367.5 8.91% 0.0 0.00%FAN PIER C Piledriver 04/19/2014

MARR EQUIPMENT CORP. 5,408.5 1,992.5 36.84% 0.0 0.00% 0.0 0.00%FAN PIER C Equipment Opera 11/01/2015

MASSEY'S PLATE GLASS & AL 16.0 0.0 0.00% 0.0 0.00% 0.0 0.00%FAN PIER C Roofer 12/20/2014

MORETRENCH 2,302.5 0.0 0.00% 1,913.5 83.11% 0.0 0.00%FAN PIER C Equipment Opera 03/29/2014

Page 150: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 150

Project Name Trade Latest Week

MORETRENCH 108.0 0.0 0.00% 0.0 0.00% 0.0 0.00%FAN PIER C Carpenter 01/25/2014

MCCUSKER-GILL INC. 10,765.0 2,268.0 21.07% 1,778.0 16.52% 0.0 0.00%FAN PIER C Sheetmetal Work 10/25/2015

MORETRENCH 6,423.0 246.5 3.84% 318.5 4.96% 0.0 0.00%FAN PIER C Laborer 04/26/2014

MASSEY'S PLATE GLASS & AL 16.0 0.0 0.00% 0.0 0.00% 0.0 0.00%FAN PIER C Pipefitter 02/07/2015

MASSEY'S PLATE GLASS & AL 8.0 0.0 0.00% 0.0 0.00% 0.0 0.00%FAN PIER C Piledriver 03/07/2015

MASSEY'S PLATE GLASS & AL 11,325.0 5,744.5 50.72% 5,744.5 50.72% 2,144.5 18.94%FAN PIER C Iron Worker 08/29/2015

MASSEY'S PLATE GLASS & AL 38,067.0 14,386.5 37.79% 3,631.0 9.54% 2,497.0 6.56%FAN PIER C Glazier 10/31/2015

MASSEY'S PLATE GLASS & AL 1,500.0 0.0 0.00% 0.0 0.00% 0.0 0.00%FAN PIER C Equipment Opera 04/11/2015

N.B. KENNEY CO. INC., 40.0 0.0 0.00% 0.0 0.00% 0.0 0.00%FAN PIER C Mason 07/25/2015

MASSEY'S PLATE GLASS & AL 6,629.5 1,867.0 28.16% 3,796.0 57.26% 0.0 0.00%FAN PIER C Bricklayer 10/31/2015

STATE ELECTRIC CO. 63,290.6 14,217.2 22.46% 9,309.3 14.71% 2,264.5 3.58%FAN PIER C Electrician 11/01/2015

MARR EQUIPMENT CORP. 332.5 0.0 0.00% 0.0 0.00% 0.0 0.00%FAN PIER C Elevator Const(M 08/16/2015

MANGANARO NORTHEAST LL 11,390.0 8,073.0 70.88% 3,491.0 30.65% 912.0 8.01%FAN PIER C Laborer 11/01/2015

MASSEY'S PLATE GLASS & AL 4,786.0 1,705.5 35.64% 621.5 12.99% 0.0 0.00%FAN PIER C Carpenter 09/19/2015

TITAN ROOFING INC. 399.5 0.0 0.00% 20.0 5.01% 0.0 0.00%FAN PIER C Sheetmetal Work 10/31/2015

NEW ENGLAND DECKS&FLOO 149.0 0.0 0.00% 0.0 0.00% 0.0 0.00%FAN PIER C Mason 09/26/2015

MANGANARO NORTHEAST LL 51,383.5 13,835.5 26.93% 8,444.0 16.43% 958.0 1.86%FAN PIER C Carpenter 11/01/2015

VALLEYCREST LANDSCAPE 184.0 0.0 0.00% 0.0 0.00% 0.0 0.00%FAN PIER C Equipment Opera 11/01/2015

VALLEYCREST LANDSCAPE 427.5 0.0 0.00% 216.0 50.53% 0.0 0.00%FAN PIER C Bricklayer 11/01/2015

URBAN INSULATION 521.5 60.0 11.51% 60.0 11.51% 0.0 0.00%FAN PIER C Insulator 10/25/2015

URBAN INSULATION 2,655.0 394.0 14.84% 521.0 19.62% 212.0 7.98%FAN PIER C Asbestos Worker 06/28/2015

UNION STEEL ERECTORS COR 3,835.0 1,715.0 44.72% 1,393.0 36.32% 72.0 1.88%FAN PIER C Iron Worker 10/24/2015

OTIS ELEVATOR COMPANY 2,387.8 294.5 12.33% 350.8 14.69% 137.0 5.74%FAN PIER C Elevator Const(M 10/08/2015

TURNER CONSTRUCTION CO. 10,345.0 4,240.5 40.99% 5,338.0 51.60% 16.0 0.15%FAN PIER C Carpenter 11/01/2015

N.B. KENNEY CO. INC., 33,668.0 5,402.0 16.04% 3,522.0 10.46% 3,035.0 9.01%FAN PIER C Pipefitter 10/30/2015

TITAN ROOFING INC. 9,664.5 2,925.0 30.27% 2,377.0 24.60% 353.0 3.65%FAN PIER C Roofer 10/31/2015

SULLIVAN & MCLAUGHLIN CO. 3,250.0 136.0 4.18% 0.0 0.00% 0.0 0.00%FAN PIER C Electrician 10/04/2015

REPLACEMENT WINBOW SYS 256.0 192.0 75.00% 192.0 75.00% 80.0 31.25%FAN PIER C Laborer 09/12/2015

OTIS ELEVATOR COMPANY 1,982.5 130.0 6.56% 0.0 0.00% 0.0 0.00%FAN PIER C Elev Const Helper 10/08/2015

NEW ENGLAND FINISH SYS. 4,014.0 910.0 22.67% 1,342.0 33.43% 613.0 15.27%FAN PIER C Carpenter 10/30/2015

VALLEYCREST LANDSCAPE 706.0 8.0 1.13% 138.0 19.55% 0.0 0.00%FAN PIER C Laborer 11/01/2015

NEW ENGLAND DECKS&FLOO 166.0 88.0 53.01% 88.0 53.01% 0.0 0.00%FAN PIER C Laborer 09/26/2015

TURNER CONSTRUCTION CO. 46,120.0 28,690.5 62.21% 10,432.0 22.62% 5,670.5 12.30%FAN PIER C Laborer 11/01/2015

ACCORD STEEL & PRECAST 3,239.0 0.0 0.00% 0.0 0.00% 0.0 0.00%FAN PIER C Oiler 03/31/2015

Page 151: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 151

Project Name Trade Latest Week

D & W CONSTRUCTION 19,675.0 5,327.0 27.07% 8,878.0 45.12% 1,591.5 8.09%FAN PIER C Taper 11/01/2015

COMPONENT ASSEMBLY SYS 9,713.0 2,027.0 20.87% 1,276.0 13.14% 538.0 5.54%FAN PIER C Carpenter 10/27/2015

ATLANTIC CONTRACTING &SP 6,762.0 496.0 7.34% 1,845.0 27.28% 192.0 2.84%FAN PIER C Insulator 11/01/2015

ARCHER CORPORATION 824.0 133.0 16.14% 0.0 0.00% 0.0 0.00%FAN PIER C Carpenter 10/30/2015

AMERICAN PLUMBING HEATIN 28,886.0 7,187.0 24.88% 5,150.5 17.83% 1,526.5 5.28%FAN PIER C Plumber 10/23/2015

ALLEGHENY CONTRACT FLOO 28,863.5 6,740.5 23.35% 11,352.5 39.33% 1,319.0 4.57%FAN PIER C Floor Layer 10/30/2015

ALLEGHENY CONTRACT FLOO 539.5 0.0 0.00% 0.0 0.00% 0.0 0.00%FAN PIER C Equipment Opera 08/28/2015

FRED SALVUCCI CORP. 2,702.5 40.0 1.48% 1,220.5 45.16% 0.0 0.00%FAN PIER C Bricklayer 09/12/2015

ALL PANEL SYSTEMS, LLC. 16,297.0 1,893.0 11.62% 2,544.0 15.61% 269.0 1.65%FAN PIER C Carpenter 10/24/2015

A. A. WILL CORPORATION 663.0 647.0 97.59% 663.0 100.00% 647.0 97.59%FAN PIER C Oiler 07/22/2014

ACCORD STEEL & PRECAST 20,751.5 5,188.5 25.00% 3,649.5 17.59% 1,491.0 7.19%FAN PIER C Iron Worker 05/19/2015

ACCORD STEEL & PRECAST 3,308.0 0.0 0.00% 0.0 0.00% 0.0 0.00%FAN PIER C Equipment Opera 03/31/2015

A. A. WILL CORPORATION 72.0 0.0 0.00% 0.0 0.00% 0.0 0.00%FAN PIER C Pumpman 05/27/2014

A. A. WILL CORPORATION 5,974.0 4,167.5 69.76% 3,497.5 58.55% 0.0 0.00%FAN PIER C Piledriver 09/01/2015

A. A. WILL CORPORATION 11,364.5 2,677.5 23.56% 4,131.5 36.35% 0.0 0.00%FAN PIER C Laborer 11/03/2015

M.L. MCDONALD SALES 32.0 0.0 0.00% 0.0 0.00% 0.0 0.00%FAN PIER C Taper 08/18/2015

NEW ENGLAND FINISH SYS. 154.0 14.0 9.09% 14.0 9.09% 0.0 0.00%FAN PIER C Laborer 10/23/2015

ALL PANEL SYSTEMS, LLC. 811.0 0.0 0.00% 0.0 0.00% 0.0 0.00%FAN PIER C Iron Worker 10/24/2015

HERITAGE RESTORATION INC. 6,648.5 1,838.0 27.65% 1,591.0 23.93% 16.0 0.24%FAN PIER C Bricklayer 10/31/2015

KENNETH CASTELLUCCI ASSO 2,944.0 552.0 18.75% 0.0 0.00% 0.0 0.00%FAN PIER C Mason 10/16/2015

A. A. WILL CORPORATION 10,476.5 170.5 1.63% 348.0 3.32% 101.5 0.97%FAN PIER C Equipment Opera 11/03/2015

M.L. MCDONALD SALES 13,055.0 5,673.0 43.45% 3,986.0 30.53% 2,324.0 17.80%FAN PIER C Painter 11/03/2015

JACKSON GLASS 1,230.5 395.5 32.14% 466.5 37.91% 0.0 0.00%FAN PIER C Glazier 10/17/2015

FRED SALVUCCI CORP. 1,837.0 447.8 24.37% 678.3 36.92% 0.0 0.00%FAN PIER C Mason Tender 08/29/2015

HERITAGE RESTORATION INC. 2,063.5 105.0 5.09% 539.0 26.12% 8.0 0.39%FAN PIER C Laborer 10/31/2015

KENNETH CASTELLUCCI ASSO 859.0 0.0 0.00% 0.0 0.00% 0.0 0.00%FAN PIER C Marble Tile Work 10/30/2015

H. CARR & SONS INC. 8.0 0.0 0.00% 0.0 0.00% 0.0 0.00%FAN PIER C Taper 06/05/2015

H. CARR & SONS INC. 1,410.5 0.0 0.00% 227.0 16.09% 0.0 0.00%FAN PIER C Plasterer 09/18/2015

G & C CONCRETE CO. 516.5 0.0 0.00% 0.0 0.00% 0.0 0.00%FAN PIER C Oiler 06/21/2014

G & C CONCRETE CO. 13,101.0 3,947.0 30.13% 4,975.5 37.98% 0.0 0.00%FAN PIER C Laborer 10/03/2015

G & C CONCRETE CO. 9,356.5 2,683.5 28.68% 2,192.0 23.43% 0.0 0.00%FAN PIER C Iron Worker 10/03/2015

G & C CONCRETE CO. 1,002.5 0.0 0.00% 0.0 0.00% 0.0 0.00%FAN PIER C Equipment Opera 09/12/2015

G & C CONCRETE CO. 106.5 0.0 0.00% 8.0 7.51% 0.0 0.00%FAN PIER C Cement Laborer 10/10/2015

FRONT LINE INC. 4,046.5 1,404.0 34.70% 3,301.5 81.59% 1,731.0 42.78%FAN PIER C Laborer 10/31/2015

Page 152: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 152

Project Name Trade Latest Week

H. CARR & SONS INC. 3,939.0 1,441.0 36.58% 1,412.0 35.85% 0.0 0.00%FAN PIER C Laborer 09/11/2015

G & C CONCRETE CO. 13,720.0 2,779.0 20.26% 3,394.0 24.74% 32.0 0.23%FAN PIER C Carpenter 10/10/2015

J. C. CANNISTRARO INC. 9,346.0 5,821.0 62.28% 1,146.0 12.26% 882.0 9.44%FAN PIER C Sprinkler Fitter 11/01/2015

G & C CONCRETE CO. 3,429.5 139.5 4.07% 890.0 25.95% 16.5 0.48%FAN PIER C Cement Finisher 10/17/2015

598,376.8 174,326.0 29.13% 134,781.3 22.52% 31,649.5 5.29%SUB TOTALS:

FAN PIER D.

$200,000,000Amount:

Gen Contractor: TURNER CONSTRUCTION CO.

(617)247-6400 TWO SEAPORT LANE BOSTON

Est Start Date:

Est End Date:

11/01/2015

01/31/2018

NEW HAMP. STEEL ERECT. 60.0 24.0 40.00% 0.0 0.00% 0.0 0.00%FAN PIER D. Iron Worker 11/15/2016

NEW ENGLAND DECKS&FLOO 351.5 40.0 11.38% 78.0 22.19% 24.0 6.83%FAN PIER D. Mason 09/09/2017

NEW ENGLAND FINISH SYS. 3,784.0 1,197.0 31.63% 2,027.0 53.57% 214.0 5.66%FAN PIER D. Carpenter 09/15/2017

NEW ENGLAND FINISH SYS. 32.0 0.0 0.00% 0.0 0.00% 0.0 0.00%FAN PIER D. Laborer 09/15/2017

NH STEEL FABRICATORS INC 3,695.5 1,647.5 44.58% 849.5 22.99% 397.0 10.74%FAN PIER D. Iron Worker 09/12/2017

NEW ENGLAND FINISH SYS. 8.0 0.0 0.00% 0.0 0.00% 0.0 0.00%FAN PIER D. Cement Finisher 06/23/2017

NEW ENGLAND DECKS&FLOO 194.0 0.0 0.00% 0.0 0.00% 0.0 0.00%FAN PIER D. Laborer 09/09/2017

MARR EQUIPMENT CORP. 3,728.5 0.0 0.00% 45.5 1.22% 9.5 0.25%FAN PIER D. Equipment Opera 09/10/2017

MARR EQUIPMENT CORP. 283.5 0.0 0.00% 0.0 0.00% 0.0 0.00%FAN PIER D. Elevator Const(M 09/10/2017

MARR EQUIPMENT CORP. 113.0 0.0 0.00% 0.0 0.00% 0.0 0.00%FAN PIER D. Elev Const Helper 07/23/2017

MANGANARO NORTHEAST LL 8,488.5 4,223.0 49.75% 2,675.0 31.51% 641.0 7.55%FAN PIER D. Laborer 09/17/2017

OTIS ELEVATOR COMPANY 1,944.0 0.0 0.00% 350.0 18.00% 752.0 38.68%FAN PIER D. Elev Const Helper 08/03/2017

KIVA SYSTEMS INC. 183.0 183.0 100.00% 0.0 0.00% 0.0 0.00%FAN PIER D. Sheetmetal Work 02/05/2017

TURNER CONSTRUCTION CO. 23,855.0 10,936.0 45.84% 7,327.0 30.71% 2,447.0 10.26%FAN PIER D. Laborer 09/17/2017

MANGANARO NORTHEAST LL 48,510.0 9,205.0 18.98% 9,299.5 19.17% 1,094.0 2.26%FAN PIER D. Carpenter 09/17/2017

TURNER CONSTRUCTION CO. 7,908.0 0.0 0.00% 2,384.0 30.15% 0.0 0.00%FAN PIER D. Carpenter 09/17/2017

H. CARR & SONS INC. 1,282.5 0.0 0.00% 143.5 11.19% 0.0 0.00%FAN PIER D. Plasterer 06/09/2017

KIVA SYSTEMS INC. 17,399.0 8,952.0 51.45% 5,885.0 33.82% 1,535.0 8.82%FAN PIER D. Iron Worker 09/17/2017

WORCESTER AIR CONDITIONI 13,859.0 2,925.5 21.11% 1,916.0 13.82% 0.0 0.00%FAN PIER D. Sheetmetal Work 09/17/2017

WALLCO INSTALLATIONS, LLC. 72.0 72.0 100.00% 0.0 0.00% 0.0 0.00%FAN PIER D. Sheetmetal Work 04/14/2017

VALLEYCREST LANDSCAPE 1,210.0 0.0 0.00% 8.0 0.66% 0.0 0.00%FAN PIER D. Laborer 09/17/2017

VALLEYCREST LANDSCAPE 216.0 0.0 0.00% 0.0 0.00% 0.0 0.00%FAN PIER D. Equipment Opera 09/17/2017

THOMAS G GALLAGHER INC. 21,164.0 5,872.0 27.75% 3,619.0 17.10% 2,793.0 13.20%FAN PIER D. Pipefitter 09/17/2017

URBAN INSULATION 2,581.0 668.5 25.90% 662.5 25.67% 689.5 26.71%FAN PIER D. Insulator 09/17/2017

OTIS ELEVATOR COMPANY 1,689.8 45.0 2.66% 70.8 4.19% 65.5 3.88%FAN PIER D. Elevator Const(M 08/24/2017

T & T STEEL ERECTORS 136.0 68.0 50.00% 68.0 50.00% 0.0 0.00%FAN PIER D. Iron Worker 07/22/2017

SULLIVAN & MCLAUGHLIN CO. 40.0 0.0 0.00% 0.0 0.00% 0.0 0.00%FAN PIER D. Installer/Apt Wirer 10/09/2016

Page 153: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 153

Project Name Trade Latest Week

SULLIVAN & MCLAUGHLIN CO. 41,465.0 16,040.0 38.68% 16,747.0 40.39% 2,797.5 6.75%FAN PIER D. Electrician 09/17/2017

SOEP PAINTING CORP. 2,690.5 393.0 14.61% 1,160.5 43.13% 48.0 1.78%FAN PIER D. Painter 09/17/2017

SCHNABEL FOUNDATION CO. 1,318.0 0.0 0.00% 0.0 0.00% 0.0 0.00%FAN PIER D. Laborer 02/28/2016

SCHNABEL FOUNDATION CO. 1,678.5 0.0 0.00% 35.0 2.09% 0.0 0.00%FAN PIER D. Equipment Opera 02/28/2016

SCHNABEL FOUNDATION CO. 1,531.5 316.0 20.63% 316.0 20.63% 0.0 0.00%FAN PIER D. Carpenter 02/28/2016

VALLEYCREST LANDSCAPE 353.0 0.0 0.00% 121.0 34.28% 0.0 0.00%FAN PIER D. Bricklayer 09/17/2017

ACCORD STEEL & PRECAST 21,455.5 3,440.0 16.03% 5,835.5 27.20% 1,477.5 6.89%FAN PIER D. Iron Worker 06/20/2017

BEACON WATERPROOFING A 488.5 127.5 26.10% 287.5 58.85% 0.0 0.00%FAN PIER D. Laborer 09/08/2017

BEACON WATERPROOFING A 3,536.5 735.5 20.80% 409.0 11.57% 0.0 0.00%FAN PIER D. Bricklayer 09/15/2017

AXION SPECIALTY CONTRACTI 4,570.0 144.0 3.15% 432.0 9.45% 72.0 1.58%FAN PIER D. Insulator 09/17/2017

AMERICAN PLUMBING HEATIN 26,572.5 8,172.0 30.75% 5,258.5 19.79% 1,999.0 7.52%FAN PIER D. Plumber 09/15/2017

ALLEGHENY CONTRACT FLOO 1,936.0 64.0 3.31% 1,300.0 67.15% 0.0 0.00%FAN PIER D. Floor Layer 09/08/2017

COMPONENT ASSEMBLY SYS 708.0 80.0 11.30% 199.0 28.11% 0.0 0.00%FAN PIER D. Carpenter 09/19/2017

ACCORD STEEL & PRECAST 2,542.5 0.0 0.00% 50.5 1.99% 0.0 0.00%FAN PIER D. Oiler 05/23/2017

ABSOLUTE FINISHING SYSTE 9,055.0 1,868.0 20.63% 4,560.0 50.36% 617.0 6.81%FAN PIER D. Taper 09/10/2017

ACCORD STEEL & PRECAST 2,511.5 0.0 0.00% 0.0 0.00% 0.0 0.00%FAN PIER D. Equipment Opera 05/23/2017

KIVA SYSTEMS INC. 14,195.0 2,409.5 16.97% 778.5 5.48% 1,294.5 9.12%FAN PIER D. Glazier 09/17/2017

A. A. WILL CORPORATION 8,609.0 3,665.0 42.57% 3,405.0 39.55% 0.0 0.00%FAN PIER D. Piledriver 07/17/2017

J. C. CANNISTRARO INC. 5,164.5 1,099.5 21.29% 1,944.0 37.64% 104.0 2.01%FAN PIER D. Sprinkler Fitter 09/17/2017

A. A. WILL CORPORATION 9,096.5 2,160.0 23.75% 2,507.5 27.57% 0.0 0.00%FAN PIER D. Laborer 09/18/2017

A. A. WILL CORPORATION 7,746.0 719.5 9.29% 683.0 8.82% 969.0 12.51%FAN PIER D. Equipment Opera 09/18/2017

ALLEGHENY CONTRACT FLOO 81.5 0.0 0.00% 0.0 0.00% 0.0 0.00%FAN PIER D. Equipment Opera 09/08/2017

KENNETH CASTELLUCCI ASSO 305.5 0.0 0.00% 0.0 0.00% 0.0 0.00%FAN PIER D. Mason 09/15/2017

A. A. WILL CORPORATION 113.0 0.0 0.00% 0.0 0.00% 0.0 0.00%FAN PIER D. Oiler 01/05/2016

FRED SALVUCCI CORP. 799.0 0.0 0.00% 375.0 46.93% 0.0 0.00%FAN PIER D. Bricklayer 06/24/2017

KERR'S WELDING IRON WORK 1,784.0 984.0 55.16% 984.0 55.16% 0.0 0.00%FAN PIER D. Welder 01/31/2017

KENNETH CASTELLUCCI ASSO 423.0 0.0 0.00% 0.0 0.00% 0.0 0.00%FAN PIER D. Marble Tile Work 09/15/2017

JOHN F. SHEA CO. INC. 2,804.6 536.2 19.12% 1,810.9 64.57% 0.0 0.00%FAN PIER D. Roofer 09/09/2017

J.M. ELECTRICAL CO. INC. 2,952.0 40.0 1.36% 616.0 20.87% 0.0 0.00%FAN PIER D. Electrician 09/15/2017

HIGH POINT INTERIORS,INC. 4,411.0 895.0 20.29% 936.0 21.22% 0.0 0.00%FAN PIER D. Marble Tile Work 09/16/2017

G & C CONCRETE CO. 9,530.5 1,456.0 15.28% 2,753.5 28.89% 312.0 3.27%FAN PIER D. Carpenter 09/16/2017

G & C CONCRETE CO. 9,279.0 3,613.5 38.94% 5,114.0 55.11% 0.0 0.00%FAN PIER D. Laborer 09/16/2017

G & C CONCRETE CO. 6,661.5 1,775.5 26.65% 2,047.0 30.73% 60.0 0.90%FAN PIER D. Iron Worker 09/16/2017

G & C CONCRETE CO. 734.0 0.0 0.00% 2.5 0.34% 0.0 0.00%FAN PIER D. Equipment Opera 09/09/2017

Page 154: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 154

Project Name Trade Latest Week

G & C CONCRETE CO. 2,821.5 404.0 14.32% 711.5 25.22% 0.0 0.00%FAN PIER D. Cement Laborer 09/16/2017

G & C CONCRETE CO. 3,447.0 477.0 13.84% 1,294.0 37.54% 24.5 0.71%FAN PIER D. Cement Finisher 09/16/2017

H. CARR & SONS INC. 2,276.0 154.5 6.79% 642.0 28.21% 0.0 0.00%FAN PIER D. Laborer 06/02/2017

KIVA SYSTEMS INC. 15,778.0 4,192.5 26.57% 777.5 4.93% 0.0 0.00%FAN PIER D. Carpenter 09/17/2017

FRED SALVUCCI CORP. 872.0 0.0 0.00% 393.5 45.13% 0.0 0.00%FAN PIER D. Mason Tender 08/05/2017

395,084.4 102,020.2 25.82% 101,895.1 25.79% 20,436.5 5.17%SUB TOTALS:

FAN PIER PARCEL I

$150,000,000Amount:

Gen Contractor: TURNER CONSTRUCTION CO.

(617)247-6400 TWO SEAPORT LANE BOSTON

Est Start Date:

Est End Date:

02/18/2014

02/28/2016

BUSINESS INTERIORS FCOVE 4,021.5 548.0 13.63% 548.0 13.63% 0.0 0.00%FAN PIER PARCEL I Marble Tile Work 04/30/2016

CENTRAL CEILINGS INC. 35,454.0 7,248.0 20.44% 8,079.5 22.79% 693.0 1.95%FAN PIER PARCEL I Carpenter 05/01/2016

CENTRAL CEILINGS INC. 3,238.5 0.0 0.00% 3,006.5 92.84% 0.0 0.00%FAN PIER PARCEL I Laborer 02/28/2016

CIRCLE FLOORS INC. 11,980.5 2,020.0 16.86% 3,157.0 26.35% 0.0 0.00%FAN PIER PARCEL I Floor Layer 05/01/2016

D & W CONSTRUCTION 3,153.5 783.5 24.85% 879.5 27.89% 564.0 17.88%FAN PIER PARCEL I Taper 03/27/2016

E. M. DUGGAN INC. 8,781.5 2,322.0 26.44% 2,215.0 25.22% 0.0 0.00%FAN PIER PARCEL I Sprinkler Fitter 04/17/2016

FRONT LINE INC. 2,151.0 1,129.0 52.49% 2,035.0 94.61% 744.0 34.59%FAN PIER PARCEL I Laborer 05/07/2016

GRIFFIN INTERIORS, INC. 35,250.0 7,162.0 20.32% 3,789.0 10.75% 2,822.0 8.01%FAN PIER PARCEL I Carpenter 05/07/2016

BUSINESS INTERIORS FCOVE 1,472.0 0.0 0.00% 313.0 21.26% 0.0 0.00%FAN PIER PARCEL I Marble Refinisher 04/23/2016

A. A. WILL CORPORATION 16.0 16.0 100.00% 16.0 100.00% 16.0 100.00%FAN PIER PARCEL I Oiler 05/06/2014

EMANOUIL BROTHERS INC. 238.5 0.0 0.00% 0.0 0.00% 0.0 0.00%FAN PIER PARCEL I Laborer 03/19/2016

BUSINESS INTERIORS FCOVE 241.0 104.0 43.15% 113.0 46.89% 0.0 0.00%FAN PIER PARCEL I Carpet Layer 11/28/2015

BAY STATE BUILDING SPECIA 5,080.0 1,895.0 37.30% 1,549.0 30.49% 897.0 17.66%FAN PIER PARCEL I Carpenter 05/10/2016

AXION SPECIALTY CONTRACTI 7,735.0 264.0 3.41% 1,042.0 13.47% 158.0 2.04%FAN PIER PARCEL I Insulator 05/08/2016

AMERICAN PLUMBING HEATIN 17,435.0 3,114.5 17.86% 1,120.0 6.42% 617.5 3.54%FAN PIER PARCEL I Plumber 04/15/2016

AMERICAN ACOUSTICAL 5,601.5 550.0 9.82% 1,053.0 18.80% 418.0 7.46%FAN PIER PARCEL I Carpenter 04/15/2016

ACCORD STEEL & PRECAST 2,042.5 0.0 0.00% 0.0 0.00% 0.0 0.00%FAN PIER PARCEL I Oiler 06/16/2015

ACCORD STEEL & PRECAST 21,320.0 6,696.5 31.41% 4,795.0 22.49% 1,662.5 7.80%FAN PIER PARCEL I Iron Worker 03/15/2016

A. A. WILL CORPORATION 12,581.5 4,583.0 36.43% 4,818.0 38.29% 0.0 0.00%FAN PIER PARCEL I Piledriver 03/29/2016

A. A. WILL CORPORATION 16,151.5 4,232.0 26.20% 5,526.0 34.21% 0.0 0.00%FAN PIER PARCEL I Laborer 05/10/2016

A. A. WILL CORPORATION 14,449.5 877.0 6.07% 204.0 1.41% 469.5 3.25%FAN PIER PARCEL I Equipment Opera 05/10/2016

JOHN A . PENNEY ELECTRIC 51,018.0 13,844.0 27.14% 4,468.0 8.76% 1,652.0 3.24%FAN PIER PARCEL I Electrician 05/08/2016

ACCORD STEEL & PRECAST 2,053.5 0.0 0.00% 0.0 0.00% 0.0 0.00%FAN PIER PARCEL I Equipment Opera 06/16/2015

THE PAPPAS COMPANY, INC 294.0 137.0 46.60% 137.0 46.60% 40.0 13.61%FAN PIER PARCEL I Carpenter 04/10/2016

P.J. SPILLANE COMPANY 4,002.0 753.0 18.82% 721.5 18.03% 16.0 0.40%FAN PIER PARCEL I Waterproofer 05/07/2016

PHOENIX BAY STATE CONSTR 4,988.3 348.0 6.98% 0.0 0.00% 24.0 0.48%FAN PIER PARCEL I Mason 03/27/2016

Page 155: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 155

Project Name Trade Latest Week

REPLACEMENT WINBOW SYS 112.0 112.0 100.00% 112.0 100.00% 0.0 0.00%FAN PIER PARCEL I Laborer 09/12/2015

RYAN IRON WORKS INC, 8,334.0 1,615.0 19.38% 1,811.0 21.73% 16.0 0.19%FAN PIER PARCEL I Iron Worker 05/08/2016

S & F CONCRETE 28,739.0 7,074.0 24.61% 9,362.0 32.58% 80.0 0.28%FAN PIER PARCEL I Carpenter 04/23/2016

S & F CONCRETE 3,608.5 142.5 3.95% 324.0 8.98% 8.5 0.24%FAN PIER PARCEL I Cement Finisher 05/07/2016

S & F CONCRETE 1,596.0 0.0 0.00% 0.0 0.00% 0.0 0.00%FAN PIER PARCEL I Equipment Opera 03/12/2016

S & F CONCRETE 32.0 0.0 0.00% 0.0 0.00% 0.0 0.00%FAN PIER PARCEL I Mason 04/16/2016

SULLIVAN & MCLAUGHLIN CO. 96.0 0.0 0.00% 0.0 0.00% 0.0 0.00%FAN PIER PARCEL I Installer/Apt Wirer 05/08/2016

P.J. SPILLANE COMPANY 672.0 63.0 9.38% 540.0 80.36% 0.0 0.00%FAN PIER PARCEL I Mason Tender 05/07/2016

THE BECHT CORPORATION 2,023.0 0.0 0.00% 489.0 24.17% 0.0 0.00%FAN PIER PARCEL I Floor Layer 04/30/2016

S & F CONCRETE 26,312.5 4,780.0 18.17% 5,017.0 19.07% 1,280.0 4.86%FAN PIER PARCEL I Laborer 04/23/2016

TURNER CONSTRUCTION CO. 13,383.0 2,566.0 19.17% 5,371.0 40.13% 1,748.0 13.06%FAN PIER PARCEL I Carpenter 05/08/2016

TURNER CONSTRUCTION CO. 52,657.0 24,065.0 45.70% 13,254.0 25.17% 5,993.0 11.38%FAN PIER PARCEL I Laborer 05/08/2016

UNION STEEL ERECTORS COR 4,559.0 1,998.0 43.83% 1,664.0 36.50% 294.0 6.45%FAN PIER PARCEL I Iron Worker 05/07/2016

URBAN INSULATION 151.5 12.0 7.92% 12.0 7.92% 12.0 7.92%FAN PIER PARCEL I Asbestos Worker 06/28/2015

URBAN INSULATION 1,191.0 134.0 11.25% 190.0 15.95% 0.0 0.00%FAN PIER PARCEL I Insulator 04/03/2016

VALLEYCREST LANDSCAPE 1,563.5 0.0 0.00% 569.0 36.39% 0.0 0.00%FAN PIER PARCEL I Bricklayer 04/10/2016

VALLEYCREST LANDSCAPE 735.5 0.0 0.00% 55.0 7.48% 0.0 0.00%FAN PIER PARCEL I Equipment Opera 01/03/2016

VALLEYCREST LANDSCAPE 2,625.5 0.0 0.00% 595.0 22.66% 0.0 0.00%FAN PIER PARCEL I Laborer 04/10/2016

VER - TEX C.S.I. 985.5 468.0 47.49% 386.5 39.22% 0.0 0.00%FAN PIER PARCEL I Carpenter 04/23/2016

J.C. HIGGINS CORP. 24,683.0 3,476.0 14.08% 3,472.5 14.07% 0.0 0.00%FAN PIER PARCEL I Pipefitter 03/27/2016

TCI INSTALLATIONS INC. 1,124.0 56.0 4.98% 32.0 2.85% 0.0 0.00%FAN PIER PARCEL I Carpenter 05/07/2016

KIVA SYSTEMS INC. 6,704.0 1,443.0 21.52% 2,981.0 44.47% 64.0 0.95%FAN PIER PARCEL I Glazier 05/08/2016

HIGH POINT INTERIORS,INC. 5,006.0 648.0 12.94% 208.0 4.16% 0.0 0.00%FAN PIER PARCEL I Marble Tile Work 04/02/2016

JOHN F. SHEA CO. INC. 3,279.0 997.5 30.42% 1,449.0 44.19% 149.5 4.56%FAN PIER PARCEL I Roofer 03/05/2016

SULLIVAN & MCLAUGHLIN CO. 34,567.5 8,975.5 25.97% 6,806.5 19.69% 1,783.5 5.16%FAN PIER PARCEL I Electrician 05/08/2016

KIVA SYSTEMS INC. 6,049.5 1,685.0 27.85% 0.0 0.00% 0.0 0.00%FAN PIER PARCEL I Carpenter 01/10/2016

P.J. SPILLANE COMPANY 1,805.0 541.0 29.97% 541.0 29.97% 0.0 0.00%FAN PIER PARCEL I Bricklayer 04/18/2015

KIVA SYSTEMS INC. 7,424.0 2,468.0 33.24% 2,005.0 27.01% 0.0 0.00%FAN PIER PARCEL I Iron Worker 04/17/2016

KIVA SYSTEMS INC. 16.0 0.0 0.00% 0.0 0.00% 0.0 0.00%FAN PIER PARCEL I Sheetmetal Work 11/01/2015

M.L. MCDONALD SALES 1,241.0 56.0 4.51% 56.0 4.51% 0.0 0.00%FAN PIER PARCEL I Insulator 01/05/2016

M.L. MCDONALD SALES 3,444.0 810.0 23.52% 327.0 9.49% 0.0 0.00%FAN PIER PARCEL I Laborer 01/19/2016

M.L. MCDONALD SALES 32.0 0.0 0.00% 0.0 0.00% 0.0 0.00%FAN PIER PARCEL I Mason 10/13/2015

MANGANARO NORTHEAST LL 13,866.0 4,210.0 30.36% 2,677.0 19.31% 176.0 1.27%FAN PIER PARCEL I Carpenter 05/08/2016

MANGANARO NORTHEAST LL 2,912.0 1,968.0 67.58% 56.0 1.92% 0.0 0.00%FAN PIER PARCEL I Laborer 05/01/2016

Page 156: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 156

Project Name Trade Latest Week

NEW ENGLAND INSULATION 4,253.0 933.5 21.95% 735.0 17.28% 257.0 6.04%FAN PIER PARCEL I Insulator 06/28/2015

JOHN F. SHEA CO. INC. 267.0 52.0 19.48% 16.0 5.99% 0.0 0.00%FAN PIER PARCEL I Sheetmetal Work 01/09/2016

MCADAM PAINTING CO, INC. 14,058.0 3,866.0 27.50% 2,890.0 20.56% 1,703.0 12.11%FAN PIER PARCEL I Painter 05/06/2016

OTIS ELEVATOR COMPANY 5,802.5 0.0 0.00% 0.0 0.00% 104.0 1.79%FAN PIER PARCEL I Elev Const Helper 05/05/2016

OTIS ELEVATOR COMPANY 8,435.3 802.0 9.51% 987.0 11.70% 171.5 2.03%FAN PIER PARCEL I Elevator Const(M 05/05/2016

NEW ENGLAND FINISH SYS. 6.0 4.0 66.67% 4.0 66.67% 0.0 0.00%FAN PIER PARCEL I Laborer 10/09/2015

NEW ENGLAND FINISH SYS. 1,841.0 232.0 12.60% 174.0 9.45% 130.0 7.06%FAN PIER PARCEL I Carpenter 04/15/2016

NEW ENGLAND DECKS&FLOO 805.0 0.0 0.00% 8.0 0.99% 0.0 0.00%FAN PIER PARCEL I Mason 01/23/2016

NEW ENGLAND DECKS&FLOO 753.0 328.0 43.56% 328.0 43.56% 0.0 0.00%FAN PIER PARCEL I Laborer 01/16/2016

MELO'S RODBUSTERS 7,620.0 1,683.0 22.09% 4,131.0 54.21% 43.0 0.56%FAN PIER PARCEL I Iron Worker 04/11/2015

MCCUSKER-GILL INC. 27,007.5 5,916.5 21.91% 6,640.5 24.59% 0.0 0.00%FAN PIER PARCEL I Sheetmetal Work 05/08/2016

603,128.1 142,807.0 23.68% 125,861.0 20.87% 24,806.5 4.11%SUB TOTALS:

FAST EDDIE'S DIZZA & SUBS

$3,000Amount:

Gen Contractor: HUNTER SIGNS

(617)360-9710 120 BUSINESS STREET HYDE PARK

Est Start Date:

Est End Date:

06/07/2015

06/13/2015

HUNTER SIGNS 4.0 4.0 100.00% 4.0 100.00% 0.0 0.00%FAST EDDIE'S DIZZA & SUBS Laborer 06/13/2015

4.0 4.0 100.00% 4.0 100.00% 0.0 0.00%SUB TOTALS:

FINAL TOUCH WITH CLASS

$2,500Amount:

Gen Contractor: CAMBRIDGE REPROGRAPHIES

(617)623-2838 21 MCGRATH HGWY SOMERVILLE

Est Start Date:

Est End Date:

01/24/2016

01/30/2016

CAMBRIDGE REPROGRAPHIE 4.0 0.0 0.00% 3.0 75.00% 1.0 25.00%FINAL TOUCH WITH CLASS Laborer 01/30/2016

4.0 0.0 0.00% 3.0 75.00% 1.0 25.00%SUB TOTALS:

FOCUS REAL ESTATE

$2,000Amount:

Gen Contractor:

Est Start Date:

Est End Date:

11/27/2016

12/03/2016

D&D SIGNS INC, ABA METRO S 4.0 0.0 0.00% 2.0 50.00% 0.0 0.00%FOCUS REAL ESTATE Laborer 12/03/2016

4.0 0.0 0.00% 2.0 50.00% 0.0 0.00%SUB TOTALS:

FOUR CORNERS

$2,000,000Amount:

Gen Contractor: NAUSET CONSTRUCTION

(781)453-2220 10 KEARNEY ROAD SUITE #307 NEEDHAM

Est Start Date:

Est End Date:

11/01/2014

02/28/2016

ESI WATERPROOFING MASON 48.0 0.0 0.00% 48.0 100.00% 0.0 0.00%FOUR CORNERS Mason Tender 10/08/2016

ON- TIME CONSTRUCTIONS S 4,312.3 1,050.8 24.37% 4,312.3 100.00% 0.0 0.00%FOUR CORNERS Millwright 03/18/2017

ESI WATERPROOFING MASON 160.0 32.0 20.00% 160.0 100.00% 0.0 0.00%FOUR CORNERS Mason 10/22/2016

KLS CONCRETE INC. 4.0 0.0 0.00% 0.0 0.00% 0.0 0.00%FOUR CORNERS Carpenter 11/21/2015

KLS CONCRETE INC. 50.0 0.0 0.00% 50.0 100.00% 0.0 0.00%FOUR CORNERS Cement Finisher 01/16/2016

KLS CONCRETE INC. 168.0 40.0 23.81% 122.0 72.62% 0.0 0.00%FOUR CORNERS Laborer 11/28/2015

KONE ELEVATOR INC. 816.5 0.0 0.00% 180.0 22.05% 64.0 7.84%FOUR CORNERS Elevator Const(M 03/15/2017

Page 157: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 157

Project Name Trade Latest Week

PRO SPRAY INSULATION 710.5 28.5 4.01% 691.5 97.33% 0.0 0.00%FOUR CORNERS Insulator 11/19/2016

REDSTAR CONSTRUCTION NO 1,606.5 0.0 0.00% 135.0 8.40% 0.0 0.00%FOUR CORNERS Carpenter 03/25/2017

REDSTAR CONSTRUCTION NO 496.5 496.5 100.00% 496.5 100.00% 0.0 0.00%FOUR CORNERS Laborer 11/12/2016

RM TECHNOLOGIES 32.0 0.0 0.00% 32.0 100.00% 0.0 0.00%FOUR CORNERS Asbestos Worker 12/07/2014

RM TECHNOLOGIES 32.0 0.0 0.00% 32.0 100.00% 0.0 0.00%FOUR CORNERS Laborer 04/19/2015

VILLAGE FORGE INC. 244.0 33.3 13.63% 53.5 21.93% 0.0 0.00%FOUR CORNERS Iron Worker 03/18/2017

CONTRACT FRAMING BUILDER 14,131.0 5,651.0 39.99% 14,131.0 100.00% 2,545.5 18.01%FOUR CORNERS Laborer 02/25/2017

ESI WATERPROOFING MASON 128.0 32.0 25.00% 128.0 100.00% 0.0 0.00%FOUR CORNERS Laborer 10/22/2016

T & T FIRE PROTECTION 1,200.0 0.0 0.00% 0.0 0.00% 0.0 0.00%FOUR CORNERS Sprinkler Fitter 09/24/2016

BAYSTATE ENGINEERING COR 2,183.5 0.0 0.00% 0.0 0.00% 0.0 0.00%FOUR CORNERS Equipment Opera 06/18/2016

ENVIRONMENTAL SYS. ENG. 11,406.0 7,430.0 65.14% 8,205.0 71.94% 0.0 0.00%FOUR CORNERS Roofer 12/10/2016

ALPHA BUILDING CONSTRUCT 582.0 92.0 15.81% 92.0 15.81% 0.0 0.00%FOUR CORNERS Carpenter 10/31/2015

ALPHA BUILDING CONSTRUCT 2,454.8 1,804.3 73.50% 2,383.3 97.09% 422.5 17.21%FOUR CORNERS Laborer 01/30/2016

BAYSTATE ENGINEERING COR 3,116.5 1,385.5 44.46% 1,847.0 59.27% 649.5 20.84%FOUR CORNERS Laborer 06/18/2016

BETTER FLOORING CORP. 4,320.0 4,320.0 100.00% 4,320.0 100.00% 0.0 0.00%FOUR CORNERS Floor Layer 02/05/2017

BOSTON ROOFING 63.0 23.0 36.51% 63.0 100.00% 0.0 0.00%FOUR CORNERS Millwright 10/15/2016

COLANTUNO ELECTRICAL CO 8,054.0 2,175.0 27.01% 6,331.0 78.61% 1,390.0 17.26%FOUR CORNERS Electrician 03/25/2017

CONTRACT FRAMING BUILDER 4,780.0 97.5 2.04% 4,780.0 100.00% 0.0 0.00%FOUR CORNERS Carpenter 02/25/2017

ELLIS PAINTING CO. INC. 1,030.0 1,030.0 100.00% 1,030.0 100.00% 0.0 0.00%FOUR CORNERS Painter 02/25/2017

ENVIRONMENTAL SYS. ENG. 4,425.0 3,000.0 67.80% 3,225.0 72.88% 0.0 0.00%FOUR CORNERS HVAC 03/11/2017

DESIGN MECHANICAL INC. 6,543.5 1,654.8 25.29% 1,687.8 25.79% 445.5 6.81%FOUR CORNERS Plumber 03/25/2017

ALPHA BUILDING CONSTRUCT 351.5 0.0 0.00% 0.0 0.00% 0.0 0.00%FOUR CORNERS Cement Finisher 08/15/2015

ALPHA BUILDING CONSTRUCT 2,068.8 1,463.8 70.76% 2,068.8 100.00% 0.0 0.00%FOUR CORNERS Bricklayer 01/30/2016

BOSTON ROOFING 483.0 0.0 0.00% 400.0 82.82% 0.0 0.00%FOUR CORNERS Roofer 12/17/2016

76,000.8 31,839.8 41.89% 57,004.6 75.01% 5,517.0 7.26%SUB TOTALS:

FUTURE CHEFS

$10,000Amount:

Gen Contractor: JOHN MCGUIRE

(617)269-5183 494 E. 4TH STREET SOUTH BOSTON

Est Start Date:

Est End Date:

06/16/2014

06/19/2014

JOHN MCGUIRE DBA JOHN MC 34.0 0.0 0.00% 0.0 0.00% 0.0 0.00%FUTURE CHEFS Plumber 06/16/2014

34.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SUB TOTALS:

GALLEY EYECARE

$2,000Amount:

Gen Contractor: CAMBRIDGE REPROGRAPHIES

(617)623-2838 21 MCGRATH HGWY SOMERVILLE

Est Start Date:

Est End Date:

01/17/2016

01/23/2016

CAMBRIDGE REPROGRAPHIE 3.0 0.0 0.00% 0.0 0.00% 0.0 0.00%GALLEY EYECARE Electrician 01/23/2016

CAMBRIDGE REPROGRAPHIE 1.0 0.0 0.00% 0.0 0.00% 1.0 100.00%GALLEY EYECARE Laborer 01/23/2016

Page 158: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 158

Project Name Trade Latest Week

4.0 0.0 0.00% 0.0 0.00% 1.0 25.00%SUB TOTALS:

GARLIC N LEMONS

$20,000Amount:

Gen Contractor:

Est Start Date:

Est End Date:

04/12/2014

07/17/2014

MCLAUGHLIN BUILDING CONT 309.5 0.0 0.00% 0.0 0.00% 0.0 0.00%GARLIC N LEMONS Carpenter 05/09/2014

SIGN ART INC. 12.0 0.0 0.00% 0.0 0.00% 0.0 0.00%GARLIC N LEMONS Laborer 07/17/2014

321.5 0.0 0.00% 0.0 0.00% 0.0 0.00%SUB TOTALS:

GARRISON TROTTER NHI

$2,954,120Amount:

Gen Contractor:

Est Start Date:

Est End Date:

11/28/2016

12/31/2017

RUDY INTERNATIONAL PAINTI 656.0 656.0 100.00% 656.0 100.00% 152.0 23.17%GARRISON TROTTER NHI Painter 09/16/2017

TRUE BROTHER CONSTRUCTI 680.0 128.0 18.82% 552.0 81.18% 160.0 23.53%GARRISON TROTTER NHI Roofer 07/29/2017

TRUE BROTHER CONSTRUCTI 3,812.0 996.0 26.13% 3,668.0 96.22% 0.0 0.00%GARRISON TROTTER NHI Carpenter 09/09/2017

T & P CONTRACTING, INC. 208.0 208.0 100.00% 208.0 100.00% 0.0 0.00%GARRISON TROTTER NHI Cement Laborer 07/29/2017

T & P CONTRACTING, INC. 392.0 312.0 79.59% 216.0 55.10% 0.0 0.00%GARRISON TROTTER NHI Cement Finisher 07/29/2017

LOWE PLUMB & HEATING 1,116.5 852.5 76.35% 1,116.5 100.00% 0.0 0.00%GARRISON TROTTER NHI Plumber 09/16/2017

C & S HEATING AND AC SERVI 496.0 0.0 0.00% 496.0 100.00% 0.0 0.00%GARRISON TROTTER NHI HVAC 09/16/2017

ATLANTIC EXCAVATION & UTIL 568.0 568.0 100.00% 0.0 0.00% 0.0 0.00%GARRISON TROTTER NHI Equipment Opera 09/16/2017

A & R LANDSCAPING 272.0 272.0 100.00% 272.0 100.00% 88.0 32.35%GARRISON TROTTER NHI Laborer 09/02/2017

NHK ELECTRIC 704.0 696.0 98.86% 704.0 100.00% 0.0 0.00%GARRISON TROTTER NHI Electrician 09/16/2017

8,904.5 4,688.5 52.65% 7,888.5 88.59% 400.0 4.49%SUB TOTALS:

GAVIN FOUNDATION / CUSHING HOUS

$8,000Amount:

Gen Contractor:

Est Start Date:

Est End Date:

04/01/2014

05/31/2014

LEVINE CONTRACTING 83.0 13.0 15.66% 0.0 0.00% 0.0 0.00%GAVIN FOUNDATION / CUSHING Painter 04/12/2014

83.0 13.0 15.66% 0.0 0.00% 0.0 0.00%SUB TOTALS:

GAVIN HOUSE

$20,000Amount:

Gen Contractor: LEVINE CONTRACTING

(617)504-6558 19 HODGDON TERR WEST ROXBURY

Est Start Date:

Est End Date:

06/06/2016

06/24/2016

LEVINE CONTRACTING 270.0 270.0 100.00% 120.0 44.44% 0.0 0.00%GAVIN HOUSE Carpenter 06/24/2016

270.0 270.0 100.00% 120.0 44.44% 0.0 0.00%SUB TOTALS:

GE HEADQUARTERS CAMPUS PROJE

$195,000,000Amount:

Gen Contractor: SUFFOLK CONSTRUCTION CO.

(617)445-3500 64 ALLERTON STREET roxbury

Est Start Date:

Est End Date:

05/01/2017

05/30/2018

LIBERTY CONST. SERVICES 196.0 32.0 16.33% 0.0 0.00% 0.0 0.00%GE HEADQUARTERS CAMPUS P Carpenter 05/31/2017

LIBERTY CONST. SERVICES 761.0 761.0 100.00% 0.0 0.00% 0.0 0.00%GE HEADQUARTERS CAMPUS P Equipment Opera 09/03/2017

LCN / E, G, SAWYER CO 196.0 64.0 32.65% 104.0 53.06% 0.0 0.00%GE HEADQUARTERS CAMPUS P Technician 06/01/2017

Page 159: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 159

Project Name Trade Latest Week

J. DERENZO CO. 242.0 145.5 60.12% 0.0 0.00% 0.0 0.00%GE HEADQUARTERS CAMPUS P Laborer 09/09/2017

J. DERENZO CO. 137.5 8.0 5.82% 8.0 5.82% 8.0 5.82%GE HEADQUARTERS CAMPUS P Equipment Opera 09/09/2017

EDWARD G. SAWYER CO. 322.0 0.0 0.00% 68.0 21.12% 0.0 0.00%GE HEADQUARTERS CAMPUS P Electrician 06/19/2017

LIBERTY CONST. SERVICES 277.0 85.0 30.69% 53.0 19.13% 0.0 0.00%GE HEADQUARTERS CAMPUS P Laborer 05/31/2017

2,131.5 1,095.5 51.40% 233.0 10.93% 8.0 0.38%SUB TOTALS:

GEORGETOWN I & II

$2,000,000Amount:

Gen Contractor: SUFFOLK CONSTRUCTION CO.

(617)445-3500 64 ALLERTON STREET roxbury

Est Start Date:

Est End Date:

05/01/2013

05/31/2015

THE PAPPAS COMPANY, INC 24.0 16.0 66.67% 16.0 66.67% 0.0 0.00%GEORGETOWN I & II Carpenter 11/23/2013

NEW FINISH SYSTEMS LLC 273.0 225.0 82.42% 96.0 35.16% 0.0 0.00%GEORGETOWN I & II Plasterer 12/01/2013

LIBERTY CONST. SERVICES 15,292.0 5,277.5 34.51% 2,984.5 19.52% 0.0 0.00%GEORGETOWN I & II Carpenter 04/19/2015

LIBERTY CONST. SERVICES 773.5 317.0 40.98% 106.0 13.70% 0.0 0.00%GEORGETOWN I & II Cement Finisher 08/24/2014

LIBERTY CONST. SERVICES 10,603.5 1,642.0 15.49% 8,029.5 75.72% 631.0 5.95%GEORGETOWN I & II Laborer 04/19/2015

K & K ACOUSTICAL CEILINGS 8.0 0.0 0.00% 0.0 0.00% 0.0 0.00%GEORGETOWN I & II Carpenter 01/12/2014

LIBERTY CONST. SERVICES 5,443.0 1,189.5 21.85% 1,084.5 19.92% 111.0 2.04%GEORGETOWN I & II Taper 04/19/2015

METROPOLITAN MASONRY IN 2,280.5 251.0 11.01% 350.5 15.37% 0.0 0.00%GEORGETOWN I & II Waterproofer 11/23/2014

MIW CORP 188.0 104.0 55.32% 24.0 12.77% 0.0 0.00%GEORGETOWN I & II Iron Worker 09/20/2014

NCM CONTRACTING GROUP, L 10,356.0 2,978.5 28.76% 7,913.0 76.41% 0.0 0.00%GEORGETOWN I & II Asbestos Worker 11/22/2014

PRO CUT CONCRETE CUTTIN 1,733.0 312.0 18.00% 1,053.0 60.76% 0.0 0.00%GEORGETOWN I & II Laborer 12/27/2014

QUALITY AIR METALS, INC. 8,451.0 2,395.0 28.34% 1,971.0 23.32% 0.0 0.00%GEORGETOWN I & II Sheetmetal Work 03/28/2015

SHAMROCK CONSTRUCTION 3,795.7 3,292.2 86.73% 216.5 5.70% 0.0 0.00%GEORGETOWN I & II Laborer 09/28/2014

SOEP PAINTING CORP. 4,592.0 2,217.0 48.28% 854.0 18.60% 3,118.0 67.90%GEORGETOWN I & II Painter 03/08/2015

STEELCO FENCING 456.0 80.0 17.54% 384.0 84.21% 48.0 10.53%GEORGETOWN I & II Laborer 09/27/2014

THE CHEVIOT CORPORATION 24.0 0.0 0.00% 0.0 0.00% 0.0 0.00%GEORGETOWN I & II Glazier 12/13/2013

US EXTERIORS, INC. 66,242.5 25,626.5 38.69% 44,540.5 67.24% 1,464.5 2.21%GEORGETOWN I & II Carpenter 02/14/2015

J.M. ELECTRICAL CO. INC. 2,565.0 2,469.0 96.26% 520.0 20.27% 0.0 0.00%GEORGETOWN I & II Electrician 03/27/2015

AXION SPECIALTY CONTRACTI 4,926.0 1,290.0 26.19% 138.0 2.80% 2,241.0 45.49%GEORGETOWN I & II Insulator 03/29/2015

THE CHEVIOT CORPORATION 24.0 0.0 0.00% 0.0 0.00% 0.0 0.00%GEORGETOWN I & II Carpenter 12/13/2013

CAVALIERI CONSTRUCTION C 158.0 0.0 0.00% 0.0 0.00% 0.0 0.00%GEORGETOWN I & II Bricklayer 06/21/2014

ALBANESE BROTHERS 245.5 245.5 100.00% 245.5 100.00% 0.0 0.00%GEORGETOWN I & II Equipment Opera 07/12/2014

ALBANESE BROTHERS 245.5 0.0 0.00% 245.5 100.00% 0.0 0.00%GEORGETOWN I & II Laborer 07/12/2014

ALBANESE BROTHERS 8.0 0.0 0.00% 0.0 0.00% 0.0 0.00%GEORGETOWN I & II Utility Operator 07/19/2014

ALLIED PAVING CORPORATIO 14.5 0.0 0.00% 0.0 0.00% 0.0 0.00%GEORGETOWN I & II Asphalt Raker 11/16/2013

J.C. FLOOR COVERING INC. 612.0 167.0 27.29% 494.0 80.72% 0.0 0.00%GEORGETOWN I & II Floor Layer 04/11/2014

CAVALIERI CONSTRUCTION C 3,492.5 0.0 0.00% 0.0 0.00% 56.0 1.60%GEORGETOWN I & II Equipment Opera 03/07/2015

Page 160: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 160

Project Name Trade Latest Week

AFFORDABLE BUSINESS SOLU 1,400.0 0.0 0.00% 1,400.0 100.00% 533.0 38.07%GEORGETOWN I & II Asbestos Worker 07/27/2014

CAVALIERI CONSTRUCTION C 7,733.0 4,137.0 53.50% 1,465.5 18.95% 582.0 7.53%GEORGETOWN I & II Laborer 03/07/2015

CHILDSCAPES 747.3 243.8 32.62% 243.8 32.62% 243.8 32.62%GEORGETOWN I & II Laborer 09/27/2014

INSUL-PRO INSULATION CO. 2,001.5 16.0 0.80% 861.5 43.04% 868.5 43.39%GEORGETOWN I & II Insulator 04/05/2015

ALLIED PAVING CORPORATIO 14.5 0.0 0.00% 0.0 0.00% 0.0 0.00%GEORGETOWN I & II Equipment Opera 11/16/2013

J & J CONSTRUCTION 306.0 0.0 0.00% 0.0 0.00% 0.0 0.00%GEORGETOWN I & II Carpenter 08/30/2014

CRUZ ELECTRIC CO. 14,481.0 8,495.0 58.66% 1,460.0 10.08% 1,586.0 10.95%GEORGETOWN I & II Electrician 03/28/2015

FRONT LINE INC. 320.0 152.0 47.50% 280.0 87.50% 216.0 67.50%GEORGETOWN I & II Laborer 10/11/2014

EMANOUIL BROTHERS INC. 4,026.0 1,147.5 28.50% 684.0 16.99% 1,147.5 28.50%GEORGETOWN I & II Laborer 12/06/2014

EAST COAST INTERIORS CO. 42,899.0 14,619.5 34.08% 14,087.5 32.84% 2,475.5 5.77%GEORGETOWN I & II Carpenter 02/28/2015

E. M. DUGGAN INC. 600.0 288.0 48.00% 288.0 48.00% 0.0 0.00%GEORGETOWN I & II Sprinkler Fitter 09/14/2014

E. M. DUGGAN INC. 11,237.0 1,648.0 14.67% 148.0 1.32% 236.0 2.10%GEORGETOWN I & II Plumber 04/26/2015

E. M. DUGGAN INC. 19,065.0 12,754.0 66.90% 2,748.0 14.41% 618.0 3.24%GEORGETOWN I & II Pipefitter 04/26/2015

247,656.9 93,595.4 37.79% 94,932.3 38.33% 16,175.8 6.53%SUB TOTALS:

GLENWAY ROXTON NHI

$1,452,000Amount:

Gen Contractor: ONE WAY DEVELOPMENT INC.

(617)390-5469 67 KEMBLE STREET SUITE 1 boston

Est Start Date:

Est End Date:

07/05/2017

02/15/2018

ONE WAY DEVELOPMENT INC. 1,080.0 1,080.0 100.00% 1,080.0 100.00% 0.0 0.00%GLENWAY ROXTON NHI Cement Laborer 09/17/2017

ONE WAY DEVELOPMENT INC. 288.0 0.0 0.00% 288.0 100.00% 0.0 0.00%GLENWAY ROXTON NHI Carpenter 09/17/2017

1,368.0 1,080.0 78.95% 1,368.0 100.00% 0.0 0.00%SUB TOTALS:

GREAT SPACES

$2,500Amount:

Gen Contractor: THE SIGN CENTER INC.

(978)372-3721 40 DORCHESTER STREET haver hill

Est Start Date:

Est End Date:

10/05/2015

10/09/2015

THE SIGN CENTER INC. 5.0 0.0 0.00% 5.0 100.00% 0.0 0.00%GREAT SPACES Laborer 10/09/2015

5.0 0.0 0.00% 5.0 100.00% 0.0 0.00%SUB TOTALS:

GREATER ASHMONT MAIN STREET B

$3,000Amount:

Gen Contractor: SRP SIGN CORP.

(617)623-6222 236 PEARL STREET SOMERVILLE

Est Start Date:

Est End Date:

04/11/2016

04/20/2016

SRP SIGN CORP. 3.0 0.0 0.00% 1.5 50.00% 0.0 0.00%GREATER ASHMONT MAIN STR Laborer 04/15/2016

3.0 0.0 0.00% 1.5 50.00% 0.0 0.00%SUB TOTALS:

GREATER BOSTON CHINESE GOLDEN

$15,000Amount:

Gen Contractor: CENTRAL COOLING & HEATING

234 PLEASANT STREET NORWOOD

Est Start Date:

Est End Date:

01/01/2014

02/28/2014

CENTRAL COOLING & HEATIN 51.3 0.0 0.00% 0.0 0.00% 0.0 0.00%GREATER BOSTON CHINESE G Plumber 01/15/2014

51.3 0.0 0.00% 0.0 0.00% 0.0 0.00%SUB TOTALS:

Page 161: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 161

Project Name Trade Latest Week

GROOVY BABY MUSIC

$2,500Amount:

Gen Contractor: EXCEL SIGNS & DECORATION CORP.

(617)479-8552 259 QUINCY AVE. QUINCY

Est Start Date:

Est End Date:

12/21/2014

12/27/2014

EXCEL SIGNS & DECORATION 6.0 0.0 0.00% 6.0 100.00% 3.0 50.00%GROOVY BABY MUSIC Laborer 12/27/2014

6.0 0.0 0.00% 6.0 100.00% 3.0 50.00%SUB TOTALS:

GROUS HALL

$40,000Amount:

Gen Contractor: COLLABORATIVE CONTRACTORS GROUP

(617)594-6767 16 HANCOCK COURT BOSTON

Est Start Date:

Est End Date:

05/01/2014

06/30/2014

COLLABORATIVE CONTRACTO 120.0 0.0 0.00% 0.0 0.00% 0.0 0.00%GROUS HALL Carpenter 05/23/2014

COLLABORATIVE CONTRACTO 240.0 240.0 100.00% 120.0 50.00% 0.0 0.00%GROUS HALL Laborer 05/23/2014

360.0 240.0 66.67% 120.0 33.33% 0.0 0.00%SUB TOTALS:

HALEY HOUSE

$20,000Amount:

Gen Contractor: SORDILLO ELECTRIC CO., INC.

(617)389-5216 5 SAWYER LANE MIDDLETON

Est Start Date:

Est End Date:

08/08/2016

08/19/2016

SORDILLO ELECTRIC CO., INC. 80.0 0.0 0.00% 0.0 0.00% 0.0 0.00%HALEY HOUSE Electrician 08/19/2016

T &T MECHANICA 51.0 0.0 0.00% 0.0 0.00% 0.0 0.00%HALEY HOUSE HVAC 08/22/2015

131.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SUB TOTALS:

HAPPY MARKET

$62,500Amount:

Gen Contractor: THE BEVERLY CONSTRUCTION COMPANY

(617)416-8931 8 BLOOMFIELD STREET dorchester

Est Start Date:

Est End Date:

07/28/2014

10/14/2014

EXCEL SIGNS & DECORATION 12.0 0.0 0.00% 12.0 100.00% 4.0 33.33%HAPPY MARKET Laborer 10/18/2014

THE BEVERLY CONSTRUCTIO 648.0 540.0 83.33% 648.0 100.00% 0.0 0.00%HAPPY MARKET Carpenter 09/26/2014

THE BEVERLY CONSTRUCTIO 256.0 256.0 100.00% 256.0 100.00% 0.0 0.00%HAPPY MARKET Laborer 09/26/2014

EMMANUEL STUCCO CONSTR 46.0 22.0 47.83% 46.0 100.00% 0.0 0.00%HAPPY MARKET Laborer 08/01/2014

962.0 818.0 85.03% 962.0 100.00% 4.0 0.42%SUB TOTALS:

HARMON APARTMENTS

$118,000,000Amount:

Gen Contractor:

Est Start Date:

Est End Date:

06/01/2017

06/17/2018

JEREZ LLC 345.0 345.0 100.00% 345.0 100.00% 345.0 100.00%HARMON APARTMENTS Laborer 09/09/2017

W. L. FRENCH EXCAVATING 990.0 120.0 12.12% 136.0 13.74% 176.5 17.83%HARMON APARTMENTS Equipment Opera 09/16/2017

W. L. FRENCH EXCAVATING 1,294.5 854.5 66.01% 358.0 27.66% 0.0 0.00%HARMON APARTMENTS Laborer 09/16/2017

2,629.5 1,319.5 50.18% 839.0 31.91% 521.5 19.83%SUB TOTALS:

HARRISON TOWER

$18,370,000Amount:

Gen Contractor: DIMEO CONSTRUCTION CO.

(401)781-9800 75 CHAPMAN ST. PROVIDENCE

Est Start Date:

Est End Date:

12/01/2014

05/30/2016

J. K. GLASS CO. INC. 3,234.0 294.5 9.11% 294.5 9.11% 0.0 0.00%HARRISON TOWER Carpenter 01/24/2016

DIMEO CONSTRUCTION CO. 5,411.0 2,981.5 55.10% 4,497.0 83.11% 861.5 15.92%HARRISON TOWER Laborer 03/06/2016

JOHN F. SHEA CO. INC. 211.0 68.0 32.23% 16.0 7.58% 0.0 0.00%HARRISON TOWER Sheetmetal Work 03/12/2016

Page 162: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 162

Project Name Trade Latest Week

UNITED H.V.A.C. COMPANY, IN 1,796.0 390.0 21.71% 318.0 17.71% 0.0 0.00%HARRISON TOWER Sheetmetal Work 03/27/2016

JOHN F. SHEA CO. INC. 1,430.0 429.0 30.00% 540.5 37.80% 0.0 0.00%HARRISON TOWER Roofer 03/12/2016

JEREZ LLC 466.5 426.5 91.43% 466.5 100.00% 176.0 37.73%HARRISON TOWER Laborer 11/21/2015

M.L. MCDONALD SALES 48.0 0.0 0.00% 0.0 0.00% 0.0 0.00%HARRISON TOWER Laborer 10/13/2015

J. K. GLASS CO. INC. 1,929.0 783.5 40.62% 1,285.0 66.61% 0.0 0.00%HARRISON TOWER Glazier 02/21/2016

NEWROADS ENVIRONMENTAL 6,575.0 824.0 12.53% 6,575.0 100.00% 64.0 0.97%HARRISON TOWER Laborer 02/06/2016

J. DERENZO CO. 120.0 0.0 0.00% 50.0 41.67% 0.0 0.00%HARRISON TOWER Laborer 12/12/2015

J.C. FLOOR COVERING INC. 2,016.0 191.0 9.47% 434.0 21.53% 109.0 5.41%HARRISON TOWER Floor Layer 04/01/2016

MARGUERITE CONCRETE 16.0 0.0 0.00% 0.0 0.00% 0.0 0.00%HARRISON TOWER Cement Finisher 06/27/2015

MARGUERITE CONCRETE 12.0 0.0 0.00% 0.0 0.00% 0.0 0.00%HARRISON TOWER Equipment Opera 07/18/2015

MURPHY SPECIALTIES, INC. 172.0 92.0 53.49% 0.0 0.00% 0.0 0.00%HARRISON TOWER Sheetmetal Work 10/24/2015

S.O.S. CORPORATION 1,862.0 1,449.0 77.82% 1,681.0 90.28% 144.0 7.73%HARRISON TOWER Laborer 02/07/2016

SENICES ENTERPRISES INC 3,424.0 3,424.0 100.00% 3,424.0 100.00% 0.0 0.00%HARRISON TOWER Painter 03/05/2016

SHILOH STEEL ERECTORS, IN 892.0 388.0 43.50% 24.0 2.69% 0.0 0.00%HARRISON TOWER Iron Worker 12/22/2015

STANLEY ELEVATOR 707.0 0.0 0.00% 0.0 0.00% 0.0 0.00%HARRISON TOWER Elev Const Helper 01/22/2016

STANLEY ELEVATOR 767.0 0.0 0.00% 0.0 0.00% 0.0 0.00%HARRISON TOWER Elevator Const(M 01/22/2016

THERMO DYNAMICS INTERNA. 420.0 279.0 66.43% 74.0 17.62% 32.0 7.62%HARRISON TOWER Insulator 03/05/2016

J. DERENZO CO. 80.0 8.0 10.00% 0.0 0.00% 0.0 0.00%HARRISON TOWER Equipment Opera 06/13/2015

MARGUERITE CONCRETE 45.0 0.0 0.00% 23.0 51.11% 0.0 0.00%HARRISON TOWER Laborer 01/23/2016

ACME WATERPROOFING CO,I 126.0 0.0 0.00% 0.0 0.00% 0.0 0.00%HARRISON TOWER Laborer 12/26/2015

EMANOUIL BROTHERS INC. 540.0 0.0 0.00% 4.0 0.74% 0.0 0.00%HARRISON TOWER Laborer 06/18/2016

ACME WATERPROOFING CO,I 1,680.0 40.0 2.38% 704.0 41.90% 416.0 24.76%HARRISON TOWER Bricklayer 04/02/2016

IKE ELECTRIC, INC. 231.0 0.0 0.00% 0.0 0.00% 0.0 0.00%HARRISON TOWER Electrician 04/09/2016

ALLAN CONSTRUCTION INC. 841.0 686.0 81.57% 131.0 15.58% 0.0 0.00%HARRISON TOWER Carpenter 03/04/2016

CARLYSLE ENGINEERING INC. 1,418.0 131.0 9.24% 120.0 8.46% 0.0 0.00%HARRISON TOWER Sprinkler Fitter 03/04/2016

CLIFFORD & GALVIN COTRACT 4,870.0 1,210.0 24.85% 296.0 6.08% 0.0 0.00%HARRISON TOWER Carpenter 02/19/2016

CLIFFORD & GALVIN COTRACT 671.0 0.0 0.00% 0.0 0.00% 0.0 0.00%HARRISON TOWER Laborer 12/25/2015

CONTROL TECHNOLOGIES, IN 17.0 0.0 0.00% 0.0 0.00% 0.0 0.00%HARRISON TOWER Pipefitter 01/02/2016

CONTROL TECHNOLOGIES, IN 16.0 0.0 0.00% 0.0 0.00% 0.0 0.00%HARRISON TOWER Plumber 04/16/2016

CRUZ ELECTRIC CO. 7,737.5 2,879.5 37.21% 2,250.5 29.09% 0.0 0.00%HARRISON TOWER Electrician 05/14/2016

GENERAL AIR COND & HEAT 4.0 0.0 0.00% 0.0 0.00% 0.0 0.00%HARRISON TOWER Insulator 06/20/2015

CRUZ ELECTRIC CO. 8.0 0.0 0.00% 0.0 0.00% 0.0 0.00%HARRISON TOWER Technician 10/10/2015

GENERAL AIR COND & HEAT 3,847.5 2,037.0 52.94% 1,966.0 51.10% 71.0 1.85%HARRISON TOWER Pipefitter 03/05/2016

GENERAL AIR COND & HEAT 88.0 88.0 100.00% 88.0 100.00% 0.0 0.00%HARRISON TOWER Electrician 02/20/2016

Page 163: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 163

Project Name Trade Latest Week

FIRST CHOICE FINISHES 1,771.0 315.0 17.79% 37.0 2.09% 0.0 0.00%HARRISON TOWER Taper 02/21/2016

FEDERAL CONCRETE 286.5 0.0 0.00% 22.0 7.68% 0.0 0.00%HARRISON TOWER Laborer 01/30/2016

FEDERAL CONCRETE 20.0 18.0 90.00% 18.0 90.00% 0.0 0.00%HARRISON TOWER Iron Worker 06/20/2015

FEDERAL CONCRETE 105.0 0.0 0.00% 0.0 0.00% 0.0 0.00%HARRISON TOWER Carpenter 01/23/2016

DYNAMIC INSULATION 256.0 101.0 39.45% 77.0 30.08% 0.0 0.00%HARRISON TOWER Insulator 12/20/2015

DIMEO CONSTRUCTION CO. 5,505.0 2,438.0 44.29% 1,343.0 24.40% 810.0 14.71%HARRISON TOWER Carpenter 02/28/2016

D J PLUMBING & HEATING 3,321.0 832.0 25.05% 832.0 25.05% 0.0 0.00%HARRISON TOWER Plumber 03/06/2016

64,993.0 22,803.5 35.09% 27,591.0 42.45% 2,683.5 4.13%SUB TOTALS:

HARVARD SCIENCE ENGINEERING CO

$380,922,575Amount:

Gen Contractor: TURNER CONSTRUCTION CO.

