PROJECT FACT SHEET
Mears Group, Inc. HDD Division 2800 Post Oak Blvd., Ste. 3010 Houston, TX 77056 U.S.A. Phone: 800-632-7727 ▪ 281-448-2488 www.mears.net
Copyright © 2014
Certified in Safety, Quality, and Environmental: OHSAS 18001:2007, ISO 9001:2008 and ISO 14001:2004
Project Fact Sheet - 1 #2346
Virginia Natural Gas Great Neck Extension
Location Norfolk, VA
Date Completed January 2011
Project Type Gas
Equipment Mears’ 60,000 lb. rig and 140,000 lb. rig
Owner/Client Virginia Natural Gas/Southeast Connections
Engineer
Length, Pipe Diameter,
Pipe Material 16-inch and 18-inch steel; Six Crossings: 1,051-ft., 1,246-ft., 1,229-ft., 1,514-ft., 1,278-ft., 1,176-ft.
Type of Crossing Highway
Project Summary
This project consisted of six (6) HDD highway crossings. Due to space limitations associated with extending the drill string during the pre-reaming process for each crossing, two drill spreads will be used. This plan describes the installation of 16-inch and 18-inch diameter steel pipeline for a land to land crossing with approximate lengths of 1100-feet to 1300-feet.