PROJECT OVERVIEWtemp3.altaprojects.net/wp-content/uploads/2018/03/... · and street trees, and...

20
2017 | FALL 2018 | WINTER 2017 2018 SPRING 2018 SUMMER 2018 FALL Visit www.beverlyhills.org/completestreets to stay up to date on upcoming events! WHY DOES THIS MATTER? Complete Streets and the tools they employ have been proven to yield positive economic, environmental, and public health and safety benefits. Complete Streets provide greater access to businesses, improve transportation options, increase physical activity, create new space for plantings and street trees, and holistically improve community livability. PARTICIPATE IN OUR SURVEY! Scan the QR code at left, or visit www.beverlyhills.org/completestreetsSURVEY HOW DO I GET INVOLVED? It’s easy! There are several ways to contribute to the plan. WHAT’S THE PROCESS? Putting together a Complete Streets Plan requires the consensus of the community, city agencies, Traffic & Parking Commission, and City council. COMMUNITY WORKSHOPS Dedicated workshops to brainstorm ideas and solutions for complete streets in Beverly Hills. OUTREACH EVENTS Events for the community to learn about the project progress and give feedback. COMMISSION MEETING Periodic review from key city agencies and the Traffic & Parking Commission to ensure the plan is implementable. COUNCIL MEETING Review and adoption from City Council. PROJECT TIMELINE This project began in Fall 2017 and will wrap up in Fall 2018. WHAT IS THE PRODUCT? At the end of this 12-month process, the City of Beverly Hills will adopt a Complete Streets Plan. This Plan will serve as guide to direct transportation planners and engineers in designing roadways that reflect the values and goals developed by the community. COMPLETE STREETS ARE STREETS FOR EVERYONE. A Complete Streets approach integrates people and place in the planning, design, construction, operation, and maintenance of our transportation networks. This helps to ensure streets are accessible for people of all ages and abilities; balances the needs of different modes; and supports local land uses, economies, cultures, and natural environments. 1 2 3 4 WORKSHOPS AND EVENTS! In addition to this event, there will be workshops in spring & summer. ONLINE SURVEY! Your responses will inform the creation of the plan. www.beverlhills.org/completestreetsSURVEY FOLLOW THE PROJECT! Use the project website and the City’s social media accounts. www.beverlhills.org/completestreets twitter: @citybh facebook.com/cityofbeverlyhills EMAIL ALERTS AND UPDATES! Sign up on our website. www.beverlyhills.org/completestreets BEVERLY HILLS COMPLETE STREETS PLAN COMPLETE STREETS PLAN PROJECT OVERVIEW

Transcript of PROJECT OVERVIEWtemp3.altaprojects.net/wp-content/uploads/2018/03/... · and street trees, and...

Page 1: PROJECT OVERVIEWtemp3.altaprojects.net/wp-content/uploads/2018/03/... · and street trees, and holistically improve community livability. ... W i lsh e B vd C r e s c n t r 0.7% 1.9%

2017 | FALL

2018 | WINTER2017

2018 SPRING

2018 SUMMER

2018 FALL

Visit www.beverlyhills.org/completestreets to stay up to date on upcoming events!

WHY DOES THIS MATTER?

Complete Streets and the tools they employ have been proven to yield positive economic, environmental, and public health and safety benefits. Complete Streets provide greater access to businesses, improve transportation options, increase physical activity, create new space for plantings and street trees, and holistically improve community livability.

PARTICIPATE IN OUR SURVEY!

Scan the QR code at left, or visit

www.beverlyhills.org/completestreetsSURVEY

HOW DO I GET INVOLVED?It’s easy! There are several ways to contribute to the plan.

WHAT’S THE PROCESS?Putting together a Complete Streets Plan requires the consensus of the community, city agencies, Traffic & Parking Commission, and City council.

COMMUNITY WORKSHOPSDedicated workshops to brainstorm ideas and solutions for complete streets in Beverly Hills.

