Trenchless Innovations from Germany

Prof. Jens HoelterhoffChairman

German Society of Trenchless Technology e.V. (GSTT)

TRENCHLESS MIDDLE EAST DUBAI26th September 2018

Trenchless Innovations from Germany

Prof. Jens HoelterhoffChairman

German Society of Trenchless Technology e.V. (GSTT)

Page 2: Prof. Jens Hoelterhoff Chairman - GSTT

2

The German Society for Trenchless Technology advocates the pioneering trenchless technology that combines economic efficiency and environmental protection.

This modern approach for installing underground supply lines can be utilized for drinking water, wastewater, gas, heating, telecommunications or electricity lines.

GSTT's goal is to promote this modern technology that has been proven and tested worldwide over 30 years. Together with international partners, GSTT is continuously working on advancing the science and the practice of trenchless technology for the public and environmental benefit.

ā€“ German Society for Trenchless Technology e.V.

Approx. 3.500 members in approx. 55 countries (Societies in 28 regions)

ā€“ International Society for Trenchless Technology

Page 3: Prof. Jens Hoelterhoff Chairman - GSTT

3

Trenchless Innovations from Germany

ā€¢ Inspection

ā€¢ Repair / Renovation

ā€¢ Renewal / New Construction

Trenchless Innovations from Germany

ā€¢ Inspection

Page 4: Prof. Jens Hoelterhoff Chairman - GSTT

4

CCTV-Inspection for smal diameter HD pushing with water

Pan & tilt camera, turn off able

Operating range DN 80 ā€“ 200

Able to negotiate bends45Ėš from DN 80

Able to negotiate bends87Ėš from DN 100

Camera diameter56 mm.

CCTV-Inspection for smal diameter HD pushing with water

87Ā° fromDN 100 into DN 100

45Ā° fromDN 80 into DN 80

Pan & tilt camera head andunimpeded view

Page 5: Prof. Jens Hoelterhoff Chairman - GSTT

5

CCTV-Inspection for Sewage Laterals with documentation

ā€¢ bendable pan and tilt colour camera forthe holistic recording anddocumentation of lateral sewer

ā€¢ Retractable guide device allowsalways a free and clear camera image

ā†’ completely panned by

ā€¢ 90Ā° degrees and circled 360 degrees

ā€¢ Inspection of branched pipe systems from DN 100 to DN 200

ā€¢ Range up to 40 m in the lateral pipe (pushing technology)

ā€¢ Range up to 120 m in the lateral pipe (water high pressure technology)

ā€¢ 3D-seawage measurement ASYS 3D

Lindauer Schere & ASYS 3D(scissors from the German town Lindau)

CCTV-Inspection for smal diameter HD pushing with water

Page 6: Prof. Jens Hoelterhoff Chairman - GSTT

6

CCTV-Inspection for Sewage Laterals with documentation

Trenchless Innovations from Germany

ā€¢ Repair / Renovation

Page 7: Prof. Jens Hoelterhoff Chairman - GSTT

7

LATERAL PREPARATION SYSTEM

SEWER to LATERAL (STL)

WOLDWIDE UNIQUE SATELLITE SYSTEM for cutting, inspection and cleaning from main sewer (DN 200 mm ā€“ 600 mm) to lateral (DN 100 mm ā€“ 150 mm)

Winner of the

NO DIG AWARD 2015

LATERAL PREPARATION SYSTEM

SEWER to LATERAL (STL)

WOLDWIDE UNIQUE SATELLITE SYSTEM for cutting, inspection and cleaning from main sewer (DN 200 mm ā€“ 600 mm) to lateral (DN 100 mm ā€“ 150 mm)

Page 8: Prof. Jens Hoelterhoff Chairman - GSTT

8

LATERAL PREPARATION SYSTEM

positioning at lateral

1.

LATERAL PREPARATION SYSTEM

Insertion into lateral

2.

Page 9: Prof. Jens Hoelterhoff Chairman - GSTT

9

LATERAL PREPARATION SYSTEM

bending insideconnection

3.

LATERAL PREPARATION SYSTEM

start working(cutting, cleaning, reopen the lateral)

4.

