PROJECT MANAGEMENT REPORT ON WEB BASED APPLICATION -BLOOD INFORMATION MANAGEMENT SYSTEM (BIMS) BY: ER. SABAN KUMAR KC ER. SANJIV KUMAR YADAV MSC ENGINEERING IN TECHNOLOGY AND INNOVATION MANAGEMENT II SEMESTER/PROJECT MANAGEMENT IOE, PULCHOWK CAMPUS DEPARTMENT OF MECHANICAL ENGINEERING 2014, AUGUST 1

Transcript of Project Management of Project-Blood Information Management System

Page 1: Project Management of Project-Blood Information Management System

1

PROJECT MANAGEMENT REPORT ON WEB BASED APPLICATION

-BLOOD INFORMATION MANAGEMENT SYSTEM

(BIMS)

BY: ER. SABAN KUMAR KC

ER. SANJIV KUMAR YADAV

MSC ENGINEERING IN TECHNOLOGY AND INNOVATION MANAGEMENT

II SEMESTER/PROJECT MANAGEMENT

IOE, PULCHOWK CAMPUS

DEPARTMENT OF MECHANICAL ENGINEERING

2014, AUGUST

Page 2: Project Management of Project-Blood Information Management System

2 OVERVIEW

1. INITIATING THE PROJECT

1.1STAKEHOLDER ANALYSIS

2. PROJECT PLANNING PROCESS

2.1 GANTT CHART

2.2 WORKBREAKDOWN STRUCTURE(WBS)

2.3 RISK ANALYSIS

2.4 COST PLANNING

3.IMPLEMENTATION

3.1ACTUAL VS PLANNED CHART

4. FINALZING THE PROJECT

4.1 ROLES AND RESPONSIBILIITES

5. CONCLUSION

6.REFERENCES

Page 3: Project Management of Project-Blood Information Management System

31.INITIATING THE PROJECT

Background of the project• Nepal Red Cross Society Blood Transfusion Centres has

been involving on Blood services. It has been recording Blood Donor’s information, Blood service transaction, Blood inventory management etc manually.

Objectives of Project• Online Blood Donor Information sharing to people who

require blood urgently

• Manage the blood database efficiently

• Blood Scarcity Maintain by better controlling and decision making feature of this system

Page 4: Project Management of Project-Blood Information Management System

41.1 STAKEHOLDER ANALYSIS

Page 5: Project Management of Project-Blood Information Management System

52.PROJECT PLANNING PROCESS2.1 GANTT CHART

Page 6: Project Management of Project-Blood Information Management System

62.2 WORKBREAKDOWN STRUCTURE(WBS)

Page 7: Project Management of Project-Blood Information Management System

72.3 RISK ANALYSIS

Page 8: Project Management of Project-Blood Information Management System

82.4 PERT ANALYSIS

Page 9: Project Management of Project-Blood Information Management System

92.5 COST PLANING

Page 10: Project Management of Project-Blood Information Management System

103. IMPLEMENTATION3.1 ACTUAL VS PLANNED CHART

Page 11: Project Management of Project-Blood Information Management System

114. FINALIZING THE PROJECT

Project Deliverables:

A web based application software named BLOOD INFORMATION MANAGEMENT SYSTEM-BIMS get available in the URL: www.bimsnrcs.org

Success Criteria:

• Experienced Software Developer working in ASP.NET platform

• A Project Coordinator who has form both technology and management background

Constraints:

1st installment (35%)at the time of agreement, Best coordination between developers and management by project coordinator, 5 month development duration, 1month Testing

Page 12: Project Management of Project-Blood Information Management System

124.1 ROLES AND RESPONSIBILITIES

Page 13: Project Management of Project-Blood Information Management System

135. CONCLUSION

• Due to the project environment-Internal, External and Task environment the time delay occurred which increases the cost of the project

• The objectives of project is implemented by implementing the different plans such as time estimated through Gantt chart, work breakdown structure, cost planning

• Risk analysis really helped for the risk recovery

• The project is heading towards its objectives fulfilment with satisfaction of the stakeholders of this project.

 

Page 14: Project Management of Project-Blood Information Management System

146. REFERENCES

Page 15: Project Management of Project-Blood Information Management System

15THANKYOU!!