OUTREACH EVENTSEvents for the community to learn about the project progress and give feedback.

COMMISSION MEETINGPeriodic review from key city agencies and the Traffic & Parking Commission to ensure the plan is implementable.

COUNCIL MEETINGReview and adoption from City Council.

PROJECT TIMELINEThis project began

in Fall 2017 and will wrap up in Fall 2018.

WHAT IS THE PRODUCT?

At the end of this 12-month process, the City of Beverly Hills will adopt a Complete Streets Plan. This Plan will serve as guide to direct transportation planners and engineers in designing roadways that reflect the values and goals developed by the community.

COMPLETE STREETS ARE STREETS FOR EVERYONE.A Complete Streets approach integrates people and place in the planning, design, construction, operation, and maintenance of our transportation networks. This helps to ensure streets are accessible for people of all ages and abilities; balances the needs of different modes; and supports local land uses, economies, cultures, and natural environments.

1

2

3

4

WORKSHOPS AND EVENTS!In addition to this event, there will be workshops in spring & summer.

ONLINE SURVEY!Your responses will inform the creation of the plan.www.beverlhills.org/completestreetsSURVEY

FOLLOW THE PROJECT!Use the project website and the City’s social media accounts.www.beverlhills.org/completestreetstwitter: @citybhfacebook.com/cityofbeverlyhills

EMAIL ALERTS AND UPDATES!Sign up on our website.www.beverlyhills.org/completestreets

BEVERLY HILLS COMPLETE STREETS PLAN COMPLETE STREETS PLAN

PROJECT OVERVIEW

Page 2: PROJECT OVERVIEWtemp3.altaprojects.net/wp-content/uploads/2018/03/... · and street trees, and holistically improve community livability. ... W i lsh e B vd C r e s c n t r 0.7% 1.9%

Crescent Dr

Wilshire Blvd

Olympic Blvd

Gregory Way

Col

dwat

er C

anyo

n D

r

Camden Dr

Bedford Dr

Roxbury Dr

Benedict Canyon Dr

Canon Dr

Elevado Ave

Crescent Dr

La C

iene

ga B

lvd

Olympic Blvd

Beverly Dr

Doheny D

r

Carmelita

AveLomitas A

ve

Sunset Blvd

Palm

Dr

Hillcrest R

d

Palm Dr

Charleville Blvd

Santa Monica

Blvd

Pico Blvd

3rd St

Beverly Blvd

Melrose Ave

Santa Monica

Blvd

City of Beverly HillsComplete Streets Bike Facilities

Legend

Bike Share Stations

Future Class II Bike Lane

Class II Bike Lane

Class III Bike Route

City Boundary

°0 10.5

Miles

Carmelita

Ave

Lomitas A

ve

Sunset Blvd Palm

Dr

Hillcrest R

d

Palm Dr

Charleville Blvd

Santa Monica

Blvd

Pico Blvd

3rd St

Beverly Blvd

Melrose Ave

Doheny D

r

Beverly Dr

Olympic Blvd

La C

iene

ga B

lvd

Crescent Dr

Elevado Ave

Canon Dr

Benedict Canyon Dr

Roxbury Dr

Bedford DrCamden Dr

Col

dwat

er C

anyo

n D

r

Gregory Way

Olympic Blvd

Wilshire Blvd

Crescent Dr

0.7%1.9%

5.3%

8.2%

7.1%6.2%

9.1%

City of Beverly HillsComplete Streets Walk to Work (%) by Census Tract

Legend

Walk to Work (%) by Census Tract

0.0%

0.1% - 1.0%

1.1% - 5.0%

5.1% - 10.0%

City Boundary

°0 10.5

MilesSource: US Census

Carmelita

Ave

Lomitas A

ve

Sunset Blvd Palm

Dr

Hillcrest R

d

Palm Dr

Charleville Blvd

Santa Monica

Blvd

Pico Blvd

3rd St

Beverly Blvd

Melrose Ave

Doheny D

r

Beverly Dr

Olympic Blvd

La C

iene

ga B

lvd

Crescent Dr

Elevado Ave

Canon Dr

Benedict Canyon Dr

Roxbury Dr

Bedford DrCamden Dr

Col

dwat

er C

anyo

n D

r

Gregory Way

Olympic Blvd

Wilshire Blvd

Crescent Dr

City of Beverly HillsComplete Streets Transit Facilities

Legend

n£ Metro Rapid Bus Stop

( Purple Line Station

Purple Line Extension (under construction)

Purple Line Extension Alignment

Other transit (Metro Local, LADOT, AVTA)

Metro Rapid

City Boundary °

Crescent Dr

Wilshire Blvd

Olympic Blvd

Gregory Way

Col

dwat

er C

anyo

n D

r

Camden Dr

Bedford Dr

Roxbury Dr

Benedict Canyon Dr

Canon Dr

Elevado Ave

Crescent Dr

La C

iene

ga B

lvd

Olympic Blvd

Beverly Dr

Doheny D

r

Carmelita

AveLomitas A

ve

Sunset Blvd

Palm

Dr

Hillcrest R

d

Palm Dr

Charleville Blvd

Santa Monica

Blvd

Pico Blvd

3rd St

Beverly Blvd

Melrose Ave

Santa Monica

Blvd

City of Beverly HillsComplete Streets Bike Facilities

Legend

Bike Share Stations

Future Class II Bike Lane

Class II Bike Lane

Class III Bike Route

City Boundary

°0 10.5

Miles

Carmelita

Ave

Lomitas A

ve

Sunset Blvd Palm

Dr

Hillcrest R

d

Palm Dr

Charleville Blvd

Santa Monica

Blvd

Pico Blvd

3rd St

Beverly Blvd

Melrose Ave

Doheny D

r

Beverly Dr

Olympic Blvd

La C

iene

ga B

lvd

Crescent Dr

Elevado Ave

Canon Dr

Benedict Canyon Dr

Roxbury Dr

Bedford DrCamden Dr

Col

dwat

er C

anyo

n D

r

Gregory Way

Olympic Blvd

Wilshire Blvd

Crescent Dr

0.7%1.9%

5.3%

8.2%

7.1%6.2%

9.1%

City of Beverly HillsComplete Streets Walk to Work (%) by Census Tract

Legend

Walk to Work (%) by Census Tract

0.0%

0.1% - 1.0%

1.1% - 5.0%

5.1% - 10.0%

City Boundary

°0 10.5

MilesSource: US Census

Carmelita

Ave

Lomitas A

ve

Sunset Blvd Palm

Dr

Hillcrest R

d

Palm Dr

Charleville Blvd

Santa Monica

Blvd

Pico Blvd

3rd St

Beverly Blvd

Melrose Ave

Doheny D

r

Beverly Dr

Olympic Blvd

La C

iene

ga B

lvd

Crescent Dr

Elevado Ave

Canon Dr

Benedict Canyon Dr

Roxbury Dr

Bedford DrCamden Dr

Col

dwat

er C

anyo

n D

r

Gregory Way

Olympic Blvd

Wilshire Blvd

Crescent Dr

City of Beverly HillsComplete Streets Transit Facilities

Legend

n£ Metro Rapid Bus Stop

( Purple Line Station

Purple Line Extension (under construction)

Purple Line Extension Alignment

Other transit (Metro Local, LADOT, AVTA)

Metro Rapid

City Boundary °

Carmelita

Ave

Lomitas A

ve

Sunset Blvd Palm

Dr

Hillcrest R

d

Palm Dr

Charleville Blvd

Santa Monica

Blvd

Pico Blvd

3rd St

Beverly Blvd

Melrose Ave

Doheny D

r

Beverly Dr

Olympic Blvd

La C

iene

ga B

lvd

Crescent Dr

Elevado Ave

Canon Dr

Benedict Canyon Dr

Roxbury Dr

Bedford DrCamden Dr

Col

dwat

er C

anyo

n D

r

Gregory Way

Olympic Blvd

Wilshire Blvd

Crescent Dr

City of Beverly HillsComplete Streets Transit Facilities

Legend

n£ Metro Rapid Bus Stop

( Purple Line Station

Purple Line Extension (under construction)

Purple Line Extension Alignment

Other transit (Metro Local, LADOT, AVTA)

Metro Rapid

City Boundary °

Visit www.beverlyhills.org/completestreets to stay up to date on upcoming events!

BIKE NETWORK

The City of Beverly Hills launched a successful pilot program in 2012 that added bike lanes to Burton Way. In 2015, the Beverly Hills Bike Share program was launched, and coming soon bike lanes will be added to N. Santa Monica Boulevard. What values and goals do you think should be established to guide the future of the City’s bike network?

PEDESTRIAN NETWORK

One of the most universal ways people experience a city is as pedestrians. In some parts of Beverly Hills, as many as 9% of neighbors walk to work. What values and goals might this Plan consider that would make pedestrian travel a more attractive, comfortable, and accessible experience?

TRANSIT NETWORK

Beverly Hills is served by Metro and Metro Rapid Bus lines, and soon the Metro Purple Line will extend into our City, expanding public transit options. What values and goals might shape the future of public transportation in Beverly Hills?

STREETS ANALYSIS

STATISTICS:

51 to 60% of people who do not ride bikes are interested, but have concerns*. What values/goals might encourage ridership? *Source: NACTO, Designing for all Ages and Abilities

As many as 9% of Beverly Hills residents in some areas commute to work by walking. What values/goals might improve the pedestrian experience for all?

A 10% increase in weekend ridership resulted from the Expo line extension in 2017*. With the Purple Line and improvements to Metro Bus service on the horizon, what values/goals might this Plan recommend that will improve the transit network and experience?*Source: http://isotp.metro.net/MetroRidership/IndexRail.aspx

BEVERLY HILLS COMPLETE STREETS PLAN COMPLETE STREETS PLAN

Page 3: PROJECT OVERVIEWtemp3.altaprojects.net/wp-content/uploads/2018/03/... · and street trees, and holistically improve community livability. ... W i lsh e B vd C r e s c n t r 0.7% 1.9%

Visit www.beverlyhills.org/completestreets to stay up to date on upcoming events!

BIKE LANES:Create a designated space on the road for people biking. This helps drivers better predict where riders will be - improving visibility and harmony on the road. Facilities may be designated with paint, as shown above in a rendering of bike lanes being added to North Santa Monica Boulevard, or a physical separator such as a curb or flexible post.

TRANSIT STOP ENHANCEMENTS:Shade structures and benches can improve the comfort of waiting for a transit connection. Street furniture that incorporates technology may also be added, such as solar charging ports, wifi hot spots, or digital feedback signs to update passengers in real-time on the status of a connection.

BULB OUTS /MEDIAN REFUGE ISLANDS: improve visibility and reduce pedestrian crossing distances. By reducing turning radius, bulb outs reduce vehicle speeds which increase the chance of survival for a pedestrian in the event of a collision.

ACCESSIBILITY / CURB RAMPS: are needed to improve travel for all residents regardless of ability or age. Smooth transitions to the street with textured warning strips coupled with wide sidewalks provide direct, predictable, and accessible streetscapes.

CROSSING WARNING DEVICES:Flashing lights and additional signage alert motorists to the presence of crosswalks and pedestrian traffic.

SMART VEHICLES:include autonomous vehicles, connected vehicles, and electric vehicles. While these vehicles are not widely used at the moment, they represent an important future form of transportation that needs to be considered in urban streets.

NETWORK TECHNOLOGY:includes the invisible ways people interact with streets. These include smart cell networks to increase public wifi, rideshare apps, and curbside management policies that impact how people and vehicles use streets and sidewalks.

GREEN INFRASTRUCTURE: Street trees, bioswales, and native plantings provide a pleasant street experience for people walking, and create a buffer between pedestrians and vehicle traffic. They improve stormwater and ecological functions while reducing a community’s carbon footprint. Street trees and plantings also provide shade, lower temperatures, and reduce the urban heat island effect.

TRAFFIC CALMING:Strategies such as lane narrowing, traffic circles, and chicanes can discourage speeding and calm traffic. When roadways are narrowed using these methods, it encourages vehicles to drive slower and provides extra space for planted medians, bike lanes, or curb extensions.

CROSSWALKS /RAISED CROSSWALKS: Wide, high-visibility striping and reflective paint enhance a motorist’s awareness of a crossing and creates a priority space for pedestrians. Raised crosswalks create a small vertical cue that forces drivers to slow down as they approach an intersection.

A COMPLETE STREET IMPROVES SAFETY, MOBILITY, AND ACCESSIBILITY ALONG A STREET FOR EVERYONE. Below are examples of typical Complete Streets ‘tools’ in a designer’s toolbox.

NEW TECHNOLOGIES

BEVERLY HILLS COMPLETE STREETS PLAN COMPLETE STREETS PLAN

WHAT IS A COMPLETE STREET?

Page 4: PROJECT OVERVIEWtemp3.altaprojects.net/wp-content/uploads/2018/03/... · and street trees, and holistically improve community livability. ... W i lsh e B vd C r e s c n t r 0.7% 1.9%

© 2018 Iteris, Inc. All rights reserved.

March 12, 2018

Complete Streets Workshop #1

City of Beverly Hills

Page 5: PROJECT OVERVIEWtemp3.altaprojects.net/wp-content/uploads/2018/03/... · and street trees, and holistically improve community livability. ... W i lsh e B vd C r e s c n t r 0.7% 1.9%

© 2018 Iteris, Inc. All rights reserved.

Agenda

1. Who we are 20 min

2. Why this project is happening

a. Mobility concerns

b. Safety concerns

3. What is a Complete Street?

4. Roundtable dialogue of community values & goals 60 min

a. Tables report back to larger group

5. Closing Remarks 15 min

6. Event End 8:30pm

2

Page 6: PROJECT OVERVIEWtemp3.altaprojects.net/wp-content/uploads/2018/03/... · and street trees, and holistically improve community livability. ... W i lsh e B vd C r e s c n t r 0.7% 1.9%

© 2018 Iteris, Inc. All rights reserved. 3

• Streets designed and operated to deliver safe access for all street users

• Pedestrians, Bicyclists, Transit Riders and Motorists in legacy vehicles, EVs, CAVs

• A balanced street network offering more choices, and connecting all modes of travel

• Making your City a better place to live

Page 7: PROJECT OVERVIEWtemp3.altaprojects.net/wp-content/uploads/2018/03/... · and street trees, and holistically improve community livability. ... W i lsh e B vd C r e s c n t r 0.7% 1.9%

© 2018 Iteris, Inc. All rights reserved. 4

Page 8: PROJECT OVERVIEWtemp3.altaprojects.net/wp-content/uploads/2018/03/... · and street trees, and holistically improve community livability. ... W i lsh e B vd C r e s c n t r 0.7% 1.9%

© 2018 Iteris, Inc. All rights reserved.

Complete Streets Network

5

Emphasize Transit Balance needs of vehicles

with other modes

Emphasize Bicycle Connectivity

Page 9: PROJECT OVERVIEWtemp3.altaprojects.net/wp-content/uploads/2018/03/... · and street trees, and holistically improve community livability. ... W i lsh e B vd C r e s c n t r 0.7% 1.9%

© 2018 Iteris, Inc. All rights reserved.

Multimodal Complete Street Attributes Transit Pedestrian

Bicycle

6

Page 10: PROJECT OVERVIEWtemp3.altaprojects.net/wp-content/uploads/2018/03/... · and street trees, and holistically improve community livability. ... W i lsh e B vd C r e s c n t r 0.7% 1.9%

© 2018 Iteris, Inc. All rights reserved.

Bicycles

7 Bike lanes added to N. Santa Monica Blvd.

Page 11: PROJECT OVERVIEWtemp3.altaprojects.net/wp-content/uploads/2018/03/... · and street trees, and holistically improve community livability. ... W i lsh e B vd C r e s c n t r 0.7% 1.9%

© 2018 Iteris, Inc. All rights reserved. 8

Bike to Work (%) by Census Tract Walk to Work (%) by Census Tract

Page 12: PROJECT OVERVIEWtemp3.altaprojects.net/wp-content/uploads/2018/03/... · and street trees, and holistically improve community livability. ... W i lsh e B vd C r e s c n t r 0.7% 1.9%

© 2018 Iteris, Inc. All rights reserved.

Pedestrians

9

Raised crosswalks Beverly Gardens Park

Bulbouts Flashing signs

Page 13: PROJECT OVERVIEWtemp3.altaprojects.net/wp-content/uploads/2018/03/... · and street trees, and holistically improve community livability. ... W i lsh e B vd C r e s c n t r 0.7% 1.9%

© 2018 Iteris, Inc. All rights reserved.

Transit

10

Page 14: PROJECT OVERVIEWtemp3.altaprojects.net/wp-content/uploads/2018/03/... · and street trees, and holistically improve community livability. ... W i lsh e B vd C r e s c n t r 0.7% 1.9%

© 2018 Iteris, Inc. All rights reserved.

Technology + Complete Streets

11

Page 15: PROJECT OVERVIEWtemp3.altaprojects.net/wp-content/uploads/2018/03/... · and street trees, and holistically improve community livability. ... W i lsh e B vd C r e s c n t r 0.7% 1.9%

© 2018 Iteris, Inc. All rights reserved.

Technology

Revolutions on the Cusp

“Almost-Autonomous” Timeline

12

Page 16: PROJECT OVERVIEWtemp3.altaprojects.net/wp-content/uploads/2018/03/... · and street trees, and holistically improve community livability. ... W i lsh e B vd C r e s c n t r 0.7% 1.9%

© 2018 Iteris, Inc. All rights reserved.

Technology Digitize the street with Shared Use Mobility Zones

13

5G/DSRC Street furniture + physical infrastructure enhanced

Page 17: PROJECT OVERVIEWtemp3.altaprojects.net/wp-content/uploads/2018/03/... · and street trees, and holistically improve community livability. ... W i lsh e B vd C r e s c n t r 0.7% 1.9%

© 2018 Iteris, Inc. All rights reserved. 14 www.beverlyhills.org/completestreets

Ways to Stay Involved + Next Steps

Page 18: PROJECT OVERVIEWtemp3.altaprojects.net/wp-content/uploads/2018/03/... · and street trees, and holistically improve community livability. ... W i lsh e B vd C r e s c n t r 0.7% 1.9%

© 2018 Iteris, Inc. All rights reserved.

Breakout Sessions: Values + Goals

15

1) Values session (20 min):

• Are broad statements

• Represent guiding ideas or approaches

2) Goals session (20 min):

• Support values

• Are specific and actionable

• Are measurable

3) Report back from each group (20 min):

• Top 3 Values

• Top 3 Goals

Page 19: PROJECT OVERVIEWtemp3.altaprojects.net/wp-content/uploads/2018/03/... · and street trees, and holistically improve community livability. ... W i lsh e B vd C r e s c n t r 0.7% 1.9%

© 2018 Iteris, Inc. All rights reserved. 16

Page 20: PROJECT OVERVIEWtemp3.altaprojects.net/wp-content/uploads/2018/03/... · and street trees, and holistically improve community livability. ... W i lsh e B vd C r e s c n t r 0.7% 1.9%

© 2018 Iteris, Inc. All rights reserved. 17