Page 1: Project Closure May 6 th, 2014. 2 …recap::Integrated Change Control Part of the Project Integration Management Knowledge Area:  Develop Project Charter,

Project Closure

May 6th, 2014

Page 2: Project Closure May 6 th, 2014. 2 …recap::Integrated Change Control Part of the Project Integration Management Knowledge Area:  Develop Project Charter,

2

…recap::Integrated Change Control Part of the Project Integration

Management Knowledge Area:Develop Project Charter, Develop Preliminary

Project Scope Statement, Develop Project Management Plan, Direct and Manage Project Execution, Monitor and Control Project Work, Integrated Change Control, and Close Project

2

Page 3: Project Closure May 6 th, 2014. 2 …recap::Integrated Change Control Part of the Project Integration Management Knowledge Area:  Develop Project Charter,

3

…recap::PMProcess Group

Integrated Change Control and all processes in the Project Integration Area are coordinated within the Project Management Process Groups

3

Page 4: Project Closure May 6 th, 2014. 2 …recap::Integrated Change Control Part of the Project Integration Management Knowledge Area:  Develop Project Charter,

4

…recap::Definition ICC is the process necessary for

controlling factors that create changes to make sure those changes are beneficial, determining whether a change has occurred, and managing the approved changes, including when they occur.

4

Page 5: Project Closure May 6 th, 2014. 2 …recap::Integrated Change Control Part of the Project Integration Management Knowledge Area:  Develop Project Charter,

5

…recap::Timing ICC process is performed throughout the

project, from project initiation through project closure.

5

Page 6: Project Closure May 6 th, 2014. 2 …recap::Integrated Change Control Part of the Project Integration Management Knowledge Area:  Develop Project Charter,

6

…recap::CMMI – Configuration Management The purpose of Configuration

Management (CM) is to establish and maintain the integrity of work products using configuration identification, configuration control, configuration status accounting, and configuration audits.

6

Page 7: Project Closure May 6 th, 2014. 2 …recap::Integrated Change Control Part of the Project Integration Management Knowledge Area:  Develop Project Charter,

7

…recap::RUP CCM Workflow

7

Page 8: Project Closure May 6 th, 2014. 2 …recap::Integrated Change Control Part of the Project Integration Management Knowledge Area:  Develop Project Charter,

8

…recap:: CCM Conclusions What are CCM objectives?

Managing change is more than just checking-in and checking-out files. It includes management of workspaces, parallel development, integration, and builds.

Which are the main topics for CCM?Coordinating the Activities and ArtifactsCoordinating Iterations and ReleasesCoordinating Changes to Software

8

Page 9: Project Closure May 6 th, 2014. 2 …recap::Integrated Change Control Part of the Project Integration Management Knowledge Area:  Develop Project Charter,

9

…recap:: CCM Conclusions When CCM is established?

Often institutionalized or established early on in the project lifecycle

CRs, can be raised at any time during the course of the project

Who is responsible for CCM?Change Control Manager/Configuration

ManagerAnyone on the project staff should be able to

raise a Change Request 9

Page 10: Project Closure May 6 th, 2014. 2 …recap::Integrated Change Control Part of the Project Integration Management Knowledge Area:  Develop Project Charter,

10

…recap:: CCM Conclusions Who tells us how CCM can be done?

In PMBOK it is ICC In CMMI it is CM In the Rational Unified Process, the

Configuration & Change Management Discipline

10

Page 11: Project Closure May 6 th, 2014. 2 …recap::Integrated Change Control Part of the Project Integration Management Knowledge Area:  Develop Project Charter,

11

Today’s topic

Project Closure

11

Page 12: Project Closure May 6 th, 2014. 2 …recap::Integrated Change Control Part of the Project Integration Management Knowledge Area:  Develop Project Charter,

12

References

PMBOK Managing Iterative Software Development

Projects by Kurt Bittner, Ian Spence CMMI RUP

12

Page 13: Project Closure May 6 th, 2014. 2 …recap::Integrated Change Control Part of the Project Integration Management Knowledge Area:  Develop Project Charter,

13

Project Lifecycle

13

Page 14: Project Closure May 6 th, 2014. 2 …recap::Integrated Change Control Part of the Project Integration Management Knowledge Area:  Develop Project Charter,

14

Why Project Closure?

