Progress of Visualization tools for EMS and Control Room Data€¦ · 10/09/2016 · • Control...
Transcript of Progress of Visualization tools for EMS and Control Room Data€¦ · 10/09/2016 · • Control...
![Page 1: Progress of Visualization tools for EMS and Control Room Data€¦ · 10/09/2016 · • Control Room Visualization • Difficult Data Integration • Energy Markets Dayna Aronson](https://reader034.fdocuments.us/reader034/viewer/2022051806/600135ca90353e6150548b92/html5/thumbnails/1.jpg)
Progress of Visualization
tools for EMS and Control
Room Data
![Page 2: Progress of Visualization tools for EMS and Control Room Data€¦ · 10/09/2016 · • Control Room Visualization • Difficult Data Integration • Energy Markets Dayna Aronson](https://reader034.fdocuments.us/reader034/viewer/2022051806/600135ca90353e6150548b92/html5/thumbnails/2.jpg)
• Control Room
Visualization
• Difficult Data Integration
• Energy Markets
Scott Stapels Dayna Aronson
Enterprise Solution Architecture
![Page 3: Progress of Visualization tools for EMS and Control Room Data€¦ · 10/09/2016 · • Control Room Visualization • Difficult Data Integration • Energy Markets Dayna Aronson](https://reader034.fdocuments.us/reader034/viewer/2022051806/600135ca90353e6150548b92/html5/thumbnails/3.jpg)
3
Evolution of Control Room Visualization
Strip Charts
Map Boards
![Page 4: Progress of Visualization tools for EMS and Control Room Data€¦ · 10/09/2016 · • Control Room Visualization • Difficult Data Integration • Energy Markets Dayna Aronson](https://reader034.fdocuments.us/reader034/viewer/2022051806/600135ca90353e6150548b92/html5/thumbnails/4.jpg)
4
Simple Trends and Tabulars
Trends
Tabular Data
![Page 5: Progress of Visualization tools for EMS and Control Room Data€¦ · 10/09/2016 · • Control Room Visualization • Difficult Data Integration • Energy Markets Dayna Aronson](https://reader034.fdocuments.us/reader034/viewer/2022051806/600135ca90353e6150548b92/html5/thumbnails/5.jpg)
5
• With mergers and ISOs larger
areas created that challenge the
human mind
• Each area of interest required one
or more displays
• Data not easily divide between
cause and symptom
• Vendors closed systems make it
difficult to bring non-ems data into
the mixture
Problems
• Alarms
• IROL
• Flow gate / Paths
• ACE
• PMU and wide
area Voltage
Angle
• Load
• Ace
• AGC
• RAS
• Systems / IT
![Page 6: Progress of Visualization tools for EMS and Control Room Data€¦ · 10/09/2016 · • Control Room Visualization • Difficult Data Integration • Energy Markets Dayna Aronson](https://reader034.fdocuments.us/reader034/viewer/2022051806/600135ca90353e6150548b92/html5/thumbnails/6.jpg)
![Page 7: Progress of Visualization tools for EMS and Control Room Data€¦ · 10/09/2016 · • Control Room Visualization • Difficult Data Integration • Energy Markets Dayna Aronson](https://reader034.fdocuments.us/reader034/viewer/2022051806/600135ca90353e6150548b92/html5/thumbnails/7.jpg)
7
Peak Visualization Platform (PVP)
![Page 8: Progress of Visualization tools for EMS and Control Room Data€¦ · 10/09/2016 · • Control Room Visualization • Difficult Data Integration • Energy Markets Dayna Aronson](https://reader034.fdocuments.us/reader034/viewer/2022051806/600135ca90353e6150548b92/html5/thumbnails/8.jpg)
8
• eTV
• WAV
• STI
• Macomber Map
• PowerWorld
• ESRI
Lots of solutions available
– about best match
Options Evaluated
![Page 9: Progress of Visualization tools for EMS and Control Room Data€¦ · 10/09/2016 · • Control Room Visualization • Difficult Data Integration • Energy Markets Dayna Aronson](https://reader034.fdocuments.us/reader034/viewer/2022051806/600135ca90353e6150548b92/html5/thumbnails/9.jpg)
9
• Systems that need to communicate with
each other about the same Equipment / Grid
speak different languages. They have
different models, units, nomenclature,
process and terminology.
“...Failure to Communicate”
Outage
Mgt EMS
Custom
SQL
Based
Apps
Share
Point Planning &
Study
Tools
![Page 10: Progress of Visualization tools for EMS and Control Room Data€¦ · 10/09/2016 · • Control Room Visualization • Difficult Data Integration • Energy Markets Dayna Aronson](https://reader034.fdocuments.us/reader034/viewer/2022051806/600135ca90353e6150548b92/html5/thumbnails/10.jpg)
10
Performed every five weeks
• Physical network topology: ETS (EMS vendor Tool)
• SCADA: In-house databases and scripts
• ICCP: In-house databases and scripts
• RTCA Contingencies: Home-grown CSV file and scripts
• Alarms: EMS vendor UI and scripts
• RAS: In-house databases and scripts
• Outages: 3rd party proprietary software
Peak RC spends significant resources to maintain models (meta-data)
Model Consolidation & Normalization
![Page 11: Progress of Visualization tools for EMS and Control Room Data€¦ · 10/09/2016 · • Control Room Visualization • Difficult Data Integration • Energy Markets Dayna Aronson](https://reader034.fdocuments.us/reader034/viewer/2022051806/600135ca90353e6150548b92/html5/thumbnails/11.jpg)
11
• Three versions over two years of development, with at least 4-5
days/month dedicated to it.
