Production schedule

12
PRODUCTION SCHEDULE ON EVERY STREET Music Video Director Robert Oliver

description

 

Transcript of Production schedule

Page 1: Production schedule

PRODUCTION SCHEDULE

ON EVERY STREETMusic Video

Director Robert Oliver

Page 2: Production schedule

Cast/Crew and Contacts

Edward Oliver: 07894371462Elenor : 07655319483David Maskell: 07213664321

CREW

Robert Oliver: 07895391847

Page 3: Production schedule

Day One

• Pictures with the Victim.Crew and Victim only.Pictures in a park, and on a road.

• In The CarFilming the detective driving the car.

Page 4: Production schedule

Day Two

• Cherry Hinton Village Centre Suspect and Detective, all inside shots to be filmed.

• Cherry Hinton Village Centre/High Street Detective walking down the street.

Page 5: Production schedule

Equipment

Camera – Nikon D3100Tripod Lamp

PropsCase FilesPictures; statue of liberty and a orchestraGuitarKeys Notes and other pictures for case board.

Page 6: Production schedule

IN AN EMERGENCY• FIRE CAMBRIDGE - 01223 376200

• Police Cambridge – 01223 358 966 Parkside poilice station City Centre Cb1 1JG• A&E – Addenbrookes Hospital Hills Road Cambridge Cb2 0QQ Netherhall Sixth form – 01223 242931

Page 7: Production schedule

Location Photos

Page 8: Production schedule

Cast

• Edward Oliver as Tony ShoreEdward is a Writer and illustrator, however I have worked with him on other projects and believe he is the suitable actor for the detectives role.

Page 9: Production schedule

Cast

• David Maskell as Lewis RoperDavid is currently undertaking a drama course at a sixth form college in Cambridge. He has had experience in many productions

Page 10: Production schedule

Day One - Morning

• Set Up time : 5 mins• Shooting commencing : 10 am • Shooting finishing : 12 pm• Equipment needed : Camera, Tripod • Crew Present: Robert Oliver• Actors Present: Elenor Dorling • Location: Park

Page 11: Production schedule

Day One - Afternoon

• Set up Time: 10 mins • Shooting commencing: 2.00pm• Shooting Finishing: 3.00pm• Equipment Needed: Camera, Tripod, Car• Crew Present: Robert Oliver• Actors Present: Edward Oliver• Location: In Car (moving)

Page 12: Production schedule

Day Two –Morning/Afternoon

• Set up Time: 1.5 hours• Shooting commencing: 11am• Shooting Finishing: 5pm (1 hour break for lunch)• Equipment Needed: ALL• Crew Present: Robert Oliver• Actors Present: David Maskell and Edward Oliver• Location: Cherry Hinton Village Centre