Without a formal closure process, project teams can fail to recognize the end, and then the project can drag on—sometimes at great expense

Closure must be done both on project completion and cancelation

Page 15: Project Closure May 6 th, 2014. 2 …recap::Integrated Change Control Part of the Project Integration Management Knowledge Area:  Develop Project Charter,

15

What does project closure?

Outcomes match the stated goals of the project (when completion is achieved)

Customers and stakeholders are happy with the results

Critical knowledge is captured The team feels a sense of completion Project resources are released for new

projects

Page 16: Project Closure May 6 th, 2014. 2 …recap::Integrated Change Control Part of the Project Integration Management Knowledge Area:  Develop Project Charter,

16

Team

One of the highest benefits from project closure is releasing the teamFormalPost mortem

16

Page 17: Project Closure May 6 th, 2014. 2 …recap::Integrated Change Control Part of the Project Integration Management Knowledge Area:  Develop Project Charter,

17

The Project Closure Phase

The last phase of the Project Life Cycle Determined by the completion of all

Project Objectives and acceptance of the end product by the customer

The outputs from Project Closure Phase is input to execute the next projects with much more efficiency and control

Page 18: Project Closure May 6 th, 2014. 2 …recap::Integrated Change Control Part of the Project Integration Management Knowledge Area:  Develop Project Charter,

18

Project Closure

18

Page 19: Project Closure May 6 th, 2014. 2 …recap::Integrated Change Control Part of the Project Integration Management Knowledge Area:  Develop Project Charter,

19

PMBOK – Closing Process Group Includes the processes to

Formally terminate all activities of a project or project phase

Hand over the project to maintenance teams The project can be either completed or

canceled

19

Page 20: Project Closure May 6 th, 2014. 2 …recap::Integrated Change Control Part of the Project Integration Management Knowledge Area:  Develop Project Charter,

20

Closing Process Group Contains two processes:

Project Closure: This is the process necessary to finalize all activities across all of the Process Groups to formally close the project or a project phase.

Contract Closure: This is the process necessary for completing and settling each contract, including the resolution of any open items, and closing each contract applicable to the project or a project phase.

20

Page 21: Project Closure May 6 th, 2014. 2 …recap::Integrated Change Control Part of the Project Integration Management Knowledge Area:  Develop Project Charter,

21

Project Closure Procedures

Administrative Project Closure includes: Integrated activities to collect project recordsAnalyze project success or failureGather lessons learnedArchive project for future use

21

Page 22: Project Closure May 6 th, 2014. 2 …recap::Integrated Change Control Part of the Project Integration Management Knowledge Area:  Develop Project Charter,

22

Project Closure Procedures

includes:Product Verification - Work completed

correctly and satisfactoryAdministrative Closure – Updating contract

records to reflect final state and prepare them for archiving

Input for the Contract Closure Process

22

Page 23: Project Closure May 6 th, 2014. 2 …recap::Integrated Change Control Part of the Project Integration Management Knowledge Area:  Develop Project Charter,

23

Project Closure Inputs

Project Management Plan Contract documentation Enterprise environmental factors Organizational process assets Work performance information Deliverables

23

Page 24: Project Closure May 6 th, 2014. 2 …recap::Integrated Change Control Part of the Project Integration Management Knowledge Area:  Develop Project Charter,

24

Inputs: Contract Documentation Used to perform the contract closure

process Includes

The contract itselfChanges to the contract Other documentation (such as the technical

approach, product description, or deliverable acceptance criteria and procedures).

24

Page 25: Project Closure May 6 th, 2014. 2 …recap::Integrated Change Control Part of the Project Integration Management Knowledge Area:  Develop Project Charter,

25

Inputs: Enterprise environmental factors Organizational or company culture and

structure Governmental or industry standards Infrastructure Existing human resources Personnel administration Company work authorization system Marketplace info, stakeholder risk

tolerance… 25

Page 26: Project Closure May 6 th, 2014. 2 …recap::Integrated Change Control Part of the Project Integration Management Knowledge Area:  Develop Project Charter,

26

Inputs: Organizational process assets Organization’s processes and procedures

for conducting workStandardized guidelines, work instructions,

proposal evaluation criteria, and performance measurement criteria, templates…

Organizational corporate knowledge base for storing and retrieving informationProcess measurement database, project files,

…26

Page 27: Project Closure May 6 th, 2014. 2 …recap::Integrated Change Control Part of the Project Integration Management Knowledge Area:  Develop Project Charter,