(617)247-6400 TWO SEAPORT LANE BOSTON

Est Start Date:

Est End Date:

07/25/2016

04/30/2020

THE AULSON COMPANY, LLC 504.0 240.0 47.62% 504.0 100.00% 240.0 47.62%HARVARD SCIENCE ENGINEERI Wrecker 10/08/2016

S & F CONCRETE 67.5 0.0 0.00% 0.0 0.00% 0.0 0.00%HARVARD SCIENCE ENGINEERI Equipment Opera 09/16/2017

MARR SCAFFOLDING COMPAN 2,053.0 771.0 37.55% 32.0 1.56% 0.0 0.00%HARVARD SCIENCE ENGINEERI Laborer 08/27/2017

MARR SCAFFOLDING COMPAN 8.0 8.0 100.00% 8.0 100.00% 0.0 0.00%HARVARD SCIENCE ENGINEERI Welder 04/30/2017

NEWROADS ENVIRONMENTAL 336.0 0.0 0.00% 336.0 100.00% 0.0 0.00%HARVARD SCIENCE ENGINEERI Laborer 02/11/2017

PRO CUT CONCRETE CUTTIN 3,824.0 352.0 9.21% 712.0 18.62% 0.0 0.00%HARVARD SCIENCE ENGINEERI Laborer 09/16/2017

S & F CONCRETE 79.0 8.0 10.13% 79.0 100.00% 0.0 0.00%HARVARD SCIENCE ENGINEERI Carpenter 09/16/2017

S & F CONCRETE 80.0 51.5 64.38% 61.0 76.25% 0.0 0.00%HARVARD SCIENCE ENGINEERI Cement Finisher 09/16/2017

MARR SCAFFOLDING COMPAN 490.0 207.0 42.24% 207.0 42.24% 0.0 0.00%HARVARD SCIENCE ENGINEERI Carpenter 08/27/2017

S & F CONCRETE 713.0 162.0 22.72% 235.5 33.03% 0.0 0.00%HARVARD SCIENCE ENGINEERI Laborer 09/16/2017

SILVERBACKCONCRETE CON 91.5 0.0 0.00% 0.0 0.00% 0.0 0.00%HARVARD SCIENCE ENGINEERI Cement Finisher 05/06/2017

SILVERBACKCONCRETE CON 147.5 0.0 0.00% 16.0 10.85% 0.0 0.00%HARVARD SCIENCE ENGINEERI Cement Laborer 05/06/2017

SULLIVAN & MCLAUGHLIN CO. 2,498.0 1,871.0 74.90% 272.0 10.89% 602.5 24.12%HARVARD SCIENCE ENGINEERI Electrician 09/17/2017

AAXIOM CONCRETE CUTTING 560.0 0.0 0.00% 0.0 0.00% 0.0 0.00%HARVARD SCIENCE ENGINEERI Laborer 03/26/2017

THE AULSON COMPANY, LLC 1,421.5 173.0 12.17% 689.0 48.47% 170.0 11.96%HARVARD SCIENCE ENGINEERI Laborer 03/18/2017

LUND REBAR SERVICES, INC. 1,695.0 222.0 13.10% 772.0 45.55% 55.0 3.24%HARVARD SCIENCE ENGINEERI Iron Worker 07/23/2017

TURNER CONSTRUCTION CO. 17,639.5 13,192.0 74.79% 8,576.0 48.62% 2,853.0 16.17%HARVARD SCIENCE ENGINEERI Carpenter 09/17/2017

TURNER CONSTRUCTION CO. 26,976.0 11,358.0 42.10% 12,519.0 46.41% 3,784.0 14.03%HARVARD SCIENCE ENGINEERI Laborer 09/17/2017

THE AULSON COMPANY, LLC 122.0 0.0 0.00% 122.0 100.00% 0.0 0.00%HARVARD SCIENCE ENGINEERI Asbestos Worker 08/27/2016

CHAPMAN WATERPROOFING 308.0 0.0 0.00% 184.0 59.74% 0.0 0.00%HARVARD SCIENCE ENGINEERI Waterproofer 05/01/2017

ACCORD STEEL & PRECAST 31,303.0 12,573.0 40.17% 11,488.0 36.70% 3,305.0 10.56%HARVARD SCIENCE ENGINEERI Iron Worker 09/19/2017

ACCORD STEEL & PRECAST 3,386.5 1,506.5 44.49% 0.0 0.00% 0.0 0.00%HARVARD SCIENCE ENGINEERI Equipment Opera 09/19/2017

ACCORD STEEL & PRECAST 1,064.0 268.0 25.19% 880.0 82.71% 0.0 0.00%HARVARD SCIENCE ENGINEERI Oiler 09/19/2017

AMERICAN PLUMBING HEATIN 80.0 0.0 0.00% 0.0 0.00% 0.0 0.00%HARVARD SCIENCE ENGINEERI Plumber 09/15/2017

Page 164: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 164

Project Name Trade Latest Week

JOHN A . PENNEY ELECTRIC 2,875.0 1,224.0 42.57% 827.0 28.77% 1,043.0 36.28%HARVARD SCIENCE ENGINEERI Electrician 04/23/2017

CHAPMAN WATERPROOFING 96.0 64.0 66.67% 0.0 0.00% 0.0 0.00%HARVARD SCIENCE ENGINEERI Laborer 04/17/2017

COMPOSITE COMPANY INC. 110.0 24.0 21.82% 56.0 50.91% 0.0 0.00%HARVARD SCIENCE ENGINEERI Iron Worker 09/16/2017

DANIEL MARR & SON CO. 460.0 238.0 51.74% 108.0 23.48% 69.0 15.00%HARVARD SCIENCE ENGINEERI Iron Worker 10/02/2016

J. C. CANNISTRARO INC. 152.0 32.0 21.05% 136.0 89.47% 0.0 0.00%HARVARD SCIENCE ENGINEERI Sprinkler Fitter 09/17/2017

AZTEC STEEL INC. 313.0 254.0 81.15% 254.0 81.15% 0.0 0.00%HARVARD SCIENCE ENGINEERI Iron Worker 09/16/2017

JDC DEMOLITION COMPANY, I 2,585.0 48.0 1.86% 48.0 1.86% 0.0 0.00%HARVARD SCIENCE ENGINEERI Equipment Opera 07/15/2017

FRED SALVUCCI CORP. 158.5 0.0 0.00% 26.0 16.40% 0.0 0.00%HARVARD SCIENCE ENGINEERI Bricklayer 08/12/2017

J. C. CANNISTRARO INC. 226.0 0.0 0.00% 18.0 7.96% 0.0 0.00%HARVARD SCIENCE ENGINEERI Pipefitter 09/17/2017

HARRINGTON AIR. 500.0 104.0 20.80% 104.0 20.80% 0.0 0.00%HARVARD SCIENCE ENGINEERI Sheetmetal Work 09/17/2017

H. CARR & SONS INC. 781.0 0.0 0.00% 24.0 3.07% 0.0 0.00%HARVARD SCIENCE ENGINEERI Plasterer 09/15/2017

H. CARR & SONS INC. 2,637.0 706.0 26.77% 1,314.0 49.83% 0.0 0.00%HARVARD SCIENCE ENGINEERI Laborer 09/15/2017

FRED SALVUCCI CORP. 135.0 0.0 0.00% 135.0 100.00% 0.0 0.00%HARVARD SCIENCE ENGINEERI Mason Tender 08/19/2017

JDC DEMOLITION COMPANY, I 16,923.0 5,249.0 31.02% 7,781.0 45.98% 1,800.0 10.64%HARVARD SCIENCE ENGINEERI Laborer 09/16/2017

123,398.5 50,906.0 41.25% 48,523.5 39.32% 13,921.5 11.28%SUB TOTALS:

HATTIE B. COOPER

$20,000Amount:

Gen Contractor:

Est Start Date:

Est End Date:

09/07/2015

09/11/2015

MCR CONSTRUCTION INC. 112.0 32.0 28.57% 112.0 100.00% 40.0 35.71%HATTIE B. COOPER Carpenter 09/11/2015

MCR CONSTRUCTION INC. 40.0 0.0 0.00% 40.0 100.00% 0.0 0.00%HATTIE B. COOPER Electrician 09/11/2015

152.0 32.0 21.05% 152.0 100.00% 40.0 26.32%SUB TOTALS:

HELM RESIDENTIAL

$2,500Amount:

Gen Contractor: INSTANT SIGN CENTER

(781)278-0150 508 BOSTON PRVIDANCE NORWOOD

Est Start Date:

Est End Date:

01/01/2014

03/31/2014

INSTANT SIGN CENTER 15.0 0.0 0.00% 0.0 0.00% 0.0 0.00%HELM RESIDENTIAL Laborer 01/10/2014

15.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SUB TOTALS:

HIAWATHA ROAD

$754,404Amount:

Gen Contractor:

Est Start Date:

Est End Date:

12/01/2016

03/31/2018

ONE WAY DEVELOPMENT INC. 160.0 0.0 0.00% 160.0 100.00% 0.0 0.00%HIAWATHA ROAD Plumber 04/16/2017

ONE WAY DEVELOPMENT INC. 2,520.0 0.0 0.00% 2,520.0 100.00% 0.0 0.00%HIAWATHA ROAD Carpenter 04/16/2017

ONE WAY DEVELOPMENT INC. 2,064.0 2,064.0 100.00% 2,064.0 100.00% 0.0 0.00%HIAWATHA ROAD Cement Laborer 04/16/2017

ONE WAY DEVELOPMENT INC. 176.0 88.0 50.00% 176.0 100.00% 0.0 0.00%HIAWATHA ROAD Electrician 04/16/2017

4,920.0 2,152.0 43.74% 4,920.0 100.00% 0.0 0.00%SUB TOTALS:

HIGHLAND PARK, IMP. TO

$441,800Amount:

Gen Contractor: AQUA LINE UTILITY, INC.

781/ 585-550 268 WASHINGTON STREET east bridgewate

Est Start Date:

Est End Date:

06/04/2013

11/04/2013

Page 165: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 165

Project Name Trade Latest Week

AQUA LINE UTILITY, INC. 104.0 104.0 100.00% 0.0 0.00% 0.0 0.00%HIGHLAND PARK, IMP. TO Laborer 05/31/2014

UNIVERSAL ABATEMENT SER 3,530.0 528.0 14.96% 3,530.0 100.00% 0.0 0.00%HIGHLAND PARK, IMP. TO Asbestos Worker 05/03/2014

3,634.0 632.0 17.39% 3,530.0 97.14% 0.0 0.00%SUB TOTALS:

HISTORIC GRAVE MARKERS CONSER

$1Amount:

Gen Contractor: BUILDING AND MONUMENT CONSERVATION

7816411603 83 SCHOOL STREET Arlington

Est Start Date:

Est End Date:

02/01/2014

06/30/2014

BUILDING AND MONUMENT CO 1,105.8 0.0 0.00% 0.0 0.00% 0.0 0.00%HISTORIC GRAVE MARKERS CO Laborer 08/08/2014

1,105.8 0.0 0.00% 0.0 0.00% 0.0 0.00%SUB TOTALS:

HOMESTEAD BAKERY

$5,000Amount:

Gen Contractor: HUNTER SIGNS

(617)360-9710 120 BUSINESS STREET HYDE PARK

Est Start Date:

Est End Date:

10/18/2015

10/24/2015

HUNTER SIGNS 2.0 2.0 100.00% 2.0 100.00% 0.0 0.00%HOMESTEAD BAKERY Laborer 10/24/2015

2.0 2.0 100.00% 2.0 100.00% 0.0 0.00%SUB TOTALS:

HONG LOK

$14,000,000Amount:

Gen Contractor: WALSH BROTHERS INC.

(617)878-4800 210 COMMERCIAL STREET BOSTON

Est Start Date:

Est End Date:

08/01/2011

08/31/2014

S & F CONCRETE 138.0 126.0 91.30% 120.0 86.96% 76.0 55.07%HONG LOK Carpenter 09/20/2014

MERRIMAC TILE CO,INC. 8.0 0.0 0.00% 0.0 0.00% 0.0 0.00%HONG LOK Carpet Layer 08/26/2014

MIDDLESEX INTERIORS INC. 930.0 180.5 19.41% 340.5 36.61% 0.0 0.00%HONG LOK Carpenter 03/22/2015

K & K ACOUSTICAL CEILINGS 210.0 146.0 69.52% 46.0 21.90% 0.0 0.00%HONG LOK Carpenter 11/09/2014

MIDDLESEX INTERIORS INC. 40.0 40.0 100.00% 40.0 100.00% 0.0 0.00%HONG LOK Taper 03/15/2015

MODERN GLASS & ALUMINUM 36.0 0.0 0.00% 0.0 0.00% 0.0 0.00%HONG LOK Carpenter 08/09/2014

MODERN GLASS & ALUMINUM 349.0 0.0 0.00% 0.0 0.00% 0.0 0.00%HONG LOK Glazier 10/04/2014

NASDI, LLC 282.0 0.0 0.00% 0.0 0.00% 0.0 0.00%HONG LOK Equipment Opera 01/25/2015

NASDI, LLC 1,061.0 259.0 24.41% 721.0 67.95% 66.0 6.22%HONG LOK Laborer 01/25/2015

NASDI, LLC 3.0 0.0 0.00% 0.0 0.00% 0.0 0.00%HONG LOK Wrecker 11/24/2013

P.J. SPILLANE COMPANY 2,525.0 0.0 0.00% 439.0 17.39% 337.0 13.35%HONG LOK Bricklayer 04/18/2015

PAVILION FLOORS, INC. 986.0 38.0 3.85% 936.0 94.93% 0.0 0.00%HONG LOK Carpet Layer 02/14/2015

S & F CONCRETE 110.0 26.0 23.64% 26.0 23.64% 0.0 0.00%HONG LOK Cement Finisher 10/04/2014

S & F CONCRETE 81.5 0.0 0.00% 0.0 0.00% 0.0 0.00%HONG LOK Equipment Opera 10/04/2014

S & F CONCRETE 455.0 16.0 3.52% 267.0 58.68% 0.0 0.00%HONG LOK Laborer 10/11/2014

SOEP PAINTING CORP. 954.0 88.0 9.22% 16.0 1.68% 0.0 0.00%HONG LOK Painter 04/12/2015

STRUCTURES DEREK INTERN 1,565.0 507.0 32.40% 827.5 52.88% 21.5 1.37%HONG LOK Iron Worker 02/07/2015

SULLIVAN & MCLAUGHLIN CO. 1,844.0 262.0 14.21% 557.0 30.21% 32.0 1.74%HONG LOK Electrician 04/05/2015

UNITED H.V.A.C. COMPANY, IN 1,737.0 106.0 6.10% 61.0 3.51% 0.0 0.00%HONG LOK Sheetmetal Work 04/12/2015

WALSH BROTHERS INC. 76.0 0.0 0.00% 16.0 21.05% 0.0 0.00%HONG LOK Sprinkler Fitter 01/02/2015

Page 166: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 166

Project Name Trade Latest Week

MERRIMAC TILE CO,INC. 265.5 0.0 0.00% 0.0 0.00% 0.0 0.00%HONG LOK Bricklayer 09/09/2014

P.J. SPILLANE COMPANY 514.0 415.5 80.84% 289.5 56.32% 0.0 0.00%HONG LOK Mason Tender 04/18/2015

BASS ASSOCIATES INC, 523.0 4.0 0.76% 0.0 0.00% 0.0 0.00%HONG LOK Carpenter 10/04/2014

KONE ELEVATOR INC. 168.5 0.0 0.00% 0.0 0.00% 0.0 0.00%HONG LOK Elevator Const(M 11/19/2014

ACCORD STEEL & PRECAST 530.0 16.0 3.02% 16.0 3.02% 0.0 0.00%HONG LOK Iron Worker 02/17/2015

M.L. MCDONALD SALES 48.0 0.0 0.00% 0.0 0.00% 0.0 0.00%HONG LOK Painter 10/21/2014

D & L, INC. 7,077.5 2,634.5 37.22% 1,988.0 28.09% 553.0 7.81%HONG LOK Carpenter 09/21/2014

D & L, INC. 1,720.0 56.0 3.26% 24.0 1.40% 0.0 0.00%HONG LOK Laborer 10/26/2014

EMPIRE MASONRY CORP. 1,222.0 330.0 27.00% 226.0 18.49% 56.0 4.58%HONG LOK Bricklayer 03/29/2015

EMPIRE MASONRY CORP. 840.0 620.0 73.81% 620.0 73.81% 0.0 0.00%HONG LOK Mason Tender 09/14/2014

FRED WILLIAMS, INC. 2,063.5 1,290.0 62.52% 752.0 36.44% 8.0 0.39%HONG LOK Pipefitter 03/01/2015

FRONT LINE INC. 244.0 48.0 19.67% 188.0 77.05% 180.0 73.77%HONG LOK Laborer 11/15/2014

GREENWOOD INDUSTRIES IN 597.3 216.3 36.21% 228.0 38.17% 0.0 0.00%HONG LOK Roofer 09/20/2014

GREENWOOD INDUSTRIES IN 45.8 0.0 0.00% 19.3 42.08% 0.0 0.00%HONG LOK Sheetmetal Work 09/20/2014

M.L. MCDONALD SALES 154.0 57.0 37.01% 57.0 37.01% 0.0 0.00%HONG LOK Laborer 06/03/2014

INSUL-PRO INSULATION CO. 206.0 0.0 0.00% 65.0 31.55% 51.0 24.76%HONG LOK Insulator 07/06/2014

M.L. MCDONALD SALES 8.0 0.0 0.00% 0.0 0.00% 0.0 0.00%HONG LOK Mason 06/10/2014

M.L. MCDONALD SALES 73.0 8.0 10.96% 0.0 0.00% 0.0 0.00%HONG LOK Insulator 10/07/2014

KONE ELEVATOR INC. 133.5 0.0 0.00% 0.0 0.00% 0.0 0.00%HONG LOK Elev Const Helper 11/19/2014

J.M. ELECTRICAL CO. INC. 443.0 0.0 0.00% 168.0 37.92% 0.0 0.00%HONG LOK Electrician 04/10/2015

J.C. HIGGINS CORP. 1,063.0 152.0 14.30% 24.0 2.26% 0.0 0.00%HONG LOK Sprinkler Fitter 11/07/2014

J.C. HIGGINS CORP. 1,752.0 424.0 24.20% 700.0 39.95% 0.0 0.00%HONG LOK Plumber 03/01/2015

J. DERENZO CO. 400.5 22.0 5.49% 34.5 8.61% 0.0 0.00%HONG LOK Laborer 10/11/2014

J. DERENZO CO. 167.0 0.0 0.00% 0.0 0.00% 0.0 0.00%HONG LOK Equipment Opera 09/27/2014

33,649.5 8,087.8 24.04% 9,812.3 29.16% 1,380.5 4.10%SUB TOTALS:

HYATT CENTRIC HOTEL

$36,868Amount:

Gen Contractor: CONSIGLI CONSTRUCTION

197 MAIN STREET MILFORD

Est Start Date:

Est End Date:

03/20/2017

09/30/2018

YOUR ELECTRICAL SOLUTION. 56.0 16.0 28.57% 0.0 0.00% 0.0 0.00%HYATT CENTRIC HOTEL Electrician 09/17/2017

J. DERENZO CO. 358.0 108.0 30.17% 64.0 17.88% 0.0 0.00%HYATT CENTRIC HOTEL Laborer 09/16/2017

MANGANARO NORTHEAST LL 152.0 0.0 0.00% 0.0 0.00% 0.0 0.00%HYATT CENTRIC HOTEL Carpenter 08/27/2017

SELECT DEMO SERVICES, LLC 112.0 112.0 100.00% 112.0 100.00% 0.0 0.00%HYATT CENTRIC HOTEL Plasterer 07/28/2017

SELECT DEMO SERVICES, LLC 2,761.5 228.0 8.26% 447.0 16.19% 0.0 0.00%HYATT CENTRIC HOTEL Laborer 09/08/2017

MORETRENCH 321.0 0.0 0.00% 0.0 0.00% 0.0 0.00%HYATT CENTRIC HOTEL Piledriver 08/19/2017

MORETRENCH 1,522.5 516.0 33.89% 779.5 51.20% 0.0 0.00%HYATT CENTRIC HOTEL Laborer 08/12/2017

Page 167: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 167

Project Name Trade Latest Week

MORETRENCH 1,037.5 417.0 40.19% 820.0 79.04% 0.0 0.00%HYATT CENTRIC HOTEL Equipment Opera 08/12/2017

MANGANARO NORTHEAST LL 11.5 0.0 0.00% 7.5 65.22% 0.0 0.00%HYATT CENTRIC HOTEL Laborer 08/20/2017

SELECT DEMO SERVICES, LLC 17.0 0.0 0.00% 17.0 100.00% 0.0 0.00%HYATT CENTRIC HOTEL Wrecker 09/08/2017

J.M. ELECTRICAL CO. INC. 8.0 0.0 0.00% 0.0 0.00% 0.0 0.00%HYATT CENTRIC HOTEL Electrician 08/25/2017

J.L. MARSHALL & SONS,INC 226.0 91.5 40.49% 10.0 4.42% 0.0 0.00%HYATT CENTRIC HOTEL Laborer 09/17/2017

J.L. MARSHALL & SONS,INC 257.0 38.0 14.79% 24.0 9.34% 0.0 0.00%HYATT CENTRIC HOTEL Iron Worker 09/03/2017

J.L. MARSHALL & SONS,INC 8.5 0.0 0.00% 0.0 0.00% 0.0 0.00%HYATT CENTRIC HOTEL Equipment Opera 09/03/2017

BADD BROS. INC. 712.0 216.0 30.34% 208.0 29.21% 0.0 0.00%HYATT CENTRIC HOTEL Iron Worker 09/16/2017

J.L. MARSHALL & SONS,INC 140.0 0.0 0.00% 0.0 0.00% 0.0 0.00%HYATT CENTRIC HOTEL Carpenter 09/03/2017

J. DERENZO CO. 834.5 525.0 62.91% 76.0 9.11% 0.0 0.00%HYATT CENTRIC HOTEL Equipment Opera 09/16/2017

GREENWOOD INDUSTRIES IN 22.0 0.0 0.00% 22.0 100.00% 0.0 0.00%HYATT CENTRIC HOTEL Roofer 08/26/2017

E. M. DUGGAN INC. 960.0 360.0 37.50% 0.0 0.00% 280.0 29.17%HYATT CENTRIC HOTEL Plumber 09/17/2017

J.L. MARSHALL & SONS,INC 29.0 0.0 0.00% 0.0 0.00% 0.0 0.00%HYATT CENTRIC HOTEL Cement Finisher 09/03/2017

9,546.0 2,627.5 27.52% 2,587.0 27.10% 280.0 2.93%SUB TOTALS:

INQUILINOS BORICUAS EN ACCION

$15,000Amount:

Gen Contractor:

Est Start Date:

Est End Date:

07/20/2014

07/26/2014

MJ AUDIO 25.0 25.0 100.00% 0.0 0.00% 10.0 40.00%INQUILINOS BORICUAS EN ACCI Laborer 07/26/2014

25.0 25.0 100.00% 0.0 0.00% 10.0 40.00%SUB TOTALS:

INTERIAN HOUSE

$10,000Amount:

Gen Contractor: ANTONIO GOMES

(617)799-4779 383 ALDEN STREET FALL RIVER

Est Start Date:

Est End Date:

01/01/2014

02/28/2014

ANTONIO GOMES 55.0 0.0 0.00% 55.0 100.00% 0.0 0.00%INTERIAN HOUSE Carpenter 01/17/2014

55.0 0.0 0.00% 55.0 100.00% 0.0 0.00%SUB TOTALS:

INTERIM HOUSE

$12,000Amount:

Gen Contractor: ANTONIO GOMES

(617)799-4779 383 ALDEN STREET FALL RIVER

Est Start Date:

Est End Date:

01/01/2014

03/31/2014

ANTONIO GOMES 72.0 0.0 0.00% 72.0 100.00% 0.0 0.00%INTERIM HOUSE Carpenter 02/27/2014

BOSTON BEST FLOORS 195.0 0.0 0.00% 0.0 0.00% 0.0 0.00%INTERIM HOUSE Floor Layer 09/12/2015

267.0 0.0 0.00% 72.0 26.97% 0.0 0.00%SUB TOTALS:

INTRIGUING HAIR

$2,500Amount:

Gen Contractor: HUNTER SIGNS

(617)360-9710 120 BUSINESS STREET HYDE PARK

Est Start Date:

Est End Date:

12/20/2015

12/26/2015

HUNTER SIGNS 2.0 2.0 100.00% 2.0 100.00% 0.0 0.00%INTRIGUING HAIR Laborer 12/26/2015

2.0 2.0 100.00% 2.0 100.00% 0.0 0.00%SUB TOTALS:

Page 168: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 168

Project Name Trade Latest Week

IRON BODY STUDIOS

$2,500Amount:

Gen Contractor: FAST SIGNS

(781)444-4889 11 B SECOND AVE. NEEDHAM

Est Start Date:

Est End Date:

06/27/2015

07/02/2016

FAST SIGNS 4.0 0.0 0.00% 0.0 0.00% 0.0 0.00%IRON BODY STUDIOS Laborer 07/02/2016

4.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SUB TOTALS:

ISLAND STYLE

$3,000Amount:

Gen Contractor: EXCEL SIGNS & DECORATION CORP.

(617)479-8552 259 QUINCY AVE. QUINCY

Est Start Date:

Est End Date:

01/01/2014

03/31/2014

EXCEL SIGNS & DECORATION 9.0 0.0 0.00% 9.0 100.00% 3.0 33.33%ISLAND STYLE Laborer 03/01/2014

9.0 0.0 0.00% 9.0 100.00% 3.0 33.33%SUB TOTALS:

ITALIAN HOME

$10,000Amount:

Gen Contractor:

Est Start Date:

Est End Date:

03/01/2014

05/30/2014

GEM PLUMBING & HEATING S 33.3 0.0 0.00% 0.0 0.00% 0.0 0.00%ITALIAN HOME Plumber 03/23/2014

33.3 0.0 0.00% 0.0 0.00% 0.0 0.00%SUB TOTALS:

J & P DRY CLEANERS

$3,000Amount:

Gen Contractor: HUNTER SIGNS

(617)360-9710 120 BUSINESS STREET HYDE PARK

Est Start Date:

Est End Date:

11/22/2015

11/28/2015

HUNTER SIGNS 6.0 6.0 100.00% 6.0 100.00% 0.0 0.00%J & P DRY CLEANERS Laborer 11/28/2015

6.0 6.0 100.00% 6.0 100.00% 0.0 0.00%SUB TOTALS:

J.P. SCATTERED SITES

$1,000,000Amount:

Gen Contractor: MASS CONSTRUCTION & MGTNT.

781/885-7162 20 SCANLON DRIVE RANDOLPH

Est Start Date:

Est End Date:

01/01/2013

01/31/2014

MCR CONSTRUCTION INC. 68.0 68.0 100.00% 0.0 0.00% 0.0 0.00%J.P. SCATTERED SITES Laborer 12/01/2013

MCR CONSTRUCTION INC. 183.0 139.0 75.96% 183.0 100.00% 0.0 0.00%J.P. SCATTERED SITES Carpenter 12/01/2013

251.0 207.0 82.47% 183.0 72.91% 0.0 0.00%SUB TOTALS:

JACKSON COMMONS

$3,000,000Amount:

Gen Contractor: N E I CONTRACTORS

(781)348-5099 27 PACELLA PARK DRIVE RANDOLPH

Est Start Date:

Est End Date:

10/01/2013

11/30/2014

TERRATEC 656.0 336.0 51.22% 320.0 48.78% 0.0 0.00%JACKSON COMMONS Utility Operator 03/15/2014

N E I CONTRACTORS 3,352.0 3,352.0 100.00% 3,352.0 100.00% 1,183.0 35.29%JACKSON COMMONS Laborer 03/28/2015

TERRATEC 5,494.0 2,168.0 39.46% 3,602.0 65.56% 16.0 0.29%JACKSON COMMONS Mason 01/24/2015

TERRATEC 8,735.0 1,715.0 19.63% 8,071.0 92.40% 0.0 0.00%JACKSON COMMONS Laborer 02/28/2015

TARA CONSTRUCTION 3,413.0 1,289.5 37.78% 3,314.0 97.10% 523.5 15.34%JACKSON COMMONS Laborer 01/24/2015

TARA CONSTRUCTION 21,285.5 5,739.5 26.96% 9,731.5 45.72% 403.0 1.89%JACKSON COMMONS Carpenter 01/24/2015

T.R. WATERPROOFERS, LLC 326.0 143.0 43.87% 143.0 43.87% 47.0 14.42%JACKSON COMMONS Waterproofer 10/24/2014

SUPERIOR PLUMBING INC. 7,704.8 1,690.5 21.94% 4,280.5 55.56% 254.3 3.30%JACKSON COMMONS HVAC 12/10/2014

SMS SERVICES, INC. 1,134.0 168.0 14.81% 1,134.0 100.00% 176.0 15.52%JACKSON COMMONS Laborer 02/23/2014

Page 169: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 169

Project Name Trade Latest Week

THE PAPPAS COMPANY, INC 39.0 13.0 33.33% 13.0 33.33% 0.0 0.00%JACKSON COMMONS Carpenter 02/22/2015

G & O INC. 9,230.0 5,043.0 54.64% 7,795.0 84.45% 1,354.0 14.67%JACKSON COMMONS Electrician 04/11/2015

KONE ELEVATOR INC. 347.5 0.0 0.00% 0.0 0.00% 0.0 0.00%JACKSON COMMONS Elevator Const(M 04/08/2015

VILLAGE FORGE INC. 186.0 92.5 49.73% 98.0 52.69% 0.0 0.00%JACKSON COMMONS Iron Worker 04/11/2015

ANCHOR INSULATION 645.5 37.0 5.73% 518.0 80.25% 0.0 0.00%JACKSON COMMONS Carpenter 01/24/2015

COVENANT FIRE PROTECTION 1,852.8 357.5 19.30% 589.5 31.82% 0.0 0.00%JACKSON COMMONS Sprinkler Fitter 04/18/2015

G. BROUILLETTE & SON INC. 1,670.8 136.0 8.14% 442.8 26.50% 51.8 3.10%JACKSON COMMONS Laborer 06/06/2015

G. BROUILLETTE & SON INC. 273.8 0.0 0.00% 88.5 32.33% 0.0 0.00%JACKSON COMMONS Roofer 06/06/2015

HAYWARD BAKER INC. 268.5 0.0 0.00% 0.0 0.00% 54.0 20.11%JACKSON COMMONS Equipment Opera 01/19/2014

K REGAN MECHANICAL INC. 975.0 975.0 100.00% 975.0 100.00% 0.0 0.00%JACKSON COMMONS Laborer 12/06/2014

K REGAN MECHANICAL INC. 3,731.0 1,047.0 28.06% 1,047.0 28.06% 0.0 0.00%JACKSON COMMONS Plumber 01/31/2015

KONE ELEVATOR INC. 200.0 0.0 0.00% 0.0 0.00% 0.0 0.00%JACKSON COMMONS Elev Const Helper 01/14/2015

A-BEST ABATEMENT INC 290.0 0.0 0.00% 257.5 88.79% 24.0 8.28%JACKSON COMMONS Asbestos Worker 04/26/2014

71,810.0 24,302.5 33.84% 45,772.3 63.74% 4,086.5 5.69%SUB TOTALS:

KATHERINE JANE PHOTOGRAPHY

$2,500Amount:

Gen Contractor: EXCEL SIGNS & DECORATION CORP.

(617)479-8552 259 QUINCY AVE. QUINCY

Est Start Date:

Est End Date:

09/28/2014

10/04/2014

EXCEL SIGNS & DECORATION 2.0 0.0 0.00% 1.0 50.00% 0.0 0.00%KATHERINE JANE PHOTOGRAP Laborer 10/04/2014

2.0 0.0 0.00% 1.0 50.00% 0.0 0.00%SUB TOTALS:

KIM'S FLOWER SHOP

$3,000Amount:

Gen Contractor:

Est Start Date:

Est End Date:

10/20/2016

10/28/2016

AZ SIGNS 4.0 2.0 50.00% 4.0 100.00% 0.0 0.00%KIM'S FLOWER SHOP Laborer 10/28/2016

4.0 2.0 50.00% 4.0 100.00% 0.0 0.00%SUB TOTALS:

KING DIAMOND MOAKLEY PARK

$140,000Amount:

Gen Contractor: W. L. FRENCH EXCAVATING

(617)924-1234 3 SURVEY CIRCLE SUIK #1 N. BILLERICA

Est Start Date:

Est End Date:

03/01/2014

06/01/2014

W. L. FRENCH EXCAVATING 25.0 0.0 0.00% 0.0 0.00% 0.0 0.00%KING DIAMOND MOAKLEY PARK Equipment Opera 05/10/2014

W. L. FRENCH EXCAVATING 110.0 39.0 35.45% 49.0 44.55% 39.0 35.45%KING DIAMOND MOAKLEY PARK Laborer 07/05/2014

M-O-N LANDSCAPING INC, 8.0 0.0 0.00% 0.0 0.00% 0.0 0.00%KING DIAMOND MOAKLEY PARK Equipment Opera 05/17/2014

M-O-N LANDSCAPING INC, 26.0 4.0 15.38% 0.0 0.00% 0.0 0.00%KING DIAMOND MOAKLEY PARK Laborer 06/21/2014

169.0 43.0 25.44% 49.0 28.99% 39.0 23.08%SUB TOTALS:

KLARMAN HALL

$98,000,000Amount:

Gen Contractor: WALSH BROTHERS INC.

(617)878-4800 210 COMMERCIAL STREET BOSTON

Est Start Date:

Est End Date:

02/29/2016

04/30/2018

THE CHEVIOT CORPORATION 216.0 0.0 0.00% 0.0 0.00% 0.0 0.00%KLARMAN HALL Carpenter 09/15/2017

PIZZOTTI BROTHERS, INC. 2,596.0 1,136.0 43.76% 1,888.0 72.73% 0.0 0.00%KLARMAN HALL Mason Tender 09/19/2017

Page 170: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 170

Project Name Trade Latest Week

W. L. FRENCH EXCAVATING 7,873.0 1,804.5 22.92% 2,347.5 29.82% 1,598.0 20.30%KLARMAN HALL Laborer 08/26/2017

POOK DIEMONT & OHL 270.0 126.0 46.67% 72.0 26.67% 54.0 20.00%KLARMAN HALL Iron Worker 06/18/2017

PIZZOTTI BROTHERS, INC. 4,392.0 1,236.0 28.14% 912.0 20.77% 0.0 0.00%KLARMAN HALL Bricklayer 09/19/2017

STRUCTURES DEREK INTERN 342.0 0.0 0.00% 0.0 0.00% 0.0 0.00%KLARMAN HALL Equipment Opera 04/29/2017

STRUCTURES DEREK INTERN 10,067.0 3,394.5 33.72% 5,838.5 58.00% 720.5 7.16%KLARMAN HALL Iron Worker 09/02/2017

STRUCTURES DEREK INTERN 8.5 0.0 0.00% 0.0 0.00% 0.0 0.00%KLARMAN HALL Laborer 09/02/2017

STRUCTURES DEREK INTERN 342.0 342.0 100.00% 342.0 100.00% 0.0 0.00%KLARMAN HALL Oiler 04/29/2017

SULLIVAN & MCLAUGHLIN CO. 9,023.5 5,775.0 64.00% 4,633.0 51.34% 785.0 8.70%KLARMAN HALL Electrician 09/17/2017

NORTHSTAR CONTRACTING G 6,328.0 1,366.0 21.59% 5,026.0 79.42% 248.0 3.92%KLARMAN HALL Asbestos Worker 07/30/2017

WOOD & WIRE FENCE CO. 18.0 0.0 0.00% 9.0 50.00% 0.0 0.00%KLARMAN HALL Laborer 03/05/2016

THE CHEVIOT CORPORATION 214.0 0.0 0.00% 0.0 0.00% 0.0 0.00%KLARMAN HALL Glazier 09/15/2017

THE CHEVIOT CORPORATION 112.0 0.0 0.00% 0.0 0.00% 0.0 0.00%KLARMAN HALL Iron Worker 09/15/2017

THOMAS G GALLAGHER INC. 2,977.0 680.0 22.84% 680.0 22.84% 48.0 1.61%KLARMAN HALL Pipefitter 09/17/2017

THOMAS G GALLAGHER INC. 3,124.0 1,394.0 44.62% 1,488.0 47.63% 170.0 5.44%KLARMAN HALL Plumber 09/17/2017

THOMAS G GALLAGHER INC. 1,401.0 0.0 0.00% 0.0 0.00% 0.0 0.00%KLARMAN HALL Sprinkler Fitter 09/17/2017

TRIPLE G SCAFFOLD SERVICE 244.5 112.0 45.81% 0.0 0.00% 0.0 0.00%KLARMAN HALL Carpenter 07/26/2017

W. L. FRENCH EXCAVATING 8,178.5 253.5 3.10% 0.0 0.00% 0.0 0.00%KLARMAN HALL Equipment Opera 08/26/2017

WALSH BROTHERS INC. 8,692.5 3,378.0 38.86% 5,575.0 64.14% 1,763.0 20.28%KLARMAN HALL Laborer 09/12/2017

NH STEEL FABRICATORS INC 716.0 152.0 21.23% 152.0 21.23% 32.0 4.47%KLARMAN HALL Iron Worker 09/19/2017

HERITAGE RESTORATION INC. 3,220.5 1,098.0 34.09% 1,153.0 35.80% 0.0 0.00%KLARMAN HALL Waterproofer 09/16/2017

TRIPLE G SCAFFOLD SERVICE 183.5 24.0 13.08% 0.0 0.00% 0.0 0.00%KLARMAN HALL Laborer 07/26/2017

HAYWARD BAKER INC. 213.0 0.0 0.00% 0.0 0.00% 0.0 0.00%KLARMAN HALL Laborer 03/26/2017

AXION SPECIALTY CONTRACTI 149.0 0.0 0.00% 0.0 0.00% 0.0 0.00%KLARMAN HALL Insulator 09/17/2017

CENTRAL CEILINGS INC. 15,065.0 4,370.0 29.01% 4,858.0 32.25% 1,070.0 7.10%KLARMAN HALL Carpenter 09/17/2017

CENTRAL CEILINGS INC. 1,620.5 566.5 34.96% 311.0 19.19% 64.0 3.95%KLARMAN HALL Laborer 09/17/2017

LANCO SCAFFOLDING INC. 340.0 128.0 37.65% 340.0 100.00% 0.0 0.00%KLARMAN HALL Laborer 09/03/2017

HAYWARD BAKER INC. 561.0 0.0 0.00% 0.0 0.00% 0.0 0.00%KLARMAN HALL Equipment Opera 11/27/2016

MCCUSKER-GILL INC. 4,224.0 912.0 21.59% 1,192.0 28.22% 0.0 0.00%KLARMAN HALL Sheetmetal Work 09/17/2017

HAYWARD BAKER INC. 4,143.0 1,281.0 30.92% 1,264.0 30.51% 0.0 0.00%KLARMAN HALL Piledriver 07/02/2017

HERITAGE RESTORATION INC. 8.0 0.0 0.00% 0.0 0.00% 0.0 0.00%KLARMAN HALL Bricklayer 03/04/2017

HERITAGE RESTORATION INC. 1,214.5 535.0 44.05% 551.0 45.37% 0.0 0.00%KLARMAN HALL Laborer 09/16/2017

LANCO SCAFFOLDING INC. 90.0 0.0 0.00% 90.0 100.00% 0.0 0.00%KLARMAN HALL Carpenter 09/03/2017

MANAFORT-PRECISION 15,843.5 2,409.5 15.21% 3,094.0 19.53% 0.0 0.00%KLARMAN HALL Laborer 09/02/2017

HALLAMORE CORPORATION 1,404.5 0.0 0.00% 0.0 0.00% 0.0 0.00%KLARMAN HALL Equipment Opera 05/13/2017

Page 171: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 171

Project Name Trade Latest Week

LUND REBAR SERVICES, INC. 30.0 0.0 0.00% 26.0 86.67% 0.0 0.00%KLARMAN HALL Iron Worker 02/05/2017

MARSHALL ROOFING & SHEET 141.0 0.0 0.00% 0.0 0.00% 0.0 0.00%KLARMAN HALL Sheetmetal Work 09/16/2017

MANAFORT-PRECISION 1,616.5 0.0 0.00% 0.0 0.00% 0.0 0.00%KLARMAN HALL Mason 09/02/2017

MANAFORT-PRECISION 7,910.5 1,395.0 17.63% 1,395.0 17.63% 600.0 7.58%KLARMAN HALL Iron Worker 07/29/2017

MANAFORT-PRECISION 26,482.5 5,694.0 21.50% 3,767.5 14.23% 267.0 1.01%KLARMAN HALL Carpenter 09/02/2017

MANAFORT BROTHERS INC. 572.5 0.0 0.00% 0.0 0.00% 0.0 0.00%KLARMAN HALL Equipment Opera 03/11/2017

MANAFORT BROTHERS INC. 2,108.5 0.0 0.00% 0.0 0.00% 0.0 0.00%KLARMAN HALL Carpenter 03/18/2017

M.L. MCDONALD SALES 928.0 144.0 15.52% 112.0 12.07% 0.0 0.00%KLARMAN HALL Laborer 09/12/2017

M.L. MCDONALD SALES 472.0 0.0 0.00% 0.0 0.00% 0.0 0.00%KLARMAN HALL Insulator 09/12/2017

MARSHALL ROOFING & SHEET 1,957.0 640.0 32.70% 1,040.5 53.17% 208.5 10.65%KLARMAN HALL Roofer 09/16/2017

157,634.0 40,346.5 25.60% 48,157.0 30.55% 7,628.0 4.84%SUB TOTALS:

KSANOFF APARTMENTS

$4,678,636Amount:

Gen Contractor: LANDMARK STRUCTURES CORP.

(781)376-1801 282 MONTVALE AVE. WOBURN

Est Start Date:

Est End Date:

07/10/2017

09/10/2018

BOSTONIAN EXCAVATION 530.0 530.0 100.00% 0.0 0.00% 0.0 0.00%KSANOFF APARTMENTS Equipment Opera 09/09/2017

LANDMARK STRUCTURES CO 116.0 0.0 0.00% 116.0 100.00% 0.0 0.00%KSANOFF APARTMENTS Carpenter 09/09/2017

T & P CONTRACTING, INC. 336.0 336.0 100.00% 336.0 100.00% 0.0 0.00%KSANOFF APARTMENTS Cement Laborer 09/09/2017

T & P CONTRACTING, INC. 512.0 104.0 20.31% 256.0 50.00% 0.0 0.00%KSANOFF APARTMENTS Cement Finisher 09/09/2017

LANDMARK STRUCTURES CO 147.0 147.0 100.00% 147.0 100.00% 0.0 0.00%KSANOFF APARTMENTS Laborer 09/09/2017

JKA CONSTRUCTION 162.0 54.0 33.33% 162.0 100.00% 54.0 33.33%KSANOFF APARTMENTS Laborer 09/09/2017

JKA CONSTRUCTION 56.0 56.0 100.00% 56.0 100.00% 0.0 0.00%KSANOFF APARTMENTS Carpenter 09/09/2017

DEVON PLUMBING HEATING 40.0 40.0 100.00% 40.0 100.00% 0.0 0.00%KSANOFF APARTMENTS Plumber 09/09/2017

CONCRETE PROS CONSTRUC 100.0 0.0 0.00% 100.0 100.00% 20.0 20.00%KSANOFF APARTMENTS Cement Finisher 09/16/2017

BOSTONIAN EXCAVATION 556.0 556.0 100.00% 556.0 100.00% 0.0 0.00%KSANOFF APARTMENTS Laborer 09/09/2017

2,555.0 1,823.0 71.35% 1,769.0 69.24% 74.0 2.90%SUB TOTALS:

KUNG FU TEA

$2,500Amount:

Gen Contractor: EXCEL SIGNS & DECORATION CORP.

(617)479-8552 259 QUINCY AVE. QUINCY

Est Start Date:

Est End Date:

07/20/2014

07/26/2014

EXCEL SIGNS & DECORATION 6.0 0.0 0.00% 6.0 100.00% 3.0 50.00%KUNG FU TEA Laborer 07/26/2014

6.0 0.0 0.00% 6.0 100.00% 3.0 50.00%SUB TOTALS:

KWONG KOW CHINESE SCHOOL

$20,000Amount:

Gen Contractor: NEXGAN MECHANICAL

(401)921-3211 205 HALLENE RD. WARWICK

Est Start Date:

Est End Date:

05/08/2016

05/14/2016

NEXGAN MECHANICAL 189.5 0.0 0.00% 0.0 0.00% 0.0 0.00%KWONG KOW CHINESE SCHOO Pipefitter 06/11/2016

189.5 0.0 0.00% 0.0 0.00% 0.0 0.00%SUB TOTALS:

Page 172: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 172

Project Name Trade Latest Week

LA MOTTA

$15,000Amount:

Gen Contractor: SRP SIGN CORP.

(617)623-6222 236 PEARL STREET SOMERVILLE

Est Start Date:

Est End Date:

10/26/2015

10/30/2015

SRP SIGN CORP. 4.0 0.0 0.00% 0.0 0.00% 0.0 0.00%LA MOTTA Laborer 10/30/2015

4.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SUB TOTALS:

LANDMARK PUBLIC HOUSE

$40,000Amount:

Gen Contractor:

Est Start Date:

Est End Date:

08/15/2016

08/26/2016

PETER CAVALLO 160.0 0.0 0.00% 0.0 0.00% 0.0 0.00%LANDMARK PUBLIC HOUSE Carpenter 09/16/2016

PETER CAVALLO 240.0 0.0 0.00% 80.0 33.33% 0.0 0.00%LANDMARK PUBLIC HOUSE Laborer 09/16/2016

400.0 0.0 0.00% 80.0 20.00% 0.0 0.00%SUB TOTALS:

LANDMARK UNLIMITED REALTY

$3,500Amount:

Gen Contractor: AZ SIGNS

(617)773-4188 33 NEWPORT AVE. QUINCY

Est Start Date:

Est End Date:

10/20/2016

10/28/2016

AZ SIGNS 4.0 2.0 50.00% 4.0 100.00% 0.0 0.00%LANDMARK UNLIMITED REALTY Laborer 10/28/2016

4.0 2.0 50.00% 4.0 100.00% 0.0 0.00%SUB TOTALS:

LAPELS DRY CLEANER

$2,500Amount:

Gen Contractor: EXCEL SIGNS & DECORATION CORP.

(617)479-8552 259 QUINCY AVE. QUINCY

Est Start Date:

Est End Date:

03/14/2014

03/23/2014

EXCEL SIGNS & DECORATION 6.0 0.0 0.00% 6.0 100.00% 3.0 50.00%LAPELS DRY CLEANER Laborer 08/23/2014

6.0 0.0 0.00% 6.0 100.00% 3.0 50.00%SUB TOTALS:

LEKKER SIGN

$2,500Amount:

Gen Contractor: INSTANT SIGN CENTER

(781)278-0150 508 BOSTON PRVIDANCE NORWOOD

Est Start Date:

Est End Date:

10/01/2013

12/31/2013

INSTANT SIGN CENTER 2.0 0.0 0.00% 0.0 0.00% 0.0 0.00%LEKKER SIGN Laborer 11/25/2013

2.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SUB TOTALS:

LIZ'S HAIR CARE

$2,500Amount:

Gen Contractor: DORCHESTER AWNING CO.

(781)826-9001 230 OAK STREET BOX 385 9 GALLEN ROAD KINGSTON

Est Start Date:

Est End Date:

10/24/2016

10/25/2016

DORCHESTER AWNING CO. 19.0 0.0 0.00% 0.0 0.00% 0.0 0.00%LIZ'S HAIR CARE Laborer 10/25/2016

19.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SUB TOTALS:

LONGWOOD CENTER

$123,000,000Amount:

Gen Contractor: JOHN MORIARTY & ASSOCIATES

(781)729-3900 3 CHURCH STREET WINCHESTER

Est Start Date:

Est End Date:

01/01/2012

11/30/2014

J. C. CANNISTRARO INC. 6,206.5 3,952.5 63.68% 1,050.0 16.92% 128.0 2.06%LONGWOOD CENTER Sprinkler Fitter 08/31/2014

KIVA SYSTEMS INC. 727.5 727.5 100.00% 0.0 0.00% 0.0 0.00%LONGWOOD CENTER Sheetmetal Work 07/20/2014

KIVA SYSTEMS INC. 5,199.0 2,876.0 55.32% 2,393.0 46.03% 24.0 0.46%LONGWOOD CENTER Iron Worker 08/24/2014

KIVA SYSTEMS INC. 6,189.0 1,619.0 26.16% 1,584.0 25.59% 40.0 0.65%LONGWOOD CENTER Glazier 08/24/2014

KIVA SYSTEMS INC. 10,618.5 1,926.5 18.14% 0.0 0.00% 0.0 0.00%LONGWOOD CENTER Carpenter 08/24/2014

Page 173: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 173

Project Name Trade Latest Week

KENNETH CASTELLUCCI ASSO 8.0 0.0 0.00% 0.0 0.00% 0.0 0.00%LONGWOOD CENTER Mason Tender 09/19/2014

KENNETH CASTELLUCCI ASSO 886.0 0.0 0.00% 0.0 0.00% 0.0 0.00%LONGWOOD CENTER Mason 10/24/2014

KENNETH CASTELLUCCI ASSO 972.0 0.0 0.00% 16.0 1.65% 0.0 0.00%LONGWOOD CENTER Marble Tile Work 10/24/2014

JOHN MORIARTY & ASSOCIAT 17,309.0 8,255.0 47.69% 9,794.0 56.58% 2,137.0 12.35%LONGWOOD CENTER Laborer 09/28/2014

M.L. MCDONALD SALES 3,451.0 1,533.0 44.42% 2,687.0 77.86% 988.0 28.63%LONGWOOD CENTER Painter 09/30/2014

J. DERENZO CO. 572.0 5.0 0.87% 0.0 0.00% 0.0 0.00%LONGWOOD CENTER Equipment Opera 09/06/2014

OTIS ELEVATOR COMPANY 2,775.3 740.8 26.69% 1,441.8 51.95% 16.0 0.58%LONGWOOD CENTER Elev Const Helper 08/07/2014

J. C. CANNISTRARO INC. 7,597.5 3,124.0 41.12% 257.0 3.38% 257.0 3.38%LONGWOOD CENTER Plumber 08/31/2014

J. DERENZO CO. 840.0 74.0 8.81% 342.5 40.77% 0.0 0.00%LONGWOOD CENTER Laborer 09/06/2014

MARR EQUIPMENT CORP. 283.5 0.0 0.00% 0.0 0.00% 0.0 0.00%LONGWOOD CENTER Elevator Const(M 06/01/2014

NEW ENGLAND DECKS&FLOO 325.0 177.0 54.46% 177.0 54.46% 0.0 0.00%LONGWOOD CENTER Laborer 09/27/2014

J. C. CANNISTRARO INC. 20,462.0 6,442.0 31.48% 3,664.0 17.91% 1,372.0 6.71%LONGWOOD CENTER Pipefitter 08/31/2014

NORTH EAST FOAM SOLUTION 16.0 16.0 100.00% 16.0 100.00% 0.0 0.00%LONGWOOD CENTER Laborer 04/29/2014

MARR EQUIPMENT CORP. 4,460.5 81.5 1.83% 2,148.0 48.16% 0.0 0.00%LONGWOOD CENTER Equipment Opera 09/07/2014

OTIS ELEVATOR COMPANY 5,530.5 217.3 3.93% 24.0 0.43% 484.8 8.77%LONGWOOD CENTER Elevator Const(M 08/21/2014

P.J. SPILLANE COMPANY 2,553.5 180.5 7.07% 298.5 11.69% 0.0 0.00%LONGWOOD CENTER Bricklayer 09/20/2014

P.J. SPILLANE COMPANY 517.0 119.5 23.11% 256.5 49.61% 0.0 0.00%LONGWOOD CENTER Mason Tender 09/20/2014

STEELCO FENCING 24.0 16.0 66.67% 8.0 33.33% 0.0 0.00%LONGWOOD CENTER Laborer 11/23/2013

SULLIVAN & MCLAUGHLIN CO. 1,136.0 0.0 0.00% 104.0 9.15% 136.0 11.97%LONGWOOD CENTER Electrician 08/24/2014

TCI INSTALLATIONS INC. 2,045.0 1,102.0 53.89% 1,102.0 53.89% 0.0 0.00%LONGWOOD CENTER Carpenter 09/27/2014

TREVIICOS CORPORATION 45.0 0.0 0.00% 45.0 100.00% 0.0 0.00%LONGWOOD CENTER Laborer 01/12/2014

TRIPLE G SCAFFOLD SERVICE 5.5 0.0 0.00% 0.0 0.00% 0.0 0.00%LONGWOOD CENTER Carpenter 01/22/2014

TRIPLE G SCAFFOLD SERVICE 11.0 0.0 0.00% 0.0 0.00% 0.0 0.00%LONGWOOD CENTER Laborer 01/22/2014

NORTH EAST FOAM SOLUTION 24.0 0.0 0.00% 0.0 0.00% 0.0 0.00%LONGWOOD CENTER Carpenter 04/29/2014

ACCORD STEEL & PRECAST 172.5 0.0 0.00% 0.0 0.00% 0.0 0.00%LONGWOOD CENTER Equipment Opera 01/21/2014

ACCORD STEEL & PRECAST 698.5 273.0 39.08% 40.0 5.73% 0.0 0.00%LONGWOOD CENTER Iron Worker 02/18/2014

ACCORD STEEL & PRECAST 169.5 0.0 0.00% 0.0 0.00% 0.0 0.00%LONGWOOD CENTER Oiler 01/21/2014

ALLAN CONSTRUCTION INC. 119.5 0.0 0.00% 8.0 6.69% 0.0 0.00%LONGWOOD CENTER Carpenter 07/18/2014

ATLANTIC CONTRACTING &SP 5,178.5 1,125.5 21.73% 1,169.5 22.58% 473.5 9.14%LONGWOOD CENTER Asbestos Worker 04/13/2014

BAY STATE BUILDING SPECIA 208.0 32.0 15.38% 24.0 11.54% 0.0 0.00%LONGWOOD CENTER Carpenter 05/20/2014

BWI STEEL & PRECAST EREC 4,122.0 995.0 24.14% 401.0 9.73% 0.0 0.00%LONGWOOD CENTER Iron Worker 08/24/2014

CENTURY DRYWALL INC, 24,534.5 5,673.5 23.12% 6,314.0 25.74% 1,438.0 5.86%LONGWOOD CENTER Carpenter 09/13/2014

CENTURY DRYWALL INC, 6,002.5 5,162.5 86.01% 4,288.0 71.44% 1,352.5 22.53%LONGWOOD CENTER Laborer 09/13/2014

CENTURY DRYWALL INC, 3,759.5 250.0 6.65% 1,588.0 42.24% 210.0 5.59%LONGWOOD CENTER Taper 09/13/2014

Page 174: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 174

Project Name Trade Latest Week

CIRCLE FLOORS INC. 2,105.0 32.0 1.52% 570.0 27.08% 0.0 0.00%LONGWOOD CENTER Floor Layer 09/21/2014

COMMONWEALTH BUILDING S 4,045.0 1,613.0 39.88% 791.5 19.57% 9.0 0.22%LONGWOOD CENTER Roofer 08/02/2014

COMMONWEALTH BUILDING S 471.0 24.0 5.10% 73.0 15.50% 0.0 0.00%LONGWOOD CENTER Sheetmetal Work 09/06/2014

J. C. CANNISTRARO INC. 16.0 0.0 0.00% 0.0 0.00% 16.0 100.00%LONGWOOD CENTER HVAC 03/02/2014

EAST COAST FIREPROOFING 1,970.5 201.5 10.23% 710.5 36.06% 0.0 0.00%LONGWOOD CENTER Laborer 03/25/2014

G & C CONCRETE CO. 484.0 71.0 14.67% 59.5 12.29% 0.0 0.00%LONGWOOD CENTER Iron Worker 07/26/2014

J & M BROWN ELECTRICAL 12.0 0.0 0.00% 0.0 0.00% 0.0 0.00%LONGWOOD CENTER Technician 08/29/2014

J & M BROWN ELECTRICAL 41,248.0 11,906.0 28.86% 7,590.0 18.40% 1,797.0 4.36%LONGWOOD CENTER Electrician 09/19/2014

HARRINGTON AIR. 7,019.5 2,052.5 29.24% 2,051.5 29.23% 0.0 0.00%LONGWOOD CENTER Sheetmetal Work 06/01/2014

GLEESON POWERS INC. 16.0 8.0 50.00% 0.0 0.00% 0.0 0.00%LONGWOOD CENTER Laborer 04/12/2014

NEW ENGLAND DECKS&FLOO 456.0 84.0 18.42% 84.0 18.42% 0.0 0.00%LONGWOOD CENTER Mason 09/27/2014

G & C CONCRETE CO. 2,935.0 469.0 15.98% 1,241.5 42.30% 0.0 0.00%LONGWOOD CENTER Laborer 08/30/2014

EAST COAST INTERIORS CO. 1,332.0 78.0 5.86% 43.0 3.23% 0.0 0.00%LONGWOOD CENTER Carpenter 09/06/2014

G & C CONCRETE CO. 87.0 0.0 0.00% 0.0 0.00% 0.0 0.00%LONGWOOD CENTER Equipment Opera 06/07/2014

G & C CONCRETE CO. 1,296.5 60.5 4.67% 321.0 24.76% 0.0 0.00%LONGWOOD CENTER Cement Finisher 08/30/2014

G & C CONCRETE CO. 2,540.0 16.5 0.65% 615.0 24.21% 0.0 0.00%LONGWOOD CENTER Carpenter 08/30/2014

FRONT LINE INC. 2,366.0 1,185.0 50.08% 1,942.0 82.08% 513.0 21.68%LONGWOOD CENTER Laborer 09/20/2014

FRED SALVUCCI CORP. 2,665.8 0.0 0.00% 82.0 3.08% 0.0 0.00%LONGWOOD CENTER Mason Tender 03/01/2014

FRED SALVUCCI CORP. 2,005.5 151.5 7.55% 0.0 0.00% 0.0 0.00%LONGWOOD CENTER Mason 03/01/2014

EIRE ELECTRICAL CORPORATI 3,009.0 563.5 18.73% 196.0 6.51% 0.0 0.00%LONGWOOD CENTER Electrician 07/11/2014

GLEESON POWERS INC. 1,044.0 0.0 0.00% 420.5 40.28% 0.0 0.00%LONGWOOD CENTER Carpenter 07/05/2014

222,878.5 65,212.5 29.26% 58,031.8 26.04% 11,391.8 5.11%SUB TOTALS:

LOPEZ THE FLORIST

$30,000Amount:

Gen Contractor:

Est Start Date:

Est End Date:

09/19/2016

10/07/2016

CASTLEMAINE INC. 74.0 74.0 100.00% 0.0 0.00% 0.0 0.00%LOPEZ THE FLORIST Carpenter 10/07/2016

CASTLEMAINE INC. 64.0 0.0 0.00% 0.0 0.00% 0.0 0.00%LOPEZ THE FLORIST Laborer 10/07/2016

138.0 74.0 53.62% 0.0 0.00% 0.0 0.00%SUB TOTALS:

LOPRESTI IMPROVEMENTS PHASE 3

$1,594,200Amount:

Gen Contractor: FLEMING BROS INC.

(781)843-4071 106 COLUMBIA STREET QUINCY

Est Start Date:

Est End Date:

06/21/2015

06/30/2016

FLEMING BROS INC. 1,056.0 968.0 91.67% 528.0 50.00% 24.0 2.27%LOPRESTI IMPROVEMENTS PHA Laborer 12/04/2015

GILMAR BASTESTIN MASONRY 208.0 0.0 0.00% 208.0 100.00% 0.0 0.00%LOPRESTI IMPROVEMENTS PHA Mason 09/11/2015

FLEMING BROS INC. 696.0 656.0 94.25% 0.0 0.00% 0.0 0.00%LOPRESTI IMPROVEMENTS PHA Equipment Opera 12/04/2015

1,960.0 1,624.0 82.86% 736.0 37.55% 24.0 1.22%SUB TOTALS:

Page 175: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 175

Project Name Trade Latest Week

LOPRESTI SPLASH PAD & COURTS

$1,166,118Amount:

Gen Contractor: TARGET CONSTRUCTION, LLC

(603)893-2229 14 PINEWOOD ROAD SALEM

Est Start Date:

Est End Date:

08/01/2014

06/30/2015

MASS BAY ELECTRIC CORP. 4.0 0.0 0.00% 0.0 0.00% 0.0 0.00%LOPRESTI SPLASH PAD & COUR Lineman 09/28/2014

MASS BAY ELECTRIC CORP. 3.0 0.0 0.00% 0.0 0.00% 0.0 0.00%LOPRESTI SPLASH PAD & COUR Electrician 09/07/2014

7.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SUB TOTALS:

LOVEJOY WHARF

$61,000,000Amount:

Gen Contractor: SUFFOLK CONSTRUCTION CO.

