Production schedule

7
Production Schedule Date What needs to be done Location By Who Equipment Needed Examples of work… Pre- production Pre-production Pre- production Pre-production Pre-production Pre-production Week of 9 th November Genre Research using a prezi. Initial ideas. Ringwood school Eleanor Penfold Computer, blogge. Week of 14 th November Music video analysis Ideas drafting Target audience Digipak and poster analysis Ringwood School Eleanor Penfold Computer, blogger.

Transcript of Production schedule

Page 1: Production schedule

Production Schedule

Date What needs to be done Location By Who Equipment Needed Examples of work…Pre-

productionPre-production Pre-

productionPre-production Pre-production Pre-production

Week of 9th November

Genre Research using a prezi.

Initial ideas.

Ringwood school

Eleanor Penfold Computer, blogge.

Week of 14th November

Music video analysis Ideas drafting Target audience Digipak and poster

analysis

Ringwood School

Eleanor Penfold Computer, blogger.

Page 2: Production schedule

The week of 21rd November

Annotated lyrics Scripts/storyboards Shot list

Ringwood School

Eleanor Penfold Computer and blogger.

The Week of 28th November

Reece photos Floor plan Costume, actors and

prop

Ringwood School

Eleanor Penfold Computer and blogger.

The Week of 5th December

Complete the layout for this production schedule.

Ringwood school

Eleanor Penfold Computer and blogger.

Dead line of Dead line of the above is on Dead line of Dead line of the Dead line of the Dead line of the above is on Friday 9h

Page 3: Production schedule

the above is on Friday 9th

of December.

Friday 9th of December. the above is on Friday 9h of December.

above is on Friday 9th of December.

above is on Friday 9th of December.

of December.

Production Production Production Production Production Production

Friday 6TH of January

Go to location Sandy Hill Eleanor Penfold Actors, script, floor plan, and crew.

Saturday 7th of January

Part one of filming Sandy Hill Eleanor Penfold Camera, lighting, actors, script, floor plan, and crew.Costume… All costume will be required: dress, jewellery, shoes, smoke, wings and makeup e.c.t

Sunday 8th of January

Part two of filming Bournemouth Beach

Eleanor Penfold Camera, lighting, actors, script, floor plan, and crew.Costume… All costume will be required: dress, jewellery, shoes, makeup e.c.t

Saturday 14th

of JanuaryPart three of filming Studio Eleanor Penfold Camera, lighting,

actors, script, floor plan, and crew.Costume… All costume will be required: dress, jewellery, shoes,

Page 4: Production schedule

makeup e.c.tMonday 11th of January

Upload blog entries include: Video blog Images of filming Outtakes Rehearsals

Ringwood School

Eleanor Penfold Blogger, camera, stand, perhaps actors, computer.

Post-Production

Post-Production Post-Production

Post-Production Post-Production Post-Production

Friday 13th January

Start editing all my work. Upload into blogger the

process and procedure of what I am doing.

Complete a step breakdown of the editing process and any special effects I have added.

Ringwood School

Eleanor Penfold Computer, blogger and Adobe Premier Pro

The week of the 16th of January

Continue with editing all my video footage. Complete a colour grading test.

Complete a step breakdown of the editing process and any special effects I have added.

Lip sync test

Ringwood School

Eleanor Penfold Computer, blogger and Adobe Premier Pro

Page 5: Production schedule

The week of the 23th of January

Continue with editing all my media video footage.

Complete a step breakdown of the editing process and any special effects I have added.

How you made/inserted your titles and fonts chosen

Digipack analyses

Ringwood School

Eleanor Penfold Computer, blogger and Adobe Premier Pro

The week of the 5th of February

Complete all editing in regards to my creating my film.

Finalize my step breakdown of the editing process and any special effects I have added.

Ringwood School

Eleanor Penfold Computer and blogger

Evaluation… Evaluation… Evaluation… Evaluation… Evaluation… Evaluation…The week beginning 13nd of February

Design digipack and poster

Ringwood school

Eleanor Penfold Computer, blogger and peer involvement.

The week beginning 27th of February

Final watching of music videos

Upload music video onto blogger

Complete digipack and poster

Ringwood school

Eleanor Penfold Computer and blogger

The week beginning 6th March

Complete evaluation question 1

Complete digipack poster and start evaluation question one

Ringwood School

Eleanor Penfold Computer and blogger

Page 6: Production schedule

The week beginning 13th of March

Complete evaluation question 2

Ringwood School

Eleanor Penfold Computer and blogger

The week beginning 20st of March

Complete question 3 and 4

Ringwood School

Eleanor Penfold Computer and blogger

Deadline by 24th March 2016

Deadline by 24th March 2016 Deadline by 24th March 2016

Deadline by 24th March 2016

Deadline by 24th March 2016

Deadline by 24th March 2016