PROCEDURE FOR OBTAINING CTE/CTO(A/W)/HWM/BMW …s Information Corner/proc_user... · khewat...

29
1 PROCEDURE FOR OBTAINING CTE/CTO(A/W)/HWM/BMW THROUGH OCMMS 1. The user has to register itself in the OCMMS Portal (if, first time) otherwise user logs into the system and applies for CTE/CTO(A/W)/HWM/BMW application. The detailed procedure is available in the OCMMS User Manual for Entrepreneurs. 2. Once the application is submitted (alongwith requisite documents and adequate fee) the application is received in the account of the receiving officer, i.e Environemental Engineer of the concerned Regional Office, in whose jurisdiction, the industry falls. 3. The application is then forwarded to the concerned Assistant Environmental Engineer(AEE) of the area for scrutiny. 4. The AEE scrutinizes the application and if found incomplete, the application is returned to the industry with reason and the industry has to apply again. 5. If the application is complete in all respects, the AEE completes the scrutiny and submits the application to Environmental Engineer, for further orders. 6. The Environmental Engineer may raise inspection to AEE for visiting the industry, according to the need, as the case may be. 7. The AEE/JEE of the office visit/ inspect the industry , as per the requirement and the inspection report is prepared for the visit. 8. The report is then uploaded on the portal within 48 hours, and the same is also visible to the industry and inspection is closed. 9. The concerned officer then forwards the application to EE with recommendations which is forwarded to SEE, CEE, , Member Secretary, Chairman as per the competency for deciding the application. 10. Any clarifications if required, are raised , and may be asked to the industry for reply of the same within stipulated time. 11. In case of violation, Show cause notice with or without the opportunity of personal hearing may be issued to the industry for submitting the reply and/or attending the hearing. 12. After the decision of the competent authority for approval / refusal, the application is forwarded to the concerned officer for issuing the certificate. 13. The officer then prepares the certificate for approval / refusal (according to the decision of the competent authority) and closes the application. 14. Once the application is closed, the copy of the generated certificate is available in the account of the industry which can be downloaded.

Transcript of PROCEDURE FOR OBTAINING CTE/CTO(A/W)/HWM/BMW …s Information Corner/proc_user... · khewat...

Page 1: PROCEDURE FOR OBTAINING CTE/CTO(A/W)/HWM/BMW …s Information Corner/proc_user... · khewat /khatauni number and Khasra numbers. Or c. Certificate of Revenue Authorities (DC/ADC/SDM)

1

PROCEDURE FOR OBTAINING CTE/CTO(A/W)/HWM/BMW THROUGH OCMMS

1. The user has to register itself in the OCMMS Portal (if, first time) otherwise user logs into the

system and applies for CTE/CTO(A/W)/HWM/BMW application. The detailed procedure is available

in the OCMMS User Manual for Entrepreneurs.

2. Once the application is submitted (alongwith requisite documents and adequate fee) the application

is received in the account of the receiving officer, i.e Environemental Engineer of the concerned

Regional Office, in whose jurisdiction, the industry falls.

3. The application is then forwarded to the concerned Assistant Environmental Engineer(AEE) of the

area for scrutiny.

4. The AEE scrutinizes the application and if found incomplete, the application is returned to the

industry with reason and the industry has to apply again.

5. If the application is complete in all respects, the AEE completes the scrutiny and submits the

application to Environmental Engineer, for further orders.

6. The Environmental Engineer may raise inspection to AEE for visiting the industry, according to the

need, as the case may be.

7. The AEE/JEE of the office visit/ inspect the industry , as per the requirement and the inspection

report is prepared for the visit.

8. The report is then uploaded on the portal within 48 hours, and the same is also visible to the

industry and inspection is closed.

9. The concerned officer then forwards the application to EE with recommendations which is

forwarded to SEE, CEE, , Member Secretary, Chairman as per the competency for deciding the

application.

10. Any clarifications if required, are raised , and may be asked to the industry for reply of the same

within stipulated time.

