Progress on the Renewable Energy IPP Procurement Programme
November 2013
Integrated Resource Plan
New build optionsCoal
(PF, FBC, imports, own
build)
Nuclear Import hydro Gas – CCGT Peak – OCGT Wind CSP Solar PV
MW MW MW MW MW MW MW MW2010 0 0 0 0 0 0 0 02011 0 0 0 0 0 0 0 02012 0 0 0 0 0 0 0 3002013 0 0 0 0 0 0 0 3002014 5001 0 0 0 0 400 0 3002015 5001 0 0 0 0 400 0 3002016 0 0 0 0 0 400 100 3002017 0 0 0 0 0 400 100 3002018 0 0 0 0 0 4004 1004 3004 2019 250 0 0 2373 0 4004 1004 3004 2020 250 0 0 2373 0 400 100 3002021 250 0 0 2373 0 400 100 3002022 250 0 1 1432 0 805 400 100 3002023 250 1 600 1 1832 0 805 400 100 3002024 250 1 600 2832 0 0 800 100 3002025 250 1 600 0 0 805 1 600 100 1 0002026 1 000 1 600 0 0 0 400 0 5002027 250 0 0 0 0 1 600 0 5002028 1 000 1 600 0 474 690 0 0 5002029 250 1 600 0 237 805 0 0 1 0002030 1 000 0 0 948 0 0 0 1 000Total 6 250 9 600 2 609 2 370 3 910 8 400 1 000 8 400
First Determination
Second Determination
1. Built, owned & operated by IPPs 2. Commitment necessary due to required high-voltage infrastructure, which has long lead time 3. Commitment necessary due to required gas infrastructure, which has long lead time 4. Possibly required grid upgrade has long lead time and thus makes commitment to power capacity necessary
1st Determination
Second Determination
Background
• To-date, the Department has: – Under Bid Window 1, entered into 28 agreements on 5 November 2012;– Under Bid Window 2, entered into 19 agreements on 9 May 2013.
•With regards to Bid Window 3:
– Received 93 bids on the 19 August 2013
– These bids amount to 6023MW whilst the available MW for allocation
was 1473MW
– The Department was pleased to note the competitive pricing offered in
the bids received
5
Procurement documents
Procurement Process Background
To be concluded in respect of all Bid Window 3 projects
To be concluded in respect of all Bid Window 3 projects
6
Contractual Arrangement
Government Framework Support Agreement
Implem
entation AgreementPo
wer
Pur
chas
e Ag
reem
ent
7
Request for Proposal (RFP)
Procurement Process Background
8
OVERVIEW OF EVALUATION PROCESS
9
Evaluation Protocols•Evaluation conducted in a ‘closed’ evaluation environment, under strict security conditions
•Members of the evaluation team are ‘ring-fenced’ within each of their firms
•Declaration of interest by all firms and individuals involved in the evaluation process
•Reports prepared by each discipline reviewed by independent review teams
•Overall process reviewed by independent governance review teams
10
PREFERRED BIDDERS
11
Preferred BiddersSummary
12
No of Bids
MW taken by Preferred Bidders
Maximum MW allocated for
Bid Window 3
Solar photovoltaic 6 435 401
Wind 7 787 654
Concentrated solar 2 200 200
Small Hydro (<40 MW) 0 0 121
Landfill gas 1 18 25
Biomass 1 16 60
Biogas 0 0 12
TOTAL 17 1 456 1 473
Preferred Bidders Salient TermsSolar Photovoltaic
13
Bid Window 3 Bid Window 2 Bid Window 1
Price: Fully Indexed (Ave Rand per MWh) (Base Apr ‘11) R 881 R 1 645 R 2 758
Price: Fully Indexed (Ave Rand per MWh) (Base Apr ‘13) R 990 R 1 848 R 3 098
MW allocation 435 MW 417 MW 632 MW
Total Project Cost (R’million) R 8 145 R 12 048 R 23 115
Preferred Bidders Salient TermsWind
14
Bid Window 3 Bid Window 2 Bid Window 1
Price: Fully Indexed (Ave Rand per MWh) (Base Apr ‘11) R 656 R 897 R 1 143
Price: Fully Indexed (Ave Rand per MWh) (Base Apr ‘13) R 737 R 1 008 R 1 284
MW allocation 787 MW 562 MW 634 MW
Total Project Cost (R’million) R 16 969 R 10 897 R 13 312
Preferred Bidders Salient TermsConcentrated Solar Power
15
Bid Window3
Bid Window2 Bid Window 1
Price: Fully Indexed (Ave Rand per MWh) (Base Apr ‘11) R 1 460* R 2 512 R 2 686
Price: Fully Indexed (Ave Rand per MWh) (Base Apr ‘13) R 1 640* R 2 822 R 3 017
MW allocation 200 MW 50 MW 150 MW
Total Project Cost (R’million) R 17 949 R 4 483 R 11 365
* Bid Window 3 base price payable for 12 hours every day and 270% of base price payable for 5 “peak” hours every day. This pricing basis is not comparable with Bid Windows 1 and 2.
