PROJECT MANAGEMENT – PRINCIPLES AND
PROCESS CHARLES COTTER
BMW, ROSSLYN
13-15 OCTOBER 2015
![Page 2: Project Management Principles and Process](https://reader033.fdocuments.us/reader033/viewer/2022061307/587f19ce1a28ab350c8b58a5/html5/thumbnails/2.jpg)
TRAINING PROGRAMME OVERVIEW
• Introduction
• Defining the fundamental concepts
• Project Management methodologies – PMBOK and PRINCE2
• Diagnosis and Evaluation of current BMW Project Management processes and practices
• Applying the 4-step generic, Project Management life-cycle/process
Project Start-up and Initiation Project Planning (and Scheduling) Project Implementation (Monitoring and Evaluation) Project Closure
• Summary and Closing
![Page 3: Project Management Principles and Process](https://reader033.fdocuments.us/reader033/viewer/2022061307/587f19ce1a28ab350c8b58a5/html5/thumbnails/3.jpg)
INTRODUCTORY ACTIVITY• Individual Activity:
• Complete the statement by inserting one (1) word. In order to be an effective Project Manager at BMW, I need to/to be…………………………………….(1 word)
• Find other learners with the same word as you. Jot these down on the flip-chart.
• Each learner will be given the opportunity to elaborate on their own word association.
![Page 4: Project Management Principles and Process](https://reader033.fdocuments.us/reader033/viewer/2022061307/587f19ce1a28ab350c8b58a5/html5/thumbnails/4.jpg)
![Page 5: Project Management Principles and Process](https://reader033.fdocuments.us/reader033/viewer/2022061307/587f19ce1a28ab350c8b58a5/html5/thumbnails/5.jpg)
DEFINING THE FUNDAMENTAL CONCEPTS
• Project
• Project characteristics
• Project Management
• The Triple Constraint
![Page 6: Project Management Principles and Process](https://reader033.fdocuments.us/reader033/viewer/2022061307/587f19ce1a28ab350c8b58a5/html5/thumbnails/6.jpg)
DEFINING PROJECTS• A project is a temporary and one-time endeavour
undertaken to create a unique product or service that brings about beneficial change or added value
• A project is a temporary piece of work with a finite
starting and ending date undertaken to create a unique product or service
• A project is a carefully defined set of activities that use resources to meet the pre-defined objectives
• Projects bring form or function to ideas or needs.
![Page 7: Project Management Principles and Process](https://reader033.fdocuments.us/reader033/viewer/2022061307/587f19ce1a28ab350c8b58a5/html5/thumbnails/7.jpg)
PROJECT CHARACTERISTICS
• Temporary
• Unique
• Involve new processes
• Undertaken to achieve a particular aim (deliverables)
• Value-adding driver of change and improvement
![Page 8: Project Management Principles and Process](https://reader033.fdocuments.us/reader033/viewer/2022061307/587f19ce1a28ab350c8b58a5/html5/thumbnails/8.jpg)
DEFINING PROJECT MANAGEMENT
• Project management is the application of knowledge, skills, tools and techniques to a broad range of activities in order to meet the requirements of the particular project.
• Project management is concerned with the overall planning and co-ordination of a project from inception to completion aimed at meeting the client's requirements and ensuring completion on time, within cost and to the required quality standards.
• These three (3) project management variables as often referred to as the eternal triangle of project management.
![Page 9: Project Management Principles and Process](https://reader033.fdocuments.us/reader033/viewer/2022061307/587f19ce1a28ab350c8b58a5/html5/thumbnails/9.jpg)
PROJECT MANAGEMENT ETERNAL TRIANGLE
![Page 10: Project Management Principles and Process](https://reader033.fdocuments.us/reader033/viewer/2022061307/587f19ce1a28ab350c8b58a5/html5/thumbnails/10.jpg)
![Page 11: Project Management Principles and Process](https://reader033.fdocuments.us/reader033/viewer/2022061307/587f19ce1a28ab350c8b58a5/html5/thumbnails/11.jpg)
DEFINING PROJECT SUCCESS CRITERIA
• Projects completed on time
• Projects completed within budget
• Projects completed according to quality standards and performance measures
• Projects completed within defined scope
• Projects completed by achieving all deliverables
• Projects completed to the satisfaction of all key stakeholders and beneficiaries
![Page 12: Project Management Principles and Process](https://reader033.fdocuments.us/reader033/viewer/2022061307/587f19ce1a28ab350c8b58a5/html5/thumbnails/12.jpg)
LEARNING ACTIVITY 1• Evaluate and rate your current BMW project
management practices against the six (6) project success criteria. Identify performance gaps. Recommend project improvement interventions
• From your experience as a project manager/team member at BMW, identify the five most common causes of project failure. For each of these 5 causes, identify an improvement strategy and/or solution to ensure a higher project success rate.