• Over 15,000 lines of code
• Jeffrey Parker
• Tim Van Prooyen
• Cody Parker
• Brian Caserta
• Ryan Schoppe
• Michael Nuget
• Todd Chumley
Collaboration Kudos
![Page 12: Progress of Visualization tools for EMS and Control Room Data€¦ · 10/09/2016 · • Control Room Visualization • Difficult Data Integration • Energy Markets Dayna Aronson](https://reader034.fdocuments.us/reader034/viewer/2022051806/600135ca90353e6150548b92/html5/thumbnails/12.jpg)
12
Dashboard
![Page 13: Progress of Visualization tools for EMS and Control Room Data€¦ · 10/09/2016 · • Control Room Visualization • Difficult Data Integration • Energy Markets Dayna Aronson](https://reader034.fdocuments.us/reader034/viewer/2022051806/600135ca90353e6150548b92/html5/thumbnails/13.jpg)
Real-time Fire Visualization
Fire location, size and spatial
geometry boundaries updating
every 5 minutes from USGS along
side of transmission assets
![Page 14: Progress of Visualization tools for EMS and Control Room Data€¦ · 10/09/2016 · • Control Room Visualization • Difficult Data Integration • Energy Markets Dayna Aronson](https://reader034.fdocuments.us/reader034/viewer/2022051806/600135ca90353e6150548b92/html5/thumbnails/14.jpg)
Navigation
![Page 15: Progress of Visualization tools for EMS and Control Room Data€¦ · 10/09/2016 · • Control Room Visualization • Difficult Data Integration • Energy Markets Dayna Aronson](https://reader034.fdocuments.us/reader034/viewer/2022051806/600135ca90353e6150548b92/html5/thumbnails/15.jpg)
15
• Any URL
Context specific App launch
![Page 16: Progress of Visualization tools for EMS and Control Room Data€¦ · 10/09/2016 · • Control Room Visualization • Difficult Data Integration • Energy Markets Dayna Aronson](https://reader034.fdocuments.us/reader034/viewer/2022051806/600135ca90353e6150548b92/html5/thumbnails/16.jpg)
16
Technical details
Portal
GeoEvent
Processor
PI Integrator AF
Historian
CoreSight
Operation
Dashboard
Context
Launching
Manages GIS
assets and user
security
Geo
Database
SQL
Sources Real time data
feeds
- Substations
- Paths (Flowgates)
- IROLs
- Lines
- BA / TOP
- Alarms
- RTCA
ArcGIS
Desktop Model
![Page 17: Progress of Visualization tools for EMS and Control Room Data€¦ · 10/09/2016 · • Control Room Visualization • Difficult Data Integration • Energy Markets Dayna Aronson](https://reader034.fdocuments.us/reader034/viewer/2022051806/600135ca90353e6150548b92/html5/thumbnails/17.jpg)
17
Peak RC Decision Drivers
• Leverage Peak Investment in OSIsoft PI
– Staff Knowledge and Comfort
– Relationship
– Infrastructure
• OSIsoft and ESRI are the “best in class”
in their core technologies
• Data driven solution
![Page 18: Progress of Visualization tools for EMS and Control Room Data€¦ · 10/09/2016 · • Control Room Visualization • Difficult Data Integration • Energy Markets Dayna Aronson](https://reader034.fdocuments.us/reader034/viewer/2022051806/600135ca90353e6150548b92/html5/thumbnails/18.jpg)
18
Solution Highlights
• Easy display creation and modification
• Rosetta Stone data Philosophy
• Whiteboard philosophy (can build anything – not
limited)
• EMS vendor Agnostic
• Eye toward secure external tablet and mobile use
• Quickly reconfigure based on input from users
• Out of the complete custom development business
• 6 months from vendor selection to available in the
control room
![Page 19: Progress of Visualization tools for EMS and Control Room Data€¦ · 10/09/2016 · • Control Room Visualization • Difficult Data Integration • Energy Markets Dayna Aronson](https://reader034.fdocuments.us/reader034/viewer/2022051806/600135ca90353e6150548b92/html5/thumbnails/19.jpg)
19
What value was achieved
• Organization of data to the operation
staff
• Empowered operations staff to
control their environment
• IT focuses on making data available
• Better decisions in less time
• Quickly incorporate changes using
vendor tools
![Page 20: Progress of Visualization tools for EMS and Control Room Data€¦ · 10/09/2016 · • Control Room Visualization • Difficult Data Integration • Energy Markets Dayna Aronson](https://reader034.fdocuments.us/reader034/viewer/2022051806/600135ca90353e6150548b92/html5/thumbnails/20.jpg)
20
• Reducing the amount of time it takes an RC to
comprehend actionable information.
Grid Reliability
• 11:44 Loss of first 500kV line
• Over next 4 hours additional facilities are
impacted as fire grows
• RC calls fire bosses to try and determine
location and direction of fire growth and
what additional facilities are about to be
impacted
• It takes up to 1 hour for this information to
get back to the RC
• No current method for analytic tools to
geographically map
• Sub optimal gen dispatch
• Extended load shed exposure
Blue
Cut
Fire
![Page 21: Progress of Visualization tools for EMS and Control Room Data€¦ · 10/09/2016 · • Control Room Visualization • Difficult Data Integration • Energy Markets Dayna Aronson](https://reader034.fdocuments.us/reader034/viewer/2022051806/600135ca90353e6150548b92/html5/thumbnails/21.jpg)
21
• Dayna Aronson
o Peak RC
o 360-448-2655
• Scott Stapels
o Utilicast
o 248-760-1058
Contact