Process Plant Start-up Commissioning - QTPCqtpc.qa/pdf/Process Plant Start-up Commissioning.pdf ·...
-
Upload
nguyentram -
Category
Documents
-
view
285 -
download
8
Transcript of Process Plant Start-up Commissioning - QTPCqtpc.qa/pdf/Process Plant Start-up Commissioning.pdf ·...
QATAR TECHNICAL PETROLEUM CENTER, P.O. Box 9955, Salwa Road, Doha, Qatar.Tel: +974 4458 1440. Fax: +974 4458 0414 Email: [email protected] URL: www.qtpc.qa
Process Plant Start-up Commissioning
Course Duration : 5 Days Training
Daily Schedule : 7:30am - 3:30pm
Training Date : Upon Request
Training Venue : Doha
Traning Fees : TBI
Course Outline
TERMS AND TOOLS• Introduction• Start-Up Problems• Discussion• Start-Up Planning• Start-Up Cost Prediction• Minimizing Equipment Problems• Discussions and Case Studies
2
QATAR TECHNICAL PETROLEUM CENTERQTPC - AN ISO 9001:2008 Regd.
Day 1 MANAGEMENT• Start-Up Safety and Environmental Issues• Start-Up Management• Start-Up Manpower• Start-Up Leadership• Discussion Case Studies
Day 2
IN THE FIELD• Construction Inspection• Construction Completion—the Beginning of Start-Up• Commissioning—The Heart of Start-Up• Start-Up Operations• Discussion & Case Studies
Day 3
SHUTDOWN and DECOMMISSIONING• Normal Shutdown• Decommissioning and demolition
Case Studies, Discussions & Last review will be carried out
Day 5
START- UP TROUBLESHOOTING• Technical Issues• Solutions• Implementing Changes
START- UP and PROCESS SIMULATION (HANDS-ON DEMONSTRATION)Case Studies Discussions
Day 4
QATAR TECHNICAL PETROLEUM CENTER, P.O. Box 9955, Salwa Road, Doha, Qatar.Tel: +974 4458 1440. Fax: +974 4458 0414 Email: [email protected] URL: www.qtpc.qa
Process Plant Start-up CommissioningQATAR TECHNICAL PETROLEUM CENTER
QTPC - AN ISO 9001:2008 Regd.
Training ObjectivesThe initial start-up of any plant, irrespective of size, type, or industry, is a unique occurrence. Therefore, start-up poses some special problems. Lack of experience in dealing with these problems has frequently resulted in prolonged and costly startups. This course will provide guidelines for all those involved in the execution of a project on how to achieve a success-ful plant start-up. The requirements for start-up oriented thinking at all stages of the project, from engineering to commis-sioning, will be demonstrated.The course material covers estimating of start-up costs, personnel requirements, and resources. It defines the vital role of project management and plant personnel in the preparation and planning for successful start-up of any process plant. Emphasis is on effective planning and use of available resources, both material and manpower.
Target AudienceThis course is designed for project managers, plant managers, plant supervisors, technical staff, and contractor personnel involved in project execution and plant start-up in any process industry. The greatest benefit arises from the application of these start-up oriented ideas throughout a project, beginning at the conceptual phase. The practical techniques and exam-ples provide useful insights that are valuable at any stage of project execution and preparation for start-up.
Training MethodologyThis training program is lecture-based and customized to the needs of the audience, providing meaningful experience for personnel that work in petroleum plants.
Daily sessions include formal presentation, prepared in the Power Point, interspersed with directed discussions and case study.
In addition to formal lectures and discussions, the delegates will learn by active participation through the use of prob-lem-solving exercises, group discussions, analysis of real-life case studies etc.All attendees receive a course manual as a reference.
At the end of the course, the delegates will be able toUpon completion of this course, delegates will gain knowledge of the problems and their sources, associated with first-time start-ups. You will have the necessary skills for anticipating and avoiding financial, technical, operational, and organizational problems associated with start-up.
He has more than 30 years of extensive field experience oil & gas, petrochemical and other process plants, and mainly in project management, design, selection, specification, installation, maintenance, operation, plant optimization and trouble-shooting of oil, water and gas handling facilities in the oil and gas industry. Throughout his professional career he have served for several oil & gas companies such as; • Process Engineer at El-Nasr Petroleum Company, Alexandria, Egypt. • Senior Technical Instructor at Saudi Aramco, Saudi Arabia. • Technical Instructor (On-Job-Training) at Saudi Arabian marketing and Refining (SAMARC), Jeddah - Saudi Arabia. • Process Advisor at Al-Furat Petroleum Company (AFPC), Shell Join Venture (Subcontractor: IHRDC), Syria. • Production Trainer (On-Job-Training) at Abu Dhabi Marine Operating company (ADMA – OPCO, Subcontractor: IHRDC), United Arab of Emirates. • Commissioning (Process) Engineer at Middle East Oil Refinery (MEDOR, Subcontractor: TECNIP International), Egypt. • Production Advisor at Al-Furat Petroleum Company (AFPC) Shell Join Venture (Subcontractor: TriStar Meddle East), Syria.
Engr. Maurice Michel Hanna, graduated with Bachelor of Science in Petroleum Refining Engineering from Suez Canal University, Egypt and Master Degree in Petroleum Refining and Petrochemical Industry from Petroleum Institute of Romania, and he is a Certified Saudi Aramco Training Specialist.
About the Course Instructor