Page 10: Prof. Jens Hoelterhoff Chairman - GSTT

10

Alphaliner500G with double wall construction:

A special, patented double wall construction Extremly tight, resin rich back wall with closed foil shell Covering of the structural load-bearing core of the Alphaliner Protection against environmental influences Perfect long-term safety Extension of the service life DIBt approval Z-42.3-447

CIPP - Cured-in-place pipe rehabilitation with double wall

Double wall and outer filmStructural thickness ā€“Statically relevant elementDefined wear protection layerRemovable inner film

Alphaliner1800 for diameters up to DN 1800:

Unique glass fibre material based on theinnovative ā€œUltrapipeā€ ECR glass fibre Higher transparency,

better and quicker curing Different layout of the

random and transversefibre orientation to createtechnical properties

CIPP - Cured-in-place pipe rehabilitation up to 1800 mm

Alphaliner1800 Technical dataElastic modulus short-term value

acc. DIN EN 122820380 MPa

Elastic modulus short-terme value

5% quantile acc. DIN EN 122816304 MPa

Elastic modulus long-term value

acc. DIN EN 122812445 MPa

Elastic modulus short-terme value

5%- quantile acc. DIN EN ISO 17813857 MPa

Bending strength short-terme

value

5% quantile acc. DIN EN ISO 178280 MPa

Bending strength long-term value 213 MPaReduction factor 50 years 1,31 [-]Wearout value as per CEN/TR

157290,23mm

Wear layer 0,5mmGrouping DWA-M 144-3 MKG 24DIBt approval Z-42.3-447

Page 11: Prof. Jens Hoelterhoff Chairman - GSTT

11

CIPP - Cured-in-place pipe rehabilitation of pressure pipes

A new company in the RELINE UVĀ®-Group since January 2017

APTEC = Advanced Liner Technology for Pressure Pipes Development and manufacturing of UV light-curing GRP

hose liner for rehabilitation of pressure mains Offering system solutions for no-dig rehabilitation of

Pressure drainage pipelines (sewerage, fire water mains, industrial and raw water)

Gas pipelines Potable water pipelines

Rehabilitation of pressure pipes with

is a trenchless technology for the rehabilitation of pressure pipelines for different applications such as water, gas and oil.

The Primus LineĀ® system

The Primus LineĀ® system

Long installation lengths of up to 2,500 m per pull and bends of up to 45 degrees

Pressure rates with up to 82 bar, independent from host pipe

Small footprint and minimal equipment requirements

Factory produced product: No curing, steaming or adhesion process

Life span of 50 years

Page 12: Prof. Jens Hoelterhoff Chairman - GSTT

12

Rehabilitation of pressure pipes with The Primus LineĀ® system

Long installation lengths of up to 2,500m per pull and bends of up to 45 degrees

Pressure rates with up to 82 bar, independent from host pipe

Small footprint and minimal equipment requirements

Factory produced product: No curing, steaming or adhesion process

Life span of 50 years

CIPP - UV curing technology for Drinking Water

SAERTEX-LINERĀ® H2OThe worldā€˜s first curable GRP-Liner for the trenchless rehabilitation of potablewater pipes: Third party approved, environmentally friendly & sustainable!

Structural classification of the Liner according to DIN EN ISO 11295 /

AWWA M28

Certifications: NSF / ANSI Standard 61 DVGW ā€“ W 270 and KTW Guideline, Ordinance 2914:2011

Due to high mechanical properties Very thin walls are used High pressure applications are possible

Diameter range 8 - 48 in (200 - 1200 mm)

The Liner can withstand external and internal pressure, including a vacuum.

Page 13: Prof. Jens Hoelterhoff Chairman - GSTT

13

New UV System for Renovating Drinking-water Pipelines

With the revolutionary concept for light curing of drinking-water pipelines, I.S.T. is putting a patent-protected technology on the market that allows for cables up to 1.000 meters in length.

front camera

backeye camera

UV-Patch System for short liners

allows the rehabilitation of damaged pipe sections From DN 150-600 (6ā€œ ā€“ 24ā€œ)

ā€¢ max. occupancy with short liners up to 100 cm (40ā€œ)

ā€¢ 3 UV-bulbs (250 watts each) ā€¢ articulated joint for better

inserting through manhole into the channel

ā€¢ curing time of only 8 minutes

Page 14: Prof. Jens Hoelterhoff Chairman - GSTT

14

STREET TO HOME

For lateral relining from of the main pipe

The system allows inverting GRP-Liner against flow direction with open-end-method:

Positioning unit and inversion unit are placed into the main pipe (> DN 250 relined) from two opposing manholes. From there, after couplingof the units, the rehabilitationof the lateral (> DN100) is carried out.