(617)445-3500 64 ALLERTON STREET roxbury

Est Start Date:

Est End Date:

01/01/2013

06/14/2014

MERRIMAC TILE CO,INC. 332.0 16.0 4.82% 60.0 18.07% 72.0 21.69%LOVEJOY WHARF Floor Layer 09/30/2014

OTIS ELEVATOR COMPANY 510.0 8.0 1.57% 0.0 0.00% 12.0 2.35%LOVEJOY WHARF Elev Const Helper 01/08/2015

OSTROW ELECTRIC CO. 1,009.0 164.0 16.25% 0.0 0.00% 24.0 2.38%LOVEJOY WHARF Electrician 12/26/2014

NEW ENGLAND SANDBLAST & 2,904.5 1,102.5 37.96% 1,000.0 34.43% 0.0 0.00%LOVEJOY WHARF Painter 10/12/2014

NEW ENGLAND SANDBLAST & 145.0 0.0 0.00% 0.0 0.00% 0.0 0.00%LOVEJOY WHARF Field Engineer 06/08/2014

NASDI, LLC 24.0 0.0 0.00% 0.0 0.00% 0.0 0.00%LOVEJOY WHARF Wrecker 01/05/2014

NASDI, LLC 2,012.0 315.0 15.66% 1,011.0 50.25% 0.0 0.00%LOVEJOY WHARF Laborer 03/16/2014

METROPOLITAN MASONRY IN 10,939.0 3,189.0 29.15% 5,838.5 53.37% 363.0 3.32%LOVEJOY WHARF Waterproofer 08/03/2014

QUINN BROTHERS ESSEX INC. 474.0 0.0 0.00% 134.0 28.27% 0.0 0.00%LOVEJOY WHARF Iron Worker 01/17/2015

MERRIMAC TILE CO,INC. 51.0 0.0 0.00% 0.0 0.00% 0.0 0.00%LOVEJOY WHARF Carpet Layer 08/19/2014

MERRIMAC TILE CO,INC. 213.0 22.0 10.33% 50.0 23.47% 38.0 17.84%LOVEJOY WHARF Bricklayer 09/02/2014

MELO'S RODBUSTERS 1,295.0 205.0 15.83% 554.0 42.78% 32.0 2.47%LOVEJOY WHARF Iron Worker 06/28/2014

LYMO CONSTRUCTION CO. 3,095.5 1,238.0 39.99% 1,060.0 34.24% 0.0 0.00%LOVEJOY WHARF Carpenter 12/21/2014

LIBERTY CONST. SERVICES 582.0 136.0 23.37% 0.0 0.00% 0.0 0.00%LOVEJOY WHARF Cement Finisher 04/13/2014

LIBERTY CONST. SERVICES 9,932.5 448.0 4.51% 3,747.5 37.73% 0.0 0.00%LOVEJOY WHARF Carpenter 12/28/2014

NASDI, LLC 37.0 0.0 0.00% 0.0 0.00% 0.0 0.00%LOVEJOY WHARF Equipment Opera 02/02/2014

SUPERIOR GUNITE 187.5 0.0 0.00% 0.0 0.00% 0.0 0.00%LOVEJOY WHARF Oiler 01/18/2014

K & H ELECTRICAL SYSTEMS 37.0 18.0 48.65% 14.0 37.84% 0.0 0.00%LOVEJOY WHARF Electrician 01/17/2014

LIBERTY CONST. SERVICES 20,935.5 2,264.0 10.81% 4,263.0 20.36% 296.0 1.41%LOVEJOY WHARF Laborer 12/28/2014

VALLEYCREST LANDSCAPE 1,101.5 180.0 16.34% 400.5 36.36% 144.0 13.07%LOVEJOY WHARF Laborer 12/28/2014

VALLEYCREST LANDSCAPE 166.0 0.0 0.00% 0.0 0.00% 0.0 0.00%LOVEJOY WHARF Equipment Opera 12/21/2014

VALLEYCREST LANDSCAPE 433.0 0.0 0.00% 252.0 58.20% 0.0 0.00%LOVEJOY WHARF Bricklayer 12/28/2014

OTIS ELEVATOR COMPANY 3,131.3 410.5 13.11% 21.0 0.67% 24.0 0.77%LOVEJOY WHARF Elevator Const(M 01/22/2015

SUPERIOR RAIL& IRON WORK 2,752.0 1,199.0 43.57% 411.0 14.93% 40.0 1.45%LOVEJOY WHARF Iron Worker 09/02/2014

PRO CUT CONCRETE CUTTIN 497.0 72.0 14.49% 124.0 24.95% 0.0 0.00%LOVEJOY WHARF Laborer 08/30/2014

SUPERIOR GUNITE 4,944.5 369.5 7.47% 3,345.0 67.65% 202.0 4.09%LOVEJOY WHARF Laborer 02/15/2014

SUPERIOR GUNITE 1,619.0 394.0 24.34% 626.0 38.67% 0.0 0.00%LOVEJOY WHARF Carpenter 02/15/2014

Page 176: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 176

Project Name Trade Latest Week

SULLIVAN & MCLAUGHLIN CO. 11,280.0 5,084.5 45.08% 4,878.5 43.25% 951.0 8.43%LOVEJOY WHARF Electrician 09/28/2014

SUB-TECHNICAL, INC. 32.0 0.0 0.00% 0.0 0.00% 0.0 0.00%LOVEJOY WHARF Laborer 01/12/2014

SUB-TECHNICAL, INC. 152.0 120.0 78.95% 0.0 0.00% 0.0 0.00%LOVEJOY WHARF Driller 02/23/2014

STRUCTURES DEREK INTERN 7,482.0 1,938.0 25.90% 3,633.5 48.56% 501.5 6.70%LOVEJOY WHARF Iron Worker 11/15/2014

THE MADDISON ASSOCIATES 1,272.5 112.0 8.80% 307.0 24.13% 357.0 28.06%LOVEJOY WHARF Carpenter 12/19/2014

ALLEGHENY CONTRACT FLOO 1,122.0 0.0 0.00% 208.0 18.54% 0.0 0.00%LOVEJOY WHARF Floor Layer 09/26/2014

HAYWARD BAKER INC. 21.0 0.0 0.00% 0.0 0.00% 0.0 0.00%LOVEJOY WHARF Equipment Opera 05/18/2014

FEDERAL CONCRETE 8.0 0.0 0.00% 8.0 100.00% 0.0 0.00%LOVEJOY WHARF Carpenter 12/27/2014

EAST COAST FIREPROOFING 2,258.0 178.0 7.88% 748.0 33.13% 0.0 0.00%LOVEJOY WHARF Laborer 08/12/2014

CYN ENVIRONMENTAL SERVIC 290.0 0.0 0.00% 0.0 0.00% 0.0 0.00%LOVEJOY WHARF Laborer 01/11/2014

COMPONENT ASSEMBLY SYS 2,964.0 1,264.0 42.65% 1,020.0 34.41% 196.0 6.61%LOVEJOY WHARF Taper 10/28/2014

COMPONENT ASSEMBLY SYS 2,378.0 267.0 11.23% 1,365.0 57.40% 0.0 0.00%LOVEJOY WHARF Laborer 11/25/2014

HAYWARD BAKER INC. 13.0 0.0 0.00% 0.0 0.00% 0.0 0.00%LOVEJOY WHARF Laborer 05/18/2014

ATLANTIC CONTRACTING &SP 2,361.0 257.0 10.89% 263.0 11.14% 0.0 0.00%LOVEJOY WHARF Insulator 01/18/2015

COMPONENT ASSEMBLY SYS 10,412.0 3,312.0 31.81% 2,643.0 25.38% 0.0 0.00%LOVEJOY WHARF Carpenter 12/02/2014

ALLEGHENY CONTRACT FLOO 8.0 0.0 0.00% 0.0 0.00% 0.0 0.00%LOVEJOY WHARF Field Engineer 07/25/2014

ALLEGHENY CONTRACT FLOO 61.0 0.0 0.00% 0.0 0.00% 0.0 0.00%LOVEJOY WHARF Equipment Opera 08/29/2014

ALLEGHENY CONTRACT FLOO 680.0 0.0 0.00% 212.0 31.18% 0.0 0.00%LOVEJOY WHARF Carpenter 07/25/2014

ALDON ELECTRIC INC. 803.0 155.0 19.30% 312.0 38.85% 272.0 33.87%LOVEJOY WHARF Electrician 12/17/2014

MCCUSKER-GILL INC. 5,475.0 176.0 3.21% 195.0 3.56% 0.0 0.00%LOVEJOY WHARF Sheetmetal Work 08/24/2014

JOHN F. SHEA CO. INC. 1,610.5 161.5 10.03% 553.0 34.34% 0.0 0.00%LOVEJOY WHARF Sheetmetal Work 12/20/2014

BACK BAY CONCRETE 432.0 0.0 0.00% 184.0 42.59% 0.0 0.00%LOVEJOY WHARF Laborer 04/05/2014

JOHN F. SHEA CO. INC. 3,509.5 1,190.5 33.92% 1,816.5 51.76% 0.0 0.00%LOVEJOY WHARF Roofer 12/20/2014

HAYWARD BAKER INC. 8.0 0.0 0.00% 0.0 0.00% 0.0 0.00%LOVEJOY WHARF Piledriver 05/18/2014

J. K. GLASS CO. INC. 1,387.0 486.0 35.04% 1,024.5 73.86% 522.5 37.67%LOVEJOY WHARF Iron Worker 07/06/2014

J. K. GLASS CO. INC. 5,103.5 1,295.5 25.38% 2,117.0 41.48% 0.0 0.00%LOVEJOY WHARF Glazier 01/11/2015

J. K. GLASS CO. INC. 4,190.0 852.0 20.33% 1,035.5 24.71% 0.0 0.00%LOVEJOY WHARF Carpenter 11/23/2014

J. DERENZO CO. 2,309.5 996.5 43.15% 988.5 42.80% 0.0 0.00%LOVEJOY WHARF Laborer 12/20/2014

BACK BAY CONCRETE 528.0 0.0 0.00% 0.0 0.00% 0.0 0.00%LOVEJOY WHARF Cement Finisher 04/05/2014

J. DERENZO CO. 1,691.0 72.0 4.26% 0.0 0.00% 0.0 0.00%LOVEJOY WHARF Equipment Opera 12/20/2014

ABSOLUTE ENVIRONMENTAL, 3,433.0 0.0 0.00% 3,433.0 100.00% 0.0 0.00%LOVEJOY WHARF Asbestos Worker 04/19/2014

J. C. CANNISTRARO INC. 4,498.0 3,247.5 72.20% 2,344.5 52.12% 533.0 11.85%LOVEJOY WHARF Sprinkler Fitter 12/14/2014

J. C. CANNISTRARO INC. 8,731.0 2,245.0 25.71% 2,243.0 25.69% 713.0 8.17%LOVEJOY WHARF Plumber 12/14/2014

J. C. CANNISTRARO INC. 13,709.0 5,533.0 40.36% 4,087.0 29.81% 722.0 5.27%LOVEJOY WHARF Pipefitter 12/21/2014

Page 177: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 177

Project Name Trade Latest Week

J. C. CANNISTRARO INC. 360.0 0.0 0.00% 40.0 11.11% 0.0 0.00%LOVEJOY WHARF HVAC 03/02/2014

HERITAGE RESTORATION INC. 3,383.5 752.0 22.23% 770.5 22.77% 0.0 0.00%LOVEJOY WHARF Laborer 11/29/2014

HERITAGE RESTORATION INC. 6,875.5 997.0 14.50% 1,012.0 14.72% 130.0 1.89%LOVEJOY WHARF Bricklayer 11/29/2014

J.M. ELECTRICAL CO. INC. 1,133.0 0.0 0.00% 53.0 4.68% 0.0 0.00%LOVEJOY WHARF Electrician 08/22/2014

181,324.3 42,442.5 23.41% 60,406.5 33.31% 6,145.0 3.39%SUB TOTALS:

LUCERNE /BALSAM GRASSROOTS

$149,000Amount:

Gen Contractor: SEQUOIA CONSTRUCTION INC.

(781)447-8052 10 BUCKLEY AVE. UNIT 9 WHITMAN

Est Start Date:

Est End Date:

05/01/2015

06/30/2016

SEQUOIA CONSTRUCTION INC 727.5 291.0 40.00% 472.0 64.88% 0.0 0.00%LUCERNE /BALSAM GRASSROO Laborer 07/18/2015

PERCY CONCRETE & DESIGN, 51.5 0.0 0.00% 0.0 0.00% 0.0 0.00%LUCERNE /BALSAM GRASSROO Cement Laborer 06/20/2015

SEQUOIA CONSTRUCTION INC 74.0 0.0 0.00% 0.0 0.00% 0.0 0.00%LUCERNE /BALSAM GRASSROO Equipment Opera 07/18/2015

853.0 291.0 34.11% 472.0 55.33% 0.0 0.00%SUB TOTALS:

LULU'S BARBERSHOP AND HAIR SAL

$5,000Amount:

Gen Contractor: CAMBRIDGE REPROGRAPHIES

(617)623-2838 21 MCGRATH HGWY SOMERVILLE

Est Start Date:

Est End Date:

05/22/2016

05/26/2016

CAMBRIDGE REPROGRAPHIE 4.0 0.0 0.00% 0.0 0.00% 0.0 0.00%LULU'S BARBERSHOP AND HAIR Electrician 05/28/2016

CAMBRIDGE REPROGRAPHIE 4.0 0.0 0.00% 0.0 0.00% 4.0 100.00%LULU'S BARBERSHOP AND HAIR Laborer 05/28/2016

8.0 0.0 0.00% 0.0 0.00% 4.0 50.00%SUB TOTALS:

LYNDHURST STREET

$590,000Amount:

Gen Contractor: NORTHEAST INT SYS N E

27 PACELLA PARK RANDOLPH

Est Start Date:

Est End Date:

01/01/2016

03/31/2017

G&G MASONRY & RESTORATI 975.0 975.0 100.00% 975.0 100.00% 0.0 0.00%LYNDHURST STREET Laborer 06/11/2016

G&G MASONRY & RESTORATI 797.5 0.0 0.00% 797.5 100.00% 0.0 0.00%LYNDHURST STREET Mason 06/11/2016

HANNAH ENVIRONMENTAL EN 216.0 0.0 0.00% 0.0 0.00% 0.0 0.00%LYNDHURST STREET Carpenter 08/06/2016

HANNAH ENVIRONMENTAL EN 256.0 0.0 0.00% 0.0 0.00% 104.0 40.63%LYNDHURST STREET Laborer 07/23/2016

LOWE PLUMB & HEATING 2,485.2 1,391.3 55.98% 2,485.2 100.00% 0.0 0.00%LYNDHURST STREET Plumber 01/28/2017

N E I CONTRACTORS 2,124.5 2,124.5 100.00% 2,124.5 100.00% 0.0 0.00%LYNDHURST STREET Laborer 01/14/2017

PAINT & COATING 3,063.0 975.0 31.83% 3,063.0 100.00% 0.0 0.00%LYNDHURST STREET Painter 03/04/2017

REFORM MASONRY 575.0 214.0 37.22% 575.0 100.00% 0.0 0.00%LYNDHURST STREET Mason Tender 02/11/2017

RISE & SHINE CLEANING & CO 283.7 281.2 99.12% 250.9 88.45% 242.2 85.37%LYNDHURST STREET Laborer 03/04/2017

TERRATEC 2,840.5 702.0 24.71% 2,840.5 100.00% 0.0 0.00%LYNDHURST STREET Laborer 12/03/2016

WENDY'S DRYWALL 2,671.0 310.0 11.61% 2,671.0 100.00% 0.0 0.00%LYNDHURST STREET Carpenter 12/04/2016

NORTH TECH BUILDERS, INC. 3,092.0 0.0 0.00% 3,092.0 100.00% 0.0 0.00%LYNDHURST STREET Carpenter 06/25/2016

FORM-UP FOUNDATIONS, LLC. 378.0 0.0 0.00% 0.0 0.00% 0.0 0.00%LYNDHURST STREET Carpenter 09/25/2016

FORCE CORP. 3,466.0 195.0 5.63% 3,466.0 100.00% 276.0 7.96%LYNDHURST STREET Laborer 11/19/2016

FORCE CORP. 950.1 0.0 0.00% 950.1 100.00% 0.0 0.00%LYNDHURST STREET Carpenter 11/19/2016

Page 178: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 178

Project Name Trade Latest Week

F & L CONSTRUCTION SERVIC 2,240.0 0.0 0.00% 1,720.0 76.79% 0.0 0.00%LYNDHURST STREET Laborer 03/05/2016

DYKEMAN WELDING & FABRIC 76.0 0.0 0.00% 24.0 31.58% 0.0 0.00%LYNDHURST STREET Welder 11/11/2016

COVENANT FIRE PROTECTION 859.0 8.0 0.93% 8.0 0.93% 0.0 0.00%LYNDHURST STREET Sprinkler Fitter 02/04/2017

CC-CONSULT 104.0 84.0 80.77% 104.0 100.00% 0.0 0.00%LYNDHURST STREET Laborer 10/01/2016

CARL-LOUIS & CO INC. 404.0 176.0 43.56% 104.0 25.74% 0.0 0.00%LYNDHURST STREET Plumber 01/07/2017

AQUARELLE PAINTING 1,519.5 1,519.5 100.00% 1,519.5 100.00% 0.0 0.00%LYNDHURST STREET Laborer 11/20/2016

AQUARELLE PAINTING 275.0 275.0 100.00% 275.0 100.00% 0.0 0.00%LYNDHURST STREET Carpenter 09/09/2016

ANCHOR INSULATION 762.0 0.0 0.00% 584.5 76.71% 0.0 0.00%LYNDHURST STREET Insulator 11/19/2016

G & O INC. 3,304.0 2,054.0 62.17% 1,516.0 45.88% 0.0 0.00%LYNDHURST STREET Electrician 02/04/2017

REFORM MASONRY 758.0 280.0 36.94% 758.0 100.00% 0.0 0.00%LYNDHURST STREET Mason 12/24/2016

34,475.0 11,564.4 33.54% 29,903.7 86.74% 622.2 1.80%SUB TOTALS:

MASS BAY BRAZILIAN

$3,000Amount:

Gen Contractor: HUNTER SIGNS

(617)360-9710 120 BUSINESS STREET HYDE PARK

Est Start Date:

Est End Date:

02/01/2014

03/01/2014

HUNTER SIGNS 5.0 5.0 100.00% 5.0 100.00% 0.0 0.00%MASS BAY BRAZILIAN Laborer 03/08/2014

5.0 5.0 100.00% 5.0 100.00% 0.0 0.00%SUB TOTALS:

MASS GENERAL HOSPITAL

$342,000,000Amount:

Gen Contractor: TURNER CONSTRUCTION CO.

(617)247-6400 TWO SEAPORT LANE BOSTON

Est Start Date:

Est End Date:

05/01/2008

04/30/2011

TURNER CONSTRUCTION CO. 80.0 40.0 50.00% 0.0 0.00% 0.0 0.00%MASS GENERAL HOSPITAL Sprinkler Fitter 06/10/2016

80.0 40.0 50.00% 0.0 0.00% 0.0 0.00%SUB TOTALS:

MB CONVENIENCE

$2,500Amount:

Gen Contractor: STATEWIDE SIGN

(617)472-8828 541-543 WASHINGHTON STREET QUINCY

Est Start Date:

Est End Date:

07/25/2014

07/25/2014

STATEWIDE SIGN 16.0 0.0 0.00% 16.0 100.00% 0.0 0.00%MB CONVENIENCE Laborer 07/25/2014

16.0 0.0 0.00% 16.0 100.00% 0.0 0.00%SUB TOTALS:

MEI MEI

$2,500Amount:

Gen Contractor:

Est Start Date:

Est End Date:

12/01/2013

01/31/2014

OSO CRWATIVE FABRICATION 15.0 0.0 0.00% 0.0 0.00% 0.0 0.00%MEI MEI Laborer 12/27/2013

15.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SUB TOTALS:

METRO BOSTON ALIVE

$20,000Amount:

Gen Contractor:

Est Start Date:

Est End Date:

08/08/2016

08/19/2016

HARBOUR POINT CONSTRUCT 68.0 68.0 100.00% 0.0 0.00% 0.0 0.00%METRO BOSTON ALIVE Cement Laborer 08/19/2016

HARBOUR POINT CONSTRUCT 24.0 24.0 100.00% 24.0 100.00% 0.0 0.00%METRO BOSTON ALIVE Electrician 08/19/2016

HARBOUR POINT CONSTRUCT 123.0 123.0 100.00% 68.0 55.28% 0.0 0.00%METRO BOSTON ALIVE Laborer 08/19/2016

Page 179: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 179

Project Name Trade Latest Week

215.0 215.0 100.00% 92.0 42.79% 0.0 0.00%SUB TOTALS:

MI PUEBLITO RESTAURANT

$2,000Amount:

Gen Contractor: EXCEL SIGNS & DECORATION CORP.

(617)479-8552 259 QUINCY AVE. QUINCY

Est Start Date:

Est End Date:

10/18/2015

10/24/2015

EXCEL SIGNS & DECORATION 12.0 0.0 0.00% 12.0 100.00% 6.0 50.00%MI PUEBLITO RESTAURANT Laborer 10/24/2015

12.0 0.0 0.00% 12.0 100.00% 6.0 50.00%SUB TOTALS:

MIAM MIAM MACARONERIE

$2,500Amount:

Gen Contractor: HUNTER SIGNS

(617)360-9710 120 BUSINESS STREET HYDE PARK

Est Start Date:

Est End Date:

10/23/2016

10/26/2016

HUNTER SIGNS 2.0 2.0 100.00% 2.0 100.00% 0.0 0.00%MIAM MIAM MACARONERIE Laborer 10/29/2016

2.0 2.0 100.00% 2.0 100.00% 0.0 0.00%SUB TOTALS:

MIDA RESTAURANT

$2,500Amount:

Gen Contractor: NE NEON CO.

(617)242-6999 50 TERMINAL STREET #1 CHARLESTOWN

Est Start Date:

Est End Date:

01/08/2017

01/15/2017

NE NEON CO. 10.0 0.0 0.00% 0.0 0.00% 0.0 0.00%MIDA RESTAURANT Laborer 01/15/2017

10.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SUB TOTALS:

MOLINARI'S

$2,500Amount:

Gen Contractor: SOUTH BOSTON SIGN CO.

(617)268-7446 89 DAMNELL STREET SOUTH BOSTON

Est Start Date:

Est End Date:

06/05/2016

06/12/2016

SOUTH BOSTON SIGN CO. 8.0 8.0 100.00% 0.0 0.00% 0.0 0.00%MOLINARI'S Laborer 06/12/2016

8.0 8.0 100.00% 0.0 0.00% 0.0 0.00%SUB TOTALS:

MOXY HOTEL

$82,400,000Amount:

Gen Contractor: LEE KENNEDY

825-6930 1792 DORCHESTER AVE BOSTON

Est Start Date:

Est End Date:

01/21/2017

04/30/2019

HUB FOUNDATION CO. 179.5 0.0 0.00% 0.0 0.00% 0.0 0.00%MOXY HOTEL Piledriver 09/17/2017

LEE KENNEDY 37.0 37.0 100.00% 0.0 0.00% 0.0 0.00%MOXY HOTEL Laborer 09/05/2017

HUB FOUNDATION CO. 40.0 40.0 100.00% 40.0 100.00% 0.0 0.00%MOXY HOTEL Technician 09/17/2017

JAMES W. FLETT CO. INC. 1,198.0 838.0 69.95% 830.0 69.28% 0.0 0.00%MOXY HOTEL Equipment Opera 09/10/2017

SOUTH COAST STEEL LLC. 771.0 312.0 40.47% 641.0 83.14% 24.0 3.11%MOXY HOTEL Iron Worker 09/09/2017

HUB FOUNDATION CO. 1,050.5 681.0 64.83% 328.0 31.22% 0.0 0.00%MOXY HOTEL Laborer 09/17/2017

HUB FOUNDATION CO. 1,115.5 0.0 0.00% 220.5 19.77% 220.5 19.77%MOXY HOTEL Equipment Opera 09/17/2017

HAYWARD BAKER INC. 94.5 4.0 4.23% 0.0 0.00% 0.0 0.00%MOXY HOTEL Piledriver 08/06/2017

HAYWARD BAKER INC. 114.0 8.0 7.02% 110.0 96.49% 0.0 0.00%MOXY HOTEL Laborer 08/06/2017

HAYWARD BAKER INC. 310.0 0.0 0.00% 0.0 0.00% 0.0 0.00%MOXY HOTEL Equipment Opera 08/06/2017

JAMES W. FLETT CO. INC. 3,047.0 1,651.0 54.18% 963.0 31.60% 0.0 0.00%MOXY HOTEL Laborer 09/03/2017

HUB FOUNDATION CO. 111.5 111.5 100.00% 111.5 100.00% 111.5 100.00%MOXY HOTEL Oiler 09/17/2017

8,068.5 3,682.5 45.64% 3,244.0 40.21% 356.0 4.41%SUB TOTALS:

Page 180: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 180

Project Name Trade Latest Week

MUJERES UNIDAS AVANZANDO

$20,000Amount:

Gen Contractor: CITY WIDE PAVING

(617)895-9692 21 WASHUSETT STREET JAMAICA PLAIN

Est Start Date:

Est End Date:

06/05/2016

06/08/2016

CITY WIDE PAVING 24.0 24.0 100.00% 0.0 0.00% 0.0 0.00%MUJERES UNIDAS AVANZANDO Laborer 06/08/2016

24.0 24.0 100.00% 0.0 0.00% 0.0 0.00%SUB TOTALS:

MUNICIPAL PARKING LOT & GROVE H

$774,734Amount:

Gen Contractor: FLEMING BROS INC.

(781)843-4071 106 COLUMBIA STREET QUINCY

Est Start Date:

Est End Date:

07/15/2017

12/31/2017

MASS BAY ELECTRIC CORP. 18.0 0.0 0.00% 0.0 0.00% 0.0 0.00%MUNICIPAL PARKING LOT & GR Lineman 08/27/2017

FLEMING BROS INC. 224.0 0.0 0.00% 0.0 0.00% 0.0 0.00%MUNICIPAL PARKING LOT & GR Equipment Opera 08/25/2017

FLEMING BROS INC. 904.0 696.0 76.99% 536.0 59.29% 80.0 8.85%MUNICIPAL PARKING LOT & GR Laborer 09/22/2017

MASS BAY ELECTRIC CORP. 20.0 8.0 40.00% 0.0 0.00% 0.0 0.00%MUNICIPAL PARKING LOT & GR Electrician 09/10/2017

MASS BAY ELECTRIC CORP. 16.0 0.0 0.00% 0.0 0.00% 0.0 0.00%MUNICIPAL PARKING LOT & GR Groundman 08/27/2017

1,182.0 704.0 59.56% 536.0 45.35% 80.0 6.77%SUB TOTALS:

MYER DANA PROPERTY 2

$25,000Amount:

Gen Contractor: ZVI CONSTRUCTION CO, LLC.

(617)731-5599 131 DUMMER STREET BROOKLINE

Est Start Date:

Est End Date:

10/24/2016

12/30/2016

SUMMIT PRINCIPLE INVESTME 180.0 0.0 0.00% 0.0 0.00% 0.0 0.00%MYER DANA PROPERTY 2 Carpenter 12/30/2016

J & C MASONRY LANDSCAPIN 160.0 0.0 0.00% 160.0 100.00% 0.0 0.00%MYER DANA PROPERTY 2 Mason 11/18/2016

STUART GLASS INC. 120.0 120.0 100.00% 120.0 100.00% 0.0 0.00%MYER DANA PROPERTY 2 Glazier 12/30/2016

460.0 120.0 26.09% 280.0 60.87% 0.0 0.00%SUB TOTALS:

MYJERS UNIDOS AUGZAUDO

$10,000Amount:

Gen Contractor: MANUEL DOSSANTOS

(617)962-1147 263 WEST ELM STREET BROCKTON

Est Start Date:

Est End Date:

04/01/2014

06/30/2014

MANUEL DOSSANTOS 64.0 0.0 0.00% 64.0 100.00% 0.0 0.00%MYJERS UNIDOS AUGZAUDO Marble Tile Work 04/25/2014

MANUEL DOSSANTOS 78.0 0.0 0.00% 78.0 100.00% 0.0 0.00%MYJERS UNIDOS AUGZAUDO Painter 05/23/2014

142.0 0.0 0.00% 142.0 100.00% 0.0 0.00%SUB TOTALS:

NEW BALANCE RESIDENTIAL / 125 GU

$125,000,000Amount:

Gen Contractor: JOHN MORIARTY & ASSOCIATES

(781)729-3900 3 CHURCH STREET WINCHESTER

Est Start Date:

Est End Date:

08/01/2016

09/01/2018

PRIME STEEL ERECTING INC, 23,709.0 10,703.5 45.15% 6,390.5 26.95% 1,116.5 4.71%NEW BALANCE RESIDENTIAL / 1 Iron Worker 08/26/2017

NEW ENGLAND FOUNDATION 1,734.0 1,325.0 76.41% 749.5 43.22% 0.0 0.00%NEW BALANCE RESIDENTIAL / 1 Laborer 12/24/2016

NEW ENGLAND FOUNDATION 1,021.5 0.0 0.00% 0.0 0.00% 0.0 0.00%NEW BALANCE RESIDENTIAL / 1 Equipment Opera 11/26/2016

NEW ENGLAND FOUNDATION 740.0 9.0 1.22% 740.0 100.00% 0.0 0.00%NEW BALANCE RESIDENTIAL / 1 Oiler 11/26/2016

NEW ENGLAND FOUNDATION 2,712.5 858.0 31.63% 568.0 20.94% 29.0 1.07%NEW BALANCE RESIDENTIAL / 1 Piledriver 12/31/2016

P.J. DIONNE CO INC. 12,291.0 2,957.0 24.06% 1,906.5 15.51% 810.0 6.59%NEW BALANCE RESIDENTIAL / 1 Plumber 09/16/2017

PRECISION STEEL PLACERS 1,165.0 14.0 1.20% 11.0 0.94% 0.0 0.00%NEW BALANCE RESIDENTIAL / 1 Iron Worker 07/22/2017

PRIME STEEL ERECTING INC, 728.0 0.0 0.00% 0.0 0.00% 0.0 0.00%NEW BALANCE RESIDENTIAL / 1 Bricklayer 08/19/2017

Page 181: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 181

Project Name Trade Latest Week

S & F CONCRETE 5,034.0 2,233.5 44.37% 1,466.0 29.12% 0.0 0.00%NEW BALANCE RESIDENTIAL / 1 Carpenter 08/26/2017

T & T STEEL ERECTORS 2,341.0 557.0 23.79% 1,951.0 83.34% 0.0 0.00%NEW BALANCE RESIDENTIAL / 1 Iron Worker 09/16/2017

S & F CONCRETE 1,440.5 154.5 10.73% 226.0 15.69% 0.0 0.00%NEW BALANCE RESIDENTIAL / 1 Cement Finisher 08/05/2017

COMMONWEALTH BUILDING S 1,826.0 747.0 40.91% 686.5 37.60% 143.5 7.86%NEW BALANCE RESIDENTIAL / 1 Roofer 09/02/2017

S & F CONCRETE 767.0 0.0 0.00% 0.0 0.00% 0.0 0.00%NEW BALANCE RESIDENTIAL / 1 Equipment Opera 09/09/2017

S & F CONCRETE 6,754.5 679.5 10.06% 2,621.5 38.81% 604.5 8.95%NEW BALANCE RESIDENTIAL / 1 Laborer 08/26/2017

SALVUCCI MASONRY COMPAN 288.0 80.0 27.78% 80.0 27.78% 0.0 0.00%NEW BALANCE RESIDENTIAL / 1 Bricklayer 06/17/2017

STATE ELECTRIC CO. 18,585.3 4,564.5 24.56% 2,433.5 13.09% 1,149.0 6.18%NEW BALANCE RESIDENTIAL / 1 Electrician 09/10/2017

LIMBACH CO. 7,511.0 1,572.0 20.93% 1,412.0 18.80% 0.0 0.00%NEW BALANCE RESIDENTIAL / 1 Pipefitter 09/19/2017

SALVUCCI MASONRY COMPAN 128.0 0.0 0.00% 0.0 0.00% 0.0 0.00%NEW BALANCE RESIDENTIAL / 1 Laborer 06/17/2017

J. DERENZO CO. 5,843.0 1,491.5 25.53% 1,482.5 25.37% 1,169.5 20.02%NEW BALANCE RESIDENTIAL / 1 Laborer 09/16/2017

BEACON WATERPROOFING A 1,774.5 525.5 29.61% 227.5 12.82% 0.0 0.00%NEW BALANCE RESIDENTIAL / 1 Bricklayer 09/08/2017

BEACON WATERPROOFING A 132.5 0.0 0.00% 132.5 100.00% 0.0 0.00%NEW BALANCE RESIDENTIAL / 1 Laborer 07/21/2017

CENTURY DRYWALL INC, 16,559.5 3,328.0 20.10% 6,643.5 40.12% 245.5 1.48%NEW BALANCE RESIDENTIAL / 1 Carpenter 09/16/2017

CENTURY DRYWALL INC, 2,343.5 435.5 18.58% 32.0 1.37% 40.0 1.71%NEW BALANCE RESIDENTIAL / 1 Laborer 09/16/2017

CENTURY DRYWALL INC, 670.5 16.0 2.39% 80.0 11.93% 24.0 3.58%NEW BALANCE RESIDENTIAL / 1 Taper 09/16/2017

COMMONWEALTH BUILDING S 4.0 0.0 0.00% 0.0 0.00% 0.0 0.00%NEW BALANCE RESIDENTIAL / 1 Sheetmetal Work 09/02/2017

EAST COAST FIREPROOFING 2,755.0 24.0 0.87% 934.0 33.90% 32.0 1.16%NEW BALANCE RESIDENTIAL / 1 Laborer 09/12/2017

J. DERENZO CO. 4,705.5 0.0 0.00% 556.0 11.82% 0.0 0.00%NEW BALANCE RESIDENTIAL / 1 Equipment Opera 09/16/2017

JULIAN CRANE & EQUIPMENT 355.0 67.0 18.87% 67.0 18.87% 0.0 0.00%NEW BALANCE RESIDENTIAL / 1 Iron Worker 08/20/2017

J. K. GLASS CO. INC. 2,035.0 332.0 16.31% 0.0 0.00% 0.0 0.00%NEW BALANCE RESIDENTIAL / 1 Carpenter 09/17/2017

J. K. GLASS CO. INC. 3,507.0 197.0 5.62% 280.0 7.98% 541.5 15.44%NEW BALANCE RESIDENTIAL / 1 Glazier 09/17/2017

J. K. GLASS CO. INC. 2,177.5 289.0 13.27% 1,110.5 51.00% 0.0 0.00%NEW BALANCE RESIDENTIAL / 1 Iron Worker 09/17/2017

JOHN MORIARTY & ASSOCIAT 3,360.0 3,360.0 100.00% 2,042.0 60.77% 552.0 16.43%NEW BALANCE RESIDENTIAL / 1 Carpenter 09/17/2017

JOHN MORIARTY & ASSOCIAT 8,776.0 3,831.0 43.65% 5,489.0 62.55% 643.0 7.33%NEW BALANCE RESIDENTIAL / 1 Laborer 09/17/2017

JULIAN CRANE & EQUIPMENT 371.0 0.0 0.00% 0.0 0.00% 0.0 0.00%NEW BALANCE RESIDENTIAL / 1 Elevator Const(M 09/17/2017

JULIAN CRANE & EQUIPMENT 1,954.5 18.0 0.92% 745.5 38.14% 763.5 39.06%NEW BALANCE RESIDENTIAL / 1 Equipment Opera 09/17/2017

J. C. CANNISTRARO INC. 3,418.0 1,236.0 36.16% 996.0 29.14% 302.0 8.84%NEW BALANCE RESIDENTIAL / 1 Sprinkler Fitter 09/17/2017

149,518.3 41,605.0 27.83% 42,060.0 28.13% 8,165.5 5.46%SUB TOTALS:

NEW ENGLAND CENTER FOR ART TE

$20,000Amount:

Gen Contractor:

Est Start Date:

Est End Date:

06/02/2016

08/05/2016

BEANTOWN DRAINS 64.0 0.0 0.00% 32.0 50.00% 0.0 0.00%NEW ENGLAND CENTER FOR A Plumber 07/29/2016

JOE WARREN AND SONS CO. 8.0 0.0 0.00% 0.0 0.00% 0.0 0.00%NEW ENGLAND CENTER FOR A Laborer 08/05/2016

72.0 0.0 0.00% 32.0 44.44% 0.0 0.00%SUB TOTALS:

Page 182: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 182

Project Name Trade Latest Week

NEW ENGLAND CENTER FOR CULLIN

$16,000Amount:

Gen Contractor: SEDERMAN BUILERS

(508)759-9050 P.O.BOX 767, MONUMENT BEACH

Est Start Date:

Est End Date:

10/12/2015

11/01/2015

SEDERMAN BUILERS 103.0 0.0 0.00% 0.0 0.00% 0.0 0.00%NEW ENGLAND CENTER FOR C Carpenter 11/01/2015

103.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SUB TOTALS:

NEW ENGLAND CENTER FOR HOMEL

$1,000,000Amount:

Gen Contractor: CONSIGLI CONSTRUCTION

197 MAIN STREET MILFORD

Est Start Date:

Est End Date:

04/01/2015

11/28/2016

S.O.S. CORPORATION 8,932.0 3,275.0 36.67% 6,866.0 76.87% 1,437.0 16.09%NEW ENGLAND CENTER FOR H Laborer 04/30/2017

MODERN GLASS & ALUMINUM 526.8 0.0 0.00% 12.0 2.28% 0.0 0.00%NEW ENGLAND CENTER FOR H Glazier 08/12/2017

NESC INC 633.0 49.0 7.74% 73.0 11.53% 0.0 0.00%NEW ENGLAND CENTER FOR H Laborer 06/24/2017

PATRIOT PLUMBING & HEATIN 12,196.0 4,185.0 34.31% 5,049.0 41.40% 0.0 0.00%NEW ENGLAND CENTER FOR H Plumber 03/26/2017

PAVILION FLOORS, INC. 80.0 32.0 40.00% 80.0 100.00% 0.0 0.00%NEW ENGLAND CENTER FOR H Floor Layer 11/26/2016

PAVILION FLOORS, INC. 2,965.5 199.0 6.71% 1,108.0 37.36% 0.0 0.00%NEW ENGLAND CENTER FOR H Terrazzo Worker 08/12/2017

QUINN BROTHERS ESSEX INC. 10.0 0.0 0.00% 0.0 0.00% 0.0 0.00%NEW ENGLAND CENTER FOR H Equipment Opera 10/08/2016

QUINN BROTHERS ESSEX INC. 1,041.0 0.0 0.00% 374.0 35.93% 0.0 0.00%NEW ENGLAND CENTER FOR H Iron Worker 06/10/2017

RICMOR CONSTRUCTION INC. 40.0 0.0 0.00% 0.0 0.00% 0.0 0.00%NEW ENGLAND CENTER FOR H Plasterer 07/30/2016

SILVERBACKCONCRETE CON 129.5 16.5 12.74% 16.0 12.36% 0.0 0.00%NEW ENGLAND CENTER FOR H Cement Finisher 11/12/2016

SILVERBACKCONCRETE CON 159.5 0.0 0.00% 0.0 0.00% 0.0 0.00%NEW ENGLAND CENTER FOR H Cement Laborer 11/12/2016

TITAN ROOFING INC. 5,600.0 972.0 17.36% 1,637.0 29.23% 227.5 4.06%NEW ENGLAND CENTER FOR H Roofer 07/01/2017

TITAN ROOFING INC. 344.0 0.0 0.00% 0.0 0.00% 0.0 0.00%NEW ENGLAND CENTER FOR H Sheetmetal Work 08/26/2017

NORTHSTAR CONTRACTING G 6,474.0 2,229.0 34.43% 5,877.0 90.78% 446.0 6.89%NEW ENGLAND CENTER FOR H Asbestos Worker 10/09/2016

MCCUSKER-GILL INC. 8,643.0 2,743.0 31.74% 3,403.0 39.37% 0.0 0.00%NEW ENGLAND CENTER FOR H Sheetmetal Work 09/03/2017

RICMOR CONSTRUCTION INC. 64.0 8.0 12.50% 8.0 12.50% 0.0 0.00%NEW ENGLAND CENTER FOR H Laborer 07/30/2016

CAVALIERI CONSTRUCTION C 180.5 0.0 0.00% 8.5 4.71% 0.0 0.00%NEW ENGLAND CENTER FOR H Equipment Opera 12/03/2016

PAVILION FLOORS, INC. 2,352.0 96.0 4.08% 1,614.0 68.62% 284.0 12.07%NEW ENGLAND CENTER FOR H Carpet Layer 09/09/2017

MASS ACOUSTICS, INC. 3,212.0 322.0 10.02% 818.0 25.47% 322.0 10.02%NEW ENGLAND CENTER FOR H Taper 06/11/2017

ARCHER CORPORATION 964.0 0.0 0.00% 0.0 0.00% 0.0 0.00%NEW ENGLAND CENTER FOR H Carpenter 06/23/2017

C & D SIGNS, INC. DBA METRO 12.4 0.0 0.00% 2.7 21.50% 0.0 0.00%NEW ENGLAND CENTER FOR H Laborer 12/17/2016

CAVALIERI CONSTRUCTION C 581.0 23.5 4.04% 222.0 38.21% 0.0 0.00%NEW ENGLAND CENTER FOR H Laborer 12/03/2016

HAVEN RESTORATION 2,287.0 405.0 17.71% 403.0 17.62% 0.0 0.00%NEW ENGLAND CENTER FOR H Bricklayer 05/27/2017

HAVEN RESTORATION 1,304.0 402.0 30.83% 252.0 19.33% 0.0 0.00%NEW ENGLAND CENTER FOR H Mason Tender 05/20/2017

J.M. ELECTRICAL CO. INC. 710.0 40.0 5.63% 76.0 10.70% 0.0 0.00%NEW ENGLAND CENTER FOR H Electrician 09/15/2017

LANCO SCAFFOLDING INC. 38.0 8.0 21.05% 38.0 100.00% 0.0 0.00%NEW ENGLAND CENTER FOR H Carpenter 07/09/2016

LANCO SCAFFOLDING INC. 177.0 43.0 24.29% 177.0 100.00% 0.0 0.00%NEW ENGLAND CENTER FOR H Laborer 07/16/2016

LYNNWELL ASSOCIATES INC 17,019.5 9,171.0 53.89% 3,270.0 19.21% 1,010.0 5.93%NEW ENGLAND CENTER FOR H Electrician 08/12/2017

Page 183: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 183

Project Name Trade Latest Week

LYNNWELL ASSOCIATES INC 1,227.0 264.0 21.52% 296.0 24.12% 264.0 21.52%NEW ENGLAND CENTER FOR H Technician 07/01/2017

K & K ACOUSTICAL CEILINGS 2,591.0 142.0 5.48% 126.0 4.86% 32.0 1.24%NEW ENGLAND CENTER FOR H Carpenter 08/06/2017

MASS ACOUSTICS, INC. 1,748.0 204.0 11.67% 272.0 15.56% 0.0 0.00%NEW ENGLAND CENTER FOR H Laborer 06/11/2017

BEACON FIRE PROTECTION, I 4,240.0 1,008.0 23.77% 1,188.0 28.02% 0.0 0.00%NEW ENGLAND CENTER FOR H Sprinkler Fitter 01/13/2017

MASS ACOUSTICS, INC. 8,376.5 2,133.5 25.47% 2,115.5 25.26% 0.0 0.00%NEW ENGLAND CENTER FOR H Carpenter 06/04/2017

94,858.2 27,970.5 29.49% 35,381.7 37.30% 4,022.5 4.24%SUB TOTALS:

NORTHAMPTON TOWERS

$1,000,000Amount:

Gen Contractor: C.W.C. BUILDERS INC.

(617)965-2800 7 WELLS AVENUE NEWTON

Est Start Date:

Est End Date:

10/01/2013

11/30/2014

MORETRENCH 534.5 0.0 0.00% 63.0 11.79% 0.0 0.00%NORTHAMPTON TOWERS Laborer 01/18/2014

URBAN INSULATION 772.0 0.0 0.00% 467.0 60.49% 0.0 0.00%NORTHAMPTON TOWERS Asbestos Worker 01/04/2015

PAYNE/SAVEON JOINT 9,605.0 4,363.5 45.43% 3,604.5 37.53% 414.5 4.32%NORTHAMPTON TOWERS Carpenter 01/31/2015

PAYNE CONTRACTING CO. 3,890.0 3,539.0 90.98% 3,539.0 90.98% 421.0 10.82%NORTHAMPTON TOWERS Painter 12/13/2014

PAYNE CONTRACTING CO. 537.0 537.0 100.00% 537.0 100.00% 0.0 0.00%NORTHAMPTON TOWERS Laborer 02/22/2014

NER CONS MANAGEMENT INC. 305.0 10.0 3.28% 0.0 0.00% 0.0 0.00%NORTHAMPTON TOWERS Mason Tender 01/04/2015

NER CONS MANAGEMENT INC. 415.5 0.0 0.00% 8.0 1.93% 0.0 0.00%NORTHAMPTON TOWERS Laborer 12/14/2014

MURPHY SPECIALTIES, INC. 160.0 48.0 30.00% 0.0 0.00% 0.0 0.00%NORTHAMPTON TOWERS Sheetmetal Work 08/02/2014

MORETRENCH 99.5 0.0 0.00% 0.0 0.00% 0.0 0.00%NORTHAMPTON TOWERS Equipment Opera 12/21/2013

MORETRENCH 182.0 0.0 0.00% 51.5 28.30% 0.0 0.00%NORTHAMPTON TOWERS Driller 12/28/2013

MARGUERITE CONCRETE 38.0 0.0 0.00% 0.0 0.00% 0.0 0.00%NORTHAMPTON TOWERS Equipment Opera 10/25/2014

STEELCO FENCING 20.0 8.0 40.00% 10.0 50.00% 0.0 0.00%NORTHAMPTON TOWERS Laborer 09/27/2014

MARGUERITE CONCRETE 32.0 0.0 0.00% 0.0 0.00% 0.0 0.00%NORTHAMPTON TOWERS Laborer 10/11/2014

NER CONS MANAGEMENT INC. 4,038.5 1,117.5 27.67% 1,154.5 28.59% 0.0 0.00%NORTHAMPTON TOWERS Bricklayer 01/04/2015

PAYNE/SAVEON JOINT 815.0 24.0 2.94% 24.0 2.94% 0.0 0.00%NORTHAMPTON TOWERS Taper 12/20/2014

PROVIDENCE WINDOW TREAT 396.0 329.0 83.08% 289.0 72.98% 40.0 10.10%NORTHAMPTON TOWERS Carpenter 06/14/2014

RICMOR CONSTRUCTION INC. 36.0 0.0 0.00% 0.0 0.00% 0.0 0.00%NORTHAMPTON TOWERS Laborer 09/16/2014

RICMOR CONSTRUCTION INC. 16.0 0.0 0.00% 0.0 0.00% 0.0 0.00%NORTHAMPTON TOWERS Plasterer 09/16/2014

S.O.S. CORPORATION 982.5 129.0 13.13% 630.5 64.17% 596.0 60.66%NORTHAMPTON TOWERS Laborer 01/04/2015

SMI DEMOLITION, INC. 8,663.0 3,685.5 42.54% 7,540.5 87.04% 0.0 0.00%NORTHAMPTON TOWERS Asbestos Worker 12/06/2014

STANLEY ELEVATOR 979.5 0.0 0.00% 0.0 0.00% 0.0 0.00%NORTHAMPTON TOWERS Elevator Const(M 03/13/2015

SUNRISE ERECTORS INC. 4,581.5 1,137.5 24.83% 443.5 9.68% 701.0 15.30%NORTHAMPTON TOWERS Carpenter 03/08/2015

SUNRISE ERECTORS INC. 1,887.3 404.3 21.42% 20.0 1.06% 0.0 0.00%NORTHAMPTON TOWERS Glazier 01/25/2015

TITAN ROOFING INC. 1,610.5 65.0 4.04% 508.5 31.57% 0.0 0.00%NORTHAMPTON TOWERS Roofer 01/10/2015

TITAN ROOFING INC. 174.0 0.0 0.00% 0.0 0.00% 0.0 0.00%NORTHAMPTON TOWERS Sheetmetal Work 01/10/2015

UNITED H.V.A.C. COMPANY, IN 1,382.5 71.0 5.14% 44.0 3.18% 0.0 0.00%NORTHAMPTON TOWERS Sheetmetal Work 02/15/2015

Page 184: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 184

Project Name Trade Latest Week

MARGUERITE CONCRETE 16.0 0.0 0.00% 0.0 0.00% 0.0 0.00%NORTHAMPTON TOWERS Cement Finisher 05/10/2014

PAYNE/SAVEON JOINT 3,786.5 2,842.5 75.07% 2,866.0 75.69% 853.0 22.53%NORTHAMPTON TOWERS Laborer 12/27/2014

STANLEY ELEVATOR 939.0 0.0 0.00% 0.0 0.00% 40.0 4.26%NORTHAMPTON TOWERS Elev Const Helper 03/13/2015

BOSTON CONTRACT DRILLING 20.0 0.0 0.00% 0.0 0.00% 0.0 0.00%NORTHAMPTON TOWERS Cement Finisher 04/04/2014

LANCO SCAFFOLDING INC. 24.0 8.0 33.33% 24.0 100.00% 0.0 0.00%NORTHAMPTON TOWERS Laborer 03/16/2014

PRO CUT CONCRETE CUTTIN 200.0 0.0 0.00% 0.0 0.00% 0.0 0.00%NORTHAMPTON TOWERS Laborer 08/30/2014

AAMS CORPORATION 986.0 393.0 39.86% 222.0 22.52% 0.0 0.00%NORTHAMPTON TOWERS Iron Worker 01/31/2015

AAXIOM CONCRETE CUTTING 72.0 0.0 0.00% 0.0 0.00% 0.0 0.00%NORTHAMPTON TOWERS Laborer 10/12/2014

ATLANTIC COAST DISMANTLIN 134.0 0.0 0.00% 38.0 28.36% 0.0 0.00%NORTHAMPTON TOWERS Laborer 12/28/2013

BONOMO TILE CO., INC. 188.0 128.0 68.09% 128.0 68.09% 0.0 0.00%NORTHAMPTON TOWERS Marble Tile Work 07/12/2014

BOSTON CONTRACT DRILLING 133.0 0.0 0.00% 0.0 0.00% 0.0 0.00%NORTHAMPTON TOWERS Cement Laborer 11/21/2014

C.W.C. BUILDERS INC. 1,373.0 0.0 0.00% 0.0 0.00% 0.0 0.00%NORTHAMPTON TOWERS Carpenter 02/04/2015

C.W.C. BUILDERS INC. 1,124.0 1,124.0 100.00% 0.0 0.00% 0.0 0.00%NORTHAMPTON TOWERS Laborer 01/14/2015

CHILLER TECHNOLOGIES. 5,923.0 1,407.5 23.76% 1,210.5 20.44% 40.0 0.68%NORTHAMPTON TOWERS Pipefitter 01/18/2015

CONTROL TECHNOLOGIES, IN 5.0 0.0 0.00% 0.0 0.00% 0.0 0.00%NORTHAMPTON TOWERS Pipefitter 05/31/2014

CRUZ ELECTRIC CO. 10,431.0 4,944.5 47.40% 4,920.5 47.17% 0.0 0.00%NORTHAMPTON TOWERS Electrician 02/07/2015

CRUZ ELECTRIC CO. 150.0 0.0 0.00% 0.0 0.00% 0.0 0.00%NORTHAMPTON TOWERS Technician 10/04/2014

D J PLUMBING & HEATING 4,476.0 1,400.0 31.28% 1,360.0 30.38% 0.0 0.00%NORTHAMPTON TOWERS Plumber 01/11/2015

J.C. FLOOR COVERING INC. 1,820.5 176.0 9.67% 522.0 28.67% 0.0 0.00%NORTHAMPTON TOWERS Floor Layer 01/16/2015

KONE ELEVATOR INC. 325.0 0.0 0.00% 0.0 0.00% 24.0 7.38%NORTHAMPTON TOWERS Elevator Const(M 01/07/2015

LANCO SCAFFOLDING INC. 8.0 0.0 0.00% 8.0 100.00% 0.0 0.00%NORTHAMPTON TOWERS Carpenter 03/16/2014

BEACON FIRE PROTECTION, I 1,399.5 0.0 0.00% 336.0 24.01% 0.0 0.00%NORTHAMPTON TOWERS Sprinkler Fitter 11/21/2014

DYNAMIC INSULATION 378.0 292.0 77.25% 46.0 12.17% 0.0 0.00%NORTHAMPTON TOWERS Insulator 11/09/2014

KONE ELEVATOR INC. 97.0 0.0 0.00% 0.0 0.00% 0.0 0.00%NORTHAMPTON TOWERS Elev Const Helper 01/07/2015

K & K ACOUSTICAL CEILINGS 580.0 68.0 11.72% 68.0 11.72% 0.0 0.00%NORTHAMPTON TOWERS Carpenter 11/23/2014

J. DERENZO CO. 1,108.0 402.5 36.33% 475.0 42.87% 0.0 0.00%NORTHAMPTON TOWERS Laborer 10/25/2014

FRONT LINE INC. 525.0 8.0 1.52% 469.0 89.33% 0.0 0.00%NORTHAMPTON TOWERS Laborer 01/03/2015

ILAMA / SAVE-ON-WALL 407.5 0.0 0.00% 0.0 0.00% 0.0 0.00%NORTHAMPTON TOWERS Taper 02/01/2014

FEDERAL CONCRETE 1,159.0 174.0 15.01% 178.0 15.36% 30.0 2.59%NORTHAMPTON TOWERS Carpenter 11/15/2014

ILAMA / SAVE-ON-WALL 1,604.0 1,126.0 70.20% 1,174.0 73.19% 478.0 29.80%NORTHAMPTON TOWERS Laborer 02/01/2014

ILAMA / SAVE-ON-WALL 6,922.0 2,984.0 43.11% 2,413.5 34.87% 436.0 6.30%NORTHAMPTON TOWERS Carpenter 02/01/2014

J. DERENZO CO. 394.0 233.5 59.26% 233.5 59.26% 0.0 0.00%NORTHAMPTON TOWERS Equipment Opera 10/11/2014

FEDERAL CONCRETE 163.0 72.0 44.17% 39.0 23.93% 0.0 0.00%NORTHAMPTON TOWERS Iron Worker 05/10/2014

FEDERAL CONCRETE 848.0 334.0 39.39% 404.0 47.64% 4.0 0.47%NORTHAMPTON TOWERS Laborer 12/06/2014

Page 185: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 185

Project Name Trade Latest Week

89,871.8 33,585.8 37.37% 36,069.5 40.13% 4,077.5 4.54%SUB TOTALS:

NORTHEASTERN SCIENCE ENG. CENT

$225,000,000Amount:

Gen Contractor: SUFFOLK CONSTRUCTION CO.

(617)445-3500 64 ALLERTON STREET roxbury

Est Start Date:

Est End Date:

04/23/2014

10/31/2016

MARR SCAFFOLDING COMPAN 988.0 8.0 0.81% 0.0 0.00% 0.0 0.00%NORTHEASTERN SCIENCE ENG. Carpenter 10/22/2016

MARR SCAFFOLDING COMPAN 2,246.0 703.0 31.30% 10.0 0.45% 0.0 0.00%NORTHEASTERN SCIENCE ENG. Laborer 10/22/2016

PAVILION FLOORS, INC. 7,904.0 1,368.0 17.31% 3,207.0 40.57% 606.0 7.67%NORTHEASTERN SCIENCE ENG. Carpet Layer 01/28/2017

NORTH AMERICAN STEEL 866.0 208.0 24.02% 481.0 55.54% 171.0 19.75%NORTHEASTERN SCIENCE ENG. Iron Worker 09/10/2016

LONGDEN COMPANY INC. 460.5 69.5 15.09% 118.5 25.73% 49.0 10.64%NORTHEASTERN SCIENCE ENG. Carpenter 09/24/2016

J.F.SHINE MECHANICAL 1,261.0 360.0 28.55% 320.0 25.38% 0.0 0.00%NORTHEASTERN SCIENCE ENG. Plumber 06/26/2015

PAVILION FLOORS, INC. 1,396.0 0.0 0.00% 0.0 0.00% 0.0 0.00%NORTHEASTERN SCIENCE ENG. Terrazzo Worker 01/21/2017

MARR SCAFFOLDING COMPAN 8.0 0.0 0.00% 0.0 0.00% 0.0 0.00%NORTHEASTERN SCIENCE ENG. Wrecker 09/17/2016

LIBERTY CONST. SERVICES 30,491.0 10,341.5 33.92% 16,430.0 53.88% 2,477.0 8.12%NORTHEASTERN SCIENCE ENG. Laborer 01/29/2017

LIBERTY CONST. SERVICES 5,946.0 80.0 1.35% 278.5 4.68% 843.0 14.18%NORTHEASTERN SCIENCE ENG. Equipment Opera 01/01/2017

LIBERTY CONST. SERVICES 352.0 0.0 0.00% 0.0 0.00% 4.0 1.14%NORTHEASTERN SCIENCE ENG. Elevator Const(M 05/01/2016

LIBERTY CONST. SERVICES 1,769.0 760.0 42.96% 768.0 43.41% 0.0 0.00%NORTHEASTERN SCIENCE ENG. Carpenter 12/13/2015

LAN-TEL COMMUNICATION INC 10,518.0 2,737.0 26.02% 1,877.5 17.85% 310.0 2.95%NORTHEASTERN SCIENCE ENG. Telephone/Data I 01/28/2017

K & K ACOUSTICAL CEILINGS 8,612.0 1,730.5 20.09% 1,667.5 19.36% 262.5 3.05%NORTHEASTERN SCIENCE ENG. Carpenter 01/22/2017

J.M. ELECTRICAL CO. INC. 6,092.0 848.0 13.92% 848.0 13.92% 802.0 13.16%NORTHEASTERN SCIENCE ENG. Electrician 01/27/2017

J. C. CANNISTRARO INC. 27,647.0 7,428.0 26.87% 6,827.0 24.69% 1,602.0 5.79%NORTHEASTERN SCIENCE ENG. Pipefitter 12/25/2016

PERMASTEELISA CLAD. 13,667.0 3,055.0 22.35% 3,457.0 25.29% 331.0 2.42%NORTHEASTERN SCIENCE ENG. Glazier 11/27/2016

THE CHEVIOT CORPORATION 4,757.0 651.5 13.70% 488.0 10.26% 163.5 3.44%NORTHEASTERN SCIENCE ENG. Glazier 01/27/2017

JEREZ LLC 2,441.0 1,623.0 66.49% 2,441.0 100.00% 2,425.0 99.34%NORTHEASTERN SCIENCE ENG. Laborer 12/17/2016

SUPERIOR RAIL& IRON WORK 896.0 196.0 21.88% 0.0 0.00% 0.0 0.00%NORTHEASTERN SCIENCE ENG. Iron Worker 07/21/2015

THE PAPPAS COMPANY, INC 107.0 64.0 59.81% 56.0 52.34% 0.0 0.00%NORTHEASTERN SCIENCE ENG. Carpenter 10/02/2016

THE DOW COMPANY INC. 870.5 870.5 100.00% 870.5 100.00% 0.0 0.00%NORTHEASTERN SCIENCE ENG. Pipelayer 11/19/2016

THE DOW COMPANY INC. 13,574.0 4,680.5 34.48% 4,832.0 35.60% 424.5 3.13%NORTHEASTERN SCIENCE ENG. Laborer 01/21/2017

THE DOW COMPANY INC. 8,033.5 0.0 0.00% 0.0 0.00% 0.0 0.00%NORTHEASTERN SCIENCE ENG. Equipment Opera 12/31/2016

THE CHEVIOT CORPORATION 513.5 441.5 85.98% 441.5 85.98% 72.0 14.02%NORTHEASTERN SCIENCE ENG. Iron Worker 06/03/2016

DELTA BECKWITH ELEVATOR 1,827.7 24.0 1.31% 24.0 1.31% 0.0 0.00%NORTHEASTERN SCIENCE ENG. Elev Const Helper 01/05/2017

THE CHEVIOT CORPORATION 4,135.5 793.5 19.19% 683.0 16.52% 80.0 1.93%NORTHEASTERN SCIENCE ENG. Carpenter 01/27/2017

INNER CITY FIRE PROTECTIO 3,644.0 1,628.0 44.68% 1,628.0 44.68% 232.0 6.37%NORTHEASTERN SCIENCE ENG. Sprinkler Fitter 04/30/2016

TAVARES, LLC 680.0 368.0 54.12% 608.0 89.41% 312.0 45.88%NORTHEASTERN SCIENCE ENG. Laborer 01/07/2017

TAVARES, LLC 1,676.0 719.0 42.90% 160.0 9.55% 0.0 0.00%NORTHEASTERN SCIENCE ENG. Carpenter 01/07/2017

PERMASTEELISA CLAD. 32,354.5 6,106.0 18.87% 7,093.0 21.92% 3,363.0 10.39%NORTHEASTERN SCIENCE ENG. Iron Worker 11/27/2016

Page 186: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 186

Project Name Trade Latest Week

STRUCTURES DEREK INTERN 22,212.5 9,417.5 42.40% 8,991.5 40.48% 1,291.0 5.81%NORTHEASTERN SCIENCE ENG. Iron Worker 11/28/2015

STEEL STRUCTURES, INC. 152.0 152.0 100.00% 76.0 50.00% 0.0 0.00%NORTHEASTERN SCIENCE ENG. Carpenter 11/19/2016

SECURITY CONSTRUCTION SE 212.0 0.0 0.00% 0.0 0.00% 0.0 0.00%NORTHEASTERN SCIENCE ENG. Laborer 08/30/2014

SAUGUS CONSTRUCTION COR 112.0 0.0 0.00% 0.0 0.00% 24.0 21.43%NORTHEASTERN SCIENCE ENG. Iron Worker 11/05/2016

S & F CONCRETE 271.5 0.0 0.00% 103.0 37.94% 0.0 0.00%NORTHEASTERN SCIENCE ENG. Mason 11/12/2016

S & F CONCRETE 1,006.0 37.0 3.68% 143.5 14.26% 0.0 0.00%NORTHEASTERN SCIENCE ENG. Laborer 12/24/2016

S & F CONCRETE 124.0 0.0 0.00% 0.0 0.00% 0.0 0.00%NORTHEASTERN SCIENCE ENG. Equipment Opera 12/24/2016

S & F CONCRETE 403.5 103.0 25.53% 105.0 26.02% 0.0 0.00%NORTHEASTERN SCIENCE ENG. Carpenter 12/10/2016

RICHARD W.REID ELECTRICAL 9,582.0 3,797.5 39.63% 4,229.5 44.14% 1,773.0 18.50%NORTHEASTERN SCIENCE ENG. Electrician 01/29/2017

TAVARES, LLC 16.0 16.0 100.00% 16.0 100.00% 0.0 0.00%NORTHEASTERN SCIENCE ENG. Iron Worker 12/31/2016

AUTOMATION SOLUTIONS INC. 272.5 0.0 0.00% 0.0 0.00% 0.0 0.00%NORTHEASTERN SCIENCE ENG. Sheetmetal Work 10/22/2016

DEPAOLI MOSAIC COMPANY 2,568.0 663.0 25.82% 40.0 1.56% 0.0 0.00%NORTHEASTERN SCIENCE ENG. Terrazzo Worker 01/18/2017

CENTURY DRYWALL INC, 5,430.0 1,476.0 27.18% 4,021.0 74.05% 964.0 17.75%NORTHEASTERN SCIENCE ENG. Painter 01/07/2017

CENTURY DRYWALL INC, 10,220.0 7,603.5 74.40% 6,233.0 60.99% 175.0 1.71%NORTHEASTERN SCIENCE ENG. Laborer 11/19/2016

CENTURY DRYWALL INC, 40.0 0.0 0.00% 0.0 0.00% 0.0 0.00%NORTHEASTERN SCIENCE ENG. HVAC 06/12/2016

CENTURY DRYWALL INC, 43,096.5 12,012.5 27.87% 18,311.5 42.49% 2,888.0 6.70%NORTHEASTERN SCIENCE ENG. Carpenter 01/28/2017

CARLYSLE ENGINEERING INC. 3,410.0 1,122.0 32.90% 1,002.0 29.38% 264.0 7.74%NORTHEASTERN SCIENCE ENG. Sprinkler Fitter 01/27/2017

BOWLINE CO. 28.0 4.0 14.29% 4.0 14.29% 0.0 0.00%NORTHEASTERN SCIENCE ENG. Laborer 04/17/2016

BOWLINE CO. 28.0 0.0 0.00% 0.0 0.00% 0.0 0.00%NORTHEASTERN SCIENCE ENG. Carpenter 04/17/2016

CENTURY DRYWALL INC, 11,953.0 2,301.0 19.25% 6,898.0 57.71% 249.0 2.08%NORTHEASTERN SCIENCE ENG. Taper 11/19/2016

AXION SPECIALTY CONTRACTI 11,414.0 1,772.0 15.52% 3,445.0 30.18% 400.0 3.50%NORTHEASTERN SCIENCE ENG. Insulator 01/29/2017

COGHLIN ELECTRICAL CONTR 72,543.5 17,669.5 24.36% 24,846.5 34.25% 4,860.0 6.70%NORTHEASTERN SCIENCE ENG. Electrician 01/27/2017

AUTOMATION SOLUTIONS INC. 742.0 0.0 0.00% 8.0 1.08% 0.0 0.00%NORTHEASTERN SCIENCE ENG. Carpenter 01/07/2017

ATI INCORPORATED 560.5 168.5 30.06% 168.5 30.06% 0.0 0.00%NORTHEASTERN SCIENCE ENG. Laborer 04/16/2016

ARCHER CORPORATION 6,016.0 1,565.0 26.01% 2,197.0 36.52% 842.0 14.00%NORTHEASTERN SCIENCE ENG. Carpenter 01/27/2017

AMERICAN PLUMBING HEATIN 21,490.0 6,443.0 29.98% 9,575.0 44.56% 1,925.0 8.96%NORTHEASTERN SCIENCE ENG. Plumber 01/27/2017

ALLIED PILE DRIVING INC. 771.5 442.5 57.36% 352.5 45.69% 144.5 18.73%NORTHEASTERN SCIENCE ENG. Piledriver 07/12/2014

ALLIED PILE DRIVING INC. 388.8 0.0 0.00% 178.3 45.85% 0.0 0.00%NORTHEASTERN SCIENCE ENG. Equipment Opera 07/12/2014

ALL TIME SERVICE INC. 48.0 48.0 100.00% 48.0 100.00% 0.0 0.00%NORTHEASTERN SCIENCE ENG. Laborer 05/23/2015

THE WATERPROOFING COMP 4,340.5 1,757.0 40.48% 1,829.5 42.15% 200.5 4.62%NORTHEASTERN SCIENCE ENG. Waterproofer 01/14/2017

BEAU SEATING 152.0 76.0 50.00% 76.0 50.00% 0.0 0.00%NORTHEASTERN SCIENCE ENG. Carpenter 11/19/2016

FRONT LINE INC. 2,588.5 970.5 37.49% 2,313.5 89.38% 691.0 26.69%NORTHEASTERN SCIENCE ENG. Laborer 01/21/2017

HARRIS ENVIORNMENTAL SYS 108.0 0.0 0.00% 0.0 0.00% 0.0 0.00%NORTHEASTERN SCIENCE ENG. Carpenter 02/28/2016

HARRINGTON AIR. 18,960.5 10,247.0 54.04% 7,551.5 39.83% 1,625.0 8.57%NORTHEASTERN SCIENCE ENG. Sheetmetal Work 01/29/2017

Page 187: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 187

Project Name Trade Latest Week

GLEESON POWERS INC. 81.0 81.0 100.00% 81.0 100.00% 0.0 0.00%NORTHEASTERN SCIENCE ENG. Laborer 04/30/2016

GLEESON POWERS INC. 2,437.0 396.0 16.25% 1,245.0 51.09% 213.5 8.76%NORTHEASTERN SCIENCE ENG. Carpenter 12/24/2016

G & C CONCRETE CO. 9,618.0 3,130.0 32.54% 7,627.0 79.30% 0.0 0.00%NORTHEASTERN SCIENCE ENG. Laborer 05/07/2016

G & C CONCRETE CO. 5,500.5 774.0 14.07% 1,711.5 31.12% 0.0 0.00%NORTHEASTERN SCIENCE ENG. Iron Worker 03/26/2016

G & C CONCRETE CO. 950.0 0.0 0.00% 31.0 3.26% 0.0 0.00%NORTHEASTERN SCIENCE ENG. Equipment Opera 04/16/2016

G & C CONCRETE CO. 680.5 45.0 6.61% 107.0 15.72% 0.0 0.00%NORTHEASTERN SCIENCE ENG. Cement Laborer 02/27/2016

CENTURY DRYWALL INC, 1,435.0 48.0 3.34% 72.0 5.02% 0.0 0.00%NORTHEASTERN SCIENCE ENG. Plasterer 12/24/2016

G & C CONCRETE CO. 9,984.5 3,008.0 30.13% 3,663.5 36.69% 660.5 6.62%NORTHEASTERN SCIENCE ENG. Carpenter 05/07/2016

HARRIS ENVIORNMENTAL SYS 108.0 0.0 0.00% 0.0 0.00% 0.0 0.00%NORTHEASTERN SCIENCE ENG. Pipefitter 03/06/2016

ESSEX NEWBURY NORTH CO 2,033.0 2,033.0 100.00% 1,465.0 72.06% 0.0 0.00%NORTHEASTERN SCIENCE ENG. Laborer 08/05/2016

ESSEX NEWBURY NORTH CO 4,280.0 2,113.0 49.37% 2,833.0 66.19% 692.0 16.17%NORTHEASTERN SCIENCE ENG. Carpenter 03/18/2016

DELTA BECKWITH ELEVATOR 2,066.0 0.0 0.00% 0.0 0.00% 0.0 0.00%NORTHEASTERN SCIENCE ENG. Elevator Const(M 01/05/2017

DEANGELIS IRON WORK INC. 8,549.0 1,781.0 20.83% 2,605.0 30.47% 382.0 4.47%NORTHEASTERN SCIENCE ENG. Iron Worker 01/07/2017

DEANGELIS IRON WORK INC. 420.0 310.0 73.81% 110.0 26.19% 0.0 0.00%NORTHEASTERN SCIENCE ENG. Glazier 06/25/2016

DCR INC. 379.5 0.0 0.00% 215.0 56.65% 0.0 0.00%NORTHEASTERN SCIENCE ENG. Mason Tender 12/19/2015

DCR INC. 184.0 0.0 0.00% 184.0 100.00% 0.0 0.00%NORTHEASTERN SCIENCE ENG. Bricklayer 12/05/2015

CRUZ ELECTRIC CO. 393.5 133.0 33.80% 35.0 8.89% 8.0 2.03%NORTHEASTERN SCIENCE ENG. Electrician 10/18/2014

G & C CONCRETE CO. 1,770.5 72.5 4.09% 662.0 37.39% 0.0 0.00%NORTHEASTERN SCIENCE ENG. Cement Finisher 02/27/2016

TITAN ROOFING INC. 8,289.5 3,118.0 37.61% 2,534.5 30.57% 516.0 6.22%NORTHEASTERN SCIENCE ENG. Roofer 01/14/2017

TITAN ROOFING INC. 112.0 0.0 0.00% 0.0 0.00% 0.0 0.00%NORTHEASTERN SCIENCE ENG. Sheetmetal Work 12/03/2016

URBAN INSULATION 1,133.5 127.5 11.25% 205.5 18.13% 64.0 5.65%NORTHEASTERN SCIENCE ENG. Insulator 12/11/2016

VALLEYCREST LANDSCAPE 393.0 0.0 0.00% 64.0 16.28% 0.0 0.00%NORTHEASTERN SCIENCE ENG. Bricklayer 11/13/2016

VALLEYCREST LANDSCAPE 467.5 0.0 0.00% 0.0 0.00% 0.0 0.00%NORTHEASTERN SCIENCE ENG. Equipment Opera 11/13/2016

VALLEYCREST LANDSCAPE 2,698.0 422.0 15.64% 1,126.0 41.73% 406.0 15.05%NORTHEASTERN SCIENCE ENG. Laborer 11/13/2016

VER-TEX CONSTRUCTION SPE 904.0 268.0 29.65% 373.3 41.29% 0.0 0.00%NORTHEASTERN SCIENCE ENG. Carpenter 01/21/2017

511,862.5 145,586.0 28.44% 185,328.5 36.21% 35,787.5 6.99%SUB TOTALS:

NOS CASA

$7,500Amount:

Gen Contractor:

Est Start Date:

Est End Date:

01/30/2017

02/03/2017

ARDON VISUAL COMMUNICATI 12.0 0.0 0.00% 0.0 0.00% 0.0 0.00%NOS CASA Laborer 02/03/2017

12.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SUB TOTALS:

OASIS CAFÉ

$2,500Amount:

Gen Contractor: EXCEL SIGNS & DECORATION CORP.

