Monica Bansal and Michael EichlerDepartment of Transportation Planning
Presentation to the TPB Technical Committee
December 5, 2008
Progress on “CLRP Aspirations” & “What Would it Take?” Scenarios
TPB SCENARIO STUDY
![Page 2: Progress on “CLRP Aspirations” & “What Would it Take?” Scenarios](https://reader035.fdocuments.us/reader035/viewer/2022070416/56815286550346895dc0ad79/html5/thumbnails/2.jpg)
2
CLRP Aspirations
Draws on past studies and public outreach to provide an ambitious yet attainable vision of land use and transportation for the 2010 CLRP update and to eventually serve as an unconstrained long range plan.
Starts with COG regional CO2 goals and assesses what scales and combinations of interventions will be necessary to achieve the goal for the transportation sector.
What Would it Take?
The Two New Scenarios
![Page 3: Progress on “CLRP Aspirations” & “What Would it Take?” Scenarios](https://reader035.fdocuments.us/reader035/viewer/2022070416/56815286550346895dc0ad79/html5/thumbnails/3.jpg)
3
Study Timeline
![Page 4: Progress on “CLRP Aspirations” & “What Would it Take?” Scenarios](https://reader035.fdocuments.us/reader035/viewer/2022070416/56815286550346895dc0ad79/html5/thumbnails/4.jpg)
4
CLRP Aspirations
Draws on past scenarios (5 transportation/land use scenarios and 2 value pricing scenarios) to provide an ambitious yet attainable vision of land use and transportation for the 2010 CLRP update.
Starts with CO2 goals (80% below 2005 levels in 2050 and 20% reduction by 2020) and assesses what scales and combinations of interventions will be necessary to achieve the goal.
What Would it Take?
The Two New Scenarios
![Page 5: Progress on “CLRP Aspirations” & “What Would it Take?” Scenarios](https://reader035.fdocuments.us/reader035/viewer/2022070416/56815286550346895dc0ad79/html5/thumbnails/5.jpg)
5
Baseline1. Round 7.1 Cooperative Forecast2. 2008 CLRP
RMAS Land Use/Transportation Scenarios 1. More Households Scenario2. Households In Scenario3. Jobs Out Scenario4. Region Undivided Scenario5. Transit-Oriented Development Scenario
Value Pricing Scenarios1. “DC and Parkways Restrained”
Public Outreach/Feedback on Previous Scenarios
The Starting Point
![Page 6: Progress on “CLRP Aspirations” & “What Would it Take?” Scenarios](https://reader035.fdocuments.us/reader035/viewer/2022070416/56815286550346895dc0ad79/html5/thumbnails/6.jpg)
6
Land Use Decisions
Supportive Transit
Goal: To move jobs and housing closer together to create highly accessible and developed areas, and achieve more efficient transportation systems
Pricing Options
• Address congestion through pricing of new and/or existing lanes
• Provide alternatives through enhanced transit
• Concentrating projected growth in activity centers and existing/planned transit stations
• Consistent review and refinement by planning directors
• Use menu of transit options from past scenarios
• Connect activity centers
• Review by Regional Bus Subcommittee
Building the Scenario
![Page 7: Progress on “CLRP Aspirations” & “What Would it Take?” Scenarios](https://reader035.fdocuments.us/reader035/viewer/2022070416/56815286550346895dc0ad79/html5/thumbnails/7.jpg)
7
“Within Reach”