27

Inputs: Work performance information Schedule progress Deliverables that have been completed

and those not completed Schedule activities that have started and

those that have been finished Extent to which quality standards are

being met Costs authorized and incurred … 27

Page 28: Project Closure May 6 th, 2014. 2 …recap::Integrated Change Control Part of the Project Integration Management Knowledge Area:  Develop Project Charter,

28

Project Closure Outputs

Administrative Closure Procedure Contract Closure Procedure Final Product, service or result Organizational process assets (updates)

28

Page 29: Project Closure May 6 th, 2014. 2 …recap::Integrated Change Control Part of the Project Integration Management Knowledge Area:  Develop Project Charter,

29

Outputs: Administrative Closure Procedure All procedures and roles involved in

administrative closure Procedures for transfer to production

Action and activities for stakeholder approvalConfirmation of goals achievement (sponsor,

client, stakeholders, etc)Actions for satisfying all exit criteria

29

Page 30: Project Closure May 6 th, 2014. 2 …recap::Integrated Change Control Part of the Project Integration Management Knowledge Area:  Develop Project Charter,

30

Outputs: Contract Closure Procedure A step-by-step methodology addressing:

Terms and conditions of the contracts and any required completion or exit criteria for contract closure

Activities and responsibilities of the project ALL team members involved in the contract closure process

Actions performed to formally close all contracts associated with the completed project 30

Page 31: Project Closure May 6 th, 2014. 2 …recap::Integrated Change Control Part of the Project Integration Management Knowledge Area:  Develop Project Charter,

31

Output: Final Product, Service or Result Formal acceptance and handover of the

final product, service, or result that the project was authorized to produce

The acceptance includes receipt of a formal statement that the terms of the contract have been met

31

Page 32: Project Closure May 6 th, 2014. 2 …recap::Integrated Change Control Part of the Project Integration Management Knowledge Area:  Develop Project Charter,

32

Output: Organizational Process Assets Formal Acceptance Documentation Project Files Project Closure Documents Historical Information

32

Page 33: Project Closure May 6 th, 2014. 2 …recap::Integrated Change Control Part of the Project Integration Management Knowledge Area:  Develop Project Charter,

33

Close Process Tools

Project Management Methodology Project Management Information System Expert Judgment

33

Page 34: Project Closure May 6 th, 2014. 2 …recap::Integrated Change Control Part of the Project Integration Management Knowledge Area:  Develop Project Charter,

34

Before Tailoring Project Closure

Understand Iteration Closure Phase Closure … and then Project Closure

34

Page 35: Project Closure May 6 th, 2014. 2 …recap::Integrated Change Control Part of the Project Integration Management Knowledge Area:  Develop Project Charter,

35

Iteration Closure

Iteration is concluded by the iteration acceptance review, where the formal result of the iteration is agreed upon and recorded

This involves considering the results of the iteration and analyzing their impact on the project as a whole

35

Page 36: Project Closure May 6 th, 2014. 2 …recap::Integrated Change Control Part of the Project Integration Management Knowledge Area:  Develop Project Charter,

36

Iteration Closure: Measurement and Analysis Absolute progress Risk exposure Estimate to complete Effort profile Cost profile Effort Expended Find/fix rate (tolerance) Defect trends (tolerance)

36

Page 37: Project Closure May 6 th, 2014. 2 …recap::Integrated Change Control Part of the Project Integration Management Knowledge Area:  Develop Project Charter,

37

Iteration Closure: Acceptance Review Results Risks Objectives Requirements Adherence to Plan Lessons Learned Rework, external changes, feedback from

demo, other deliverables…37

Page 38: Project Closure May 6 th, 2014. 2 …recap::Integrated Change Control Part of the Project Integration Management Knowledge Area:  Develop Project Charter,

38

Iteration Grades

Exceptional Passed Passed at risk Unfinished Failed Abandoned

38

Page 39: Project Closure May 6 th, 2014. 2 …recap::Integrated Change Control Part of the Project Integration Management Knowledge Area:  Develop Project Charter,

39

Iteration recommendations

For Unfinished, Failed or Abandoned we can have the following recommendations:Re-planDe-scopeExtendTry againCancel

39

Page 40: Project Closure May 6 th, 2014. 2 …recap::Integrated Change Control Part of the Project Integration Management Knowledge Area:  Develop Project Charter,