(617)479-8552 259 QUINCY AVE. QUINCY

Est Start Date:

Est End Date:

01/31/2016

02/06/2016

EXCEL SIGNS & DECORATION 4.0 0.0 0.00% 4.0 100.00% 0.0 0.00%OASIS CAFÉ Laborer 02/06/2016

Page 188: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 188

Project Name Trade Latest Week

4.0 0.0 0.00% 4.0 100.00% 0.0 0.00%SUB TOTALS:

OLD COLONY II A & B

$40,000,000Amount:

Gen Contractor: SUFFOLK CONSTRUCTION CO.

(617)445-3500 64 ALLERTON STREET roxbury

Est Start Date:

Est End Date:

10/01/2012

10/01/2014

P.J. SPILLANE COMPANY 748.0 56.0 7.49% 522.5 69.85% 0.0 0.00%OLD COLONY II A & B Bricklayer 03/22/2014

OTIS ELEVATOR COMPANY 1,127.0 39.8 3.53% 8.0 0.71% 16.0 1.42%OLD COLONY II A & B Elevator Const(M 03/20/2014

OTIS ELEVATOR COMPANY 691.0 0.0 0.00% 0.0 0.00% 371.8 53.80%OLD COLONY II A & B Elev Const Helper 03/20/2014

NORTH EAST FOAM SOLUTION 174.0 104.0 59.77% 104.0 59.77% 0.0 0.00%OLD COLONY II A & B Laborer 12/17/2013

NORTH EAST FOAM SOLUTION 387.0 126.0 32.56% 124.0 32.04% 0.0 0.00%OLD COLONY II A & B Carpenter 12/17/2013

NESC INC 744.5 96.5 12.96% 126.0 16.92% 0.0 0.00%OLD COLONY II A & B Laborer 02/08/2014

MERRIMAC TILE CO,INC. 3,892.0 375.0 9.64% 609.0 15.65% 55.0 1.41%OLD COLONY II A & B Floor Layer 03/18/2014

P.J. SPILLANE COMPANY 10.0 0.0 0.00% 8.0 80.00% 0.0 0.00%OLD COLONY II A & B Mason Tender 03/22/2014

MANGANARO NORTHEAST LL 1,213.0 481.0 39.65% 0.0 0.00% 0.0 0.00%OLD COLONY II A & B Laborer 03/09/2014

STEELCO FENCING 1,164.0 248.0 21.31% 1,076.0 92.44% 0.0 0.00%OLD COLONY II A & B Laborer 03/15/2014

MELO'S RODBUSTERS 8.0 8.0 100.00% 0.0 0.00% 0.0 0.00%OLD COLONY II A & B Iron Worker 11/23/2013

S.O.S. CORPORATION 1,572.5 237.0 15.07% 383.5 24.39% 1,227.0 78.03%OLD COLONY II A & B Laborer 03/23/2014

SENICES ENTERPRISES INC 1,020.5 971.5 95.20% 1,020.5 100.00% 152.0 14.89%OLD COLONY II A & B Painter 12/07/2013

SHILOH STEEL ERECTORS, IN 824.0 64.0 7.77% 16.0 1.94% 0.0 0.00%OLD COLONY II A & B Iron Worker 03/18/2014

MANGANARO NORTHEAST LL 11,477.0 2,974.5 25.92% 2,571.5 22.41% 368.5 3.21%OLD COLONY II A & B Carpenter 03/23/2014

STANLEY $ SONS 48.0 48.0 100.00% 0.0 0.00% 0.0 0.00%OLD COLONY II A & B Laborer 01/11/2014

URBAN INSULATION 634.0 0.0 0.00% 0.0 0.00% 0.0 0.00%OLD COLONY II A & B Asbestos Worker 02/23/2014

TOTAL MECHANICAL SERVICE 2,018.0 553.0 27.40% 873.0 43.26% 273.0 13.53%OLD COLONY II A & B Insulator 03/22/2014

TRUE LIGHT SYSTEMS INC 631.0 118.5 18.78% 0.0 0.00% 0.0 0.00%OLD COLONY II A & B Glazier 02/22/2014

UNITED H.V.A.C. COMPANY, IN 3,234.0 1,328.0 41.06% 946.0 29.25% 0.0 0.00%OLD COLONY II A & B Sheetmetal Work 03/23/2014

US EXTERIORS, INC. 2,623.0 924.0 35.23% 2,036.0 77.62% 113.0 4.31%OLD COLONY II A & B Carpenter 03/22/2014

STANLEY $ SONS 1,879.0 1,097.0 58.38% 1,115.0 59.34% 112.0 5.96%OLD COLONY II A & B Carpenter 01/18/2014

BAY STATE BUILDING SPECIA 331.0 36.0 10.88% 24.0 7.25% 24.0 7.25%OLD COLONY II A & B Carpenter 03/11/2014

LIBERTY CONST. SERVICES 16.0 0.0 0.00% 0.0 0.00% 0.0 0.00%OLD COLONY II A & B Taper 03/23/2014

CRUZ ELECTRIC CO. 9,925.5 2,561.5 25.81% 1,864.0 18.78% 0.0 0.00%OLD COLONY II A & B Electrician 03/22/2014

CRUZ ELECTRIC CO. 664.0 0.0 0.00% 0.0 0.00% 0.0 0.00%OLD COLONY II A & B Telephone/Data I 03/22/2014

D & W CONSTRUCTION 5,189.5 1,121.5 21.61% 2,456.0 47.33% 674.5 13.00%OLD COLONY II A & B Taper 03/23/2014

DCR INC. 769.0 198.0 25.75% 51.0 6.63% 51.0 6.63%OLD COLONY II A & B Bricklayer 12/14/2013

DCR INC. 16.0 0.0 0.00% 8.0 50.00% 0.0 0.00%OLD COLONY II A & B Mason 02/15/2014

DCR INC. 401.5 76.0 18.93% 150.5 37.48% 0.0 0.00%OLD COLONY II A & B Mason Tender 02/15/2014

E. M. DUGGAN INC. 3,389.0 1,556.0 45.91% 484.0 14.28% 692.0 20.42%OLD COLONY II A & B Pipefitter 03/23/2014

Page 189: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 189

Project Name Trade Latest Week

E. M. DUGGAN INC. 5,764.0 2,036.0 35.32% 712.0 12.35% 316.0 5.48%OLD COLONY II A & B Plumber 03/23/2014

EAST COAST INTERIORS CO. 2,690.0 338.0 12.57% 559.0 20.78% 0.0 0.00%OLD COLONY II A & B Carpenter 02/15/2014

LIBERTY CONST. SERVICES 8.0 0.0 0.00% 0.0 0.00% 0.0 0.00%OLD COLONY II A & B Cement Finisher 02/02/2014

EMANOUIL BROTHERS INC. 864.0 304.0 35.19% 232.0 26.85% 0.0 0.00%OLD COLONY II A & B Laborer 05/17/2014

GREENWOOD INDUSTRIES IN 468.5 38.0 8.11% 92.0 19.64% 62.0 13.23%OLD COLONY II A & B Roofer 03/08/2014

GREENWOOD INDUSTRIES IN 358.5 94.0 26.22% 57.0 15.90% 0.0 0.00%OLD COLONY II A & B Sheetmetal Work 03/22/2014

INNER CITY FIRE PROTECTIO 1,764.0 1,224.0 69.39% 1,048.0 59.41% 0.0 0.00%OLD COLONY II A & B Pipefitter 03/23/2014

J. DERENZO CO. 141.0 72.0 51.06% 72.0 51.06% 0.0 0.00%OLD COLONY II A & B Equipment Opera 03/01/2014

J. DERENZO CO. 425.0 36.0 8.47% 36.0 8.47% 0.0 0.00%OLD COLONY II A & B Laborer 03/22/2014

K & K ACOUSTICAL CEILINGS 234.0 0.0 0.00% 134.0 57.26% 0.0 0.00%OLD COLONY II A & B Carpenter 03/23/2014

LIBERTY CONST. SERVICES 1,731.0 488.0 28.19% 56.0 3.24% 0.0 0.00%OLD COLONY II A & B Carpenter 03/23/2014

LIBERTY CONST. SERVICES 6,059.0 3,881.0 64.05% 2,023.0 33.39% 1,003.0 16.55%OLD COLONY II A & B Laborer 03/23/2014

EMANOUIL BROTHERS INC. 104.0 0.0 0.00% 0.0 0.00% 0.0 0.00%OLD COLONY II A & B Equipment Opera 11/30/2013

77,432.0 23,909.8 30.88% 21,597.5 27.89% 5,510.8 7.12%SUB TOTALS:

OLD COLONY TWO - C.

$16,494,600Amount:

Gen Contractor: C.W.C. BUILDERS INC.

(617)965-2800 7 WELLS AVENUE NEWTON

Est Start Date:

Est End Date:

05/01/2014

07/31/2015

TARA CONSTRUCTION 3,015.0 900.0 29.85% 1,079.0 35.79% 0.0 0.00%OLD COLONY TWO - C. Carpenter 06/27/2015

STEELCO FENCING 22.0 3.0 13.64% 4.0 18.18% 0.0 0.00%OLD COLONY TWO - C. Laborer 05/31/2014

SOINI EROSION CONTROL, IN 12.0 0.0 0.00% 4.0 33.33% 0.0 0.00%OLD COLONY TWO - C. Laborer 05/31/2014

SAVE-ON-WALL CO, INC. 782.0 404.0 51.66% 404.0 51.66% 0.0 0.00%OLD COLONY TWO - C. Taper 02/14/2015

SAVE-ON-WALL CO, INC. 1,426.0 1,253.5 87.90% 1,078.0 75.60% 61.0 4.28%OLD COLONY TWO - C. Laborer 02/14/2015

SAVE-ON-WALL CO, INC. 2,707.5 805.0 29.73% 648.0 23.93% 295.0 10.90%OLD COLONY TWO - C. Carpenter 02/14/2015

THE WATERPROOFING COMP 61.0 0.0 0.00% 53.0 86.89% 0.0 0.00%OLD COLONY TWO - C. Laborer 11/15/2014

NORTH EAST FOAM SOLUTION 552.0 480.0 86.96% 480.0 86.96% 0.0 0.00%OLD COLONY TWO - C. Laborer 03/10/2015

US EXTERIORS, INC. 2,365.5 976.0 41.26% 1,956.5 82.71% 0.0 0.00%OLD COLONY TWO - C. Carpenter 03/07/2015

QUALITY AIR METALS, INC. 1,795.0 659.0 36.71% 435.0 24.23% 0.0 0.00%OLD COLONY TWO - C. Sheetmetal Work 06/06/2015

THE WATERPROOFING COMP 349.5 131.5 37.63% 131.5 37.63% 24.0 6.87%OLD COLONY TWO - C. Waterproofer 06/06/2015

TITAN ROOFING INC. 22.0 0.0 0.00% 0.0 0.00% 0.0 0.00%OLD COLONY TWO - C. Equipment Opera 11/01/2014

TITAN ROOFING INC. 443.0 155.0 34.99% 128.0 28.89% 43.0 9.71%OLD COLONY TWO - C. Roofer 11/08/2014

XQUISITE LANDSCAPING 870.0 306.0 35.17% 194.0 22.30% 186.0 21.38%OLD COLONY TWO - C. Laborer 07/12/2015

URBAN INSULATION 632.0 0.0 0.00% 368.0 58.23% 0.0 0.00%OLD COLONY TWO - C. Asbestos Worker 05/31/2015

W. L. FRENCH EXCAVATING 1,944.0 0.0 0.00% 16.0 0.82% 216.0 11.11%OLD COLONY TWO - C. Equipment Opera 06/27/2015

W. L. FRENCH EXCAVATING 3,542.5 1,830.0 51.66% 772.0 21.79% 770.0 21.74%OLD COLONY TWO - C. Laborer 06/27/2015

XQUISITE LANDSCAPING 93.5 0.0 0.00% 0.0 0.00% 0.0 0.00%OLD COLONY TWO - C. Equipment Opera 07/05/2015

Page 190: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 190

Project Name Trade Latest Week

NORTH EAST FOAM SOLUTION 1,245.5 352.0 28.26% 280.0 22.48% 0.0 0.00%OLD COLONY TWO - C. Carpenter 03/10/2015

FEDERAL CONCRETE 1,276.5 434.5 34.04% 146.0 11.44% 298.5 23.38%OLD COLONY TWO - C. Laborer 07/04/2015

TITAN ROOFING INC. 89.0 0.0 0.00% 0.0 0.00% 0.0 0.00%OLD COLONY TWO - C. Sheetmetal Work 07/04/2015

CRUZ ELECTRIC CO. 6,296.5 2,632.0 41.80% 1,528.0 24.27% 0.0 0.00%OLD COLONY TWO - C. Electrician 07/04/2015

BEACON FIRE PROTECTION, I 1,220.0 0.0 0.00% 328.0 26.89% 0.0 0.00%OLD COLONY TWO - C. Sprinkler Fitter 02/13/2015

C.W.C. BUILDERS INC. 16.0 16.0 100.00% 0.0 0.00% 0.0 0.00%OLD COLONY TWO - C. Laborer 01/21/2015

HAYWARD BAKER INC. 32.0 0.0 0.00% 0.0 0.00% 0.0 0.00%OLD COLONY TWO - C. Piledriver 09/28/2014

CHILLER TECHNOLOGIES. 1,780.5 279.5 15.70% 200.5 11.26% 0.0 0.00%OLD COLONY TWO - C. Pipefitter 05/24/2015

MARGUERITE CONCRETE 273.0 0.0 0.00% 107.5 39.38% 0.0 0.00%OLD COLONY TWO - C. Laborer 06/27/2015

CRUZ ELECTRIC CO. 136.0 0.0 0.00% 0.0 0.00% 0.0 0.00%OLD COLONY TWO - C. Technician 06/13/2015

D J PLUMBING & HEATING 2,960.0 904.0 30.54% 520.0 17.57% 0.0 0.00%OLD COLONY TWO - C. Plumber 07/12/2015

DYNAMIC INSULATION 469.0 282.0 60.13% 31.0 6.61% 0.0 0.00%OLD COLONY TWO - C. Insulator 02/01/2015

EMPIRE MASONRY CORP. 2,303.0 799.5 34.72% 799.5 34.72% 0.0 0.00%OLD COLONY TWO - C. Bricklayer 06/07/2015

FEDERAL CONCRETE 3,223.5 719.0 22.30% 902.5 28.00% 47.0 1.46%OLD COLONY TWO - C. Carpenter 07/04/2015

FEDERAL CONCRETE 303.0 93.5 30.86% 101.5 33.50% 0.0 0.00%OLD COLONY TWO - C. Iron Worker 05/23/2015

HAYWARD BAKER INC. 852.0 0.0 0.00% 0.0 0.00% 144.0 16.90%OLD COLONY TWO - C. Equipment Opera 06/29/2014

AAMS CORPORATION 714.0 357.0 50.00% 40.0 5.60% 0.0 0.00%OLD COLONY TWO - C. Iron Worker 06/06/2015

J & J CONSTRUCTION 13,000.5 4,241.0 32.62% 3,676.0 28.28% 429.0 3.30%OLD COLONY TWO - C. Carpenter 12/20/2014

MARGUERITE CONCRETE 4.0 0.0 0.00% 0.0 0.00% 0.0 0.00%OLD COLONY TWO - C. Carpenter 06/27/2015

MARGUERITE CONCRETE 152.5 32.0 20.98% 34.0 22.30% 0.0 0.00%OLD COLONY TWO - C. Cement Finisher 06/27/2015

MARGUERITE CONCRETE 98.0 0.0 0.00% 0.0 0.00% 0.0 0.00%OLD COLONY TWO - C. Equipment Opera 05/30/2015

EMPIRE MASONRY CORP. 2,219.5 897.5 40.44% 452.5 20.39% 0.0 0.00%OLD COLONY TWO - C. Mason Tender 06/07/2015

CARLYSLE ENGINEERING INC. 4.0 0.0 0.00% 0.0 0.00% 0.0 0.00%OLD COLONY TWO - C. Sprinkler Fitter 09/11/2015

59,302.5 19,942.5 33.63% 16,898.0 28.49% 2,513.5 4.24%SUB TOTALS:

OLMSTED GREEN

$8,500,000Amount:

Gen Contractor: N E I CONTRACTORS

(781)348-5099 27 PACELLA PARK DRIVE RANDOLPH

Est Start Date:

Est End Date:

04/18/2017

04/18/2019

RENEW CONSTRUCTION 112.0 112.0 100.00% 112.0 100.00% 112.0 100.00%OLMSTED GREEN Laborer 09/09/2017

RENEW CONSTRUCTION 460.0 280.0 60.87% 460.0 100.00% 0.0 0.00%OLMSTED GREEN Roofer 09/16/2017

SEAN FARRELL EXCAUTION 597.0 0.0 0.00% 0.0 0.00% 0.0 0.00%OLMSTED GREEN Equipment Opera 08/19/2017

SEAN FARRELL EXCAUTION 702.0 455.0 64.81% 567.0 80.77% 73.0 10.40%OLMSTED GREEN Laborer 08/19/2017

SEAN FARRELL EXCAUTION 11.0 0.0 0.00% 0.0 0.00% 11.0 100.00%OLMSTED GREEN Surveyor 08/12/2017

T & T FIRE PROTECTION 280.0 16.0 5.71% 16.0 5.71% 0.0 0.00%OLMSTED GREEN Sprinkler Fitter 08/26/2017

TITAN SERVICES LIMITED, INC 436.0 41.0 9.40% 436.0 100.00% 0.0 0.00%OLMSTED GREEN Carpenter 09/09/2017

TITAN SERVICES LIMITED, INC 819.0 509.0 62.15% 702.0 85.71% 23.0 2.81%OLMSTED GREEN Laborer 09/09/2017

Page 191: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 191

Project Name Trade Latest Week

HELICAL DRILLING INC 120.8 0.0 0.00% 0.0 0.00% 0.0 0.00%OLMSTED GREEN Equipment Opera 04/29/2017

YOUNG ELECTRICAL SERVICE 2,210.5 421.0 19.05% 741.0 33.52% 0.0 0.00%OLMSTED GREEN Electrician 09/10/2017

MAPLE MECHANICAL SERVICE 144.0 144.0 100.00% 112.0 77.78% 0.0 0.00%OLMSTED GREEN Laborer 09/01/2017

JKA CONSTRUCTION 5,411.8 3,883.8 71.77% 5,411.8 100.00% 430.0 7.95%OLMSTED GREEN Laborer 09/08/2017

DIAZ CONSTRUCTION CO. INC. 540.5 170.0 31.45% 170.0 31.45% 0.0 0.00%OLMSTED GREEN Carpenter 09/02/2017

HELICAL DRILLING INC 50.0 0.0 0.00% 0.0 0.00% 0.0 0.00%OLMSTED GREEN Laborer 04/29/2017

MAPLE MECHANICAL SERVICE 2,150.0 543.0 25.26% 0.0 0.00% 0.0 0.00%OLMSTED GREEN Plumber 09/01/2017

GREENSTAMP 192.0 16.0 8.33% 184.0 95.83% 0.0 0.00%OLMSTED GREEN Insulator 09/02/2017

FRANCA SERVICE, INC. 2,065.0 1,022.0 49.49% 2,065.0 100.00% 0.0 0.00%OLMSTED GREEN Carpenter 09/16/2017

FLETCHER'S INSTALLATION 1,588.5 617.5 38.87% 1,290.0 81.21% 86.0 5.41%OLMSTED GREEN Sheetmetal Work 09/08/2017

DIAZ CONSTRUCTION CO. INC. 1,352.0 863.5 63.87% 863.5 63.87% 41.0 3.03%OLMSTED GREEN Laborer 09/02/2017

JKA CONSTRUCTION 676.0 0.0 0.00% 676.0 100.00% 0.0 0.00%OLMSTED GREEN Carpenter 09/08/2017

19,918.1 9,093.8 45.66% 13,806.3 69.32% 776.0 3.90%SUB TOTALS:

OMG OPTICAL

$2,500Amount:

Gen Contractor: JIM DID IT SIGN CO.

(781)933-1865 465 CAMBRIDGE STREET 10 DRAPER STREET #11 WOBURN

Est Start Date:

Est End Date:

03/16/2015

03/20/2015

JIM DID IT SIGN CO. 22.0 0.0 0.00% 0.0 0.00% 0.0 0.00%OMG OPTICAL Laborer 03/20/2015

22.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SUB TOTALS:

ON CENTRE

$3,000Amount:

Gen Contractor: SIGN DESIGN INC.

(508)580-0094 170 LIBERTY STREET BROCKTON

Est Start Date:

Est End Date:

05/21/2017

05/27/2017

SIGN DESIGN INC. 13.5 0.0 0.00% 0.0 0.00% 0.0 0.00%ON CENTRE Laborer 05/27/2017

13.5 0.0 0.00% 0.0 0.00% 0.0 0.00%SUB TOTALS:

ONE DALTON STREET

$400,000,000Amount:

Gen Contractor: SUFFOLK CONSTRUCTION CO.

(617)445-3500 64 ALLERTON STREET roxbury

Est Start Date:

Est End Date:

01/01/2015

01/31/2018

THE WELCH CORPORATION 8,880.5 1,612.5 18.16% 2,525.0 28.43% 606.5 6.83%ONE DALTON STREET Laborer 02/18/2017

METRO GLASS & METAL LLC 1,265.5 740.5 58.51% 0.0 0.00% 216.5 17.11%ONE DALTON STREET Glazier 09/24/2017

METRO GLASS & METAL LLC 1,103.0 466.5 42.29% 661.0 59.93% 0.0 0.00%ONE DALTON STREET Iron Worker 09/24/2017

NATIONAL WATER MAIN C. 4.0 0.0 0.00% 0.0 0.00% 0.0 0.00%ONE DALTON STREET Laborer 03/12/2016

NEW ENGLAND BORING CONT 96.0 36.0 37.50% 0.0 0.00% 0.0 0.00%ONE DALTON STREET Driller 03/26/2016

NEW HAMP. STEEL ERECT. 6,524.0 1,674.0 25.66% 1,813.0 27.79% 354.0 5.43%ONE DALTON STREET Iron Worker 09/19/2017

PRO CUT CONCRETE CUTTIN 256.0 0.0 0.00% 104.0 40.63% 0.0 0.00%ONE DALTON STREET Laborer 02/25/2017

REGIS STEEL CORPORATION 4,633.0 1,321.0 28.51% 1,465.0 31.62% 8.0 0.17%ONE DALTON STREET Iron Worker 03/26/2016

LIBERTY CONST. SERVICES 20,419.0 2,002.5 9.81% 6,885.0 33.72% 1,344.0 6.58%ONE DALTON STREET Laborer 08/06/2017

SOEP PAINTING CORP. 1,020.0 176.0 17.25% 157.0 15.39% 112.0 10.98%ONE DALTON STREET Painter 09/17/2017

Page 192: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 192

Project Name Trade Latest Week

LIBERTY CONST. SERVICES 48.0 0.0 0.00% 0.0 0.00% 0.0 0.00%ONE DALTON STREET Taper 10/02/2016

THE CHEVIOT CORPORATION 1,295.0 0.0 0.00% 0.0 0.00% 0.0 0.00%ONE DALTON STREET Carpenter 09/15/2017

THE CHEVIOT CORPORATION 1,446.0 0.0 0.00% 372.5 25.76% 0.0 0.00%ONE DALTON STREET Glazier 09/15/2017

THE CHEVIOT CORPORATION 1,193.5 0.0 0.00% 860.0 72.06% 0.0 0.00%ONE DALTON STREET Iron Worker 09/15/2017

LIBERTY CONST. SERVICES 4,480.5 1,444.5 32.24% 1,293.5 28.87% 0.0 0.00%ONE DALTON STREET Carpenter 08/06/2017

THE WELCH CORPORATION 6,340.5 1,427.0 22.51% 1,034.0 16.31% 0.0 0.00%ONE DALTON STREET Equipment Opera 02/18/2017

SELECT DEMO SERVICES, LLC 24.0 0.0 0.00% 24.0 100.00% 0.0 0.00%ONE DALTON STREET Laborer 11/11/2016

TREVIICOS CORPORATION 21,242.5 0.0 0.00% 3,346.5 15.75% 0.0 0.00%ONE DALTON STREET Equipment Opera 04/02/2017

TREVIICOS CORPORATION 210.0 0.0 0.00% 0.0 0.00% 0.0 0.00%ONE DALTON STREET Iron Worker 10/02/2016

TREVIICOS CORPORATION 21,379.5 4,100.0 19.18% 10,554.5 49.37% 419.5 1.96%ONE DALTON STREET Laborer 05/21/2017

TREVIICOS CORPORATION 8,708.0 5,023.5 57.69% 4,142.0 47.57% 0.0 0.00%ONE DALTON STREET Oiler 05/29/2016

TREVIICOS CORPORATION 14,129.5 2,348.5 16.62% 3,129.5 22.15% 0.0 0.00%ONE DALTON STREET Piledriver 04/02/2017

UNITED H.V.A.C. COMPANY, IN 9,959.0 3,757.0 37.72% 1,570.0 15.76% 0.0 0.00%ONE DALTON STREET Sheetmetal Work 09/10/2017

THE CHEVIOT CORPORATION 118.0 118.0 100.00% 0.0 0.00% 0.0 0.00%ONE DALTON STREET Sheetmetal Work 07/28/2017

COSTELLO CONTRACTING 418.0 0.0 0.00% 0.0 0.00% 0.0 0.00%ONE DALTON STREET Equipment Opera 08/22/2015

STRUCTURES DEREK INTERN 329.0 0.0 0.00% 48.0 14.59% 9.0 2.74%ONE DALTON STREET Iron Worker 08/12/2017

KONE ELEVATOR INC. 413.0 72.0 17.43% 62.0 15.01% 0.0 0.00%ONE DALTON STREET Elevator Const(M 08/30/2017

ABSOLUTE ENVIRONMENTAL, 956.5 0.0 0.00% 956.5 100.00% 0.0 0.00%ONE DALTON STREET Asbestos Worker 02/04/2017

COMPONENT ASSEMBLY SYS 4,611.0 1,087.0 23.57% 520.0 11.28% 84.0 1.82%ONE DALTON STREET Carpenter 09/19/2017

COMPONENT ASSEMBLY SYS 245.0 0.0 0.00% 0.0 0.00% 0.0 0.00%ONE DALTON STREET Taper 09/19/2017

COSTELLO CONTRACTING 1,315.0 212.0 16.12% 444.0 33.76% 0.0 0.00%ONE DALTON STREET Laborer 12/10/2016

E. M. DUGGAN INC. 6,955.0 3,898.0 56.05% 2,653.0 38.15% 272.0 3.91%ONE DALTON STREET Pipefitter 09/24/2017

E. M. DUGGAN INC. 16,582.0 3,870.0 23.34% 4,540.0 27.38% 399.5 2.41%ONE DALTON STREET Plumber 09/24/2017

E. M. DUGGAN INC. 2,589.0 1,972.0 76.17% 898.0 34.69% 104.0 4.02%ONE DALTON STREET Sprinkler Fitter 09/24/2017

FRED SALVUCCI CORP. 1,711.0 348.5 20.37% 956.0 55.87% 0.0 0.00%ONE DALTON STREET Bricklayer 08/26/2017

FRED SALVUCCI CORP. 1,265.8 0.0 0.00% 656.0 51.83% 0.0 0.00%ONE DALTON STREET Mason Tender 08/26/2017

G & C CONCRETE CO. 56,648.0 19,685.5 34.75% 11,342.0 20.02% 1,886.5 3.33%ONE DALTON STREET Carpenter 09/16/2017

HAYWARD BAKER INC. 240.0 24.0 10.00% 24.0 10.00% 0.0 0.00%ONE DALTON STREET Piledriver 09/11/2016

K & H ELECTRICAL SYSTEMS 12,376.5 5,086.0 41.09% 3,588.0 28.99% 560.0 4.52%ONE DALTON STREET Electrician 09/15/2017

COMPONENT ASSEMBLY SYS 1,409.0 8.0 0.57% 514.0 36.48% 8.0 0.57%ONE DALTON STREET Laborer 09/19/2017

G & C CONCRETE CO. 5,071.0 952.0 18.77% 1,442.0 28.44% 0.0 0.00%ONE DALTON STREET Cement Finisher 09/16/2017

HERITAGE RESTORATION INC. 6,001.0 960.0 16.00% 1,534.0 25.56% 11.5 0.19%ONE DALTON STREET Bricklayer 09/16/2017

HERITAGE RESTORATION INC. 3,025.5 384.0 12.69% 1,050.0 34.71% 0.0 0.00%ONE DALTON STREET Laborer 09/16/2017

HAYWARD BAKER INC. 215.5 0.0 0.00% 97.5 45.24% 0.0 0.00%ONE DALTON STREET Laborer 09/11/2016

Page 193: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 193

Project Name Trade Latest Week

HAYWARD BAKER INC. 494.5 0.0 0.00% 61.5 12.44% 0.0 0.00%ONE DALTON STREET Equipment Opera 05/08/2016

G & C CONCRETE CO. 1,701.5 0.0 0.00% 45.0 2.64% 0.0 0.00%ONE DALTON STREET Oiler 12/31/2016

G & C CONCRETE CO. 29,772.5 8,534.5 28.67% 21,405.0 71.90% 1,920.0 6.45%ONE DALTON STREET Laborer 09/16/2017

G & C CONCRETE CO. 40,821.5 13,936.0 34.14% 19,810.5 48.53% 584.5 1.43%ONE DALTON STREET Iron Worker 09/16/2017

G & C CONCRETE CO. 9,804.0 11.0 0.11% 146.5 1.49% 1,655.0 16.88%ONE DALTON STREET Equipment Opera 09/16/2017

G & C CONCRETE CO. 14,728.0 3,905.5 26.52% 9,729.0 66.06% 0.0 0.00%ONE DALTON STREET Cement Laborer 09/16/2017

354,473.8 91,193.5 25.73% 122,459.0 34.55% 10,554.5 2.98%SUB TOTALS:

ONE FRANKLIN

$343,000,000Amount:

Gen Contractor: SUFFOLK CONSTRUCTION CO.

(617)445-3500 64 ALLERTON STREET roxbury

Est Start Date:

Est End Date:

08/01/2013

09/01/2016

QUALITY AIR METALS, INC. 34,763.5 10,140.5 29.17% 6,643.0 19.11% 1,414.5 4.07%ONE FRANKLIN Sheetmetal Work 10/01/2016

LIBERTY CONST. SERVICES 76,334.5 39,038.5 51.14% 18,088.0 23.70% 5,228.5 6.85%ONE FRANKLIN Laborer 10/02/2016

PAVILION FLOORS, INC. 5,567.0 873.0 15.68% 4,719.0 84.77% 282.0 5.07%ONE FRANKLIN Carpet Layer 09/17/2016

NEWTECH INS. USA INC. 8,800.5 1,456.0 16.54% 738.5 8.39% 602.0 6.84%ONE FRANKLIN Carpenter 10/01/2016

NESC INC 17.5 0.0 0.00% 0.0 0.00% 0.0 0.00%ONE FRANKLIN Mason 05/14/2016

NESC INC 19,913.0 2,241.0 11.25% 4,210.5 21.14% 0.0 0.00%ONE FRANKLIN Laborer 10/01/2016

LIBERTY CONST. SERVICES 902.5 902.5 100.00% 0.0 0.00% 0.0 0.00%ONE FRANKLIN Oiler 01/24/2016

PAVILION FLOORS, INC. 8.0 0.0 0.00% 8.0 100.00% 0.0 0.00%ONE FRANKLIN Floor Layer 10/24/2015

LIBERTY CONST. SERVICES 224.0 72.0 32.14% 0.0 0.00% 0.0 0.00%ONE FRANKLIN Iron Worker 07/10/2016

LIBERTY CONST. SERVICES 21,880.0 531.0 2.43% 3,222.0 14.73% 106.0 0.48%ONE FRANKLIN Equipment Opera 10/02/2016

LIBERTY CONST. SERVICES 1,366.5 0.0 0.00% 0.0 0.00% 13.0 0.95%ONE FRANKLIN Elevator Const(M 04/24/2016

K & K ACOUSTICAL CEILINGS 780.0 26.0 3.33% 13.0 1.67% 5.0 0.64%ONE FRANKLIN Carpenter 08/14/2016

K & H ELECTRICAL SYSTEMS 115,084.0 56,119.0 48.76% 28,374.0 24.66% 6,177.0 5.37%ONE FRANKLIN Electrician 09/30/2016

K & G ENTRANCES INC. 18,968.0 2,523.0 13.30% 1,216.0 6.41% 1,834.0 9.67%ONE FRANKLIN Glazier 10/01/2016

RYAN IRON WORKS INC, 1,106.0 224.0 20.25% 202.5 18.31% 64.0 5.79%ONE FRANKLIN Iron Worker 08/28/2016

THERMO DYNAMICS INTERNA. 6,346.5 1,300.0 20.48% 1,512.5 23.83% 398.0 6.27%ONE FRANKLIN Insulator 10/01/2016

LIBERTY CONST. SERVICES 8,013.7 246.0 3.07% 0.0 0.00% 0.0 0.00%ONE FRANKLIN Carpenter 10/02/2016

STANLEY & SONS INC. 28,612.0 9,548.0 33.37% 6,381.0 22.30% 1,849.0 6.46%ONE FRANKLIN Carpenter 10/01/2016

K & G ENTRANCES INC. 2,225.0 858.0 38.56% 0.0 0.00% 0.0 0.00%ONE FRANKLIN Carpenter 09/24/2016

JAJ COMPANY INC. 40.0 0.0 0.00% 40.0 100.00% 0.0 0.00%ONE FRANKLIN Terrazzo Worker 12/06/2015

YOUTH BUILD BOSTON 623.0 387.0 62.12% 535.0 85.87% 104.0 16.69%ONE FRANKLIN Carpenter 01/29/2016

VAL FLOORS INC. 20,238.0 5,809.5 28.71% 15,746.5 77.81% 199.0 0.98%ONE FRANKLIN Carpenter 10/02/2016

SUPERIOR RAIL& IRON WORK 20,218.5 7,883.0 38.99% 4,489.0 22.20% 261.0 1.29%ONE FRANKLIN Iron Worker 09/13/2016

SUNRISE ERECTORS INC. 59.5 8.0 13.45% 48.0 80.67% 0.0 0.00%ONE FRANKLIN Laborer 06/12/2016

SUNRISE ERECTORS INC. 108.0 55.0 50.93% 0.0 0.00% 0.0 0.00%ONE FRANKLIN Sheetmetal Work 06/12/2016

Page 194: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 194

Project Name Trade Latest Week

STANLEY & SONS INC. 2,160.0 2,160.0 100.00% 888.0 41.11% 0.0 0.00%ONE FRANKLIN Laborer 09/10/2016

S & F CONCRETE 118,311.5 44,116.0 37.29% 31,608.5 26.72% 6,662.0 5.63%ONE FRANKLIN Carpenter 09/24/2016

SCHINDLER ELEVATOR CORP. 20,259.5 3,264.0 16.11% 4,081.0 20.14% 0.0 0.00%ONE FRANKLIN Elevator Const(M 09/28/2016

SCHINDLER ELEVATOR CORP. 17,843.5 1,955.5 10.96% 2,231.5 12.51% 0.0 0.00%ONE FRANKLIN Elev Const Helper 09/28/2016

S & F CONCRETE 94.0 32.0 34.04% 57.0 60.64% 0.0 0.00%ONE FRANKLIN Mason 04/16/2016

S & F CONCRETE 116,729.0 37,026.0 31.72% 37,153.0 31.83% 6,004.0 5.14%ONE FRANKLIN Laborer 09/24/2016

S & F CONCRETE 4,255.0 0.0 0.00% 0.0 0.00% 0.0 0.00%ONE FRANKLIN Equipment Opera 08/27/2016

S & F CONCRETE 10,674.0 3,587.5 33.61% 1,257.0 11.78% 0.0 0.00%ONE FRANKLIN Cement Finisher 09/10/2016

SUNRISE ERECTORS INC. 1,246.0 250.0 20.06% 149.0 11.96% 229.5 18.42%ONE FRANKLIN Carpenter 10/02/2016

DIVERSIFIED CONSTRUCTION 15,373.0 4,953.0 32.22% 12,114.0 78.80% 3,437.0 22.36%ONE FRANKLIN Laborer 10/01/2016

GREENWOOD INDUSTRIES IN 483.5 270.5 55.95% 0.0 0.00% 0.0 0.00%ONE FRANKLIN Sheetmetal Work 10/01/2016

GREENWOOD INDUSTRIES IN 6,693.0 702.3 10.49% 989.0 14.78% 98.0 1.46%ONE FRANKLIN Roofer 08/06/2016

GAMMA 7,842.0 6,044.0 77.07% 2,221.0 28.32% 0.0 0.00%ONE FRANKLIN Laborer 08/01/2016

GAMMA 47,188.5 13,005.0 27.56% 8,285.5 17.56% 3,795.0 8.04%ONE FRANKLIN Iron Worker 10/03/2016

FRED SALVUCCI CORP. 5,072.5 726.3 14.32% 1,963.3 38.70% 0.0 0.00%ONE FRANKLIN Mason Tender 10/01/2016

ELEVATOR INTERIOR DESIGN. 300.0 0.0 0.00% 0.0 0.00% 0.0 0.00%ONE FRANKLIN Elevator Const(M 06/18/2016

HAYWARD BAKER INC. 681.5 0.0 0.00% 0.0 0.00% 0.0 0.00%ONE FRANKLIN Equipment Opera 01/26/2014

E. M. DUGGAN INC. 42,404.0 24,756.5 58.38% 8,031.0 18.94% 3,859.5 9.10%ONE FRANKLIN Pipefitter 10/02/2016

GAMMA 28,917.0 4,396.0 15.20% 2,095.0 7.24% 0.0 0.00%ONE FRANKLIN Glazier 10/03/2016

CENTURY DRYWALL INC, 42,266.0 15,860.0 37.52% 27,740.5 65.63% 1,749.0 4.14%ONE FRANKLIN Taper 10/01/2016

CENTURY DRYWALL INC, 88.0 0.0 0.00% 0.0 0.00% 0.0 0.00%ONE FRANKLIN Plasterer 09/03/2016

CENTURY DRYWALL INC, 35,496.0 10,398.5 29.29% 10,323.0 29.08% 3,621.0 10.20%ONE FRANKLIN Painter 10/01/2016

CENTURY DRYWALL INC, 26,081.0 7,130.5 27.34% 7,822.5 29.99% 2,331.5 8.94%ONE FRANKLIN Laborer 09/03/2016

CENTURY DRYWALL INC, 99,697.0 23,395.5 23.47% 28,169.0 28.25% 2,361.5 2.37%ONE FRANKLIN Carpenter 09/24/2016

AZTEC STEEL INC. 32,035.0 12,677.5 39.57% 8,751.0 27.32% 2,339.5 7.30%ONE FRANKLIN Iron Worker 09/17/2016

K & G ENTRANCES INC. 100.0 0.0 0.00% 0.0 0.00% 0.0 0.00%ONE FRANKLIN Iron Worker 08/13/2016

ELEVATOR INTERIOR DESIGN. 270.0 126.0 46.67% 0.0 0.00% 0.0 0.00%ONE FRANKLIN Elev Const Helper 06/18/2016

J.M. ELECTRICAL CO. INC. 5,530.0 2,224.0 40.22% 842.0 15.23% 0.0 0.00%ONE FRANKLIN Electrician 09/30/2016

JAJ COMPANY INC. 3,906.5 0.0 0.00% 262.0 6.71% 0.0 0.00%ONE FRANKLIN Marble Tile Work 03/27/2016

ADVANCED INFORM. TECH. 7,147.0 0.0 0.00% 1,748.0 24.46% 1,556.0 21.77%ONE FRANKLIN Telephone/Data I 09/23/2016

FRED SALVUCCI CORP. 6,138.0 2,002.5 32.62% 2,288.5 37.28% 0.0 0.00%ONE FRANKLIN Bricklayer 10/01/2016

JAJ COMPANY INC. 3,087.0 0.0 0.00% 946.0 30.64% 8.0 0.26%ONE FRANKLIN Mason Tender 03/27/2016

HAYWARD BAKER INC. 1,551.5 1,007.0 64.90% 0.0 0.00% 0.0 0.00%ONE FRANKLIN Laborer 06/22/2014

J.C. FLOOR COVERING INC. 1,218.5 0.0 0.00% 232.0 19.04% 0.0 0.00%ONE FRANKLIN Floor Layer 07/01/2016

Page 195: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 195

Project Name Trade Latest Week

J. DERENZO CO. 12,595.5 5,086.0 40.38% 4,642.0 36.85% 979.5 7.78%ONE FRANKLIN Laborer 10/01/2016

J. DERENZO CO. 10,085.0 1,980.5 19.64% 632.5 6.27% 85.5 0.85%ONE FRANKLIN Equipment Opera 09/24/2016

J. C. CANNISTRARO INC. 23,208.3 11,300.5 48.69% 4,170.5 17.97% 856.0 3.69%ONE FRANKLIN Sprinkler Fitter 04/24/2016

J. C. CANNISTRARO INC. 388.5 0.0 0.00% 258.5 66.54% 0.0 0.00%ONE FRANKLIN Metal Refinisher 06/26/2016

HIGH POINT INTERIORS,INC. 48,660.5 4,828.0 9.92% 6,562.0 13.49% 1,420.5 2.92%ONE FRANKLIN Marble Tile Work 09/24/2016

HERITAGE RESTORATION INC. 1,583.0 193.0 12.19% 467.5 29.53% 0.0 0.00%ONE FRANKLIN Laborer 10/01/2016

HERITAGE RESTORATION INC. 6,529.0 955.0 14.63% 1,483.5 22.72% 310.0 4.75%ONE FRANKLIN Bricklayer 10/01/2016

HAYWARD BAKER INC. 5,356.5 1,785.5 33.33% 1,650.5 30.81% 0.0 0.00%ONE FRANKLIN Piledriver 06/15/2014

HAYWARD BAKER INC. 133.5 133.5 100.00% 133.5 100.00% 133.5 100.00%ONE FRANKLIN Oiler 12/08/2013

J. C. CANNISTRARO INC. 101,516.0 28,052.0 27.63% 12,641.2 12.45% 4,762.5 4.69%ONE FRANKLIN Plumber 10/02/2016

JAJ COMPANY INC. 59.0 59.0 100.00% 0.0 0.00% 0.0 0.00%ONE FRANKLIN Laborer 03/27/2016

1,313,453.0 416,680.0 31.72% 331,076.5 25.21% 65,136.0 4.96%SUB TOTALS:

ORIENT HEIGHTS PHASE ONE

$1,000,000Amount:

Gen Contractor: SUFFOLK CONSTRUCTION CO.

(617)445-3500 64 ALLERTON STREET roxbury

Est Start Date:

Est End Date:

11/01/2016

12/31/2018

PATRICK J. KENNEDY & SONS, 197.0 88.0 44.67% 88.0 44.67% 0.0 0.00%ORIENT HEIGHTS PHASE ONE Pipefitter 08/26/2017

IKE ELECTRIC, INC. 28.0 0.0 0.00% 0.0 0.00% 0.0 0.00%ORIENT HEIGHTS PHASE ONE Electrician 09/09/2017

JDC DEMOLITION COMPANY, I 682.0 51.0 7.48% 51.0 7.48% 0.0 0.00%ORIENT HEIGHTS PHASE ONE Equipment Opera 04/22/2017

JDC DEMOLITION COMPANY, I 2,522.0 593.0 23.51% 1,227.0 48.65% 227.0 9.00%ORIENT HEIGHTS PHASE ONE Laborer 04/22/2017

LIBERTY CONST. SERVICES 122.0 32.0 26.23% 24.0 19.67% 0.0 0.00%ORIENT HEIGHTS PHASE ONE Carpenter 07/23/2017

LIBERTY CONST. SERVICES 3,131.0 1,869.0 59.69% 41.0 1.31% 0.0 0.00%ORIENT HEIGHTS PHASE ONE Laborer 08/06/2017

MARGUERITE CONCRETE 367.5 22.0 5.99% 22.0 5.99% 0.0 0.00%ORIENT HEIGHTS PHASE ONE Cement Finisher 09/16/2017

MARGUERITE CONCRETE 175.0 33.0 18.86% 16.0 9.14% 8.0 4.57%ORIENT HEIGHTS PHASE ONE Cement Laborer 09/16/2017

MARGUERITE CONCRETE 87.5 0.0 0.00% 4.0 4.57% 0.0 0.00%ORIENT HEIGHTS PHASE ONE Field Engineer 07/01/2017

MARGUERITE CONCRETE 134.0 0.0 0.00% 0.0 0.00% 0.0 0.00%ORIENT HEIGHTS PHASE ONE Pumpman 09/02/2017

CRUZ ELECTRIC CO. 523.0 327.0 62.52% 327.0 62.52% 0.0 0.00%ORIENT HEIGHTS PHASE ONE Laborer 09/16/2017

FEDERAL CONCRETE 2,774.5 1,787.0 64.41% 750.5 27.05% 511.5 18.44%ORIENT HEIGHTS PHASE ONE Laborer 09/02/2017

MARGUERITE CONCRETE 800.5 16.0 2.00% 529.0 66.08% 0.0 0.00%ORIENT HEIGHTS PHASE ONE Laborer 09/16/2017

ATLAS DRILLING 202.0 0.0 0.00% 0.0 0.00% 0.0 0.00%ORIENT HEIGHTS PHASE ONE Piledriver 03/04/2017

CUTTING EDGE ENVIRONMEN 165.0 0.0 0.00% 42.0 25.45% 0.0 0.00%ORIENT HEIGHTS PHASE ONE Laborer 02/18/2017

FEDERAL CONCRETE 1,339.5 466.5 34.83% 646.5 48.26% 0.0 0.00%ORIENT HEIGHTS PHASE ONE Iron Worker 09/02/2017

ATLAS DRILLING 343.5 168.0 48.91% 343.5 100.00% 0.0 0.00%ORIENT HEIGHTS PHASE ONE Laborer 02/18/2017

ATLAS DRILLING 502.0 0.0 0.00% 0.0 0.00% 0.0 0.00%ORIENT HEIGHTS PHASE ONE Driller 03/04/2017

CAVALIERI CONSTRUCTION C 3,875.5 0.0 0.00% 1,054.5 27.21% 0.0 0.00%ORIENT HEIGHTS PHASE ONE Equipment Opera 09/09/2017

CAVALIERI CONSTRUCTION C 5,518.5 3,478.5 63.03% 3,051.0 55.29% 920.0 16.67%ORIENT HEIGHTS PHASE ONE Laborer 09/09/2017

Page 196: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 196

Project Name Trade Latest Week

CRUZ ELECTRIC CO. 1,926.0 517.0 26.84% 517.0 26.84% 0.0 0.00%ORIENT HEIGHTS PHASE ONE Electrician 09/16/2017

E. M. DUGGAN INC. 1,342.0 336.0 25.04% 352.0 26.23% 0.0 0.00%ORIENT HEIGHTS PHASE ONE Plumber 09/17/2017

CUTTING EDGE ENVIRONMEN 5,363.5 923.0 17.21% 3,963.0 73.89% 182.0 3.39%ORIENT HEIGHTS PHASE ONE Asbestos Worker 02/11/2017

D.C.R. INC. 471.0 0.0 0.00% 254.0 53.93% 0.0 0.00%ORIENT HEIGHTS PHASE ONE Bricklayer 08/05/2017

D.C.R. INC. 402.0 148.0 36.82% 402.0 100.00% 0.0 0.00%ORIENT HEIGHTS PHASE ONE Mason Tender 08/05/2017

FEDERAL CONCRETE 6,056.0 1,851.5 30.57% 1,067.0 17.62% 945.0 15.60%ORIENT HEIGHTS PHASE ONE Carpenter 09/02/2017

39,050.5 12,706.5 32.54% 14,772.0 37.83% 2,793.5 7.15%SUB TOTALS:

OXFORD PING ON

$2,055,000Amount:

Gen Contractor: CONSIGLI CONSTRUCTION

197 MAIN STREET MILFORD

Est Start Date:

Est End Date:

04/01/2014

08/31/2015

S & F CONCRETE 2,087.5 605.0 28.98% 878.0 42.06% 8.0 0.38%OXFORD PING ON Laborer 04/30/2016

S & F CONCRETE 274.5 0.0 0.00% 0.0 0.00% 0.0 0.00%OXFORD PING ON Equipment Opera 04/30/2016

S & F CONCRETE 358.0 87.5 24.44% 104.5 29.19% 0.0 0.00%OXFORD PING ON Cement Finisher 04/02/2016

S & F CONCRETE 1,201.0 212.0 17.65% 212.0 17.65% 0.0 0.00%OXFORD PING ON Carpenter 04/02/2016

RICMOR CONSTRUCTION INC. 600.0 176.0 29.33% 240.0 40.00% 8.0 1.33%OXFORD PING ON Laborer 10/17/2015

RIGGS CONTRACTING, INC. 184.0 176.0 95.65% 176.0 95.65% 0.0 0.00%OXFORD PING ON Carpenter 04/09/2016

N.B. KENNEY CO. INC., 10,432.0 3,351.0 32.12% 840.0 8.05% 0.0 0.00%OXFORD PING ON Plumber 05/14/2016

RICMOR CONSTRUCTION INC. 168.0 0.0 0.00% 48.0 28.57% 0.0 0.00%OXFORD PING ON Plasterer 09/12/2015

SAFWAY SERVICES LLC. 528.0 104.0 19.70% 88.0 16.67% 0.0 0.00%OXFORD PING ON Carpenter 03/12/2016

N.B. KENNEY CO. INC., 2,629.5 0.0 0.00% 121.0 4.60% 278.0 10.57%OXFORD PING ON Pipefitter 04/23/2016

RIGGS CONTRACTING, INC. 1,778.5 940.5 52.88% 1,202.0 67.59% 42.0 2.36%OXFORD PING ON Laborer 04/23/2016

SAFWAY SERVICES LLC. 501.0 328.0 65.47% 320.0 63.87% 208.0 41.52%OXFORD PING ON Laborer 03/12/2016

SAVE-ON-WALL CO, INC. 1,656.5 538.5 32.51% 302.0 18.23% 560.5 33.84%OXFORD PING ON Painter 05/14/2016

SPECIALTY INSULATION GRO 1,158.0 258.0 22.28% 112.0 9.67% 0.0 0.00%OXFORD PING ON Carpenter 02/20/2016

UNIVERSAL STEEL ERECTORS 702.5 396.5 56.44% 0.0 0.00% 0.0 0.00%OXFORD PING ON Oiler 08/08/2015

T & T ELECTRICAL CO. 9,948.0 1,248.5 12.55% 2,355.0 23.67% 0.0 0.00%OXFORD PING ON Electrician 04/09/2016

T. J. MCCARTNEY, INC. 3,850.0 312.0 8.10% 1,083.0 28.13% 280.0 7.27%OXFORD PING ON Taper 04/22/2016

TITAN ROOFING INC. 1,362.0 322.0 23.64% 394.5 28.96% 80.5 5.91%OXFORD PING ON Roofer 04/23/2016

TITAN ROOFING INC. 201.5 0.0 0.00% 10.0 4.96% 0.0 0.00%OXFORD PING ON Sheetmetal Work 04/23/2016

UNIVERSAL STEEL ERECTORS 405.5 0.0 0.00% 0.0 0.00% 0.0 0.00%OXFORD PING ON Equipment Opera 08/01/2015

UNIVERSAL STEEL ERECTORS 5,608.5 1,612.0 28.74% 1,928.5 34.39% 446.0 7.95%OXFORD PING ON Iron Worker 04/16/2016

STRONG ARM IRON WORKERS 1,270.0 249.0 19.61% 406.0 31.97% 0.0 0.00%OXFORD PING ON Iron Worker 08/15/2015

KONE ELEVATOR INC. 1,669.5 41.0 2.46% 16.0 0.96% 120.0 7.19%OXFORD PING ON Elevator Const(M 05/21/2016

T. J. MCCARTNEY, INC. 3,398.5 2,966.5 87.29% 2,233.5 65.72% 0.0 0.00%OXFORD PING ON Laborer 04/22/2016

ANGELINI PLASTERING 2,266.0 397.0 17.52% 397.0 17.52% 0.0 0.00%OXFORD PING ON Plasterer 02/06/2016

Page 197: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 197

Project Name Trade Latest Week

T. J. MCCARTNEY, INC. 15,834.5 2,824.0 17.83% 4,280.0 27.03% 1,116.5 7.05%OXFORD PING ON Carpenter 04/22/2016

JULIAN CRANE & EQUIPMENT 123.0 0.0 0.00% 0.0 0.00% 0.0 0.00%OXFORD PING ON Iron Worker 02/06/2016

A & J WINDOW INC. 368.0 0.0 0.00% 0.0 0.00% 0.0 0.00%OXFORD PING ON Carpenter 03/19/2016

ANGELINI PLASTERING 362.5 0.0 0.00% 0.0 0.00% 0.0 0.00%OXFORD PING ON Laborer 12/12/2015

AXION SPECIALTY CONTRACTI 1,250.0 229.0 18.32% 0.0 0.00% 0.0 0.00%OXFORD PING ON Insulator 04/09/2016

BADD BROS. INC. 104.0 8.0 7.69% 8.0 7.69% 0.0 0.00%OXFORD PING ON Iron Worker 05/28/2016

BEACON FIRE PROTECTION, I 2,718.0 16.0 0.59% 356.0 13.10% 0.0 0.00%OXFORD PING ON Sprinkler Fitter 04/30/2016

CAPITAL CARPET&FLOORING 1,951.0 302.0 15.48% 742.0 38.03% 150.0 7.69%OXFORD PING ON Floor Layer 05/07/2016

CHAPMAN WATERPROOFING 76.0 6.0 7.89% 0.0 0.00% 0.0 0.00%OXFORD PING ON Laborer 07/18/2015

CHAPMAN WATERPROOFING 408.0 144.0 35.29% 136.0 33.33% 16.5 4.04%OXFORD PING ON Waterproofer 04/30/2016

EMPIRE MASONRY CORP. 1,267.0 387.0 30.54% 1,062.0 83.82% 0.0 0.00%OXFORD PING ON Laborer 03/19/2016

EMPIRE MASONRY CORP. 1,445.0 570.0 39.45% 570.0 39.45% 0.0 0.00%OXFORD PING ON Mason 03/19/2016

J. DERENZO CO. 1,304.5 466.5 35.76% 498.5 38.21% 8.0 0.61%OXFORD PING ON Laborer 09/26/2015

JEREZ LLC 915.0 552.0 60.33% 915.0 100.00% 232.0 25.36%OXFORD PING ON Laborer 04/30/2016

AMERICAN CONTRACTORS CO 937.0 72.0 7.68% 108.0 11.53% 0.0 0.00%OXFORD PING ON Carpenter 04/09/2016

EMPIRE MASONRY CORP. 273.5 273.5 100.00% 273.5 100.00% 0.0 0.00%OXFORD PING ON Mason Tender 01/02/2016

JULIAN CRANE & EQUIPMENT 1,684.5 1,644.5 97.63% 0.0 0.00% 0.0 0.00%OXFORD PING ON Equipment Opera 04/09/2016

JULIAN CRANE & EQUIPMENT 402.5 120.0 29.81% 10.0 2.48% 0.0 0.00%OXFORD PING ON Elevator Const(M 02/06/2016

J. DERENZO CO. 1,160.5 133.5 11.50% 97.5 8.40% 0.0 0.00%OXFORD PING ON Equipment Opera 08/01/2015

HAYWARD BAKER INC. 233.5 123.0 52.68% 123.0 52.68% 0.0 0.00%OXFORD PING ON Piledriver 12/28/2014

HAYWARD BAKER INC. 41.5 0.0 0.00% 0.0 0.00% 0.0 0.00%OXFORD PING ON Laborer 11/30/2014

HAYWARD BAKER INC. 99.0 41.5 41.92% 41.5 41.92% 0.0 0.00%OXFORD PING ON Equipment Opera 12/07/2014

GLEESON POWERS INC. 438.0 0.0 0.00% 160.0 36.53% 0.0 0.00%OXFORD PING ON Carpenter 01/30/2016

FRAZIER SHEET METAL INC 2,907.0 460.0 15.82% 954.0 32.82% 0.0 0.00%OXFORD PING ON Sheetmetal Work 04/02/2016

J.M. ELECTRICAL CO. INC. 714.0 0.0 0.00% 8.0 1.12% 0.0 0.00%OXFORD PING ON Electrician 04/09/2016

91,256.0 22,693.5 24.87% 23,810.0 26.09% 3,554.0 3.89%SUB TOTALS:

P & R RESTAURANT ICE CREAM

$7,500Amount:

Gen Contractor: CAMBRIDGE REPROGRAPHIES

(617)623-2838 21 MCGRATH HGWY SOMERVILLE

Est Start Date:

Est End Date:

11/01/2015

11/27/2015

CAMBRIDGE REPROGRAPHIE 7.0 0.0 0.00% 0.0 0.00% 0.0 0.00%P & R RESTAURANT ICE CREAM Electrician 11/28/2015

CAMBRIDGE REPROGRAPHIE 16.0 0.0 0.00% 6.0 37.50% 6.0 37.50%P & R RESTAURANT ICE CREAM Laborer 11/07/2015

23.0 0.0 0.00% 6.0 26.09% 6.0 26.09%SUB TOTALS:

PAIGE ACADMEY

$17,000Amount:

Gen Contractor: FARAH PAINTING

(617)282-4606 245 GRANITE AVE. Milton

Est Start Date:

Est End Date:

08/03/2015

08/07/2015

FARAH PAINTING 120.0 0.0 0.00% 120.0 100.00% 0.0 0.00%PAIGE ACADMEY Painter 08/14/2015

Page 198: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 198

Project Name Trade Latest Week

120.0 0.0 0.00% 120.0 100.00% 0.0 0.00%SUB TOTALS:

PARACLETE

$18,000Amount:

Gen Contractor: JACK WELCH PLUMBERS

(617)913-0896 823 EAST FIFTH STREET

Est Start Date:

Est End Date:

07/27/2015

09/18/2015

JACK WELCH PLUMBERS 191.0 0.0 0.00% 0.0 0.00% 0.0 0.00%PARACLETE Plumber 09/18/2015

191.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SUB TOTALS:

PARAISO

$5,000Amount:

Gen Contractor: EXCEL SIGNS & DECORATION CORP.

(617)479-8552 259 QUINCY AVE. QUINCY

Est Start Date:

Est End Date:

02/01/2014

02/28/2014

EXCEL SIGNS & DECORATION 12.0 0.0 0.00% 12.0 100.00% 4.0 33.33%PARAISO Laborer 02/22/2014

12.0 0.0 0.00% 12.0 100.00% 4.0 33.33%SUB TOTALS:

PARCEL 1B

$151,000,000Amount:

Gen Contractor: CONSIGLI CONSTRUCTION

197 MAIN STREET MILFORD

Est Start Date:

Est End Date:

12/20/2015

04/01/2018

M.L. MCDONALD SALES 3,471.0 1,700.0 48.98% 1,770.0 50.99% 648.0 18.67%PARCEL 1B Painter 09/12/2017

MARR RIGGING COMPANY 5,873.0 2,216.5 37.74% 0.0 0.00% 68.0 1.16%PARCEL 1B Equipment Opera 09/10/2017

MARR RIGGING COMPANY 285.5 0.0 0.00% 0.0 0.00% 0.0 0.00%PARCEL 1B Elevator Const(M 06/25/2017

MARR RIGGING COMPANY 125.0 0.0 0.00% 0.0 0.00% 0.0 0.00%PARCEL 1B Elev Const Helper 05/07/2017

MANAFORT BROTHERS INC. 3,458.5 0.0 0.00% 0.0 0.00% 0.0 0.00%PARCEL 1B Mason 06/24/2017

MANAFORT BROTHERS INC. 17,366.0 2,857.5 16.45% 8,057.0 46.40% 0.0 0.00%PARCEL 1B Laborer 07/22/2017

MANAFORT BROTHERS INC. 11,629.5 1,559.0 13.41% 0.0 0.00% 0.0 0.00%PARCEL 1B Carpenter 07/22/2017

JOHN F. SHEA CO. INC. 8,220.7 2,446.3 29.76% 2,922.2 35.55% 8.0 0.10%PARCEL 1B Roofer 09/16/2017

LYMO CONSTRUCTION CO. 20,779.0 3,254.0 15.66% 5,301.0 25.51% 2,474.0 11.91%PARCEL 1B Carpenter 09/17/2017

KERR'S WELDING IRON WORK 5,813.0 3,053.0 52.52% 3,690.0 63.48% 0.0 0.00%PARCEL 1B Welder 12/07/2016

K & K ACOUSTICAL CEILINGS 724.0 278.0 38.40% 0.0 0.00% 0.0 0.00%PARCEL 1B Carpenter 09/17/2017

JOHN F. SHEA CO. INC. 192.8 0.0 0.00% 0.0 0.00% 0.0 0.00%PARCEL 1B Sheetmetal Work 09/16/2017

MCDONALD ELECTRICAL COR 50,302.5 14,088.0 28.01% 11,921.0 23.70% 3,090.5 6.14%PARCEL 1B Electrician 09/10/2017

MANAFORT BROTHERS INC. 8,283.5 2,813.0 33.96% 2,781.0 33.57% 48.0 0.58%PARCEL 1B Iron Worker 07/01/2017

RIGGS CONTRACTING, INC. 1,284.5 653.0 50.84% 277.5 21.60% 634.0 49.36%PARCEL 1B Carpenter 07/29/2017

WALKER SPECIALITES INC 252.0 72.0 28.57% 148.0 58.73% 0.0 0.00%PARCEL 1B Carpenter 09/19/2017

J. DERENZO CO. 5,245.5 296.0 5.64% 1,363.5 25.99% 442.0 8.43%PARCEL 1B Laborer 09/16/2017

UNION FLOORING INSTALL 6,939.5 3,727.0 53.71% 4,265.5 61.47% 0.0 0.00%PARCEL 1B Carpenter 09/17/2017

STANLEY & SONS INC. 1,157.0 0.0 0.00% 640.0 55.32% 0.0 0.00%PARCEL 1B Laborer 09/09/2017

STANLEY & SONS INC. 8,399.0 4,035.5 48.05% 4,103.0 48.85% 650.5 7.74%PARCEL 1B Carpenter 09/09/2017

SERA DESIGNS. 268.0 0.0 0.00% 36.8 13.71% 0.0 0.00%PARCEL 1B Bricklayer 09/10/2017

THE PAPPAS COMPANY, INC 52.0 16.0 30.77% 28.0 53.85% 12.0 23.08%PARCEL 1B Carpenter 09/03/2017

Page 199: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 199

Project Name Trade Latest Week

RIGGS CONTRACTING, INC. 12,605.5 5,270.5 41.81% 8,016.0 63.59% 1,480.0 11.74%PARCEL 1B Laborer 09/16/2017

MURPHY ELEC INDUS CONTR 2,538.0 842.0 33.18% 906.0 35.70% 8.0 0.32%PARCEL 1B Electrician 09/15/2017

QUALITY AIR METALS, INC. 13,383.5 6,028.0 45.04% 3,068.0 22.92% 1,254.5 9.37%PARCEL 1B Sheetmetal Work 09/16/2017

PIZZOTTI BROTHERS, INC. 3,116.0 480.0 15.40% 680.0 21.82% 0.0 0.00%PARCEL 1B Mason Tender 09/19/2017

PIZZOTTI BROTHERS, INC. 4,486.0 1,572.0 35.04% 1,572.0 35.04% 224.0 4.99%PARCEL 1B Bricklayer 09/19/2017

OTIS ELEVATOR COMPANY 3,825.3 1,019.5 26.65% 1,019.5 26.65% 80.0 2.09%PARCEL 1B Elevator Const(M 09/14/2017

OTIS ELEVATOR COMPANY 3,767.5 8.0 0.21% 32.0 0.85% 16.0 0.42%PARCEL 1B Elev Const Helper 09/14/2017

MURPHY SPECIALTIES, INC. 180.0 92.0 51.11% 0.0 0.00% 0.0 0.00%PARCEL 1B Sheetmetal Work 04/15/2017

RYAN IRON WORKS INC, 9,504.5 2,810.0 29.56% 3,469.0 36.50% 575.0 6.05%PARCEL 1B Iron Worker 09/17/2017

BOWLINE CO. 423.0 137.0 32.39% 149.0 35.22% 0.0 0.00%PARCEL 1B Laborer 09/16/2017

CENTURY DRYWALL INC, 11,952.0 2,395.5 20.04% 7,862.5 65.78% 1,199.5 10.04%PARCEL 1B Taper 09/09/2017

CENTURY DRYWALL INC, 2,761.0 479.0 17.35% 630.0 22.82% 0.0 0.00%PARCEL 1B Plasterer 09/02/2017

CENTURY DRYWALL INC, 13,808.5 3,044.5 22.05% 4,786.5 34.66% 971.5 7.04%PARCEL 1B Laborer 09/09/2017

CENTURY DRYWALL INC, 50,007.5 9,839.0 19.68% 20,502.0 41.00% 863.0 1.73%PARCEL 1B Carpenter 09/09/2017

BUSINESS INTERIORS FCOVE 496.0 0.0 0.00% 496.0 100.00% 0.0 0.00%PARCEL 1B Metal Refinisher 08/26/2017

CHAPMAN WATERPROOFING 3,869.5 1,328.5 34.33% 1,530.5 39.55% 674.0 17.42%PARCEL 1B Bricklayer 09/18/2017

BUSINESS INTERIORS FCOVE 2,017.0 376.0 18.64% 1,096.0 54.34% 8.0 0.40%PARCEL 1B Marble Refinisher 08/26/2017

ACCORD STEEL & PRECAST 31,334.1 15,870.6 50.65% 7,509.0 23.96% 865.5 2.76%PARCEL 1B Iron Worker 01/31/2017

BOWLINE CO. 192.0 0.0 0.00% 20.0 10.42% 0.0 0.00%PARCEL 1B Carpenter 09/16/2017

ACCORD STEEL & PRECAST 2,224.5 0.0 0.00% 0.0 0.00% 0.0 0.00%PARCEL 1B Oiler 01/17/2017

ACCORD STEEL & PRECAST 341.0 0.0 0.00% 0.0 0.00% 0.0 0.00%PARCEL 1B Mason 01/03/2017

J. K. GLASS CO. INC. 7,243.0 5,937.5 81.98% 5,373.0 74.18% 222.0 3.07%PARCEL 1B Iron Worker 09/10/2017

ACCORD STEEL & PRECAST 2,238.5 0.0 0.00% 0.0 0.00% 0.0 0.00%PARCEL 1B Equipment Opera 01/17/2017

J. K. GLASS CO. INC. 9,829.0 2,677.5 27.24% 1,344.0 13.67% 232.0 2.36%PARCEL 1B Glazier 09/10/2017

BUSINESS INTERIORS FCOVE 3,742.0 688.0 18.39% 1,640.0 43.83% 0.0 0.00%PARCEL 1B Marble Tile Work 08/26/2017

J. DERENZO CO. 4,406.9 2,586.9 58.70% 2,271.5 51.54% 0.0 0.00%PARCEL 1B Equipment Opera 09/16/2017

CHAPMAN WATERPROOFING 184.0 8.0 4.35% 0.0 0.00% 0.0 0.00%PARCEL 1B Laborer 05/29/2017

J. K. GLASS CO. INC. 8,912.0 386.0 4.33% 1,517.0 17.02% 0.0 0.00%PARCEL 1B Carpenter 09/10/2017

HUB FOUNDATION CO. 448.0 0.0 0.00% 0.0 0.00% 0.0 0.00%PARCEL 1B Piledriver 03/26/2016

HUB FOUNDATION CO. 1,939.5 692.0 35.68% 949.0 48.93% 0.0 0.00%PARCEL 1B Laborer 04/09/2016

HUB FOUNDATION CO. 1,672.5 419.5 25.08% 419.5 25.08% 419.5 25.08%PARCEL 1B Equipment Opera 03/26/2016

HERITAGE RESTORATION INC. 535.5 154.0 28.76% 154.0 28.76% 0.0 0.00%PARCEL 1B Laborer 02/04/2017

HERITAGE RESTORATION INC. 2,412.0 505.0 20.94% 505.0 20.94% 262.0 10.86%PARCEL 1B Bricklayer 02/11/2017

E. M. DUGGAN INC. 10,511.0 1,461.0 13.90% 1,819.0 17.31% 673.0 6.40%PARCEL 1B Sprinkler Fitter 09/17/2017

Page 200: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 200

Project Name Trade Latest Week

E. M. DUGGAN INC. 27,794.0 6,030.0 21.70% 1,714.0 6.17% 2,571.0 9.25%PARCEL 1B Plumber 09/17/2017

E. M. DUGGAN INC. 5,661.0 2,993.0 52.87% 1,812.0 32.01% 645.0 11.39%PARCEL 1B Pipefitter 09/17/2017

COMPOSITE COMPANY INC. 671.0 244.0 36.36% 302.0 45.01% 0.0 0.00%PARCEL 1B Iron Worker 11/26/2016

CIP CONCRETE, INC. 960.0 0.0 0.00% 0.0 0.00% 0.0 0.00%PARCEL 1B Mason 08/26/2017

FIBER-FIT INSULATION. 9,656.5 3,506.0 36.31% 5,341.5 55.32% 0.0 0.00%PARCEL 1B Insulator 09/16/2017

CIP CONCRETE, INC. 347.0 0.0 0.00% 81.0 23.34% 0.0 0.00%PARCEL 1B Laborer 08/26/2017

432,117.3 122,945.3 28.45% 135,891.0 31.45% 21,318.5 4.93%SUB TOTALS:

PARCEL 24

$3,700,000Amount:

Gen Contractor: SUFFOLK CONSTRUCTION CO.

