Getting Started in P3:Basic Tips and Techniques
Beverley M. Sheafer
Assistant Professor, CSUS
-
8/2/2019 Primevera Kitap 6
2/52
Sheafer / 2
Getting Started in P3: Basic Tips & Techniques
WELCOMELadies and Gentlemen
-
8/2/2019 Primevera Kitap 6
3/52
Sheafer / 3
Getting Started in P3: Basic Tips & Techniques
Focus of Presentation
To give the occasional user or beginningscheduler a higher comfort level with the P3
software. To teach those basic skills needed to start using
Primavera Project Planner for scheduling
projects. To teach the tips and tricks to using the P3
software most effectively.
-
8/2/2019 Primevera Kitap 6
4/52
Sheafer / 4
Getting Started in P3: Basic Tips & Techniques
Aspects to be addressed
1. Capturing the overall project scope of work
2. Defining the Activity Codes structure
3. Establishing the Cost Accounts Codes structure
4. Defining the Resources
5. Establishing the Calendar ID structure6. Creating activities and their relationships
7. Organizing activities
-
8/2/2019 Primevera Kitap 6
5/52
Sheafer / 5
Getting Started in P3: Basic Tips & Techniques
1. Capturing the overall project scope of work
1.1 Using the Contract
1.1.1 Instructions to Bidders
1.1.2 The Agreement (Contract Terms and Conditions)
1.1.3 Project Schedule Requirements
1.1.4 Special Provisions
-
8/2/2019 Primevera Kitap 6
6/52
Sheafer / 6
Getting Started in P3: Basic Tips & Techniques
1. Capturing the overall project scope of work
Figure 1.1.1: Instruction to Bidders
A Project description shall be provided, which illustrates thefunctional characteristics and particular features of the design,through text and drawings, in at least the detail indicated, foreach of the Project elements below.
The Bidder shall provide a plan, which addresses how the final
design and engineering, permitting, interface management,commissioning and testing will be completed within theconstraints of the Project Schedule, while maintaining the railroadoperation.
-
8/2/2019 Primevera Kitap 6
7/52
Sheafer / 7
Getting Started in P3: Basic Tips & Techniques
1. Capturing the overall project scope of work
Figure 1.1.2: The Agreement
The Projects scope of Work includes the design and constructionof a new twin-track high-level fixed bridge over the South Fork ofthe New River, positioned within the existing right-of-way andapproximately 1.7 miles of new twin-track alignment.
-
8/2/2019 Primevera Kitap 6
8/52
Sheafer / 8
Getting Started in P3: Basic Tips & Techniques
1. Capturing the overall project scope of work
Figure 1.1.3: Project Schedule Requirements
The Contractor shall at its own expense prepare, maintain andupdate detailed Project Schedules for the review and acceptanceof (The Owner), all as described in this Section 5. The ProjectSchedules shall be prepared in such a manner as to permit theorderly planning, organization, and execution of the Work andshall be sufficiently detailed to accurately depict all the Workrequired for Final Acceptance and Revenue Ready Status. TheContractor's and Subcontractors management personnel shallactively participate in its development and implementation.
-
8/2/2019 Primevera Kitap 6
9/52
Sheafer / 9
Getting Started in P3: Basic Tips & Techniques
1. Capturing the overall project scope of work
Figure 1.1.4: Special Provisions(The Owner) has created a Work Breakdown Structure (WBS) forthe Project. The WBS is intended to provide a hierarchy of work
to be accomplished to complete the Project. The hierarchicalstructure subdivides all of the Work elements into successivelysmaller increments of Work. Each division of the Work is definedas a level. The number of levels is determined based on thenecessary detail required to track the Project elements. The level
of detail provides a breakdown of the Project which facilitates theProject team with tracking and monitoring Project progress. TheWBS provides a hierarchical structure to segregate Projectelements to facilitate the collection and analysis of Project Dataand to serve as a mechanism for payment and scheduling for
Project design, procurement and construction.