Preferred Bidders Salient TermsLandfill Gas
16
Bid Window 3 Bid Window 2 Bid Window 1
Price: Fully Indexed (Ave Rand per MWh) (Base Apr ‘11) R 837 N/A N/A
Price: Fully Indexed (Ave Rand per MWh) (Base Apr ‘13) R 940 N/A N/A
MW allocation 18 MW 0 MW 0 MW
Total Project Cost (R’million) R 288 R 0 R 0
Preferred Bidders Salient TermsBiomass
17
Bid Window 3 Bid Window 2 Bid Window 1
Price: Fully Indexed (Ave Rand per MWh) (Base Apr ‘11) R 1 246 N/A N/A
Price: Fully Indexed (Ave Rand per MWh) (Base Apr ‘13) R 1 400 N/A N/A
MW allocation 16 MW 0 MW 0 MW
Total Project Cost (R’million) R 1 062 R 0 R 0
Preferred BiddersJob creation per Province
18
DescriptionJobs during
construction period
Jobs during operations
period*Eastern Cape 512 4908Free State 414 1443Gauteng 6 240KwaZulu-Natal 96 240Limpopo 160 1366Northern Cape 6502 8736Western Cape 223 1295
TOTAL 7915 18228
* One job = 12 person-months
Preferred BiddersInvestment per Province
19
DescriptionTotal Project
Cost **(ZAR million)
Total Project Value *
(ZAR million)
Local content value (ZAR
million)Eastern Cape 3 880 3 520 1 612Free State 1 253 1 106 574Gauteng 288 210 88KwaZulu-Natal 1 062 653 261Limpopo 952 819 412Northern Cape 35 747 26 427 12 482Western Cape 1 230 1 075 528
TOTAL 44 412 33 810 15 957* Total Project Cost - aggregate Debt and Equity required to fund the Project** Total Project Value - defined in the IA, used to calculate the Bidder’s local content commitment
Preferred BiddersForeign Investment
20
Totalfunding
Foreignportion
% of Total funding
Debt R 26 791 R 6 718 15,1%
Equity R 17 621 R 8 884 20,0%
TOTAL R 44 412 R 15 602 31.1%
Preferred Bidders Economic Development
Solar Photovoltaic
21
Bid Window 3
Bid Window 2
Bid Window 1
Local Content Value (R’million) R 3 698 R 4 943 R 6 563
Local Content % 53.8% 53.4% 38.4%
Job Creation : Construction (Citizens) 2119 2270 2381
Job Creation : Operations (Citizens) 7513 3809 6117
Preferred Bidders Economic Development
Wind
22
Bid Window 3
Bid Window 2
Bid Window 1
Local Content Value (R’million) R 6 283 R 4 817 R 2 727
Local Content % 46.9% 48.1% 27.4%
Job Creation : Construction (Citizens) 2612 1787 1810
Job Creation : Operations (Citizens) 8506 2238 2461
Preferred Bidder Economic Development
Concentrated Solar Power
23
Bid Window 3
Bid Window 2
Bid Window 1
Local Content Value (R’million) R5 627 R 1 723 R 2 391
Local Content % 44.3% 43.8% 34.6%
Job Creation : Construction (Citizens) 3082 1164 1883
Job Creation : Operations (Citizens) 1730 1180 1382
Preferred Bidders Economic DevelopmentLandfill Gas
24
Bid Window 3
Bid Window 2
Bid Window 1
Local Content Value (R’million) R88 N/A N/A
Local Content % 41.9% N/A N/A
Job Creation : Construction (Citizens) 6 N/A N/A
Job Creation : Operations (Citizens) 240 N/A N/A
Preferred Bidders Economic Development
Biomass
25
Bid Window 3
Bid Window 2
Bid Window 1
Local Content Value (R’million) R261 N/A N/A
Local Content % 40.0% N/A N/A
Job Creation : Construction (Citizens) 96 N/A N/A
Job Creation : Operations (Citizens) 240 N/A N/A
Analysis of MW allocation and remaining
Technology
MW capacity allocated in
First Bid Window
MW capacity allocated in Second Bid
Window
MW capacity allocated in
Third Bid Window
MW capacity remaining
Solar photovoltaic 632 417 435 1 041
Wind 634 563 787 1 336
Concentrated solar 150 50 200 200
Small hydro (≤ 40MW) 0 14 0 121
Landfill gas 0 0 18 7
Biomass 0 0 16 43
Biogas 0 0 0 60
Total 1 416 1 044 1 456 2 808
Preferred BiddersGeographic Distribution
27
28
Project_Name Capacity (MW)
1 Khi Solar One 50.002 KaXu Solar One 100.00No. of Preferred Bidders for Solar CSP: 2 150.00
Recommended Preferred Bidders – CSPLocation for window one projects
Thank you
• For more information visit:– www.energy.gov.za and– www.ipp-renewbles.co.za