(617)445-3500 64 ALLERTON STREET roxbury

Est Start Date:

Est End Date:

08/13/2013

10/31/2015

K & K ACOUSTICAL CEILINGS 764.0 8.0 1.05% 8.0 1.05% 0.0 0.00%PARCEL 24 Carpenter 08/23/2015

MERRIMAC TILE CO,INC. 429.0 190.0 44.29% 190.0 44.29% 190.0 44.29%PARCEL 24 Marble Tile Work 05/26/2015

MERRIMAC TILE CO,INC. 3,093.5 0.0 0.00% 954.0 30.84% 0.0 0.00%PARCEL 24 Marble Refinisher 07/28/2015

MERRIMAC TILE CO,INC. 7.0 0.0 0.00% 0.0 0.00% 0.0 0.00%PARCEL 24 Floor Layer 03/10/2015

LM HEAVY CIVIL 7,039.0 2,224.0 31.60% 1,918.5 27.26% 0.0 0.00%PARCEL 24 Piledriver 11/29/2014

LM HEAVY CIVIL 6,089.5 364.5 5.99% 1,252.5 20.57% 97.0 1.59%PARCEL 24 Laborer 06/27/2015

LM HEAVY CIVIL 6,886.0 495.0 7.19% 1,250.0 18.15% 0.0 0.00%PARCEL 24 Equipment Opera 06/27/2015

LM HEAVY CIVIL 21.5 0.0 0.00% 0.0 0.00% 0.0 0.00%PARCEL 24 Carpenter 04/26/2014

J. K. GLASS CO. INC. 4,216.5 1,754.5 41.61% 1,098.0 26.04% 1,181.5 28.02%PARCEL 24 Iron Worker 08/23/2015

LIBERTY CONST. SERVICES 4,396.0 1,183.5 26.92% 1,202.5 27.35% 0.0 0.00%PARCEL 24 Carpenter 09/20/2015

K & H ELECTRICAL SYSTEMS 32,640.5 19,314.5 59.17% 9,846.0 30.16% 2,944.0 9.02%PARCEL 24 Electrician 10/16/2015

NORTHEAST AUTOMATIC SPK 7,900.0 2,216.0 28.05% 424.0 5.37% 780.0 9.87%PARCEL 24 Sprinkler Fitter 08/22/2015

TITAN ROOFING INC. 376.0 0.0 0.00% 0.0 0.00% 0.0 0.00%PARCEL 24 Sheetmetal Work 10/10/2015

LIBERTY CONST. SERVICES 28,351.0 13,029.0 45.96% 8,472.0 29.88% 1,251.0 4.41%PARCEL 24 Laborer 09/20/2015

OTIS ELEVATOR COMPANY 4,245.5 520.0 12.25% 687.3 16.19% 225.3 5.31%PARCEL 24 Elevator Const(M 10/22/2015

SOEP PAINTING CORP. 9,824.0 1,181.0 12.02% 1,828.0 18.61% 824.0 8.39%PARCEL 24 Painter 10/25/2015

SPECIALTY INSULATION GRO 1,449.0 247.0 17.05% 100.0 6.90% 0.0 0.00%PARCEL 24 Carpenter 07/26/2015

STRUCTURES DEREK INTERN 1,602.5 0.0 0.00% 0.0 0.00% 0.0 0.00%PARCEL 24 Equipment Opera 12/27/2014

STRUCTURES DEREK INTERN 21,677.0 9,892.0 45.63% 9,412.5 43.42% 882.0 4.07%PARCEL 24 Iron Worker 02/21/2015

STRUCTURES DEREK INTERN 1,602.5 0.0 0.00% 33.0 2.06% 0.0 0.00%PARCEL 24 Oiler 12/27/2014

J. K. GLASS CO. INC. 4,988.5 345.0 6.92% 312.0 6.25% 441.0 8.84%PARCEL 24 Glazier 10/18/2015

TITAN ROOFING INC. 4,394.5 579.0 13.18% 913.0 20.78% 112.0 2.55%PARCEL 24 Roofer 10/10/2015

VYNORIUS PILEDRIVING INC. 367.0 0.0 0.00% 0.0 0.00% 0.0 0.00%PARCEL 24 Equipment Opera 05/24/2014

VYNORIUS PILEDRIVING INC. 430.5 284.0 65.97% 147.0 34.15% 0.0 0.00%PARCEL 24 Piledriver 05/24/2014

WORCESTER AIR CONDITIONI 4,755.0 575.0 12.09% 615.0 12.93% 0.0 0.00%PARCEL 24 Sheetmetal Work 08/09/2015

Page 201: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 201

Project Name Trade Latest Week

YOUTH BUILD BOSTON 317.0 237.0 74.76% 317.0 100.00% 0.0 0.00%PARCEL 24 Carpenter 05/01/2015

MERRIMAC TILE CO,INC. 2,956.5 0.0 0.00% 696.0 23.54% 0.0 0.00%PARCEL 24 Mason Tender 07/28/2015

SUPERIOR RAIL& IRON WORK 5,431.0 808.0 14.88% 1,004.0 18.49% 478.0 8.80%PARCEL 24 Iron Worker 10/27/2015

CHAPMAN WATERPROOFING 2,048.0 642.5 31.37% 895.5 43.73% 93.0 4.54%PARCEL 24 Waterproofer 07/06/2015

J. K. GLASS CO. INC. 6,452.5 3,217.5 49.86% 2,505.5 38.83% 0.0 0.00%PARCEL 24 Carpenter 10/18/2015

AXION SPECIALTY CONTRACTI 259.0 0.0 0.00% 0.0 0.00% 0.0 0.00%PARCEL 24 Insulator 09/13/2015

BETONS PREFABRIQUES DU L 455.0 455.0 100.00% 455.0 100.00% 0.0 0.00%PARCEL 24 Bricklayer 12/20/2014

BETONS PREFABRIQUES DU L 590.5 0.0 0.00% 0.0 0.00% 0.0 0.00%PARCEL 24 Equipment Opera 12/13/2014

BETONS PREFABRIQUES DU L 4,566.0 862.0 18.88% 568.5 12.45% 149.5 3.27%PARCEL 24 Iron Worker 06/06/2015

BETONS PREFABRIQUES DU L 590.5 260.0 44.03% 463.0 78.41% 0.0 0.00%PARCEL 24 Oiler 12/13/2014

CHAPMAN WATERPROOFING 335.5 115.0 34.28% 22.0 6.56% 8.0 2.38%PARCEL 24 Bricklayer 09/14/2015

CHAPMAN WATERPROOFING 3,051.5 1,113.0 36.47% 853.5 27.97% 417.5 13.68%PARCEL 24 Mason Tender 10/12/2015

CIRCLE FLOORS INC. 1,871.0 64.0 3.42% 1,615.0 86.32% 0.0 0.00%PARCEL 24 Floor Layer 08/30/2015

COMPONENT ASSEMBLY SYS 54,812.0 12,592.0 22.97% 9,874.0 18.01% 533.0 0.97%PARCEL 24 Carpenter 10/27/2015

COMPONENT ASSEMBLY SYS 13,567.0 7,940.0 58.52% 4,035.0 29.74% 0.0 0.00%PARCEL 24 Laborer 03/17/2015

COMPONENT ASSEMBLY SYS 11,442.0 2,750.0 24.03% 5,822.0 50.88% 1,140.0 9.96%PARCEL 24 Taper 03/17/2015

OTIS ELEVATOR COMPANY 2,478.3 592.5 23.91% 0.0 0.00% 0.0 0.00%PARCEL 24 Elev Const Helper 10/22/2015

DIAMOND TECH ASSOCIATES 776.0 0.0 0.00% 240.0 30.93% 0.0 0.00%PARCEL 24 Electrician 08/19/2015

G & C CONCRETE CO. 434.5 0.0 0.00% 0.0 0.00% 0.0 0.00%PARCEL 24 Oiler 05/17/2014

CHAPMAN WATERPROOFING 445.0 174.0 39.10% 53.5 12.02% 0.0 0.00%PARCEL 24 Laborer 10/05/2015

INNER CITY FIRE PROTECTIO 734.0 265.0 36.10% 212.0 28.88% 0.0 0.00%PARCEL 24 Sprinkler Fitter 01/03/2015

ALL TIME SERVICE INC. 2,296.0 2,104.0 91.64% 2,296.0 100.00% 764.0 33.28%PARCEL 24 Laborer 07/25/2015

G & C CONCRETE CO. 10,553.5 2,445.0 23.17% 5,864.0 55.56% 0.0 0.00%PARCEL 24 Laborer 10/17/2015

G & C CONCRETE CO. 7,381.0 2,980.5 40.38% 2,226.0 30.16% 0.0 0.00%PARCEL 24 Iron Worker 10/03/2015

G & C CONCRETE CO. 942.0 0.0 0.00% 0.0 0.00% 0.0 0.00%PARCEL 24 Equipment Opera 05/23/2015

G & C CONCRETE CO. 3,312.5 137.5 4.15% 1,181.5 35.67% 17.0 0.51%PARCEL 24 Cement Finisher 10/17/2015

G & C CONCRETE CO. 11,215.0 1,446.0 12.89% 2,136.5 19.05% 64.0 0.57%PARCEL 24 Carpenter 10/10/2015

FRED WILLIAMS, INC. 12,813.5 3,747.5 29.25% 1,731.0 13.51% 1,060.0 8.27%PARCEL 24 Pipefitter 10/25/2015

FRED SALVUCCI CORP. 804.5 219.0 27.22% 236.0 29.33% 0.0 0.00%PARCEL 24 Mason Tender 06/27/2015

FRED SALVUCCI CORP. 1,858.5 494.0 26.58% 206.0 11.08% 0.0 0.00%PARCEL 24 Bricklayer 06/27/2015

EM DUGGAN/GIBBS MCALISTE 27,214.0 6,758.0 24.83% 4,259.0 15.65% 683.0 2.51%PARCEL 24 Plumber 09/06/2015

EAST COAST INTERIORS CO. 10,951.0 4,858.0 44.36% 3,419.5 31.23% 483.0 4.41%PARCEL 24 Carpenter 07/18/2015

EAST COAST FIREPROOFING 4,184.5 875.0 20.91% 1,354.0 32.36% 0.0 0.00%PARCEL 24 Laborer 03/17/2015

364,684.3 112,554.0 30.86% 95,204.3 26.11% 14,817.8 4.06%SUB TOTALS:

Page 202: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 202

Project Name Trade Latest Week

PARCEL 24 SOUTH

$15,630,000Amount:

Gen Contractor: N E I CONTRACTORS

(781)348-5099 27 PACELLA PARK DRIVE RANDOLPH

Est Start Date:

Est End Date:

05/05/2016

11/01/2017

SUPERIOR PLUMBING INC. 11,184.3 3,589.3 32.09% 5,425.3 48.51% 542.8 4.85%PARCEL 24 SOUTH Plumber 08/29/2017

N E I CONTRACTORS 1,952.0 1,952.0 100.00% 1,952.0 100.00% 229.0 11.73%PARCEL 24 SOUTH Laborer 09/16/2017

SEA & SHORE CONTRACTING 202.5 0.0 0.00% 192.5 95.06% 0.0 0.00%PARCEL 24 SOUTH Equipment Opera 07/23/2016

SEA & SHORE CONTRACTING 16.5 0.0 0.00% 10.0 60.61% 0.0 0.00%PARCEL 24 SOUTH Laborer 07/02/2016

SEA & SHORE CONTRACTING 3.0 3.0 100.00% 0.0 0.00% 0.0 0.00%PARCEL 24 SOUTH Piledriver 08/06/2016

SEAN FARRELL EXCAUTION 887.5 0.0 0.00% 0.0 0.00% 0.0 0.00%PARCEL 24 SOUTH Equipment Opera 07/29/2017

SEAN FARRELL EXCAUTION 860.5 746.0 86.69% 714.0 82.98% 7.0 0.81%PARCEL 24 SOUTH Laborer 07/29/2017

SEAN FARRELL EXCAUTION 121.0 0.0 0.00% 0.0 0.00% 121.0 100.00%PARCEL 24 SOUTH Surveyor 12/24/2016

SUPERIOR PLUMBING INC. 52.5 0.0 0.00% 0.0 0.00% 0.0 0.00%PARCEL 24 SOUTH Electrician 08/22/2017

TITAN SERVICES LIMITED, INC 8,127.0 3,001.0 36.93% 6,879.0 84.64% 135.0 1.66%PARCEL 24 SOUTH Laborer 07/29/2017

SUPERIOR PLUMBING INC. 186.5 186.5 100.00% 186.5 100.00% 29.5 15.82%PARCEL 24 SOUTH Insulator 08/29/2017

LIGHTHOUSE MASONRY, INC. 3,937.0 183.5 4.66% 2,763.5 70.19% 0.0 0.00%PARCEL 24 SOUTH Mason Tender 09/02/2017

T.R. WATERPROOFERS, LLC 8.0 4.0 50.00% 4.0 50.00% 0.0 0.00%PARCEL 24 SOUTH Waterproofer 08/05/2016

TITAN SERVICES LIMITED, INC 3,611.0 973.0 26.95% 2,366.0 65.52% 151.0 4.18%PARCEL 24 SOUTH Carpenter 07/29/2017

SUPERIOR PLUMBING INC. 5,543.3 0.0 0.00% 1,076.0 19.41% 56.0 1.01%PARCEL 24 SOUTH HVAC 08/29/2017

COMPOSITE COMPANY INC. 44.0 16.0 36.36% 24.0 54.55% 0.0 0.00%PARCEL 24 SOUTH Iron Worker 12/03/2016

LIGHTHOUSE MASONRY, INC. 2,622.0 342.0 13.04% 1,165.0 44.43% 0.0 0.00%PARCEL 24 SOUTH Bricklayer 08/26/2017

BAY STATE SHORING & EXCA 733.0 181.0 24.69% 181.0 24.69% 0.0 0.00%PARCEL 24 SOUTH Piledriver 07/23/2016

BEL-LIN CORP 1,852.3 936.8 50.57% 925.5 49.96% 134.5 7.26%PARCEL 24 SOUTH Iron Worker 12/24/2016

C SMITH STEEL INC. 773.0 217.0 28.07% 209.0 27.04% 209.0 27.04%PARCEL 24 SOUTH Iron Worker 07/01/2017

COVENANT FIRE PROTECTION 1,590.0 72.0 4.53% 1,306.0 82.14% 0.0 0.00%PARCEL 24 SOUTH Sprinkler Fitter 09/16/2017

DE LA VEGA PAINTING, LLC. 495.0 463.0 93.54% 495.0 100.00% 0.0 0.00%PARCEL 24 SOUTH Painter 09/16/2017

DIAZ CONSTRUCTION CO. INC. 354.0 0.0 0.00% 0.0 0.00% 0.0 0.00%PARCEL 24 SOUTH Carpenter 01/14/2017

G. BROUILLETTE & SON INC. 749.5 0.0 0.00% 40.5 5.40% 0.0 0.00%PARCEL 24 SOUTH Roofer 08/25/2017

DIAZ CONSTRUCTION CO. INC. 1,685.0 1,282.0 76.08% 1,392.5 82.64% 0.0 0.00%PARCEL 24 SOUTH Cement Laborer 04/15/2017

EAST COAST INTERIORS CO. 8,210.0 2,392.0 29.14% 3,209.0 39.09% 198.0 2.41%PARCEL 24 SOUTH Carpenter 07/29/2017

ENERGY ELECTRIC CO., INC. 7,348.0 1,342.5 18.27% 2,217.0 30.17% 0.0 0.00%PARCEL 24 SOUTH Electrician 09/16/2017

G. BROUILLETTE & SON INC. 422.5 185.5 43.91% 185.5 43.91% 41.0 9.70%PARCEL 24 SOUTH Laborer 08/18/2017

DIAZ CONSTRUCTION CO. INC. 368.0 0.0 0.00% 69.5 18.89% 0.0 0.00%PARCEL 24 SOUTH Cement Finisher 04/15/2017

TITAN SERVICES LIMITED, INC 16.0 0.0 0.00% 16.0 100.00% 0.0 0.00%PARCEL 24 SOUTH Taper 11/26/2016

KONE ELEVATOR INC. 352.0 0.0 0.00% 142.0 40.34% 21.0 5.97%PARCEL 24 SOUTH Elevator Const(M 08/16/2017

64,306.8 18,068.1 28.10% 33,146.3 51.54% 1,874.8 2.92%SUB TOTALS:

Page 203: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 203

Project Name Trade Latest Week

PARCEL M1 & M2

$580,000,000Amount:

Gen Contractor: JOHN MORIARTY & ASSOCIATES

(781)729-3900 3 CHURCH STREET WINCHESTER

Est Start Date:

Est End Date:

05/12/2017

02/01/2020

REGIS STEEL CORPORATION 3,986.0 971.0 24.36% 900.0 22.58% 162.0 4.06%PARCEL M1 & M2 Iron Worker 08/19/2017

S & F CONCRETE 1,316.0 414.0 31.46% 414.0 31.46% 0.0 0.00%PARCEL M1 & M2 Carpenter 09/16/2017

S & F CONCRETE 86.5 0.0 0.00% 0.0 0.00% 0.0 0.00%PARCEL M1 & M2 Equipment Opera 09/16/2017

S & F CONCRETE 417.5 307.0 73.53% 12.5 2.99% 0.0 0.00%PARCEL M1 & M2 Laborer 09/16/2017

TREVIICOS CORPORATION 11,367.0 717.0 6.31% 2,713.0 23.87% 0.0 0.00%PARCEL M1 & M2 Equipment Opera 09/10/2017

TREVIICOS CORPORATION 7,634.5 1,865.0 24.43% 2,263.5 29.65% 539.0 7.06%PARCEL M1 & M2 Piledriver 09/10/2017

LUND REBAR SERVICES, INC. 701.0 155.0 22.11% 436.0 62.20% 0.0 0.00%PARCEL M1 & M2 Iron Worker 09/17/2017

BAY CRANE NORTHEAST 22.5 0.0 0.00% 0.0 0.00% 0.0 0.00%PARCEL M1 & M2 Oiler 07/20/2017

TREVIICOS CORPORATION 7,006.5 3,176.5 45.34% 1,746.5 24.93% 0.0 0.00%PARCEL M1 & M2 Laborer 09/10/2017

J. DERENZO CO. 2,440.0 1,169.5 47.93% 8.0 0.33% 780.5 31.99%PARCEL M1 & M2 Laborer 09/16/2017

J. DERENZO CO. 3,165.5 1,207.0 38.13% 200.0 6.32% 0.0 0.00%PARCEL M1 & M2 Equipment Opera 09/16/2017

HAYWARD BAKER INC. 433.0 96.0 22.17% 88.0 20.32% 0.0 0.00%PARCEL M1 & M2 Piledriver 09/17/2017

HAYWARD BAKER INC. 757.0 412.0 54.43% 88.0 11.62% 0.0 0.00%PARCEL M1 & M2 Laborer 09/17/2017

HAYWARD BAKER INC. 221.0 0.0 0.00% 0.0 0.00% 0.0 0.00%PARCEL M1 & M2 Equipment Opera 09/17/2017

CHAPMAN WATERPROOFING 219.0 163.0 74.43% 157.0 71.69% 0.0 0.00%PARCEL M1 & M2 Laborer 09/18/2017

BAY CRANE NORTHEAST 413.5 38.0 9.19% 38.0 9.19% 38.0 9.19%PARCEL M1 & M2 Equipment Opera 08/17/2017

CHAPMAN WATERPROOFING 292.0 101.0 34.59% 133.0 45.55% 24.0 8.22%PARCEL M1 & M2 Waterproofer 09/18/2017

40,478.5 10,792.0 26.66% 9,197.5 22.72% 1,543.5 3.81%SUB TOTALS:

PAREDISE BEAUTY SALON

$2,000Amount:

Gen Contractor: HUNTER SIGNS

(617)360-9710 120 BUSINESS STREET HYDE PARK

Est Start Date:

Est End Date:

04/29/2017

05/06/2017

HUNTER SIGNS 2.0 2.0 100.00% 2.0 100.00% 0.0 0.00%PAREDISE BEAUTY SALON Laborer 05/06/2017

2.0 2.0 100.00% 2.0 100.00% 0.0 0.00%SUB TOTALS:

PARIS VILLAGE

$9,023,760Amount:

Gen Contractor: DELPHI CONSTRUCTION INC.

(781)893-9900 130 OVERLAND ROAD WALTHAM

Est Start Date:

Est End Date:

08/24/2017

09/28/2018

M. T. MAYO CORP 24.0 0.0 0.00% 24.0 100.00% 0.0 0.00%PARIS VILLAGE Laborer 09/02/2017

M. T. MAYO CORP 16.0 0.0 0.00% 0.0 0.00% 0.0 0.00%PARIS VILLAGE Utility Operator 08/26/2017

M. T. MAYO CORP 56.0 0.0 0.00% 0.0 0.00% 0.0 0.00%PARIS VILLAGE Equipment Opera 09/09/2017

96.0 0.0 0.00% 24.0 25.00% 0.0 0.00%SUB TOTALS:

PASSION BEAUTY SUPPLY & SALON

$2,500Amount:

Gen Contractor: HUNTER SIGNS

(617)360-9710 120 BUSINESS STREET HYDE PARK

Est Start Date:

Est End Date:

06/12/2016

06/18/2016

HUNTER SIGNS 2.0 2.0 100.00% 2.0 100.00% 0.0 0.00%PASSION BEAUTY SUPPLY & SA Laborer 06/18/2016

Page 204: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 204

Project Name Trade Latest Week

2.0 2.0 100.00% 2.0 100.00% 0.0 0.00%SUB TOTALS:

PATRIOT HOMES PROJECT

$12,749,467Amount:

Gen Contractor: BILT-RITE CONSTRUCTION

(617)541-9777 150 SHIRLEY STREET BOSTON

Est Start Date:

Est End Date:

02/16/2015

12/31/2016

NORTH EAST FOAM SOLUTION 224.0 0.0 0.00% 32.0 14.29% 0.0 0.00%PATRIOT HOMES PROJECT Carpenter 04/12/2016

MARGUERITE CONCRETE 13.0 0.0 0.00% 0.0 0.00% 0.0 0.00%PATRIOT HOMES PROJECT Field Engineer 09/05/2015

MARGUERITE CONCRETE 98.5 0.0 0.00% 24.5 24.87% 0.0 0.00%PATRIOT HOMES PROJECT Laborer 08/27/2016

NASDI, LLC 3,806.0 0.0 0.00% 3,412.0 89.65% 184.0 4.83%PATRIOT HOMES PROJECT Asbestos Worker 11/08/2015

NASDI, LLC 521.0 0.0 0.00% 40.0 7.68% 120.0 23.03%PATRIOT HOMES PROJECT Equipment Opera 11/08/2015

NASDI, LLC 3,975.0 1,035.0 26.04% 2,042.0 51.37% 0.0 0.00%PATRIOT HOMES PROJECT Laborer 11/08/2015

NER CONS MANAGEMENT INC. 1,244.0 0.0 0.00% 316.0 25.40% 104.0 8.36%PATRIOT HOMES PROJECT Bricklayer 10/30/2016

NER CONS MANAGEMENT INC. 670.0 0.0 0.00% 16.0 2.39% 0.0 0.00%PATRIOT HOMES PROJECT Mason Tender 08/07/2016

J.M. ELECTRICAL CO. INC. 72.0 0.0 0.00% 40.0 55.56% 0.0 0.00%PATRIOT HOMES PROJECT Electrician 07/01/2016

NORTH EAST FOAM SOLUTION 192.0 136.0 70.83% 136.0 70.83% 0.0 0.00%PATRIOT HOMES PROJECT Laborer 04/12/2016

RISE & SHINE CLEANING & CO 191.4 177.6 92.77% 191.4 100.00% 187.4 97.91%PATRIOT HOMES PROJECT Laborer 10/29/2016

SECURITY FENCE CO 32.0 0.0 0.00% 0.0 0.00% 0.0 0.00%PATRIOT HOMES PROJECT Laborer 09/10/2016

TARA CONSTRUCTION 9,288.5 2,765.0 29.77% 3,878.0 41.75% 582.0 6.27%PATRIOT HOMES PROJECT Carpenter 10/15/2016

TARA CONSTRUCTION 119.0 85.0 71.43% 119.0 100.00% 0.0 0.00%PATRIOT HOMES PROJECT Laborer 10/15/2016

TELECONSTRUCTIONS, INC. 144.0 64.0 44.44% 16.0 11.11% 0.0 0.00%PATRIOT HOMES PROJECT Iron Worker 01/30/2016

TITAN ROOFING INC. 730.0 182.0 24.93% 168.0 23.01% 47.0 6.44%PATRIOT HOMES PROJECT Roofer 09/17/2016

NER CONS MANAGEMENT INC. 120.0 0.0 0.00% 8.0 6.67% 0.0 0.00%PATRIOT HOMES PROJECT Laborer 01/24/2016

CRUZ ELECTRIC CO. 4,226.0 1,567.0 37.08% 1,511.0 35.75% 0.0 0.00%PATRIOT HOMES PROJECT Electrician 10/22/2016

TITAN ROOFING INC. 288.0 0.0 0.00% 0.0 0.00% 0.0 0.00%PATRIOT HOMES PROJECT Sheetmetal Work 10/22/2016

A.C.K. PAINTING LLC. 1,600.0 636.0 39.75% 614.0 38.38% 0.0 0.00%PATRIOT HOMES PROJECT Painter 10/28/2016

AMERPHIL INC 1,544.0 0.0 0.00% 0.0 0.00% 0.0 0.00%PATRIOT HOMES PROJECT Equipment Opera 10/18/2016

AMERPHIL INC 3,001.0 1,057.0 35.22% 2,889.0 96.27% 0.0 0.00%PATRIOT HOMES PROJECT Laborer 10/25/2016

APEX CORPORATION 997.0 112.0 11.23% 0.0 0.00% 0.0 0.00%PATRIOT HOMES PROJECT HVAC 09/04/2016

CAPEWAY INTERIORS, INC. 1,786.0 568.0 31.80% 693.0 38.80% 112.0 6.27%PATRIOT HOMES PROJECT Carpenter 05/13/2016

MARGUERITE CONCRETE 34.0 0.0 0.00% 0.0 0.00% 0.0 0.00%PATRIOT HOMES PROJECT Equipment Opera 07/23/2016

CAPEWAY INTERIORS, INC. 1,500.0 248.0 16.53% 1,492.0 99.47% 72.0 4.80%PATRIOT HOMES PROJECT Taper 05/27/2016

MARGUERITE CONCRETE 58.5 0.0 0.00% 0.0 0.00% 0.0 0.00%PATRIOT HOMES PROJECT Cement Finisher 08/27/2016

D J PLUMBING & HEATING 1,127.0 0.0 0.00% 0.0 0.00% 0.0 0.00%PATRIOT HOMES PROJECT Plumber 10/30/2016

DYNAMIC INSULATION 126.0 0.0 0.00% 46.0 36.51% 0.0 0.00%PATRIOT HOMES PROJECT Insulator 10/23/2016

FEDERAL CONCRETE 943.0 237.0 25.13% 228.0 24.18% 60.0 6.36%PATRIOT HOMES PROJECT Carpenter 08/27/2016

FEDERAL CONCRETE 156.0 8.0 5.13% 16.0 10.26% 0.0 0.00%PATRIOT HOMES PROJECT Iron Worker 05/21/2016

Page 205: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 205

Project Name Trade Latest Week

FEDERAL CONCRETE 456.0 96.0 21.05% 140.5 30.81% 0.0 0.00%PATRIOT HOMES PROJECT Laborer 08/27/2016

INNER CITY FIRE PROTECTIO 1,164.0 748.0 64.26% 748.0 64.26% 0.0 0.00%PATRIOT HOMES PROJECT Sprinkler Fitter 09/17/2016

J.C. FLOOR COVERING INC. 873.5 30.0 3.43% 148.0 16.94% 0.0 0.00%PATRIOT HOMES PROJECT Floor Layer 10/28/2016

CAPEWAY INTERIORS, INC. 309.0 58.0 18.77% 207.0 66.99% 0.0 0.00%PATRIOT HOMES PROJECT Laborer 06/17/2016

41,629.4 9,809.6 23.56% 19,171.4 46.05% 1,468.4 3.53%SUB TOTALS:

PEAK PERFORMANCE

$2,500Amount:

Gen Contractor: HUNTER SIGNS

(617)360-9710 120 BUSINESS STREET HYDE PARK

Est Start Date:

Est End Date:

02/01/2014

03/31/2014

HUNTER SIGNS 5.0 5.0 100.00% 5.0 100.00% 0.0 0.00%PEAK PERFORMANCE Laborer 03/08/2014

5.0 5.0 100.00% 5.0 100.00% 0.0 0.00%SUB TOTALS:

PEARL BUILDING

$3,200,000Amount:

Gen Contractor: KAPLAN CORPORATION

(617)232-3300 116 HARVARD STREET BROOKLINE

Est Start Date:

Est End Date:

06/13/2013

01/31/2014

MCR CONSTRUCTION INC. 32.0 32.0 100.00% 32.0 100.00% 0.0 0.00%PEARL BUILDING Carpenter 12/22/2013

VILLAGE FORGE INC. 77.3 45.5 58.90% 45.5 58.90% 0.0 0.00%PEARL BUILDING Iron Worker 02/22/2014

PRECISION GLASS 16.0 0.0 0.00% 16.0 100.00% 0.0 0.00%PEARL BUILDING Glazier 01/25/2014

PLATINUM SERVICES, INC. 2,287.0 947.0 41.41% 955.0 41.76% 461.0 20.16%PEARL BUILDING Electrician 02/22/2014

METRO EQUIPMENT CORP. 159.0 159.0 100.00% 0.0 0.00% 0.0 0.00%PEARL BUILDING Equipment Opera 01/14/2014

M.A.D CONSTRUCTION 16.0 16.0 100.00% 16.0 100.00% 0.0 0.00%PEARL BUILDING Mason 12/07/2013

M.A.D CONSTRUCTION 24.0 24.0 100.00% 24.0 100.00% 0.0 0.00%PEARL BUILDING Laborer 12/07/2013

LYNCO FIRE PROTECTION INC 716.0 322.0 44.97% 354.0 49.44% 0.0 0.00%PEARL BUILDING Sprinkler Fitter 02/04/2014

LUNDY INC. 1,779.0 1,072.0 60.26% 558.0 31.37% 0.0 0.00%PEARL BUILDING Plumber 02/22/2014

BRENNAN INTERIOR CONT 118.0 69.0 58.47% 48.0 40.68% 0.0 0.00%PEARL BUILDING Carpenter 02/16/2014

KAPLAN CORPORATION 2,137.0 1,452.0 67.95% 1,865.0 87.27% 410.0 19.19%PEARL BUILDING Laborer 02/23/2014

KAPLAN CORPORATION 450.0 0.0 0.00% 0.0 0.00% 0.0 0.00%PEARL BUILDING Carpenter 02/23/2014

GREYLOCK ROOFING COMPA 179.5 59.5 33.15% 59.5 33.15% 31.5 17.55%PEARL BUILDING Roofer 02/15/2014

AMERICAN EAST PAINTING 48.0 48.0 100.00% 48.0 100.00% 0.0 0.00%PEARL BUILDING Painter 12/21/2013

ENVIRONMENTAL SYS. ENG. 656.0 325.0 49.54% 504.0 76.83% 0.0 0.00%PEARL BUILDING HVAC 02/09/2014

COASTAL CONSTRUCTION 32.0 8.0 25.00% 32.0 100.00% 32.0 100.00%PEARL BUILDING Laborer 01/05/2014

COASTAL CONSTRUCTION 330.0 53.0 16.06% 190.0 57.58% 0.0 0.00%PEARL BUILDING Carpenter 01/05/2014

KARE'S PAINTING. 48.0 24.0 50.00% 48.0 100.00% 24.0 50.00%PEARL BUILDING Painter 12/06/2013

METRO EQUIPMENT CORP. 1,392.5 803.5 57.70% 773.5 55.55% 127.5 9.16%PEARL BUILDING Laborer 03/18/2014

10,497.3 5,459.5 52.01% 5,568.5 53.05% 1,086.0 10.35%SUB TOTALS:

PHILIP EDWARDS SALON

$20,000Amount:

Gen Contractor: MORGAN AWNING CO.

(781)569-6311 10 ATLANTIC AVE. WOBURN

Est Start Date:

Est End Date:

02/01/2016

06/20/2016

Page 206: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 206

Project Name Trade Latest Week

MORGAN AWNING CO. 20.0 0.0 0.00% 14.0 70.00% 0.0 0.00%PHILIP EDWARDS SALON Laborer 06/02/2016

BOSTON HARDSCAPES LLC. 160.0 0.0 0.00% 0.0 0.00% 0.0 0.00%PHILIP EDWARDS SALON Carpenter 02/26/2016

BOSTON HARDSCAPES LLC. 320.0 0.0 0.00% 0.0 0.00% 0.0 0.00%PHILIP EDWARDS SALON Laborer 02/26/2016

500.0 0.0 0.00% 14.0 2.80% 0.0 0.00%SUB TOTALS:

PIER 4 PHASE 3 CONDO BLDG.

$125,000,000Amount:

Gen Contractor: TURNER CONSTRUCTION CO.

(617)247-6400 TWO SEAPORT LANE BOSTON

Est Start Date:

Est End Date:

06/07/2017

03/27/2019

IPSWICH BAY GLASS CO. 98.0 26.0 26.53% 0.0 0.00% 0.0 0.00%PIER 4 PHASE 3 CONDO BLDG. Iron Worker 09/16/2017

THOMAS G GALLAGHER INC. 1,273.0 253.0 19.87% 0.0 0.00% 0.0 0.00%PIER 4 PHASE 3 CONDO BLDG. Plumber 09/17/2017

TURNER CONSTRUCTION CO. 600.5 171.5 28.56% 389.5 64.86% 0.0 0.00%PIER 4 PHASE 3 CONDO BLDG. Laborer 09/17/2017

THOMAS G GALLAGHER INC. 357.0 0.0 0.00% 0.0 0.00% 0.0 0.00%PIER 4 PHASE 3 CONDO BLDG. Sprinkler Fitter 09/17/2017

THOMAS G GALLAGHER INC. 730.0 33.0 4.52% 22.0 3.01% 0.0 0.00%PIER 4 PHASE 3 CONDO BLDG. Pipefitter 09/17/2017

STATE ELECTRIC CO. 889.0 404.0 45.44% 404.0 45.44% 0.0 0.00%PIER 4 PHASE 3 CONDO BLDG. Electrician 09/17/2017

REGIS STEEL CORPORATION 5,873.0 1,931.0 32.88% 1,643.0 27.98% 597.0 10.17%PIER 4 PHASE 3 CONDO BLDG. Iron Worker 09/16/2017

IPSWICH BAY GLASS CO. 5.5 5.5 100.00% 0.0 0.00% 0.0 0.00%PIER 4 PHASE 3 CONDO BLDG. Carpenter 09/16/2017

G & C CONCRETE CO. 3,816.0 1,447.5 37.93% 1,971.5 51.66% 0.0 0.00%PIER 4 PHASE 3 CONDO BLDG. Laborer 09/16/2017

G & C CONCRETE CO. 85.0 0.0 0.00% 0.0 0.00% 0.0 0.00%PIER 4 PHASE 3 CONDO BLDG. Equipment Opera 09/16/2017

TURNER CONSTRUCTION CO. 56.0 1.0 1.79% 25.0 44.64% 0.0 0.00%PIER 4 PHASE 3 CONDO BLDG. Carpenter 09/17/2017

G & C CONCRETE CO. 594.5 0.0 0.00% 219.0 36.84% 0.0 0.00%PIER 4 PHASE 3 CONDO BLDG. Cement Laborer 09/16/2017

IPSWICH BAY GLASS CO. 40.0 24.0 60.00% 0.0 0.00% 0.0 0.00%PIER 4 PHASE 3 CONDO BLDG. Glazier 09/16/2017

G & C CONCRETE CO. 719.5 109.0 15.15% 161.5 22.45% 0.0 0.00%PIER 4 PHASE 3 CONDO BLDG. Cement Finisher 09/16/2017

G & C CONCRETE CO. 8,701.0 2,388.5 27.45% 1,866.5 21.45% 0.0 0.00%PIER 4 PHASE 3 CONDO BLDG. Carpenter 09/16/2017

23,838.0 6,794.0 28.50% 6,702.0 28.11% 597.0 2.50%SUB TOTALS:

PIKALO RESTAURANT

$3,000Amount:

Gen Contractor: MR. IMPRINT AND SIGNS COMPANY

(617)623-1131 247 HIGHLAND AVE. SOMERVILLE

Est Start Date:

Est End Date:

08/24/2015

08/28/2015

MR. IMPRINT AND SIGNS COM 56.0 0.0 0.00% 56.0 100.00% 0.0 0.00%PIKALO RESTAURANT Carpenter 08/28/2015

56.0 0.0 0.00% 56.0 100.00% 0.0 0.00%SUB TOTALS:

PINE VILLAGE PRESCHOOL

$2,500Amount:

Gen Contractor: FAST SIGNS

(781)444-4889 11 B SECOND AVE. NEEDHAM

Est Start Date:

Est End Date:

12/14/2014

12/18/2014

FAST SIGNS 3.0 0.0 0.00% 0.0 0.00% 0.0 0.00%PINE VILLAGE PRESCHOOL Laborer 12/14/2014

3.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SUB TOTALS:

PIZZA TALIA

$2,500Amount:

Gen Contractor: FALCON GRAPHICS

(617)306-7748 826 MASS AVE. ARLINGTON

Est Start Date:

Est End Date:

06/01/2014

07/31/2014

FALCON GRAPHICS 40.0 0.0 0.00% 0.0 0.00% 0.0 0.00%PIZZA TALIA Laborer 06/12/2014

Page 207: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 207

Project Name Trade Latest Week

40.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SUB TOTALS:

PIZZATALIA

$10,000Amount:

Gen Contractor: LOGAN GRATE

(617)569-5280 42 LYNDE STREET EVERETT

Est Start Date:

Est End Date:

12/01/2013

06/30/2013

JONE CO. 96.0 96.0 100.00% 0.0 0.00% 0.0 0.00%PIZZATALIA Laborer 05/23/2014

JONE CO. 48.0 48.0 100.00% 48.0 100.00% 0.0 0.00%PIZZATALIA Bricklayer 05/10/2014

JONE CO. 48.0 48.0 100.00% 48.0 100.00% 0.0 0.00%PIZZATALIA Carpenter 05/23/2014

192.0 192.0 100.00% 96.0 50.00% 0.0 0.00%SUB TOTALS:

PROJECT HOPE

$50,000Amount:

Gen Contractor:

Est Start Date:

Est End Date:

09/25/2016

10/01/2016

WATERTOWN FLOOR COVERI 62.0 0.0 0.00% 0.0 0.00% 0.0 0.00%PROJECT HOPE Floor Layer 10/01/2016

62.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SUB TOTALS:

PROJECT PLACE

$13,000Amount:

Gen Contractor: THOMAS G GALLAGHER INC.

(617)661-7000 109 SMITH PLACE CAMBRIDGE

Est Start Date:

Est End Date:

08/03/2015

08/09/2015

THOMAS G GALLAGHER INC. 36.0 0.0 0.00% 0.0 0.00% 0.0 0.00%PROJECT PLACE Plumber 08/09/2015

36.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SUB TOTALS:

PURE JOY FLOWERS

$3,000Amount:

Gen Contractor: HUNTER SIGNS

(617)360-9710 120 BUSINESS STREET HYDE PARK

Est Start Date:

Est End Date:

06/26/2016

07/02/2016

HUNTER SIGNS 2.0 2.0 100.00% 2.0 100.00% 0.0 0.00%PURE JOY FLOWERS Laborer 07/02/2016

2.0 2.0 100.00% 2.0 100.00% 0.0 0.00%SUB TOTALS:

QUINCY COMMONS

$2,250,000Amount:

Gen Contractor: VERTEC CORP.

(508)230-2600 180 MAIN STREET NORTH EASTON

Est Start Date:

Est End Date:

10/01/2012

12/01/2013

VERTEC CORP. 40.0 0.0 0.00% 0.0 0.00% 0.0 0.00%QUINCY COMMONS Mason 08/01/2014

SANTIAGO QUINDE DBA QUIN 114.0 0.0 0.00% 114.0 100.00% 0.0 0.00%QUINCY COMMONS Floor Layer 03/07/2015

SANTIAGO QUINDE DBA QUIN 106.0 0.0 0.00% 106.0 100.00% 106.0 100.00%QUINCY COMMONS Laborer 10/04/2014

ROMAN IRON WORKS INC. 281.5 0.0 0.00% 0.0 0.00% 0.0 0.00%QUINCY COMMONS Iron Worker 03/21/2015

SCHLAGER COMPANY INC. 200.0 24.0 12.00% 0.0 0.00% 0.0 0.00%QUINCY COMMONS Laborer 09/10/2014

PROGRESSIVE ROOFING,INC. 1,670.8 367.0 21.97% 638.8 38.23% 89.8 5.37%QUINCY COMMONS Roofer 06/06/2015

SCHLAGER COMPANY INC. 3,905.5 1,514.0 38.77% 328.0 8.40% 0.0 0.00%QUINCY COMMONS Plumber 03/18/2015

SOLECT ENERGY 8.5 0.0 0.00% 0.0 0.00% 0.0 0.00%QUINCY COMMONS Electrician 02/07/2014

STREAMLINE WATERPROOFIN 152.5 0.0 0.00% 0.0 0.00% 0.0 0.00%QUINCY COMMONS Glazier 11/01/2014

XQUISITE LANDSCAPING 64.0 0.0 0.00% 0.0 0.00% 0.0 0.00%QUINCY COMMONS Mason 05/10/2015

STREAMLINE WATERPROOFIN 499.0 0.0 0.00% 0.0 0.00% 0.0 0.00%QUINCY COMMONS Waterproofer 11/29/2014

Page 208: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 208

Project Name Trade Latest Week

TARA CONSTRUCTION 7,329.0 1,257.5 17.16% 1,497.0 20.43% 0.0 0.00%QUINCY COMMONS Carpenter 03/28/2015

TARA CONSTRUCTION 49.5 49.5 100.00% 49.5 100.00% 49.5 100.00%QUINCY COMMONS Laborer 10/04/2014

TRAINOR CONSTRUCTION 5.0 0.0 0.00% 0.0 0.00% 0.0 0.00%QUINCY COMMONS Equipment Opera 11/29/2013

TRAINOR CONSTRUCTION 394.0 0.0 0.00% 0.0 0.00% 0.0 0.00%QUINCY COMMONS Laborer 07/11/2014

UNERECTORS INC. 152.0 0.0 0.00% 0.0 0.00% 0.0 0.00%QUINCY COMMONS Iron Worker 11/22/2014

VEEJAY FLOORS 280.0 0.0 0.00% 0.0 0.00% 0.0 0.00%QUINCY COMMONS Floor Layer 10/10/2014

VERTEC CORP. 4,004.5 2,563.5 64.02% 3,133.5 78.25% 495.0 12.36%QUINCY COMMONS Laborer 09/25/2015

XQUISITE LANDSCAPING 74.0 0.0 0.00% 0.0 0.00% 0.0 0.00%QUINCY COMMONS Equipment Opera 06/07/2015

XQUISITE LANDSCAPING 666.0 32.0 4.80% 81.0 12.16% 8.0 1.20%QUINCY COMMONS Laborer 08/02/2015

PRECISION CONCRETE 24.0 0.0 0.00% 24.0 100.00% 0.0 0.00%QUINCY COMMONS Laborer 09/27/2014

ESPAILLAT CONSTRUCTION L 1,085.8 373.8 34.43% 1,045.8 96.32% 0.0 0.00%QUINCY COMMONS Taper 06/29/2014

VEEJAY FLOORS 168.0 0.0 0.00% 0.0 0.00% 0.0 0.00%QUINCY COMMONS Laborer 09/26/2014

BROKK PRO'S 32.0 0.0 0.00% 0.0 0.00% 0.0 0.00%QUINCY COMMONS Laborer 04/30/2016

GEMNINT FLOORS 49.5 49.5 100.00% 49.5 100.00% 24.0 48.48%QUINCY COMMONS Laborer 09/13/2014

PRECISION CONCRETE 120.0 0.0 0.00% 48.0 40.00% 0.0 0.00%QUINCY COMMONS Cement Finisher 10/11/2014

AGB CONSTRUCTION SERVIC 480.0 480.0 100.00% 480.0 100.00% 0.0 0.00%QUINCY COMMONS Painter 12/26/2014

ANDERSON INSULATION 350.5 0.0 0.00% 331.0 94.44% 0.0 0.00%QUINCY COMMONS Carpenter 09/06/2014

ANDERSON INSULATION 333.3 88.3 26.48% 309.3 92.80% 0.0 0.00%QUINCY COMMONS Laborer 07/12/2014

BROKK PRO'S 8.0 0.0 0.00% 0.0 0.00% 0.0 0.00%QUINCY COMMONS Equipment Opera 04/30/2016

COMMONWEALTH ELECTRICA 5,277.0 918.0 17.40% 1,388.0 26.30% 0.0 0.00%QUINCY COMMONS Electrician 03/14/2015

DILLON ACOUSTICAL CEILING, 172.0 0.0 0.00% 0.0 0.00% 0.0 0.00%QUINCY COMMONS Carpenter 02/28/2015

EAST COAST FIREPROOFING 88.0 0.0 0.00% 56.0 63.64% 0.0 0.00%QUINCY COMMONS Laborer 04/01/2014

ESPAILLAT CONSTRUCTION L 3,197.2 899.9 28.15% 897.9 28.09% 114.5 3.58%QUINCY COMMONS Carpenter 06/29/2014

LIGHTHOUSE MASONRY, INC. 1,380.5 443.5 32.13% 1,017.5 73.71% 0.0 0.00%QUINCY COMMONS Mason 10/11/2014

PAYNE CONTRACTING CO. 1,712.0 1,648.0 96.26% 1,648.0 96.26% 0.0 0.00%QUINCY COMMONS Painter 10/18/2014

BOSTON FIRE SPRINKLER CO 1,415.0 82.0 5.80% 772.0 54.56% 0.0 0.00%QUINCY COMMONS Sprinkler Fitter 04/19/2015

ESPAILLAT CONSTRUCTION L 1,685.0 1,685.0 100.00% 1,661.0 98.58% 617.5 36.65%QUINCY COMMONS Laborer 06/29/2014

NEW ENGLAND MECHNICAL 2,753.0 2,393.0 86.92% 2,143.0 77.84% 0.0 0.00%QUINCY COMMONS Pipefitter 12/13/2014

LIGHTHOUSE MASONRY, INC. 2,126.0 286.0 13.45% 1,605.0 75.49% 24.0 1.13%QUINCY COMMONS Mason Tender 10/11/2014

NICKERSON SHEETMETAL 1,223.0 92.5 7.56% 92.5 7.56% 92.5 7.56%QUINCY COMMONS Sheetmetal Work 01/02/2015

LIGHTHOUSE MASONRY, INC. 144.0 0.0 0.00% 64.0 44.44% 0.0 0.00%QUINCY COMMONS Bricklayer 04/18/2014

LC CLEANING 398.0 398.0 100.00% 398.0 100.00% 213.0 53.52%QUINCY COMMONS Laborer 04/10/2015

KONE ELEVATOR INC. 304.0 6.0 1.97% 6.0 1.97% 36.0 11.84%QUINCY COMMONS Elevator Const(M 03/25/2015

KONE ELEVATOR INC. 146.0 0.0 0.00% 0.0 0.00% 0.0 0.00%QUINCY COMMONS Elev Const Helper 04/16/2014

Page 209: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 209

Project Name Trade Latest Week

GEMNINT FLOORS 67.5 67.5 100.00% 67.5 100.00% 0.0 0.00%QUINCY COMMONS Floor Layer 09/13/2014

44,734.9 15,718.4 35.14% 20,051.7 44.82% 1,869.8 4.18%SUB TOTALS:

QUINCY HEIGHTS I

$18,000,000Amount:

Gen Contractor: BILT-RITE CONSTRUCTION

(617)541-9777 150 SHIRLEY STREET BOSTON

Est Start Date:

Est End Date:

05/01/2013

05/31/2015

PROGRESSIVE ROOFING,INC. 712.0 0.0 0.00% 293.8 41.26% 0.0 0.00%QUINCY HEIGHTS I Roofer 12/13/2014

NEW ENGLAND SOLAR HOT W 134.8 15.0 11.13% 15.0 11.13% 0.0 0.00%QUINCY HEIGHTS I Laborer 12/27/2014

NICKERSON SHEETMETAL 472.5 43.0 9.10% 43.0 9.10% 43.0 9.10%QUINCY HEIGHTS I Sheetmetal Work 11/21/2014

NEW ENGLAND SOLAR HOT W 9.0 0.0 0.00% 0.0 0.00% 0.0 0.00%QUINCY HEIGHTS I Pipefitter 05/03/2014

PAN ELECTRIC COMPANY INC. 1,511.0 785.5 51.99% 1,511.0 100.00% 80.0 5.29%QUINCY HEIGHTS I Electrician 01/17/2015

NEW ENGLAND MECHNICAL 3,399.0 2,239.0 65.87% 3,375.0 99.29% 0.0 0.00%QUINCY HEIGHTS I Plumber 10/11/2014

MK ENVIRONMENTAL SPECIAL 3,289.6 1,946.6 59.17% 3,289.6 100.00% 343.3 10.44%QUINCY HEIGHTS I Asbestos Worker 05/03/2014

METRO EQUIPMENT CORP. 4,167.0 2,974.5 71.38% 1,862.0 44.68% 381.5 9.16%QUINCY HEIGHTS I Laborer 10/28/2014

MATHIAS CORPORATION 17.0 0.0 0.00% 17.0 100.00% 0.0 0.00%QUINCY HEIGHTS I Laborer 11/08/2014

PROVIDENCE WINDOW TREAT 128.0 0.0 0.00% 0.0 0.00% 0.0 0.00%QUINCY HEIGHTS I Carpenter 09/27/2014

THE WATERPROOFING COMP 30.5 0.0 0.00% 30.5 100.00% 0.0 0.00%QUINCY HEIGHTS I Laborer 12/21/2013

MCCOY & ANDERSEN FENCE, I 1,552.0 910.0 58.63% 1,552.0 100.00% 324.0 20.88%QUINCY HEIGHTS I Laborer 12/05/2014

RISE & SHINE CLEANING & CO 902.3 735.5 81.52% 902.3 100.00% 646.1 71.60%QUINCY HEIGHTS I Laborer 01/17/2015

SANTIAGO QUINDE DBA QUIN 120.0 0.0 0.00% 120.0 100.00% 0.0 0.00%QUINCY HEIGHTS I Floor Layer 12/13/2014

SANTIAGO QUINDE DBA QUIN 120.0 0.0 0.00% 120.0 100.00% 120.0 100.00%QUINCY HEIGHTS I Laborer 12/13/2014

TWOMEY PLUMBING & HEATIN 4,378.0 2,380.0 54.36% 2,104.0 48.06% 0.0 0.00%QUINCY HEIGHTS I Plumber 08/02/2014

SOLECT ENERGY 15.5 0.0 0.00% 0.0 0.00% 0.0 0.00%QUINCY HEIGHTS I Electrician 01/09/2015

CENTAUR CONSTRUCTION SE 531.5 48.0 9.03% 110.0 20.70% 0.0 0.00%QUINCY HEIGHTS I Laborer 01/21/2014

T & P CONTRACTING, INC. 553.0 338.0 61.12% 176.0 31.83% 0.0 0.00%QUINCY HEIGHTS I Carpenter 01/10/2014

T & P CONTRACTING, INC. 170.0 170.0 100.00% 170.0 100.00% 72.0 42.35%QUINCY HEIGHTS I Laborer 01/03/2014

TARA CONSTRUCTION 21,680.5 12,041.0 55.54% 12,932.5 59.65% 883.5 4.08%QUINCY HEIGHTS I Carpenter 12/27/2014

TARA CONSTRUCTION 1,028.5 821.5 79.87% 1,028.5 100.00% 314.0 30.53%QUINCY HEIGHTS I Laborer 08/16/2014

THE WATERPROOFING COMP 70.5 0.0 0.00% 0.0 0.00% 0.0 0.00%QUINCY HEIGHTS I Bricklayer 05/10/2014

MATHIAS CORPORATION 68.0 34.0 50.00% 17.0 25.00% 0.0 0.00%QUINCY HEIGHTS I Equipment Opera 11/08/2014

TARA CONSTRUCTION 2,774.0 259.0 9.34% 2,426.0 87.45% 144.0 5.19%QUINCY HEIGHTS I Taper 12/13/2014

ANCHOR INSULATION 583.5 362.0 62.04% 402.5 68.98% 93.0 15.94%QUINCY HEIGHTS I Carpenter 12/06/2014

LOWE PLUMB & HEATING 2,306.5 1,868.5 81.01% 2,037.5 88.34% 0.0 0.00%QUINCY HEIGHTS I Plumber 12/27/2014

DAVID BUBB REFORM MASON 371.0 0.0 0.00% 243.0 65.50% 0.0 0.00%QUINCY HEIGHTS I Mason 09/27/2014

ABBOT BLDG RESTOR CO,INC. 147.0 0.0 0.00% 58.0 39.46% 0.0 0.00%QUINCY HEIGHTS I Mason 12/12/2014

AMERICAN EAST PAINTING 8,172.0 7,188.0 87.96% 8,172.0 100.00% 514.0 6.29%QUINCY HEIGHTS I Painter 10/18/2014

Page 210: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 210

Project Name Trade Latest Week

BOSTON FIRE SPRINKLER CO 1,967.5 669.0 34.00% 644.5 32.76% 0.0 0.00%QUINCY HEIGHTS I Sprinkler Fitter 11/16/2014

CARL-LOUIS & COMPANY INC. 401.0 195.0 48.63% 76.0 18.95% 0.0 0.00%QUINCY HEIGHTS I Plumber 12/19/2014

CENTAUR CONSTRUCTION SE 500.5 262.5 52.45% 262.5 52.45% 0.0 0.00%QUINCY HEIGHTS I Equipment Opera 01/21/2014

CGL ELECTRONIC SECURITY 132.0 30.0 22.73% 88.0 66.67% 0.0 0.00%QUINCY HEIGHTS I Technician 11/22/2014

DAVID BUBB REFORM MASON 931.0 666.0 71.54% 931.0 100.00% 0.0 0.00%QUINCY HEIGHTS I Mason Tender 09/27/2014

FIRST NICK PAINTING CO. 1,152.0 0.0 0.00% 0.0 0.00% 0.0 0.00%QUINCY HEIGHTS I Painter 11/16/2014

G & O INC. 2,872.0 2,135.0 74.34% 2,600.0 90.53% 0.0 0.00%QUINCY HEIGHTS I Electrician 12/27/2014

INTEGRA NETWORK SERVICE 253.0 189.0 74.70% 189.0 74.70% 0.0 0.00%QUINCY HEIGHTS I Telephone/Data I 09/20/2014

LC CLEANING 196.0 196.0 100.00% 196.0 100.00% 53.0 27.04%QUINCY HEIGHTS I Laborer 12/19/2014

ABBOT BLDG RESTOR CO,INC. 233.0 139.0 59.66% 180.0 77.25% 0.0 0.00%QUINCY HEIGHTS I Mason Tender 12/05/2014

G. BROUILLETTE & SON INC. 456.5 160.5 35.16% 249.0 54.55% 47.5 10.41%QUINCY HEIGHTS I Laborer 06/20/2014

JOHNSON HARDWOOD FLOOR 2,648.0 1,480.0 55.89% 2,648.0 100.00% 0.0 0.00%QUINCY HEIGHTS I Floor Layer 01/04/2015

J.C. FLOOR COVERING INC. 886.0 404.0 45.60% 552.0 62.30% 17.0 1.92%QUINCY HEIGHTS I Floor Layer 10/10/2014

INSUL-PRO INSULATION CO. 333.0 301.5 90.54% 333.0 100.00% 0.0 0.00%QUINCY HEIGHTS I Laborer 05/25/2014

INSUL-PRO INSULATION CO. 456.0 48.0 10.53% 104.5 22.92% 51.0 11.18%QUINCY HEIGHTS I Insulator 05/18/2014

HERCULES BUILDING WRECKI 304.0 264.0 86.84% 304.0 100.00% 40.0 13.16%QUINCY HEIGHTS I Laborer 05/09/2014

HERBERT CONSTRE TILE 251.0 0.0 0.00% 251.0 100.00% 0.0 0.00%QUINCY HEIGHTS I Floor Layer 06/21/2014

HARRINGTON & CALLAHAN 356.0 159.0 44.66% 102.0 28.65% 0.0 0.00%QUINCY HEIGHTS I Iron Worker 02/07/2015

GREEN GROUP, LLC 303.8 0.0 0.00% 166.5 54.81% 0.0 0.00%QUINCY HEIGHTS I Laborer 12/21/2014

G. BROUILLETTE & SON INC. 330.0 0.0 0.00% 51.5 15.61% 0.0 0.00%QUINCY HEIGHTS I Roofer 06/20/2014

74,376.4 42,457.6 57.08% 52,936.7 71.17% 4,166.9 5.60%SUB TOTALS:

QUINCY HEIGHTS II

$18,000,000Amount:

Gen Contractor: VERTEC CORP.

(508)230-2600 180 MAIN STREET NORTH EASTON

Est Start Date:

Est End Date:

05/01/2013

05/31/2015

LOWE PLUMB & HEATING 4,122.8 3,246.1 78.74% 3,564.8 86.47% 0.0 0.00%QUINCY HEIGHTS II Plumber 02/07/2015

VILLAGE FORGE INC. 24.0 4.8 19.79% 0.0 0.00% 0.0 0.00%QUINCY HEIGHTS II Iron Worker 10/11/2014

SOLECT ENERGY 363.0 0.0 0.00% 0.0 0.00% 0.0 0.00%QUINCY HEIGHTS II Electrician 01/16/2015

NE SOLAR HOT WATER 73.0 19.5 26.71% 19.5 26.71% 0.0 0.00%QUINCY HEIGHTS II Laborer 11/29/2014

NE SOLAR HOT WATER 5.0 0.0 0.00% 0.0 0.00% 0.0 0.00%QUINCY HEIGHTS II Pipefitter 05/17/2014

NG ENVIRONMENTAL CO. 3,958.0 1,836.0 46.39% 3,958.0 100.00% 270.0 6.82%QUINCY HEIGHTS II Asbestos Worker 07/19/2014

PAYNE CONTRACTING CO. 3,386.0 3,226.0 95.27% 3,226.0 95.27% 32.0 0.95%QUINCY HEIGHTS II Painter 08/30/2014

METRO EQUIPMENT CORP. 1,972.5 1,339.0 67.88% 1,047.5 53.11% 227.0 11.51%QUINCY HEIGHTS II Laborer 09/23/2014

TARA CONSTRUCTION 18,309.5 9,504.0 51.91% 8,945.5 48.86% 8.0 0.04%QUINCY HEIGHTS II Carpenter 12/27/2014

TARA CONSTRUCTION 2,022.5 1,934.0 95.62% 2,022.5 100.00% 1,659.0 82.03%QUINCY HEIGHTS II Laborer 12/13/2014

TARA CONSTRUCTION 32.0 32.0 100.00% 32.0 100.00% 0.0 0.00%QUINCY HEIGHTS II Lather 02/08/2014

Page 211: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 211

Project Name Trade Latest Week

TARA CONSTRUCTION 1,014.5 86.0 8.48% 1,001.5 98.72% 0.0 0.00%QUINCY HEIGHTS II Taper 12/06/2014

THE FLOOR SANDERS CO. 1,457.0 377.0 25.88% 1,457.0 100.00% 0.0 0.00%QUINCY HEIGHTS II Carpenter 12/07/2014

VERTEC CORP. 347.0 0.0 0.00% 0.0 0.00% 0.0 0.00%QUINCY HEIGHTS II Mason 12/05/2014

XQUISITE LANDSCAPING 138.0 0.0 0.00% 47.0 34.06% 0.0 0.00%QUINCY HEIGHTS II Laborer 10/19/2014

LC CLEANING 855.0 855.0 100.00% 855.0 100.00% 329.5 38.54%QUINCY HEIGHTS II Laborer 01/16/2015

NICKERSON SHEETMETAL 603.0 81.0 13.43% 81.0 13.43% 81.0 13.43%QUINCY HEIGHTS II Sheetmetal Work 01/02/2015

VERTEC CORP. 2,903.0 2,295.0 79.06% 2,640.0 90.94% 200.0 6.89%QUINCY HEIGHTS II Laborer 07/10/2015

AGB CONSTRUCTION SERVIC 600.0 600.0 100.00% 600.0 100.00% 0.0 0.00%QUINCY HEIGHTS II Painter 12/26/2014

HERCULES BUILDING WRECKI 19.0 19.0 100.00% 19.0 100.00% 5.0 26.32%QUINCY HEIGHTS II Laborer 11/22/2013

AAMS CORPORATION 399.0 71.0 17.79% 143.0 35.84% 0.0 0.00%QUINCY HEIGHTS II Iron Worker 04/04/2015

ABBOT BLDG RESTOR CO,INC. 44.0 0.0 0.00% 0.0 0.00% 0.0 0.00%QUINCY HEIGHTS II Mason 01/02/2015

PROGRESSIVE ROOFING,INC. 1,845.3 439.5 23.82% 757.3 41.04% 122.0 6.61%QUINCY HEIGHTS II Roofer 08/08/2015

AFFORDABLE ENVIRONMENTA 216.0 112.0 51.85% 136.0 62.96% 0.0 0.00%QUINCY HEIGHTS II Asbestos Worker 12/15/2013

ANCHOR INSULATION 1,692.5 955.5 56.45% 1,080.3 63.83% 390.0 23.04%QUINCY HEIGHTS II Carpenter 11/22/2014

ARCHER CORPORATION 1,789.0 661.0 36.95% 56.0 3.13% 53.0 2.96%QUINCY HEIGHTS II Carpenter 11/21/2014

BOSTON FIRE SPRINKLER CO 1,639.0 519.0 31.67% 67.0 4.09% 0.0 0.00%QUINCY HEIGHTS II Sprinkler Fitter 01/18/2015

CARL-LOUIS & COMPANY INC. 1,045.0 511.0 48.90% 192.0 18.37% 0.0 0.00%QUINCY HEIGHTS II Plumber 12/26/2014

DAVID BUBB REFORM MASON 103.0 0.0 0.00% 16.0 15.53% 0.0 0.00%QUINCY HEIGHTS II Mason 05/17/2014

DAVID BUBB REFORM MASON 633.0 329.0 51.97% 633.0 100.00% 0.0 0.00%QUINCY HEIGHTS II Mason Tender 08/23/2014

GEMNINT FLOORS 592.5 592.5 100.00% 592.5 100.00% 42.0 7.09%QUINCY HEIGHTS II Laborer 12/27/2014

ESPAILLAT CONSTRUCTION L 72.0 0.0 0.00% 72.0 100.00% 0.0 0.00%QUINCY HEIGHTS II Laborer 01/05/2014

ESPAILLAT CONSTRUCTION L 953.0 13.0 1.36% 953.0 100.00% 0.0 0.00%QUINCY HEIGHTS II Taper 04/06/2014

G & O INC. 4,625.0 4,303.0 93.04% 4,358.0 94.23% 0.0 0.00%QUINCY HEIGHTS II Electrician 01/10/2015

GEMNINT FLOORS 713.0 641.0 89.90% 713.0 100.00% 0.0 0.00%QUINCY HEIGHTS II Floor Layer 12/27/2014

CGL ELECTRONIC SECURITY 8.0 0.0 0.00% 0.0 0.00% 0.0 0.00%QUINCY HEIGHTS II Technician 05/17/2014

ABBOT BLDG RESTOR CO,INC. 344.0 208.0 60.47% 240.0 69.77% 0.0 0.00%QUINCY HEIGHTS II Mason Tender 01/02/2015

58,918.0 34,809.8 59.08% 39,525.3 67.09% 3,418.5 5.80%SUB TOTALS:

QUINCY TOWER APARTMENTS

$1,750,000Amount:

Gen Contractor: KEITH CONSTRUCTION INC.

(781)828-8474 532 PAGE STREET 14 PAGE TERR. STOUGHTON

Est Start Date:

Est End Date:

01/15/2017

01/15/2018

W. L. FRENCH EXCAVATING 91.5 0.0 0.00% 0.0 0.00% 0.0 0.00%QUINCY TOWER APARTMENTS Equipment Opera 04/29/2017

PAYNE CONTRACTING CO. 1,107.5 1,107.5 100.00% 1,107.5 100.00% 0.0 0.00%QUINCY TOWER APARTMENTS Painter 09/09/2017

SUPERIOR PLUMBING INC. 9.0 0.0 0.00% 0.0 0.00% 0.0 0.00%QUINCY TOWER APARTMENTS Electrician 09/05/2017

SUPERIOR PLUMBING INC. 11.0 11.0 100.00% 11.0 100.00% 0.0 0.00%QUINCY TOWER APARTMENTS Insulator 09/05/2017

SUPERIOR PLUMBING INC. 2,787.3 1,302.0 46.71% 2,334.5 83.76% 39.8 1.43%QUINCY TOWER APARTMENTS Plumber 09/05/2017

Page 212: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 212

Project Name Trade Latest Week

SUPERIOR PLUMBING INC. 195.5 0.0 0.00% 0.0 0.00% 0.0 0.00%QUINCY TOWER APARTMENTS Sheetmetal Work 09/05/2017

UNION CONSTRUCTION 806.0 282.0 34.99% 282.0 34.99% 0.0 0.00%QUINCY TOWER APARTMENTS Carpenter 05/28/2017

VERSATILE BUILDERS LLC 78.0 0.0 0.00% 78.0 100.00% 0.0 0.00%QUINCY TOWER APARTMENTS Marble Tile Work 09/08/2017

PAN ELECTRIC COMPANY INC. 1,417.0 619.5 43.72% 1,417.0 100.00% 158.0 11.15%QUINCY TOWER APARTMENTS Electrician 09/09/2017

W. L. FRENCH EXCAVATING 51.5 0.0 0.00% 0.0 0.00% 0.0 0.00%QUINCY TOWER APARTMENTS Laborer 04/29/2017

UNION CONSTRUCTION 606.0 0.0 0.00% 0.0 0.00% 0.0 0.00%QUINCY TOWER APARTMENTS Laborer 05/28/2017

ELECTRONIC SECURITY GRO 231.0 87.0 37.66% 231.0 100.00% 24.0 10.39%QUINCY TOWER APARTMENTS Electrician 06/22/2017

KELMON DRYWALL.INC. 320.0 176.0 55.00% 0.0 0.00% 0.0 0.00%QUINCY TOWER APARTMENTS Plasterer 09/09/2017

KEITH CONSTRUCTION INC. 856.0 856.0 100.00% 856.0 100.00% 0.0 0.00%QUINCY TOWER APARTMENTS Laborer 09/06/2017

CATAMOUNT COMMERCIAL C 122.0 0.0 0.00% 0.0 0.00% 8.0 6.56%QUINCY TOWER APARTMENTS Laborer 07/14/2017

CATAMOUNT COMMERCIAL C 114.0 0.0 0.00% 0.0 0.00% 0.0 0.00%QUINCY TOWER APARTMENTS Carpenter 07/14/2017

BRENCO CONSTRUCTION, CO. 206.0 168.0 81.55% 0.0 0.00% 0.0 0.00%QUINCY TOWER APARTMENTS Carpenter 09/10/2017

A.SCOLARO & SONS MASONR 1,734.0 649.0 37.43% 1,701.0 98.10% 0.0 0.00%QUINCY TOWER APARTMENTS Laborer 09/11/2017

A.SCOLARO & SONS MASONR 1,344.0 0.0 0.00% 1,242.0 92.41% 0.0 0.00%QUINCY TOWER APARTMENTS Bricklayer 09/11/2017

PAVILION FLOORS, INC. 9.0 9.0 100.00% 9.0 100.00% 0.0 0.00%QUINCY TOWER APARTMENTS Floor Layer 07/22/2017

PAVILION FLOORS, INC. 622.0 272.0 43.73% 334.0 53.70% 0.0 0.00%QUINCY TOWER APARTMENTS Carpet Layer 08/19/2017

12,718.3 5,539.0 43.55% 9,603.0 75.51% 229.8 1.81%SUB TOTALS:

REGENERATION TATTOO

$3,000Amount:

Gen Contractor:

Est Start Date:

Est End Date:

06/23/2014

06/27/2014

ACME SIGN CORPORATION 4.0 0.0 0.00% 2.0 50.00% 0.0 0.00%REGENERATION TATTOO Laborer 06/27/2014

4.0 0.0 0.00% 2.0 50.00% 0.0 0.00%SUB TOTALS:

REHABILITATION & HEALTH, INC

$20,000Amount:

Gen Contractor:

Est Start Date:

Est End Date:

10/03/2016

10/07/2016

RESIDENTIAL ELEVATOR & LIF 40.0 0.0 0.00% 0.0 0.00% 0.0 0.00%REHABILITATION & HEALTH, INC Elevator Const(M 10/07/2016

40.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SUB TOTALS:

RENWOOD PWA.

