Progress on Proposed Project Chernobyl Cooling Pond as Case Study for Improving the Scientific Basis for Multimedia Environmental Modeling, Risk Assessment, and Database Development 2011 Annual Public Meeting of the Interagency Steering Committee on Multimedia Environmental Modeling (ISCMEM) November 28 - 29, 2011 1

Transcript of Progress on Proposed Project Chernobyl Cooling Pond as Case Study for Improving the Scientific Basis...

Page 1: Progress on Proposed Project Chernobyl Cooling Pond as Case Study for Improving the Scientific Basis for Multimedia Environmental Modeling, Risk Assessment,

1

Progress on Proposed Project Chernobyl Cooling Pond as Case Study

for Improving the Scientific Basis for Multimedia Environmental Modeling, Risk Assessment, and Database Development

2011 Annual Public Meeting of the Interagency Steering Committee on Multimedia

Environmental Modeling (ISCMEM)November 28 - 29, 2011

Page 2: Progress on Proposed Project Chernobyl Cooling Pond as Case Study for Improving the Scientific Basis for Multimedia Environmental Modeling, Risk Assessment,

2

Outline

• Timeline of the Proposal Preparation and Overall Objective of the Case Study

• Brief Information about the Chernobyl Cooling Pond• Benefits and Relevance to the U.S. Federal Agencies and

International Agencies Missions • Information about the International Meeting on ”Feasibility

Study of the Chernobyl Cooling Pond Decommissioning and Remediation” organized by the ChNPP Administration

• IAEA Involvement and Recommendations• Potential Case Studies at DOE sites• Project Organization

Page 3: Progress on Proposed Project Chernobyl Cooling Pond as Case Study for Improving the Scientific Basis for Multimedia Environmental Modeling, Risk Assessment,

3

Timeline• February 2010 – Preliminary discussion of the proposal to NRC Staff• April 10, 2010 – Submitted 1st draft of the proposal to ISCMEM• June 10 and September 8, 2010 –

Presentation to ISCMEM Working Group 2 • September 16, 2010 –

Presentation to the ISCMEM Annual Meeting, Vicksburg, MS• July 29, 2010 – Submitted a revised proposal which was uploaded to the

EPA Integrated Environmental Modeling Hub

iemHUB: http://iemhub.org/• August 3, 2011– Presentation to joint meeting of ISCMEM WGs 1, 2, 3 and 4

November 29, 2011 – Steering Committee vote to approve 1st ISCMEM international test case

Page 4: Progress on Proposed Project Chernobyl Cooling Pond as Case Study for Improving the Scientific Basis for Multimedia Environmental Modeling, Risk Assessment,

4

Overall Objective of the Case Study• Provide an opportunity for Federal Agencies to review and

select information from the long-term observations at the Chernobyl Cooling Pond and the surrounding watersheds, which can be used as an analogue for improving the scientific basis and developing linkages, in the areas of multimedia environmental modeling, focusing on: – parameter estimation and modeling uncertainty, – site characterization and monitoring, – human health risk and safety, – loss of natural resources, – cleanup, and evaluation of remediation technologies on a large

scale.

Page 5: Progress on Proposed Project Chernobyl Cooling Pond as Case Study for Improving the Scientific Basis for Multimedia Environmental Modeling, Risk Assessment,

5

137Cs Fallout in Ukraine, Belorussia, Russia

ChNPP

Pripyat River

• Area ~ 23 km2 , ~ 108 m3 of water• Water is pumped from the Pripyat River to the

Cooling Pond

Sources of Contamination • Dispersed fuel particles • Heavily contaminated water from the reactor basement and soils.• Total radioactivity >200 TBq, including 137Cs-80%, 90Sr-10%, 239,240, 241Pu-10%• Routine releases of contaminated water into the pond

Chernobyl Cooling Pond Cs-137

Sr-90

Page 6: Progress on Proposed Project Chernobyl Cooling Pond as Case Study for Improving the Scientific Basis for Multimedia Environmental Modeling, Risk Assessment,

6

• Complete remediation of the Cooling Pond would significantly damage the ecosystem whilst not significantly reducing doses;

• Phytostabilisation of some small areas may be worthwhile;

• Drawdown of water level should be as slow as practicable;

• Monitored natural attenuation is the most environmentally sound remediation option.