CIPP ā€“ Lateral detector

Proceeding: An antenna is routed along the liner wall. The output signal of the sensor changes depending on the structure detected behind the wall.

embedding

main pipe

branch

route

Inliner

U/V

Lateral Detector

IBAK ā€“ Lateral DetectorSensor system for locating branches in rehabilitated sewer pipes

Page 15: Prof. Jens Hoelterhoff Chairman - GSTT

15

CIPP ā€“ Lateral detector

With this innovative technology it is possible to locate and cut open branches (size DN 80 or larger) to be opened after liner insertion.

IBAK ā€“ Lateral DetectorSensor system for locating branches in rehabilitated sewer pipes

CIPP ā€“ Linerend sleeve for the connection of liner systems

ā€¢ Seal against residual intrusionbetween liner / old pipe

ā€¢ Mechanical protection against

ā€¢ high pressure cleaning

ā€¢ German DIBt approvalā€¢ Sealed against sewer infiltration

water up to 1 barā€¢ Jetting resistant according

to DIN 19523 testing

ā€¢ Fast and easy installation process

Page 16: Prof. Jens Hoelterhoff Chairman - GSTT

16

Heating and Cooling with Waste Water

ā€¢ Innovate ā€“ Regenerating -Economical

ā€¢ Reducing the use of Fossil Fuels

ā€¢ Major reduction of CO2 Emmisons

ā€¢ Waste Water a home made Energy Source

ā€¢ Recycling Industrial Waste heat Energy

Manhole rehabilitation technologies

cleaning equipment

Page 17: Prof. Jens Hoelterhoff Chairman - GSTT

17

Manhole rehabilitation technologies

motarcoating equipment

Manhole rehabilitation technologies

motarcoating

Page 18: Prof. Jens Hoelterhoff Chairman - GSTT

18

Manhole rehabilitation technologies

GRP ā€“ Liner with UV curing technologyin different shapes of usual manholes

Manhole rehabilitation technologies

Page 19: Prof. Jens Hoelterhoff Chairman - GSTT

19

Manhole rehabilitation technologies

Trenchless Innovations from Germany

ā€¢ Renewal / New Construction

Page 20: Prof. Jens Hoelterhoff Chairman - GSTT

20

PRM ā€“ Pipe Replacement Method

Bursting head

Widening

So far only pipe bursting and modified micro tunneling systems (pipe-eating method) are available for a pipeline

corridor, trenchless replacement of old pipelines.

pipe bursting pipe eating

A prerequisite to utilize this method isthat the surrounding ground can be displaced; major increases of dimensions are often problematic or impossible.

Pipe burstingmethod

Static pullingdevice

Old pipe Pull rodNew pipeStrech (tension) unit

PRM ā€“ Pipe Replacement Method

Page 21: Prof. Jens Hoelterhoff Chairman - GSTT

21

technical perfected systems

ā€¦but too long construction timePipe Eating

systems

PRM ā€“ Pipe Replacement Method

An Example: Advance length 60 meters, d = days

Pipe-eating method with slurry system: set up 3.5 d, pipe eating 6.0 d, dismantling 2.0 d Ī£ 11.5 d

Pipe-eating method with guided auger system: set up 2.5 d, pipe eating 6.0 d, dismantling 1.5 d Ī£ 10 d

The new Invention method with short pipes*: set up 1.0 d, pulling process 2.5 d, dismantling 0.5 d Ī£ 4 d*for example polymer concrete jacking pipe

The new Invention method with PE Long pipes: set up 1.0 d, pulling process 1.0 d, dismantling 0.5 d Ī£ 2.5 d

60 % - 80 % lower construction time!

PRM ā€“ Pipe Replacement Method

Page 22: Prof. Jens Hoelterhoff Chairman - GSTT

22

PRM ā€“ Pipe Replacement Method

chamber

removal of drilled material is done with a suction excavator

PRM ā€“ Pipe Replacement Method

Page 23: Prof. Jens Hoelterhoff Chairman - GSTT

23

PRM ā€“ Pipe Replacement Method

PRM ā€“ Pipe Replacement Method

Page 24: Prof. Jens Hoelterhoff Chairman - GSTT

24

PRM ā€“ Pipe Replacement Method

Suction hose DN 100 for the Pneumatic conveying with quick coupling

Suction Excavator - patented suction principle

Computer-optimizedsound-absorbing unit

efficientmicromesh filter

standard radioremote control

patentedseparation system

high performancefan

integratedcompressor

resistanttilting container

hydraulik drivenArticulated hose carrier

PRM ā€“ Pipe Replacement Method

Page 25: Prof. Jens Hoelterhoff Chairman - GSTT

25

Suction Excavators ā€“ a wealth of applications

PRT ā€“ Pipe Replacement Technology

Page 26: Prof. Jens Hoelterhoff Chairman - GSTT

26

PRT ā€“ Pipe Replacement Technology

A lot of the components canbe used for other applicabilties(pipe bursting etc.)

