Progress in LAB Progress in CLEX Anastasiya Solodko TMWG – Meeting, 3.05.2010

description

Progress in LAB Progress in CLEX. Anastasiya Solodko. TMWG – Meeting, 3.05.2010. Progress in LAB Installation of Test Modules in the building 162 . Before. After. The room is empty now. Progress in LAB Installation of Test Modules in the building 162 . - PowerPoint PPT Presentation

Transcript of Progress in LAB Progress in CLEX

Page 1: Progress in LAB  Progress in CLEX

Progress in LAB Progress in CLEX

Anastasiya Solodko TMWG – Meeting, 3.05.2010

Page 2: Progress in LAB  Progress in CLEX

Progress in LABInstallation of Test Modules in the building 162

2

The room is empty now

Before

After

Page 3: Progress in LAB  Progress in CLEX

3

Progress in LABInstallation of Test Modules in the building 162

Page 4: Progress in LAB  Progress in CLEX

4

Progress in LABInstallation of Test Modules in the building 162

Page 5: Progress in LAB  Progress in CLEX

5

Two possibilities:1.Installation without moving PETS TANK(with present set-up)

2. Installation with moving PETS TANK upstream

Progress in CLEXSpace for installation of TM type 0

Page 6: Progress in LAB  Progress in CLEX

6

PROBE BEAM LINE

REMOVE

REMOVE

Options Description We need Space Work

Option 1Move PETS TANK and all upstream components

upstream

PROBE BEAM:1.Removing the test area girder(2200mm)2.Remove Flash Box3.Vacuum Sector Valve, Orbit Corrector are placed on the upstream girder

PROBE BEAM:

2200 mm

Re-cabling of upstream components

Installation with moving PETS TANK upstreamHow we can obtain a free floor space for installation of Test Module type 0:

Page 7: Progress in LAB  Progress in CLEX

How we can obtain a free floor space for installation of Test Module type 0:

7

Installation with moving PETS TANK upstream

DRIVE BEAM LINE MOVE

Options Description We need Space Work

Option 1/2Move PETS TANK and

all upstream components upstream

DRIVE BEAM:1. Use the free floor space (1620 mm)2. Move PETS TANK and all upstream

components upstream (1550 mm)3. Move downstream girders towards

BEAM DUMP (900mm)/ remove one Orbit Corrector and Pumping Pot and shorten girder (900 mm)

DRIVE BEAM:

2050 mm

• Move girdersRe-cabling components/Shorten girder

MOVE

Page 8: Progress in LAB  Progress in CLEX

8

PROBE BEAM LINE

Installation with moving PETS TANK upstreamDRIVE BEAM LINE

(opt.1)

DRIVE BEAM LINE (opt.2)

Page 9: Progress in LAB  Progress in CLEX

9

RE-CABLING

Progress in CLEXChallenges

CANAL FOR COOLING SYSTEM

COOLING PIPES

Page 10: Progress in LAB  Progress in CLEX

10

Progress in CLEX

Test Module type 0 integration into CLEX