Transcript of Profile, F E S Int.
FES INTERNATIONAL
Established in 2011
COMPANY PROFILECommitment our ethics, knowledge our strength
Consultancy & Supply
FES INTERNATIONAL BACKGROUND
Since its birth in 2011, formed by some experienced and adolescent engineers
from Bangladesh University of Engineering and Technology (BUET), the adage of
FAHIM ENGINEERING SOLUTION is to accommodate one stop band-aid to the
client. Thats why the basin of experts includes humans from altered abandon and
sectors which accommodate it is the adequacy to complete multidisciplinary
tasks. As the name FAHIM ENGINEERING SOLUTIONS means derives ideas, style,
or aftertaste from a ample and assorted ambit of sources. We ace the appropriate
ideas, methods and plan for the applicant and abutment with our expertise. The
basin of experts includes professionals from the acreage of management,
engineering, amusing and ambiance studies. We accept acquired ability in activity
management, activity monitoring, study, research, analysis in altered field.
On the added duke Fahim Engineering Band-aid has been formed beneath the
administration of Mohammad Azhar Ali who has a continued career in the RMG
area in industrial Design, installation Master Plan, Layout, machineries selection,
Electro-Mechanical Design aliment specialization. He has served abounding
companies as agent and aswell as consultant; above audience are Bitopi-Misami
Group, Integrated Textile Ltd., Bangladesh Navy, Metro Knitting and Dyeing
Industries, IDS Group, Square Knit Fabrics Ltd., Sparkle Knit Composite Ltd.,
Esquire Knit Composite Ltd. etc. FES has all-inclusive ability in Electro-Mechanical
Architecture of RMGs. This accumulated access will advance to a different
consultancy band-aid to the applicant both in architecture aesthetics and able use
of resources.
COMPANY HIERARCHY
CEO
DESIGN SALES & SERVICE
SERVICE
HR& ACCOUNTS
DESIGN HEAD
EXECUTIVE
DRAFTS MAN
GM
SALES EXECUTIVE
SERVICE EXECUTIVE
HR & ACC HEAD
ACCOUNTS
OFFICE ASSISTANT
SERIAL NO
CLIENTS NAME YEAR OF SERVICE
TYPES OF SERVICE RENDERED
1. BITOPI-MISAMI GROUPContact Details- Col Hasan Executive DirectorMob- 01713095748
2011-2013
Design of all utility (water supply, air line system, boiler system) works
Supervision of utility line setup Selection of machineries WTP, ETP design and
installation. Water recycle plant design.
2.
INTEGRATED TEXTILE LTDContact Details- Md. MoniruzzamanManaging DirectorMob-01755568404
2011
Factory design Machine layout preparation Design of utility (water supply,
air line system, boiler system) works
ETP design.
3. BANGLADESH NAVY 2011-2012
Design of Iron removal plant
Supervision of plant installation.
4.
METRO KNITTING &DYEING Contact Details-Mr Taraq GM EngineeringMob-01713041526
Running
Design of 40 ton dyeing capacity plant
All utility system design
Supervision of works
5. IDS GROUP Completed Energy audit of whole
electromechanical system.
6. BROTHER FURNITURE FACTORY
Completed
Electrical & Plumbing design &drawing
Estimating electrical and plumbing
500kva substation design and supervision
Supervision of labor shed and all lighting works
PROJECT STRENGTH OF FAHIM ENGINEERING SOLUTIONS
PROJECT STRENGTH OF FAHIM ENGINEERING SOLUTIONS
SERIAL NO
CLIENTS NAME YEAR OF SERVICE
TYPES OF SERVICE RENDERED
7 SPARKLE KNIT COMPOSITE LTD.Contact details- Mr Azizul IslamHead Of FinanceMob-01713388102
2011-2012 Master plan Making. Utility Design. Machineries selection. Etp, Wtp design. Installation of whole project.
8 SQUARE KNIT FABRICS LTD
Completed Machine layout making. Energy savings utility Design Energy efficient boiler selection. Energy efficient machineries
selection. Salt recovery plant design. Cost effective ETP Design. Effient thermal design. Lighting and ventilation design. Humidification plant design
9 MASCO GROUP Completed Energy efficiency Audit and solution.
ETP Plant making. WTP Installation.
10 Leeu Fashion Ltd. Completed Complete Factory design ETP Plant making. Lighting and ventilation design. Machine layout making.
Note- Act as External Consultant of CP project of WORLD Bank Project.