Chernobyl Cooling Pond Radio-Ecological Study

RESRAD-BIOTA: A Tool for Implementing aGraded Approach to Biota Dose Evaluation (Argonne Lab)

• EU (INTAS); Royal Society• AQUASCOPE--Aquatic modeling study• AQUACURE--Countermeasures• EU INCO – Copernicus

Jim Smith -- School of Earth and Environmental Sciences, University of Portsmouth, UK, Oleg Voitsekhovich – Ukrainian Hydrometeorological Institute, Kiev, Ukraine

Page 7: Progress on Proposed Project Chernobyl Cooling Pond as Case Study for Improving the Scientific Basis for Multimedia Environmental Modeling, Risk Assessment,

7

Expected exposed area 58%. 137Cs- 78%, 90Sr--74%, Pu-85% will remain

under water in bottom sediments.

Chernobyl Cooling Pond Decommissioning is an Opportunity to Study the Effect of Changes in Climatic

Conditions on Contaminated Water Bodies

Expected exposed area 80%

Dry scenarioNormal scenario

Bugai et al. 2006

Page 8: Progress on Proposed Project Chernobyl Cooling Pond as Case Study for Improving the Scientific Basis for Multimedia Environmental Modeling, Risk Assessment,

8

Microbial communities

Dissolved radionuclides

Radionuclides in suspended sediments

Radionuclides in bottom sediments

Advection

Diffusion/Dispersion

Adsorption Desorption

Adsorption

Desorption

Sedimentation

Resuspension

Uptake

Radionuclide Transport Processes in the Chernobyl Cooling Pond

Suspended sediments

Modified after M.Zheleznyak

Hot particles

Page 9: Progress on Proposed Project Chernobyl Cooling Pond as Case Study for Improving the Scientific Basis for Multimedia Environmental Modeling, Risk Assessment,

9

Case Studies Stemming from the Chernobyl Cooling Pond Monitoring and Modeling

(1) Evaluation of hydrologic and geochemical processes for unsaturated-saturated soils and bottom sediments;

(2) Modeling of coupled hydrological and biogeochemical processes, including parameter estimation, aleatory, epistemic, and scenario uncertainties;

(3) Design and implementation of appropriate site characterization and monitoring techniques for highly contaminated soils and groundwater

- geophysical monitoring, natural and radioactive isotopic methods, remote sensing;

(4) Assessing the efficacy of different remediation approaches including monitored natural attenuation (MNA).

(5) DOE ASCEM project, NRC/EPA/USGS Integrated Environmental Modeling.

Page 10: Progress on Proposed Project Chernobyl Cooling Pond as Case Study for Improving the Scientific Basis for Multimedia Environmental Modeling, Risk Assessment,

10

• If endorsed by ISCMEM, Chernobyl Cooling Pond International case study will provide the opportunity for collaboration between different Federal agencies, and international organizations in accomplishing their missions associated with predicting the post-accident, long-term behavior of radionuclides and remediation of radioactively contaminated sites.

– US NRC—ensure adequate protection of public health and safety, and to protect the environment;

– US DOE and DoD—advance science, engineering, and cleanup technologies to help ensure that it meets its national environmental cleanup strategic goals; testing high performance computing capabilities, parameter estimation, UQ, data management, visualization;

– US EPA—protect human health and the environment;

– US Army Corps of Engineering – evaluate watershed modeling codes, and

– USGS—provide information to effectively and responsibly utilize natural resources, and to protect the health, safety, and well-being of the people.

– IAEA – develop recommendations for member states;

– European Network of Excellence in Radioecology (STAR): Chernobyl observatory.

Benefits and Relevance to the U.S. Federal and International Agencies Missions

Page 11: Progress on Proposed Project Chernobyl Cooling Pond as Case Study for Improving the Scientific Basis for Multimedia Environmental Modeling, Risk Assessment,

11

Meeting on ”Feasibility Study of the Chernobyl Cooling Pond Decommissioning and Remediation” organized by

the ChNPP Administration (Sept 2011)

• Goals of the Meeting: Provide the background information and direct the scientific organizations involved in the project.

