    Project Feasibility Calculations

    These are some ofhand calculations to gauge whether cutting bottles actually savemoney or it is better to transport the bottles as such without cutting them.

    Truck used or the calculations: Ashok Leyland Boss LX mileage athttp:!!www.vicky.in!trucks!ashok"leyland"boss"l#"mileage! $ speci%cations athttp:!!www.vicky.in!trucks!ashok"leyland!boss"l#! &.

    Average mileage o 'kmpl assumed.

    (ow without cutting the bottles$ the limiting actor or how many bottles the truckcan carry is the volume o the carriage which is calculated to be about )' m* .+onsidering the volume o ,-- mL bottles to be -- cm* $ the truck can carry /-kbottles per trip.

    (Revision: The bottles are assumed to have a volume of 350 cm

    3

    , so thetruc can carry !0 bottles no"#$

    0ith bottles cut beorehand$ the limiting actor is now the weight o the plasticbottles. Taking a bottle to weigh about /) gm$ kerb weight o the truck being about',-- kg and gross weight to be about )/,-- kg$ the truck can now carry ' lakhbottles per trip.

    (Revision: The truc no" has the ca%acity reduced to be able to carry 50bottles %er tri%#$

    (ow to calculate the energy cost o cutting the bottles$ the motor is assumed togenerate 1w power. Assuming )- seconds or each bottle to be cut$ it takes '-

    lakh seconds to cut all the bottles$ and the motor consumes 2'------!*3-- 4. units costing about 5s 3/---at 5s 6 a unit&.

    (Revision: &o" to calculate the ener'y cost of cuttin' the bottles, themotor is assumed to 'enerate )" %o"er# *ssumin' +0 seconds for eachbottle to be cut, it taes 5 lah seconds to cut all the bottles, and themotor consumes 500000-3.00 / 1 units costin' about Rs .(at Rs 2a unit$ $#

    To calculate the diesel cost or transporting the bottles$ assuming *-- km round tripor the truck to go rom 7ilani to 8elhi it would take /, litres o diesel every tripcosting about 5s *,-. 9o or /- trips it would take 5s ,---.

    (Revision: To calculate the diesel cost for trans%ortin' the bottles,assumin' 300 m round tri% for the truc to 'o from Pilani to elhi it"ould tae 15 litres of diesel every tri% costin' about Rs 350# 4o totrans%ort 50 bottles it "ould tae +#1 tri%s costin' around Rs !500#$

    9o the cost bene%t in cutting the bottles beore transporting is about 5s )*---.

    http://www.vicky.in/trucks/ashok-leyland-boss-lx-mileage/http://www.vicky.in/trucks/ashok-leyland/boss-lx/http://www.vicky.in/trucks/ashok-leyland/boss-lx/http://www.vicky.in/trucks/ashok-leyland-boss-lx-mileage/
  • 8/9/2019 Project Feasibility Calculations (1)

    2/2

    (Revision: Tain' in the ne" 'ures 'ives a cost shortfall of Rs 31., i#e# ittaes Rs 31. more if "e %rocess the bottles throu'h our R67 than if "etrans%ort it directly#$

    1eep in mind that some %gures are very rough and the actual cost bene%t would bemuch higher$ apart rom the environmental goodwill that the proect generates.

    (Revision: 8ven a cost shortfall is not bad as the 'overnment 'iveshandsome subsidies to recyclers and if "e are able to nd a bi''er truc,"e can easily be able to mae a %rot#$

    8o tell i you %nd any %gure that is not looking proper to you and ; would change thecalculations with the proper %gures$ also tell ; ; have missed something.