-
8/2/2019 Primevera Kitap 6
10/52
Sheafer / 10
Getting Started in P3: Basic Tips & Techniques
1. Capturing the overall project scope of work
1.2 Developing the Work Breakdown Structure(WBS)
1.2.1 Levels Width number of characters
Separators type of symbol
1.2.2 Codes Use typical abbreviations and standards
Keep it simple
-
8/2/2019 Primevera Kitap 6
11/52
Sheafer / 11
Getting Started in P3: Basic Tips & Techniques
1. Capturing the overall project scope of work
Screen 1.2:
Opening the
WBS dialog box
-
8/2/2019 Primevera Kitap 6
12/52
Sheafer / 12
Getting Started in P3: Basic Tips & Techniques
1. Capturing the overall project scope of work
Screen 1.2.1:
Operating within
the WBS dialogbox - defining theWBS levels
-
8/2/2019 Primevera Kitap 6
13/52
Sheafer / 13
Getting Started in P3: Basic Tips & Techniques
1. Capturing the overall project scope of work
Screen 1.2.2:
Operating within
the WBS dialogbox - creating theWBS codes
-
8/2/2019 Primevera Kitap 6
14/52
Sheafer / 14
Getting Started in P3: Basic Tips & Techniques
2. Defining the Activity Codes structure
2.1 Codes (category)
2.1.1 Name
2.1.2 Length2.1.3 Description
2.2 Values (items within category)
2.2.1 Value Code
2.2.2 Description
-
8/2/2019 Primevera Kitap 6
15/52
Sheafer / 15
Getting Started in P3: Basic Tips & Techniques
2. Defining the Activity Codes structure
Screen 2.:
Opening the
Activity Codesdialog box
-
8/2/2019 Primevera Kitap 6
16/52
Sheafer / 16
Getting Started in P3: Basic Tips & Techniques
2. Defining the Activity Codes structure
Screen 2.1:
Operating within
the Activity Codesdialog box -entering activitycodes
-
8/2/2019 Primevera Kitap 6
17/52
Sheafer / 17
Getting Started in P3: Basic Tips & Techniques
2. Defining the Activity Codes structure
Screen 2.2:
Operating within
the Activity Codesdialog box entering activitycode values
-
8/2/2019 Primevera Kitap 6
18/52
Sheafer / 18
Getting Started in P3: Basic Tips & Techniques
3. Establishing the Cost Accounts Codes structure
3.1 Categories
3.1.1 Code
3.1.2 Category Title
3.2 Titles
3.2.1 Account Number
3.2.2 Account Title
-
8/2/2019 Primevera Kitap 6
19/52
Sheafer / 19
Getting Started in P3: Basic Tips & Techniques
3. Establishing the Cost Accounts Codes structure
Screen 3.:
Opening the Cost
Accounts dialogbox
-
8/2/2019 Primevera Kitap 6
20/52
Sheafer / 20
Getting Started in P3: Basic Tips & Techniques
3. Establishing the Cost Accounts Codes structure
Screen 3.1:
Operating within
the CostAccounts dialogbox defining costcategories
-
8/2/2019 Primevera Kitap 6
21/52
Sheafer / 21
Getting Started in P3: Basic Tips & Techniques
3. Establishing the Cost Accounts Codes structure
Screen 3.2:
Operating within
the CostAccounts dialogbox defining costaccounts
-
8/2/2019 Primevera Kitap 6
22/52
Sheafer / 22
Getting Started in P3: Basic Tips & Techniques
4. Defining the Resources
4.1 Resources4.1.1 Resource Code
4.1.2 Units4.1.3 Driving
4.1.4 Base
4.1.5 Description4.2 Limits
4.3 Prices
-
8/2/2019 Primevera Kitap 6
23/52
Sheafer / 23
Getting Started in P3: Basic Tips & Techniques
4. Defining the Resources
Screen 4.:
Opening the
Resources dialogbox
-
8/2/2019 Primevera Kitap 6
24/52
Sheafer / 24
Getting Started in P3: Basic Tips & Techniques
4. Defining the Resources
Screen 4.1:
Operating within
the Resourcesdialog box defining theresource
-
8/2/2019 Primevera Kitap 6
25/52
Sheafer / 25
Getting Started in P3: Basic Tips & Techniques
4. Defining the Resources
Screen 4.2:
Operating within
the Resourcesdialog box defining the limits
-
8/2/2019 Primevera Kitap 6
26/52
Sheafer / 26
Getting Started in P3: Basic Tips & Techniques
4. Defining the Resources
Screen 4.3:
Operating within
the Resourcesdialog box defining the prices
-
8/2/2019 Primevera Kitap 6
27/52
Sheafer / 27
Getting Started in P3: Basic Tips & Techniques
5. Establishing the Calendar ID structure
5.1 Calendars
5.1.1 Standard (daily information)
5.1.2 Holidays5.1.3 Work periods/Non-work periods
5.2 Assigning
5.2.1 To activities
5.2.2 To resources
-
8/2/2019 Primevera Kitap 6
28/52
Sheafer / 28
Getting Started in P3: Basic Tips & Techniques
5. Establishing the Calendar ID structure
Screen 5.:
Opening the
Calendar IDdialog box
-
8/2/2019 Primevera Kitap 6
29/52
Sheafer / 29
Getting Started in P3: Basic Tips & Techniques
5. Establishing the Calendar ID structure
