PRINCE OF WALES...PRINCE OF WALES APPROVED DESIGN CODE TRANSFORMING. REGENERATING. REVITALISING....

9
TRANSFORMING. REGENERATING. REVITALISING. PRINCE OF WALES DETAILS OF THE PLANS WHICH WERE SHOWN AT THE RESIDENTS LIASION MEETING HELD ON MONDAY 18TH SEPTEMBER AT ST GILES CHURCH, PONTEFRACT

Transcript of PRINCE OF WALES...PRINCE OF WALES APPROVED DESIGN CODE TRANSFORMING. REGENERATING. REVITALISING....

Page 1: PRINCE OF WALES...PRINCE OF WALES APPROVED DESIGN CODE TRANSFORMING. REGENERATING. REVITALISING. Entrance Layout Approved Design Code (November 2014) A Design Code was agreed with

TRANSFORMING. REGENERATING. REVITALISING.

PRINCE OF WALES

DETAILS OF THE PLANS WHICH WERE SHOWN AT THE RESIDENTS LIASION MEETING HELD ON MONDAY 18TH SEPTEMBER AT ST GILES

CHURCH, PONTEFRACT

Page 2: PRINCE OF WALES...PRINCE OF WALES APPROVED DESIGN CODE TRANSFORMING. REGENERATING. REVITALISING. Entrance Layout Approved Design Code (November 2014) A Design Code was agreed with

PRINCE OF WALES ORIGINAL CONSENT & MASTERPLAN (2013)

TRANSFORMING. REGENERATING. REVITALISING.

The scheme was granted outline planning permission for mixed-use development. This approval

was for the following elements:

RESIDENTIAL DEVELOPMENT

EMPLOYMENT / COMMERCIAL

COMMUNITY

RETAIL

Consented Masterplan - December 2013

A medical centre (D1)

A community centre (D1)

A new road, access roads, a linear park,

footpaths, public squares and public open

spaces, car parking, landscaping and

associated works

917 residential units (use class C3)

21,583 sq metres of employment (B1)

2,474 square metres of retail, restaurants

cafés and drinking establishments

10 live-work units (sui generis)

Page 3: PRINCE OF WALES...PRINCE OF WALES APPROVED DESIGN CODE TRANSFORMING. REGENERATING. REVITALISING. Entrance Layout Approved Design Code (November 2014) A Design Code was agreed with

PRINCE OF WALES APPROVED DESIGN CODE

TRANSFORMING. REGENERATING. REVITALISING.

Entrance Layout Approved Design Code (November 2014)

A Design Code was agreed with Wakefield Council in 2014 to ensure quality of development

throughout. As part of this, a green/urban square was introduced with commercial uses to frame

a square.

Significant engagement through workshops took place with a Design Panel to review the Design

Code. A community engagement event also took place in September 2014 at Pontefract Town

Hall with the public generally supportive of the proposed Design Code.

The Design Code was finally approved on 7th November 2014 which included the plans on this

and the following two boards. Residents should note that these are outline plans and that any

future detailed plans will be the subject of further consultation.

Page 4: PRINCE OF WALES...PRINCE OF WALES APPROVED DESIGN CODE TRANSFORMING. REGENERATING. REVITALISING. Entrance Layout Approved Design Code (November 2014) A Design Code was agreed with

TRANSFORMING. REGENERATING. REVITALISING.

PRINCE OF WALES APPROVED DESIGN CODE

Green/urban Square Approved Design Code (November 2014)

Design Strategy - Entrance Approved Design Code (November 2014)

Instead of general employment units

(known as B1 uses) fronting onto the site

entrance as outlined in the original

masterplan, an urban green square with

retail and live-work units were proposed

at the Park Road entrance as it was

considered to be suitable in terms of

location, good access and compatibility

with phasing.

As well as including built development in

the form of retail and live-work units, the

suggestion for the Park Road entrance

included a green/urban Square.

Page 5: PRINCE OF WALES...PRINCE OF WALES APPROVED DESIGN CODE TRANSFORMING. REGENERATING. REVITALISING. Entrance Layout Approved Design Code (November 2014) A Design Code was agreed with

Forming part of the approved Design Code was an updated masterplan, which reflected the

movement of community facilities and the introduction of a green/urban square surrounded by

the retail and live-work units.

This masterplan was approved by Wakefield Council in November 2014 and has guided all

on-site development since that time.

Current Masterplan (Approved November 2014)

PRINCE OF WALES CURRENT MASTERPLAN

TRANSFORMING. REGENERATING. REVITALISING.

Page 6: PRINCE OF WALES...PRINCE OF WALES APPROVED DESIGN CODE TRANSFORMING. REGENERATING. REVITALISING. Entrance Layout Approved Design Code (November 2014) A Design Code was agreed with

175 homes have been built by

Avant Homes and Harron Homes.

Another 140 will be built in the next

two years as part of the current

phases being brought forward.

Signalised junction and entrance

off Park Road installed.

New Pontefract East link road

delivered on-site of former spoil

heap, with improvements to

Skinner Lane due to commence.

New Cycleway/Greenway being

constructed.

TRANSFORMING. REGENERATING. REVITALISING.

PRINCE OF WALES PROGRESS SINCE 2014

Aerial Photograph - January 2014

Aerial Photograph - May 2017

175 homes now

built

400 residents moved in

Greenway under con-struction

Page 7: PRINCE OF WALES...PRINCE OF WALES APPROVED DESIGN CODE TRANSFORMING. REGENERATING. REVITALISING. Entrance Layout Approved Design Code (November 2014) A Design Code was agreed with

TRANSFORMING. REGENERATING. REVITALISING.

PRINCE OF WALES WORK ON-SITE NOW

Construction of new

Cycleway and Greenway

due to complete in Spring

2018.

New entrance feature to be

installed off Park Road.

We are also temporarily

greening a section of public

open space in the centre of

the site, ready to be used

from Spring 2018.

The Greenway

Entrance Wall Feature

Page 8: PRINCE OF WALES...PRINCE OF WALES APPROVED DESIGN CODE TRANSFORMING. REGENERATING. REVITALISING. Entrance Layout Approved Design Code (November 2014) A Design Code was agreed with

TRANSFORMING. REGENERATING. REVITALISING.

PRINCE OF WALES WHAT WE’RE PROPOSING NEXT

2017

Continue construction of Greenway.

Seeding of public open space at the centre of the site (for temporary use ahead of final

design).

Commence Skinner Lane road improvements.

Proposed masterplan to be consulted on and revised following feedback, prior to being

Proposed new masterplan

RESIDENTIAL DEVELOPMENT COMMUNITY USE COMMUNITY USE KEY:

Page 9: PRINCE OF WALES...PRINCE OF WALES APPROVED DESIGN CODE TRANSFORMING. REGENERATING. REVITALISING. Entrance Layout Approved Design Code (November 2014) A Design Code was agreed with

TRANSFORMING. REGENERATING. REVITALISING.

PRINCE OF WALES WHAT WE’RE PROPOSING NEXT

Residential Phasing Plan

2018

Public consultation on proposals for what will become the urban green square and central

open space.

Further phase of housebuilding to begin off Skinner Lane (Phase 3), subject to planning.

Further phase of housebuilding to begin behind the retail park (Phase 6), subject to planning.

Enhancement of Tanshelf Walk and Colonels Walk to improve site accessibility.

Discussions with local stakeholders on location of local centre prior to plans being worked up.