1 Use of Dynamic Traffic Assignment in FSUTMS in Support of Transportation Planning in Florida

FDOT Research #BDK80Task Work Order No. 977-12

June 22 2010

Page 2: Project Goal

2

Project GoalImplement a dynamic traffic assignment

process within the FSUTMS environment

Page 3: Project Goal

3

Background (1)

MTF with input from the transportation planning community in Florida has identified the incorporation of DTA in the FSUTMS, as a high priority required improvement

There are many issues that need to be addressed for the successful and optimal implementation of DTA in the FSUTMS

Fright Corridor Management research project will provide valuable input to this project

Interaction with the ITS Operation Tool Project

Page 4: Project Goal

4

Background (2)

DTA technical sub-committee of the MTF model task force

Coordination with SHRP2 projects

Page 5: Project Goal

5

Project ObjectivesReview existing DTA capabilitiesIdentify the requirements of Florida demand

modelingIdentify the ability of DTA tools to meet

requirementsIdentify the data requirements and sourcesIdentify and conduct needed modificationsIntegrate DTA capabilities within the FSUTMSDevelop tools to support useDocument the project effort, results, and conclusion

Page 6: Project Goal

6

Task 1 DTA ReviewReview of DTA literature

DTA approachesTraffic flow modelsModeling capabilities and featuresPrevious applicationsO-D matrix estimationData needsCalibration approaches Integration with other environments

Page 7: Project Goal

7Task 2: Requirements IdentificationPotential for early surveyWorkshop: In coordination with the DTA sub-

committee of the MTF model advancement committee.Review the results from Task 1 Determine the requirements for DTA modeling as part of

the travel demand forecasting process in Florida

Page 8: Project Goal

8Task 3: Assessment of Existing Tools Assessment of existing tools and models

Ensure that the tools meet the requirements of using DTA as part of Florida demand forecasting modeling processes

Assess if the tool performs as expectedBugs, limitation, constraints, unexpected/illogical

results, run time, integration problems, technical support

Page 9: Project Goal

9

Task 4: Enhancement of Tools Perform the enhancements needed to existing DTA

tools to satisfy the Florida modeling requirements

Integrate DTA capabilities within the FSUTMS

Not all identified required enhancements may be possibleReasons why any requirements are not addressed in

this project will be documented

Page 10: Project Goal

10

Task 5: DTA SupportTools and data to support use and calibration of DTA

Conventional and ITS data will be integrated according to requirement.

O-D estimation process

DTA and traffic flow model parameter calibration

Post processing of data

Advanced technology modeling

Page 11: Project Goal

11

Potential ProcessFLSWM Matrix

(daily)

Produce hourly matrices using hourly local distribution factors

Short interval matrix estimation using TDM/CUBE

Analyst

Short Interval OD Matrix Estimation using DTA

Page 12: Project Goal

12

Task 6: Testing This task will include the testing of the developed

DTA environment and tools within the FSUTMS

The research team will select a regional FSUTMS demand model in Florida for the testing of the developments.

The test will include all components of the developed DTA modeling process including data collection, data processing, trip matrix estimation, model input generation, model execution, calibration support, and output post processing

Page 13: Project Goal

13

Task 7: Workshop and Documentation  Final report

Training workshop

Page 14: Project Goal

14

Project Researchers Mohammed Hadi

Citilabs

Halit Ozen

Yan Xiao

Wei Zhao

Shaghayegh Shabanian

Page 15: Project Goal

15

Research AgencyPrincipal Investigator

RESEARCH 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 ESTIMATED %

TASK COMPLETION

DTA Review20% 40% 60% 80% 90% 100%

Review and Requirement Workshop 100%

Assessment of Existing Tools 15% 15% 70% 100%

Enhancement and Integration of DTA Tools10% 20% 30% 40% 50% 60% 70% 80% 90% 100%

Development and Calibration Support 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%

Testing the Developed Environment10% 20% 30% 40% 50% 60% 70% 80% 90% 100%

Documentation 5% 10% 15% 20% 25% 45 65% 90% 93% 96% 100%

First Quarterly Progress Report

Quarterly Progress Report

Quarterly Progress Report

Quarterly Progress Report

Quarterly Progress Report

Quarterly Progress Report

Quarterly Progress Report

Draft Final Report

Mohammed HadiFlorida International University