Screen 5.1:
Operating within
the Calendar IDdialog box addinga calendar
-
8/2/2019 Primevera Kitap 6
30/52
Sheafer / 30
Getting Started in P3: Basic Tips & Techniques
5. Establishing the Calendar ID structure
Screen 5.2:
Operating within
the Calendar IDdialog box assigning toresources
-
8/2/2019 Primevera Kitap 6
31/52
Sheafer / 31
Getting Started in P3: Basic Tips & Techniques
6. Creating activities and their relationships
6.1 Adding New activities
6.1.1 Assigning Activity ID and Name
6.1.2 Assigning Calendar ID and Original Duration6.1.3 Assigning Predecessors and Successors
6.2 Assigning the WBS
6.3 Assigning Activity Codes
-
8/2/2019 Primevera Kitap 6
32/52
Sheafer / 32
Getting Started in P3: Basic Tips & Techniques
6. Creating activities and their relationships
6.4 Assigning Resources
6.5 Assigning Cost Accounts
-
8/2/2019 Primevera Kitap 6
33/52
Sheafer / 33
Getting Started in P3: Basic Tips & Techniques
6. Creating activities and their relationships
Screen 6.1:
Adding Activities
-
8/2/2019 Primevera Kitap 6
34/52
Sheafer / 34
Getting Started in P3: Basic Tips & Techniques
6. Creating activities and their relationships
Screen 6.1.1:
Assigning Activity
ID and ActivityName
-
8/2/2019 Primevera Kitap 6
35/52
Sheafer / 35
Getting Started in P3: Basic Tips & Techniques
6. Creating activities and their relationships
Screen 6.1.2:
Assigning Calendar
ID and OriginalDuration
-
8/2/2019 Primevera Kitap 6
36/52
Sheafer / 36
Getting Started in P3: Basic Tips & Techniques
6. Creating activities and their relationships
Screen 6.1.3:
Establishing
Predecessor andSuccessorrelationships
-
8/2/2019 Primevera Kitap 6
37/52
Sheafer / 37
Getting Started in P3: Basic Tips & Techniques
6. Creating activities and their relationships
Screen 6.2:
Assigning the WBS
-
8/2/2019 Primevera Kitap 6
38/52
Sheafer / 38
Getting Started in P3: Basic Tips & Techniques
6. Creating activities and their relationships
Screen 6.3:
Assigning the
Activity Codes
-
8/2/2019 Primevera Kitap 6
39/52
Sheafer / 39
Getting Started in P3: Basic Tips & Techniques
6. Creating activities and their relationships
Screen 6.4:
Assigning
Resources
-
8/2/2019 Primevera Kitap 6
40/52
Sheafer / 40
Getting Started in P3: Basic Tips & Techniques
6. Creating activities and their relationships
Screen 6.5:
Assigning CostAccounts
-
8/2/2019 Primevera Kitap 6
41/52
Sheafer / 41
Getting Started in P3: Basic Tips & Techniques
7. Organizing activities
7.1 Organize by
7.2 Group by
7.3 Sort by
7.4 Filtering
-
8/2/2019 Primevera Kitap 6
42/52
Sheafer / 42
Getting Started in P3: Basic Tips & Techniques
7. Organizing activities
Screen 7.:
Opening theOrganize dialogbox
-
8/2/2019 Primevera Kitap 6
43/52
Sheafer / 43
Getting Started in P3: Basic Tips & Techniques
7. Organizing activities
Screen 7.1:
Operating withinthe Organizedialog box Organize byfunction
-
8/2/2019 Primevera Kitap 6
44/52
Sheafer / 44
Getting Started in P3: Basic Tips & Techniques
7. Organizing activities
Screen 7.2:
Operating withinthe Organizedialog box Group by function
-
8/2/2019 Primevera Kitap 6
45/52
-
8/2/2019 Primevera Kitap 6
46/52
Sheafer / 46
Getting Started in P3: Basic Tips & Techniques
7. Organizing activities
Screen 7.4:
Opening the Filterdialog box
-
8/2/2019 Primevera Kitap 6
47/52
Sheafer / 47
Getting Started in P3: Basic Tips & Techniques
7. Organizing activities
Screen 7.4-a:
Operating withinthe Filter dialogbox modifying anexisting filter
-
8/2/2019 Primevera Kitap 6
48/52
Sheafer / 48
Getting Started in P3: Basic Tips & Techniques
Summary
1. WBS
2. Activity Codes
3. Cost Accounts Codes
4. Resources
5. Calendar ID6. Creating Activities
7. Organizing Activities
-
8/2/2019 Primevera Kitap 6
49/52
Sheafer / 49
Getting Started in P3: Basic Tips & Techniques
QUESTIONS ?
-
8/2/2019 Primevera Kitap 6
50/52
Sheafer / 50
Getting Started in P3: Basic Tips & Techniques
THANK-YOULadies and Gentlemen
-
8/2/2019 Primevera Kitap 6
51/52
Sheafer / 51
Getting Started in P3: Basic Tips & Techniques
Suggested Resources
Construction Scheduling with Primavera ProjectPlanner, 2nd edition by Leslie Feigenbaum
Project Scheduling and Management for Constructionby David R. Pierce
Project Scheduling Handbookby Jonathan F. Hutchings
-
8/2/2019 Primevera Kitap 6
52/52
Sheafer / 52
Getting Started in P3: Basic Tips & Techniques