$1,500,000Amount:

Gen Contractor: THOMAS CONSTRUCTION INC.

(617)427-8443 2 WAUMBECK STREET SUITE 3B DORCHESTER

Est Start Date:

Est End Date:

01/01/2013

01/31/2014

OUTKAST ELECTRICAL CO 2,578.0 2,578.0 100.00% 2,578.0 100.00% 0.0 0.00%RENWOOD PWA. Electrician 01/13/2017

THOMAS CONSTRUCTION INC. 2,190.0 2,190.0 100.00% 2,190.0 100.00% 0.0 0.00%RENWOOD PWA. Laborer 04/28/2017

COMMUNITY RESTORATION 978.0 822.0 84.05% 978.0 100.00% 0.0 0.00%RENWOOD PWA. Mason 02/17/2017

THOMAS CONSTRUCTION INC. 5,749.0 1,132.0 19.69% 3,428.0 59.63% 0.0 0.00%RENWOOD PWA. Carpenter 06/30/2017

SMALL WORLD ENVIRONMENT 80.0 64.0 80.00% 80.0 100.00% 0.0 0.00%RENWOOD PWA. Asbestos Worker 07/25/2015

PREMIERE CUSTOMIZED SER 632.0 632.0 100.00% 632.0 100.00% 64.0 10.13%RENWOOD PWA. Painter 04/01/2016

Page 213: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 213

Project Name Trade Latest Week

THOMAS CONSTRUCTION INC. 1,336.0 1,336.0 100.00% 0.0 0.00% 0.0 0.00%RENWOOD PWA. Painter 05/12/2017

MIKE GORMAN ROOFING 208.0 0.0 0.00% 0.0 0.00% 0.0 0.00%RENWOOD PWA. Roofer 04/08/2016

MEYOTTE CONTRACTING 492.0 332.0 67.48% 492.0 100.00% 0.0 0.00%RENWOOD PWA. Mason 03/24/2017

MAS HOME IMPROVEMENT 328.0 328.0 100.00% 328.0 100.00% 0.0 0.00%RENWOOD PWA. Floor Layer 04/22/2016

HURST LANDSCAPING INC. 224.0 177.0 79.02% 224.0 100.00% 44.0 19.64%RENWOOD PWA. Groundman 11/20/2015

ENVIROGREEN LLC 312.0 312.0 100.00% 312.0 100.00% 0.0 0.00%RENWOOD PWA. Laborer 08/21/2015

H AND H CONTRACTING 266.0 266.0 100.00% 266.0 100.00% 0.0 0.00%RENWOOD PWA. Plumber 09/23/2016

15,373.0 10,169.0 66.15% 11,508.0 74.86% 108.0 0.70%SUB TOTALS:

RESIDENCES AT FAIRMONT STATION

$12,370,535Amount:

Gen Contractor: DELPHI CONSTRUCTION INC.

(781)893-9900 130 OVERLAND ROAD WALTHAM

Est Start Date:

Est End Date:

07/10/2017

08/01/2018

HOPE TRUCKING DEMO INC. 45.0 0.0 0.00% 45.0 100.00% 0.0 0.00%RESIDENCES AT FAIRMONT ST Equipment Opera 08/12/2017

HOPE TRUCKING DEMO INC. 90.0 45.0 50.00% 90.0 100.00% 0.0 0.00%RESIDENCES AT FAIRMONT ST Laborer 08/12/2017

DAVID A. BOSWORTH COMPA 96.0 0.0 0.00% 0.0 0.00% 0.0 0.00%RESIDENCES AT FAIRMONT ST Equipment Opera 09/17/2017

DAVID A. BOSWORTH COMPA 144.0 112.0 77.78% 112.0 77.78% 0.0 0.00%RESIDENCES AT FAIRMONT ST Laborer 09/17/2017

375.0 157.0 41.87% 247.0 65.87% 0.0 0.00%SUB TOTALS:

RIVER GRILLE

$5,000Amount:

Gen Contractor: JIM DID IT SIGN CO.

(781)933-1865 465 CAMBRIDGE STREET 10 DRAPER STREET #11 WOBURN

Est Start Date:

Est End Date:

06/17/2014

06/20/2014

JIM DID IT SIGN CO. 36.0 0.0 0.00% 0.0 0.00% 0.0 0.00%RIVER GRILLE Laborer 06/20/2014

36.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SUB TOTALS:

RIVERSIDE THEATRE WORKS

$3,500Amount:

Gen Contractor:

Est Start Date:

Est End Date:

04/01/2014

05/31/2014

BEYOND PLUMBING 15.0 0.0 0.00% 0.0 0.00% 0.0 0.00%RIVERSIDE THEATRE WORKS Plumber 04/11/2014

15.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SUB TOTALS:

ROSE'S HAIR DESIGN

$2,500Amount:

Gen Contractor: CAMBRIDGE REPROGRAPHIES

(617)623-2838 21 MCGRATH HGWY SOMERVILLE

Est Start Date:

Est End Date:

12/27/2015

01/02/2016

CAMBRIDGE REPROGRAPHIE 8.0 0.0 0.00% 4.0 50.00% 4.0 50.00%ROSE'S HAIR DESIGN Laborer 01/02/2016

8.0 0.0 0.00% 4.0 50.00% 4.0 50.00%SUB TOTALS:

ROXBURY CROSSING

$11,000,000Amount:

Gen Contractor: BILT-RITE CONSTRUCTION

(617)541-9777 150 SHIRLEY STREET BOSTON

Est Start Date:

Est End Date:

01/01/2014

03/31/2015

TARA CONSTRUCTION 528.0 25.0 4.73% 528.0 100.00% 0.0 0.00%ROXBURY CROSSING Laborer 04/18/2015

PACIFIC DRYWALL 56.0 56.0 100.00% 56.0 100.00% 0.0 0.00%ROXBURY CROSSING Laborer 12/07/2014

PACIFIC DRYWALL 276.0 276.0 100.00% 276.0 100.00% 0.0 0.00%ROXBURY CROSSING Taper 08/24/2014

Page 214: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 214

Project Name Trade Latest Week

RISE & SHINE CLEANING & CO 591.4 440.7 74.51% 591.4 100.00% 373.9 63.22%ROXBURY CROSSING Laborer 07/11/2015

RS ANCTIL PLUMBING 104.0 104.0 100.00% 104.0 100.00% 0.0 0.00%ROXBURY CROSSING Laborer 05/01/2015

RS ANCTIL PLUMBING 3,254.0 336.0 10.33% 336.0 10.33% 336.0 10.33%ROXBURY CROSSING Plumber 06/26/2015

SYDNEY SHEETMETAL INC 1,720.0 1,008.0 58.60% 1,720.0 100.00% 0.0 0.00%ROXBURY CROSSING Sheetmetal Work 01/24/2015

T & P CONTRACTING, INC. 523.5 265.5 50.72% 0.0 0.00% 0.0 0.00%ROXBURY CROSSING Carpenter 05/10/2014

PACIFIC DRYWALL 7,835.0 3,674.0 46.89% 4,258.0 54.35% 552.0 7.05%ROXBURY CROSSING Carpenter 12/07/2014

TARA CONSTRUCTION 3,045.0 594.5 19.52% 1,017.0 33.40% 0.0 0.00%ROXBURY CROSSING Carpenter 05/30/2015

THE WATERPROOFING COMP 93.0 0.0 0.00% 0.0 0.00% 0.0 0.00%ROXBURY CROSSING Waterproofer 10/18/2014

TARA CONSTRUCTION 860.0 0.0 0.00% 860.0 100.00% 208.0 24.19%ROXBURY CROSSING Taper 06/20/2015

TELECONSTRUCTIONS, INC. 2,494.0 203.5 8.16% 268.5 10.77% 0.0 0.00%ROXBURY CROSSING Iron Worker 04/11/2015

UNERECTORS INC. 1,788.0 361.0 20.19% 0.0 0.00% 0.0 0.00%ROXBURY CROSSING Carpenter 08/22/2015

T & P CONTRACTING, INC. 855.0 426.0 49.82% 855.0 100.00% 0.0 0.00%ROXBURY CROSSING Laborer 05/10/2014

DC ENTERPRISE 614.0 339.0 55.21% 310.0 50.49% 0.0 0.00%ROXBURY CROSSING Roofer 01/10/2015

XCEL FIRE PROTECTION, 1,542.0 738.0 47.86% 1,504.0 97.54% 0.0 0.00%ROXBURY CROSSING Plumber 06/30/2015

BLACK BEAR COATINGS & CO 21.3 0.0 0.00% 3.0 14.12% 0.0 0.00%ROXBURY CROSSING Cement Finisher 02/01/2015

ARCHER CORPORATION 2,583.0 784.0 30.35% 212.0 8.21% 0.0 0.00%ROXBURY CROSSING Carpenter 06/19/2015

CAPITAL CARPET&FLOORING 771.0 131.0 16.99% 675.0 87.55% 0.0 0.00%ROXBURY CROSSING Floor Layer 06/07/2015

CAPITAL CARPET&FLOORING 28.0 0.0 0.00% 28.0 100.00% 0.0 0.00%ROXBURY CROSSING Marble Tile Work 05/24/2015

COSTA BROTHERS MASONRY 3,178.5 1,626.0 51.16% 1,036.5 32.61% 0.0 0.00%ROXBURY CROSSING Bricklayer 06/27/2015

OUTKAST ELECTRICAL CO 4,158.0 2,798.0 67.29% 4,158.0 100.00% 0.0 0.00%ROXBURY CROSSING Electrician 06/19/2015

CRF INC. INTERIOR SYSTEM 36.0 0.0 0.00% 0.0 0.00% 0.0 0.00%ROXBURY CROSSING Carpenter 06/24/2015

FIRST NICK PAINTING CO. 3,054.5 440.0 14.40% 2,404.0 78.70% 0.0 0.00%ROXBURY CROSSING Painter 05/31/2015

GENERAL AIR COND & HEAT 2,142.0 1,068.0 49.86% 1,068.0 49.86% 0.0 0.00%ROXBURY CROSSING Pipefitter 04/25/2015

K & K ACOUSTICAL CEILINGS 155.0 8.0 5.16% 0.0 0.00% 0.0 0.00%ROXBURY CROSSING Carpenter 06/21/2015

K & T TILE 592.0 0.0 0.00% 592.0 100.00% 0.0 0.00%ROXBURY CROSSING Floor Layer 05/02/2015

KONE ELEVATOR INC. 789.0 0.0 0.00% 0.0 0.00% 16.0 2.03%ROXBURY CROSSING Elevator Const(M 06/17/2015

METRO EQUIPMENT CORP. 2,575.0 941.5 36.56% 978.5 38.00% 303.5 11.79%ROXBURY CROSSING Laborer 06/23/2015

OLDCASTLE PRECAST 972.5 0.0 0.00% 40.5 4.16% 0.0 0.00%ROXBURY CROSSING Laborer 09/20/2014

COSTA BROTHERS MASONRY 2,948.0 0.0 0.00% 788.0 26.73% 0.0 0.00%ROXBURY CROSSING Laborer 06/27/2015

50,182.7 16,643.7 33.17% 24,667.4 49.16% 1,789.4 3.57%SUB TOTALS:

ROXBURY GRILLED CHEESE

$3,000Amount:

Gen Contractor:

Est Start Date:

Est End Date:

06/21/2015

06/28/2015

JUSTIN KELLY CONTRACTING 4.0 0.0 0.00% 0.0 0.00% 0.0 0.00%ROXBURY GRILLED CHEESE Carpenter 06/28/2015

4.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SUB TOTALS:

Page 215: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 215

Project Name Trade Latest Week

SALAMANDERS CAFÉ

$3,000Amount:

Gen Contractor: HUNTER SIGNS

(617)360-9710 120 BUSINESS STREET HYDE PARK

Est Start Date:

Est End Date:

01/10/2016

01/16/2016

HUNTER SIGNS 4.0 2.0 50.00% 4.0 100.00% 0.0 0.00%SALAMANDERS CAFÉ Laborer 01/16/2016

4.0 2.0 50.00% 4.0 100.00% 0.0 0.00%SUB TOTALS:

SAVIN HILL SPECIALITIES

$20,000Amount:

Gen Contractor:

Est Start Date:

Est End Date:

11/11/2013

11/01/2014

KEVIN PICCININ 37.0 37.0 100.00% 37.0 100.00% 0.0 0.00%SAVIN HILL SPECIALITIES Laborer 11/22/2013

KEVIN PICCININ 111.0 74.0 66.67% 74.0 66.67% 0.0 0.00%SAVIN HILL SPECIALITIES Carpenter 11/22/2013

148.0 111.0 75.00% 111.0 75.00% 0.0 0.00%SUB TOTALS:

SEAPORT B/C

$40,100,000Amount:

Gen Contractor: JOHN MORIARTY & ASSOCIATES

(781)729-3900 3 CHURCH STREET WINCHESTER

Est Start Date:

Est End Date:

10/14/2014

06/05/2017

J. DERENZO CO. 16,875.5 6,070.0 35.97% 3,071.5 18.20% 613.5 3.64%SEAPORT B/C Equipment Opera 06/17/2017

OTIS ELEVATOR COMPANY 8,180.5 1,275.8 15.60% 189.5 2.32% 905.0 11.06%SEAPORT B/C Elev Const Helper 07/27/2017

N2 FLOORS, LLC 8,890.0 3,388.0 38.11% 3,293.5 37.05% 0.0 0.00%SEAPORT B/C Floor Layer 07/29/2017

MANGANARO NORTHEAST LL 8,196.0 3,795.5 46.31% 2,257.0 27.54% 993.5 12.12%SEAPORT B/C Laborer 09/10/2017

MANGANARO NORTHEAST LL 36,607.5 7,849.5 21.44% 6,805.5 18.59% 503.0 1.37%SEAPORT B/C Carpenter 09/10/2017

J. C. CANNISTRARO INC. 49,087.0 15,002.0 30.56% 16,325.0 33.26% 3,468.5 7.07%SEAPORT B/C Pipefitter 07/16/2017

KIVA SYSTEMS INC. 21,127.0 7,816.5 37.00% 6,198.0 29.34% 2,010.0 9.51%SEAPORT B/C Iron Worker 09/03/2017

KIVA SYSTEMS INC. 23,200.0 10,048.5 43.31% 0.0 0.00% 0.0 0.00%SEAPORT B/C Carpenter 09/17/2017

KERR'S WELDING IRON WORK 5,378.0 3,155.0 58.66% 3,918.0 72.85% 0.0 0.00%SEAPORT B/C Welder 08/17/2016

SUPERIOR RAIL/A.J. STEEL 13,601.0 3,529.0 25.95% 2,320.0 17.06% 376.0 2.76%SEAPORT B/C Iron Worker 01/31/2017

JOHN MORIARTY & ASSOCIAT 62,387.0 33,826.0 54.22% 22,841.0 36.61% 3,121.0 5.00%SEAPORT B/C Laborer 09/17/2017

JOHN MORIARTY & ASSOCIAT 4,169.0 4,017.0 96.35% 1,479.0 35.48% 152.0 3.65%SEAPORT B/C Carpenter 09/17/2017

J. DERENZO CO. 18,543.0 3,960.5 21.36% 2,278.5 12.29% 38.0 0.20%SEAPORT B/C Laborer 06/17/2017

OTIS ELEVATOR COMPANY 9,864.0 992.0 10.06% 409.0 4.15% 563.5 5.71%SEAPORT B/C Elevator Const(M 07/27/2017

KIVA SYSTEMS INC. 21,450.0 4,849.5 22.61% 7,165.5 33.41% 0.0 0.00%SEAPORT B/C Glazier 09/17/2017

PAVILION FLOORS, INC. 6,729.0 930.0 13.82% 2,799.0 41.60% 253.0 3.76%SEAPORT B/C Carpet Layer 09/16/2017

PAVILION FLOORS, INC. 2,832.0 1,013.0 35.77% 2,248.0 79.38% 0.0 0.00%SEAPORT B/C Floor Layer 09/16/2017

PHOENIX BAY STATE CONSTR 9,446.0 1,529.0 16.19% 164.0 1.74% 336.0 3.56%SEAPORT B/C Mason 01/08/2017

WILLIAM M. COLLINS COMPAN 37,625.5 12,809.0 34.04% 6,813.0 18.11% 0.0 0.00%SEAPORT B/C Sprinkler Fitter 07/23/2017

PORT MORRIS TILE & MARBLE 8,201.5 2,008.5 24.49% 1,108.5 13.52% 0.0 0.00%SEAPORT B/C Marble Tile Work 07/30/2017

REGIS STEEL CORPORATION 2,787.0 994.0 35.67% 1,019.0 36.56% 15.0 0.54%SEAPORT B/C Iron Worker 03/21/2015

STANLEY & SONS INC. 18,806.0 6,668.5 35.46% 10,529.0 55.99% 1,361.5 7.24%SEAPORT B/C Carpenter 04/15/2017

STANLEY & SONS INC. 1,053.0 1,005.0 95.44% 72.0 6.84% 8.0 0.76%SEAPORT B/C Laborer 04/15/2017

Page 216: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 216

Project Name Trade Latest Week

SULLIVAN & MCLAUGHLIN CO. 7,176.0 16.0 0.22% 2,928.0 40.80% 761.0 10.60%SEAPORT B/C Electrician 08/20/2017

TREVIICOS CORPORATION 9,758.0 779.0 7.98% 3,070.5 31.47% 779.0 7.98%SEAPORT B/C Equipment Opera 03/20/2016

TREVIICOS CORPORATION 7,489.5 3,186.5 42.55% 3,489.0 46.59% 0.0 0.00%SEAPORT B/C Laborer 07/10/2016

TREVIICOS CORPORATION 1,200.5 359.5 29.95% 1,069.5 89.09% 343.5 28.61%SEAPORT B/C Oiler 05/24/2015

J & M BROWN ELECTRICAL 87.0 0.0 0.00% 0.0 0.00% 5.0 5.75%SEAPORT B/C Technician 07/14/2017

CENTURY DRYWALL INC, 40,454.0 13,167.0 32.55% 24,158.0 59.72% 4,571.0 11.30%SEAPORT B/C Taper 09/09/2017

STATE ELECTRIC CO. 56,371.4 12,271.3 21.77% 16,231.7 28.79% 2,813.5 4.99%SEAPORT B/C Electrician 09/17/2017

G & C CONCRETE CO. 23,029.5 7,189.0 31.22% 4,613.0 20.03% 1,869.0 8.12%SEAPORT B/C Carpenter 07/29/2017

TREVIICOS CORPORATION 6,576.0 2,179.5 33.14% 2,917.0 44.36% 0.0 0.00%SEAPORT B/C Piledriver 03/20/2016

ACCORD STEEL & PRECAST 3,959.5 0.0 0.00% 0.0 0.00% 0.0 0.00%SEAPORT B/C Equipment Opera 09/13/2016

ACCORD STEEL & PRECAST 69,744.5 22,646.5 32.47% 18,349.0 26.31% 3,005.0 4.31%SEAPORT B/C Iron Worker 01/31/2017

ACCORD STEEL & PRECAST 4,081.0 0.0 0.00% 80.0 1.96% 0.0 0.00%SEAPORT B/C Oiler 09/13/2016

ALLAN CONSTRUCTION INC. 2,637.5 684.5 25.95% 822.0 31.17% 0.0 0.00%SEAPORT B/C Carpenter 03/31/2017

ALLEGHENY CONTRACT FLOO 7,781.0 1,766.0 22.70% 7,733.0 99.38% 695.0 8.93%SEAPORT B/C Floor Layer 06/23/2017

AMERICAN PLUMBING HEATIN 69,696.5 18,085.0 25.95% 15,859.5 22.76% 5,110.5 7.33%SEAPORT B/C Plumber 09/15/2017

CENTURY DRYWALL INC, 49,525.0 13,041.0 26.33% 21,059.0 42.52% 756.5 1.53%SEAPORT B/C Carpenter 09/09/2017

CENTURY DRYWALL INC, 10,551.0 2,125.5 20.15% 2,616.5 24.80% 1,280.0 12.13%SEAPORT B/C Laborer 07/29/2017

CENTURY DRYWALL INC, 40.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SEAPORT B/C Plasterer 09/09/2017

CHAPMAN WATERPROOFING 5,879.5 3,186.0 54.19% 288.0 4.90% 0.0 0.00%SEAPORT B/C Laborer 09/18/2017

D & W CONSTRUCTION 2,273.5 590.0 25.95% 1,422.5 62.57% 128.0 5.63%SEAPORT B/C Taper 05/07/2017

DANIEL MARR & SON CO. 349.0 79.0 22.64% 56.0 16.05% 0.0 0.00%SEAPORT B/C Iron Worker 08/14/2016

CHAPMAN WATERPROOFING 19,994.5 6,812.5 34.07% 7,520.0 37.61% 1,368.0 6.84%SEAPORT B/C Waterproofer 09/18/2017

G & C CONCRETE CO. 1,080.0 67.5 6.25% 0.0 0.00% 0.0 0.00%SEAPORT B/C Oiler 11/28/2015

IPSWICH BAY GLASS CO. 7,528.0 2,381.0 31.63% 884.0 11.74% 0.0 0.00%SEAPORT B/C Iron Worker 08/26/2017

IPSWICH BAY GLASS CO. 17,010.0 3,482.0 20.47% 2,125.0 12.49% 1,597.0 9.39%SEAPORT B/C Glazier 09/16/2017

IPSWICH BAY GLASS CO. 16,836.0 6,087.0 36.15% 3,045.0 18.09% 224.0 1.33%SEAPORT B/C Carpenter 09/16/2017

HAYWARD BAKER INC. 2,514.5 1,183.0 47.05% 1,137.0 45.22% 0.0 0.00%SEAPORT B/C Piledriver 02/28/2016

HAYWARD BAKER INC. 2,497.0 906.0 36.28% 1,033.0 41.37% 0.0 0.00%SEAPORT B/C Laborer 09/13/2015

EAST COAST FIREPROOFING 16,918.0 3,925.0 23.20% 6,024.0 35.61% 0.0 0.00%SEAPORT B/C Laborer 04/04/2017

HARRINGTON AIR. 41,166.5 18,982.5 46.11% 12,323.0 29.93% 1,819.0 4.42%SEAPORT B/C Sheetmetal Work 08/13/2017

FRONT LINE INC. 11,750.0 4,752.0 40.44% 8,387.5 71.38% 3,677.0 31.29%SEAPORT B/C Laborer 09/09/2017

G & C CONCRETE CO. 21,384.0 6,363.0 29.76% 12,499.5 58.45% 0.0 0.00%SEAPORT B/C Laborer 07/29/2017

G & C CONCRETE CO. 18,531.0 4,609.0 24.87% 7,141.5 38.54% 0.0 0.00%SEAPORT B/C Iron Worker 07/01/2017

G & C CONCRETE CO. 2,628.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SEAPORT B/C Equipment Opera 06/17/2017

Page 217: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 217

Project Name Trade Latest Week

G & C CONCRETE CO. 8,353.5 121.0 1.45% 2,493.0 29.84% 0.0 0.00%SEAPORT B/C Cement Laborer 07/15/2017

G & C CONCRETE CO. 10,579.0 1,867.0 17.65% 4,604.5 43.52% 200.0 1.89%SEAPORT B/C Cement Finisher 07/22/2017

J & M BROWN ELECTRICAL 113,107.5 33,145.0 29.30% 31,302.5 27.67% 10,610.5 9.38%SEAPORT B/C Electrician 09/15/2017

HAYWARD BAKER INC. 479.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SEAPORT B/C Equipment Opera 09/13/2015

1,086,051.9 332,566.5 30.62% 330,585.2 30.44% 56,330.0 5.19%SUB TOTALS:

SEAPORT PARCEL H

$9,000,000Amount:

Gen Contractor: TISHMAN CONSTRUCTION

(617)723-2050 101 FEDERAL STREET BOSTON

Est Start Date:

Est End Date:

10/08/2015

12/31/2015

PIZZOTTI BROTHERS, INC. 1,476.0 440.0 29.81% 440.0 29.81% 0.0 0.00%SEAPORT PARCEL H Bricklayer 06/28/2016

M.L. MCDONALD SALES 29.0 29.0 100.00% 29.0 100.00% 0.0 0.00%SEAPORT PARCEL H Painter 08/09/2016

MANGANARO NORTHEAST LL 884.5 279.0 31.54% 150.0 16.96% 18.0 2.04%SEAPORT PARCEL H Carpenter 07/24/2016

MANGANARO NORTHEAST LL 196.0 196.0 100.00% 46.0 23.47% 0.0 0.00%SEAPORT PARCEL H Laborer 07/03/2016

MANSOUR CONSTRUCTION IN 1,979.0 292.0 14.75% 123.0 6.22% 0.0 0.00%SEAPORT PARCEL H Carpenter 08/06/2016

MANSOUR CONSTRUCTION IN 1,500.5 346.5 23.09% 370.5 24.69% 0.0 0.00%SEAPORT PARCEL H Laborer 08/06/2016

MARSHALL ROOFING & SHEET 2,188.0 559.5 25.57% 603.5 27.58% 0.0 0.00%SEAPORT PARCEL H Roofer 11/05/2016

MARSHALL ROOFING & SHEET 416.5 0.0 0.00% 39.0 9.36% 0.0 0.00%SEAPORT PARCEL H Sheetmetal Work 10/29/2016

KONE ELEVATOR INC. 146.0 0.0 0.00% 72.0 49.32% 8.0 5.48%SEAPORT PARCEL H Elevator Const(M 08/03/2016

N.B. KENNEY CO. INC., 86.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SEAPORT PARCEL H Pipefitter 10/17/2016

PIZZOTTI BROTHERS, INC. 752.0 528.0 70.21% 528.0 70.21% 0.0 0.00%SEAPORT PARCEL H Mason Tender 06/28/2016

S.O.S. CORPORATION 3,581.0 721.0 20.13% 126.0 3.52% 0.0 0.00%SEAPORT PARCEL H Laborer 10/23/2016

TCI INSTALLATIONS INC. 108.0 16.0 14.81% 16.0 14.81% 0.0 0.00%SEAPORT PARCEL H Carpenter 10/22/2016

THE WELCH CORPORATION 1,815.0 413.0 22.75% 266.0 14.66% 0.0 0.00%SEAPORT PARCEL H Equipment Opera 10/29/2016

THE WELCH CORPORATION 3,597.5 1,434.0 39.86% 159.0 4.42% 241.0 6.70%SEAPORT PARCEL H Laborer 10/29/2016

VALLEYCREST LANDSCAPE 546.5 0.0 0.00% 323.5 59.19% 0.0 0.00%SEAPORT PARCEL H Bricklayer 09/18/2016

VALLEYCREST LANDSCAPE 446.5 0.0 0.00% 0.0 0.00% 0.0 0.00%SEAPORT PARCEL H Equipment Opera 09/18/2016

VALLEYCREST LANDSCAPE 1,116.5 287.0 25.71% 359.0 32.15% 0.0 0.00%SEAPORT PARCEL H Laborer 09/18/2016

AMERICAN PLUMBING HEATIN 714.0 416.0 58.26% 86.0 12.04% 0.0 0.00%SEAPORT PARCEL H Sprinkler Fitter 08/12/2016

N.B. KENNEY CO. INC., 8.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SEAPORT PARCEL H Bricklayer 11/06/2016

CHAPMAN WATERPROOFING 631.0 139.0 22.03% 189.0 29.95% 38.0 6.02%SEAPORT PARCEL H Waterproofer 10/31/2016

STATE ELECTRIC CO. 3,281.0 685.0 20.88% 333.0 10.15% 392.0 11.95%SEAPORT PARCEL H Electrician 10/30/2016

J. K. GLASS CO. INC. 1,060.5 490.5 46.25% 490.5 46.25% 0.0 0.00%SEAPORT PARCEL H Iron Worker 09/04/2016

ANDELLA IRON INC. 196.0 0.0 0.00% 196.0 100.00% 0.0 0.00%SEAPORT PARCEL H Iron Worker 04/02/2016

ATLANTIC CONTRACTING &SP 196.0 0.0 0.00% 70.0 35.71% 0.0 0.00%SEAPORT PARCEL H Insulator 10/09/2016

CAPITAL CARPET&FLOORING 0.5 0.0 0.00% 0.0 0.00% 0.0 0.00%SEAPORT PARCEL H Floor Layer 07/10/2016

CHAPMAN WATERPROOFING 132.0 62.0 46.97% 8.0 6.06% 0.0 0.00%SEAPORT PARCEL H Laborer 10/03/2016

Page 218: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 218

Project Name Trade Latest Week

DANIEL KOURY CONSTRUCTI 2,296.5 413.0 17.98% 224.0 9.75% 0.0 0.00%SEAPORT PARCEL H Iron Worker 07/02/2016

E. M. DUGGAN INC. 943.0 45.0 4.77% 0.0 0.00% 0.0 0.00%SEAPORT PARCEL H Plumber 10/09/2016

E.M.R. DRYWALL, INC. 3,797.5 1,374.5 36.19% 1,118.5 29.45% 104.0 2.74%SEAPORT PARCEL H Carpenter 09/24/2016

HAYWARD BAKER INC. 219.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SEAPORT PARCEL H Piledriver 12/20/2015

J. K. GLASS CO. INC. 1,197.0 300.5 25.10% 0.0 0.00% 512.0 42.77%SEAPORT PARCEL H Glazier 10/09/2016

CAPITAL CARPET&FLOORING 16.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SEAPORT PARCEL H Marble Tile Work 10/23/2016

J. K. GLASS CO. INC. 706.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SEAPORT PARCEL H Carpenter 10/09/2016

E.M.R. DRYWALL, INC. 16.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SEAPORT PARCEL H Laborer 04/23/2016

HAYWARD BAKER INC. 99.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SEAPORT PARCEL H Equipment Opera 10/25/2015

GARAVENTA USA IN 127.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SEAPORT PARCEL H Elevator Const(M 07/24/2016

GARAVENTA USA IN 243.8 0.0 0.00% 0.0 0.00% 0.0 0.00%SEAPORT PARCEL H Elev Const Helper 07/24/2016

EXCEL HVAC INC. 514.0 64.0 12.45% 64.0 12.45% 0.0 0.00%SEAPORT PARCEL H Sheetmetal Work 08/02/2016

E.M.R. DRYWALL, INC. 388.0 164.0 42.27% 164.0 42.27% 0.0 0.00%SEAPORT PARCEL H Taper 09/24/2016

37,646.3 9,694.5 25.75% 6,593.5 17.51% 1,313.0 3.49%SUB TOTALS:

SEAPORT PARCEL J

$46,000,000Amount:

Gen Contractor: TISHMAN CONSTRUCTION

(617)723-2050 101 FEDERAL STREET BOSTON

Est Start Date:

Est End Date:

10/08/2015

10/31/2015

STRUCTURES DEREK INTERN 884.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SEAPORT PARCEL J Oiler 06/18/2016

WORCESTER AIR CONDITIONI 4,152.5 332.0 8.00% 1,892.0 45.56% 0.0 0.00%SEAPORT PARCEL J Sheetmetal Work 05/14/2017

PIZZOTTI BROTHERS, INC. 888.0 656.0 73.87% 656.0 73.87% 0.0 0.00%SEAPORT PARCEL J Mason Tender 01/31/2017

PIZZOTTI BROTHERS, INC. 3,686.0 936.0 25.39% 816.0 22.14% 192.0 5.21%SEAPORT PARCEL J Bricklayer 04/04/2017

S & F CONCRETE 373.0 42.5 11.39% 53.5 14.34% 34.5 9.25%SEAPORT PARCEL J Cement Finisher 10/29/2016

S & F CONCRETE 174.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SEAPORT PARCEL J Equipment Opera 02/04/2017

S & F CONCRETE 1,054.5 160.0 15.17% 242.5 23.00% 0.0 0.00%SEAPORT PARCEL J Laborer 03/25/2017

S.O.S. CORPORATION 1,756.0 515.0 29.33% 755.0 43.00% 0.0 0.00%SEAPORT PARCEL J Laborer 08/07/2016

STATE ELECTRIC CO. 22,421.5 6,029.0 26.89% 5,993.0 26.73% 943.0 4.21%SEAPORT PARCEL J Electrician 06/18/2017

STRUCTURES DEREK INTERN 883.5 0.0 0.00% 0.0 0.00% 0.0 0.00%SEAPORT PARCEL J Equipment Opera 06/18/2016

STRUCTURES DEREK INTERN 9,746.5 2,407.0 24.70% 2,351.0 24.12% 136.0 1.40%SEAPORT PARCEL J Iron Worker 09/10/2016

S & F CONCRETE 1,123.5 704.0 62.66% 337.0 30.00% 0.0 0.00%SEAPORT PARCEL J Carpenter 03/25/2017

SUNRISE ERECTORS INC. 2,845.5 885.5 31.12% 144.0 5.06% 568.0 19.96%SEAPORT PARCEL J Carpenter 06/04/2017

SUNRISE ERECTORS INC. 4,802.5 1,399.5 29.14% 634.0 13.20% 106.0 2.21%SEAPORT PARCEL J Glazier 06/04/2017

SUNRISE ERECTORS INC. 874.5 0.0 0.00% 0.0 0.00% 0.0 0.00%SEAPORT PARCEL J Iron Worker 04/02/2017

SUNRISE ERECTORS INC. 2.5 0.0 0.00% 0.0 0.00% 0.0 0.00%SEAPORT PARCEL J Laborer 09/04/2016

THE WELCH CORPORATION 2,135.0 472.5 22.13% 334.5 15.67% 0.0 0.00%SEAPORT PARCEL J Equipment Opera 05/13/2017

THE WELCH CORPORATION 3,476.0 1,620.5 46.62% 826.0 23.76% 185.0 5.32%SEAPORT PARCEL J Laborer 05/13/2017

Page 219: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 219

Project Name Trade Latest Week

THOMAS G GALLAGHER INC. 7,097.0 1,031.0 14.53% 550.0 7.75% 0.0 0.00%SEAPORT PARCEL J Pipefitter 06/04/2017

THOMAS G GALLAGHER INC. 12,896.0 3,747.0 29.06% 3,522.0 27.31% 1,217.0 9.44%SEAPORT PARCEL J Plumber 06/04/2017

URBAN INSULATION 1,475.0 128.0 8.68% 104.0 7.05% 88.0 5.97%SEAPORT PARCEL J Insulator 04/02/2017

VALLEYCREST LANDSCAPE 242.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SEAPORT PARCEL J Equipment Opera 05/28/2017

NORTH AMERICAN STEEL 1,106.0 0.0 0.00% 388.0 35.08% 314.0 28.39%SEAPORT PARCEL J Iron Worker 10/29/2016

VALLEYCREST LANDSCAPE 937.0 192.0 20.49% 38.0 4.06% 0.0 0.00%SEAPORT PARCEL J Laborer 06/18/2017

VALLEYCREST LANDSCAPE 309.0 0.0 0.00% 248.0 80.26% 0.0 0.00%SEAPORT PARCEL J Bricklayer 06/18/2017

H. CARR & SONS INC. 6,844.5 2,299.5 33.60% 2,203.5 32.19% 0.0 0.00%SEAPORT PARCEL J Laborer 05/12/2017

NEW ENGLAND FINISH SYS. 36.0 2.0 5.56% 2.0 5.56% 0.0 0.00%SEAPORT PARCEL J Laborer 03/10/2017

AECOM TISHMAN 96.0 0.0 0.00% 96.0 100.00% 0.0 0.00%SEAPORT PARCEL J Laborer 05/28/2017

CHAPMAN WATERPROOFING 433.5 335.5 77.39% 0.0 0.00% 0.0 0.00%SEAPORT PARCEL J Laborer 04/03/2017

CHAPMAN WATERPROOFING 3,386.5 648.0 19.13% 1,099.0 32.45% 187.5 5.54%SEAPORT PARCEL J Waterproofer 06/12/2017

E. M. DUGGAN INC. 3,264.0 2,246.0 68.81% 0.0 0.00% 0.0 0.00%SEAPORT PARCEL J Sprinkler Fitter 05/21/2017

H. CARR & SONS INC. 31,939.5 9,378.5 29.36% 18,754.5 58.72% 1,645.5 5.15%SEAPORT PARCEL J Carpenter 06/02/2017

ALLAN CONSTRUCTION INC. 276.0 64.0 23.19% 16.0 5.80% 0.0 0.00%SEAPORT PARCEL J Carpenter 04/07/2017

H. CARR & SONS INC. 428.0 16.0 3.74% 404.0 94.39% 0.0 0.00%SEAPORT PARCEL J Plasterer 01/06/2017

H. CARR & SONS INC. 7,091.5 1,165.0 16.43% 723.5 10.20% 888.0 12.52%SEAPORT PARCEL J Taper 06/16/2017

HAYWARD BAKER INC. 1,199.5 45.0 3.75% 0.0 0.00% 0.0 0.00%SEAPORT PARCEL J Equipment Opera 02/07/2016

HAYWARD BAKER INC. 144.5 0.0 0.00% 0.0 0.00% 0.0 0.00%SEAPORT PARCEL J Laborer 01/10/2016

HAYWARD BAKER INC. 2,881.0 766.5 26.61% 492.5 17.09% 0.0 0.00%SEAPORT PARCEL J Piledriver 08/28/2016

LUND REBAR SERVICES, INC. 438.0 106.0 24.20% 166.0 37.90% 0.0 0.00%SEAPORT PARCEL J Iron Worker 10/09/2016

NEW ENGLAND FINISH SYS. 1,572.0 312.0 19.85% 544.0 34.61% 294.0 18.70%SEAPORT PARCEL J Carpenter 04/07/2017

EAST COAST INTERIORS CO. 179.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SEAPORT PARCEL J Carpenter 05/20/2017

J. K. GLASS CO. INC. 756.5 0.0 0.00% 0.0 0.00% 0.0 0.00%SEAPORT PARCEL J Carpenter 10/16/2016

LYMO CONSTRUCTION CO. 12,316.0 2,868.0 23.29% 4,694.0 38.11% 1,500.0 12.18%SEAPORT PARCEL J Carpenter 03/12/2017

MCADAM PAINTING CO, INC. 2,084.0 438.0 21.02% 182.0 8.73% 118.0 5.66%SEAPORT PARCEL J Painter 06/16/2017

LAB SPECIALTIES CO. 34.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SEAPORT PARCEL J Carpenter 06/02/2017

JOHN F. SHEA CO. INC. 15.5 0.0 0.00% 0.0 0.00% 0.0 0.00%SEAPORT PARCEL J Sheetmetal Work 11/12/2016

JOHN F. SHEA CO. INC. 2,837.5 737.5 25.99% 1,797.3 63.34% 0.0 0.00%SEAPORT PARCEL J Roofer 06/17/2017

J.C. FLOOR COVERING INC. 5,219.0 711.0 13.62% 1,340.0 25.68% 0.0 0.00%SEAPORT PARCEL J Floor Layer 03/24/2017

J. K. GLASS CO. INC. 270.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SEAPORT PARCEL J Iron Worker 08/28/2016

J. K. GLASS CO. INC. 461.5 42.0 9.10% 0.0 0.00% 66.0 14.30%SEAPORT PARCEL J Glazier 10/16/2016

MAIA STEEL 870.0 112.0 12.87% 220.0 25.29% 52.0 5.98%SEAPORT PARCEL J Iron Worker 05/14/2017

170,414.5 43,550.0 25.56% 52,618.8 30.88% 8,534.5 5.01%SUB TOTALS:

Page 220: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 220

Project Name Trade Latest Week

SEAPORT SQUARE PARCEL 2

$122,000,000Amount:

Gen Contractor: SKANSKA CO.

(617)574-1400 253 SUMMER STREET BOSTON

Est Start Date:

Est End Date:

07/27/2015

03/30/2018

SKANSKA USA CIVIL NORTHE 728.5 286.0 39.26% 113.0 15.51% 0.0 0.00%SEAPORT SQUARE PARCEL 2 Carpenter 11/06/2016

S & F CONCRETE 82.5 67.0 81.21% 67.0 81.21% 0.0 0.00%SEAPORT SQUARE PARCEL 2 Mason 02/11/2017

SKANSKA CO. 24,163.0 14,622.0 60.51% 3,552.5 14.70% 41.0 0.17%SEAPORT SQUARE PARCEL 2 Laborer 09/24/2017

SKANSKA CO. 6,636.5 2,549.5 38.42% 2,549.5 38.42% 408.0 6.15%SEAPORT SQUARE PARCEL 2 Carpenter 09/24/2017

S & F CONCRETE 52.5 0.0 0.00% 0.0 0.00% 0.0 0.00%SEAPORT SQUARE PARCEL 2 Pumpman 02/04/2017

S & F CONCRETE 13,211.0 5,333.5 40.37% 4,114.0 31.14% 389.0 2.94%SEAPORT SQUARE PARCEL 2 Laborer 09/02/2017

S & F CONCRETE 625.5 0.0 0.00% 0.0 0.00% 0.0 0.00%SEAPORT SQUARE PARCEL 2 Equipment Opera 08/26/2017

ACCORD STEEL & PRECAST 1,996.5 0.0 0.00% 0.0 0.00% 0.0 0.00%SEAPORT SQUARE PARCEL 2 Equipment Opera 08/08/2017

S & F CONCRETE 13,868.0 4,483.0 32.33% 3,817.5 27.53% 0.0 0.00%SEAPORT SQUARE PARCEL 2 Carpenter 09/02/2017

P.J. SPILLANE COMPANY 361.0 24.0 6.65% 24.0 6.65% 0.0 0.00%SEAPORT SQUARE PARCEL 2 Mason Tender 09/09/2017

SKANSKA USA CIVIL NORTHE 8,525.0 389.0 4.56% 311.5 3.65% 0.0 0.00%SEAPORT SQUARE PARCEL 2 Equipment Opera 03/26/2017

P.J. SPILLANE COMPANY 1,900.0 736.5 38.76% 190.0 10.00% 0.0 0.00%SEAPORT SQUARE PARCEL 2 Waterproofer 09/16/2017

SKANSKA USA CIVIL NORTHE 16,314.5 8,943.5 54.82% 6,871.0 42.12% 0.0 0.00%SEAPORT SQUARE PARCEL 2 Laborer 03/26/2017

SKANSKA USA CIVIL NORTHE 436.5 0.0 0.00% 0.0 0.00% 0.0 0.00%SEAPORT SQUARE PARCEL 2 Oiler 12/04/2016

SKANSKA USA CIVIL NORTHE 2,953.3 756.5 25.62% 1,005.5 34.05% 0.0 0.00%SEAPORT SQUARE PARCEL 2 Piledriver 12/25/2016

STATE ELECTRIC CO. 22,444.8 7,104.5 31.65% 5,942.5 26.48% 2,102.0 9.37%SEAPORT SQUARE PARCEL 2 Electrician 09/17/2017

TREVIICOS CORPORATION 5,808.0 0.0 0.00% 1,525.0 26.26% 0.0 0.00%SEAPORT SQUARE PARCEL 2 Equipment Opera 05/29/2016

TREVIICOS CORPORATION 6,911.5 3,115.0 45.07% 3,349.0 48.46% 0.0 0.00%SEAPORT SQUARE PARCEL 2 Laborer 02/05/2017

TREVIICOS CORPORATION 1,860.0 50.5 2.72% 977.0 52.53% 633.5 34.06%SEAPORT SQUARE PARCEL 2 Oiler 02/14/2016

TREVIICOS CORPORATION 1,629.0 932.5 57.24% 719.0 44.14% 0.0 0.00%SEAPORT SQUARE PARCEL 2 Piledriver 02/07/2016

TREVIICOS CORPORATION 880.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SEAPORT SQUARE PARCEL 2 Pumpman 02/14/2016

URBAN INSULATION 627.0 472.0 75.28% 472.0 75.28% 0.0 0.00%SEAPORT SQUARE PARCEL 2 Insulator 09/17/2017

W. L. FRENCH EXCAVATING 871.5 0.0 0.00% 0.0 0.00% 0.0 0.00%SEAPORT SQUARE PARCEL 2 Equipment Opera 01/30/2016

OTIS ELEVATOR COMPANY 4,653.0 551.3 11.85% 626.8 13.47% 0.0 0.00%SEAPORT SQUARE PARCEL 2 Elevator Const(M 09/07/2017

XQUISITE LANDSCAPING 655.0 0.0 0.00% 645.0 98.47% 0.0 0.00%SEAPORT SQUARE PARCEL 2 Laborer 09/17/2017

REGIS STEEL CORPORATION 2,076.5 8.0 0.39% 32.0 1.54% 32.0 1.54%SEAPORT SQUARE PARCEL 2 Iron Worker 01/30/2016

XQUISITE LANDSCAPING 224.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SEAPORT SQUARE PARCEL 2 Equipment Opera 09/17/2017

BOSS STEEL INC. 4,316.0 874.5 20.26% 935.5 21.68% 852.0 19.74%SEAPORT SQUARE PARCEL 2 Iron Worker 09/17/2017

S & F CONCRETE 2,811.0 469.0 16.68% 614.5 21.86% 0.0 0.00%SEAPORT SQUARE PARCEL 2 Cement Finisher 08/26/2017

OTIS ELEVATOR COMPANY 5,124.8 1,063.3 20.75% 820.3 16.01% 919.5 17.94%SEAPORT SQUARE PARCEL 2 Elev Const Helper 09/07/2017

ACCORD STEEL & PRECAST 25,849.6 6,497.6 25.14% 10,504.1 40.64% 1,169.0 4.52%SEAPORT SQUARE PARCEL 2 Iron Worker 08/01/2017

ACCORD STEEL & PRECAST 8.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SEAPORT SQUARE PARCEL 2 Oiler 08/08/2017

Page 221: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 221

Project Name Trade Latest Week

ARCHER CORPORATION 72.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SEAPORT SQUARE PARCEL 2 Carpenter 08/11/2017

CARLYSLE ENGINEERING INC. 7,833.0 914.0 11.67% 978.0 12.49% 382.0 4.88%SEAPORT SQUARE PARCEL 2 Sprinkler Fitter 09/15/2017

CENTURY DRYWALL INC, 14,460.5 2,626.0 18.16% 3,682.5 25.47% 1,363.5 9.43%SEAPORT SQUARE PARCEL 2 Carpenter 09/09/2017

CENTURY DRYWALL INC, 3,581.0 2,390.0 66.74% 2,344.0 65.46% 16.0 0.45%SEAPORT SQUARE PARCEL 2 Laborer 09/09/2017

CENTURY DRYWALL INC, 1,468.5 187.0 12.73% 695.0 47.33% 69.5 4.73%SEAPORT SQUARE PARCEL 2 Taper 09/09/2017

E. M. DUGGAN INC. 6,220.0 2,799.0 45.00% 820.0 13.18% 714.0 11.48%SEAPORT SQUARE PARCEL 2 Pipefitter 09/24/2017

FRED SALVUCCI CORP. 1,319.0 0.0 0.00% 272.5 20.66% 0.0 0.00%SEAPORT SQUARE PARCEL 2 Bricklayer 08/12/2017

FRED SALVUCCI CORP. 1,011.5 0.0 0.00% 778.5 76.96% 0.0 0.00%SEAPORT SQUARE PARCEL 2 Mason Tender 06/10/2017

M.L. MCDONALD SALES 1,009.0 96.0 9.51% 24.0 2.38% 0.0 0.00%SEAPORT SQUARE PARCEL 2 Painter 09/12/2017

NH STEEL FABRICATORS INC 1,593.0 216.0 13.56% 122.0 7.66% 108.0 6.78%SEAPORT SQUARE PARCEL 2 Iron Worker 06/13/2017

MCCUSKER-GILL INC. 8,863.0 2,728.0 30.78% 5,990.0 67.58% 0.0 0.00%SEAPORT SQUARE PARCEL 2 Sheetmetal Work 09/17/2017

AMERICAN PLUMBING HEATIN 11,161.0 3,113.0 27.89% 2,496.0 22.36% 685.0 6.14%SEAPORT SQUARE PARCEL 2 Plumber 09/15/2017

H. CARR & SONS INC. 48.0 0.0 0.00% 48.0 100.00% 0.0 0.00%SEAPORT SQUARE PARCEL 2 Carpenter 05/05/2017

MARSHALL ROOFING & SHEET 4,428.0 1,796.0 40.56% 2,169.0 48.98% 371.0 8.38%SEAPORT SQUARE PARCEL 2 Roofer 09/16/2017

LUND REBAR SERVICES, INC. 12,264.0 2,931.0 23.90% 4,145.0 33.80% 13.0 0.11%SEAPORT SQUARE PARCEL 2 Iron Worker 06/04/2017

KIVA SYSTEMS INC. 120.0 120.0 100.00% 0.0 0.00% 0.0 0.00%SEAPORT SQUARE PARCEL 2 Sheetmetal Work 08/20/2017

KIVA SYSTEMS INC. 6,388.5 1,775.5 27.79% 3,190.0 49.93% 389.0 6.09%SEAPORT SQUARE PARCEL 2 Iron Worker 09/17/2017

KIVA SYSTEMS INC. 7,146.5 1,977.5 27.67% 1,062.5 14.87% 158.5 2.22%SEAPORT SQUARE PARCEL 2 Glazier 09/17/2017

KIVA SYSTEMS INC. 5,870.0 1,819.0 30.99% 11.5 0.20% 0.0 0.00%SEAPORT SQUARE PARCEL 2 Carpenter 09/17/2017

HIGH POINT INTERIORS,INC. 220.0 100.0 45.45% 0.0 0.00% 0.0 0.00%SEAPORT SQUARE PARCEL 2 Marble Tile Work 09/09/2017

H. CARR & SONS INC. 2,094.0 0.0 0.00% 412.0 19.68% 0.0 0.00%SEAPORT SQUARE PARCEL 2 Plasterer 09/01/2017

H. CARR & SONS INC. 3,702.0 708.0 19.12% 1,568.0 42.36% 0.0 0.00%SEAPORT SQUARE PARCEL 2 Laborer 07/28/2017

279,476.4 85,624.6 30.64% 80,586.6 28.83% 10,815.5 3.87%SUB TOTALS:

SEAPORT SQUARE PARCEL L1

$135,000,000Amount:

Gen Contractor: SKANSKA CO.

(617)574-1400 253 SUMMER STREET BOSTON

Est Start Date:

Est End Date:

08/01/2013

09/01/2015

SWEENEY DRYWALL FINISHE 112.0 112.0 100.00% 112.0 100.00% 0.0 0.00%SEAPORT SQUARE PARCEL L1 Cement Finisher 01/31/2015

MODERN GLASS & ALUMINUM 1,261.0 44.0 3.49% 44.0 3.49% 44.0 3.49%SEAPORT SQUARE PARCEL L1 Glazier 10/03/2015

SKANSKA CO. 36,099.0 20,138.5 55.79% 544.0 1.51% 1,684.0 4.66%SEAPORT SQUARE PARCEL L1 Laborer 10/11/2015

SWEENEY DRYWALL FINISHE 48.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SEAPORT SQUARE PARCEL L1 Bricklayer 08/01/2015

SUNRISE ERECTORS INC. 120.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SEAPORT SQUARE PARCEL L1 Sheetmetal Work 05/03/2015

SUNRISE ERECTORS INC. 1,548.0 589.5 38.08% 39.0 2.52% 281.5 18.18%SEAPORT SQUARE PARCEL L1 Carpenter 05/24/2015

SULLIVAN & MCLAUGHLIN CO. 97,173.5 29,506.5 30.36% 26,775.5 27.55% 1,065.5 1.10%SEAPORT SQUARE PARCEL L1 Electrician 10/11/2015

SWEENEY DRYWALL FINISHE 8,993.0 4,736.0 52.66% 4,761.0 52.94% 591.0 6.57%SEAPORT SQUARE PARCEL L1 Carpenter 10/17/2015

SKANSKA CO. 2,716.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SEAPORT SQUARE PARCEL L1 Carpenter 10/04/2015

Page 222: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 222

Project Name Trade Latest Week

SCHNEIDER ELECTRIC 2,683.5 0.0 0.00% 0.0 0.00% 12.0 0.45%SEAPORT SQUARE PARCEL L1 Technician 10/11/2015

PRIME STEEL ERECTING INC, 25,101.0 10,579.0 42.15% 4,987.0 19.87% 1,102.0 4.39%SEAPORT SQUARE PARCEL L1 Iron Worker 04/11/2015

PHOENIX BAY STATE CONSTR 7,852.0 1,587.5 20.22% 1,081.5 13.77% 318.0 4.05%SEAPORT SQUARE PARCEL L1 Mason 10/04/2015

PERMASTEELISA CLAD. 2,385.0 1,921.0 80.55% 1,705.0 71.49% 114.0 4.78%SEAPORT SQUARE PARCEL L1 Glazier 08/02/2015

MCLAUGHLIN MARBLE & TILE 3,575.0 442.0 12.36% 140.0 3.92% 0.0 0.00%SEAPORT SQUARE PARCEL L1 Marble Tile Work 10/10/2015

SWEENEY DRYWALL FINISHE 2,332.0 1,254.0 53.77% 964.5 41.36% 73.0 3.13%SEAPORT SQUARE PARCEL L1 Laborer 10/17/2015

XQUISITE LANDSCAPING 98.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SEAPORT SQUARE PARCEL L1 Equipment Opera 10/11/2015

PERMASTEELISA CLAD. 5,551.0 630.0 11.35% 1,949.0 35.11% 127.0 2.29%SEAPORT SQUARE PARCEL L1 Iron Worker 08/02/2015

THYSSEN KRUPP ELEVATOR 10,676.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SEAPORT SQUARE PARCEL L1 Elevator Const(M 10/15/2015

MCCUSKER-GILL INC. 18,882.0 3,823.0 20.25% 3,813.0 20.19% 88.0 0.47%SEAPORT SQUARE PARCEL L1 Sheetmetal Work 10/11/2015

THOMAS G GALLAGHER INC. 57,548.0 11,263.0 19.57% 8,970.0 15.59% 4,493.0 7.81%SEAPORT SQUARE PARCEL L1 Pipefitter 10/11/2015

XQUISITE LANDSCAPING 391.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SEAPORT SQUARE PARCEL L1 Mason 10/11/2015

XQUISITE LANDSCAPING 1,878.0 344.0 18.32% 411.5 21.91% 38.5 2.05%SEAPORT SQUARE PARCEL L1 Laborer 10/11/2015

WATERTOWN IRON WORKS IN 1,800.0 616.0 34.22% 570.0 31.67% 156.0 8.67%SEAPORT SQUARE PARCEL L1 Iron Worker 08/15/2015

VERTEX WINDOW DECON INC. 947.5 230.0 24.27% 265.5 28.02% 0.0 0.00%SEAPORT SQUARE PARCEL L1 Carpenter 09/12/2015

WALTER A FURMAN CO 7,045.0 1,454.5 20.65% 283.5 4.02% 245.0 3.48%SEAPORT SQUARE PARCEL L1 Carpenter 10/10/2015

URBAN INSULATION 884.0 0.0 0.00% 8.0 0.90% 0.0 0.00%SEAPORT SQUARE PARCEL L1 Asbestos Worker 06/21/2015

SWEENEY DRYWALL FINISHE 1,317.5 224.0 17.00% 297.0 22.54% 72.0 5.46%SEAPORT SQUARE PARCEL L1 Taper 10/17/2015

THOMAS G GALLAGHER INC. 398.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SEAPORT SQUARE PARCEL L1 Plumber 09/27/2015

THE PAPPAS COMPANY, INC 943.5 455.0 48.22% 455.0 48.22% 62.0 6.57%SEAPORT SQUARE PARCEL L1 Carpenter 07/19/2015

THE CHEVIOT CORPORATION 1,126.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SEAPORT SQUARE PARCEL L1 Glazier 10/09/2015

THE CHEVIOT CORPORATION 1,010.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SEAPORT SQUARE PARCEL L1 Carpenter 10/09/2015

T. J. MCCARTNEY, INC. 13,417.0 1,958.5 14.60% 5,601.5 41.75% 1,391.0 10.37%SEAPORT SQUARE PARCEL L1 Taper 10/02/2015

T. J. MCCARTNEY, INC. 10,370.8 7,571.3 73.01% 2,101.0 20.26% 0.0 0.00%SEAPORT SQUARE PARCEL L1 Laborer 09/18/2015

T. J. MCCARTNEY, INC. 31,007.0 8,027.5 25.89% 9,053.0 29.20% 735.5 2.37%SEAPORT SQUARE PARCEL L1 Carpenter 10/02/2015

URBAN INSULATION 674.0 194.0 28.78% 218.0 32.34% 0.0 0.00%SEAPORT SQUARE PARCEL L1 Insulator 10/04/2015

COLONIAL SYSTEMS, INC. 18.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SEAPORT SQUARE PARCEL L1 Laborer 07/26/2015

G & C CONCRETE CO. 19,430.0 5,452.0 28.06% 4,500.5 23.16% 144.0 0.74%SEAPORT SQUARE PARCEL L1 Carpenter 10/10/2015

FRONT LINE INC. 3,771.0 1,289.0 34.18% 3,208.0 85.07% 1,550.0 41.10%SEAPORT SQUARE PARCEL L1 Laborer 10/10/2015

E. M. DUGGAN INC. 13,999.0 2,315.5 16.54% 1,272.0 9.09% 1,747.0 12.48%SEAPORT SQUARE PARCEL L1 Plumber 10/18/2015

DIAMOND STEEL AND FABRIC 36.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SEAPORT SQUARE PARCEL L1 Iron Worker 05/23/2015

COMMONWEALTH BUILDING S 199.5 0.0 0.00% 16.0 8.02% 0.0 0.00%SEAPORT SQUARE PARCEL L1 Sheetmetal Work 08/22/2015

ALLEGHENY CONTRACT FLOO 3,844.0 676.0 17.59% 2,045.0 53.20% 192.0 4.99%SEAPORT SQUARE PARCEL L1 Floor Layer 10/09/2015

G & C CONCRETE CO. 5,011.5 352.0 7.02% 1,687.5 33.67% 99.5 1.99%SEAPORT SQUARE PARCEL L1 Cement Finisher 10/17/2015

Page 223: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 223

Project Name Trade Latest Week

M.L. MCDONALD SALES 16.0 16.0 100.00% 0.0 0.00% 0.0 0.00%SEAPORT SQUARE PARCEL L1 Taper 06/23/2015

AMERICAN ACOUSTICAL 7,539.0 1,649.5 21.88% 979.0 12.99% 182.0 2.41%SEAPORT SQUARE PARCEL L1 Carpenter 09/04/2015

COLONIAL SYSTEMS, INC. 503.0 126.5 25.15% 0.0 0.00% 0.0 0.00%SEAPORT SQUARE PARCEL L1 Glazier 07/26/2015

COLONIAL SYSTEMS, INC. 992.0 14.5 1.46% 14.5 1.46% 0.0 0.00%SEAPORT SQUARE PARCEL L1 Carpenter 07/26/2015

CENTURY DRYWALL INC, 3,354.0 1,321.0 39.39% 2,272.0 67.74% 957.0 28.53%SEAPORT SQUARE PARCEL L1 Painter 10/10/2015

BRIGHT WINDOW CO. 1,472.0 360.0 24.46% 360.0 24.46% 0.0 0.00%SEAPORT SQUARE PARCEL L1 Carpenter 09/18/2015

ATLANTIC CONTRACTING &SP 8,848.0 918.0 10.38% 1,528.0 17.27% 0.0 0.00%SEAPORT SQUARE PARCEL L1 Insulator 09/20/2015

ALLIED PILE DRIVING INC. 2,082.0 440.5 21.16% 227.0 10.90% 8.0 0.38%SEAPORT SQUARE PARCEL L1 Piledriver 09/13/2014

THYSSEN KRUPP ELEVATOR 2,883.2 0.0 0.00% 0.0 0.00% 56.0 1.94%SEAPORT SQUARE PARCEL L1 Elev Const Helper 10/15/2015

COMMONWEALTH BUILDING S 9,593.5 4,026.5 41.97% 5,224.0 54.45% 88.5 0.92%SEAPORT SQUARE PARCEL L1 Roofer 10/03/2015

J. C. CANNISTRARO INC. 1,154.0 232.0 20.10% 540.0 46.79% 72.0 6.24%SEAPORT SQUARE PARCEL L1 Plumber 10/11/2015

G & C CONCRETE CO. 243.0 0.0 0.00% 43.0 17.70% 0.0 0.00%SEAPORT SQUARE PARCEL L1 Cement Laborer 10/10/2015

JAJ COMPANY INC. 2,199.0 0.0 0.00% 171.0 7.78% 0.0 0.00%SEAPORT SQUARE PARCEL L1 Mason Tender 10/11/2015

ALLIED PILE DRIVING INC. 194.0 0.0 0.00% 65.0 33.51% 0.0 0.00%SEAPORT SQUARE PARCEL L1 Equipment Opera 09/06/2014

JAJ COMPANY INC. 1,170.0 0.0 0.00% 172.0 14.70% 0.0 0.00%SEAPORT SQUARE PARCEL L1 Marble Tile Work 10/11/2015

JAJ COMPANY INC. 85.0 85.0 100.00% 0.0 0.00% 0.0 0.00%SEAPORT SQUARE PARCEL L1 Laborer 09/20/2015

J.M. ELECTRICAL CO. INC. 7,973.0 746.0 9.36% 746.0 9.36% 0.0 0.00%SEAPORT SQUARE PARCEL L1 Electrician 10/23/2015

J. DERENZO CO. 10,299.0 5,812.5 56.44% 1,188.0 11.54% 0.0 0.00%SEAPORT SQUARE PARCEL L1 Laborer 10/10/2015

M.L. MCDONALD SALES 2,822.0 1,234.0 43.73% 582.0 20.62% 0.0 0.00%SEAPORT SQUARE PARCEL L1 Painter 09/08/2015

J. C. CANNISTRARO INC. 7,707.5 1,361.0 17.66% 792.5 10.28% 112.0 1.45%SEAPORT SQUARE PARCEL L1 Sprinkler Fitter 09/27/2015

J. C. CANNISTRARO INC. 264.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SEAPORT SQUARE PARCEL L1 Pipefitter 08/23/2015

HERITAGE RESTORATION INC. 1,655.0 12.0 0.73% 307.5 18.58% 24.0 1.45%SEAPORT SQUARE PARCEL L1 Laborer 10/17/2015

HERITAGE RESTORATION INC. 3,375.5 993.5 29.43% 486.5 14.41% 0.0 0.00%SEAPORT SQUARE PARCEL L1 Bricklayer 10/17/2015

H. CARR & SONS INC. 1,747.0 0.0 0.00% 555.5 31.80% 0.0 0.00%SEAPORT SQUARE PARCEL L1 Plasterer 10/09/2015

H. CARR & SONS INC. 4,674.5 437.5 9.36% 1,042.0 22.29% 0.0 0.00%SEAPORT SQUARE PARCEL L1 Laborer 10/09/2015

G & C CONCRETE CO. 19,612.5 6,270.0 31.97% 5,443.0 27.75% 0.0 0.00%SEAPORT SQUARE PARCEL L1 Laborer 10/17/2015

G & C CONCRETE CO. 10,190.5 1,127.0 11.06% 1,896.5 18.61% 0.0 0.00%SEAPORT SQUARE PARCEL L1 Iron Worker 08/08/2015

G & C CONCRETE CO. 1,200.5 37.5 3.12% 37.5 3.12% 0.0 0.00%SEAPORT SQUARE PARCEL L1 Equipment Opera 10/03/2015

J. DERENZO CO. 6,436.0 533.0 8.28% 250.0 3.88% 225.0 3.50%SEAPORT SQUARE PARCEL L1 Equipment Opera 10/10/2015

524,557.0 145,538.8 27.75% 112,801.0 21.50% 18,150.0 3.46%SUB TOTALS:

SHARPS BARBER SHOP

$2,500Amount:

Gen Contractor: JIM DID IT SIGN CO.

(781)933-1865 465 CAMBRIDGE STREET 10 DRAPER STREET #11 WOBURN

Est Start Date:

Est End Date:

03/16/2015

03/20/2015

JIM DID IT SIGN CO. 10.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SHARPS BARBER SHOP Laborer 03/20/2015

10.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SUB TOTALS:

Page 224: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 224

Project Name Trade Latest Week

SIMON'S SEAFOOD

$2,500Amount:

Gen Contractor: HUNTER SIGNS

(617)360-9710 120 BUSINESS STREET HYDE PARK

Est Start Date:

Est End Date:

01/24/2016

01/30/2016

HUNTER SIGNS 4.0 4.0 100.00% 4.0 100.00% 0.0 0.00%SIMON'S SEAFOOD Laborer 01/30/2016

4.0 4.0 100.00% 4.0 100.00% 0.0 0.00%SUB TOTALS:

SIMPLI BAR & BITES

$7,500Amount:

Gen Contractor: BARLO SIGN COMPANY

(603)882-2638 158 GREELEY STREET HUDSON

Est Start Date:

Est End Date:

12/01/2013

01/31/2014

BARLO SIGN COMPANY 34.5 0.0 0.00% 0.0 0.00% 0.0 0.00%SIMPLI BAR & BITES Laborer 04/10/2014

34.5 0.0 0.00% 0.0 0.00% 0.0 0.00%SUB TOTALS:

SOTHEBY'S INTERNATIONAL REALTY

$2,500Amount:

Gen Contractor: EXCEL SIGNS & DECORATION CORP.

(617)479-8552 259 QUINCY AVE. QUINCY

Est Start Date:

Est End Date:

09/11/2016

09/13/2016

EXCEL SIGNS & DECORATION 9.0 0.0 0.00% 9.0 100.00% 3.0 33.33%SOTHEBY'S INTERNATIONAL RE Laborer 09/17/2016

9.0 0.0 0.00% 9.0 100.00% 3.0 33.33%SUB TOTALS:

SOULFIRE BBQ

$2,000Amount:

Gen Contractor: SRP SIGN CORP.