Design SMFL of Square Group
FIGURE: ETP PLANT OF SQUARE FASION LTD
POJECT RESPONSIBILITIES:
1. ETP RENNOVATION DESIGN
2. SALT RECOVERY PLANT ANALYSIS
3. WHOLE UTILITY DESIGN
4. ESTIMATING AND BOQ
5. SUPERVISION OF THE PROJECT
BRIEF DESCRIPTION OF THE PROJECTLOCATION HORINDHORA, TANNERY
HEMAYETPUR, SAVAR ,DHAKACOUNTRY BANGLADESH
CLIENT BROTHERS FURNITURE LTD YEAR 2012-2013CLIENT ADDRESS
HORINDHORA, TANNERY HEMAYETPUR, SAVAR ,DHAKA
STATUS 80 % COMPLETE
PROJECT TYPE
INDUSTRIAL ELECTRICAL & PLUMBING DESIGN
PROJECT COST
15 CRORE VALUE OF SERVICE
4 LAC
FIGURE: UNDER CONTRUCTION OF DB, MDB OF BROTHER FURNITURE FACTORY SHED 1
POJECT RESPONSIBILITIES:
6. ELECTRICAL DESIGN & DRAWING
7. PLUMBING DESIGN & DRAWING
8. ESTIMATING ELECTRICAL AND PLUMBING
9. 500KVA SUBSTATION DESIGN AND SUPERVISION
10. SUPERVISION OF LABOR SHED AND ALL LIGHTING WORKS
ELECTRIFICATION DESIGN AND SUPERVISION OF BROTHERS FURNITURE
Design SPARKLE KNIT COMPOSITE LTD
BRIEF DESCRIPTION OF THE PROJECTLOCATION JIRANI BAZAR, SAVAR COUNTRY BANGLADESH
CLIENT SPARKLE KNIT COMPOSITE LTD. YEAR 2010-2012CLIENT ADDRESS
JIRANI BAZAR, SAVAR
STATUS COMPLETED PROJECT TYPE
INDUSTRIAL DESIGN, ETP , WATER RECYCLE, UTILITY,ELECTRICAL.
PROJECT COST
80 CRORE
FIGURE: FACTORY PREMISES OF SPARKLE KNIT COMPOSITE LTD.
POJECT RESPONSIBILITIES:
1. FACTORY MASTER PLAN MAKING, MACHINERIES SELECTION, PROCESS LAYOUT DESIGN AND INSTALLATION .
2. ETP,WTP DESIGN AND INSTALLATION.
3. WHOLE UTILITY DESIGN AND INSTALLATION.
4. ESTIMATING AND BOQ, SUPERVISION OF THE PROJECT
BRIEF DESCRIPTION OF THE PROJECTLOCATION SAVAR,NOBINOGOR COUNTRY BANGLADESHCLIENT BANGLADESH ARMY YEAR 2013CLIENT ADDRESS
BANGLADESH ARMY ,SAVAR CANTONMENT
STATUS RUNNUNG PROJECT TYPE
UTILITY DESIGN
PROJECT COST
35 CRORE
FIGURE: ELECTRICAL NETWORK OF SAVAR DOHS
POJECT RESPONSIBILITIES:
1. ELECTRICAL DESIGN & DRAWING2. ESTIMATING ELECTRICAL AND PLUMBING3. STREET LIGHTING DESIGN 4. SOLAR PANEL DESIGN
ELECTRIC AND PLUMBING DESIGN OF SAVAR DOHS
BRIEF DESCRIPTION OF THE PROJECTLOCATION NABIK COLONY COUNTRY BANGLADESHCLIENT BANGLADESH NAVY YEAR 2011-2012CLIENT ADDRESS
GE NAVY , ISSA KHA, CTITTAGONG , BANGLADESH
STATUS COMPLETED PROJECT TYPE
PLANT DESIGN
PROJECT COST
1.41 CRORE VALUE OF SERVICE
3 LAC
FIGURE: BANGLADESH NAVY CHIEF VISITED IRON REMOVAL PLANT
POJECT RESPONSIBILITIES:
1. WHOLE PLANT FILTRATION SYSTEM 2. PLUMBING AND ELECTRIFICATION DESIGN3. BOQ AND ESTIMATING OF PLUMBING , FILTRATION VASSEL AND ELECTRICAL WORKS4. IRON REMOVAL ON CHEMICAL PROCESS5. SUPERVIOSION OF THE PROJECT
IRON REMOVAL PLANT DESIGN ( BANGLADESH NEAVY)
BMA ( MILITARY ACADEMY)
BRIEF DESCRIPTION OF THE PROJECTLOCATION VATIARY COUNTRY BANGLADESHCLIENT BANGLADESH ARMY YEAR 2011-2012CLIENT ADDRESS
MILITARY ACADEMY, CTITTAGONG , BANGLADESH
STATUS ONGOING PROJECT TYPE
LIGHTING DESIGN
PROJECT COST
VALUE OF SERVICE
PRODUCTS AND SERVICES
1. TUPESA WASHING PLANT MACHINERIES – SPAIN
2. Belly Wash – Taizhou. China
3. Warehouse rack , fork lift ,Scissor Lift – Sino Lift
Warehouse fork lift, Ireland Scissor lift, China
Ware House Rack, China
4. Industrial Lighting with 50-80% Energy savings – Spark LED
5. Industrial and Commercial Design and Installation
6. Energy Efficiency Audit and Improvement
7. WTP, ETP, Sewerage Treatment plant , Water Recycle System , Salt Recovery Plant ,