1. Land use shifts should be within reach for inclusion in the COG Cooperative Forecast
2. Transportation projects should be financially within reach through tax revenues, developer contributions, or pricing.
Scenario Criteria
![Page 8: Progress on “CLRP Aspirations” & “What Would it Take?” Scenarios](https://reader035.fdocuments.us/reader035/viewer/2022070416/56815286550346895dc0ad79/html5/thumbnails/8.jpg)
8
CLRP Aspirations: Land Use Component
![Page 9: Progress on “CLRP Aspirations” & “What Would it Take?” Scenarios](https://reader035.fdocuments.us/reader035/viewer/2022070416/56815286550346895dc0ad79/html5/thumbnails/9.jpg)
9
![Page 10: Progress on “CLRP Aspirations” & “What Would it Take?” Scenarios](https://reader035.fdocuments.us/reader035/viewer/2022070416/56815286550346895dc0ad79/html5/thumbnails/10.jpg)
10
![Page 11: Progress on “CLRP Aspirations” & “What Would it Take?” Scenarios](https://reader035.fdocuments.us/reader035/viewer/2022070416/56815286550346895dc0ad79/html5/thumbnails/11.jpg)
11
![Page 12: Progress on “CLRP Aspirations” & “What Would it Take?” Scenarios](https://reader035.fdocuments.us/reader035/viewer/2022070416/56815286550346895dc0ad79/html5/thumbnails/12.jpg)
12
CLRP Aspirations: Transportation Component
![Page 13: Progress on “CLRP Aspirations” & “What Would it Take?” Scenarios](https://reader035.fdocuments.us/reader035/viewer/2022070416/56815286550346895dc0ad79/html5/thumbnails/13.jpg)
13
Existing system of activity centers and high quality transit shows mis-match. Many transit stations without activity and many activity centers without high-quality transit.
Existing System
![Page 14: Progress on “CLRP Aspirations” & “What Would it Take?” Scenarios](https://reader035.fdocuments.us/reader035/viewer/2022070416/56815286550346895dc0ad79/html5/thumbnails/14.jpg)
14
The transit projects in the CLRP work to address some of these concerns.
CLRP Projects
Columbia Pike Streetcar
Corridor Cities Transitway
Bi-County Transitway
Crystal City/Potomac Yard Transitway
Dulles Metrorail
Anacostia Streetcar
![Page 15: Progress on “CLRP Aspirations” & “What Would it Take?” Scenarios](https://reader035.fdocuments.us/reader035/viewer/2022070416/56815286550346895dc0ad79/html5/thumbnails/15.jpg)
15
Additional projects evaluated under RMAS should be carried forward, with minor modification to provide transit service to additional activity centers.
Recommended RMAS Projects
US 1 Transitway
Extend Purple Line to New Carrollton
Georgia Ave Transitway
VRE Extension to Haymarket
![Page 16: Progress on “CLRP Aspirations” & “What Would it Take?” Scenarios](https://reader035.fdocuments.us/reader035/viewer/2022070416/56815286550346895dc0ad79/html5/thumbnails/16.jpg)
16
A value pricing study completed by the TPB in February of 2008 evaluated a regional network of variably priced lanes, made up of new capacity and selected existing facilities.
Studied Network of Variably Priced Lanes
![Page 17: Progress on “CLRP Aspirations” & “What Would it Take?” Scenarios](https://reader035.fdocuments.us/reader035/viewer/2022070416/56815286550346895dc0ad79/html5/thumbnails/17.jpg)
17
A regional network of BRT operating mostly on the priced lanes will provide high-quality transit service to nearly all activity centers in the region.
BRT Network Recommended for Scenario Study
![Page 18: Progress on “CLRP Aspirations” & “What Would it Take?” Scenarios](https://reader035.fdocuments.us/reader035/viewer/2022070416/56815286550346895dc0ad79/html5/thumbnails/18.jpg)
18
BRT to Provide Rail-Like Level of Service
The Shirlington Transit Station in Arlington, VA.
BRT stations will provide many features to decrease boarding time:
• All-door, level boarding• Off-board payment• Room for 60’ articulated multi-door buses
Other Operating Details:• 12 minute peak headways• 30 minute off-peak headways• 45 MPH on priced lanes• 15 MPH on priority corridor network • Circulator service in activity centers
![Page 19: Progress on “CLRP Aspirations” & “What Would it Take?” Scenarios](https://reader035.fdocuments.us/reader035/viewer/2022070416/56815286550346895dc0ad79/html5/thumbnails/19.jpg)
19
This network will provide another layer of high-quality transit on top of existing and proposed transit services.
Full Scenario Transit Network
![Page 20: Progress on “CLRP Aspirations” & “What Would it Take?” Scenarios](https://reader035.fdocuments.us/reader035/viewer/2022070416/56815286550346895dc0ad79/html5/thumbnails/20.jpg)
20
Transportation Component of the CLRP Aspirations Scenario
• Evaluates a regional network of priced lanes that serves as the right-of-way for a high-quality Bus Rapid Transit (BRT) network.