(617)623-6222 236 PEARL STREET SOMERVILLE

Est Start Date:

Est End Date:

10/01/2013

01/01/2014

SRP SIGN CORP. 12.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SOULFIRE BBQ Laborer 11/29/2013

12.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SUB TOTALS:

SOUTH BAY DEVELOPMENT PHASE I

$0Amount:

Gen Contractor: LEE KENNEDY

825-6930 1792 DORCHESTER AVE BOSTON

Est Start Date:

Est End Date:

05/01/2016

03/01/2018

MIDNIGHT IRON CONST. 2,294.0 1,221.0 53.23% 892.0 38.88% 21.0 0.92%SOUTH BAY DEVELOPMENT PH Iron Worker 09/16/2017

RICMOR CONSTRUCTION INC. 1,108.0 248.0 22.38% 296.0 26.71% 24.0 2.17%SOUTH BAY DEVELOPMENT PH Laborer 09/12/2017

PRIME STEEL ERECTING INC, 237.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SOUTH BAY DEVELOPMENT PH Laborer 03/11/2017

PRIME STEEL ERECTING INC, 3,341.5 941.5 28.18% 968.0 28.97% 0.0 0.00%SOUTH BAY DEVELOPMENT PH Iron Worker 03/18/2017

PAVILION FLOORS, INC. 514.5 0.0 0.00% 284.5 55.30% 0.0 0.00%SOUTH BAY DEVELOPMENT PH Terrazzo Worker 09/16/2017

P.J. SPILLANE COMPANY 2,104.0 915.5 43.51% 892.5 42.42% 0.0 0.00%SOUTH BAY DEVELOPMENT PH Waterproofer 09/16/2017

P.J. SPILLANE COMPANY 369.5 0.0 0.00% 8.0 2.17% 0.0 0.00%SOUTH BAY DEVELOPMENT PH Mason Tender 08/05/2017

MARMELO BROS. CONS, CO. 4,672.5 1,148.0 24.57% 1,858.5 39.78% 0.0 0.00%SOUTH BAY DEVELOPMENT PH Bricklayer 09/09/2017

OTIS ELEVATOR COMPANY 245.8 0.0 0.00% 0.0 0.00% 8.0 3.26%SOUTH BAY DEVELOPMENT PH Elev Const Helper 08/31/2017

RICMOR CONSTRUCTION INC. 488.0 0.0 0.00% 8.0 1.64% 0.0 0.00%SOUTH BAY DEVELOPMENT PH Plasterer 09/12/2017

MAIURI ELECTRICAL CORPOR 5,953.0 3,644.0 61.21% 3,046.0 51.17% 0.0 0.00%SOUTH BAY DEVELOPMENT PH Electrician 09/08/2017

MARMELO BROS. CONS, CO. 3,735.0 860.0 23.03% 2,092.0 56.01% 645.0 17.27%SOUTH BAY DEVELOPMENT PH Mason Tender 09/09/2017

ZICHELLE STEEL ERECTORS 7,690.5 1,889.0 24.56% 2,529.5 32.89% 0.0 0.00%SOUTH BAY DEVELOPMENT PH Iron Worker 07/21/2017

OTIS ELEVATOR COMPANY 544.3 7.0 1.29% 7.0 1.29% 170.5 31.33%SOUTH BAY DEVELOPMENT PH Elevator Const(M 09/14/2017

RYAN IRON WORKS INC, 2,982.0 1,456.0 48.83% 907.0 30.42% 8.0 0.27%SOUTH BAY DEVELOPMENT PH Iron Worker 09/17/2017

Page 225: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 225

Project Name Trade Latest Week

SALEM GLASS CO. 2,562.0 625.5 24.41% 290.0 11.32% 0.0 0.00%SOUTH BAY DEVELOPMENT PH Glazier 09/16/2017

SALEM GLASS CO. 1,268.5 652.5 51.44% 652.5 51.44% 0.0 0.00%SOUTH BAY DEVELOPMENT PH Iron Worker 09/16/2017

SAVE-ON-WALL CO, INC. 24,762.0 6,595.0 26.63% 6,829.5 27.58% 1,876.5 7.58%SOUTH BAY DEVELOPMENT PH Carpenter 09/09/2017

SAVE-ON-WALL CO, INC. 2,692.0 501.0 18.61% 997.0 37.04% 0.0 0.00%SOUTH BAY DEVELOPMENT PH Laborer 09/09/2017

SAVE-ON-WALL CO, INC. 2,391.0 88.0 3.68% 1,080.0 45.17% 583.0 24.38%SOUTH BAY DEVELOPMENT PH Taper 09/09/2017

SILVERBACKCONCRETE CON 1,814.0 72.5 4.00% 295.5 16.29% 8.5 0.47%SOUTH BAY DEVELOPMENT PH Cement Finisher 09/09/2017

SILVERBACKCONCRETE CON 1,677.5 0.0 0.00% 78.0 4.65% 0.0 0.00%SOUTH BAY DEVELOPMENT PH Cement Laborer 09/09/2017

SOEP PAINTING CORP. 477.0 32.0 6.71% 32.0 6.71% 32.0 6.71%SOUTH BAY DEVELOPMENT PH Carpenter 09/17/2017

SOEP PAINTING CORP. 758.0 0.0 0.00% 104.0 13.72% 104.0 13.72%SOUTH BAY DEVELOPMENT PH Painter 09/17/2017

THE WATERPROOFING COMP 1,914.0 865.5 45.22% 549.5 28.71% 143.0 7.47%SOUTH BAY DEVELOPMENT PH Waterproofer 08/19/2017

VALLEYCREST LANDSCAPE 112.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SOUTH BAY DEVELOPMENT PH Laborer 09/17/2017

LM HEAVY CIVIL 12,568.5 4,199.5 33.41% 2,641.5 21.02% 1,123.0 8.94%SOUTH BAY DEVELOPMENT PH Laborer 09/16/2017

GASTON ELECTRICAL CO, INC 164.0 0.0 0.00% 0.0 0.00% 164.0 100.00%SOUTH BAY DEVELOPMENT PH Telephone/Data I 09/03/2017

VALLEYCREST LANDSCAPE 48.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SOUTH BAY DEVELOPMENT PH Equipment Opera 09/17/2017

GASTON ELECTRICAL CO, INC 15,570.0 4,468.5 28.70% 2,523.0 16.20% 654.0 4.20%SOUTH BAY DEVELOPMENT PH Electrician 09/17/2017

ARCHER CORPORATION 32.0 0.0 0.00% 16.0 50.00% 0.0 0.00%SOUTH BAY DEVELOPMENT PH Carpenter 09/15/2017

BASS ASSOCIATES INC, 4,198.0 1,009.0 24.04% 989.0 23.56% 0.0 0.00%SOUTH BAY DEVELOPMENT PH Carpenter 09/16/2017

CARLYSLE ENGINEERING INC. 2,793.0 832.0 29.79% 1,272.0 45.54% 648.0 23.20%SOUTH BAY DEVELOPMENT PH Sprinkler Fitter 09/15/2017

DON MARTIN CORPORATION 66.0 0.0 0.00% 22.0 33.33% 0.0 0.00%SOUTH BAY DEVELOPMENT PH Equipment Opera 06/24/2017

DON MARTIN CORPORATION 154.5 0.0 0.00% 64.0 41.42% 0.0 0.00%SOUTH BAY DEVELOPMENT PH Laborer 06/24/2017

G & G PLASTERING 198.0 64.0 32.32% 0.0 0.00% 0.0 0.00%SOUTH BAY DEVELOPMENT PH Laborer 08/12/2017

G & G PLASTERING 2,002.0 413.0 20.63% 216.0 10.79% 438.5 21.90%SOUTH BAY DEVELOPMENT PH Plasterer 08/19/2017

GALLAGHER CONCRETE CON. 9,814.5 3,407.0 34.71% 815.5 8.31% 317.0 3.23%SOUTH BAY DEVELOPMENT PH Carpenter 08/26/2017

GREENWOOD INDUSTRIES IN 56.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SOUTH BAY DEVELOPMENT PH Sheetmetal Work 07/01/2017

GALLAGHER CONCRETE CON. 4,332.0 1,750.5 40.41% 1,854.0 42.80% 128.5 2.97%SOUTH BAY DEVELOPMENT PH Laborer 08/26/2017

LM HEAVY CIVIL 8,315.5 818.0 9.84% 1,409.5 16.95% 0.0 0.00%SOUTH BAY DEVELOPMENT PH Equipment Opera 09/16/2017

GASTON ELECTRICAL CO, INC 168.0 0.0 0.00% 168.0 100.00% 0.0 0.00%SOUTH BAY DEVELOPMENT PH Technician 09/03/2017

GREENWOOD INDUSTRIES IN 2,820.3 0.0 0.00% 22.0 0.78% 8.0 0.28%SOUTH BAY DEVELOPMENT PH Roofer 09/09/2017

JOHN F. SHEA CO. INC. 13.7 0.0 0.00% 0.0 0.00% 0.0 0.00%SOUTH BAY DEVELOPMENT PH Sheetmetal Work 09/16/2017

LEE KENNEDY 6,985.0 3,410.0 48.82% 1,924.0 27.54% 1,470.0 21.05%SOUTH BAY DEVELOPMENT PH Laborer 09/19/2017

GALLAGHER CONCRETE CON. 1,332.0 287.0 21.55% 287.0 21.55% 0.0 0.00%SOUTH BAY DEVELOPMENT PH Equipment Opera 08/26/2017

K & K ACOUSTICAL CEILINGS 516.0 0.0 0.00% 24.0 4.65% 0.0 0.00%SOUTH BAY DEVELOPMENT PH Carpenter 09/17/2017

JOHN F. SHEA CO. INC. 498.1 189.3 38.01% 296.3 59.49% 0.0 0.00%SOUTH BAY DEVELOPMENT PH Roofer 09/09/2017

JDC DEMOLITION COMPANY, I 2,263.0 556.0 24.57% 573.0 25.32% 120.0 5.30%SOUTH BAY DEVELOPMENT PH Laborer 09/17/2016

Page 226: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 226

Project Name Trade Latest Week

JDC DEMOLITION COMPANY, I 871.0 24.0 2.76% 24.0 2.76% 0.0 0.00%SOUTH BAY DEVELOPMENT PH Equipment Opera 09/17/2016

ISLAND SPRINKLERS 3,093.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SOUTH BAY DEVELOPMENT PH Sheetmetal Work 09/17/2017

ISLAND SPRINKLERS 2,744.0 786.0 28.64% 804.0 29.30% 254.0 9.26%SOUTH BAY DEVELOPMENT PH Pipefitter 09/17/2017

ISLAND SPRINKLERS 17.3 0.0 0.00% 0.0 0.00% 0.0 0.00%SOUTH BAY DEVELOPMENT PH Laborer 09/17/2017

HERITAGE RESTORATION INC. 76.0 27.0 35.53% 23.0 30.26% 0.0 0.00%SOUTH BAY DEVELOPMENT PH Laborer 09/16/2017

J SHINE PLUMBING 12,032.0 5,997.0 49.84% 4,376.0 36.37% 0.0 0.00%SOUTH BAY DEVELOPMENT PH Plumber 09/15/2017

LEE KENNEDY 1,480.0 264.0 17.84% 200.0 13.51% 0.0 0.00%SOUTH BAY DEVELOPMENT PH Carpenter 09/19/2017

HERITAGE RESTORATION INC. 1,231.5 295.0 23.95% 518.5 42.10% 0.0 0.00%SOUTH BAY DEVELOPMENT PH Bricklayer 09/16/2017

173,160.2 50,558.8 29.20% 45,759.3 26.43% 8,948.5 5.17%SUB TOTALS:

SOUTH BAY DEVELOPMENT PHASE II

$150,000,000Amount:

Gen Contractor: LEE KENNEDY

825-6930 1792 DORCHESTER AVE BOSTON

Est Start Date:

Est End Date:

04/10/2017

10/30/2018

PATRIOT PLUMBING & HEATIN 965.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SOUTH BAY DEVELOPMENT PH Plumber 09/17/2017

J.L. MARSHALL & SONS,INC 3,561.5 1,463.5 41.09% 303.5 8.52% 541.0 15.19%SOUTH BAY DEVELOPMENT PH Laborer 09/17/2017

JOHN F. SHEA CO. INC. 182.4 119.9 65.77% 152.0 83.36% 0.0 0.00%SOUTH BAY DEVELOPMENT PH Roofer 07/22/2017

LM HEAVY CIVIL 4,875.5 86.5 1.77% 689.0 14.13% 0.0 0.00%SOUTH BAY DEVELOPMENT PH Equipment Opera 09/16/2017

THE WATERPROOFING COMP 186.0 134.0 72.04% 5.0 2.69% 40.0 21.51%SOUTH BAY DEVELOPMENT PH Waterproofer 09/16/2017

LUND REBAR SERVICES, INC. 3,887.0 1,500.0 38.59% 1,378.0 35.45% 26.0 0.67%SOUTH BAY DEVELOPMENT PH Iron Worker 09/10/2017

NORTHEASTERN MECHANICA 137.5 0.0 0.00% 0.0 0.00% 0.0 0.00%SOUTH BAY DEVELOPMENT PH Sheetmetal Work 09/17/2017

RYAN IRON WORKS INC, 151.0 25.0 16.56% 19.0 12.58% 0.0 0.00%SOUTH BAY DEVELOPMENT PH Iron Worker 09/17/2017

LM HEAVY CIVIL 6,198.5 1,926.5 31.08% 779.0 12.57% 387.5 6.25%SOUTH BAY DEVELOPMENT PH Laborer 09/16/2017

J.L. MARSHALL & SONS,INC 1,361.0 0.0 0.00% 515.5 37.88% 0.0 0.00%SOUTH BAY DEVELOPMENT PH Equipment Opera 09/17/2017

NORTHEASTERN MECHANICA 21.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SOUTH BAY DEVELOPMENT PH Pipefitter 06/11/2017

CECO CONCRETE CONSTRUC 402.5 254.5 63.23% 0.0 0.00% 0.0 0.00%SOUTH BAY DEVELOPMENT PH Laborer 09/17/2017

J.L. MARSHALL & SONS,INC 176.6 0.0 0.00% 9.5 5.38% 0.0 0.00%SOUTH BAY DEVELOPMENT PH Cement Finisher 09/17/2017

MCDONALD ELECTRICAL COR 474.0 144.0 30.38% 88.0 18.57% 32.0 6.75%SOUTH BAY DEVELOPMENT PH Electrician 09/17/2017

ATLAS DRILLING 995.5 0.0 0.00% 0.0 0.00% 0.0 0.00%SOUTH BAY DEVELOPMENT PH Driller 07/22/2017

CECO CONCRETE CONSTRUC 1,839.0 409.0 22.24% 495.0 26.92% 0.0 0.00%SOUTH BAY DEVELOPMENT PH Carpenter 09/17/2017

COGSWELL SPRINKLER CO 26.5 0.0 0.00% 0.0 0.00% 0.0 0.00%SOUTH BAY DEVELOPMENT PH Sprinkler Fitter 09/16/2017

COSTA BROTHERS MASONRY 160.5 0.0 0.00% 0.0 0.00% 0.0 0.00%SOUTH BAY DEVELOPMENT PH Bricklayer 09/16/2017

COSTA BROTHERS MASONRY 72.5 0.0 0.00% 0.0 0.00% 0.0 0.00%SOUTH BAY DEVELOPMENT PH Laborer 09/02/2017

DON MARTIN CORPORATION 12.0 0.0 0.00% 4.0 33.33% 0.0 0.00%SOUTH BAY DEVELOPMENT PH Equipment Opera 08/05/2017

DON MARTIN CORPORATION 20.0 0.0 0.00% 8.0 40.00% 0.0 0.00%SOUTH BAY DEVELOPMENT PH Laborer 08/05/2017

GREENWOOD INDUSTRIES IN 9.0 0.0 0.00% 9.0 100.00% 0.0 0.00%SOUTH BAY DEVELOPMENT PH Roofer 09/02/2017

J.L. MARSHALL & SONS,INC 5,251.0 1,391.5 26.50% 976.0 18.59% 96.0 1.83%SOUTH BAY DEVELOPMENT PH Carpenter 09/17/2017

Page 227: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 227

Project Name Trade Latest Week

ATLAS DRILLING 153.0 0.0 0.00% 85.0 55.56% 0.0 0.00%SOUTH BAY DEVELOPMENT PH Laborer 07/22/2017

31,118.4 7,454.4 23.96% 5,515.5 17.72% 1,122.5 3.61%SUB TOTALS:

SOUTH BOSTON NEIGHBORHOOD HO

$9,500Amount:

Gen Contractor: MATHIAS CORPORATION

(617)524-4372 86 RUSSMORE ROAD P.O.366343 BOSTON

Est Start Date:

Est End Date:

06/17/2016

06/17/2016

MATHIAS CORPORATION 4.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SOUTH BOSTON NEIGHBORHO Equipment Opera 06/17/2016

MATHIAS CORPORATION 20.0 12.0 60.00% 20.0 100.00% 0.0 0.00%SOUTH BOSTON NEIGHBORHO Laborer 06/17/2016

24.0 12.0 50.00% 20.0 83.33% 0.0 0.00%SUB TOTALS:

SOUTH END COMMUNITY HEALTH CE

$2,000Amount:

Gen Contractor: CAMBRIDGE REPROGRAPHIES

(617)623-2838 21 MCGRATH HGWY SOMERVILLE

Est Start Date:

Est End Date:

06/19/2016

06/22/2016

CAMBRIDGE REPROGRAPHIE 4.0 0.0 0.00% 2.0 50.00% 2.0 50.00%SOUTH END COMMUNITY HEAL Laborer 06/25/2016

4.0 0.0 0.00% 2.0 50.00% 2.0 50.00%SUB TOTALS:

SPECIAL TOWNIES

$7,000Amount:

Gen Contractor: RED HAND CONSTRUCTION

(617)803-8879 95 GOVERNORS AVE. medford

Est Start Date:

Est End Date:

04/14/2014

04/18/2014

RED HAND CONSTRUCTION 40.0 0.0 0.00% 40.0 100.00% 0.0 0.00%SPECIAL TOWNIES Laborer 04/18/2014

RED HAND CONSTRUCTION 12.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SPECIAL TOWNIES Plumber 04/18/2014

RED HAND CONSTRUCTION 80.0 0.0 0.00% 40.0 50.00% 0.0 0.00%SPECIAL TOWNIES Carpenter 04/18/2014

132.0 0.0 0.00% 80.0 60.61% 0.0 0.00%SUB TOTALS:

SPENCER HOUSE II

$1,500,000Amount:

Gen Contractor: VERTEC CORP.

(508)230-2600 180 MAIN STREET NORTH EASTON

Est Start Date:

Est End Date:

09/01/2012

11/30/2012

SCHLAGER COMPANY INC. 322.0 24.0 7.45% 0.0 0.00% 0.0 0.00%SPENCER HOUSE II Laborer 09/24/2014

NEW ENGLAND MECHNICAL 1,175.0 1,175.0 100.00% 1,119.0 95.23% 0.0 0.00%SPENCER HOUSE II Pipefitter 11/08/2014

NG ENVIRONMENTAL CO. 444.0 6.0 1.35% 444.0 100.00% 0.0 0.00%SPENCER HOUSE II Laborer 08/16/2014

PRECISION CONCRETE 104.0 0.0 0.00% 58.0 55.77% 0.0 0.00%SPENCER HOUSE II Cement Finisher 01/03/2015

PRECISION CONCRETE 40.0 0.0 0.00% 24.0 60.00% 0.0 0.00%SPENCER HOUSE II Cement Laborer 01/03/2015

REFORM MASONRY 202.0 5.0 2.48% 123.0 60.89% 0.0 0.00%SPENCER HOUSE II Mason 01/18/2014

REFORM MASONRY 285.5 128.0 44.83% 285.5 100.00% 0.0 0.00%SPENCER HOUSE II Mason Tender 01/18/2014

ZUCCO ELETRIC, INC. 2,206.5 168.0 7.61% 176.0 7.98% 0.0 0.00%SPENCER HOUSE II Electrician 06/28/2014

S.R.C. ROOFING INC. 343.0 249.3 72.67% 290.0 84.55% 0.0 0.00%SPENCER HOUSE II Roofer 11/22/2014

ESPAILLAT CONSTRUCTION L 757.8 757.8 100.00% 647.5 85.44% 413.8 54.61%SPENCER HOUSE II Laborer 05/04/2014

SCHLAGER COMPANY INC. 2,414.0 530.5 21.98% 262.0 10.85% 0.0 0.00%SPENCER HOUSE II Plumber 11/19/2014

STREAMLINE WATERPROOFIN 133.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SPENCER HOUSE II Waterproofer 05/03/2014

UNERECTORS INC. 960.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SPENCER HOUSE II Iron Worker 09/06/2014

VERTEC CORP. 2,966.0 2,742.5 92.46% 2,839.0 95.72% 0.0 0.00%SPENCER HOUSE II Laborer 05/22/2015

Page 228: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 228

Project Name Trade Latest Week

VILLAGE FORGE INC. 151.3 82.3 54.38% 41.5 27.44% 0.0 0.00%SPENCER HOUSE II Iron Worker 04/25/2015

WAYNE J GRIFFIN ELECTRIC 2,575.5 0.0 0.00% 0.0 0.00% 0.0 0.00%SPENCER HOUSE II Electrician 12/28/2014

MOST GIFTED FAMILY MANAG 320.0 320.0 100.00% 320.0 100.00% 0.0 0.00%SPENCER HOUSE II Laborer 12/13/2014

S.R.C. ROOFING INC. 15.5 5.5 35.48% 8.5 54.84% 0.0 0.00%SPENCER HOUSE II Laborer 06/28/2014

DAVID BUBB REFORM MASON 393.0 5.0 1.27% 267.0 67.94% 0.0 0.00%SPENCER HOUSE II Mason 04/26/2014

ANDERSON INSULATION 97.3 0.0 0.00% 97.3 100.00% 0.0 0.00%SPENCER HOUSE II Carpenter 03/29/2014

ANDERSON INSULATION 151.0 54.3 35.93% 110.3 73.01% 0.0 0.00%SPENCER HOUSE II Insulator 01/25/2014

ANDERSON INSULATION 187.8 37.0 19.71% 179.8 95.74% 0.0 0.00%SPENCER HOUSE II Laborer 05/10/2014

F.S. PAYNE CO. 350.0 0.0 0.00% 0.0 0.00% 72.0 20.57%SPENCER HOUSE II Laborer 05/30/2015

BOSTON FIRE SPRINKLER CO 472.5 124.5 26.35% 53.0 11.22% 0.0 0.00%SPENCER HOUSE II Sprinkler Fitter 12/14/2014

KONE ELEVATOR INC. 273.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SPENCER HOUSE II Elevator Const(M 03/18/2015

DAVID BUBB REFORM MASON 677.5 378.5 55.87% 677.5 100.00% 0.0 0.00%SPENCER HOUSE II Mason Tender 06/14/2014

DILLON ACOUSTICAL CEILING, 44.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SPENCER HOUSE II Carpenter 09/20/2014

EAST COAST INTERIORS CO. 2,433.0 609.0 25.03% 256.0 10.52% 0.0 0.00%SPENCER HOUSE II Carpenter 10/25/2014

ESPAILLAT CONSTRUCTION L 2,400.6 810.8 33.78% 577.7 24.07% 101.9 4.24%SPENCER HOUSE II Carpenter 05/25/2014

ESPAILLAT CONSTRUCTION L 939.9 939.9 100.00% 939.9 100.00% 0.0 0.00%SPENCER HOUSE II Taper 05/25/2014

FIRST NICK PAINTING CO. 1,456.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SPENCER HOUSE II Painter 12/07/2014

GEMNINT FLOORS 681.5 681.5 100.00% 681.5 100.00% 0.0 0.00%SPENCER HOUSE II Floor Layer 01/03/2015

GEMNINT FLOORS 721.5 721.5 100.00% 721.5 100.00% 236.5 32.78%SPENCER HOUSE II Laborer 12/27/2014

KONE ELEVATOR INC. 240.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SPENCER HOUSE II Elev Const Helper 03/11/2015

ARCHER CORPORATION 859.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SPENCER HOUSE II Carpenter 11/07/2014

27,792.5 10,555.8 37.98% 11,199.4 40.30% 824.2 2.97%SUB TOTALS:

ST AMBROSE FAMILY SHELTER

$20,000Amount:

Gen Contractor:

Est Start Date:

Est End Date:

06/20/2016

08/08/2016

NS CONTRACTING CO INC. 29.0 29.0 100.00% 29.0 100.00% 0.0 0.00%ST AMBROSE FAMILY SHELTER Laborer 08/08/2016

NS CONTRACTING CO INC. 59.0 35.0 59.32% 35.0 59.32% 0.0 0.00%ST AMBROSE FAMILY SHELTER Painter 08/08/2016

88.0 64.0 72.73% 64.0 72.73% 0.0 0.00%SUB TOTALS:

ST AMBROSE HOMELESS SHELTER

$20,000Amount:

Gen Contractor:

Est Start Date:

Est End Date:

02/01/2014

04/30/2014

CATHOLIC CHARTIES 77.0 77.0 100.00% 77.0 100.00% 0.0 0.00%ST AMBROSE HOMELESS SHEL Carpenter 03/22/2014

CATHOLIC CHARTIES 25.0 25.0 100.00% 25.0 100.00% 0.0 0.00%ST AMBROSE HOMELESS SHEL Laborer 03/15/2014

102.0 102.0 100.00% 102.0 100.00% 0.0 0.00%SUB TOTALS:

Page 229: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 229

Project Name Trade Latest Week

ST MARY'S CENTER FOR WAMEN & C

$20,000Amount:

Gen Contractor:

Est Start Date:

Est End Date:

08/08/2016

09/02/2016

OASIS TEMP SYSTEMS 122.0 0.0 0.00% 30.0 24.59% 0.0 0.00%ST MARY'S CENTER FOR WAME Plumber 09/02/2016

RTP ASSOCIATES INC 108.0 0.0 0.00% 0.0 0.00% 0.0 0.00%ST MARY'S CENTER FOR WAME Laborer 09/02/2016

230.0 0.0 0.00% 30.0 13.04% 0.0 0.00%SUB TOTALS:

ST. FRANCIS HOUSE

$20,000Amount:

Gen Contractor: RED STAR CONSTRUCTION

(617)243-0700 313 WASHINGTON STREET NEWTON

Est Start Date:

Est End Date:

09/07/2015

10/16/2015

FORD MECHANICAL CO. 80.0 80.0 100.00% 0.0 0.00% 0.0 0.00%ST. FRANCIS HOUSE Plumber 10/02/2015

PAL FLOORING INC. 160.0 0.0 0.00% 0.0 0.00% 0.0 0.00%ST. FRANCIS HOUSE Marble Tile Work 10/16/2015

RED STAR CONSTRUCTION 144.0 72.0 50.00% 0.0 0.00% 0.0 0.00%ST. FRANCIS HOUSE Laborer 09/18/2015

384.0 152.0 39.58% 0.0 0.00% 0.0 0.00%SUB TOTALS:

ST. FRANCIS HOUSE INC.

$20,000Amount:

Gen Contractor:

Est Start Date:

Est End Date:

06/27/2016

07/08/2016

JAN CO 32.0 0.0 0.00% 32.0 100.00% 0.0 0.00%ST. FRANCIS HOUSE INC. Plasterer 07/08/2016

JAN CO 30.0 0.0 0.00% 30.0 100.00% 0.0 0.00%ST. FRANCIS HOUSE INC. Plumber 07/08/2016

62.0 0.0 0.00% 62.0 100.00% 0.0 0.00%SUB TOTALS:

ST. KEVIN'S & UPHAM'S CORNER

$27,000,000Amount:

Gen Contractor: BILT-RITE CONSTRUCTION

(617)541-9777 150 SHIRLEY STREET BOSTON

Est Start Date:

Est End Date:

01/01/2014

03/31/2015

RISE & SHINE CLEANING & CO 1,023.3 736.3 71.95% 992.3 96.97% 720.3 70.39%ST. KEVIN'S & UPHAM'S CORNE Laborer 09/19/2015

KONE ELEVATOR INC. 244.0 0.0 0.00% 0.0 0.00% 0.0 0.00%ST. KEVIN'S & UPHAM'S CORNE Elev Const Helper 06/03/2015

MARGUERITE CONCRETE 542.5 0.0 0.00% 8.0 1.47% 0.0 0.00%ST. KEVIN'S & UPHAM'S CORNE Cement Finisher 08/01/2015

MARGUERITE CONCRETE 304.5 0.0 0.00% 35.5 11.66% 0.0 0.00%ST. KEVIN'S & UPHAM'S CORNE Laborer 08/01/2015

NORTH EAST FOAM SOLUTION 616.0 160.0 25.97% 152.0 24.68% 0.0 0.00%ST. KEVIN'S & UPHAM'S CORNE Carpenter 06/02/2015

NORTH EAST FOAM SOLUTION 96.0 88.0 91.67% 88.0 91.67% 0.0 0.00%ST. KEVIN'S & UPHAM'S CORNE Laborer 05/05/2015

PAN ELECTRIC COMPANY INC. 6,168.5 3,540.5 57.40% 6,168.5 100.00% 496.0 8.04%ST. KEVIN'S & UPHAM'S CORNE Electrician 09/12/2015

PEGASUS SONS MASONRY IN 8,853.0 4,120.5 46.54% 4,120.5 46.54% 0.0 0.00%ST. KEVIN'S & UPHAM'S CORNE Mason 09/22/2015

PEGASUS SONS MASONRY IN 4,852.0 2,590.5 53.39% 2,571.5 53.00% 0.0 0.00%ST. KEVIN'S & UPHAM'S CORNE Mason Tender 08/18/2015

RICMOR CONSTRUCTION INC. 24.0 0.0 0.00% 0.0 0.00% 0.0 0.00%ST. KEVIN'S & UPHAM'S CORNE Cement Finisher 01/20/2015

K & K ACOUSTICAL CEILINGS 307.0 100.0 32.57% 108.0 35.18% 0.0 0.00%ST. KEVIN'S & UPHAM'S CORNE Carpenter 08/30/2015

RICMOR CONSTRUCTION INC. 32.0 0.0 0.00% 0.0 0.00% 0.0 0.00%ST. KEVIN'S & UPHAM'S CORNE Plasterer 09/16/2014

KONE ELEVATOR INC. 627.0 0.0 0.00% 0.0 0.00% 8.0 1.28%ST. KEVIN'S & UPHAM'S CORNE Elevator Const(M 08/19/2015

SENICES ENTERPRISES AND 9,671.0 3,863.0 39.94% 3,305.0 34.17% 747.5 7.73%ST. KEVIN'S & UPHAM'S CORNE Carpenter 08/22/2015

SENICES ENTERPRISES AND 299.0 283.0 94.65% 299.0 100.00% 16.0 5.35%ST. KEVIN'S & UPHAM'S CORNE Laborer 07/04/2015

Page 230: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 230

Project Name Trade Latest Week

SENICES ENTERPRISES AND 2,400.5 932.0 38.83% 932.0 38.83% 456.0 19.00%ST. KEVIN'S & UPHAM'S CORNE Taper 07/18/2015

SENICES ENTERPRISES INC 4,584.0 3,086.0 67.32% 4,414.0 96.29% 579.0 12.63%ST. KEVIN'S & UPHAM'S CORNE Painter 08/08/2015

TARA CONSTRUCTION 19,443.3 7,151.3 36.78% 7,508.8 38.62% 353.5 1.82%ST. KEVIN'S & UPHAM'S CORNE Carpenter 09/19/2015

TARA CONSTRUCTION 1,299.5 829.5 63.83% 1,299.5 100.00% 34.5 2.65%ST. KEVIN'S & UPHAM'S CORNE Laborer 08/29/2015

TF ANDREW CARPET ONE FLO 303.5 121.5 40.03% 243.5 80.23% 0.0 0.00%ST. KEVIN'S & UPHAM'S CORNE Laborer 07/19/2015

TF ANDREW CARPET ONE FLO 288.5 288.5 100.00% 288.5 100.00% 0.0 0.00%ST. KEVIN'S & UPHAM'S CORNE Mason 07/19/2015

UNIVERSAL ABATEMENT SER 802.0 212.0 26.43% 802.0 100.00% 0.0 0.00%ST. KEVIN'S & UPHAM'S CORNE Asbestos Worker 05/31/2014

RICMOR CONSTRUCTION INC. 168.0 0.0 0.00% 40.0 23.81% 0.0 0.00%ST. KEVIN'S & UPHAM'S CORNE Laborer 01/20/2015

ENVIRONMENTAL SYS. ENG. 1,410.0 1,179.0 83.62% 1,410.0 100.00% 0.0 0.00%ST. KEVIN'S & UPHAM'S CORNE HVAC 04/19/2015

BARRY WELDING & IRON WOR 1,760.0 808.0 45.91% 1,672.0 95.00% 40.0 2.27%ST. KEVIN'S & UPHAM'S CORNE Welder 09/04/2015

BILT-RITE CONSTRUCTION 808.0 550.0 68.07% 550.0 68.07% 0.0 0.00%ST. KEVIN'S & UPHAM'S CORNE Laborer 08/08/2015

CHAPMAN WATERPROOFING 96.0 16.0 16.67% 0.0 0.00% 0.0 0.00%ST. KEVIN'S & UPHAM'S CORNE Laborer 07/20/2015

CHAPMAN WATERPROOFING 1,355.0 753.5 55.61% 610.0 45.02% 102.0 7.53%ST. KEVIN'S & UPHAM'S CORNE Waterproofer 09/21/2015

COMMONWEALTH FIRE PROT 3,601.5 1,377.0 38.23% 1,894.0 52.59% 517.0 14.36%ST. KEVIN'S & UPHAM'S CORNE Sprinkler Fitter 07/18/2015

MARGUERITE CONCRETE 235.5 0.0 0.00% 0.0 0.00% 0.0 0.00%ST. KEVIN'S & UPHAM'S CORNE Equipment Opera 08/01/2015

DEVON PLUMBING HEATING 10,192.0 6,472.0 63.50% 8,212.0 80.57% 0.0 0.00%ST. KEVIN'S & UPHAM'S CORNE Plumber 09/19/2015

K & J INTEGRATED SYSTEMS 57.5 0.0 0.00% 0.0 0.00% 0.0 0.00%ST. KEVIN'S & UPHAM'S CORNE Technician 04/11/2015

FEDERAL CONCRETE 2,564.0 336.0 13.10% 685.0 26.72% 0.0 0.00%ST. KEVIN'S & UPHAM'S CORNE Carpenter 08/01/2015

FEDERAL CONCRETE 48.0 16.0 33.33% 16.0 33.33% 0.0 0.00%ST. KEVIN'S & UPHAM'S CORNE Iron Worker 11/29/2014

FEDERAL CONCRETE 1,164.5 422.0 36.24% 527.0 45.26% 96.0 8.24%ST. KEVIN'S & UPHAM'S CORNE Laborer 08/01/2015

JDC DEMOLITION COMPANY, I 197.0 0.0 0.00% 0.0 0.00% 0.0 0.00%ST. KEVIN'S & UPHAM'S CORNE Equipment Opera 07/12/2014

DEVON PLUMBING HEATING 2,524.0 2,524.0 100.00% 2,524.0 100.00% 2,524.0 100.00%ST. KEVIN'S & UPHAM'S CORNE Laborer 08/15/2015

JDC DEMOLITION COMPANY, I 1,582.0 144.0 9.10% 360.0 22.76% 0.0 0.00%ST. KEVIN'S & UPHAM'S CORNE Laborer 07/19/2014

G. BROUILLETTE & SON INC. 1,661.0 264.0 15.89% 572.5 34.47% 46.5 2.80%ST. KEVIN'S & UPHAM'S CORNE Laborer 09/26/2015

J.R.VINAGRO CORP. 45.5 0.0 0.00% 0.0 0.00% 0.0 0.00%ST. KEVIN'S & UPHAM'S CORNE Laborer 05/10/2014

J.R.VINAGRO CORP. 73.0 0.0 0.00% 0.0 0.00% 0.0 0.00%ST. KEVIN'S & UPHAM'S CORNE Equipment Opera 05/10/2014

J.C. FLOOR COVERING INC. 3,445.5 1,132.0 32.85% 777.0 22.55% 0.0 0.00%ST. KEVIN'S & UPHAM'S CORNE Floor Layer 09/25/2015

J. DERENZO CO. 6,326.0 2,701.0 42.70% 2,189.0 34.60% 16.0 0.25%ST. KEVIN'S & UPHAM'S CORNE Equipment Opera 08/01/2015

INDEPENDENT WELDING INC. 503.0 224.0 44.53% 327.0 65.01% 0.0 0.00%ST. KEVIN'S & UPHAM'S CORNE Iron Worker 08/23/2014

HERITAGE HEATING & A/C 5,038.5 2,320.0 46.05% 0.0 0.00% 56.0 1.11%ST. KEVIN'S & UPHAM'S CORNE Sheetmetal Work 09/05/2015

HERITAGE HEATING & A/C 898.5 0.0 0.00% 0.0 0.00% 0.0 0.00%ST. KEVIN'S & UPHAM'S CORNE Insulator 06/19/2015

G. BROUILLETTE & SON INC. 679.0 0.0 0.00% 390.0 57.44% 0.0 0.00%ST. KEVIN'S & UPHAM'S CORNE Roofer 09/26/2015

J. DERENZO CO. 5,999.0 2,604.0 43.41% 1,562.0 26.04% 0.0 0.00%ST. KEVIN'S & UPHAM'S CORNE Laborer 08/08/2015

115,213.1 51,945.1 45.09% 57,654.1 50.04% 6,808.3 5.91%SUB TOTALS:

Page 231: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 231

Project Name Trade Latest Week

ST. MARY'S

$2,270,000Amount:

Gen Contractor: N E I CONTRACTORS

(781)348-5099 27 PACELLA PARK DRIVE RANDOLPH

Est Start Date:

Est End Date:

12/01/2014

05/30/2016

THYSSEN KRUPP ELEVATOR 256.0 0.0 0.00% 0.0 0.00% 0.0 0.00%ST. MARY'S Elevator Const(M 10/15/2015

N E I CONTRACTORS 40.0 0.0 0.00% 40.0 100.00% 0.0 0.00%ST. MARY'S Carpenter 09/05/2015

N E I CONTRACTORS 765.0 765.0 100.00% 765.0 100.00% 0.0 0.00%ST. MARY'S Laborer 10/10/2015

NEW YANKEE WALL SYSTEMS 1,330.0 0.0 0.00% 1,034.0 77.74% 0.0 0.00%ST. MARY'S Carpenter 07/25/2015

NEW YANKEE WALL SYSTEMS 75.0 75.0 100.00% 75.0 100.00% 0.0 0.00%ST. MARY'S Laborer 07/25/2015

SMS SERVICES, INC. 1,370.0 458.0 33.43% 1,370.0 100.00% 0.0 0.00%ST. MARY'S Laborer 05/02/2015

MONAHAN TECHNOLOGIES IN 966.5 406.5 42.06% 406.5 42.06% 0.0 0.00%ST. MARY'S Sheetmetal Work 10/02/2015

TERRATEC 1,678.0 762.0 45.41% 1,678.0 100.00% 0.0 0.00%ST. MARY'S Laborer 09/05/2015

TERRATEC 748.0 132.0 17.65% 748.0 100.00% 0.0 0.00%ST. MARY'S Mason 07/25/2015

TAVARES, LLC 676.0 0.0 0.00% 676.0 100.00% 0.0 0.00%ST. MARY'S Painter 10/10/2015

MONAHAN TECHNOLOGIES IN 686.0 0.0 0.00% 314.0 45.77% 0.0 0.00%ST. MARY'S Pipefitter 10/02/2015

DESIGN MECHANICAL INC. 1,730.5 766.0 44.26% 1,576.0 91.07% 0.0 0.00%ST. MARY'S Plumber 10/10/2015

G & O INC. 2,170.0 1,221.0 56.27% 1,903.0 87.70% 0.0 0.00%ST. MARY'S Electrician 10/10/2015

G. BROUILLETTE & SON INC. 323.5 60.5 18.70% 196.5 60.74% 0.0 0.00%ST. MARY'S Laborer 09/05/2015

G. BROUILLETTE & SON INC. 93.0 0.0 0.00% 0.0 0.00% 0.0 0.00%ST. MARY'S Roofer 09/05/2015

HANNAH ENVIRONMENTAL EN 94.0 0.0 0.00% 0.0 0.00% 0.0 0.00%ST. MARY'S Carpenter 08/08/2015

HANNAH ENVIRONMENTAL EN 259.0 57.0 22.01% 57.0 22.01% 0.0 0.00%ST. MARY'S Laborer 08/08/2015

KILLELEA PROPERTY SOLUT. 40.0 0.0 0.00% 0.0 0.00% 0.0 0.00%ST. MARY'S Carpenter 01/10/2014

MONAHAN TECHNOLOGIES IN 701.0 0.0 0.00% 701.0 100.00% 0.0 0.00%ST. MARY'S Laborer 09/25/2015

ACCOLADE ENVIRONMENTAL 1,365.0 293.0 21.47% 1,285.0 94.14% 520.0 38.10%ST. MARY'S Asbestos Worker 04/17/2015

15,366.5 4,996.0 32.51% 12,825.0 83.46% 520.0 3.38%SUB TOTALS:

ST. MARY'S CENTER

$20,000Amount:

Gen Contractor: R.T.P.ASSOCATE INC.

(781)551-8885 916 PLEASANT STREET UNIT 1 NORWOOD

Est Start Date:

Est End Date:

09/02/2015

09/16/2015

R.T.P.ASSOCATE INC. 124.0 0.0 0.00% 0.0 0.00% 0.0 0.00%ST. MARY'S CENTER Carpenter 09/16/2015

124.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SUB TOTALS:

START WIRELESS

$3,500Amount:

Gen Contractor:

Est Start Date:

Est End Date:

08/04/2014

08/08/2014

RAPHAGRAPHIC 6.0 6.0 100.00% 6.0 100.00% 0.0 0.00%START WIRELESS Laborer 08/08/2014

6.0 6.0 100.00% 6.0 100.00% 0.0 0.00%SUB TOTALS:

STREET FOOD REVOLUTION

$3,000Amount:

Gen Contractor: CAMBRIDGE REPROGRAPHIES

(617)623-2838 21 MCGRATH HGWY SOMERVILLE

Est Start Date:

Est End Date:

02/14/2016

02/20/2016

Page 232: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 232

Project Name Trade Latest Week

CRAIG MURPHY 4.0 0.0 0.00% 0.0 0.00% 0.0 0.00%STREET FOOD REVOLUTION Electrician 02/20/2016

CRAIG MURPHY 6.0 0.0 0.00% 0.0 0.00% 3.0 50.00%STREET FOOD REVOLUTION Laborer 02/20/2016

10.0 0.0 0.00% 0.0 0.00% 3.0 30.00%SUB TOTALS:

SUFFOLK UNIVERSITY / L.S.

$33,000,000Amount:

Gen Contractor: SUFFOLK CONSTRUCTION CO.

(617)445-3500 64 ALLERTON STREET roxbury

Est Start Date:

Est End Date:

06/16/1997

07/01/1999

ARCHER CORPORATION 160.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SUFFOLK UNIVERSITY / L.S. Carpenter 04/03/2015

160.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SUB TOTALS:

SULLY'S BARBER SHOP

$2,500Amount:

Gen Contractor:

Est Start Date:

Est End Date:

05/04/2015

05/08/2015

KEITH O'SULLIVAN 4.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SULLY'S BARBER SHOP Laborer 05/08/2015

4.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SUB TOTALS:

SUYA JOINT

$7,000Amount:

Gen Contractor: ALLEN & SONS

(617)594-0555 4 BROWNING AVE. #1 DORCHESTER

Est Start Date:

Est End Date:

10/04/2015

12/11/2015

ALLEN & SONS 80.0 80.0 100.00% 80.0 100.00% 0.0 0.00%SUYA JOINT Carpenter 12/11/2015

80.0 80.0 100.00% 80.0 100.00% 0.0 0.00%SUB TOTALS:

SWEENEY PLAYGROUND, DESIGN SE

$47,000Amount:

Gen Contractor: FLEMING BROS INC.

(781)843-4071 106 COLUMBIA STREET QUINCY

Est Start Date:

Est End Date:

10/01/2013

06/01/2014

FLEMING BROS INC. 176.0 24.0 13.64% 16.0 9.09% 0.0 0.00%SWEENEY PLAYGROUND, DESI Laborer 05/02/2014

FLEMING BROS INC. 152.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SWEENEY PLAYGROUND, DESI Equipment Opera 05/02/2014

328.0 24.0 7.32% 16.0 4.88% 0.0 0.00%SUB TOTALS:

SWEET RICE

$3,000Amount:

Gen Contractor: CAMBRIDGE REPROGRAPHIES

(617)623-2838 21 MCGRATH HGWY SOMERVILLE

Est Start Date:

Est End Date:

05/15/2016

06/04/2016

CAMBRIDGE REPROGRAPHIE 15.0 0.0 0.00% 5.0 33.33% 10.0 66.67%SWEET RICE Laborer 06/04/2016

CAMBRIDGE REPROGRAPHIE 6.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SWEET RICE Electrician 06/04/2016

21.0 0.0 0.00% 5.0 23.81% 10.0 47.62%SUB TOTALS:

SYNERGY REHAB

$2,500Amount:

Gen Contractor: EXCEL SIGNS & DECORATION CORP.

(617)479-8552 259 QUINCY AVE. QUINCY

Est Start Date:

Est End Date:

05/01/2014

06/30/2014

EXCEL SIGNS & DECORATION 15.0 0.0 0.00% 15.0 100.00% 5.0 33.33%SYNERGY REHAB Laborer 05/31/2014

15.0 0.0 0.00% 15.0 100.00% 5.0 33.33%SUB TOTALS:

TEA - DO

$12,500Amount:

Gen Contractor: EXCEL SIGNS & DECORATION CORP.

(617)479-8552 259 QUINCY AVE. QUINCY

Est Start Date:

Est End Date:

03/01/2014

05/31/2014

EXCEL SIGNS & DECORATION 63.0 0.0 0.00% 63.0 100.00% 21.0 33.33%TEA - DO Laborer 03/08/2014

Page 233: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 233

Project Name Trade Latest Week

63.0 0.0 0.00% 63.0 100.00% 21.0 33.33%SUB TOTALS:

THE DORSET HALL

$20,000Amount:

Gen Contractor: BROMFIELD DEVELOPMENT

(617)592-5953 33 WEST BROADWAY south boston

Est Start Date:

Est End Date:

12/14/2015

01/01/2016

BROMFIELD DEVELOPMENT 224.0 0.0 0.00% 0.0 0.00% 0.0 0.00%THE DORSET HALL Carpenter 01/01/2016

BROMFIELD DEVELOPMENT 112.0 0.0 0.00% 0.0 0.00% 0.0 0.00%THE DORSET HALL Laborer 01/01/2016

336.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SUB TOTALS:

THE FOOD PROJECT

$20,000Amount:

Gen Contractor: RELIABLE FENCE

1-800-321-9363 283 SALEM STREET wuburn

Est Start Date:

Est End Date:

09/18/2016

09/24/2016

RELIABLE FENCE 76.0 24.0 31.58% 36.0 47.37% 0.0 0.00%THE FOOD PROJECT Laborer 09/24/2016

76.0 24.0 31.58% 36.0 47.37% 0.0 0.00%SUB TOTALS:

THE MANEIKIS COMPANY

$10,000Amount:

Gen Contractor: BOSTON GLASS & BOARDING SERVICES

(617)298-5744 108 DORCHESTER AVENUE DORCHESTER

Est Start Date:

Est End Date:

04/13/2015

04/19/2015

BOSTON GLASS & BOARDING 8.0 4.0 50.00% 0.0 0.00% 0.0 0.00%THE MANEIKIS COMPANY Glazier 04/19/2015

8.0 4.0 50.00% 0.0 0.00% 0.0 0.00%SUB TOTALS:

THE POOPED POOCH

$3,500Amount:

Gen Contractor: HUNTER SIGNS

(617)360-9710 120 BUSINESS STREET HYDE PARK

Est Start Date:

Est End Date:

09/14/2014

09/20/2014

HUNTER SIGNS 2.0 2.0 100.00% 2.0 100.00% 0.0 0.00%THE POOPED POOCH Laborer 09/20/2014

2.0 2.0 100.00% 2.0 100.00% 0.0 0.00%SUB TOTALS:

THE PRIVATE OFFICE BARBERSHOP

$2,500Amount:

Gen Contractor: HUNTER SIGNS

(617)360-9710 120 BUSINESS STREET HYDE PARK

Est Start Date:

Est End Date:

02/29/2016

03/07/2016

HUNTER SIGNS 4.0 4.0 100.00% 4.0 100.00% 0.0 0.00%THE PRIVATE OFFICE BARBERS Laborer 03/07/2016

4.0 4.0 100.00% 4.0 100.00% 0.0 0.00%SUB TOTALS:

THE PUDDINGSTONE TAVERN

$3,000Amount:

Gen Contractor: JACK CLARKE PAINTING

(617)596-5979 22 CREST AVE. DEDHAM

Est Start Date:

Est End Date:

09/14/2015

09/18/2015

JACK CLARKE PAINTING 40.0 0.0 0.00% 0.0 0.00% 0.0 0.00%THE PUDDINGSTONE TAVERN Painter 09/18/2015

40.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SUB TOTALS:

THE STOCK YARD

$10,000Amount:

Gen Contractor: MARK GRUNDIG

(617)592-2130 28 BAYLEY STREET #303 PAWTUCKET

Est Start Date:

Est End Date:

06/23/2014

06/27/2014

MARK GRUNDIG 150.0 60.0 40.00% 0.0 0.00% 0.0 0.00%THE STOCK YARD Painter 06/27/2014

150.0 60.0 40.00% 0.0 0.00% 0.0 0.00%SUB TOTALS:

Page 234: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 234

Project Name Trade Latest Week

THE TRULL - WARE STREET

$317,995Amount:

Gen Contractor: CAPE CONTRACTOR'S

617/325-1212 18 CROWELL BOSTON DOWNTOWN

Est Start Date:

Est End Date:

07/01/2016

02/28/2017

FULL FORCE CONSTRUCTION, 116.0 116.0 100.00% 116.0 100.00% 0.0 0.00%THE TRULL - WARE STREET Painter 12/31/2016

DARDEN'S TREE COMPANY 24.0 18.0 75.00% 12.0 50.00% 0.0 0.00%THE TRULL - WARE STREET Laborer 07/13/2016

WHOLESALE CARPET 16.0 16.0 100.00% 16.0 100.00% 0.0 0.00%THE TRULL - WARE STREET Carpet Layer 03/04/2017

T & P CONTRACTING, INC. 248.0 176.0 70.97% 176.0 70.97% 0.0 0.00%THE TRULL - WARE STREET Laborer 08/12/2016

PLOW KING 7.0 7.0 100.00% 7.0 100.00% 0.0 0.00%THE TRULL - WARE STREET Equipment Opera 12/24/2016

NEW ENGLAND HARDWOOD F 152.0 0.0 0.00% 32.0 21.05% 0.0 0.00%THE TRULL - WARE STREET Floor Layer 02/25/2017

MASS WOODS 360.0 0.0 0.00% 360.0 100.00% 0.0 0.00%THE TRULL - WARE STREET Carpenter 11/04/2016

JJRG PLUMBING AND HEATIN 283.0 120.0 42.40% 283.0 100.00% 44.0 15.55%THE TRULL - WARE STREET Plumber 08/04/2017

CLIMATECH 325.0 261.0 80.31% 306.5 94.31% 0.0 0.00%THE TRULL - WARE STREET HVAC 02/25/2017

CAPE CONTRACTOR'S 240.0 176.0 73.33% 240.0 100.00% 0.0 0.00%THE TRULL - WARE STREET HVAC 11/04/2016

CAPE CONTRACTOR'S 390.0 0.0 0.00% 390.0 100.00% 0.0 0.00%THE TRULL - WARE STREET Carpenter 09/02/2016

CANKO-CONTRACTING COMP 227.0 227.0 100.00% 227.0 100.00% 0.0 0.00%THE TRULL - WARE STREET Carpenter 03/04/2017

ATLANTIC EXCAVATION & UTIL 84.0 84.0 100.00% 84.0 100.00% 0.0 0.00%THE TRULL - WARE STREET Laborer 08/12/2016

ATLANTIC EXCAVATION & UTIL 84.0 84.0 100.00% 0.0 0.00% 0.0 0.00%THE TRULL - WARE STREET Equipment Opera 08/12/2016

ALWAYS ELECTRIC 172.0 152.0 88.37% 172.0 100.00% 0.0 0.00%THE TRULL - WARE STREET Electrician 03/04/2017

HIEP TILE 80.0 80.0 100.00% 80.0 100.00% 0.0 0.00%THE TRULL - WARE STREET Terrazzo Worker 01/07/2017

2,808.0 1,517.0 54.02% 2,501.5 89.08% 44.0 1.57%SUB TOTALS:

THE WINSOR SCHOOL

$70,000,000Amount:

Gen Contractor: LEE KENNEDY

825-6930 1792 DORCHESTER AVE BOSTON

Est Start Date:

Est End Date:

06/01/2013

08/01/2015

PIZZOTTI BROTHERS, INC. 1,724.0 552.0 32.02% 464.0 26.91% 0.0 0.00%THE WINSOR SCHOOL Laborer 09/15/2015

SULLIVAN & MCLAUGHLIN CO. 1,506.0 788.0 52.32% 380.0 25.23% 0.0 0.00%THE WINSOR SCHOOL Electrician 04/17/2016

SULLIVAN & MCLAUGHLIN CO. 280.0 0.0 0.00% 0.0 0.00% 0.0 0.00%THE WINSOR SCHOOL Carpenter 11/08/2015

STATE ELECTRIC CO. 1,290.0 392.0 30.39% 111.0 8.60% 281.0 21.78%THE WINSOR SCHOOL Electrician 04/12/2015

SPECIALTY SERVICES OF NE 58.0 1.0 1.72% 25.0 43.10% 0.0 0.00%THE WINSOR SCHOOL Carpenter 01/30/2015

SPECIALTY INSULATION GRO 364.0 0.0 0.00% 0.0 0.00% 0.0 0.00%THE WINSOR SCHOOL Carpenter 11/01/2015

SOEP PAINTING CORP. 5,565.0 461.0 8.28% 453.0 8.14% 421.0 7.57%THE WINSOR SCHOOL Carpenter 01/10/2016

SALEM GLASS CO. 3,420.0 1,556.0 45.50% 1,556.0 45.50% 0.0 0.00%THE WINSOR SCHOOL Iron Worker 03/28/2015

SALEM GLASS CO. 12,894.0 4,413.5 34.23% 3,151.0 24.44% 1,546.0 11.99%THE WINSOR SCHOOL Glazier 11/21/2015

SUNRISE ERECTORS INC. 11,235.0 4,549.5 40.49% 3,278.0 29.18% 774.5 6.89%THE WINSOR SCHOOL Carpenter 11/01/2015

PIZZOTTI BROTHERS, INC. 4,367.5 1,377.5 31.54% 903.5 20.69% 0.0 0.00%THE WINSOR SCHOOL Mason Tender 12/30/2014

THE WATERPROOFING COMP 3,283.5 1,301.0 39.62% 871.0 26.53% 135.0 4.11%THE WINSOR SCHOOL Bricklayer 11/21/2015

PIZZOTTI BROTHERS, INC. 8,918.0 3,525.0 39.53% 3,505.0 39.30% 367.0 4.12%THE WINSOR SCHOOL Bricklayer 09/15/2015

Page 235: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 235

Project Name Trade Latest Week

N.B. KENNEY CO. INC., 18,172.5 1,991.0 10.96% 1,435.0 7.90% 1,916.0 10.54%THE WINSOR SCHOOL Pipefitter 05/06/2016

MCDONALD ELECTRICAL COR 40,686.5 13,238.0 32.54% 8,793.5 21.61% 3,001.0 7.38%THE WINSOR SCHOOL Electrician 01/24/2016

SALEM GLASS CO. 1,601.5 14.5 0.91% 0.0 0.00% 0.0 0.00%THE WINSOR SCHOOL Carpenter 08/22/2015

UNIVERSAL STEEL ERECTORS 700.0 0.0 0.00% 0.0 0.00% 0.0 0.00%THE WINSOR SCHOOL Equipment Opera 08/24/2014

MCCUSKER-GILL INC. 11,888.0 3,529.5 29.69% 1,579.0 13.28% 212.0 1.78%THE WINSOR SCHOOL Sheetmetal Work 01/03/2016

XQUISITE LANDSCAPING 491.0 0.0 0.00% 0.0 0.00% 0.0 0.00%THE WINSOR SCHOOL Mason 12/06/2015

XQUISITE LANDSCAPING 1,339.0 76.0 5.68% 241.0 18.00% 41.0 3.06%THE WINSOR SCHOOL Laborer 12/06/2015

WATCH CITY DOOR SPECIALIS 1,708.0 754.0 44.15% 754.0 44.15% 612.0 35.83%THE WINSOR SCHOOL Carpenter 04/18/2015

W. L. FRENCH EXCAVATING 6,310.0 1,013.5 16.06% 1,465.5 23.23% 555.5 8.80%THE WINSOR SCHOOL Laborer 11/28/2015

T. J. MCCARTNEY, INC. 7,630.5 1,070.0 14.02% 3,014.0 39.50% 2,083.0 27.30%THE WINSOR SCHOOL Taper 09/25/2015

UNIVERSAL STEEL ERECTORS 9,807.0 2,779.0 28.34% 2,931.5 29.89% 469.0 4.78%THE WINSOR SCHOOL Iron Worker 09/07/2014

T. J. MCCARTNEY, INC. 31,180.0 12,400.0 39.77% 15,944.5 51.14% 2,794.5 8.96%THE WINSOR SCHOOL Carpenter 09/25/2015

UNITED INSULATION SPECIAL 1,864.0 0.0 0.00% 0.0 0.00% 0.0 0.00%THE WINSOR SCHOOL Insulator 03/27/2015

UNION STEEL ERECTORS COR 9,067.0 3,075.5 33.92% 2,452.5 27.05% 406.0 4.48%THE WINSOR SCHOOL Iron Worker 12/26/2015

THE WATERPROOFING COMP 469.5 0.0 0.00% 469.5 100.00% 0.0 0.00%THE WINSOR SCHOOL Laborer 09/19/2015

UNIVERSAL STEEL ERECTORS 553.5 0.0 0.00% 0.0 0.00% 157.0 28.36%THE WINSOR SCHOOL Oiler 03/23/2014

THE PAPPAS COMPANY, INC 669.0 202.0 30.19% 194.0 29.00% 139.0 20.78%THE WINSOR SCHOOL Carpenter 03/15/2015

T. J. MCCARTNEY, INC. 6,127.5 4,491.5 73.30% 2,274.5 37.12% 0.0 0.00%THE WINSOR SCHOOL Laborer 09/25/2015

VER-TEX CONSTRUCTION SPE 1,131.0 472.0 41.73% 329.0 29.09% 0.0 0.00%THE WINSOR SCHOOL Carpenter 11/21/2015

ATLANTIC CONTRACTING &SP 3,735.0 556.0 14.89% 954.5 25.56% 612.0 16.39%THE WINSOR SCHOOL Insulator 02/14/2016

G & C CONCRETE CO. 109.0 0.0 0.00% 40.5 37.16% 0.0 0.00%THE WINSOR SCHOOL Cement Laborer 11/21/2015

G & C CONCRETE CO. 6,405.5 1,311.0 20.47% 941.0 14.69% 224.0 3.50%THE WINSOR SCHOOL Carpenter 11/28/2015

DIVERSIFIED CONSTRUCTION 1,444.0 16.0 1.11% 1,388.0 96.12% 264.0 18.28%THE WINSOR SCHOOL Laborer 06/20/2015

DEPAOLI MOSAIC COMPANY 478.0 0.0 0.00% 8.0 1.67% 0.0 0.00%THE WINSOR SCHOOL Terrazzo Worker 02/18/2015

COLLINS OVERHEAD DOORS 26.0 0.0 0.00% 0.0 0.00% 0.0 0.00%THE WINSOR SCHOOL Iron Worker 04/11/2015

G & C CONCRETE CO. 469.0 0.0 0.00% 0.0 0.00% 0.0 0.00%THE WINSOR SCHOOL Equipment Opera 08/15/2015

ALLAN CONSTRUCTION INC. 3,575.0 1,145.5 32.04% 787.0 22.01% 0.0 0.00%THE WINSOR SCHOOL Carpenter 11/13/2015

G & C CONCRETE CO. 2,073.5 114.0 5.50% 460.5 22.21% 0.0 0.00%THE WINSOR SCHOOL Cement Finisher 11/21/2015

W. L. FRENCH EXCAVATING 4,300.5 8.0 0.19% 0.0 0.00% 1,076.0 25.02%THE WINSOR SCHOOL Equipment Opera 11/28/2015

AMERICAN PLUMBING HEATIN 9,490.0 3,521.0 37.10% 3,110.0 32.77% 294.0 3.10%THE WINSOR SCHOOL Plumber 11/27/2015

ALLIED PILE DRIVING INC. 130.0 27.5 21.15% 16.0 12.31% 0.0 0.00%THE WINSOR SCHOOL Piledriver 03/01/2014

ALLIED PILE DRIVING INC. 11.5 0.0 0.00% 0.0 0.00% 0.0 0.00%THE WINSOR SCHOOL Equipment Opera 03/01/2014

ALLEGHENY CONTRACT FLOO 1,834.0 721.0 39.31% 249.0 13.58% 48.0 2.62%THE WINSOR SCHOOL Floor Layer 11/13/2015

MANGANARO CORPORATION 902.0 326.0 36.14% 136.0 15.08% 136.0 15.08%THE WINSOR SCHOOL Carpenter 04/05/2015

Page 236: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 236

Project Name Trade Latest Week

CIRCLE FLOORS INC. 2,889.0 375.0 12.98% 1,924.0 66.60% 36.0 1.25%THE WINSOR SCHOOL Floor Layer 12/06/2015

KONE ELEVATOR INC. 318.0 104.0 32.70% 104.0 32.70% 0.0 0.00%THE WINSOR SCHOOL Elev Const Helper 09/16/2015

MAJOR THEATRE EQUIPMENT 865.0 705.0 81.50% 0.0 0.00% 144.0 16.65%THE WINSOR SCHOOL Stage Hand 04/03/2015

LYN HOVEY STUDIO INC 317.0 246.0 77.60% 246.0 77.60% 7.0 2.21%THE WINSOR SCHOOL Glazier 09/09/2015

LEE KENNEDY 32.0 0.0 0.00% 0.0 0.00% 0.0 0.00%THE WINSOR SCHOOL Mason 11/03/2015

LEE KENNEDY 19,456.0 7,483.0 38.46% 6,187.0 31.80% 999.0 5.13%THE WINSOR SCHOOL Laborer 05/03/2016

E. M. DUGGAN INC. 9,215.0 1,822.0 19.77% 1,952.5 21.19% 16.0 0.17%THE WINSOR SCHOOL Sprinkler Fitter 01/17/2016

KONE ELEVATOR INC. 1,655.0 5.0 0.30% 0.0 0.00% 79.0 4.77%THE WINSOR SCHOOL Elevator Const(M 11/25/2015

G & C CONCRETE CO. 2,152.0 378.0 17.57% 222.5 10.34% 0.0 0.00%THE WINSOR SCHOOL Iron Worker 11/07/2015

KENVO FLOORS 2,085.0 161.0 7.72% 1,073.0 51.46% 0.0 0.00%THE WINSOR SCHOOL Floor Layer 04/18/2015

KENVO FLOORS 656.0 88.0 13.41% 254.0 38.72% 72.0 10.98%THE WINSOR SCHOOL Carpenter 02/28/2015

H. CARR & SONS INC. 309.0 0.0 0.00% 0.0 0.00% 0.0 0.00%THE WINSOR SCHOOL Taper 02/13/2015

H. CARR & SONS INC. 810.5 0.0 0.00% 0.0 0.00% 0.0 0.00%THE WINSOR SCHOOL Plasterer 08/15/2014

H. CARR & SONS INC. 1,376.5 917.0 66.62% 431.5 31.35% 0.0 0.00%THE WINSOR SCHOOL Laborer 12/05/2014

GILBERT & BECKER CO. 9,746.0 4,430.0 45.45% 3,032.0 31.11% 0.0 0.00%THE WINSOR SCHOOL Roofer 10/11/2015

GALWAY DEVELOPMENT COR 9,612.0 3,160.0 32.88% 1,276.0 13.28% 864.0 8.99%THE WINSOR SCHOOL Carpenter 12/15/2015

G & C CONCRETE CO. 4,728.0 1,003.5 21.22% 3,256.5 68.88% 0.0 0.00%THE WINSOR SCHOOL Laborer 11/28/2015

LEE KENNEDY 9,768.5 4,555.0 46.63% 1,249.0 12.79% 1,249.0 12.79%THE WINSOR SCHOOL Carpenter 05/03/2016

317,274.0 97,201.5 30.64% 85,873.5 27.07% 22,030.5 6.94%SUB TOTALS:

THETFORD DYER NHI

$3,449,605Amount:

Gen Contractor:

Est Start Date:

Est End Date:

06/27/2016

11/30/2016

MAIGHEO CONSTRUCTION (G 1,040.0 712.0 68.46% 408.0 39.23% 0.0 0.00%THETFORD DYER NHI Carpenter 07/15/2017

DMC CONTRACTORS 800.0 800.0 100.00% 800.0 100.00% 452.0 56.50%THETFORD DYER NHI Painter 07/01/2017

T & P CONTRACTING, INC. 320.0 320.0 100.00% 320.0 100.00% 0.0 0.00%THETFORD DYER NHI Cement Laborer 11/12/2016

T & P CONTRACTING, INC. 376.0 96.0 25.53% 200.0 53.19% 0.0 0.00%THETFORD DYER NHI Cement Finisher 11/12/2016

SORASOKHOM CHHIM. 432.0 432.0 100.00% 432.0 100.00% 0.0 0.00%THETFORD DYER NHI Electrician 06/24/2017

NEVIN EXCAVATION 160.0 0.0 0.00% 80.0 50.00% 0.0 0.00%THETFORD DYER NHI Equipment Opera 10/01/2016

MARTIN MCMANUS PLUMBING 2,370.0 1,140.0 48.10% 484.0 20.42% 0.0 0.00%THETFORD DYER NHI Plumber 07/15/2017

BOSTONIAN EXCAVATION 580.0 450.0 77.59% 0.0 0.00% 0.0 0.00%THETFORD DYER NHI Equipment Opera 07/29/2017

DRUMHIRK COMPANY 7,588.5 3,969.5 52.31% 2,921.5 38.50% 392.0 5.17%THETFORD DYER NHI Carpenter 06/03/2017

JOE HESTER HEATING AIR 2,515.0 1,053.5 41.89% 2,431.0 96.66% 0.0 0.00%THETFORD DYER NHI HVAC 07/15/2017

D+W ELECTRICAL 1,992.0 724.0 36.35% 1,992.0 100.00% 0.0 0.00%THETFORD DYER NHI Electrician 07/01/2017

BOSTONIAN EXCAVATION 356.0 356.0 100.00% 356.0 100.00% 0.0 0.00%THETFORD DYER NHI Laborer 11/19/2016

KISMET VENTURES LLC (QUIN 920.0 616.0 66.96% 920.0 100.00% 0.0 0.00%THETFORD DYER NHI Floor Layer 07/08/2017

Page 237: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 237

Project Name Trade Latest Week

19,449.5 10,669.0 54.85% 11,344.5 58.33% 844.0 4.34%SUB TOTALS:

THIRST

$8,000Amount:

Gen Contractor: SHEPERD CONSTRUCTION

(617)763-9817 202 GOVERNORS ROAD QUINCY

Est Start Date:

Est End Date:

11/01/2015

11/19/2015

SHEPERD CONSTRUCTION 21.0 21.0 100.00% 0.0 0.00% 0.0 0.00%THIRST Laborer 11/19/2015

SHEPERD CONSTRUCTION 21.0 0.0 0.00% 0.0 0.00% 0.0 0.00%THIRST Carpenter 11/19/2015

42.0 21.0 50.00% 0.0 0.00% 0.0 0.00%SUB TOTALS:

TONY'S MARKET

$25,000Amount:

Gen Contractor: TRI CONSTRUCTION CO, INC.

(617)288-1255 320 ADAMS STREET dorchester

Est Start Date:

Est End Date:

05/16/2016

05/20/2016

TRI CONSTRUCTION CO, INC. 40.0 0.0 0.00% 32.0 80.00% 0.0 0.00%TONY'S MARKET Laborer 07/06/2016

BOSTON GLASS & BOARDING 30.0 6.0 20.00% 0.0 0.00% 0.0 0.00%TONY'S MARKET Laborer 05/20/2016

TRI CONSTRUCTION CO, INC. 32.0 0.0 0.00% 0.0 0.00% 0.0 0.00%TONY'S MARKET Carpenter 07/06/2016

102.0 6.0 5.88% 32.0 31.37% 0.0 0.00%SUB TOTALS:

TOTTO RAMEN

$2,500Amount:

Gen Contractor:

Est Start Date:

Est End Date:

03/01/2014

04/28/2014

SAM HUYAH 13.5 0.0 0.00% 4.0 29.63% 0.0 0.00%TOTTO RAMEN Laborer 03/09/2014

13.5 0.0 0.00% 4.0 29.63% 0.0 0.00%SUB TOTALS:

TRANSFORMATIONS

$2,500Amount:

Gen Contractor: HUNTER SIGNS

(617)360-9710 120 BUSINESS STREET HYDE PARK

Est Start Date:

Est End Date:

01/31/2016

03/07/2016

HUNTER SIGNS 4.0 4.0 100.00% 4.0 100.00% 0.0 0.00%TRANSFORMATIONS Laborer 03/07/2016

4.0 4.0 100.00% 4.0 100.00% 0.0 0.00%SUB TOTALS:

TWELVE HOUR RESTAURANT

$3,000Amount:

Gen Contractor: HUNTER SIGNS

(617)360-9710 120 BUSINESS STREET HYDE PARK

Est Start Date:

Est End Date:

12/13/2015

12/17/2015

HUNTER SIGNS 6.0 6.0 100.00% 6.0 100.00% 0.0 0.00%TWELVE HOUR RESTAURANT Laborer 12/19/2015

6.0 6.0 100.00% 6.0 100.00% 0.0 0.00%SUB TOTALS:

UNION CHIROPRACIC CLINIC

Amount:

Gen Contractor: EXCEL SIGNS & DECORATION CORP.

