Project Leadership Skills that
Revolutionized the World
Joseph R. Luttrell, PMP
President / CEO EQ Seminars, LLC.
KIPMI Chapter Immediate Past President
IMS, LLC - U of L PM Delphi Instructor
Dale Carnegie Graduate Assistant
Operations Manager ASAP Supply Chain Automation
Has that Moment in History for
Revolution arrived for Us?
Recession Impact Solution PM Acceptance
1952 Federal Reserve tightens money supply to curb inflation.
Unemployment: 6.1% GDP Decline: 2.06%
Increase Taxes Dupont: CPM
US Navy: PERT
DoD: Uses Modern PM
Tech on Polaris Missile
1969 Budget cuts to address deficits from Vietnam War.
Unemployment: 6.1% GDP Decline: .6%
Increase Taxes Project Management
Institute Founded
1982 OPEC forms to manipulate global oil prices. *Interest rate 22%
Unemployment:
10.8%
GDP Decline:
2 .7%
Cut income taxes
from 72% to 33%
and deficit
spending.
PMBOK Introduced as a
white paper.
2001 .com bubble burst and 9/11 attacks
Unemployment:
6.3%
GDP Decline:
.3%
Increase consumer
debt w predatory
lending practices.
PMP Introduced
2002 – 50,000
2009 – 400,00
2009 Poor mortgage lending practices drives US debt crisis.
Unemployment:
10.2%
GDP Decline:
3.9%
Previous options
are off the table.
Free government is
in a state of peril.
Management & Leadership
1940s Governance Structures
CEO
Director Director Director
Functional Mgr Functional Mgr Functional Mgr
C-Level
VP
Direct Report Direct Report
C-Level
Director
Functional Mgr
Direct Report Direct Report
VP
Technology Unleashed a Torrent of Capabilities
And the Age of Collaboration
Cell Phone
CD
DVD
Laptop
PDA
Internet
PDA Phone
Wireless
Sharepoint
Facebook, Youtube, Linked In
Management
Leadership
Level 5 Leadership Definition
Level 5 Executive
Builds enduring greatness through a paradoxical blend of
personal humility and professional will (aka. tenacity).
Level 2 Contributing Team Member
Contributes individual capabilities to the achievement of group
objectives and works effectively with others in a group setting.
Level 1 Highly Capable Individual
Makes productive contributions through talent, knowledge,
skill, and good work habits.
Level 3 Competent Manager
Organizes people and resources toward the effective and
efficient pursuit of predetermined objectives.
Level 4 Effective Leader
Catalyzes commitment to and vigorous pursuit of a clear and
compelling vision, stimulating higher performance standards.
Jim Collins – Good to Great
“The great irony is that the animus and
personal ambition that often drive people to
positions of power stands at odds with the
humility required
for Level 5 leadership.”
Has that Moment in History for
Revolution arrived for Us?
Project Management Techniques
Three PM Techniques:
Charter with Actionable Customer Requirements
Scope Statement w Unambiguous Scope Boundaries
WBS with 80% plus of work discovered
Project Leadership Skills
Takes specific Project
Leadership Skills to use
Project Management
Techniques.
Progressive
Collaboration
Conflict
Confrontation
Decisive
Facilitation
The 3 Key Project Leadership Skills
“I do the very best I know how - the very best I
can; and I mean to keep doing so until the
end. If the end brings me out all right, what's
said against me won't amount to anything. If
the end brings me out wrong, ten angels
swearing I was right would make no
difference.
Abraham Lincoln
Progressive
Collaboration
Conflict
Confrontation
Decisive
Facilitation
The 3 Key Project Leadership Skills
The 3 Key Project Leadership Skills
Progressive
Collaboration
Conflict
Confrontation
Decisive
Facilitation
The 3 Key Project Leadership Skills
“When making a decision, I know I have it
about right when I have angered equal
numbers on both sides”.
Abe Lincoln
Progressive
Collaboration
Conflict
Confrontation
Decisive
Facilitation
The 3 Key Project Leadership Skills
Compromise
Smoothing
Confrontation
Progressive
Collaboration
Conflict
Confrontation
Decisive
Facilitation
The 3 Key Project Leadership Skills
“The highest function of a leader is to help a
group make the best decision possible”.
Progressive
Collaboration
Conflict
Confrontation
Decisive
Facilitation
The 3 Key Project Leadership Skills
Practical Example
Practical Example CSR
Contacts
BPE
DAX
MySGS
NA
Order Entry
Customer Set UpAXAPTA
DAX Shipping
VIPOR
NA
Pre-
Invoicing
MySGS
NA
Order Entry
AS400
Invoice Entry,
AS400 Invoice Entry
DAX Cash Application
DAX invoicing
DAX Financials
Application of DAX Cash
ProcessingA
B
C
Scope Statement: The scope of this effort includes the following major featuress:
Business Requirement 1: Pricing Reports would pull from one system
A list of AS400 reports used will be pulled from the system. The Pricing BPO will review list for
completeness, purpose and use of reports with the idea of determining data required for Pricing to
successfully run reports. Data to support these reports will need to be in DAX.
Data Feeds - Current Daily Pricing Activity (with Invoicing details) would be migrated into DAX on a
daily basis to provide the data needed in these reports. The file extraction will be developed by the
AS400 Resource. Remote DAX resources will code the interface. (Interface A).