• This project on the ChNPP Cooling Pond decommissioning was stipulated by the Law of Ukraine 886-VI “On National Program of Chernobyl NPP Decommissioning and Shelter object transformation into environmentally safe system,” starting January 1, 2010.

• ChNPP Administration will fund the project. Partial funding will be provided by IAEA.

• Tender to select a company to perform the Feasibility Study was announced at the meeting.

Page 12: Progress on Proposed Project Chernobyl Cooling Pond as Case Study for Improving the Scientific Basis for Multimedia Environmental Modeling, Risk Assessment,

12

Meeting on ”Feasibility Study of the Chernobyl Cooling Pond Decommissioning and Remediation” organized the ChNPP Administration (Sept 2011)

Ukrainian Organizations Involved in the Project:

• State Special Enterprise “Chernobyl NPP”• Institute of Safety Problems of Nuclear Power Plants of the National Academy of

Sciences of Ukraine• Ukrainian Scientific-Research Hydrometeorological Institute• Ukrainian Scientific-Research Institute of Agricultural Radioecology• Institute of Geological Sciences of the National Academy of Sciences of Ukraine,• Institute of Mathematical Machines and Systems of the National Academy of

Sciences of Ukraine • Institute of Hydrobiology of the National Academy of Sciences of Ukraine• Scientific-Research Institute of Radiation Protection• Chernobyl Center for Nuclear Safety, Radioactive Waste and Radioecology, and• International Radioecology Laboratory• State Specialized Scientific and Industrial Enterprise Chernobyl Radioecological

Center (GSNPP ECOCENTER)

Page 13: Progress on Proposed Project Chernobyl Cooling Pond as Case Study for Improving the Scientific Basis for Multimedia Environmental Modeling, Risk Assessment,

13

The Most Critical Problem is Monitoring During the Water Level Drawdown

Structure and Main Types of Monitoring of the Chernobyl Cooling Pond

SSttrruuccttuurree:: 11 –– CCeenntteerr 22 –– AAddjjaacceenntt area 33 –– BBoottttoomm

sseeddiimmeenntt MMoonniittoorriinngg mmeeddiiaa::

SSuurrffaaccee wwaatteerr GGrroouunnddwwaatteerr HHyyddrroobbiioottaa PPrreecciippiittaattiioonn NNeeaarr--ssuurrffaaccee

aattmmoosspphheerree LLaannssccaappee

1

2

2

2

2

2

2

3

3

Monitoring System:1 – Center2 – Adjacent area3 – Bottom sediments

Monitoring Media:•Surface water•Groundwater•Hydrobiota•Precipitation•Near-surface atmosphere•Landscape

Page 14: Progress on Proposed Project Chernobyl Cooling Pond as Case Study for Improving the Scientific Basis for Multimedia Environmental Modeling, Risk Assessment,

14

IAEA Point of Contact: Horst Monken-Fernandes, IAEA Waste Technology Section

• IAEA supported three missions of international technical experts to Chernobyl (October 2009, July 2010, September 2011) to initiate the development of a roadmap and modeling of groundwater flow and contaminant transport for the feasibility study of the Chernobyl Cooling Pond decommissioning and remediation

IAEA Involvement and Recommendations

Page 15: Progress on Proposed Project Chernobyl Cooling Pond as Case Study for Improving the Scientific Basis for Multimedia Environmental Modeling, Risk Assessment,

15

IAEA’s List of Suggested TasksCollate existing data of monitoring, modeling and risk assessment of the Cooling Pond and groundwater system.

Consultation with regulators and stakeholders.

Key objectives: agree on remediation

endpoints, gaps in data/risk assessment

and action plan

Identify gaps in monitoring and modeling data and risk assessment. Conduct research to address gaps.

Develop an improved monitoring plan and conduct an initial experimental 1-2 m drawdown—Stage 1 of Feasibility Study.

Complete experimental drawdown and provide data for Stage 2 Feasibility Study

Regulatory approval for complete, staged

drawdown

Finish installation of a monitoring system prior to full, staged drawdown. Begin full drawdown.