![Page 13: Project Management Principles and Process](https://reader033.fdocuments.us/reader033/viewer/2022061307/587f19ce1a28ab350c8b58a5/html5/thumbnails/13.jpg)
![Page 14: Project Management Principles and Process](https://reader033.fdocuments.us/reader033/viewer/2022061307/587f19ce1a28ab350c8b58a5/html5/thumbnails/14.jpg)
CAUSES OF PROJECT FAILURE (DISTRESSED PROJECTS)
• The wrong business requirements have been addressed
• It's not possible to deliver on the original business case
• Poor project governance and management
• Project managers don't usually have any influence over who their project sponsor is
• Poor project execution/implementation
• People lose focus on the project's benefits
• The environment changes
![Page 15: Project Management Principles and Process](https://reader033.fdocuments.us/reader033/viewer/2022061307/587f19ce1a28ab350c8b58a5/html5/thumbnails/15.jpg)
WHY DO PROJECTS FAIL?
![Page 16: Project Management Principles and Process](https://reader033.fdocuments.us/reader033/viewer/2022061307/587f19ce1a28ab350c8b58a5/html5/thumbnails/16.jpg)
ILLUSTRATION: PMBOK PROJECT MANAGEMENT
LIFE-CYCLE
![Page 17: Project Management Principles and Process](https://reader033.fdocuments.us/reader033/viewer/2022061307/587f19ce1a28ab350c8b58a5/html5/thumbnails/17.jpg)
ILLUSTRATION: PRINCE2 PROCESS
![Page 18: Project Management Principles and Process](https://reader033.fdocuments.us/reader033/viewer/2022061307/587f19ce1a28ab350c8b58a5/html5/thumbnails/18.jpg)
GENERIC PROJECT MANAGEMENT LIFE-CYCLE
• Phase 1: Project Start-up and Initiation
• Phase 2: Project Planning (and Scheduling)
• Phase 3: Project Implementation (Monitoring, Review and Evaluation)
• Phase 4: Project Closure
![Page 19: Project Management Principles and Process](https://reader033.fdocuments.us/reader033/viewer/2022061307/587f19ce1a28ab350c8b58a5/html5/thumbnails/19.jpg)
PHASE ONE: PROJECT
START-UP/INITIATION – PROCESS
STEPS/FLOW • Identification of a business problem,
opportunity and/or need
• Generation of prospective project proposal/s
• Evaluation and building of a business case for the prospective project proposal/s
• Selection and approval of most value-adding project/s
• Compilation of Terms of Reference (ToR) document, defining and scoping of the project
![Page 20: Project Management Principles and Process](https://reader033.fdocuments.us/reader033/viewer/2022061307/587f19ce1a28ab350c8b58a5/html5/thumbnails/20.jpg)
IDENTIFICATION OF PROBLEM, NEED OF OPPORTUNITY
• Conduct an Environmental scan:
Micro Market Stakeholder Analysis Macro
• Perform a SWOT Analysis:
Strengths Weaknesses Resources Capabilities Capacity Opportunities Threats
![Page 21: Project Management Principles and Process](https://reader033.fdocuments.us/reader033/viewer/2022061307/587f19ce1a28ab350c8b58a5/html5/thumbnails/21.jpg)
EVALUATION OF PROJECT PROPOSAL/S
• Financial and numerical metrics:
Cost-Benefit Analysis
Payback period
Return-on-Investment (ROI)
Net Present Value (NPV)
Internal Rate of Return (IRR)
![Page 22: Project Management Principles and Process](https://reader033.fdocuments.us/reader033/viewer/2022061307/587f19ce1a28ab350c8b58a5/html5/thumbnails/22.jpg)
PROJECT EVALUATION CRITERIA
• Viability
• Feasibility
• Sustainability
Profits People Planet
![Page 23: Project Management Principles and Process](https://reader033.fdocuments.us/reader033/viewer/2022061307/587f19ce1a28ab350c8b58a5/html5/thumbnails/23.jpg)
SUSTAINABILITY (TRIPLE BOTTOM LINE)
![Page 24: Project Management Principles and Process](https://reader033.fdocuments.us/reader033/viewer/2022061307/587f19ce1a28ab350c8b58a5/html5/thumbnails/24.jpg)
LEARNING ACTIVITY • Complete Learning Activity 2 (pages 35-36)
• Syndicate group discussion
• Present a summary of key discussion points
![Page 25: Project Management Principles and Process](https://reader033.fdocuments.us/reader033/viewer/2022061307/587f19ce1a28ab350c8b58a5/html5/thumbnails/25.jpg)
PURPOSE OF THE ToR• Defines your project and its scope
• Justifies the project
• Secures funding for the project, if necessary
• Defines the roles and responsibilities of project participants
• Gives people the information they need to be productive and effective right from the start
![Page 26: Project Management Principles and Process](https://reader033.fdocuments.us/reader033/viewer/2022061307/587f19ce1a28ab350c8b58a5/html5/thumbnails/26.jpg)
CONTENTS OF A ToR• Section 1: What?
Background Project Definition
• Section 2: Why?
Purpose Business Case
• Section 3: Who?
Roles and Responsibilities
• Section 4: How and When?
Defined milestones and target dates Initial/head-line project plan
![Page 27: Project Management Principles and Process](https://reader033.fdocuments.us/reader033/viewer/2022061307/587f19ce1a28ab350c8b58a5/html5/thumbnails/27.jpg)
LEARNING ACTIVITY • Complete Learning Activity 2 (page 37)
• Syndicate group discussion
• Present a summary of key discussion points
![Page 28: Project Management Principles and Process](https://reader033.fdocuments.us/reader033/viewer/2022061307/587f19ce1a28ab350c8b58a5/html5/thumbnails/28.jpg)
PHASE TWO: PROJECT PLANNING
• Project planning defines project activities that will be performed, the deliverables and describes how these activities will be accomplished and managed
• A Project Plan sets out the phases, activities and tasks needed to deliver a project
• The timeframes required to deliver the project, along with the resources and milestones are also shown in the Project Plan
• The project plan establishes a baseline which identifies and documents project scope, tasks, schedules, cost, risk, quality and staffing needs throughout the entire project life-cycle
![Page 29: Project Management Principles and Process](https://reader033.fdocuments.us/reader033/viewer/2022061307/587f19ce1a28ab350c8b58a5/html5/thumbnails/29.jpg)
COMPONENTS OF PROJECT PLANNING
• Resource plan
• Financial plan (project budget)
• Quality plan
• Risk management plan
• Communications plan
• Procurement plan
![Page 30: Project Management Principles and Process](https://reader033.fdocuments.us/reader033/viewer/2022061307/587f19ce1a28ab350c8b58a5/html5/thumbnails/30.jpg)
PROJECT ACTION PLAN TEMPLATE
• Objective (What?)
• Tasks (How?)
• Responsible (Who?)
• Time (When?)
• KPI (Weight?)
![Page 31: Project Management Principles and Process](https://reader033.fdocuments.us/reader033/viewer/2022061307/587f19ce1a28ab350c8b58a5/html5/thumbnails/31.jpg)
PROJECT ACTION PLAN TEMPLATE
![Page 32: Project Management Principles and Process](https://reader033.fdocuments.us/reader033/viewer/2022061307/587f19ce1a28ab350c8b58a5/html5/thumbnails/32.jpg)
PROJECT BUDGET
![Page 33: Project Management Principles and Process](https://reader033.fdocuments.us/reader033/viewer/2022061307/587f19ce1a28ab350c8b58a5/html5/thumbnails/33.jpg)
LEARNING ACTIVITY • Complete Learning Activity 3 (pages 45-46)
• Syndicate group discussion
• Present a summary of key discussion points
![Page 34: Project Management Principles and Process](https://reader033.fdocuments.us/reader033/viewer/2022061307/587f19ce1a28ab350c8b58a5/html5/thumbnails/34.jpg)
PROJECT SCHEDULING• Project scheduling means detailing what
activities have to be done, the order (sequence) in which they are to be completed, who is to do each, and how they are to be completed.
• Project scheduling entails the planning and plotting the following project variables:
Tasks (e.g. Work Breakdown Structure) Time (e.g. Gantt chart and PERT/network diagramme) Resources (e.g. Resource Allocation Matrix and Resource Histogram) Responsibility (e.g. Load Chart and Responsibility Matrix)
![Page 35: Project Management Principles and Process](https://reader033.fdocuments.us/reader033/viewer/2022061307/587f19ce1a28ab350c8b58a5/html5/thumbnails/35.jpg)
WORK BREAKDOWN STRUCTURE (WBS)
• A Work Breakdown Structure (WBS) is a detailed list of all of the things that need to be delivered and the activities that need to be carried out to complete the project.
• A WBS is a chart in which the critical work elements, called tasks, of a project are illustrated to portray their relationships to each other and to the project as a whole.
• It's represented as a tree-structure, with each deliverable or activity broken down into further components. When completed, a well-structured WBS resembles a flowchart in which all elements are logically connected, redundancy is avoided and no critical elements are left out.
• The graphical nature of the WBS can help a project manager predict outcomes based on various scenarios, which can ensure that optimum decisions are made about whether or not to adopt suggested procedures or changes.
![Page 36: Project Management Principles and Process](https://reader033.fdocuments.us/reader033/viewer/2022061307/587f19ce1a28ab350c8b58a5/html5/thumbnails/36.jpg)
ILLUSTRATION: WBS
![Page 37: Project Management Principles and Process](https://reader033.fdocuments.us/reader033/viewer/2022061307/587f19ce1a28ab350c8b58a5/html5/thumbnails/37.jpg)
GANTT CHARTS (SCHEDULING TIME)
• Project Managers need to estimate time accurately if they’re going to deliver their project on time (and on budget)
• Without this skill, PM’s won't know how long your project will take, and won't be able to get commitment from the people required to help achieve the project objectives
• Gantt Charts are useful tools for analyzing and planning more complex projects. It plots scheduled projects tasks/activities on a time-line.
• When a project is under way, Gantt Charts help PM’s to monitor whether the project is on schedule. If it is not, it allows PM’s to pinpoint the remedial action necessary to put it back on schedule.
![Page 38: Project Management Principles and Process](https://reader033.fdocuments.us/reader033/viewer/2022061307/587f19ce1a28ab350c8b58a5/html5/thumbnails/38.jpg)
ILLUSTRATION: GANTT CHART
![Page 39: Project Management Principles and Process](https://reader033.fdocuments.us/reader033/viewer/2022061307/587f19ce1a28ab350c8b58a5/html5/thumbnails/39.jpg)
LEARNING ACTIVITY • Complete Learning Activity 4 (pages 52-53)
• Syndicate group discussion
• Present a summary of key discussion points
![Page 40: Project Management Principles and Process](https://reader033.fdocuments.us/reader033/viewer/2022061307/587f19ce1a28ab350c8b58a5/html5/thumbnails/40.jpg)
ILLUSTRATION: PROJECT RISK MANAGEMENT PROCESS
![Page 41: Project Management Principles and Process](https://reader033.fdocuments.us/reader033/viewer/2022061307/587f19ce1a28ab350c8b58a5/html5/thumbnails/41.jpg)
PROJECT RISK MANAGEMENT PROCESS
• Step 1: Risk Identification
• Step 2: Risk Analysis
• Step 3: Risk Prioritization
• Step 4: Risk Response
• Step 5: Risk Evaluation
![Page 42: Project Management Principles and Process](https://reader033.fdocuments.us/reader033/viewer/2022061307/587f19ce1a28ab350c8b58a5/html5/thumbnails/42.jpg)
PROJECT RISK MATRIX
![Page 43: Project Management Principles and Process](https://reader033.fdocuments.us/reader033/viewer/2022061307/587f19ce1a28ab350c8b58a5/html5/thumbnails/43.jpg)
PROJECT RISK RESPONSE STRATEGIES
![Page 44: Project Management Principles and Process](https://reader033.fdocuments.us/reader033/viewer/2022061307/587f19ce1a28ab350c8b58a5/html5/thumbnails/44.jpg)
LEARNING ACTIVITY • Complete Learning Activity 6 (pages 68-69)
• Syndicate group discussion
• Present a summary of key discussion points
![Page 45: Project Management Principles and Process](https://reader033.fdocuments.us/reader033/viewer/2022061307/587f19ce1a28ab350c8b58a5/html5/thumbnails/45.jpg)
PHASE THREE: PROJECT IMPLEMENTATION
• The most important issue in this phase is to ensure project activities are properly executed and controlled
• This phase involves the execution of each activity and task listed in the project plan.
• While the activities and tasks are being executed, a series of project management and quality assurance processes are undertaken by the Project Manager to observe, monitor, analyze and control the project deliverables to ensure that the key project objectives are achieved.
![Page 46: Project Management Principles and Process](https://reader033.fdocuments.us/reader033/viewer/2022061307/587f19ce1a28ab350c8b58a5/html5/thumbnails/46.jpg)
PROJECT IMPLEMENTATION ACTIONS
• Resource mobilization and deployment
• Organizing and delegating tasks
• Performance Management
Project (time, cost, quality and scope) Project team members Contractors and sub-contractors (SLA) Earned Value Management
• Leading and motivating project team
![Page 47: Project Management Principles and Process](https://reader033.fdocuments.us/reader033/viewer/2022061307/587f19ce1a28ab350c8b58a5/html5/thumbnails/47.jpg)
![Page 48: Project Management Principles and Process](https://reader033.fdocuments.us/reader033/viewer/2022061307/587f19ce1a28ab350c8b58a5/html5/thumbnails/48.jpg)
PROJECT IMPLEMENTATION ACTIONS
• Problem-solving/Trouble-shooting
• Conflict Management/Resolution
• Change and Scope Management
• Communication
Project (progress/status) meetings Stakeholder engagement and liaising
![Page 49: Project Management Principles and Process](https://reader033.fdocuments.us/reader033/viewer/2022061307/587f19ce1a28ab350c8b58a5/html5/thumbnails/49.jpg)
POWER-INTEREST MATRIX
![Page 50: Project Management Principles and Process](https://reader033.fdocuments.us/reader033/viewer/2022061307/587f19ce1a28ab350c8b58a5/html5/thumbnails/50.jpg)
PROJECT CONTROL• The purpose of the control process is to ensure that the
project work can be carried out as scheduled.
• Checkpoints are held throughout the project at weekly intervals and provide the mechanism for monitoring and controlling the day to day work on the project.
• Performance information is captured and plans are updated prior to the Project Status meeting. This enables the meeting to concentrate on determining what to do next.
• Defining the control procedures includes the setting of tolerance levels for project performance.
![Page 51: Project Management Principles and Process](https://reader033.fdocuments.us/reader033/viewer/2022061307/587f19ce1a28ab350c8b58a5/html5/thumbnails/51.jpg)
ILLUSTRATION: PROJECT CONTROL PROCESS
![Page 52: Project Management Principles and Process](https://reader033.fdocuments.us/reader033/viewer/2022061307/587f19ce1a28ab350c8b58a5/html5/thumbnails/52.jpg)
LEARNING ACTIVITY • Complete Learning Activity 5 (page 61)
• Syndicate group discussion
• Present a summary of key discussion points
![Page 53: Project Management Principles and Process](https://reader033.fdocuments.us/reader033/viewer/2022061307/587f19ce1a28ab350c8b58a5/html5/thumbnails/53.jpg)
![Page 54: Project Management Principles and Process](https://reader033.fdocuments.us/reader033/viewer/2022061307/587f19ce1a28ab350c8b58a5/html5/thumbnails/54.jpg)
PROJECT CHANGE MANAGEMENT
• Project change is inevitable. These project changes cannot always be avoided, but their impact can be predicted and controlled.
• The impact of these changes must be considered and factored in terms time; cost; quality and customer satisfaction.
• Change requests to the project scope or functionality may come from a variety of sources, but they will require Project Board sponsorship to be processed.
• The originator will describe the change request and provide a justification. Alternative solutions and their respective impacts on the project will be identified and a recommendation made. The recommendation will be presented to the Project Board who will decide whether to accept it or make an alternative recommendation.
• These change requests are formalized through the completion of a Project Change Request Form (CRF).
![Page 55: Project Management Principles and Process](https://reader033.fdocuments.us/reader033/viewer/2022061307/587f19ce1a28ab350c8b58a5/html5/thumbnails/55.jpg)
![Page 56: Project Management Principles and Process](https://reader033.fdocuments.us/reader033/viewer/2022061307/587f19ce1a28ab350c8b58a5/html5/thumbnails/56.jpg)
![Page 57: Project Management Principles and Process](https://reader033.fdocuments.us/reader033/viewer/2022061307/587f19ce1a28ab350c8b58a5/html5/thumbnails/57.jpg)
LEARNING ACTIVITY • Complete Learning Activity 7 (page 72)
• Syndicate group discussion
• Present a summary of key discussion points
![Page 58: Project Management Principles and Process](https://reader033.fdocuments.us/reader033/viewer/2022061307/587f19ce1a28ab350c8b58a5/html5/thumbnails/58.jpg)
PHASE FOUR: PROJECT CLOSURE
• This process verifies that the project has delivered the required outcomes and that stakeholder expectations have been met.
• It also makes sure that everyone involved in the project knows how to move forward.
• Project closeout is a fairly routine process, but it remains an important process.
• By properly completing the project closeout, organizations can benefit from lessons learned and information compiled at closure.
![Page 59: Project Management Principles and Process](https://reader033.fdocuments.us/reader033/viewer/2022061307/587f19ce1a28ab350c8b58a5/html5/thumbnails/59.jpg)
PROJECT CLOSURE ACTIVITIES
• Releasing the final deliverables to the customer
• Handing over project documentation and administration and terminating contracts
• Communicating the closure to all stakeholders
• Releasing staff
• Closing the Project Office
![Page 60: Project Management Principles and Process](https://reader033.fdocuments.us/reader033/viewer/2022061307/587f19ce1a28ab350c8b58a5/html5/thumbnails/60.jpg)
PROJECT CLOSURE ACTIVITIES
• Perform a Post Implementation Review of the project
• Close-out report:
Assessment of the project against actual performance
Quality of management (focusing on quality and risk management)
The lessons learnt that can be applied to future projects
![Page 61: Project Management Principles and Process](https://reader033.fdocuments.us/reader033/viewer/2022061307/587f19ce1a28ab350c8b58a5/html5/thumbnails/61.jpg)
![Page 62: Project Management Principles and Process](https://reader033.fdocuments.us/reader033/viewer/2022061307/587f19ce1a28ab350c8b58a5/html5/thumbnails/62.jpg)
LEARNING ACTIVITY • Complete Learning Activity 8 (page 76)
• Syndicate group discussion
• Present a summary of key discussion points
![Page 63: Project Management Principles and Process](https://reader033.fdocuments.us/reader033/viewer/2022061307/587f19ce1a28ab350c8b58a5/html5/thumbnails/63.jpg)
CONCLUSION
• Key points
• Summary
• Questions
![Page 64: Project Management Principles and Process](https://reader033.fdocuments.us/reader033/viewer/2022061307/587f19ce1a28ab350c8b58a5/html5/thumbnails/64.jpg)
CONTACT DETAILS
• Charles Cotter
• (+27) 84 562 9446
• Twitter: Charles_Cotter
• http://www.slideshare.net/CharlesCotter