• Uses previously studied transportation facilities as starting points– 2008 CLRP Baseline– Regional network of variably priced lanes– RMAS transit
• Focuses accessibility improvements on regional activity centers– Direct access ramps from priced lanes to activity centers– BRT stations serve activity centers, Metro stations, park-and-ride lots– Include RMAS projects that provide access to activity centers– New activity centers proposed: Fort Detrick, Wheaton, Westphalia and
Fort Belvoir
• Makes use of WMATA Priority Corridor Network (PCN) to provide service to the urban core.
Summary
![Page 21: Progress on “CLRP Aspirations” & “What Would it Take?” Scenarios](https://reader035.fdocuments.us/reader035/viewer/2022070416/56815286550346895dc0ad79/html5/thumbnails/21.jpg)
21
CLRP Aspirations
Draws on past scenarios (5 transportation/land use scenarios and 2 value pricing scenarios) to provide an ambitious yet attainable vision of land use and transportation for the 2010 CLRP update.
Starts with CO2 goals (80% below 2005 levels in 2050 and 20% reduction by 2020) and assesses what scales and combinations of interventions will be necessary to achieve the goal.
What Would it Take?
The Two New Scenarios
![Page 22: Progress on “CLRP Aspirations” & “What Would it Take?” Scenarios](https://reader035.fdocuments.us/reader035/viewer/2022070416/56815286550346895dc0ad79/html5/thumbnails/22.jpg)
22
Fuel EfficiencyFuel Carbon
Intensity
3 categories of strategies to reduce mobile CO2 emissions
Travel Efficiency
Reduce VMT through changes in land use, travel behavior, prices
Reduce congestion
Improve operational efficiency
Beyond CAFE standards [currently 35 mpg by 2020]
Alternative fuels (biofuels, hydrogen, electricity)
Goal: To reduce CO2 emissions by 10% in 2012, and 20% and 80% below 2005 levels in 2012, 2020 and 2050 respectively
Setting up the WWIT Scenario
FLEET USE of FLEET
![Page 23: Progress on “CLRP Aspirations” & “What Would it Take?” Scenarios](https://reader035.fdocuments.us/reader035/viewer/2022070416/56815286550346895dc0ad79/html5/thumbnails/23.jpg)
23
1. Effectiveness
2. Cost-effectiveness
3. Timeframe for Implementation
Analyzing the WWIT Scenario
3 categories of analysis for each strategy
![Page 24: Progress on “CLRP Aspirations” & “What Would it Take?” Scenarios](https://reader035.fdocuments.us/reader035/viewer/2022070416/56815286550346895dc0ad79/html5/thumbnails/24.jpg)
24
Fuel EfficiencyFuel Carbon
IntensityTravel Efficiency
Reduce VMT through changes in land use, travel behavior, prices
Reduce congestion
Improve operational efficiency
Beyond CAFE standards [currently 35 mpg by 2020]
Alternative fuels (biofuels, hydrogen, electricity)
What can we do with the fleet?
![Page 25: Progress on “CLRP Aspirations” & “What Would it Take?” Scenarios](https://reader035.fdocuments.us/reader035/viewer/2022070416/56815286550346895dc0ad79/html5/thumbnails/25.jpg)
25
What can we get with CAFE?
2010 Travel and CO2 Emissions
8-Hour Ozone Non-Attainment Area
VMT (Billions) - Annual
% CO2 Emissions (Mil. Annual Tons)
%
Passenger Cars 19.06 47% 6.76 24%
Light Duty Trucks (SUVs, etc)
18.94 46% 15.38 56%
Heavy Duty (Trucks, Buses, etc)
2.94 7% 5.46 20%
Total
40.95 100% 27.60 100%
![Page 26: Progress on “CLRP Aspirations” & “What Would it Take?” Scenarios](https://reader035.fdocuments.us/reader035/viewer/2022070416/56815286550346895dc0ad79/html5/thumbnails/26.jpg)
26
Characteristics of the Region’s Vehicle Fleet
![Page 27: Progress on “CLRP Aspirations” & “What Would it Take?” Scenarios](https://reader035.fdocuments.us/reader035/viewer/2022070416/56815286550346895dc0ad79/html5/thumbnails/27.jpg)
27
Fuel EfficiencyFuel Carbon
IntensityTravel Efficiency
Reduce VMT through changes in land use, travel behavior, prices
Reduce congestion
Improve operational efficiency
Beyond CAFE standards [currently 35 mpg by 2020]
Alternative fuels (biofuels, hydrogen, electricity)
What can we do with the fleet?