11. In case of violation, Show cause notice with or without the opportunity of personal hearing may be

issued to the industry for submitting the reply and/or attending the hearing.

12. After the decision of the competent authority for approval / refusal, the application is forwarded to

the concerned officer for issuing the certificate.

13. The officer then prepares the certificate for approval / refusal (according to the decision of the

competent authority) and closes the application.

14. Once the application is closed, the copy of the generated certificate is available in the account of

the industry which can be downloaded.

Page 2: PROCEDURE FOR OBTAINING CTE/CTO(A/W)/HWM/BMW …s Information Corner/proc_user... · khewat /khatauni number and Khasra numbers. Or c. Certificate of Revenue Authorities (DC/ADC/SDM)

Industry registered itself & then apply for CTO/CTE/HWM Application

Application received in EE ,RO Login. EE ,RO forwards the application to AEE for Scrutiny

AEE will scrutinize the application

AEE will submit to EE, Regional Office after scrutiny complete

EE, Regional Office raise inspection to AEE to visit the industry and put up agenda note

After visit AEE put up agenda note and forwarded it to EE, RO with recommendation

If application is Complete

YES

NO

Re

turn

to

Ind

ustry

FLOW CHART FOR ONLINE APPLICATION PROCESSING

EE, RO

Forwards to AEE to clarify certain observations or further raise clarification

AEE clarifies the observations & forwards to EE, RO for approval

After approval / refusal by EE, Regional Office,

application forwarded to AEE, Regional Office for issue of certificate

AEE generate certificate for grant/ refusal and application is closed and saved in the completed applications of EE, RO. A

copy of certificate is sent to industry login.

EE, RO raise clarification to industry

SEE, ZO

Re

turn

to In

du

stry

EE will raise clarification / SCN to industry to reply within specific

no. of days

EE to process application/ prepare certificate(grant/refusal) and close after approval / refusalas the case may be. And application is closed andsaved in the completed applications of SEE / AEElogin. A copy of certificate is sent to industry login.

Forwards to EE, RO to clarify certain observations

Recommendation for grant/ refusal for approval

Granted / Refusal / Consent /NOC Application forward to EE,ZO

EE, ZO can return the application to the industry due to specific

reasons.

Return to Industry Return to RO

Forward to EE Forward to CEE

After approval / refusal forward to SEE for process

Certificate saved in Industry login

Ce

rtificate saved

in In

du

stry login

AEE/JEE publish Inspection report to industry with in 48 hours & close inspection

Page 3: PROCEDURE FOR OBTAINING CTE/CTO(A/W)/HWM/BMW …s Information Corner/proc_user... · khewat /khatauni number and Khasra numbers. Or c. Certificate of Revenue Authorities (DC/ADC/SDM)

Documents required for Consent To Establish (NOC) Application for Consent to establish (NOC) for Red/Orange Category – Fresh Case

1. Site Plan/Location Plan of the industry. 2. Partnership Deed/Memorandum of Article of Association /Proprietorship certificate/

Resolution of Board of Director/ partners regarding authorized signatory. 3. Land documents such as Registration deed/ Jamabandi/ Rent deed/ lease deed

indicating details of the property. 4. Any one of the following documents regarding designation of area/compliance of

specific guidelines a. Allotment letter of the Designated Authority, if the site of the project is located

in the designated Industrial Area/ Industrial Estate/ Focal Point. Or

b. Undertaking to the effect that the proposed site of the project / industry is located in the designated Industrial zone/ area of the notified/ draft Master Plan in which the establishment of such industry/ project is permissible. The undertaking shall clearly indicate the revenue entries I.e. Hadbast Number, khewat /khatauni number and Khasra numbers.

Or

c. Certificate of Revenue Authorities (DC/ADC/SDM) indicating the distance of proposed site of industry from the MC Iimits/Phirni / Lallakir of the nearest village, in case, the industry is to be established at a site other than the site in the industrial area / industrial estate /industrial zone of the draft master plan / industrial zone of the notified master plan.