(617)479-8552 259 QUINCY AVE. QUINCY

Est Start Date:

Est End Date:

07/10/2016

07/16/2016

EXCEL SIGNS & DECORATION 9.0 0.0 0.00% 9.0 100.00% 3.0 33.33%UNION CHIROPRACIC CLINIC Laborer 07/16/2016

9.0 0.0 0.00% 9.0 100.00% 3.0 33.33%SUB TOTALS:

UNITED SOUTH END SETTLEMENTS

$20,000Amount:

Gen Contractor:

Est Start Date:

Est End Date:

07/11/2016

08/12/2016

BOSTON INTERCOM GROUP 128.0 64.0 50.00% 64.0 50.00% 0.0 0.00%UNITED SOUTH END SETTLEME Electrician 08/12/2016

Page 238: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 238

Project Name Trade Latest Week

128.0 64.0 50.00% 64.0 50.00% 0.0 0.00%SUB TOTALS:

UNLIMITED REALTY SOLUTIONS

$2,000Amount:

Gen Contractor: HUNTER SIGNS

(617)360-9710 120 BUSINESS STREET HYDE PARK

Est Start Date:

Est End Date:

02/12/2017

02/18/2017

HUNTER SIGNS 2.0 2.0 100.00% 2.0 100.00% 0.0 0.00%UNLIMITED REALTY SOLUTIONS Laborer 02/18/2017

2.0 2.0 100.00% 2.0 100.00% 0.0 0.00%SUB TOTALS:

UPSCALE UNISEX SALON

$2,500Amount:

Gen Contractor: HUNTER SIGNS

(617)360-9710 120 BUSINESS STREET HYDE PARK

Est Start Date:

Est End Date:

04/13/2015

04/17/2015

HUNTER SIGNS 6.0 6.0 100.00% 6.0 100.00% 0.0 0.00%UPSCALE UNISEX SALON Laborer 04/17/2015

6.0 6.0 100.00% 6.0 100.00% 0.0 0.00%SUB TOTALS:

URBAN LEAGUE

$20,000Amount:

Gen Contractor: SPECIAL AGENT SYSTEMS, INC.

(617)924-2100 67 PLEASANT STREET WATERTOWN

Est Start Date:

Est End Date:

06/19/2016

07/02/2016

PROP MANAGEMENT & CONT 50.0 25.0 50.00% 50.0 100.00% 0.0 0.00%URBAN LEAGUE Carpet Layer 07/02/2016

SPECIAL AGENT SYSTEMS, IN 16.0 0.0 0.00% 0.0 0.00% 0.0 0.00%URBAN LEAGUE Telephone/Data I 06/24/2016

FOUR SEASONS 186.0 186.0 100.00% 82.0 44.09% 0.0 0.00%URBAN LEAGUE Laborer 07/31/2015

252.0 211.0 83.73% 132.0 52.38% 0.0 0.00%SUB TOTALS:

URBANITY DANCE

$2,000Amount:

Gen Contractor: BOSTON SIGN CO. INC.

(617)338-2114 40 PLYMPTON STREET BOSTON

Est Start Date:

Est End Date:

06/22/2015

06/24/2015

BOSTON SIGN CO. INC. 4.0 2.0 50.00% 0.0 0.00% 0.0 0.00%URBANITY DANCE Laborer 06/26/2015

4.0 2.0 50.00% 0.0 0.00% 0.0 0.00%SUB TOTALS:

VALENTE INSURANCE

$2,500Amount:

Gen Contractor: CAMBRIDGE REPROGRAPHIES

(617)623-2838 21 MCGRATH HGWY SOMERVILLE

Est Start Date:

Est End Date:

03/29/2015

04/04/2015

CAMBRIDGE REPROGRAPHIE 6.0 0.0 0.00% 3.0 50.00% 0.0 0.00%VALENTE INSURANCE Laborer 04/04/2015

6.0 0.0 0.00% 3.0 50.00% 0.0 0.00%SUB TOTALS:

VALHALLA

$34,000Amount:

Gen Contractor: E.R. LEWIN, INC.

(508)384-0363 10 INDUSTRIAL RD. 25 CUSHING DRIVE WALPOLE

Est Start Date:

Est End Date:

08/01/2012

09/30/2013

DONALD P. ROBERTO CONST. 1,272.0 392.0 30.82% 218.0 17.14% 0.0 0.00%VALHALLA Sprinkler Fitter 03/12/2017

1,272.0 392.0 30.82% 218.0 17.14% 0.0 0.00%SUB TOTALS:

VERY BERRY FROZEN YOGURT

$2,500Amount:

Gen Contractor: ARDON VINYL GRAPHICS & SIGNAGE

(617)782-7366 61 NORTH BEACON STREET ALLSTON

Est Start Date:

Est End Date:

09/08/2014

09/12/2014

ARDON VINYL GRAPHICS & SI 14.0 0.0 0.00% 0.0 0.00% 0.0 0.00%VERY BERRY FROZEN YOGURT Laborer 09/12/2014

14.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SUB TOTALS:

Page 239: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 239

Project Name Trade Latest Week

VIBRANT SALON

$2,000Amount:

Gen Contractor: HUNTER SIGNS

(617)360-9710 120 BUSINESS STREET HYDE PARK

Est Start Date:

Est End Date:

10/04/2015

10/19/2015

HUNTER SIGNS 4.0 4.0 100.00% 4.0 100.00% 0.0 0.00%VIBRANT SALON Laborer 10/10/2015

4.0 4.0 100.00% 4.0 100.00% 0.0 0.00%SUB TOTALS:

VICTORIA'S DINER

$20,000Amount:

Gen Contractor: C & D SIGNS, INC. DBA METRO SIGN & AWNIN

(978)851-2424 170 LORUM STREET TEWKSBURY

Est Start Date:

Est End Date:

11/01/2013

04/30/2014

C & D SIGNS, INC. DBA METRO 28.4 0.0 0.00% 0.0 0.00% 0.0 0.00%VICTORIA'S DINER Laborer 11/30/2013

28.4 0.0 0.00% 0.0 0.00% 0.0 0.00%SUB TOTALS:

VICTORY PROGRAMS INC / 70 BROOK

$1,667,494Amount:

Gen Contractor:

Est Start Date:

Est End Date:

09/30/2016

03/08/2017

HARBORSIDE REMODELING 632.0 0.0 0.00% 0.0 0.00% 0.0 0.00%VICTORY PROGRAMS INC / 70 B Carpenter 01/14/2017

HARBORSIDE REMODELING 364.0 364.0 100.00% 364.0 100.00% 0.0 0.00%VICTORY PROGRAMS INC / 70 B Laborer 01/14/2017

MJM CONSTRUCTION 36.0 0.0 0.00% 0.0 0.00% 0.0 0.00%VICTORY PROGRAMS INC / 70 B Equipment Opera 10/29/2016

MJM CONSTRUCTION 40.0 0.0 0.00% 0.0 0.00% 0.0 0.00%VICTORY PROGRAMS INC / 70 B Laborer 10/29/2016

P.J. SPILLANE COMPANY 41.5 0.0 0.00% 0.0 0.00% 0.0 0.00%VICTORY PROGRAMS INC / 70 B Waterproofer 03/25/2017

V.FRANCIS MECHANICAL INC. 634.0 518.0 81.70% 634.0 100.00% 0.0 0.00%VICTORY PROGRAMS INC / 70 B Pipefitter 04/29/2017

GENERAL CONTRACTING SER 920.0 520.0 56.52% 880.0 95.65% 40.0 4.35%VICTORY PROGRAMS INC / 70 B Laborer 12/03/2016

V.FRANCIS MECHANICAL INC. 312.0 312.0 100.00% 312.0 100.00% 312.0 100.00%VICTORY PROGRAMS INC / 70 B Laborer 05/06/2017

CEDRO CONTRACTORS 288.0 0.0 0.00% 288.0 100.00% 0.0 0.00%VICTORY PROGRAMS INC / 70 B Painter 04/15/2017

G & G PLASTERING 400.0 200.0 50.00% 0.0 0.00% 200.0 50.00%VICTORY PROGRAMS INC / 70 B Plasterer 02/25/2017

G & G PLASTERING 104.0 0.0 0.00% 104.0 100.00% 0.0 0.00%VICTORY PROGRAMS INC / 70 B Laborer 02/11/2017

G & G PLASTERING 200.0 0.0 0.00% 200.0 100.00% 0.0 0.00%VICTORY PROGRAMS INC / 70 B Carpenter 02/11/2017

ESSEX BUILDERS CORP. 50.0 0.0 0.00% 0.0 0.00% 0.0 0.00%VICTORY PROGRAMS INC / 70 B Cement Laborer 12/03/2016

DEVON PLUMBING HEATING 1,464.0 1,104.0 75.41% 1,464.0 100.00% 0.0 0.00%VICTORY PROGRAMS INC / 70 B Plumber 04/15/2017

CEDRO CONTRACTORS 116.0 58.0 50.00% 116.0 100.00% 0.0 0.00%VICTORY PROGRAMS INC / 70 B Carpenter 03/04/2017

G & O INC. 2,181.0 786.0 36.04% 1,218.0 55.85% 0.0 0.00%VICTORY PROGRAMS INC / 70 B Electrician 04/29/2017

7,782.5 3,862.0 49.62% 5,580.0 71.70% 552.0 7.09%SUB TOTALS:

VIET - AID COMMUNITY CTR.

$20,000Amount:

Gen Contractor: ABEL FLOOR COVERING

(617)288-0103 410 NEPONSET AVENUE DORCHESTER

Est Start Date:

Est End Date:

03/01/2014

06/01/2014

ABEL FLOOR COVERING 128.0 64.0 50.00% 96.0 75.00% 0.0 0.00%VIET - AID COMMUNITY CTR. Floor Layer 04/19/2014

128.0 64.0 50.00% 96.0 75.00% 0.0 0.00%SUB TOTALS:

VIET AID

$20,000Amount:

Gen Contractor: ALPHA BUILDING CONSTRUCTION AND DEVELOP.

(617)314-9812 272 WASHINGTON STREET DORCHESTER

Est Start Date:

Est End Date:

07/06/2015

08/08/2015

Page 240: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 240

Project Name Trade Latest Week

ALPHA BUILDING CONSTRUCT 26.0 26.0 100.00% 26.0 100.00% 0.0 0.00%VIET AID Carpenter 07/19/2015

ALPHA BUILDING CONSTRUCT 51.5 51.5 100.00% 51.5 100.00% 0.0 0.00%VIET AID Floor Layer 08/08/2015

ALPHA BUILDING CONSTRUCT 51.0 51.0 100.00% 51.0 100.00% 12.5 24.51%VIET AID Laborer 08/08/2015

ABEL FLOOR COVERING 48.0 32.0 66.67% 32.0 66.67% 0.0 0.00%VIET AID Floor Layer 07/16/2016

176.5 160.5 90.93% 160.5 90.93% 12.5 7.08%SUB TOTALS:

VILLA MEXICO

$10,000Amount:

Gen Contractor: NORTH HILL DEV. INC

(978)551-5519 8 WINDING WAY westford

Est Start Date:

Est End Date:

10/12/2015

12/11/2015

NORTH HILL DEV. INC 120.0 0.0 0.00% 0.0 0.00% 0.0 0.00%VILLA MEXICO Carpenter 10/16/2015

THE SIGN CENTER INC. 8.0 0.0 0.00% 8.0 100.00% 0.0 0.00%VILLA MEXICO Laborer 12/11/2015

128.0 0.0 0.00% 8.0 6.25% 0.0 0.00%SUB TOTALS:

VINE & BARLEY

$6,000Amount:

Gen Contractor: LOGAN GLASS

(617)567-7859 340 CHELSEA STREET EAST BOSTON

Est Start Date:

Est End Date:

10/17/2015

12/19/2015

FAST SIGNS 12.6 0.0 0.00% 0.0 0.00% 0.0 0.00%VINE & BARLEY Laborer 10/19/2015

LOGAN GLASS 32.0 32.0 100.00% 0.0 0.00% 0.0 0.00%VINE & BARLEY Glazier 10/23/2015

ST. GERMAIN ELECTRI 13.0 13.0 100.00% 0.0 0.00% 0.0 0.00%VINE & BARLEY Electrician 12/19/2015

57.6 45.0 78.13% 0.0 0.00% 0.0 0.00%SUB TOTALS:

WALKER PARK APARTMENTS

$11,000,000Amount:

Gen Contractor: N E I CONTRACTORS

(781)348-5099 27 PACELLA PARK DRIVE RANDOLPH

Est Start Date:

Est End Date:

07/03/2017

09/03/2018

PHANEUF ASSOCIATES, INC. 176.0 0.0 0.00% 0.0 0.00% 0.0 0.00%WALKER PARK APARTMENTS Equipment Opera 09/09/2017

PHANEUF ASSOCIATES, INC. 219.0 8.0 3.65% 8.0 3.65% 8.0 3.65%WALKER PARK APARTMENTS Laborer 09/09/2017

395.0 8.0 2.03% 8.0 2.03% 8.0 2.03%SUB TOTALS:

WALNUT AVENUE APARTMENTS

$2,015,000Amount:

Gen Contractor: JOHN B. CRUZ CONSTRUCTION

(617)445-6901 ONE JOHN ELLIOT SQUARE ROXBURY

Est Start Date:

Est End Date:

08/01/2014

05/31/2015

S. BARBARZOLA CONCRETE C 307.0 0.0 0.00% 307.0 100.00% 136.0 44.30%WALNUT AVENUE APARTMENTS Cement Laborer 07/28/2015

MEYOTTE CONTRACTING 3,060.0 2,477.0 80.95% 3,060.0 100.00% 0.0 0.00%WALNUT AVENUE APARTMENTS Mason Tender 01/22/2016

XCEL FIRE PROTECTION, 776.0 398.0 51.29% 742.0 95.62% 0.0 0.00%WALNUT AVENUE APARTMENTS Sprinkler Fitter 07/28/2015

N6 ENERGY INC. 255.4 148.7 58.23% 148.7 58.23% 0.0 0.00%WALNUT AVENUE APARTMENTS Insulator 12/13/2015

J.C. FLOOR COVERING INC. 1,213.0 158.0 13.03% 238.0 19.62% 158.0 13.03%WALNUT AVENUE APARTMENTS Floor Layer 02/19/2016

NG ENVIRONMENTAL CO. 3,736.0 957.0 25.62% 3,736.0 100.00% 222.0 5.94%WALNUT AVENUE APARTMENTS Asbestos Worker 06/27/2015

RESTORATION PRESERVATIO 249.0 75.0 30.12% 0.0 0.00% 0.0 0.00%WALNUT AVENUE APARTMENTS Plumber 12/05/2015

S. BARBARZOLA CONCRETE C 60.0 36.0 60.00% 16.0 26.67% 0.0 0.00%WALNUT AVENUE APARTMENTS Cement Finisher 07/28/2015

TCT ROOFING CONTRACTORS 418.5 0.0 0.00% 418.5 100.00% 0.0 0.00%WALNUT AVENUE APARTMENTS Roofer 12/25/2015

V.FRANCIS MECHANICAL INC. 1,588.0 600.0 37.78% 1,588.0 100.00% 304.0 19.14%WALNUT AVENUE APARTMENTS Laborer 02/20/2016

Page 241: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 241

Project Name Trade Latest Week

V.FRANCIS MECHANICAL INC. 2,918.0 1,800.0 61.69% 2,918.0 100.00% 0.0 0.00%WALNUT AVENUE APARTMENTS Pipefitter 03/19/2016

MEYOTTE CONTRACTING 857.0 857.0 100.00% 857.0 100.00% 0.0 0.00%WALNUT AVENUE APARTMENTS Mason 01/08/2016

RISE & SHINE CLEANING & CO 404.9 278.4 68.76% 400.9 99.01% 386.9 95.55%WALNUT AVENUE APARTMENTS Laborer 04/30/2016

ELLIS PAINTING CO. INC. 1,534.0 1,158.0 75.49% 1,534.0 100.00% 0.0 0.00%WALNUT AVENUE APARTMENTS Painter 02/15/2016

JOHN B. CRUZ CONSTRUCTIO 3,074.0 3,074.0 100.00% 3,074.0 100.00% 0.0 0.00%WALNUT AVENUE APARTMENTS Laborer 05/14/2016

METRO EQUIPMENT CORP. 2,127.5 1,668.0 78.40% 1,152.0 54.15% 102.0 4.79%WALNUT AVENUE APARTMENTS Laborer 03/19/2016

CLARK CONSTRUCTION GROU 1,581.0 553.5 35.01% 1,581.0 100.00% 0.0 0.00%WALNUT AVENUE APARTMENTS Iron Worker 03/25/2016

DIVISIONAL 7 ARCHITECTURA 780.5 0.0 0.00% 0.0 0.00% 0.0 0.00%WALNUT AVENUE APARTMENTS Sheetmetal Work 04/30/2016

ENERGY ELECTRIC CO., INC. 2,317.5 0.0 0.00% 326.5 14.09% 0.0 0.00%WALNUT AVENUE APARTMENTS Electrician 08/22/2015

ENERGY ELECTRIC CO., INC. 24.0 24.0 100.00% 24.0 100.00% 0.0 0.00%WALNUT AVENUE APARTMENTS Laborer 08/22/2015

FLETCHER'S INSTALLATION 2,020.5 40.0 1.98% 16.0 0.79% 0.0 0.00%WALNUT AVENUE APARTMENTS Sheetmetal Work 01/29/2016

HEL-TER ENTREPRISES 1,213.0 0.0 0.00% 381.5 31.45% 0.0 0.00%WALNUT AVENUE APARTMENTS Carpenter 04/01/2016

JOHN B. CRUZ CONSTRUCTIO 9,463.0 7,656.0 80.90% 9,455.0 99.92% 1,970.5 20.82%WALNUT AVENUE APARTMENTS Carpenter 05/14/2016

K & K CONTRACTORS 60.0 0.0 0.00% 8.0 13.33% 0.0 0.00%WALNUT AVENUE APARTMENTS Floor Layer 09/11/2015

KIDIK PLUMBING & HEATING 4,997.0 1,292.0 25.86% 0.0 0.00% 0.0 0.00%WALNUT AVENUE APARTMENTS Plumber 02/27/2016

DIVISIONAL 7 ARCHITECTURA 31.0 0.0 0.00% 0.0 0.00% 0.0 0.00%WALNUT AVENUE APARTMENTS Laborer 09/19/2015

45,065.8 23,250.6 51.59% 31,982.1 70.97% 3,279.4 7.28%SUB TOTALS:

WARD 8

$20,000Amount:

Gen Contractor: LOGAN GLASS

(617)567-7859 340 CHELSEA STREET EAST BOSTON

Est Start Date:

Est End Date:

04/01/2014

06/30/2014

LOGAN GLASS 56.0 56.0 100.00% 0.0 0.00% 0.0 0.00%WARD 8 Glazier 04/04/2014

56.0 56.0 100.00% 0.0 0.00% 0.0 0.00%SUB TOTALS:

WASHINGTON PARK

$950,000Amount:

Gen Contractor: KEITH CONSTRUCTION INC.

(781)828-8474 532 PAGE STREET 14 PAGE TERR. STOUGHTON

Est Start Date:

Est End Date:

03/01/2013

08/31/2014

PERFORMANCE BUILDING CO. 2,091.5 364.5 17.43% 348.5 16.66% 0.0 0.00%WASHINGTON PARK Carpenter 06/06/2014

VENTURELLI MECHANICAL CO 1,928.0 576.0 29.88% 424.0 21.99% 0.0 0.00%WASHINGTON PARK Floor Layer 07/20/2014

METRO EQUIPMENT CORP. 848.0 447.0 52.71% 391.0 46.11% 9.5 1.12%WASHINGTON PARK Laborer 07/29/2014

METRO EQUIPMENT CORP. 22.0 10.0 45.45% 0.0 0.00% 0.0 0.00%WASHINGTON PARK Equipment Opera 03/25/2014

PEGASUS SONS MASONRY IN 58.5 0.0 0.00% 58.5 100.00% 0.0 0.00%WASHINGTON PARK Laborer 12/20/2013

PERFORMANCE BUILDING CO. 1,291.5 1,289.5 99.85% 0.0 0.00% 0.0 0.00%WASHINGTON PARK Laborer 06/06/2014

PREMIER PAINT FINISHES INC. 3,228.0 3,228.0 100.00% 3,228.0 100.00% 498.0 15.43%WASHINGTON PARK Painter 07/26/2014

QUALITY CONST /MAINT INC. 1,553.5 1,022.0 65.79% 1,553.5 100.00% 0.0 0.00%WASHINGTON PARK Laborer 03/28/2014

RISE & SHINE CLEANING & CO 556.5 471.7 84.76% 534.0 95.96% 262.2 47.12%WASHINGTON PARK Laborer 05/03/2014

V.FRANCIS MECHANICAL INC. 401.0 288.0 71.82% 401.0 100.00% 288.0 71.82%WASHINGTON PARK Laborer 07/26/2014

LIGHTHOUSE MASONRY, INC. 8.0 8.0 100.00% 8.0 100.00% 0.0 0.00%WASHINGTON PARK Bricklayer 11/22/2013

Page 242: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 242

Project Name Trade Latest Week

V.FRANCIS MECHANICAL INC. 3,609.0 3,465.0 96.01% 3,609.0 100.00% 0.0 0.00%WASHINGTON PARK Pipefitter 07/26/2014

PEGASUS SONS MASONRY IN 73.5 35.5 48.30% 35.5 48.30% 0.0 0.00%WASHINGTON PARK Bricklayer 12/20/2013

KELMON DRYWALL.INC. 3,680.0 3,040.0 82.61% 800.0 21.74% 0.0 0.00%WASHINGTON PARK Plasterer 06/29/2014

ACCOLADE ENVIRONMENTAL 824.0 0.0 0.00% 816.0 99.03% 384.0 46.60%WASHINGTON PARK Asbestos Worker 08/01/2014

ANDERSON INSULATION 31.5 0.0 0.00% 7.5 23.81% 0.0 0.00%WASHINGTON PARK Carpenter 06/28/2014

ANDERSON INSULATION 23.5 0.0 0.00% 7.5 31.91% 0.0 0.00%WASHINGTON PARK Laborer 06/28/2014

ATLANTIC BAY CONTRACTING 1,790.0 483.0 26.98% 1,790.0 100.00% 249.0 13.91%WASHINGTON PARK Asbestos Worker 03/21/2014

ATLANTIC BAY CONTRACTING 18.0 0.0 0.00% 18.0 100.00% 0.0 0.00%WASHINGTON PARK Laborer 03/14/2014

DEVON PLUMBING HEATING 3,744.0 2,824.0 75.43% 2,824.0 75.43% 0.0 0.00%WASHINGTON PARK Plumber 08/30/2014

G & O INC. 6,899.0 3,953.5 57.31% 6,510.0 94.36% 0.0 0.00%WASHINGTON PARK Electrician 07/26/2014

G. BROUILLETTE & SON INC. 504.0 45.5 9.03% 229.0 45.44% 0.0 0.00%WASHINGTON PARK Laborer 06/06/2014

G. BROUILLETTE & SON INC. 232.0 0.0 0.00% 104.3 44.94% 0.0 0.00%WASHINGTON PARK Roofer 05/30/2014

HANNAH ENVIRONMENTAL EN 2,635.0 163.0 6.19% 669.0 25.39% 264.0 10.02%WASHINGTON PARK Laborer 08/02/2014

KEITH CONSTRUCTION INC. 1,320.0 1,320.0 100.00% 880.0 66.67% 440.0 33.33%WASHINGTON PARK Laborer 05/09/2014

DEVON PLUMBING HEATING 432.0 0.0 0.00% 432.0 100.00% 0.0 0.00%WASHINGTON PARK Laborer 06/30/2014

37,802.0 23,034.2 60.93% 25,678.2 67.93% 2,394.7 6.33%SUB TOTALS:

WATERMARK SEAPORT

$125,800,000Amount:

Gen Contractor: SKANSKA CO.

(617)574-1400 253 SUMMER STREET BOSTON

Est Start Date:

Est End Date:

12/01/2013

12/15/2015

NEW ENGLAND FOUNDATION 1,247.5 285.0 22.85% 293.0 23.49% 0.0 0.00%WATERMARK SEAPORT Piledriver 11/01/2014

S & F CONCRETE 25,108.0 8,444.0 33.63% 5,698.0 22.69% 0.0 0.00%WATERMARK SEAPORT Laborer 01/09/2016

S & F CONCRETE 1,423.5 0.0 0.00% 0.0 0.00% 0.0 0.00%WATERMARK SEAPORT Equipment Opera 01/02/2016

S & F CONCRETE 3,859.5 1,437.0 37.23% 1,290.5 33.44% 0.0 0.00%WATERMARK SEAPORT Cement Finisher 01/02/2016

S & F CONCRETE 31,910.5 9,779.0 30.65% 7,055.5 22.11% 1,567.0 4.91%WATERMARK SEAPORT Carpenter 01/02/2016

QUALITY AIR METALS, INC. 4,701.0 1,960.0 41.69% 351.0 7.47% 21.0 0.45%WATERMARK SEAPORT Sheetmetal Work 01/30/2016

PRIME STEEL ERECTING INC, 5,704.0 3,053.0 53.52% 1,483.0 26.00% 0.0 0.00%WATERMARK SEAPORT Iron Worker 07/18/2015

PAVILION FLOORS, INC. 8,152.0 2,604.0 31.94% 7,364.0 90.33% 0.0 0.00%WATERMARK SEAPORT Floor Layer 03/26/2016

PAVILION FLOORS, INC. 2,816.0 8.0 0.28% 1,286.0 45.67% 186.0 6.61%WATERMARK SEAPORT Carpet Layer 03/12/2016

NEW ENGLAND FOUNDATION 259.0 259.0 100.00% 259.0 100.00% 259.0 100.00%WATERMARK SEAPORT Oiler 09/13/2014

OTIS ELEVATOR COMPANY 2,394.8 374.0 15.62% 0.0 0.00% 0.0 0.00%WATERMARK SEAPORT Elev Const Helper 03/10/2016

SAVE-ON-WALL CO, INC. 36,521.5 9,055.0 24.79% 7,677.0 21.02% 1,246.0 3.41%WATERMARK SEAPORT Carpenter 03/12/2016

THE WATERPROOFING COMP 939.5 0.0 0.00% 829.5 88.29% 0.0 0.00%WATERMARK SEAPORT Laborer 01/23/2016

OTIS ELEVATOR COMPANY 3,561.3 671.3 18.85% 445.0 12.50% 333.3 9.36%WATERMARK SEAPORT Elevator Const(M 03/10/2016

SAVE-ON-WALL CO, INC. 8,506.5 1,931.0 22.70% 1,485.5 17.46% 2,589.0 30.44%WATERMARK SEAPORT Laborer 02/20/2016

SAVE-ON-WALL CO, INC. 14,703.5 4,595.0 31.25% 5,584.5 37.98% 2,369.0 16.11%WATERMARK SEAPORT Painter 03/19/2016

Page 243: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 243

Project Name Trade Latest Week

SAVE-ON-WALL CO, INC. 11,323.0 3,956.0 34.94% 6,182.0 54.60% 1,403.5 12.40%WATERMARK SEAPORT Taper 03/05/2016

SKANSKA CO. 1,831.5 206.5 11.27% 0.0 0.00% 0.0 0.00%WATERMARK SEAPORT Carpenter 02/21/2016

SKANSKA CO. 16,620.0 6,343.5 38.17% 2,291.5 13.79% 8.0 0.05%WATERMARK SEAPORT Laborer 04/02/2016

NEW ENGLAND FOUNDATION 198.5 198.5 100.00% 198.5 100.00% 0.0 0.00%WATERMARK SEAPORT Laborer 09/13/2014

THE CHEVIOT CORPORATION 3,932.0 1,470.5 37.40% 3,060.0 77.82% 24.0 0.61%WATERMARK SEAPORT Iron Worker 12/18/2015

SWEENEY DRYWALL FINISHE 72.0 0.0 0.00% 0.0 0.00% 0.0 0.00%WATERMARK SEAPORT Carpenter 09/19/2015

THE WATERPROOFING COMP 3,407.5 1,507.0 44.23% 541.0 15.88% 22.0 0.65%WATERMARK SEAPORT Waterproofer 03/19/2016

VALLEYCREST LANDSCAPE 263.0 0.0 0.00% 13.0 4.94% 0.0 0.00%WATERMARK SEAPORT Bricklayer 12/20/2015

VALLEYCREST LANDSCAPE 328.5 0.0 0.00% 0.0 0.00% 0.0 0.00%WATERMARK SEAPORT Equipment Opera 12/20/2015

VALLEYCREST LANDSCAPE 1,857.5 191.0 10.28% 356.0 19.17% 39.0 2.10%WATERMARK SEAPORT Laborer 12/20/2015

WATERTOWN IRON WORKS IN 6,488.0 1,730.0 26.66% 3,409.0 52.54% 208.0 3.21%WATERMARK SEAPORT Iron Worker 03/12/2016

THE CHEVIOT CORPORATION 18,573.0 4,851.0 26.12% 4,388.0 23.63% 592.0 3.19%WATERMARK SEAPORT Carpenter 04/01/2016

CIP CONCRETE, INC. 18.0 18.0 100.00% 0.0 0.00% 0.0 0.00%WATERMARK SEAPORT Laborer 08/29/2015

THE CHEVIOT CORPORATION 8,463.5 1,960.5 23.16% 899.0 10.62% 1,434.0 16.94%WATERMARK SEAPORT Glazier 03/11/2016

NEW ENGLAND FOUNDATION 242.5 0.0 0.00% 0.0 0.00% 0.0 0.00%WATERMARK SEAPORT Equipment Opera 09/13/2014

A. A. WILL CORPORATION 6,074.0 3,145.5 51.79% 1,606.0 26.44% 0.0 0.00%WATERMARK SEAPORT Laborer 02/09/2016

A. A. WILL CORPORATION 2,500.0 967.5 38.70% 692.0 27.68% 0.0 0.00%WATERMARK SEAPORT Piledriver 11/03/2015

ALLIED PILE DRIVING INC. 502.8 0.0 0.00% 152.3 30.28% 0.0 0.00%WATERMARK SEAPORT Equipment Opera 04/12/2014

ALLIED PILE DRIVING INC. 1,250.5 676.0 54.06% 357.0 28.55% 16.5 1.32%WATERMARK SEAPORT Piledriver 04/12/2014

ARCHER CORPORATION 10,261.5 424.0 4.13% 906.5 8.83% 0.0 0.00%WATERMARK SEAPORT Carpenter 04/01/2016

CIP CONCRETE, INC. 137.0 60.0 43.80% 0.0 0.00% 0.0 0.00%WATERMARK SEAPORT Bricklayer 08/29/2015

DANIEL MARR & SON CO. 4,773.0 967.5 20.27% 394.5 8.27% 0.0 0.00%WATERMARK SEAPORT Iron Worker 07/26/2015

A. A. WILL CORPORATION 4,876.5 56.5 1.16% 24.0 0.49% 32.0 0.66%WATERMARK SEAPORT Equipment Opera 02/09/2016

E. M. DUGGAN INC. 8,657.0 3,063.0 35.38% 2,713.0 31.34% 246.0 2.84%WATERMARK SEAPORT Pipefitter 02/07/2016

E. M. DUGGAN INC. 17,553.5 4,083.0 23.26% 358.0 2.04% 352.0 2.01%WATERMARK SEAPORT Plumber 02/07/2016

E. M. DUGGAN INC. 7,409.5 1,232.5 16.63% 1,134.5 15.31% 0.0 0.00%WATERMARK SEAPORT Sprinkler Fitter 12/27/2015

FRED SALVUCCI CORP. 421.0 40.0 9.50% 0.0 0.00% 0.0 0.00%WATERMARK SEAPORT Bricklayer 05/16/2015

JOHN A . PENNEY ELECTRIC 43,834.0 11,851.0 27.04% 9,599.0 21.90% 954.0 2.18%WATERMARK SEAPORT Electrician 03/20/2016

MARSHALL ROOFING & SHEET 10,423.5 958.5 9.20% 1,737.0 16.66% 0.0 0.00%WATERMARK SEAPORT Roofer 04/02/2016

FRED SALVUCCI CORP. 194.0 0.0 0.00% 112.5 57.99% 0.0 0.00%WATERMARK SEAPORT Mason Tender 05/09/2015

LUND REBAR SERVICES, INC. 11,632.0 3,128.5 26.90% 2,098.5 18.04% 0.0 0.00%WATERMARK SEAPORT Iron Worker 11/29/2015

LANCO SCAFFOLDING INC. 842.0 298.0 35.39% 842.0 100.00% 0.0 0.00%WATERMARK SEAPORT Laborer 07/19/2015

JOSEPH COHN AND SON TILE 10,679.0 1,477.0 13.83% 1,541.0 14.43% 986.5 9.24%WATERMARK SEAPORT Marble Tile Work 02/07/2016

MARSHALL ROOFING & SHEET 671.0 0.0 0.00% 0.0 0.00% 0.0 0.00%WATERMARK SEAPORT Sheetmetal Work 04/02/2016

Page 244: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 244

Project Name Trade Latest Week

JAJ COMPANY INC. 1,644.0 0.0 0.00% 270.0 16.42% 0.0 0.00%WATERMARK SEAPORT Mason Tender 03/27/2016

JAJ COMPANY INC. 301.0 0.0 0.00% 301.0 100.00% 0.0 0.00%WATERMARK SEAPORT Marble Tile Work 02/07/2016

J & M BROWN ELECTRICAL 9,103.5 3,918.5 43.04% 4,861.0 53.40% 775.0 8.51%WATERMARK SEAPORT Electrician 01/01/2016

H. CARR & SONS INC. 988.0 246.0 24.90% 0.0 0.00% 0.0 0.00%WATERMARK SEAPORT Taper 05/29/2015

H. CARR & SONS INC. 335.0 0.0 0.00% 75.0 22.39% 0.0 0.00%WATERMARK SEAPORT Plasterer 09/25/2015

H. CARR & SONS INC. 982.0 24.0 2.44% 24.0 2.44% 0.0 0.00%WATERMARK SEAPORT Laborer 09/25/2015

LANCO SCAFFOLDING INC. 392.0 80.0 20.41% 392.0 100.00% 0.0 0.00%WATERMARK SEAPORT Carpenter 07/19/2015

381,863.8 103,584.8 27.13% 92,630.3 24.26% 15,662.8 4.10%SUB TOTALS:

WAYNE AT BICKNELL

$250,000Amount:

Gen Contractor: JOHN B. CRUZ CONSTRUCTION

(617)445-6901 ONE JOHN ELLIOT SQUARE ROXBURY

Est Start Date:

Est End Date:

08/01/2016

05/01/2019

KIDIK PLUMBING & HEATING 1,001.0 1,001.0 100.00% 1,001.0 100.00% 0.0 0.00%WAYNE AT BICKNELL Plumber 09/16/2017

V.FRANCIS MECHANICAL INC. 1,484.0 1,484.0 100.00% 1,484.0 100.00% 0.0 0.00%WAYNE AT BICKNELL Pipefitter 07/01/2017

NG ENVIRONMENTAL CO. 2,175.0 948.0 43.59% 2,175.0 100.00% 69.0 3.17%WAYNE AT BICKNELL Laborer 09/16/2017

LANCASTER ENTERPRISES IN 637.0 0.0 0.00% 108.5 17.03% 0.0 0.00%WAYNE AT BICKNELL Roofer 05/31/2017

LYDON PLUMBING & HEATING 120.0 120.0 100.00% 120.0 100.00% 0.0 0.00%WAYNE AT BICKNELL Laborer 09/03/2017

MHF PLASTERING 96.0 40.0 41.67% 40.0 41.67% 56.0 58.33%WAYNE AT BICKNELL Laborer 08/12/2017

MHF PLASTERING 1,472.0 728.0 49.46% 248.0 16.85% 32.0 2.17%WAYNE AT BICKNELL Plasterer 09/02/2017

PEGASUS SONS MASONRY IN 958.0 958.0 100.00% 958.0 100.00% 0.0 0.00%WAYNE AT BICKNELL Laborer 08/18/2017

PEGASUS SONS MASONRY IN 2,814.0 1,945.5 69.14% 2,814.0 100.00% 0.0 0.00%WAYNE AT BICKNELL Mason 08/18/2017

R.J.FLOORING, INC. 456.0 72.0 15.79% 72.0 15.79% 72.0 15.79%WAYNE AT BICKNELL Floor Layer 08/26/2017

RISE & SHINE CLEANING & CO 156.1 152.6 97.76% 156.1 100.00% 156.1 100.00%WAYNE AT BICKNELL Laborer 09/16/2017

XCEL FIRE PROTECTION, 970.5 0.0 0.00% 87.5 9.02% 0.0 0.00%WAYNE AT BICKNELL Pipefitter 08/08/2017

TOP MECHANICAL SERVICES 244.0 0.0 0.00% 244.0 100.00% 0.0 0.00%WAYNE AT BICKNELL Laborer 08/01/2017

JOHN B. CRUZ CONSTRUCTIO 3,750.5 3,750.5 100.00% 3,750.5 100.00% 0.0 0.00%WAYNE AT BICKNELL Laborer 09/16/2017

EXCELLE MASONRY INC. 1,156.0 1,156.0 100.00% 1,156.0 100.00% 0.0 0.00%WAYNE AT BICKNELL Mason Tender 09/15/2017

TOP MECHANICAL SERVICES 260.0 154.0 59.23% 260.0 100.00% 0.0 0.00%WAYNE AT BICKNELL Iron Worker 08/01/2017

ANDERSON INSULATION 89.5 0.0 0.00% 89.5 100.00% 0.0 0.00%WAYNE AT BICKNELL Carpenter 02/04/2017

G & O INC. 1,078.0 536.0 49.72% 536.0 49.72% 0.0 0.00%WAYNE AT BICKNELL Electrician 09/16/2017

JOHN B. CRUZ CONSTRUCTIO 14,187.0 11,323.5 79.82% 12,633.0 89.05% 1,603.5 11.30%WAYNE AT BICKNELL Carpenter 09/16/2017

AMERICAN FLOORING. 1,060.0 460.0 43.40% 1,060.0 100.00% 0.0 0.00%WAYNE AT BICKNELL Floor Layer 09/23/2017

ANDERSON INSULATION 152.3 0.0 0.00% 129.8 85.22% 0.0 0.00%WAYNE AT BICKNELL Insulator 09/02/2017

BROTHERS ROOFING 30.5 14.5 47.54% 30.5 100.00% 0.0 0.00%WAYNE AT BICKNELL Laborer 05/20/2017

BROTHERS ROOFING 176.5 0.0 0.00% 176.5 100.00% 0.0 0.00%WAYNE AT BICKNELL Roofer 06/17/2017

DESCO - DEFENSE EQUIPMEN 40.0 40.0 100.00% 40.0 100.00% 0.0 0.00%WAYNE AT BICKNELL Cement Finisher 02/10/2017

Page 245: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 245

Project Name Trade Latest Week

HIEP TILE 40.0 40.0 100.00% 40.0 100.00% 0.0 0.00%WAYNE AT BICKNELL Cement Finisher 02/03/2017

ENVIROGREEN LLC 1,608.0 324.0 20.15% 1,608.0 100.00% 24.0 1.49%WAYNE AT BICKNELL Asbestos Worker 07/21/2017

EXCELLE MASONRY INC. 897.0 897.0 100.00% 897.0 100.00% 0.0 0.00%WAYNE AT BICKNELL Bricklayer 09/15/2017

EXCELLE MASONRY INC. 829.0 829.0 100.00% 829.0 100.00% 0.0 0.00%WAYNE AT BICKNELL Laborer 07/14/2017

FARAH PAINTING 1,131.0 0.0 0.00% 1,131.0 100.00% 0.0 0.00%WAYNE AT BICKNELL Painter 08/19/2017

DEVON PLUMBING HEATING 264.0 256.0 96.97% 264.0 100.00% 0.0 0.00%WAYNE AT BICKNELL Plumber 09/09/2017

ALWAYS ELECTRIC 1,627.0 1,262.0 77.57% 1,028.0 63.18% 0.0 0.00%WAYNE AT BICKNELL Electrician 08/11/2017

HOWSE CORPORATION INC. 4.0 0.0 0.00% 0.0 0.00% 0.0 0.00%WAYNE AT BICKNELL Electrician 03/25/2017

40,963.8 28,491.6 69.55% 35,166.8 85.85% 2,012.6 4.91%SUB TOTALS:

WAYNE AT COLUMBIA

$900,000Amount:

Gen Contractor: JOHN B. CRUZ CONSTRUCTION

(617)445-6901 ONE JOHN ELLIOT SQUARE ROXBURY

Est Start Date:

Est End Date:

11/01/2014

11/30/2015

NG ENVIRONMENTAL CO. 6,582.0 1,998.0 30.36% 6,582.0 100.00% 500.0 7.60%WAYNE AT COLUMBIA Asbestos Worker 05/28/2016

MHF PLASTERING 4,364.0 2,924.0 67.00% 1,884.0 43.17% 0.0 0.00%WAYNE AT COLUMBIA Plasterer 05/07/2016

MHF PLASTERING 340.0 300.0 88.24% 300.0 88.24% 0.0 0.00%WAYNE AT COLUMBIA Laborer 05/07/2016

MHF PLASTERING 332.0 32.0 9.64% 16.0 4.82% 0.0 0.00%WAYNE AT COLUMBIA Carpenter 02/21/2015

MEYOTTE CONTRACTING 2,592.0 1,728.0 66.67% 2,592.0 100.00% 0.0 0.00%WAYNE AT COLUMBIA Mason Tender 10/16/2015

METRO EQUIPMENT CORP. 689.0 570.0 82.73% 472.0 68.51% 129.0 18.72%WAYNE AT COLUMBIA Laborer 10/10/2015

LYDON PLUMBING & HEATING 164.0 0.0 0.00% 0.0 0.00% 0.0 0.00%WAYNE AT COLUMBIA Plumber 06/26/2016

NORFOLK KITCHEN & BATH 25.5 0.0 0.00% 0.0 0.00% 0.0 0.00%WAYNE AT COLUMBIA Carpenter 04/20/2015

V.FRANCIS MECHANICAL INC. 2,258.0 2,258.0 100.00% 2,258.0 100.00% 0.0 0.00%WAYNE AT COLUMBIA Pipefitter 09/26/2015

MEYOTTE CONTRACTING 359.0 359.0 100.00% 359.0 100.00% 0.0 0.00%WAYNE AT COLUMBIA Mason 10/16/2015

NORFOLK KITCHEN & BATH 17.0 0.0 0.00% 0.0 0.00% 0.0 0.00%WAYNE AT COLUMBIA Laborer 04/20/2015

R J FLOORING 24.0 0.0 0.00% 0.0 0.00% 0.0 0.00%WAYNE AT COLUMBIA Floor Layer 06/20/2015

R.J.FLOORING, INC. 1,128.0 120.0 10.64% 128.0 11.35% 120.0 10.64%WAYNE AT COLUMBIA Floor Layer 11/19/2016

XCEL FIRE PROTECTION, 2,237.5 88.0 3.93% 713.0 31.87% 0.0 0.00%WAYNE AT COLUMBIA Pipefitter 11/08/2016

RISE & SHINE CLEANING & CO 749.1 555.8 74.19% 749.1 100.00% 641.4 85.62%WAYNE AT COLUMBIA Laborer 11/26/2016

BOSTON GLASS & BOARDING 32.0 16.0 50.00% 0.0 0.00% 0.0 0.00%WAYNE AT COLUMBIA Glazier 07/15/2015

SONTZ 875.0 188.0 21.49% 845.0 96.57% 0.0 0.00%WAYNE AT COLUMBIA Roofer 08/01/2015

TOP MECHANICAL SERVICES 96.0 0.0 0.00% 96.0 100.00% 0.0 0.00%WAYNE AT COLUMBIA Laborer 10/26/2016

XCEL FIRE PROTECTION, 18.0 0.0 0.00% 18.0 100.00% 0.0 0.00%WAYNE AT COLUMBIA Laborer 01/06/2015

LYDON PLUMBING & HEATING 276.0 276.0 100.00% 276.0 100.00% 0.0 0.00%WAYNE AT COLUMBIA Laborer 07/22/2016

TOP MECHANICAL SERVICES 216.0 96.0 44.44% 216.0 100.00% 0.0 0.00%WAYNE AT COLUMBIA Iron Worker 10/26/2016

ANDERSON INSULATION 376.5 0.0 0.00% 153.3 40.70% 0.0 0.00%WAYNE AT COLUMBIA Carpenter 10/29/2016

LEON LEDGEWOOD 1,946.0 0.0 0.00% 1,946.0 100.00% 0.0 0.00%WAYNE AT COLUMBIA Painter 10/29/2016

Page 246: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 246

Project Name Trade Latest Week

EXCELLE MASONRY INC. 1,951.0 1,275.0 65.35% 1,951.0 100.00% 0.0 0.00%WAYNE AT COLUMBIA Laborer 06/24/2016

ALWAYS ELECTRIC 580.0 233.0 40.17% 214.0 36.90% 0.0 0.00%WAYNE AT COLUMBIA Electrician 06/26/2015

AMERICAN FLOORING. 2,186.0 104.0 4.76% 2,186.0 100.00% 64.0 2.93%WAYNE AT COLUMBIA Floor Layer 10/29/2016

ANDRADE'S CONSTRUCTION 161.0 0.0 0.00% 161.0 100.00% 0.0 0.00%WAYNE AT COLUMBIA Marble Tile Work 05/16/2015

EXCELLE MASONRY INC. 1,518.0 1,518.0 100.00% 1,518.0 100.00% 0.0 0.00%WAYNE AT COLUMBIA Bricklayer 04/22/2016

FLETCHER'S INSTALLATION 104.0 15.0 14.42% 15.0 14.42% 0.0 0.00%WAYNE AT COLUMBIA Sheetmetal Work 04/08/2016

G & O INC. 2,851.0 1,821.0 63.87% 2,747.0 96.35% 0.0 0.00%WAYNE AT COLUMBIA Electrician 07/16/2016

GEMNINT FLOORS 328.5 328.5 100.00% 328.5 100.00% 47.5 14.46%WAYNE AT COLUMBIA Floor Layer 08/08/2015

JOHN B. CRUZ CONSTRUCTIO 27,019.0 21,786.5 80.63% 23,400.5 86.61% 4,091.5 15.14%WAYNE AT COLUMBIA Carpenter 11/26/2016

LANCASTER ENTERPRISES IN 67.0 0.0 0.00% 29.5 44.03% 0.0 0.00%WAYNE AT COLUMBIA Roofer 05/11/2016

ALWAYS ELECTRIC 40.0 0.0 0.00% 40.0 100.00% 40.0 100.00%WAYNE AT COLUMBIA Laborer 02/06/2015

GEMNINT FLOORS 319.5 319.5 100.00% 319.5 100.00% 62.0 19.41%WAYNE AT COLUMBIA Laborer 07/11/2015

JOHN B. CRUZ CONSTRUCTIO 6,207.0 6,207.0 100.00% 6,207.0 100.00% 0.0 0.00%WAYNE AT COLUMBIA Laborer 11/19/2016

KUSTOM KLOSETS 14.5 0.0 0.00% 0.0 0.00% 0.0 0.00%WAYNE AT COLUMBIA Carpenter 02/13/2016

JJRG WILLIAMS MECHANICAL 2,703.5 1,349.0 49.90% 2,703.5 100.00% 582.5 21.55%WAYNE AT COLUMBIA Plumber 03/04/2016

HOWSE CORPORATION INC. 182.5 0.0 0.00% 0.0 0.00% 0.0 0.00%WAYNE AT COLUMBIA Electrician 10/22/2016

HIEP TILE 160.0 160.0 100.00% 160.0 100.00% 0.0 0.00%WAYNE AT COLUMBIA Cement Finisher 04/10/2016

HEL-TER ENTREPRISES 32.0 32.0 100.00% 32.0 100.00% 0.0 0.00%WAYNE AT COLUMBIA Laborer 04/03/2015

HEL-TER ENTREPRISES 360.0 14.0 3.89% 14.0 3.89% 0.0 0.00%WAYNE AT COLUMBIA Carpenter 01/01/2016

72,481.1 46,671.3 64.39% 61,629.9 85.03% 6,277.9 8.66%SUB TOTALS:

WAYNE AT FRANKLIN

$1,000,000Amount:

Gen Contractor: JOHN B. CRUZ CONSTRUCTION

(617)445-6901 ONE JOHN ELLIOT SQUARE ROXBURY

Est Start Date:

Est End Date:

05/01/2013

07/31/2014

MEYOTTE CONTRACTING 368.0 368.0 100.00% 368.0 100.00% 0.0 0.00%WAYNE AT FRANKLIN Mason Tender 06/27/2014

PRO PAVING 72.0 0.0 0.00% 0.0 0.00% 0.0 0.00%WAYNE AT FRANKLIN Asphalt Raker 09/19/2014

MHF PLASTERING 984.0 984.0 100.00% 984.0 100.00% 0.0 0.00%WAYNE AT FRANKLIN Laborer 05/10/2014

MHF PLASTERING 1,016.0 624.0 61.42% 0.0 0.00% 0.0 0.00%WAYNE AT FRANKLIN Plasterer 05/10/2014

NG ENVIRONMENTAL CO. 2,773.0 1,041.0 37.54% 2,773.0 100.00% 116.0 4.18%WAYNE AT FRANKLIN Asbestos Worker 04/12/2014

MHF PLASTERING 624.0 464.0 74.36% 328.0 52.56% 0.0 0.00%WAYNE AT FRANKLIN Carpenter 05/10/2014

PRO PAVING 137.0 0.0 0.00% 0.0 0.00% 0.0 0.00%WAYNE AT FRANKLIN Equipment Opera 09/19/2014

R.J.FLOORING, INC. 1,201.0 273.0 22.73% 317.0 26.39% 281.0 23.40%WAYNE AT FRANKLIN Floor Layer 06/29/2014

RISE & SHINE CLEANING & CO 830.5 764.0 91.99% 830.5 100.00% 571.3 68.78%WAYNE AT FRANKLIN Laborer 07/26/2014

V.FRANCIS MECHANICAL INC. 21.0 0.0 0.00% 0.0 0.00% 0.0 0.00%WAYNE AT FRANKLIN Sheetmetal Work 01/31/2014

XCEL FIRE PROTECTION, 2,260.0 466.5 20.64% 636.5 28.16% 0.0 0.00%WAYNE AT FRANKLIN Sprinkler Fitter 07/22/2014

MEYOTTE CONTRACTING 368.0 368.0 100.00% 368.0 100.00% 0.0 0.00%WAYNE AT FRANKLIN Mason 06/27/2014

Page 247: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 247

Project Name Trade Latest Week

SONTZ 82.5 0.0 0.00% 82.5 100.00% 0.0 0.00%WAYNE AT FRANKLIN Laborer 02/08/2014

SONTZ 69.0 0.0 0.00% 69.0 100.00% 0.0 0.00%WAYNE AT FRANKLIN Roofer 02/08/2014

COMMUNITY RESTORATION 78.0 0.0 0.00% 78.0 100.00% 0.0 0.00%WAYNE AT FRANKLIN Laborer 01/11/2014

METRO EQUIPMENT CORP. 1,951.5 1,668.5 85.50% 1,547.5 79.30% 68.5 3.51%WAYNE AT FRANKLIN Laborer 09/30/2014

V.FRANCIS MECHANICAL INC. 3,480.0 3,480.0 100.00% 3,480.0 100.00% 0.0 0.00%WAYNE AT FRANKLIN Pipefitter 08/23/2014

ALWAYS ELECTRIC 2,960.0 1,218.0 41.15% 949.0 32.06% 0.0 0.00%WAYNE AT FRANKLIN Electrician 12/14/2014

AMERICAN FLOORING. 2,101.0 40.0 1.90% 2,061.0 98.10% 685.0 32.60%WAYNE AT FRANKLIN Floor Layer 07/05/2014

ANDERSON INSULATION 93.8 28.5 30.40% 35.5 37.87% 0.0 0.00%WAYNE AT FRANKLIN Laborer 05/10/2014

COMMUNITY RESTORATION 31.0 31.0 100.00% 31.0 100.00% 0.0 0.00%WAYNE AT FRANKLIN Mason 01/11/2014

EXCELLE MASONRY INC. 539.0 539.0 100.00% 539.0 100.00% 0.0 0.00%WAYNE AT FRANKLIN Bricklayer 03/27/2015

EXCELLE MASONRY INC. 815.0 350.0 42.94% 815.0 100.00% 0.0 0.00%WAYNE AT FRANKLIN Laborer 03/27/2015

FLETCHER'S INSTALLATION 26.0 0.0 0.00% 0.0 0.00% 0.0 0.00%WAYNE AT FRANKLIN Sheetmetal Work 06/13/2014

JOHN B. CRUZ CONSTRUCTIO 11,293.5 6,359.5 56.31% 9,098.5 80.56% 0.0 0.00%WAYNE AT FRANKLIN Carpenter 11/08/2014

JOHN B. CRUZ CONSTRUCTIO 2,778.5 2,455.5 88.38% 2,778.5 100.00% 323.0 11.62%WAYNE AT FRANKLIN Laborer 11/01/2014

LEON LEDGEWOOD 267.0 147.0 55.06% 267.0 100.00% 0.0 0.00%WAYNE AT FRANKLIN Laborer 03/15/2014

LEON LEDGEWOOD 824.0 0.0 0.00% 824.0 100.00% 0.0 0.00%WAYNE AT FRANKLIN Painter 05/31/2014

LYDON PLUMBING & HEATING 1,529.3 848.3 55.47% 843.3 55.14% 0.0 0.00%WAYNE AT FRANKLIN Plumber 08/15/2014

ANDERSON INSULATION 53.3 0.0 0.00% 19.5 36.62% 0.0 0.00%WAYNE AT FRANKLIN Carpenter 01/25/2014

39,626.8 22,517.8 56.82% 30,123.3 76.02% 2,044.8 5.16%SUB TOTALS:

WESLEY SHOOL MISC REPAIRS TO B

$10,000Amount:

Gen Contractor:

Est Start Date:

Est End Date:

04/01/2014

04/30/2014

J & J PLUMBING & HEATING 33.0 33.0 100.00% 33.0 100.00% 0.0 0.00%WESLEY SHOOL MISC REPAIRS Plumber 04/26/2014

YAX SERVICE CORP. 8.0 0.0 0.00% 8.0 100.00% 0.0 0.00%WESLEY SHOOL MISC REPAIRS Floor Layer 04/13/2014

41.0 33.0 80.49% 41.0 100.00% 0.0 0.00%SUB TOTALS:

WEST END HOUSE

$10,000Amount:

Gen Contractor: MCI CONTRACTING INC.

(781)344-5567 1296 WASHINGTON STREET STOUGHTON

Est Start Date:

Est End Date:

05/25/2014

06/07/2014

MCI CONTRACTING INC. 16.0 0.0 0.00% 16.0 100.00% 0.0 0.00%WEST END HOUSE Laborer 05/31/2014

ATLANTIC ELEVATOR SERVIC 54.0 0.0 0.00% 24.0 44.44% 0.0 0.00%WEST END HOUSE Elevator Const(M 09/20/2015

MCI CONTRACTING INC. 32.0 0.0 0.00% 0.0 0.00% 0.0 0.00%WEST END HOUSE Carpenter 06/07/2014

102.0 0.0 0.00% 40.0 39.22% 0.0 0.00%SUB TOTALS:

WEST NAPOLI PIZZA

$35,000Amount:

Gen Contractor: AB DESIGN CONSTRUCTION

(857)272-8603 36 VANE STREET revere

Est Start Date:

Est End Date:

03/03/2014

05/08/2015

THE SIGN CENTER INC. 3.0 0.0 0.00% 0.0 0.00% 0.0 0.00%WEST NAPOLI PIZZA Laborer 05/08/2015

Page 248: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 248

Project Name Trade Latest Week

AB DESIGN CONSTRUCTION 1,093.0 112.0 10.25% 0.0 0.00% 0.0 0.00%WEST NAPOLI PIZZA Carpenter 06/08/2014

AB DESIGN CONSTRUCTION 200.0 0.0 0.00% 0.0 0.00% 0.0 0.00%WEST NAPOLI PIZZA Mason 06/08/2014

1,296.0 112.0 8.64% 0.0 0.00% 0.0 0.00%SUB TOTALS:

WHITTIER SCHOOL

$1,600,000Amount:

Gen Contractor: NORTHERN CONTRACTING CORP

(781)821-4200 68 JACKSON STREET P.O. BOX 96 CANTON

Est Start Date:

Est End Date:

01/01/2016

03/31/2017

STEELCO FENCING 40.0 0.0 0.00% 0.0 0.00% 0.0 0.00%WHITTIER SCHOOL Laborer 12/24/2016

NEW GENERATION PAINTING 396.0 52.0 13.13% 332.0 83.84% 96.0 24.24%WHITTIER SCHOOL Painter 02/10/2017

NORTHERN CONTRACTING CO 3,245.5 1,670.0 51.46% 2,819.0 86.86% 123.5 3.81%WHITTIER SCHOOL Carpenter 06/17/2017

NORTHERN CONTRACTING CO 494.0 494.0 100.00% 0.0 0.00% 0.0 0.00%WHITTIER SCHOOL Equipment Opera 12/10/2016

NORTHERN CONTRACTING CO 85.5 0.0 0.00% 0.0 0.00% 0.0 0.00%WHITTIER SCHOOL Floor Layer 07/23/2016

NORTHERN CONTRACTING CO 623.0 0.0 0.00% 0.0 0.00% 0.0 0.00%WHITTIER SCHOOL HVAC 08/21/2016

NORTHERN CONTRACTING CO 2,355.0 463.5 19.68% 915.0 38.85% 0.0 0.00%WHITTIER SCHOOL Laborer 07/01/2017

NORTHERN CONTRACTING CO 384.0 0.0 0.00% 384.0 100.00% 0.0 0.00%WHITTIER SCHOOL Mason 09/24/2016

NORTHERN CONTRACTING CO 35.0 0.0 0.00% 23.0 65.71% 0.0 0.00%WHITTIER SCHOOL Terrazzo Worker 11/19/2016

MERCURY MECHANICAL 38.5 0.0 0.00% 0.0 0.00% 0.0 0.00%WHITTIER SCHOOL Laborer 02/28/2016

NORTHERN CONTRACTING CO 8.0 0.0 0.00% 8.0 100.00% 0.0 0.00%WHITTIER SCHOOL Utility Operator 06/17/2017

EAST COAST FIREPROOFING 32.0 0.0 0.00% 0.0 0.00% 0.0 0.00%WHITTIER SCHOOL Laborer 12/20/2016

REPLACEMENT WINDOW SPE. 504.6 0.0 0.00% 0.0 0.00% 0.0 0.00%WHITTIER SCHOOL Carpenter 12/03/2016

REPLACEMENT WINDOW SPE. 232.3 0.0 0.00% 0.0 0.00% 0.0 0.00%WHITTIER SCHOOL Laborer 12/03/2016

RIVERDALE PLUMBING & HEA 597.0 248.0 41.54% 248.0 41.54% 0.0 0.00%WHITTIER SCHOOL Plumber 01/07/2017

RSI METAL FABRICATION, LLC 172.0 0.0 0.00% 0.0 0.00% 0.0 0.00%WHITTIER SCHOOL Iron Worker 01/14/2017

RUSTIC FIRE PROTECTION 1,738.0 0.0 0.00% 797.0 45.86% 0.0 0.00%WHITTIER SCHOOL Sprinkler Fitter 01/14/2017

NORTHERN CONTRACTING CO 544.0 0.0 0.00% 544.0 100.00% 0.0 0.00%WHITTIER SCHOOL Taper 12/03/2016

HARRISON ELECTRIC,LLC. 1,331.0 0.0 0.00% 0.0 0.00% 0.0 0.00%WHITTIER SCHOOL Electrician 03/11/2017

C.S.ALLISON CO. 568.0 72.0 12.68% 568.0 100.00% 0.0 0.00%WHITTIER SCHOOL Laborer 10/14/2016

CAPITAL CARPET&FLOORING 1,010.0 0.0 0.00% 432.0 42.77% 0.0 0.00%WHITTIER SCHOOL Floor Layer 04/02/2017

DON MARTIN CORPORATION 8.0 0.0 0.00% 4.0 50.00% 0.0 0.00%WHITTIER SCHOOL Asphalt Raker 10/01/2016

DON MARTIN CORPORATION 8.0 0.0 0.00% 0.0 0.00% 0.0 0.00%WHITTIER SCHOOL Equipment Opera 10/01/2016

DON MARTIN CORPORATION 16.0 0.0 0.00% 12.0 75.00% 0.0 0.00%WHITTIER SCHOOL Laborer 10/01/2016

FEDERAL CONCRETE 299.0 0.0 0.00% 0.0 0.00% 0.0 0.00%WHITTIER SCHOOL Carpenter 07/23/2016

FEDERAL CONCRETE 160.0 144.0 90.00% 144.0 90.00% 0.0 0.00%WHITTIER SCHOOL Laborer 07/30/2016

MERCURY MECHANICAL 560.0 0.0 0.00% 0.0 0.00% 0.0 0.00%WHITTIER SCHOOL HVAC 02/12/2017

HARRISON ELECTRIC,LLC. 524.0 0.0 0.00% 524.0 100.00% 0.0 0.00%WHITTIER SCHOOL Laborer 12/24/2016

JOHN F. SHEA CO. INC. 852.8 212.8 24.95% 222.1 26.04% 55.8 6.55%WHITTIER SCHOOL Roofer 02/04/2017

Page 249: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 249

Project Name Trade Latest Week

JOHN F. SHEA CO. INC. 135.6 13.5 9.93% 0.0 0.00% 0.0 0.00%WHITTIER SCHOOL Sheetmetal Work 01/07/2017

K. DAPONTE CONSTRUCTION 16.0 0.0 0.00% 8.0 50.00% 0.0 0.00%WHITTIER SCHOOL Equipment Opera 10/15/2016

K. DAPONTE CONSTRUCTION 112.0 0.0 0.00% 8.0 7.14% 8.0 7.14%WHITTIER SCHOOL Laborer 12/10/2016

MARGUERITE CONCRETE 8.0 0.0 0.00% 0.0 0.00% 0.0 0.00%WHITTIER SCHOOL Cement Finisher 07/23/2016

MARGUERITE CONCRETE 8.0 0.0 0.00% 0.0 0.00% 0.0 0.00%WHITTIER SCHOOL Laborer 07/23/2016

FACADES, INC 106.0 0.0 0.00% 0.0 0.00% 0.0 0.00%WHITTIER SCHOOL Carpenter 01/07/2017

17,246.9 3,369.7 19.54% 7,992.1 46.34% 283.3 1.64%SUB TOTALS:

WILDFLOWER PANTRY INC.

$2,000Amount:

Gen Contractor: HUNTER SIGNS

(617)360-9710 120 BUSINESS STREET HYDE PARK

Est Start Date:

Est End Date:

11/06/2016

11/12/2016

HUNTER SIGNS 4.0 4.0 100.00% 4.0 100.00% 0.0 0.00%WILDFLOWER PANTRY INC. Laborer 11/12/2016

4.0 4.0 100.00% 4.0 100.00% 0.0 0.00%SUB TOTALS:

WILLOW WOOD

$6,000,000Amount:

Gen Contractor:

Est Start Date:

Est End Date:

12/01/2016

12/30/2017

STEVEN MITCHELL CONSTRU 144.0 144.0 100.00% 0.0 0.00% 0.0 0.00%WILLOW WOOD Laborer 05/27/2017

144.0 144.0 100.00% 0.0 0.00% 0.0 0.00%SUB TOTALS:

WOODMEISTER

$2,500Amount:

Gen Contractor:

Est Start Date:

Est End Date:

08/25/2014

08/29/2014

INSIGNRA DBA INSTANT SIGN 3.0 0.0 0.00% 3.0 100.00% 0.0 0.00%WOODMEISTER Laborer 08/29/2014

3.0 0.0 0.00% 3.0 100.00% 0.0 0.00%SUB TOTALS:

WORK, INC.

$20,000Amount:

Gen Contractor: DE LA VEGA PAINTING, LLC.

(617)596-1251 23 CALDWELL ROAD WALTHAM

Est Start Date:

Est End Date:

10/01/2013

12/31/2013

G & G FIRE PROTECTION, INC. 8.0 0.0 0.00% 0.0 0.00% 0.0 0.00%WORK, INC. Sprinkler Fitter 11/23/2013

BRENAN INTERIOR CONT 29.0 26.0 89.66% 0.0 0.00% 0.0 0.00%WORK, INC. Carpenter 12/01/2013

DOOR CONCEPTS, INC. 14.8 0.0 0.00% 0.0 0.00% 0.0 0.00%WORK, INC. Carpenter 11/21/2013

ESI WATERPROOFING MASON 320.0 40.0 12.50% 320.0 100.00% 0.0 0.00%WORK, INC. Mason 08/07/2015

EVOLOTION FLOORING 48.0 0.0 0.00% 0.0 0.00% 0.0 0.00%WORK, INC. Floor Layer 11/22/2013

419.8 66.0 15.72% 320.0 76.22% 0.0 0.00%SUB TOTALS:

WY BEAUTY SALON & BARBER SHOP

$3,000Amount:

Gen Contractor: HUNTER SIGNS

(617)360-9710 120 BUSINESS STREET HYDE PARK

Est Start Date:

Est End Date:

05/10/2015

05/23/2015

HUNTER SIGNS 5.0 5.0 100.00% 5.0 100.00% 0.0 0.00%WY BEAUTY SALON & BARBER Laborer 05/23/2015

5.0 5.0 100.00% 5.0 100.00% 0.0 0.00%SUB TOTALS:

Page 250: Project Name Trade Latest Week Contractor Name Pct. · From: 11/16/2013 To: 09/15/2017 Contractor Name Total Hours Resident Hours Resident Pct. Minority Hours Minority Pct. Female

From: 11/16/2013 To: 09/15/2017

Contractor NameTotal

Hours

Resident

Hours

Resident

Pct.

Minority

Hours

Minority

Pct.

Female

Hours

Female

Pct.

BRJP Compliance Data By Project/Contractor/Trade PAGE: 250

Project Name Trade Latest Week

YANG'S MARTIAL ARTS ASSOCIATION

$3,000Amount:

Gen Contractor: HUNTER SIGNS

(617)360-9710 120 BUSINESS STREET HYDE PARK

Est Start Date:

Est End Date:

02/07/2016

02/12/2016

HUNTER SIGNS 4.0 4.0 100.00% 4.0 100.00% 0.0 0.00%YANG'S MARTIAL ARTS ASSOCI Laborer 02/07/2016

4.0 4.0 100.00% 4.0 100.00% 0.0 0.00%SUB TOTALS:

YMCA DORCHESTER

$30,000Amount:

Gen Contractor:

Est Start Date:

Est End Date:

06/20/2016

09/30/2016

MGT CONSTRUCTION CORP. 92.0 92.0 100.00% 92.0 100.00% 0.0 0.00%YMCA DORCHESTER Laborer 09/30/2016

MGT CONSTRUCTION CORP. 80.0 0.0 0.00% 0.0 0.00% 0.0 0.00%YMCA DORCHESTER Painter 09/30/2016

REFRIGERATION SER. OF N.E 22.0 7.0 31.82% 0.0 0.00% 0.0 0.00%YMCA DORCHESTER Plumber 08/07/2016

194.0 99.0 51.03% 92.0 47.42% 0.0 0.00%SUB TOTALS:

YOUTH ENRICHMENT SERVICES

$5,000,000Amount:

Gen Contractor: STORROW COMPANY, INC.

(617)491-3772 777 CONCORD AVE. SUITE 205 cambridge

Est Start Date:

Est End Date:

03/23/2014

04/21/2014

STORROW COMPANY, INC. 46.0 0.0 0.00% 0.0 0.00% 0.0 0.00%YOUTH ENRICHMENT SERVICES Carpenter 04/12/2014

STORROW COMPANY, INC. 8.0 0.0 0.00% 0.0 0.00% 0.0 0.00%YOUTH ENRICHMENT SERVICES Floor Layer 04/12/2014

STORROW COMPANY, INC. 8.0 0.0 0.00% 0.0 0.00% 0.0 0.00%YOUTH ENRICHMENT SERVICES Plumber 04/12/2014

62.0 0.0 0.00% 0.0 0.00% 0.0 0.00%SUB TOTALS:

ZAZ RESTAURANT

$8,000Amount:

Gen Contractor: G & S CONSTRUCTION

(617)201-6839 14 BIRCH ROAD WEST ROXBURY

Est Start Date:

Est End Date:

05/28/2017

06/03/2017

G & S CONSTRUCTION 32.0 20.0 62.50% 0.0 0.00% 12.0 37.50%ZAZ RESTAURANT Glazier 06/03/2017

32.0 20.0 62.50% 0.0 0.00% 12.0 37.50%SUB TOTALS:

20,892,545.8 6,294,808.7 30.13% 6,472,530.2 30.98% 1,070,806.0 5.13%TOTALS: