PROJECT AMENDMENT REQUEST
MCCCD Project Amendment Request 800017 CFS R12 Upgrade 9/13/2010, Page 1
PROJECT NAME 800017 CFS R12 Upgrade
DATE 9/3/2010
CLIENT Business Services
EXECUTIVE CHAMPION George Kahkedjian, Debra Thompson
PROJECT MANAGER Philip Cram
AFFECTED AREAS (please check all that apply)
Project Start Date Project End Date Development Costs Total Costs
Project Scope Proposed Technology Major Deliverables/Outcomes Roles/Responsibilities
NOTE: If there are changes in the project cost you must provide:
• REVISED Funding Source: 774420 - Enterprise Applications
• REVISED Funding Timeline:
o September ITC
o October Governing Board
• Project Sponsor Signatures:
o George Kahkedjian
o Debra Thompson
Current Recorded Dates/Costs Requested Revisions to Dates/Costs
Start Date
10/2009
End Date
3/2011
Development Cost ($000)
Total Cost ($000)
$530,000
Start Date
End Date
3/2012
Development Cost ($000)
Total Cost ($000)
$2,092,400
Justification Summary
The R12 Upgrade Project has been working over the past year to upgrade CFS to Release 12 of Oracle Applications. The project began with the pre-upgrade readiness assessment from Solution Beacon in the Fall of 2009. This year, a vendor was selected, HighPoint Consulting, to partner with MCCCD to complete the upgrade project. The vendor selection process was based on a RFQ issued to qualified vendors under RFP# 2977-10.
Following best practices and configuration suggestions from Solution Beacon, HighPoint, and Oracle, it has become evident that additional funds are needed for the project. These additional funds can be broken into three separate categories: Hardware, Additional R12 Upgrade Costs and New Application Modules. Hardware includes the new hardware and operating software support. The Additional R12 Upgrade Costs includes consulting and training dollars. The New Application Modules includes the upgrade of the application software license along with the costs for implementation of three new modules for Business Services.
Hardware and Operating System
The hardware that hosts the CFS application needs to be replaced. This will allow CFS to separate the database and the application server tiers to provide for better system performance, as recommended by Solution Beacon. It will also position CFS for external access to the application for such services as iSupplier, an application module that allows external suppliers to maintain their own supplier record with MCCCD. Additionally, the new hardware will provide a more robust development environment so that more instances can be created for testing and developmental purposes. As with the current system, an upgrade
PROJECT AMENDMENT REQUEST
MCCCD Project Amendment Request 800017 CFS R12 Upgrade 9/13/2010, Page 2
in production hardware also requires an upgrade to the disaster recovery hardware, and that is included. Also included is three years of support for the operating systems for the database and application servers. Total cost for the Hardware and Operating System Upgrade is $120,000
R12 Upgrade Additional Consulting and Training
The original budget request for the R12 Upgrade Project was based on research on other public and governmental agencies that had allocated monies for an R12 upgrade; those estimates ranged from a low of $837,000 and a high of $1,901,000. An optimistic request of $540,000 was submitted, but after a year of working with consultants and vendors, it seems that the original request was lacking. The estimate for consulting for the project from the vendor selected to perform the upgrade shows that we will need additional monies for services including a fixed-price performance tuning engagement and additional dollars for customization/modification development and remediation to the new software version. Along with UPK for the users, the DBA’s and developers will need to update their skills to maintain the new version of CFS once the upgrade is complete. Under the original project request, there was an $84,000 line item for training, but those dollars were absorbed by the consulting required for the upgrade project, so training dollars need to be added back into the project budget. Total cost for the R12 Upgrade Additional Consulting and training is $295,000.
UPK Content
Project discussions with various vendors have uncovered a method that will allow for better training of our on-line users. UPK, or User Productivity Kit, is an interactive product that users can access while in the application for documentation of application processes. MCCCD owns UPK developer licenses that can be used to customize content, and Oracle provides already-built content for the eBusiness suite modules. Total cost for UPK Content is $152,000.
New Application Modules
Solution Beacon, the company that performed the pre-upgrade readiness assessment, included a future footprint in their report that included recommendations on additional modules for Oracle eBusiness. These additional modules align closely with 21
st Century goals for effectiveness and efficiency, including modules
such as iExpense, which will allow for the automation of the expense reporting process and iSupplier, a product that enables MCCCD suppliers to actively maintain their supplier record within CFS. iExpense will save MCCCD dollars on processing expense reports and payments, and iSupplier will free up Purchasing Office employee time spent maintaining the supplier records. In addition to these two modules, Business Services has been interested in implementing the Treasury module for a number of years, which will provide efficiencies for the management of MCCCD’s monetary and bond accounts. These new application modules will require an upgrade to the application software license and implementation consulting costs.
Application Software License Upgrade
MCCCD’s application license is for individual modules of the eBusiness Suite and is based on a licensing metric of named users. This license dates back 15 years when MCCCD first purchased the application from Oracle. Oracle has changed the metric by which the software is licensed, but they grandfathered MCCCD’s licensing structure as long as there were no changes to application license. Since MCCCD wants to license additional new modules, the licensing structure needs to be converted to what is called an Enterprise license which is based on annual budgets rather than named users. A by-product of this license conversion is that MCCCD will be licensed for the full version of eBusiness suite, which will allow unlimited access to all seven of the eBusiness modules instead of the four MCCCD currently licenses. The conversion cost will include the licensing for the three new modules and also include the first year of support. Total cost for the Application Software License Upgrade is $695,000.
PROJECT AMENDMENT REQUEST
MCCCD Project Amendment Request 800017 CFS R12 Upgrade 9/13/2010, Page 3
New Module Implementation
MCCCD will require additional consulting for the new modules that will include the functional configuration and setup of the new modules as well as testing and validation of the software. The implementation of the new modules will be included as part of the R12 upgrade project and be completed in March 2012. Total cost for New Module Implementation is $226,000.
800017 CFS R12 Upgrade Project Budget
Original Budget Allocation $530,000
CFS R12 Upgrade Project Amendment
Hardware and Operating System
CFS Hardware $101,000
CFS Operating Systems $19,000
Subtotal Hardware and Operating System $120,000
Additional R12 Upgrade Costs
Additional Consulting and Training
Performance Tuning $75,000
CEMLI Development/Remediation $150,000
DBA/Developer Training $70,000
Total Additional Consulting and Training $295,000
UPK Content
UPK Content $125,000
Support Costs - 1st year $27,000
Total UPK Content $152,000
Subtotal Additional R12 Upgrade Costs $447,000
New Application Modules
Application Software License Upgrade
Conversion/Licensing $570,000
Support Costs - 1st year $125,000
Total Application Software License Upgrade $695,000
New Module Implementation
Consulting Services $226,000
Total New Module Implementation $226,000
Subtotal New Application Modules $921,000
Total CFS R12 Upgrade Project Amendment $1,488,000
5% Contigency $74,400
Amended Total 800017 CFS R12 Upgrade Project Budget $2,092,400
PROJECT AMENDMENT REQUEST
MCCCD Project Amendment Request 800017 CFS R12 Upgrade 9/13/2010, Page 4
Note: Above figures include estimated taxes
Note: The VC Information Technology/CIO signature is required for this form.
Submitted By (Printed Name & Signature)
Philip Cram
Date:
VC Information Technology/CIO (Printed Name and Signature)
George Kahkedjian
Date:
IT Partners2828 N. Central Ave,Suite 1203Phoenix, AZ 85004
Richard Cook
Company:Attention:Phone:Address:
Email:
Bob Carrigan
Date:
Quote:
Prepared By:
Terms:
07/08/2010
Troy Wittrock
2411 West 14th StreetTempe, AZ 85281-6942
Maricopa County Community College District
Net 30
(602) 296-6111(602) 667-0384
(480) 731-8857
Phone:FAX:
CFS R12 - budgetary
Expires: 08/08/2010
307113
Budgetary Only Quotation
QTY MODEL DESCRIPTION List Price Net Price Extended Price
S.A.V.E. Cooperative Procurement 1 * City of Tempe Contract ID: IT10-132-01 $0.00 $0.00 $0.00
bl465G7 12-core 16GB Memory 6 518857-B21 HP BL465c G7 CTO Blade $1,571.00 $1,335.35 $8,012.10
6 518852-L21 HP BL465c G7 O6172 12C FIO Kit $1,249.00 $1,061.65 $6,369.90
6 518852-B21 HP BL465c G7 O6172 12C Kit $1,249.00 $1,061.65 $6,369.90
6 588184-B21 HP Smart Array BL465c/685c G7 FIO Cntrlr $399.00 $339.15 $2,034.90
24 604500-B21 HP 4GB 1Rx4 PC3L-10600R-9 Kit $275.00 $233.75 $5,610.00
12 507125-B21 HP 146GB 6G SAS 10K 2.5in DP ENT HDD $269.00 $228.65 $2,743.80
1 HA110A3 HP 3y Support Plus 24 SVC $0.00 $0.00 $0.00
6 HA110A3 7XE BL4xxc Svr Bld HW Support $482.00 $409.70 $2,458.20
HP DL385G7 12-core Large Memory Large 1 573122-B21 HP DL385G7 SFF CTO Chassis $1,511.00 $1,284.35 $1,284.35
1 585324-L21 HP 6172 DL385G7 FIO Kit $1,249.00 $1,061.65 $1,061.65
1 585324-B21 HP 6172 DL385G7 Kit $1,249.00 $1,061.65 $1,061.65
8 604500-B21 HP 4GB 1Rx4 PC3L-10600R-9 Kit $275.00 $233.75 $1,870.00
8 507127-B21 HP 300GB 6G SAS 10K 2.5in DP ENT HDD $519.00 $441.15 $3,529.20
1 481041-B21 HP Slim 12.7mm SATA DVD Optical Kit $90.00 $76.50 $76.50
1 534916-B21 HP 512MB Flash Backed Write Cache $429.00 $364.65 $364.65
2 512327-B21 HP 750W CS HE Power Supply Kit $299.00 $254.15 $508.30
1 534516-B21 HP PL Foundation Pk Single Rel FIO SW $1.00 $0.85 $0.85
1 HA110A3 HP 3y Support Plus 24 SVC $0.00 $0.00 $0.00
1 HA110A3 7G3 Proliant ServerDL38x HWSupport $879.00 $747.15 $747.15
1 TC278AAE HP Insight Ctl ML/DL Bdl E-LTU 24x7 SW $449.00 $381.65 $381.65
1 HA110A3 HP 3y Support Plus 24 SVC $0.00 $0.00 $0.00
1 HA110A3 4YD HP IC ML-DL-BL SW Sup $181.00 $153.85 $153.85
bl685G7 12-core Large Memory High 2 518878-B21 HP BL685c G7 CTO Blade $4,191.00 $3,562.35 $7,124.70
2 593675-L21 HP BL685c G7 O6172 12C 2P FIO Kit $2,500.00 $2,125.00 $4,250.00
Page 1 of 3
Quote #: Quote Date: 07/08/2010307113
QTY MODEL DESCRIPTION List Price Net Price Extended Price
2 593675-B21 HP BL685c G7 O6172 12C 2P Kit $2,499.00 $2,124.15 $4,248.30
2 588184-B21 HP Smart Array BL465c/685c G7 FIO Cntrlr $399.00 $339.15 $678.30
32 604500-B21 HP 4GB 1Rx4 PC3L-10600R-9 Kit $275.00 $233.75 $7,480.00
4 507127-B21 HP 300GB 6G SAS 10K 2.5in DP ENT HDD $519.00 $441.15 $1,764.60
2 451871-B21 HP BLc QLogic QMH2562 8Gb FC HBA Opt $849.00 $721.65 $1,443.30
1 HA110A3 HP 3y Support Plus 24 SVC $0.00 $0.00 $0.00
2 HA110A3 7XF BL6xxc Svr Bld HW Support $828.00 $703.80 $1,407.60
bl465G7 12-core 32GB Memory 1 518857-B21 HP BL465c G7 CTO Blade $1,571.00 $1,335.35 $1,335.35
1 518852-L21 HP BL465c G7 O6172 12C FIO Kit $1,249.00 $1,061.65 $1,061.65
1 518852-B21 HP BL465c G7 O6172 12C Kit $1,249.00 $1,061.65 $1,061.65
1 588184-B21 HP Smart Array BL465c/685c G7 FIO Cntrlr $399.00 $339.15 $339.15
8 604500-B21 HP 4GB 1Rx4 PC3L-10600R-9 Kit $275.00 $233.75 $1,870.00
2 507127-B21 HP 300GB 6G SAS 10K 2.5in DP ENT HDD $519.00 $441.15 $882.30
1 HA110A3 HP 3y Support Plus 24 SVC $0.00 $0.00 $0.00
1 HA110A3 7XE BL4xxc Svr Bld HW Support $482.00 $409.70 $409.70
300GB EVA Drives 8 AG690B HP EVA M6412A 300GB 15K FC Drive $1,660.00 $1,411.00 $11,288.00
1 HA110A3 HP 3y Support Plus 24 SVC $0.00 $0.00 $0.00
8 HA110A3 13H EVA 146-400GB HDD HW Supp $218.00 $185.30 $1,482.40
$92,765.60 Sub Total:
Estimated Shipping Fee:
Total:
TBD$92,765.60
Budgetary use only. Not for Orders
Page 2 of 3
Standard Sales Terms and Conditions1. PAYMENT:
(a) Checks are accepted subject to collection and the date of collection shall be deemed the date of payment. Any check received fr under's liability for any additional amounts owing by Buyer to Seller; and the acceptance by Seller of such
check shall not constitute a waiver of Seller's right to pursue the collection of any remaining balance.
(b) On any invoice not paid by maturity date (net thirty (30) days from the date of invoice), Buyer shall pay interest from maturity to date of payment at the annual percentage rate of 18% (or such lower rate as may
be the maximum allowable by law), together with Seller's costs of collection (including reasonable attorneys' fees).
(c) Buyer agrees to pay the entire net amount of each invoice rendered by Seller pursuant to the terms of each such invoice without offset or deduction.
(d) Prices for any undelivered Products may be increased by Seller in the event of any increase in Seller’s cost of supplies, raw m's
action or any other cause beyond Seller's control.
2. CREDIT:
Seller may at its sole discretion at any time and from time to time change the terms of Buyer's credit, require payment in cash before shipment of any or all of the Products specified herein, and/or require anticipated
payment of any or all amounts due or to become due under this contract. If Seller believes in good faith that Buyer's ability to make the payments called for by this contract is or may be impaired, Seller may cancel this
contract or any remaining balance thereof, Buyer remaining liable to pay for any Products already shipped.
3. DELIVERIES/TITLE:
(a) Subject to Seller's right of stoppage in transit, delivery of the Products to a carrier shall constitute delivery to Buyer, and risk of loss shall however,
makes payment in full under the contract. Products invoiced and held by Seller for any reason shall be at Buyer's risk and expense. Delivery route shall be the election of Seller unless specifically designated by Buyer.
.
(b) Should delivery of all or any part of the Products specified herein (or any other obligation of Seller) be delayed by events beyond Seller's control, Seller’s time for performance shall be extended by the period of
delay, or Seller may, at its option, cancel this contract without liability, Buyer remaining liable for shipments already made.
4. ORDERS:
(a) Each order for Products is subject to acceptance in writing by Seller.
(b) Orders may not be canceled or rescheduled after delivery by Seller to the carrier. In the event of allocation of Products, orders that are accepted by Seller will be accepted using a fair schedule method.
(c) Special Orders - Special orders for items not normally stocked are non-cancelable and non-returnable.
5. SELLER'S LIMITED WARRANTY AND LIMITATION OF LIABILITIES:
Seller warrants to Buyer that the Products will conform to the applicable manufacturer's specifications for such Products and that any value-added work performed by Seller on any such Products will conform to
applicable Buyer’s specifications relating to such work. Seller makes no other warranty, express or implied, with respect to the Products. MERCHANTABILITY However, Seller will transfer to Buyer
whatever transferable warranties and indemnities Seller receives from the manufacturer of the Products. With respect to Products which d value-added's specifications, Seller’s liability is limited (at Seller's election)to (1) Refund of Buyer's purchase price for such Products (without interest), 2) repair
of Products, or (3) replacement of such Products, provided, however, that such Products must be returned to Seller, along with acceptable evidence of purchase, within twenty (20) days from date of delivery,
transportation charges prepaid. BUYER SHALL NOT IN ANY EVENT BE ENTITLED TO, AND SELLER SHALL NOT BE LIABLE OR INDIRECT, SPECIAL, INCIDENTAL OR CONSEQUENTIAL DAMAGES
OF ANY NATURE INCLUDING, WITHOUT BEING LIMITED TO, LOSS OF PROFIT, OSS OF DATA, LOSS OF USE, PROMOTIONAL OR MANUFACTURING EXPENSEOVERHEAD,
REPUTATION OR LOSS OF CUSTOMERS, BUYER'S RECOVERY FROM SELLER FOR ANY CLAIM SHALL NOT EXCEED BUYER'S PURCHASE PRICE FOR THE PRODUCTS IRRESPECTIVE OF THE
NATURE OF THE CLAIM, WHETHER IN CONTRACT, TORT, WARRANTY, OR OTHERWISE.
6. USE OF PRODUCTS IN LIFE SUPPORT APPLICATIONS:
Products sold by Seller are not designed for use in life support or nuclear applications. Seller's customers using or selling products for use in life support or nuclear applications do so at their own risk, agree that Seller
and the Manufacturer of Products are not liable, in whole or in part, for any claim or damage arising from such use, and agree to floss, cost, expense or liability arising out of or in connection with the use or performance of Products in life support or nuclear applications. 7. CLAIMS: (a)
acceptance thereafter.
(b) Claims of late delivery are barred unless made prior to receipt of Products and the receipt of any Products shall constitute a waiver of any claim that they were delivered late.
(c) No return of Products will be accepted by Seller without a return material authorization number (RMA#), which will be issued in Seller's sole discretion. Returned Products must be in original shipping cartons, and
must be complete with all packing materials. All Products for return must be freight prepaid. Defective software will be replaced, b within(10) calendar days of receipt. A complete description regarding the nature of the defect must be included with all returned Product.transportation collect. 8. TAXES/FREIGHT: Unless's location and all taxes or other charges now or hereafter imposed by any government authority upon the sale, purchase, resale,
delivery, manufacture, production or possession of the Products specified herein, which maybe paid by Seller or for which Seller may be liable, shall Products. 9. ADVICE: Ifthen,
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
From: Robert Carrigan <[email protected]>
Sent: Tuesday, August 17, 2010 5:33 PM
To: Philip Cram
Cc: Richard Lang
Subject: OEL Support for CFS R12 project
Phil,
I was a little off in my original estimate at the meeting, so see what
you think of the following - using Oracle online resources as a
starting point, budgetary pricing for basic 24x7 Oracle Enterprise
Linux support for the hardware being considered is:
$5,751.00 for the 1st year (we'd add renewals to our annual
renewals budget)
Or -
$17,253.00 for 3 years (we'd add subsequent renweals for our
annual renewals budget)
Derived from the following...
For the web / app / DR servers: Enterprise Linux Basic Limited
Support
$3,592.80 ($449.10 annually per system, qty = 8)
For the dev / prod database servers: Enterprise Linux Basic Support
$2,158.20 ($1,079.10 annually per system, qty = 2)
For reference, URLs to Oracle's OEL support options is the
following...
https://shop.oracle.com/pls/ostore/product?p1=EnterpriseLinux&sc=ocoml
ink_buynow_enterpriselinux
OEL Support for CFS R12 project.txt 9/13/2010 7:36 AM
Page 1 of 1
192.168.10.15
PIX firewall PIX firewall
ACE ACE
FWSM firewall FWSM fireall
ASA firewall ASA firewall
Internet
CFS R12 Upgrade - ProductionVersion 1.0 8/31/2010
Maricopa Computers
PerimeterFirewall
DatacenterFirewall
HP BL465Application and Web servers
Load Balancers HP BL465Apex Server
VPN concentrator
VPN
HP BL685Oracle Database Server
Dataguard to Airpark
B2B Client Connections
Storage on EVA4400 (approx 1T)
Other systems accessing the database server include: SIS,
HR, BOXI
Note, Imaging, stage1probably connect to
this subnet.
192.168.10.15
PIX firewall PIX firewall
ACE ACE
FWSM firewall FWSM fireall
CFS R12 Upgrade - DevelopmentVersion 1.0 8/31/2010
Maricopa Computers
DatacenterFirewall
HP BL465Application and Web servers
Load Balancers HP BL465Apex Server
VPN concentrator
VPN
HP BL685Oracle Database Server
Storage on Compellent (if it ever gets ordered)
Other systems accessing the database server include: dev
SIS, dev HR, dev BOXI
MCCCD Financials Pricing
License and Support Costs
License
Metric
License Qty
Enterprise
List Price
Net License
Fees
Net 1st Yr
Support Fees
Total
CORE SW
EB
S F
ina
ncia
ls *
*
Op
era
tin
g
Bu
dg
et
1,6
00
5,6
69
,97
55
19
,17
4
1
14
,21
8
6
33
,39
2
Inclu
de
d:
Ge
ne
ral L
ed
ge
r-
Acco
un
ts P
aya
ble
-
Acco
un
ts R
ece
iva
ble
-
iAsse
ts-
Ca
sh
Ma
na
ge
me
nt
-
Glo
ba
bl C
on
so
lida
tio
n M
an
ag
er
-
CP
G T
rad
e A
cco
un
tin
g-
Pu
rch
asin
g *
*
Op
ert
atin
g
Bu
dg
et
1,6
00
Inclu
de
d
iSu
pp
ler
Po
rta
l
Op
ert
atin
g
Bu
dg
et
1,6
00
Inclu
de
d
Inte
rne
t E
xp
en
se
s
Op
ert
atin
g
Bu
dg
et
1,6
00
Inclu
de
d
Tre
asu
ryN
am
ed
Use
r5
In
clu
de
d
CORE SW - SUBTOTAL
5,669,975
519,174
114,218
633,392
ADDITIONAL SW
Ora
cle
e-B
usin
ess S
uite
UP
K -
G
en
era
l L
ed
ge
rM
od
ule
70
,00
0
35
,00
0
7,7
00
42
,70
0
Ora
cle
e-B
usin
ess S
uite
UP
K -
Acco
un
ts P
aya
ble
Mo
du
le3
5,0
00
1
7,5
00
3
,85
0
2
1,3
50
Ora
cle
e-B
usin
ess S
uite
UP
K -
A
cco
un
ts R
ece
iva
ble
Mo
du
le3
5,0
00
1
7,5
00
3
,85
0
2
1,3
50
Ora
cle
e-B
usin
ess S
uite
UP
K -
A
sse
tsM
od
ule
35
,00
0
17
,50
0
3,8
50
21
,35
0
Ora
cle
e-B
usin
ess S
uite
UP
K -
In
tern
et
Exp
en
se
sM
od
ule
17
,60
0
8,8
00
1,9
36
10
,73
6
Ora
cle
e-B
usin
ess S
uite
UP
K -
P
urc
ha
sin
gM
od
ule
70
,00
0
35
,00
0
7,7
00
42
,70
0
Hig
he
r E
d C
on
stitu
en
t H
ub
Op
era
tin
g
Bu
dg
et
1,6
00
2,4
40
,00
0
3
78
,20
0
8
3,2
04
4
61
,40
4
Hig
he
r E
d C
on
stitu
en
t H
ub
- D
ata
Ste
wa
rd
Op
era
tin
g
Bu
dg
et
1,6
00
Inclu
de
d
ADDITIONAL SW - SUBTOTAL
2,702,600
509,500
112,090
621,590
SOFTWARE - GRAND TOTAL
8,372,575
1,028,674
226,308
1,254,982
Oracle Corporation Confidential
8/1
7/2
01
0P
ag
e 1
MCCCD Financials Pricing
License and Support Costs
3.
1st
Ye
ar
An
nu
al S
up
po
rt is c
alc
ula
ted
at
22
% o
f N
et
Lic
en
se
Fe
es.
2.
All
pro
du
cts
are
price
d u
sin
g a
Pe
rpe
tua
l lic
en
se
te
rm.
** T
he
pricin
g r
efle
cts
th
e m
igra
tio
n o
f th
e e
xis
tin
g m
od
ule
s o
f G
/L,
A/P
, A
sse
ts &
Pu
rch
asin
g f
rom
a c
on
cu
rre
nt
use
r b
asis
to
an
en
terp
rise
use
me
tric
PRICING NOTES:
1.
Op
era
tin
g B
ud
ge
t q
ua
ntity
is lis
ted
as M
illio
ns
Oracle Corporation Confidential
8/1
7/2
01
0P
ag
e 2
Maricopa County Community College DistrictBudgetary Estimate - eBusiness Suite Financials Upgrade & Implementation Project August 16, 2010
8/16/2010 2 | PageHighPoint Consulting Proprietary and Confidential
HighPoint Team ApproachTimeline & Budgetary Estimates for Phased Oct. 2011 Upgrade & March 2012 Implementation
8/16/2010 3 | PageHighPoint Consulting Proprietary and Confidential
T&M Functional Resources $481,600
Fixed Price EBS Upgrade (inc. 2 Upgrade
Migrations & Production Upgrade) $202,000
Total $683,600
Optional Services:
T&M CEMLI Remediation $100,000
T&M CEMLI Development $50,000
Fixed Price Tuning $75,000
Budgetary Estimate – EBS Financials Phased Oct. 2011 Upgrade & March 2012 Implementation