Or

d. For industry specific guidelines, certificates/ documents as mentioned in the

said guidelines (In case of Rice Sheller/Saila Plant/Stone Crusher/Brick Kiln/Hot Mix plant/Cement Grinding units etc.)

5. Brief Project Report with Manufacturing Process Flow sheet . 6. Compliance report of pervious consent to operate condition in annotated form (in

case of modernization/expansion only)

Note: Application shall be accompanied by NOC Fee as per total project cost. Application for Consent to establish (NOC) for Green Category - Fresh Case

1. Site Plan/Location Plan of the industry.

2. Partnership Deed/Memorandum of Article of Association /Proprietorship certificate/ Resolution of Board of Director/ partners regarding authorized signatory.

3. Land documents such as Registration deed/ Jamabandi/ Rent deed/ lease deed indicating details of the property.

Page 4: PROCEDURE FOR OBTAINING CTE/CTO(A/W)/HWM/BMW …s Information Corner/proc_user... · khewat /khatauni number and Khasra numbers. Or c. Certificate of Revenue Authorities (DC/ADC/SDM)

4. Documents regarding designation of area/compliance of specific guidelines (Any one of the following:

a. Allotment letter of the Designated Authority, if the site of the project is located in the designated Industrial Area/ Industrial Estate/ Focal Point.

Or

b. Undertaking to the effect that the proposed site of the project / industry is located in the designated Industrial zone/ area of the notified/ draft Master Plan in which the establishment of such industry/ project is permissible. The undertaking shall clearly indicate the revenue entries I.e. Hadbast Number, khewat /khatauni number and Khasra numbers.

Or

c. Certificate of Revenue Authorities (DC/ADC/SDM) indicating the distance of proposed site of industry from the MC Limits/Phirni / Lallakir of the nearest village, in case, the industry is to be established at a site other than the site in the industrial area / industrial estate /industrial zone of the draft master plan / industrial zone of the notified master plan.

5. Brief Project Report with Manufacturing Process Flow sheet. 6. Compliance report of pervious consent to operate condition in annotated form (in

case of modernization/expansion only)

Note: Application shall be accompanied by NOC Fee as per total project cost. Application for Extension in validity of Consent to Establish (NOC) for Red/Orange/Green Category.

1. Request letter giving the reason for non-completion of project in stipulated time along with the status of installation of plant and machinery/pollution control devices.

Note:

1. Application shall be accompanied by 50% of NOC Fee per year as per total project cost

2. In case the NOC was not granted online, you requested to submit a copy NOC granted, copy of Project Report and Feasibility Report submitted at the time of obtaining NOC.

Page 5: PROCEDURE FOR OBTAINING CTE/CTO(A/W)/HWM/BMW …s Information Corner/proc_user... · khewat /khatauni number and Khasra numbers. Or c. Certificate of Revenue Authorities (DC/ADC/SDM)

PUNJAB POLLUTION CONTROL BOARD

Vatavaran Bhawan, Nabha Road, Patiala, 147001

ONLINE CONSENT MANAGEMENT AND MONITORING SYSTEM

(Application for Consent to Establish)

USER MANUAL

PUNJAB POLLUTION CONTROL BOARD Vatavaran Bhawan, Nabha Road, Patiala- 147001

Page 6: PROCEDURE FOR OBTAINING CTE/CTO(A/W)/HWM/BMW …s Information Corner/proc_user... · khewat /khatauni number and Khasra numbers. Or c. Certificate of Revenue Authorities (DC/ADC/SDM)

PUNJAB POLLUTION CONTROL BOARD

Vatavaran Bhawan, Nabha Road, Patiala, 147001

APPLICATION PROCESS FOR CONSENT TO ESTABLISH

1. Visit the website of the Board, www.ppcb.gov.in and click on Online Consent

Management and Monitoring System under the E-Governance Projects Tab.

