Problems and issues encountered on river restoration projects – a consultants view

13
Sally German, Senior Fluvial Geomorphologist, Arup Problems and issues encountered on river restoration projects – a consultants view

description

Problems and issues encountered on river restoration projects – a consultants view. Sally German, Senior Fluvial Geomorphologist, Arup. Appreciation of the need for detailed information. - PowerPoint PPT Presentation

Transcript of Problems and issues encountered on river restoration projects – a consultants view

Page 1: Problems and issues encountered on river restoration projects – a consultants view

Sally German, Senior Fluvial Geomorphologist, Arup

Problems and issues encountered on river restoration projects – a consultants view

Page 2: Problems and issues encountered on river restoration projects – a consultants view

2

Appreciation of the need for detailed information

The level of detailed information needed to develop a comprehensive design is often under estimated by the client – esp in the early stages of the project - therefore little budget to undertake geomorphological surveys/investigations to provide robust case for design parameters

Page 3: Problems and issues encountered on river restoration projects – a consultants view

3

Translation of concept to construction drawing

Difficult to present complex and diverse features in a ‘proper’ engineering drawing (and contractors not experienced in undertaking this type of work) – often results in the need for a high level of specialised on-site supervision

Page 4: Problems and issues encountered on river restoration projects – a consultants view

4

Engineering design issues

Disparities between designing features geomorphological vs engineering

Bed material – scour calcs to cope with 1in200yr flows vs ‘typical bed material’ or sediment size determined using sed transport rates

Bank slopes – natural slopes vs geotechnical stability Structures in the channel – appropriate size vs

engineering robustness (i.e. ability to withstand extreme conditions to ensure life of feature and reduce risk to flooding d/s if dislodged)

Page 5: Problems and issues encountered on river restoration projects – a consultants view

5

Acceptance of natural processes occurring

Sediment accumulation and erosion – acceptance (by client) that these processes may occur

Page 6: Problems and issues encountered on river restoration projects – a consultants view

6

Constraints on design

Issues relating to physical constraints – laterally due to development on the bank or the presence of a structure – design needed to manage this if risk considered high

Page 7: Problems and issues encountered on river restoration projects – a consultants view

7

Contractors – in the ground

Getting contractors to be more ‘natural’ with excavations – i.e not getting everything flat/level

Getting contractors to understand the importance of relative levels of the long profile – not just the cross-section – are v important – hard bed needs to be right

Page 8: Problems and issues encountered on river restoration projects – a consultants view

8

Tregaron - before

Page 9: Problems and issues encountered on river restoration projects – a consultants view

9

Tregaron - during

Page 10: Problems and issues encountered on river restoration projects – a consultants view

10

Tregaron - after

Page 11: Problems and issues encountered on river restoration projects – a consultants view

11

Beam Parklands - before

Page 12: Problems and issues encountered on river restoration projects – a consultants view

12

Beam Parkland - during

Page 13: Problems and issues encountered on river restoration projects – a consultants view

13

Beam Parkland - after