Process Improvement and CMMI Maturity Level 3: In the Ultra-Small
March 13, 2009
JFR Consulting 2
Feeling Ancient? Ancient Egyptians realized the
need for middle-management when they buried 401 shabtis with their royalty; 365 to perform daily tasks, and 36 to manage those 365. How many shabtis should be buried if there were only 10 days in a year?
This is the story of a 12 person company that achieved maturity level 3.
JFR Consulting 3
Table of Contents
The Organization (company) The Defined Process (OSP) The Appraisal
JFR Consulting 4
the Organization (Company) 1
Physically 12 person company Geographically disparate personnel Incorporated 20 October 2000 Based in Mesa, Arizona Software Systems engineering company
Specializing in software architectures Bleeding edge technologies
Target Domains Government Commercial
JFR Consulting 5
the Organization (Company) 2
Values Have fun Control our own time / control our own destiny Work with bleeding edge technologies Build good products from which others can
benefit Have fun Say what you’ll do, do what you say Make sure it makes sense Paid for every hour worked Insurance / Medical package 401k
JFR Consulting 6
the Organization (Company) 3
Cultural Results Communicative, intimate Transparency- standing communication events
and associated tools Social amplification- no time or opportunity for
hidden agendas manipulating the system or hiding out
As well, if you are not of an open and cooperative spirit, and not a top performer, you will never work for this company to begin with
JFR Consulting 7
Personnel conditions- keys to success Geographically distributed Working out of homes Primarily responsible for their own time Very limited face-to-face contact
Making Lemonade Personnel conditions detrimental to
success Geographically distributed Working out of homes Primarily responsible for their own time Very limited face-to-face contact
Lemons
Lemonade
JFR Consulting 8
Communication- Virtual Office Use of Bridgit and Skype key tools
Asynchronous – sending files over Skype. Also standard external and secure internal email.
Semi-Asynchronous – Skype chat, notes pop up on your screen, like someone popping by your office. Even men can multi-task. Can see when people are on or off-line.
Synchronous Skype VTC, used occasionally for 1 on 1 meetings Skype telecom, a teleconference used extensively With the addition of Bridgit (where participants can view the
discussion leader’s desktop, and do whiteboarding), you are virtually in the conference room during the discussion.
JFR Consulting 9
Extreme Tipping Point In typical organizations there can be various
levels of buy in, and still the entire organization is level 3.
In the ultra-small environment this is not possible. Either everyone is a liar, diluted, or actually doing it; there is no in between.
“try not; do, or do not, there is no try” - Yoda
JFR Consulting 10
“Because you have personality”
Little Rascals- Darla to Alfalfa GM and CTO set the
tone of open and frank
They are the process leads, trash pickup
Tasks well outside the job description The task of giving employees reasons to love
working for the company is taken seriously
JFR Consulting 11
Good Process Genes OR- “They cheated, they have good DNA”-
Process background of company principals Both are process wonks Both had significant roles in defining and
establishing software processes for a level 5 company
Both managed Quality Assurance/Design teams
Both are trained assessors (CMM / CMMI) Both participated in multiple assessments
(including Level 5)
JFR Consulting 12
Table of Contents
The Organization (company) The Defined Process (OSP) The Appraisal
JFR Consulting 13
OSP Approach Basic precepts
Maximize the work that can be accomplished by focusing people on the artifacts that need to be generated
Minimize the number of things that must be touched to perform an activity
The process is embedded in the templates, forms, and checklists
JFR Consulting 14
OSP Architecture
JFR Consulting 15
OSP Breakdown Policies
Provide the “authorization” 4 Manuals
Describe “what to do” Grouping of topics is based on the CMMI Builds on the millions invested in the SEI models
Handbooks Describe some of “what to do” Capture “how to do it”
Templates / forms / additional materials Provide the bulk of the “record” Facilitate execution (more of “how to do it”) Provide consistency and support deployment of
improvements Include instructions
JFR Consulting 16
Reviews: Milestone Milestone Reviews
Project Kick-off (PK) Software Requirements Review (SRR) System Design Review (SDR) Integration Readiness Review (IRR) System Test Readiness Review (STRR) Release Readiness Review (RRR) Post Mortem
Characteristics May overlap customer reviews (in addition to OR pre-
empt) SRR, SDR, and IRR are not gating, but must be
completed successfully to exit the phase STRR or RRR must completed successfully prior to
delivery
JFR Consulting 17
Reviews: Internal Most Engineering artifacts are reviewed
Requirements Use Cases DAR Vignettes Code Test Plan Test Cases Test report SVD
Activity record containing list of participants, review status, action items, decisions, and checklist
JFR Consulting 18
Checklists Highlight / ensure
Participation Preparation Compliance to key elements of applicable processes
Associated with… Reviews (Internal / Milestone)
Checklists customized to the artifact or activity Meetings
Senior Staff Program Management Reviews CCBs
JFR Consulting 19
Templates and Forms Majority of defined artifacts have
supporting templates, activities have associated templates or forms
Provide the bulk of the “record” Facilitate execution Provide consistency, support
deployment of improvements Normally contain guidance on how to
use them (limited training materials)
JFR Consulting 20
Table of Contents
The Organization (company) The Defined Process (OSP) The Appraisal
JFR Consulting 21
Institutionalization… … a moot point or instantaneous;
you be the judge The GM only allows process changes that are
common sense and truly help his company perform.
As such process updates are instantaneous, why wouldn’t the company want to adopt them?
Example: the GM agreed to a priority column for the risk list template; it was drafted, reviewed, updated, rolled out, and adopted by projects in one week.
JFR Consulting 22
Quandary Becomes Reality This small, intimate setting poses some
challenges for some appraisal guidance topics. One of which is that no superior-subordinate
relationships can exists in the appraisal room within the team and during interviews.
This simply cannot be achieved; the appraisal team consisted of the lead, a process consultant, the GM and CTO (who are the process principals).
The QA lead/lead SE took care of the sponsor role, there are simply no other choices.
JFR Consulting 23
Interesting Process Math
GP 2.3 = GP 3.1 FlySpray (CM tool) Manual describes the CM tool which
also contains some process definition.
OSP=PDP=GP 2.2 The organization’s standard process is the project’s
defined process, which also constitutes some of the planned activities that all projects must follow.
GP 2.8 = GP 2.10 The weekly senior staff meeting includes detailed
project status, it is a working meeting, not just a reporting meeting.
JFR Consulting 24
Interesting Appraisal Algebra
Transitive Property of Equality
The following property: If a = b and b = c, then a = c.
Applying this property to services appraisals:
If CMMI = Manuals/Templates/Handbooks
and Manuals/Templates/Handbooks = Project Activities
then CMMI = Project Activities
JFR Consulting 25
Interesting Appraisal Algebra
Interview PA TopicAll GP2.5 all Training ReceivedI&T TS SP2 - SVD for both projectsI&T VER Project Test PlanI&T VER Review Handbook (Milestone ~ IRR, STRR, RRR)I&T VER PI Project Test Case ResultsI&T VER Project Test ReportI&T PI Project IRR checklistI&T PI Make files and Installer filesPL CM GP2.6 PP Project Data PlanPL RskM Project Risk List
PL PP VER GP2.8 PMC IPM Project Schedules
JFR Consulting 26