Page 7: PROCEDURE FOR OBTAINING CTE/CTO(A/W)/HWM/BMW …s Information Corner/proc_user... · khewat /khatauni number and Khasra numbers. Or c. Certificate of Revenue Authorities (DC/ADC/SDM)

PUNJAB POLLUTION CONTROL BOARD

Vatavaran Bhawan, Nabha Road, Patiala, 147001

2. If you are a new user,

(i). Click on New Industry Registration.

(ii). Choose the Industry Industry type (Industry / HCF / Local body)

(iii). Enter the Industry Details, Occupier Details.

(iv). Click on Save

Page 8: PROCEDURE FOR OBTAINING CTE/CTO(A/W)/HWM/BMW …s Information Corner/proc_user... · khewat /khatauni number and Khasra numbers. Or c. Certificate of Revenue Authorities (DC/ADC/SDM)

PUNJAB POLLUTION CONTROL BOARD

Vatavaran Bhawan, Nabha Road, Patiala, 147001

(v). A new Login ID and Password would be generated (This would be required to be

changed on first login)

(vi). Continue to Homepage and Login with the generated User ID and Password.

Page 9: PROCEDURE FOR OBTAINING CTE/CTO(A/W)/HWM/BMW …s Information Corner/proc_user... · khewat /khatauni number and Khasra numbers. Or c. Certificate of Revenue Authorities (DC/ADC/SDM)

PUNJAB POLLUTION CONTROL BOARD

Vatavaran Bhawan, Nabha Road, Patiala, 147001

3. If you are an existing user,

(i). Check the Industry / HCE / Local Body checkbox.

(ii). Enter the UserID, Password and Captcha.

(iii). Click on Login Button.

4. After Logging in:

(i). Click on Consent Management Tab.

(ii). In the left navigation menu, click on Apply for Consent.

Page 10: PROCEDURE FOR OBTAINING CTE/CTO(A/W)/HWM/BMW …s Information Corner/proc_user... · khewat /khatauni number and Khasra numbers. Or c. Certificate of Revenue Authorities (DC/ADC/SDM)

PUNJAB POLLUTION CONTROL BOARD

Vatavaran Bhawan, Nabha Road, Patiala, 147001

Screen Shot: Consent Management Window

5. Select the following:

(i). Consent Type as CTE.

(ii). Consent For as Fresh / Renew / Modernization / Expansion depending upon the

requirement of the project.

6. A pop-up window of the list of documents required for the application process would be

open. Read the document list carefully and be prepared with the said documents before

proceeding. Click on Next Button.

Page 11: PROCEDURE FOR OBTAINING CTE/CTO(A/W)/HWM/BMW …s Information Corner/proc_user... · khewat /khatauni number and Khasra numbers. Or c. Certificate of Revenue Authorities (DC/ADC/SDM)

PUNJAB POLLUTION CONTROL BOARD

Vatavaran Bhawan, Nabha Road, Patiala, 147001

7. Fill the preliminary information of the project:

(i). Details of the project.

(ii). Attach the requisite documents

(iii). Click on next button to go to the next step.

8. Fill the Primary Details of the project as follows:

(i). Industry Details

Page 12: PROCEDURE FOR OBTAINING CTE/CTO(A/W)/HWM/BMW …s Information Corner/proc_user... · khewat /khatauni number and Khasra numbers. Or c. Certificate of Revenue Authorities (DC/ADC/SDM)

PUNJAB POLLUTION CONTROL BOARD

Vatavaran Bhawan, Nabha Road, Patiala, 147001

(ii). Occupier Details

(iii). Other Details.

Page 13: PROCEDURE FOR OBTAINING CTE/CTO(A/W)/HWM/BMW …s Information Corner/proc_user... · khewat /khatauni number and Khasra numbers. Or c. Certificate of Revenue Authorities (DC/ADC/SDM)

PUNJAB POLLUTION CONTROL BOARD

Vatavaran Bhawan, Nabha Road, Patiala, 147001

(iv). Product/Power Details.