Balancing reports will be written to ensure that data balances to both systems (see DAX report charter).
Business Requirement 2: Pricing History available for all Reports
Data Migration - Historical Pricing Activity (with Invoicing Details) would be migrated from AS400
into DAX (note: down to the allocation level) so that the reports created in BR1 can be run out of one
system.
Resource for the data migration will be a remote DAX programmer using data from the AS400 file
extraction. Pricing requires 4 years of detail.
Business Requirement 3: AS400 Daily Invoice Totals will post in DAX.
Data Feeds – Daily Invoice totals will update DAX so customer data in DAX is current. Will need
customer, invoice number, amount, and date. (Interface B).
The AS400 Programmer will determine the tables and fields necessary to update in order to keep
Customer balances current. Timing is critical.
The file extraction will be developed by the AS400 Resource. Remote DAX resources will design and
develop the interface in conjunction with the AS400 resource (who will need to define the
requirements).
Balance reports will be created for AS400 and DAX with procedure established to run and validate
reports.
Business Requirement 4: Cash Application would be done in one system (DAX). AS400 Daily Invoice
Totals will post in DAX.
The Credit team would apply cash solely in the DAX system.
Business Requirement 5: Customer Updates would post to AS400 to keep credit checks in the AS400
Since all cash application is done in DAX, cash payment history will have to update the AS400
Data Feeds – Daily Customer balance changes will have to be updated in the AS400 system. This feed
will have to go to the invoice header level. Will need invoice number, amount paid, and date.
The AS400 Programmer will determine the tables and fields necessary to update in order to keep
Customer balances current and create the import into the system. Timing is critical. (Interface C).
Remote DAX resources will develop the data extraction file in conjunction with the AS400 resource
(who will need to define their requirements). The AS400 resource will be responsible for updating the
AS400.
Not in Scope:
Data migration beyond the active AS400
AS400 Reports that need to be run for Manufacturing Purposes
Changes to DAX for shipping, invoicing, credit check, or customer data (any changes to processing fall
under the scope of other Project Assignments)
Plants in Europe or Mexico
Work Shop Vision:
• Sell in down market
• Get at least budget spend back
• Sell property quickly
Resources:
• My budget is $7,500
• Timeline is 2 weeks
• Market is Beach near Charleston SC
• Could be residence or investment
property
Tell Me My Requirements
(3 to 5):
_____________________
_____________________
_____________________
Advise Me of What to Stay
Away From (3):
_____________________
_____________________
_____________________
Leadership Roles:
• Progressive Collaborator
• Conflict Confronter
• Decisive Facilitator
• Dysfunctional Team Member
Lincoln’s War Scope Vision
That this nation, under God, shall have a new birth of freedom - and
that government of the people, by the people, for the people, shall not perish
from the earth.
Save the only Government founded on Law
Lincoln’s War Scope Vision
Methodically Destroy
Army of The South
Industry
Tele-graph
Railroad
Emancipation
Lincoln’s War Scope Boundaries
• Can not allow enemy to escape.
• Can not capitulate or compromise.
• Can not lose the will of “the people”.
Lincoln’s War Charter
Telecom
Technology
Modern
Weapon
Technology
Transportation
Technology • Put north’s 24,000 miles of railroad under
government control and add 4,000 more miles.
• Convert all factories over to production of cannon,
weapons and war supplies to win war of attrition.
• Leverage Telegraph (followed rail lines).
Business Requirements
Lincoln’s War Charter
Telecom
Technology
Transportation
Technology • 25 thousand troops could be moved to front in 7 days
by rail as opposed to 2 months by horse.
• 80 box cars of supplies could be moved a day.
• South has 9,000 miles of rail. Davis leaves under
private control. Only adds 900 more.
• Southern troops in Virginia starve a mere 30 miles
from their capitol.
Put north’s 24,000 miles of railroad under gov
control and add 4,000 more miles.
Modern
Weapon
Technology
• Lincoln puts lines directly into war department from every
direction (first central command).
• Places all telegraph under government control.
• Provides strategic overview of commanders’ tactical thinking
that allows him to manage overall strategy.
• Issues his own direct orders to Generals.
• Lee doesn’t know his own troops’ movements 40 miles away.
Telecom
Technology
Transportation
Technology
Modern
Weapon
Technology
Leverage Telegraph (followed rail lines). Equivalent of today’s
satellite communications.
Lincoln’s War Charter
• Ky long-rifle and mini-ball have range of two
football fields (equivalent of a modern sniper rifle).
• Half a billion mini-balls produced. 33 hours from
manufacturer to front. 200,000 could be produced in
one day.
Telecom
Technology
Transportation
Technology
Convert all factories over to production of cannon,
weapons and war supplies to win war of attrition.
Modern
Weapon
Technology
Lincoln’s War Charter
Modernized Governance Structures
CEO
Director Director Director
Functional Mgr Functional Mgr Functional Mgr
C-Level
VP
Direct Report Direct Report
C-Level
Director
Functional Mgr
Direct Report Direct Report
VP
Decisive
Facilitation
Conflict
Confrontation
Progressive
Collaboration Charter w Clear
Customer
Requirements
Scope Statement
Clear Boundaries
Work Break
Down
We Must Now Ask Ourselves
• Who leads people by letting them know they can get it wrong until
they get it right?
• Who leads people by letting them know that conflict is a good thing?
• Who leads people by driving groups to make the best decisions
possible?