London Power Tunnels – Risk Brief In order to ensure the London Power Tunnels project is successful, all risks must be considered, monitored and counteracted. This brief outlines potential risks, correct methods of management in accordance to each risk, and the consequences of ineffective risk management. Project Initiation Project Planning Project Execution Project Closure
Transcript of Project Initiation - WordPress.com · Web viewIn order to ensure the London Power Tunnels project...
![Page 1: Project Initiation - WordPress.com · Web viewIn order to ensure the London Power Tunnels project is successful, all risks must be considered, monitored and counteracted. This brief](https://reader033.fdocuments.us/reader033/viewer/2022042120/5e9a51ce2952bf29b37a31b6/html5/thumbnails/1.jpg)
In order to ensure the London Power Tunnels project is successful, all risks must be considered, monitored and counteracted. This brief outlines potential risks, correct methods of management in accordance to each risk, and the consequences of ineffective risk management.
Project Initiation
Project Planning
Project Execution
Project Closure
London Power Tunnels – Risk Brief