Page 14: PROCEDURE FOR OBTAINING CTE/CTO(A/W)/HWM/BMW …s Information Corner/proc_user... · khewat /khatauni number and Khasra numbers. Or c. Certificate of Revenue Authorities (DC/ADC/SDM)

PUNJAB POLLUTION CONTROL BOARD

Vatavaran Bhawan, Nabha Road, Patiala, 147001

(v). Air Emission Details.

Page 15: PROCEDURE FOR OBTAINING CTE/CTO(A/W)/HWM/BMW …s Information Corner/proc_user... · khewat /khatauni number and Khasra numbers. Or c. Certificate of Revenue Authorities (DC/ADC/SDM)

PUNJAB POLLUTION CONTROL BOARD

Vatavaran Bhawan, Nabha Road, Patiala, 147001

(vi). Water Consumption / Discharge Details.

Page 16: PROCEDURE FOR OBTAINING CTE/CTO(A/W)/HWM/BMW …s Information Corner/proc_user... · khewat /khatauni number and Khasra numbers. Or c. Certificate of Revenue Authorities (DC/ADC/SDM)

PUNJAB POLLUTION CONTROL BOARD

Vatavaran Bhawan, Nabha Road, Patiala, 147001

Page 17: PROCEDURE FOR OBTAINING CTE/CTO(A/W)/HWM/BMW …s Information Corner/proc_user... · khewat /khatauni number and Khasra numbers. Or c. Certificate of Revenue Authorities (DC/ADC/SDM)

PUNJAB POLLUTION CONTROL BOARD

Vatavaran Bhawan, Nabha Road, Patiala, 147001

(vii). Hazardous waste Details.

(viii). Attach Documents.

Page 18: PROCEDURE FOR OBTAINING CTE/CTO(A/W)/HWM/BMW …s Information Corner/proc_user... · khewat /khatauni number and Khasra numbers. Or c. Certificate of Revenue Authorities (DC/ADC/SDM)

PUNJAB POLLUTION CONTROL BOARD

Vatavaran Bhawan, Nabha Road, Patiala, 147001

9. Complete the Payment for the application by following payment modes :

(i). Online Payment through:

i. Credit/Debit Card

Select the Payment Mode

Select the Payment Type

Select your Bank

Page 19: PROCEDURE FOR OBTAINING CTE/CTO(A/W)/HWM/BMW …s Information Corner/proc_user... · khewat /khatauni number and Khasra numbers. Or c. Certificate of Revenue Authorities (DC/ADC/SDM)

PUNJAB POLLUTION CONTROL BOARD

Vatavaran Bhawan, Nabha Road, Patiala, 147001

Select your Card

Enter the Card Details

After the Entering the card details and click on Pay NOW Button,

Page 20: PROCEDURE FOR OBTAINING CTE/CTO(A/W)/HWM/BMW …s Information Corner/proc_user... · khewat /khatauni number and Khasra numbers. Or c. Certificate of Revenue Authorities (DC/ADC/SDM)

PUNJAB POLLUTION CONTROL BOARD

Vatavaran Bhawan, Nabha Road, Patiala, 147001

a confirmation page will be Popup

Enter the Passward Security Details

After the Successful Payment Dedution Onlion Payment Recipt will be generated, then click on Process Button, Application would be submitted.

Page 21: PROCEDURE FOR OBTAINING CTE/CTO(A/W)/HWM/BMW …s Information Corner/proc_user... · khewat /khatauni number and Khasra numbers. Or c. Certificate of Revenue Authorities (DC/ADC/SDM)

PUNJAB POLLUTION CONTROL BOARD

Vatavaran Bhawan, Nabha Road, Patiala, 147001

After the submission of application following message will be display to the industry.

ii. NEFT/RTGS

For Payment select the Fee tab, entry the fee details

Select the Payment Mode

Page 22: PROCEDURE FOR OBTAINING CTE/CTO(A/W)/HWM/BMW …s Information Corner/proc_user... · khewat /khatauni number and Khasra numbers. Or c. Certificate of Revenue Authorities (DC/ADC/SDM)

PUNJAB POLLUTION CONTROL BOARD

Vatavaran Bhawan, Nabha Road, Patiala, 147001

Select the Payment Type

After selecting the NEFT /RTGS, List of multiple Bank would be displayed, then select your bank and add as beneficiary with the following details

After the T+1 day verify your transaction details, Click on Online Payment Verification, Enter the application No.

