PROJECT MANAGEMENT REPORT ON WEB BASED APPLICATION
-BLOOD INFORMATION MANAGEMENT SYSTEM
(BIMS)
BY: ER. SABAN KUMAR KC
ER. SANJIV KUMAR YADAV
MSC ENGINEERING IN TECHNOLOGY AND INNOVATION MANAGEMENT
II SEMESTER/PROJECT MANAGEMENT
IOE, PULCHOWK CAMPUS
DEPARTMENT OF MECHANICAL ENGINEERING
2014, AUGUST
![Page 2: Project Management of Project-Blood Information Management System](https://reader036.fdocuments.us/reader036/viewer/2022071723/55c3a787bb61eb210b8b4585/html5/thumbnails/2.jpg)
2 OVERVIEW
1. INITIATING THE PROJECT
1.1STAKEHOLDER ANALYSIS
2. PROJECT PLANNING PROCESS
2.1 GANTT CHART
2.2 WORKBREAKDOWN STRUCTURE(WBS)
2.3 RISK ANALYSIS
2.4 COST PLANNING
3.IMPLEMENTATION
3.1ACTUAL VS PLANNED CHART
4. FINALZING THE PROJECT
4.1 ROLES AND RESPONSIBILIITES
5. CONCLUSION
6.REFERENCES
![Page 3: Project Management of Project-Blood Information Management System](https://reader036.fdocuments.us/reader036/viewer/2022071723/55c3a787bb61eb210b8b4585/html5/thumbnails/3.jpg)
31.INITIATING THE PROJECT
Background of the project• Nepal Red Cross Society Blood Transfusion Centres has
been involving on Blood services. It has been recording Blood Donor’s information, Blood service transaction, Blood inventory management etc manually.
Objectives of Project• Online Blood Donor Information sharing to people who
require blood urgently
• Manage the blood database efficiently
• Blood Scarcity Maintain by better controlling and decision making feature of this system
![Page 4: Project Management of Project-Blood Information Management System](https://reader036.fdocuments.us/reader036/viewer/2022071723/55c3a787bb61eb210b8b4585/html5/thumbnails/4.jpg)
41.1 STAKEHOLDER ANALYSIS
![Page 5: Project Management of Project-Blood Information Management System](https://reader036.fdocuments.us/reader036/viewer/2022071723/55c3a787bb61eb210b8b4585/html5/thumbnails/5.jpg)
52.PROJECT PLANNING PROCESS2.1 GANTT CHART
![Page 6: Project Management of Project-Blood Information Management System](https://reader036.fdocuments.us/reader036/viewer/2022071723/55c3a787bb61eb210b8b4585/html5/thumbnails/6.jpg)
62.2 WORKBREAKDOWN STRUCTURE(WBS)
![Page 7: Project Management of Project-Blood Information Management System](https://reader036.fdocuments.us/reader036/viewer/2022071723/55c3a787bb61eb210b8b4585/html5/thumbnails/7.jpg)
72.3 RISK ANALYSIS
![Page 8: Project Management of Project-Blood Information Management System](https://reader036.fdocuments.us/reader036/viewer/2022071723/55c3a787bb61eb210b8b4585/html5/thumbnails/8.jpg)
82.4 PERT ANALYSIS
![Page 9: Project Management of Project-Blood Information Management System](https://reader036.fdocuments.us/reader036/viewer/2022071723/55c3a787bb61eb210b8b4585/html5/thumbnails/9.jpg)
92.5 COST PLANING
![Page 10: Project Management of Project-Blood Information Management System](https://reader036.fdocuments.us/reader036/viewer/2022071723/55c3a787bb61eb210b8b4585/html5/thumbnails/10.jpg)
103. IMPLEMENTATION3.1 ACTUAL VS PLANNED CHART
![Page 11: Project Management of Project-Blood Information Management System](https://reader036.fdocuments.us/reader036/viewer/2022071723/55c3a787bb61eb210b8b4585/html5/thumbnails/11.jpg)
114. FINALIZING THE PROJECT
Project Deliverables:
A web based application software named BLOOD INFORMATION MANAGEMENT SYSTEM-BIMS get available in the URL: www.bimsnrcs.org
Success Criteria:
• Experienced Software Developer working in ASP.NET platform
• A Project Coordinator who has form both technology and management background
Constraints:
1st installment (35%)at the time of agreement, Best coordination between developers and management by project coordinator, 5 month development duration, 1month Testing
![Page 12: Project Management of Project-Blood Information Management System](https://reader036.fdocuments.us/reader036/viewer/2022071723/55c3a787bb61eb210b8b4585/html5/thumbnails/12.jpg)
124.1 ROLES AND RESPONSIBILITIES
![Page 13: Project Management of Project-Blood Information Management System](https://reader036.fdocuments.us/reader036/viewer/2022071723/55c3a787bb61eb210b8b4585/html5/thumbnails/13.jpg)
135. CONCLUSION
• Due to the project environment-Internal, External and Task environment the time delay occurred which increases the cost of the project
• The objectives of project is implemented by implementing the different plans such as time estimated through Gantt chart, work breakdown structure, cost planning
• Risk analysis really helped for the risk recovery
• The project is heading towards its objectives fulfilment with satisfaction of the stakeholders of this project.
![Page 14: Project Management of Project-Blood Information Management System](https://reader036.fdocuments.us/reader036/viewer/2022071723/55c3a787bb61eb210b8b4585/html5/thumbnails/14.jpg)
146. REFERENCES
![Page 15: Project Management of Project-Blood Information Management System](https://reader036.fdocuments.us/reader036/viewer/2022071723/55c3a787bb61eb210b8b4585/html5/thumbnails/15.jpg)
15THANKYOU!!