Project Management Plan Mt. Angel Abbey Archives LI863XI Project Management for MLS Group Project...

21
Project Management Plan Mt. Angel Abbey Archives LI863XI Project Management for MLS Group Project Plan July 15, 2007 TECH SERVICES GROUP April Younglove Kate Wise Patty Charlesworth

Transcript of Project Management Plan Mt. Angel Abbey Archives LI863XI Project Management for MLS Group Project...

Page 1: Project Management Plan Mt. Angel Abbey Archives LI863XI Project Management for MLS Group Project Plan July 15, 2007 TECH SERVICES GROUP April Younglove.

Project Management PlanMt. Angel Abbey Archives

LI863XI Project Management for MLSGroup Project PlanJuly 15, 2007TECH SERVICES GROUP April Younglove Kate Wise Patty Charlesworth

Page 2: Project Management Plan Mt. Angel Abbey Archives LI863XI Project Management for MLS Group Project Plan July 15, 2007 TECH SERVICES GROUP April Younglove.

Introduction

Mt. Angel Abbey was founded in 1882 by Benedictine by monks from the Abbey of Engelberg in Switzerland. Mt. Angel Abbey Library serves patrons including monks of the abbey, students and faculty of the affiliated seminary and researchers.

Page 3: Project Management Plan Mt. Angel Abbey Archives LI863XI Project Management for MLS Group Project Plan July 15, 2007 TECH SERVICES GROUP April Younglove.

Introduction, cont’d The Abbey Archives is a primary focus of the library. The

geographic focus of the archive collection is Mt. Angel Abbey and its various apostolates, with the primary collection subject area being all areas regarding life at the Abbey. The primary collection includes: liturgies, the work of the seminary, the library, and all activities sponsored by the Abbey.

A secondary collecting subject area is Catholic history in Oregon, including early territorial history. The Abbey Archives also houses individual collections of original music by several of the monks including Father Dominic Waedenschyler and Abbot Placidus Fuerst.

While the Abbey restricts access to its archive collections, arrangements can be made through scheduled appointments for research.

Page 4: Project Management Plan Mt. Angel Abbey Archives LI863XI Project Management for MLS Group Project Plan July 15, 2007 TECH SERVICES GROUP April Younglove.

Initiation Phase

Project Name:Database for Mt. Angel Abbey Archives

Project Overview:Mt. Angel Abbey currently does not have a digital system for information storage in their archive. The Abbey is interested in creating a database to cross reference material, more easily locate items within the archive (for instance, to search by both author and event) and make finding aids and post them online. Currently the archive only has finding aids for the photographs and these aids are not online.

Page 5: Project Management Plan Mt. Angel Abbey Archives LI863XI Project Management for MLS Group Project Plan July 15, 2007 TECH SERVICES GROUP April Younglove.

Project Initiation, cont’d

Purpose and Goal:To make the location of materials in the Mt. Angel Abbey easier for users.

Project Manager:Library science student

Page 6: Project Management Plan Mt. Angel Abbey Archives LI863XI Project Management for MLS Group Project Plan July 15, 2007 TECH SERVICES GROUP April Younglove.

Project Initiation, cont’d Team Members:

One monk and one nun who run the archives – they will advise the project manager in database creation through interviews and constant feedback, also, the nun should create finding aids.

Stakeholders:Members of the abbey, local churches connected to the abbey, historians, the public, workers in the abbey’s archives and library.

Page 7: Project Management Plan Mt. Angel Abbey Archives LI863XI Project Management for MLS Group Project Plan July 15, 2007 TECH SERVICES GROUP April Younglove.

Project Planning

Project Objectives: To deliver collection content

through digital technology To facilitate the location and use of

archival material. To document & preserve the

cultural heritage of Mt. Angel Abbey To develop collection finding aids

Page 8: Project Management Plan Mt. Angel Abbey Archives LI863XI Project Management for MLS Group Project Plan July 15, 2007 TECH SERVICES GROUP April Younglove.

Project Planning, cont’d Scope:

Provide digital access to a cultural heritage collection, through the use of online finding aids.

Cost:Computers, with hard drive space, are available for the actual database construction. The project is being undertaken by a SLIM student who will be receiving a grade, therefore labor is being provided at no charge. The database will be constructed in Access which may require a purchase involving $100.00.

Time:There is no official deadline for this project as far as the abbey is concerned. The LIS student, however, must conform to the time parameters set for the class which is two and one-half months. During this time period the database will be created and put online. The cataloging will take an additional six to twelve months, and will be performed by library archives staff.

Page 9: Project Management Plan Mt. Angel Abbey Archives LI863XI Project Management for MLS Group Project Plan July 15, 2007 TECH SERVICES GROUP April Younglove.

Project Planning, cont’d

Available Resources: Staff members’ expertise

and familiarity with the collection

Library Science student expertise and familiarity with database creation, organization, theory and best practices

Web access Computers Prior descriptive

/cataloging data Volunteers from a nearby

church

Page 10: Project Management Plan Mt. Angel Abbey Archives LI863XI Project Management for MLS Group Project Plan July 15, 2007 TECH SERVICES GROUP April Younglove.

Project Planning, cont’d

Limitations:Several limitations may impact this project. The project is being undertaken by a library science

student with a half-time day job in addition to this project.

While labor is being provided free of charge, therefore no funding is necessary, the technical expertise/assistance of the student may be limited once the project is completed.

This student will want to address this limitation when creating the database by making it user friendly and by providing training to the monks and nuns working in the archives.

