Experience

Leeds City Council Basic Need Programme, Leeds

£3.2m Extension and refurbishment work across 3 primary schools

Projects to support increase in pupil numbers and change in demography

2, four classroom extension projects at Rufford Park and East Ardsley schools

‘Bulge’ works at Kippax, Rufford Park and East Ardsley

All projects undertaken in a ‘live’ school environment

‘Bulge’ works now complete, Rufford Park due on site January 2014

Page 3: Primary School Projects

P r i m a r y S c h o o l P r o j e c t s

Experience

Saighton Camp Primary School, Chester

£2.4m new 1 fe primary school

Part of a wider regeneration scheme

210 pupils plus a 30 place nursery

Single storey with access to external learning from each teaching bases

Modular component design in line with EFA guidelines

Planning application submitted March 2013

Page 4: Primary School Projects

P r i m a r y S c h o o l P r o j e c t s

Experience

Priority Schools Building Programme – North East Batch

£64m total programme contract value

9 schools as part of the programme

Watson Batty to deliver 4 new primary schools concurrently by 2015

Range of 1 and 2 form entry buildings

Single and two storey design solutions

Each school includes wrap around nursery provision

Contract award due by the end of January 2013

Page 5: Primary School Projects

P r i m a r y S c h o o l P r o j e c t s

Experience

Leeds 10 Primary Schools PFI

£35m total contract value

10 new primary schools delivered concurrently

Range of 1 and 2 form entry buildings

Single and two storey design solutions

Each school includes wrap around nursery provision

All schools completed on time and on budget

One school brought forward as a sample school

Page 6: Primary School Projects

P r i m a r y S c h o o l P r o j e c t s

Experience

The Grammar School at Leeds, Prep School

£7.5m total contract value

4 form entry junior school over 2 floors

480 students

Integrated into the senior school environment

Shared facilities

Work on a live school site

Successfully delivered on time and on budget

Page 7: Primary School Projects

P r i m a r y S c h o o l P r o j e c t s

Experience

Our Lady Queens of Martyrs RC Primary School, York

£4.5m total contract value

2 form entry primary school over 2 floors

420 primary students with a 26 place nursery

Allows for future flexibility with integrated design approach

Detailed phasing to eliminate temporary accommodation

Over came significant issues regarding flood storage and highways

Page 8: Primary School Projects

P r i m a r y S c h o o l P r o j e c t s

Experience

North Yorkshire Schools Framework

£20m total contract value over 6 years

120 different primary school projects

Most projects involved significant extension and refurbishment

All projects delivered in a live school environment

Contracts delivered under a traditional procurement route

Working very closely with the Senior Management Team at each school

Detailed understanding of learning environments and school management

Page 9: Primary School Projects

P r i m a r y S c h o o l P r o j e c t s

Experience

Bradford Girls Grammar School, Bradford

£2.8m total contract value

New 1 form entry prep school as part of the grammar school

2 storey extension to the existing grammar school

Learning space for 200 students together with a 26 place nursery

The project was delivered in a live school environment

Traditionally procured and delivered on time and on budget

Page 10: Primary School Projects

P r i m a r y S c h o o l P r o j e c t s

Experience

Bronte House Prep School, Bradford

The Prep School for Woodhouse Grove School in Bradford

£6m total contract value since 1995

6 separate projects involving a variety of new build and refurbishment

All schemes were delivered in a live school environment

Traditionally procured and delivered on time and on budget

Page 11: Primary School Projects

P r i m a r y S c h o o l P r o j e c t s

Experience

Bradford Schools Reorganisation, Bradford

Appointment from RIBA Stage A – D including planning applications

Included 9 primary school projects

Detailed plans to review current capacity and propose alterations and extensions

We worked closely with the existing Senior Management team at all the schools

Page 12: Primary School Projects

P r i m a r y S c h o o l P r o j e c t s

Experience

Diocese Projects

Includes; Middlesbrough, Leeds, Bradford and Ripon and Leeds, and York Diocese

£9.5m total contract value since 2000

25 separate projects involving a variety of new build and refurbishment

All schemes were delivered in a live school environment

Traditionally procured and delivered on time and on budget

Page 13: Primary School Projects

P r i m a r y S c h o o l P r o j e c t s

Experience

Ashville College Junior School, Harrogate

£1m total contract value

Complete refresh and refurbishment of the existing junior school building

Creative use of space to support the delivery of the curriculum

The project was delivered in a live school environment

Traditionally procured and delivered on time and on budget

Page 14: Primary School Projects

P r i m a r y S c h o o l P r o j e c t s

Experience

Individual Staff Experience

(former company)

Mark Sidding - Leeds 7 pfi schools – design and delivery of 5, 1 and 2 form entry primary

schools

Lisa Nutton – Design and delivery of 2 new 2 form entry primary schools for York CC

Steve Powell – Design and delivery of 2 primary school projects in Menwith Hill