YES

NO

IAEA report, 2009

Page 16: Progress on Proposed Project Chernobyl Cooling Pond as Case Study for Improving the Scientific Basis for Multimedia Environmental Modeling, Risk Assessment,

List of Potential Projects in Support of Cooling Pond Decommissioning and Remediation

Potential Projects Tentative duration

1. Data collation and development of GIS/Database/Data Management System

6 months

2. Risk assessment research, with focusing on fire risk/wind resuspension, flooding, dam failure and surface water-groundwater flow and radionuclide transport modeling and uncertainty evaluation.

2 years

3. Experimental (pilot) drawdown project and associated monitoring and modeling; improved experimental/modeling assessment of remediation technologies and monitored natural attenuation

2 years

4. Planning, testing and installation of an upgraded adaptive monitoring system, including a timeline of expanding the system as the Cooling Pond water level declines.

2-3 years

5. Monitoring and risk assessment, including modeling of impacts of drawdown on ecology and radioecology of the area surrounding Cooling Pond, Chernobyl Exclusion Zone, and the Pripyat’ River System.

3-5 years

IAEA report, 2009, with changes.

Page 17: Progress on Proposed Project Chernobyl Cooling Pond as Case Study for Improving the Scientific Basis for Multimedia Environmental Modeling, Risk Assessment,

17

• Constructed in 1958 as a Cooling Pond for the Savannah River Site's P and R Reactors

• After the water level drawdown in 1991:– Exposed 5.3 km2 of contaminated

sediments. – Mobility of the radionuclides was much

greater than expected (Hinton et al. 1999; Whicker et al. 1999).

– Cs-137 concentrations increased, probably resulting from the Cs-137 increase in sediments.

– Sedimentation rates and water turbidity increased due to erosion processes.

Savannah River PAR PondOak Ridge Reservation--White Oak Lake

DOE EM Points of Contact:Kurt Gerdes, DOE EM-32, Director, [email protected]

Mark Williamson, DOE EM-32, ASCEM Lead, [email protected]

Case Studies to Test DOE Field Remotely Operated Monitoring Techniques

Page 18: Progress on Proposed Project Chernobyl Cooling Pond as Case Study for Improving the Scientific Basis for Multimedia Environmental Modeling, Risk Assessment,

18

Savannah River Site

• ADCON Telemetry-a real-time soil moisture monitoring system (D-Area Phytoremediation).

• FDTAS-tritium analysis system in surface and groundwater in near real- time.

• Sol-Gel Indicators for Process and Environmental Measurements .

INL Soil and Surface Assay Systems for Gamma, Beta, and Alpha Radiation Sources

Case Studies to Test DOE Field Remotely Operated Monitoring Techniques

Page 19: Progress on Proposed Project Chernobyl Cooling Pond as Case Study for Improving the Scientific Basis for Multimedia Environmental Modeling, Risk Assessment,

19

Project Organization• Lead Agencies and Coordinating Managers:

– DOE-EM—Kurt Gerdes and Skip Chamberlain– NRC—Thomas J. Nicholson, Ralph E. Cady, Mark Fuhrman

• Subject Area: – Modeling and Uncertainty Evaluation, Parameter Estimation, Monitoring, and Risk Analysis

• USA Agencies Potentially Interested in the Project: – DOE, EPA, NRCS, DOD, USGS, US Army Corps.

• International Organizations Potentially Interested in the Project:– International Atomic Energy Agency (IAEA), Institute for Radiation Protection (France).

• Ukrainian Organizations Involved in the Chernobyl Cooling Pond Studies:– Administration of the Chernobyl Exclusion Zone, Chernobyl Nuclear Power Plant, National– Academy of Sciences of Ukraine (Institute of Geological Sciences, Institute of Mathematical

Machines and Systems, Hydrobiological Institute, Institute of of Safety Problems of Nuclear Power Plants),

– State Nuclear Regulatory Committee of Ukraine, Radioecology Center, – State Scientific-Technical Centre Nuclear Radiation Safety (SSTC NRS),– Hydrometeorological Institute.

• Data/reports/publications exchange and coordination –– EPA Integrated Environmental Modeling Hub (iemHUB) – http://iemhub.org/, Gene Whelan,