Another limitation may be approval time. The authority structure of the abbey requires all work to be approved by the abbot, which may add time.

Page 11: Project Management Plan Mt. Angel Abbey Archives LI863XI Project Management for MLS Group Project Plan July 15, 2007 TECH SERVICES GROUP April Younglove.

Project Planning, cont’d

Work Breakdown Schedule (Tasks): Using the Work Breakdown Schedule (Richman,

p.80, Fig. 8-1) would be beneficial to estimate a specific task schedule

Nuns will answer questions and periodically test the database during creation.

Nuns and monks will be responsible for cataloging, during and after creation.

Breakdown of database creations stages: Concept map Database creation Database testing & revision Interface polishing Putting information on the Web

Page 12: Project Management Plan Mt. Angel Abbey Archives LI863XI Project Management for MLS Group Project Plan July 15, 2007 TECH SERVICES GROUP April Younglove.

Project Execution

Information Needed During Execution: How and where the pieces in the collection

are physically located Regular updates on percentage completed Any unexpected costs incurred Any unexpected setbacks Feedback from project advisors (monks

and nuns) Any necessary technology updates Previous finding aids used

Page 13: Project Management Plan Mt. Angel Abbey Archives LI863XI Project Management for MLS Group Project Plan July 15, 2007 TECH SERVICES GROUP April Younglove.

Project Execution, cont’dData collection

methods during the project:

Schedules detailing percentage completed

Checklist/master list of materials to be indexed and entered into the digital database

Feedback in the form of meeting notes from project advisors

Page 14: Project Management Plan Mt. Angel Abbey Archives LI863XI Project Management for MLS Group Project Plan July 15, 2007 TECH SERVICES GROUP April Younglove.

Project Execution, cont’d

Controlling Objectives: Benchmarks:

The first cataloguing of items Teaching people how to use the database Transferring information about catalogued

items Assessments

Favorable grade given by instructor Used easily by nuns & monks Continued use into the future

Page 15: Project Management Plan Mt. Angel Abbey Archives LI863XI Project Management for MLS Group Project Plan July 15, 2007 TECH SERVICES GROUP April Younglove.

Project Execution, cont’d

Monitoring the Team: Communication with project advisors will be in

person in the form of regular meetings. These meetings will provide informal feedback and assessment on fulfillment of project goals and objectives, and provide a forum for necessary changes to the project.

Dealing with Changes: Changes will be approved by all project team

members and the abbot To monitor and track requests for changes to the

project plan a form such as Figure A (see next slide) will be used

This form will be made available in an online format to facilitate ease of request submission

Page 16: Project Management Plan Mt. Angel Abbey Archives LI863XI Project Management for MLS Group Project Plan July 15, 2007 TECH SERVICES GROUP April Younglove.

Project Execution, cont’dMt. Angel Abbey Change Request & Approval Form

Project title:Date:

Activity Revision

Activity description:

Submitted by: Date:

Description of change:

Reason for Change:

Impact of change on this activity and on other activities

Activity Impact on schedule Impact on cost Impact on scope

Approvals

(Adapted from: Richman, p. 187)

Page 17: Project Management Plan Mt. Angel Abbey Archives LI863XI Project Management for MLS Group Project Plan July 15, 2007 TECH SERVICES GROUP April Younglove.

Project Execution, cont’d Communicating wit

Stakeholders during Project Execution:

Updates in the form of a newsletter will be sent to all interested stakeholders on a regular basis

Communication will also take place through regular church communication channels i.e. bulletin, etc.

Page 18: Project Management Plan Mt. Angel Abbey Archives LI863XI Project Management for MLS Group Project Plan July 15, 2007 TECH SERVICES GROUP April Younglove.

Project Closedown

Evaluation of Project: The project will be evaluated with a

grade. It will also be evaluated by the abbot who will approve the final product for use.

In addition, the completed project will be compared to the initial project goals to see how things changed, could have been different or will be done differently next time the library science student creates a database.

Page 19: Project Management Plan Mt. Angel Abbey Archives LI863XI Project Management for MLS Group Project Plan July 15, 2007 TECH SERVICES GROUP April Younglove.

Project Closedown

Dissembling the Team: The PM will gradually reduce contact

after the class. After she has helped the abbot put items online, she will no longer work on the project and it will be considered complete.

At this point, it should be easy for the remaining team members to complete cataloging and then, the database will be complete and the nun and monk responsible for the archives should be able to add information to the database gradually as new items come in.

Page 20: Project Management Plan Mt. Angel Abbey Archives LI863XI Project Management for MLS Group Project Plan July 15, 2007 TECH SERVICES GROUP April Younglove.

Project Closedown

Project Review with Stakeholders: The entire database will be mapped with

boxes and lines (kind of like a mind map) and it will be downloaded and sent to the instructor of the class for evaluation.

The abbot will look at the database and listen to reports from the two archives workers.

Upon approval, these workers will inform and instruct (along with the PM) volunteers and interested library staff.

Church members will see results online and hopefully will increase their use of and support for the archives as a result.

Page 21: Project Management Plan Mt. Angel Abbey Archives LI863XI Project Management for MLS Group Project Plan July 15, 2007 TECH SERVICES GROUP April Younglove.

References

Mount Angel Abbey Library. (2007). Mount Angel Abbey. Accessed July 9, 2007 at http://www.mtangel.edu/library/main/library.htm

Richman, L. (2002). Project management:step-by-step. New York: AMACOM American Management Association.