Pulling rod

Clamb systemPulling rig

Hydraulic aggregate

PRM ā€“ Pipe Replacement Method

Page 27: Prof. Jens Hoelterhoff Chairman - GSTT

27

HDD - Rock Drilling Rig

with Prime Double Rod System and ā€žon boardā€œ pump ā€¢ HDD-Compact Rig for rock drilling equipped with double rod

magazineā€¢ First rock drilling rig in this high-performance

category (> 50 t)ā€¢ Inner and outer rods are

independentlyā€¢ driven by two flotable

rotary headsā€¢ high torque

(up to 90,000 kN)ā€¢ Use of any

common locating system possible

ā€¢ Application with standard drill pipes

HDD - Rock Drilling Rig

with Prime Double Rod System and ā€žon boardā€œ pump

Page 28: Prof. Jens Hoelterhoff Chairman - GSTT

28

HDD - Rock Drilling Rig

Guided Auger Boring with Front Steer and Optical Path in Extremest Ground Conditions

Page 29: Prof. Jens Hoelterhoff Chairman - GSTT

29

Guided Auger Boring with Front Steer and Optical Path in Extremest Ground Conditions

Guided Auger Boring with Front Steer and Optical Path in Extremest Ground Conditions

Here the construction as a pedestrian umbrella underpass

Page 30: Prof. Jens Hoelterhoff Chairman - GSTT

30

Trenchless underground cable construction

Requirements by Transition System Operator (TSO).

ā€¢ Limited job site, construction roads, preparation areaā€¢ No heavy equipment between launch and reception pointā€¢ Steerable installation of casing pipes for AC & DC linesā€¢ Length: 1.000m ā€“ 1.500mā€¢ Depth: 1,5 m to 4 m, constantā€¢ Diameter:

approx. DN 250 ā€“ DN 400ā€¢ Casing material:

plastic, non-conductive, e.g. PEHD

ā€¢ Distance between lines:1 m ā€“ 2 m, constant

Trenchless underground cable construction

Peripheral Drive

Navigation System

Hydraulic Tank

Hydraulic Pump

Jet Pump

Machine technology AVNS 350 XB

Page 31: Prof. Jens Hoelterhoff Chairman - GSTT

31

Trenchless underground cable construction

1. Pilot Bore with steel pipes

2. Removal of machine, jacking frame turned by 180Ā°

3. Mounting of a pullhead for pull-in of casing pipe

Principle

Trenchless underground cable construction

Steel pilot pipes & connection principle

Pilot pipe length: 9 m

Interlocking position for Jacking frame

12 x M30 bolt

Guide pin

Cable channel

Seal

Page 32: Prof. Jens Hoelterhoff Chairman - GSTT

32

A Tiny Circle - the Construction Pit of the Future

Where the keyhole technique is applied, surface damage and consequential costs only too well known from open trench installation methods are insignificant. The performance of soil and surface works is safer, more productive and less elaborate. Inspection of the construction pit is not required.

Application range: - installation of new property service

connections with non-directional GRUNDOMAT impact moles

- installation of new property serviceconnectionswith the directional drill rig GRUNDOPIT-K

- replacement of new property serviceconnections with the cable winchGRUNDOTUGGER

- sleeve sealing of cast iron and steel lines- repair of high pressure PE pipe lines- insertion of survey slots- pipe line inspection- corrosion protection sacrificial anodes

Keyhole-Technology + Trenchless Technique

Keyhole-Technology + Trenchless Technique

Establishing a keyhole using a core drill

ā€¢ the core drill CD 650 bores a hole of 650 mm in diameter in the road surface. ā€¢ after all other jobs are done, the bore core yielded in this working step is reinserted into the

road surface, fitting perfectly.ā€¢ a suction excavator takes up the soil covering the main lineā€¢ installation of the Pit K rig and performance of the bore with wall duct into the basementā€¢ connection with the main line is carried out above the surface.

Page 33: Prof. Jens Hoelterhoff Chairman - GSTT

33

Thank you for your attention

Messedamm 22D ā€“ 14055 BerlinTel.: +49 30 3038-2143FAX: +49 30 3038-2079E-Mail: [email protected]: www.gstt.de

^Prof. Jens HoelterhoffChairman