40

Acting on Iteration assessment results Never confuse the map with the journey Adopt an attitude that continuous planning

is good Mature your process alongside your team Be prepared to cut your losses Be honest

40

Page 41: Project Closure May 6 th, 2014. 2 …recap::Integrated Change Control Part of the Project Integration Management Knowledge Area:  Develop Project Charter,

41

Phase Assessment

Differences from iteration assessments:Judge the project, not a single iterationAlways decide whether to continue or cancel

the projectFocus on the delivered value rather than on

performanceAssess project against the business case

41

Page 42: Project Closure May 6 th, 2014. 2 …recap::Integrated Change Control Part of the Project Integration Management Knowledge Area:  Develop Project Charter,

42

Phase Assessment topics Progress Risk Scope Baseline Performance Plans Business Case

42

Page 43: Project Closure May 6 th, 2014. 2 …recap::Integrated Change Control Part of the Project Integration Management Knowledge Area:  Develop Project Charter,

43

Phase Assessment approaches

Formal Phase Assessment Extend Iteration Assessment

43

Page 44: Project Closure May 6 th, 2014. 2 …recap::Integrated Change Control Part of the Project Integration Management Knowledge Area:  Develop Project Charter,

44

Concluding a Phase

Passed Passed at risk Failed

44

Page 45: Project Closure May 6 th, 2014. 2 …recap::Integrated Change Control Part of the Project Integration Management Knowledge Area:  Develop Project Charter,

45

Project conclusions

Approved Temporary approved Extended Paused Postponed Canceled

45

Page 46: Project Closure May 6 th, 2014. 2 …recap::Integrated Change Control Part of the Project Integration Management Knowledge Area:  Develop Project Charter,

46

Project Assessments

Performed not only at project closure Cover for:

Handle exceptions raised by the iteration assessments

Phase assessments are too far apartProvide review points for the overall project

(might include non-software subprojects)

46

Page 47: Project Closure May 6 th, 2014. 2 …recap::Integrated Change Control Part of the Project Integration Management Knowledge Area:  Develop Project Charter,

47

Assessment objectives [1]

Confirm that the need for the project has not changed

Satisfy the stakeholders of the quality of the products delivered by the project

Confirm that the business case is still viable

47

Page 48: Project Closure May 6 th, 2014. 2 …recap::Integrated Change Control Part of the Project Integration Management Knowledge Area:  Develop Project Charter,

48

Assessment objectives [2]

Authorize the continuation or cancellation of the project

Assess the benefits that the project has delivered

Assess the overall effectiveness of the project

48

Page 49: Project Closure May 6 th, 2014. 2 …recap::Integrated Change Control Part of the Project Integration Management Knowledge Area:  Develop Project Charter,

Transition planning

49

Page 50: Project Closure May 6 th, 2014. 2 …recap::Integrated Change Control Part of the Project Integration Management Knowledge Area:  Develop Project Charter,

1. Has the product been implemented and is it producing the expected benefits?

2. Have all deliverables been completed and implemented? If not, has accountability for outstanding items been assigned?

3. Have new workflows and procedures been documented, tested and implemented?

4. Have all outstanding issues been resolved or assigned owners?

5. Have hardware, software and other components been installed?

50

Page 51: Project Closure May 6 th, 2014. 2 …recap::Integrated Change Control Part of the Project Integration Management Knowledge Area:  Develop Project Charter,

6. Are system, functional, performance and user acceptance testing complete? Have serious bugs been fixed and a process implemented to deal with smaller bugs and/or new bugs that might surface during regular operations?

7. Is training of all staff (users, support, help desk) complete?

8. Is all required system and user documentation complete and available?

9. Has any old hardware, software, licenses been decommissioned?

10. Do you have the formal approval of the project from the Sponsor? 51

Page 52: Project Closure May 6 th, 2014. 2 …recap::Integrated Change Control Part of the Project Integration Management Knowledge Area:  Develop Project Charter,

52

Project Closure Example

In RUP we have the following activities:Update Project Close-Out Plan and Schedule

ActivitiesSchedule Final Configuration AuditsConduct a Project Post-Mortem ReviewComplete Acceptance Action ItemsClose Out the Project

52

Page 53: Project Closure May 6 th, 2014. 2 …recap::Integrated Change Control Part of the Project Integration Management Knowledge Area:  Develop Project Charter,

53

Tasks

Release of the resources Closure of any financial issues (labour,

contract etc. ) Collection and Completion of All Project

Records and Archiving them Recording Lessons Learned Debriefing Celebrate your success as a TEAM!!!

