    Process Industries Data Handover Procedure

    M MechanicalCode Information Description LifecyclecodeFormatM01 Plot Plans Plan view of a area showing exact location of main items ofequipment.2 NativeM02 Equipment Location Plan Showing next level of etail from plot plan 2 NativeM0! "eneral #rrangement $imensional rawing inicating overall extremities of plant orequipment in plan% elevation or sectional view.2 NativeM0& 'essel $etail $rawing Sectional or exploe view rawing etailing mainfa(rication)assem(l* information + esign parameters,pressures% temperatures% manufacturing coe etc.-% materials%wall thicnesses% lining% internal fittings% test etails of ma/orprocess an utilit* vessels.2 NativeM0 'essel $esign alculations Prepare in orer to prove that the item of equipment ors*stem selecte meets the esign criteria.2 Native

    M0 ritical 3el Proceures 4equire for critical plant an equipment where non stanar,exotic- materials an methos are use i.e. vessel lining% sourservice. 5he proceures ma* not (e inustr* stanar orreail* availa(le thus resulting in significant costs ,forproceure evelopment)qualification an prouction loss- ifrepairs etc. require at short notice.! NativeM06 Stanar wel proceure 3el proceures not covere (* the a(ove ! NativeM07 Performance urves 5hese are charts etailing the esign performance envelopean limits for ma/or rotating machiner* + tur(ines%crane)auxiliar* iesels% compressors% transfer% fire an 38pumpsets.! NativeM09 #lignment Specifications Manufacturers recommene alignment reaings antolerances neee for re+coupling of ma/or rotating machiner*following overhaul.! Native

    M10 Start+up Logs for M)c:s 4unning logs taen on first start up)commissioning of ma/orrotating machiner*. ;f particular importance are running hoursfor scheuling overspee tests an initial oil changes.! NativeM11 onition Monitoring

  • 8/9/2019 Process Industries Data Handover Procedure 9

    2/2

    ! =ar op*M1 Lifting Equipment ertificate 8ssue (* competent thir part* inspector covering all porta(lean fixe lifting gear.! =ar op*