Project Goals
1. New Location for Developers Business’s
2. Community Leadership
3. LEED Certification
4. From Novelty to Necessity
5. ……..
$
A Green Business Model
• Overhead Leveraging
• Lifecycle Costs• Maximizing Tenant Love
– Reduces turnover and infill waste
Site Challenges
-Small Site-Water Retention Threatens Trees-Parking is abundant but not within zoning regulations-Zoning requirements mandate Detention
-But we don’t need detention!
Site Challenges
Site Features
The Plan-Tenant Preselection-Shared Facilities-Infill Efficiencies
Public Funding
Federal Energy Act 2005
$1.80 per sq/ft. tax credit
1. Energy 2. Envelope 3. Lighting
Math 23,000 x 1.80 = $41,400
-subtract modeling fees
Additional Features
LEED CS v2.2