![Page 28: Progress on “CLRP Aspirations” & “What Would it Take?” Scenarios](https://reader035.fdocuments.us/reader035/viewer/2022070416/56815286550346895dc0ad79/html5/thumbnails/28.jpg)
28
Forecast Characteristics of the Region’s Vehicle Fleet
![Page 29: Progress on “CLRP Aspirations” & “What Would it Take?” Scenarios](https://reader035.fdocuments.us/reader035/viewer/2022070416/56815286550346895dc0ad79/html5/thumbnails/29.jpg)
29
Fuel EfficiencyFuel Carbon
IntensityTravel Efficiency
Reduce VMT through changes in land use, travel behavior, prices
Reduce congestion
Improve operational efficiency
Beyond CAFE standards [currently 35 mpg by 2020]
Alternative fuels (biofuels, hydrogen, electricity)
How do we use the fleet?(and how can this change)
![Page 30: Progress on “CLRP Aspirations” & “What Would it Take?” Scenarios](https://reader035.fdocuments.us/reader035/viewer/2022070416/56815286550346895dc0ad79/html5/thumbnails/30.jpg)
30
How We Use the Fleet, An Example
![Page 31: Progress on “CLRP Aspirations” & “What Would it Take?” Scenarios](https://reader035.fdocuments.us/reader035/viewer/2022070416/56815286550346895dc0ad79/html5/thumbnails/31.jpg)
31
![Page 32: Progress on “CLRP Aspirations” & “What Would it Take?” Scenarios](https://reader035.fdocuments.us/reader035/viewer/2022070416/56815286550346895dc0ad79/html5/thumbnails/32.jpg)
32
1. Effectiveness
2. Cost-effectiveness
3. Timeframe for Implementation
Analyzing the WWIT Scenario
3 categories of analysis for each strategy
![Page 33: Progress on “CLRP Aspirations” & “What Would it Take?” Scenarios](https://reader035.fdocuments.us/reader035/viewer/2022070416/56815286550346895dc0ad79/html5/thumbnails/33.jpg)
33
Initial analysis of cost-effectiveness of Transportation Emissions Reduction Measures ($ per ton of CO2 reduced)
How can we begin to prioritize strategies?
Cost-effectiveness
Number Category DescriptionCO2 Cost
Effectiveness Range *
1 Telecommute Programs $10 to $40
2 Signal Optimization $30 to $50
3 Park & Ride Lots (Transit and HOV) $100 to $500
4 Transit Service improvements $100 to $800
![Page 34: Progress on “CLRP Aspirations” & “What Would it Take?” Scenarios](https://reader035.fdocuments.us/reader035/viewer/2022070416/56815286550346895dc0ad79/html5/thumbnails/34.jpg)
34
1. Effectiveness
2. Cost-effectiveness
3. Timeframe for Implementation
Analyzing the WWIT Scenario
3 categories of analysis for each strategy
![Page 35: Progress on “CLRP Aspirations” & “What Would it Take?” Scenarios](https://reader035.fdocuments.us/reader035/viewer/2022070416/56815286550346895dc0ad79/html5/thumbnails/35.jpg)
35
While all 3 example measures reduce 100 units of CO2 in 2020, the cumulative emissions reductions from 2011-2020 differ based on the time required for implementation and realization of benefits.
Example Reductions for Measures
Early action is essential to meet the goals
Timeframe for Implementation
![Page 36: Progress on “CLRP Aspirations” & “What Would it Take?” Scenarios](https://reader035.fdocuments.us/reader035/viewer/2022070416/56815286550346895dc0ad79/html5/thumbnails/36.jpg)
36
“Sliders” metaphor
Different combinations of interventions can be assessed for cost-effectiveness and feasibility.
Products
![Page 37: Progress on “CLRP Aspirations” & “What Would it Take?” Scenarios](https://reader035.fdocuments.us/reader035/viewer/2022070416/56815286550346895dc0ad79/html5/thumbnails/37.jpg)
37
![Page 38: Progress on “CLRP Aspirations” & “What Would it Take?” Scenarios](https://reader035.fdocuments.us/reader035/viewer/2022070416/56815286550346895dc0ad79/html5/thumbnails/38.jpg)
38
![Page 39: Progress on “CLRP Aspirations” & “What Would it Take?” Scenarios](https://reader035.fdocuments.us/reader035/viewer/2022070416/56815286550346895dc0ad79/html5/thumbnails/39.jpg)
39