project kickoff meeting
-
Upload
samuel90 -
Category
Technology
-
view
2.208 -
download
1
description
Transcript of project kickoff meeting
![Page 1: project kickoff meeting](https://reader031.fdocuments.us/reader031/viewer/2022013109/54b3b03a4a79591d438b456c/html5/thumbnails/1.jpg)
Campus Technology Projects“Kickoff” Meeting
![Page 2: project kickoff meeting](https://reader031.fdocuments.us/reader031/viewer/2022013109/54b3b03a4a79591d438b456c/html5/thumbnails/2.jpg)
Deployments & AD Migrations
• Complex & lengthy productions
• Takes a village• Collaboration
is the key to success
• Expectations & requirements for all
![Page 3: project kickoff meeting](https://reader031.fdocuments.us/reader031/viewer/2022013109/54b3b03a4a79591d438b456c/html5/thumbnails/3.jpg)
![Page 4: project kickoff meeting](https://reader031.fdocuments.us/reader031/viewer/2022013109/54b3b03a4a79591d438b456c/html5/thumbnails/4.jpg)
![Page 5: project kickoff meeting](https://reader031.fdocuments.us/reader031/viewer/2022013109/54b3b03a4a79591d438b456c/html5/thumbnails/5.jpg)
Outlining our Purpose• Provide bond-funded refreshed hardware
according to standards: teacher workstations and student access in designated areas such as Library, Labs, Special Ed. & GT
• Standardize network system to assist with district cost-savings and efficiency and to provide end-user benefits such as access to files from home.
• Provide a periodic software audit for licensure verification and refocusing of instructional objectives via software applications.
• Provide “just in time” training to end users to help make the transition as seamless as possible, and to take advantage of newly available features.
![Page 6: project kickoff meeting](https://reader031.fdocuments.us/reader031/viewer/2022013109/54b3b03a4a79591d438b456c/html5/thumbnails/6.jpg)
Introducing our Team
• Technology Acquisitions & Project Mgmt.– Joe McMonagle, Director
• Tracy Rayburn, Project Manager• Martha Smith, Project Manager
• Integrated Infrastructure Services– Ernest Vasquez, Assistant Director
• Mark Cavazos, Technical Supervisor• Henry Rogers, AD Migrations PM
• Academic Technology Services– Joyce Stevens, Director
• Dana Bickley, Coordinator• Doug Shudde, Coordinator
![Page 7: project kickoff meeting](https://reader031.fdocuments.us/reader031/viewer/2022013109/54b3b03a4a79591d438b456c/html5/thumbnails/7.jpg)
Deployments - What to Expect • Campus Deployment Meeting• Campus Software Template• Campus Walk Through• Technology Deployment Plan• Hardware Repurpose/Disposal Plan• Software Review, Image Creation & Testing• Ordering of Equipment• Daily Schedule Created & Communicated• Staff Workstation Preparation & Release• On-Site Deployment & AD Migration• Hardware/Software Quality Check• Campus Sign Off and Feedback
![Page 8: project kickoff meeting](https://reader031.fdocuments.us/reader031/viewer/2022013109/54b3b03a4a79591d438b456c/html5/thumbnails/8.jpg)
Deployments - Major MilestonesCampusName
Campus Meeting
SW List to PM
Repurpose Plan to
PM
Deployment Start
HW & SW Check
Carson* Feb 4 March 18 Mar 18 May 27 At Completion
Ward April 13 May 25 May 25 Oct 12 At Completion
Beard April 9 May 26 May 26 Nov 9 At Completion
Blattman April 15 May 25 May 25 Dec 1 At Completion
*Already AD – Deployment Only
Deployment Project Managers:Tracy Rayburn – Carson ES, Beard ES Martha Smith – Ward ES, Blattman ES
![Page 9: project kickoff meeting](https://reader031.fdocuments.us/reader031/viewer/2022013109/54b3b03a4a79591d438b456c/html5/thumbnails/9.jpg)
Hardware RedeploymentWhat is Replaced? PCs & Related Hardware:• Teacher workstation & personal printer• Staff workroom workstations• Library student & staff workstations• Lab student workstations • Special Ed. student workstations• Gifted & Talented student workstations• Not Replaced - Previously re-purposed
computers, non-Bond computers, TV’s, etcAll bond standards are posted online!
![Page 10: project kickoff meeting](https://reader031.fdocuments.us/reader031/viewer/2022013109/54b3b03a4a79591d438b456c/html5/thumbnails/10.jpg)
Hardware RepurposingWhat hardware can be repurposed? The lifecycle for desktops is six years(warranty plus one year). This chart showsDell workstation models and eligibility forplacement on the network:
Workstation Class & Last Repurposing Date:
GX150 – June 30, 2008GX240 – December 31, 2008GX260 – December 31, 2009GX270 – January 31, 2011GX280 – January 31, 2012GX620 – February 28, 2013
![Page 11: project kickoff meeting](https://reader031.fdocuments.us/reader031/viewer/2022013109/54b3b03a4a79591d438b456c/html5/thumbnails/11.jpg)
AD Migrations – Primary Benefits• Remote File Access for Staff via
eFiles (e.g., Home and Shared Drive access from Home)
• Network Administrators can more easily deploy software and updates remotely
• District cost savings from Novell licensure
![Page 12: project kickoff meeting](https://reader031.fdocuments.us/reader031/viewer/2022013109/54b3b03a4a79591d438b456c/html5/thumbnails/12.jpg)
AD Migrations – What to Expect• Campus Migration Meeting• Campus Software Template• Campus Walk Through• Software Review, Image Creation &Testing• Daily Schedule Created & Communicated• Staff Workstation Preparation & Release• On-Site AD Migration • Software Quality Check• Campus Sign Off and Feedback
![Page 13: project kickoff meeting](https://reader031.fdocuments.us/reader031/viewer/2022013109/54b3b03a4a79591d438b456c/html5/thumbnails/13.jpg)
Campus Name
Campus Meeting
SW List to PM
Migration Start
Krueger Complete May 12 Sept 30
Northwest Crossing
May 4 Oct 5 Dec 14
AD Migrations – Major Milestones
AD Migration Project Manager: Henry Rogers
![Page 14: project kickoff meeting](https://reader031.fdocuments.us/reader031/viewer/2022013109/54b3b03a4a79591d438b456c/html5/thumbnails/14.jpg)
Periodic Software Audits
Periodic software inventories/audits are essential when it comes to following the letter of the law and software licensing agreements.
The campus will document reinstallation needs of the following software types:– Central Office purchased software– Textbook software– Campus-purchased software
![Page 15: project kickoff meeting](https://reader031.fdocuments.us/reader031/viewer/2022013109/54b3b03a4a79591d438b456c/html5/thumbnails/15.jpg)
Campus Training Needs
• Technology Services has established a central Web site that can be referred to for project details.
• This Website will also contain links to needed training documents for the campus staff as their project is in progress (from the “how to’s” on migrating current files off the hard drive to the “how to’s” of using eFiles from home).
• Visit this site often for updates: http://www.nisd.net/technology/projects/index.html