Page 54: Project Closure May 6 th, 2014. 2 …recap::Integrated Change Control Part of the Project Integration Management Knowledge Area:  Develop Project Charter,

54

Documents Collect final time sheets, expense reports, and team

status reports. Close or complete remaining tasks in the project

schedule. Collect final cost and schedule metrics. Make final payments to vendors and contractors, and

close out contracts. Review and update the issues log, highlight remaining

issues, and decide how these issues are to be addressed.

Prepare a plan for handling ongoing product support. Prepare a final project status report.

Page 55: Project Closure May 6 th, 2014. 2 …recap::Integrated Change Control Part of the Project Integration Management Knowledge Area:  Develop Project Charter,

55

Project Library Project planning documents Status reports Design documents Test cases and test results Issues and resolutions Risk documentation Change requests Presentations Important communications (both those sent and those

received) Time and expense reports Contracts and invoices

Page 56: Project Closure May 6 th, 2014. 2 …recap::Integrated Change Control Part of the Project Integration Management Knowledge Area:  Develop Project Charter,

56

Project Closure Report Prepared by the Project Manager and

presented to the Project Sponsor for sign-off

Document to be released at the beginning of the project closure (after execution is completed)

Page 57: Project Closure May 6 th, 2014. 2 …recap::Integrated Change Control Part of the Project Integration Management Knowledge Area:  Develop Project Charter,

57

Project Closure Report Contains:

A list of completion criteriaConfirmation that each completion criterion

has been metA list of outstanding business activities,

risks and issuesA set of closure actionsA request for project closure approval

Page 58: Project Closure May 6 th, 2014. 2 …recap::Integrated Change Control Part of the Project Integration Management Knowledge Area:  Develop Project Charter,

58

Post Implementation Review [1] The last record of the project Assess the projects level of success Identify lessons learnt and make

recommendations for future projects to enhance their likelihood of success

Page 59: Project Closure May 6 th, 2014. 2 …recap::Integrated Change Control Part of the Project Integration Management Knowledge Area:  Develop Project Charter,

59

Post Implementation Review [2] Done by reviewing the project's

performance against the original plans and conformance against the original processes outlined for the project.

May be completed by either the Project Manager or (ideally) an independent resource which offers an unbiased opinion of the project's success

Page 60: Project Closure May 6 th, 2014. 2 …recap::Integrated Change Control Part of the Project Integration Management Knowledge Area:  Develop Project Charter,

60

Document what you've learned [1] Survey team members about what

worked and what didn't Personal Feedback is important closure

for team members Call a meeting with your sponsor and

executive stakeholders to capture their thoughts

Complete customer satisfaction survey

Page 61: Project Closure May 6 th, 2014. 2 …recap::Integrated Change Control Part of the Project Integration Management Knowledge Area:  Develop Project Charter,

61

Document what you've learned Ask consultants and vendors for

objective feedback, both about your organization and about the project's execution

Provide a summary of your results to team members, either as a presentation at a meeting or as a formal document

Page 62: Project Closure May 6 th, 2014. 2 …recap::Integrated Change Control Part of the Project Integration Management Knowledge Area:  Develop Project Charter,

62

Resources Staff and non-staff resources will be

released and reallocated If your project team used a project

management office you probably have to make arrangements for return

When you organize the shutdown process for the project office, review the original setup procedures

Page 63: Project Closure May 6 th, 2014. 2 …recap::Integrated Change Control Part of the Project Integration Management Knowledge Area:  Develop Project Charter,

63

Recognize and reward

Provide each team member with a performance evaluation:Highlight contributions the member made. Identify skills the member updated. Recommend new roles the member might

be ready for. Celebrate! (team dinner, team outing,

gift certificates, or other rewards)

Page 64: Project Closure May 6 th, 2014. 2 …recap::Integrated Change Control Part of the Project Integration Management Knowledge Area:  Develop Project Charter,

64

Conclusion Formal project closure ensures that your

team has: met its objectives, satisfied the customer, captured important knowledge, and been rewarded for their efforts.

With the door closed securely behind you, you can move on to your next project with Confidence.