Page 23: PROCEDURE FOR OBTAINING CTE/CTO(A/W)/HWM/BMW …s Information Corner/proc_user... · khewat /khatauni number and Khasra numbers. Or c. Certificate of Revenue Authorities (DC/ADC/SDM)

PUNJAB POLLUTION CONTROL BOARD

Vatavaran Bhawan, Nabha Road, Patiala, 147001

Enter the following details :- UTR No. / Reference No. & following details, then click on verify Button

After the Successful payment the verification, Online Payment Receipt would be generated and application would be submitted

After the submission of application following message will be display to the industry.

Page 24: PROCEDURE FOR OBTAINING CTE/CTO(A/W)/HWM/BMW …s Information Corner/proc_user... · khewat /khatauni number and Khasra numbers. Or c. Certificate of Revenue Authorities (DC/ADC/SDM)

PUNJAB POLLUTION CONTROL BOARD

Vatavaran Bhawan, Nabha Road, Patiala, 147001

iii. Net Banking through Multiple Banks Gateway

Select the Payment Mode

Select your Bank & Enter the Bank details

Page 25: PROCEDURE FOR OBTAINING CTE/CTO(A/W)/HWM/BMW …s Information Corner/proc_user... · khewat /khatauni number and Khasra numbers. Or c. Certificate of Revenue Authorities (DC/ADC/SDM)

PUNJAB POLLUTION CONTROL BOARD

Vatavaran Bhawan, Nabha Road, Patiala, 147001

After the Succeeful Payment Dedution Onlion Payment Recipt will be generated, then click on Process Button, Application would be submitted.

After the submission of application following message will be display to the industry.

Page 26: PROCEDURE FOR OBTAINING CTE/CTO(A/W)/HWM/BMW …s Information Corner/proc_user... · khewat /khatauni number and Khasra numbers. Or c. Certificate of Revenue Authorities (DC/ADC/SDM)

PUNJAB POLLUTION CONTROL BOARD

Vatavaran Bhawan, Nabha Road, Patiala, 147001

iv. Net Banking through PNB Gateway

Select the Payment Mode

Page 27: PROCEDURE FOR OBTAINING CTE/CTO(A/W)/HWM/BMW …s Information Corner/proc_user... · khewat /khatauni number and Khasra numbers. Or c. Certificate of Revenue Authorities (DC/ADC/SDM)

PUNJAB POLLUTION CONTROL BOARD

Vatavaran Bhawan, Nabha Road, Patiala, 147001

After the Succeeful Payment Dedution Onlion Payment Recipt will be generated, then click on Process Button, Application would be submitted.

After the submission of application following message will be display to the industry.

Page 28: PROCEDURE FOR OBTAINING CTE/CTO(A/W)/HWM/BMW …s Information Corner/proc_user... · khewat /khatauni number and Khasra numbers. Or c. Certificate of Revenue Authorities (DC/ADC/SDM)

PUNJAB POLLUTION CONTROL BOARD

Vatavaran Bhawan, Nabha Road, Patiala, 147001

(ii). Offline Payment using Demand Draft / Cheque

Select Payment mode Offiline

Add the Bank Details and attached the scan copy of DD/Cheque

After the Succeeful Payment Dedution Onlion Payment Recipt will be generated, then click on Process Button,

Application would be submitted.

Page 29: PROCEDURE FOR OBTAINING CTE/CTO(A/W)/HWM/BMW …s Information Corner/proc_user... · khewat /khatauni number and Khasra numbers. Or c. Certificate of Revenue Authorities (DC/ADC/SDM)

PUNJAB POLLUTION CONTROL BOARD

Vatavaran Bhawan, Nabha Road, Patiala, 147001

9. The Status of the submitted application would be shown in the completed tab.