Price Schedule and Rate-Rev0

59
Thyss Indu LOY KRATHONG PROJECT SCHEDULE OF PRICE AND RATES Project No. : 01-5004 Title of Works: Piping Fabrication and Erection / Mechanical Erection CONTENTS SCHEDULE A CONTRACT PRICE SCHEDULE B SCHEDULE OF RATES - CONTRACT SCHEDULE B1-B11 SCHEDULE OF RATES - CONTRACT (BREAK DOWN) SCHEDULE C SCHEDULE OF RATES - HOUR / DAYWORKS RATE (To be proposed by Contractor)

description

22

Transcript of Price Schedule and Rate-Rev0

IndexThyssenKruppIndustrial SolutionsLOY KRATHONG PROJECTSCHEDULE OF PRICE AND RATESProject No. : 01-5004Rev 00Title of Works: Piping Fabrication and Erection / Mechanical ErectionCONTENTSSCHEDULE ACONTRACT PRICESCHEDULE BSCHEDULE OF RATES - CONTRACTSCHEDULE B1-B11SCHEDULE OF RATES - CONTRACT (BREAK DOWN)SCHEDULE CSCHEDULE OF RATES - HOUR / DAYWORKS RATE(To be proposed by Contractor)

&R&"Arial,Bold"&12

Sched A-Subcont PriceThyssenKruppIndustrial SolutionsLOY KRATHONG PROJECTCONTRACT PRICEProject No. : 01-5004Schedule ARev 00Title of Works: Piping Fabrication and Erection / Mechanical Erectiona) The price's set out in this Schedule constitutes the Contract Price for the full performance of the WORKS in accordance with the Contract. The Contract Price is a lump sum and is inclusive of all costs and the like to perform the WORKS including Temporary Works and Defects Liability. Profit and overhead shall be included as a separate portion, Item No 7 and shall be fixed and only subject to variance/adjustment if the value of Item No 6 SUBTOTAL is increased by + (plus) 20% (twenty percent) or decreased - (minus) 20% (twenty percent). The Lump Contract Price is in the currency as stated below and is fixed and firm and not subject to fluctuation, except as specifically provided for in accordance with the Contract.b) Where the Contract Price is expressed as" Estimated Contract Price" then the basis of the Contract is Schedule of Rates and the "Estimated Contract Price" is calculated as the total of all rates items extended by multiplying the estimated quantities by the CONTRACTORS rates. In all other respects rates and prices shall be inclusive as above.c) Should the ESTIMATED CONTRACT PRICE be varied by more than 20% (twenty percent) then Contract shall:- 1) If increased by more than 20% (twenty percent) be entiled to 10% profit and overhead on the amount which exceeds the 20%. 2) If decreased by more than 20% (twenty percent) then decrease the profit and overhead by 10% when the decreased amount exceeds the 20%Item No.DescriptionPrice Thai Baht1Sch.AMobilization and establishment of site facilities2Sch.AManagement and Supervision3Sch.ADemobilization from site4TOTAL LUMP SUM PRICE for Sch.A0.05Sch.B1Pipe fabrication and installation (estimated price)6Sch.B2Tie-In work (estimated price)7Sch.B3Pipe supports fabrication and installation (estimated price)8Sch.B4Paint pipe spools and pipe supports (estimated price)9Sch.B5Installation of Valves (estimated price)10Sch.B6Presure test (estimated price)11Sch.B7NDT (estimated price)12Sch.B8Post Weld Heat Treatment (estimated price)13Sch.B9Equipment Internal Installation (estimated price)14Sch.B10Miscellaneous Work (estimated price)15SUBTOTAL of items 5 - 120.016Profit and Overhead on item - 13 Subtotal0.017TOTAL PRICE for Sch.B0.0TOTAL PRICE0.0Page 4 of 4

Sched A - Price BreakdownThyssenKruppIndustrial SolutionsLOY KRATHONG PROJECTCONTRACT PRICE BREAKDOWNProject No. : 01-5004Schedule ATitle of Works: Piping Fabrication and Erection / Mechanical ErectionRev 00Section 2: Contract Price BreakdownThe amounts shown in this Schedule are the breakdown of the Lump Sum Contract Price for accounting and progress payment purposes and are inclusive of all customs duties and assessments, taxes, insurances, permits, fees, transport, delivery, escorts, craneage, labour, inspection, providing amenities as necessary, consumables, temporary construction materials, tools, plant, equipment, temporary services, derived from compliance with the requirements of the Contract and other like charges.Item No.DescriptionUnitQuantityRateTotal Thai BahtManhours1Mobilise to siteL/S2Management and supervisionL/S3Demobilise from siteL/STOTAL FOR INDIRECT

Sched B-Sched of RatesThyssenKruppIndustrial SolutionsLOY KRATHONG PROJECTSCHEDULE OF RATES - CONTRACT - BProject No. : 01-5004Schedule BRev 00Title of Works: Piping Fabrication and Erection / Mechanical ErectionWhere the Contract Price is expressed as"Estimated Contract Price" in Schedule A then the basis of the Contract is Schedule of Rates and the "Estimated Contract Price" is calculated as the total of all rates items below, each extended by multiplying the estimated quantities by the CONTRACTORS rates.Item No.DescriptionUnitQty EstimatedUnit Rate (Thai Baht)Amount Estimated1B1Piping Fabrication and installationUnder Ground Piping- FRP PipeDB663.00Above Ground Piping- Welding Type- Carbon SteelDB16,199.00- Carbon Steel ( to Hot dip Galv. after fab. pipe spool)DB425.00- Stainless Steel TP304L abnd TP316LDB23,246.00- Threaded Type- GalvanizedDB500.00- Plastic pipe- PE 100DB1442B2Tie-in WorkWelding typeDB50.00Flanged typePoint5.003B3Pipe Support Fabrication & Installation- Fabrication and InstallationKgs.51,440.00- Installation only (Spring support, etc.)Ea10.004B4Painting WorkSq.m3,145.005B5Valves InstallationEa756.006B6Pressure Testlot1.007B7Non Destrcutive TestingJoint1,679.008B8Post Weld Heat TreatmentJointN/A9B9Equipment Internal InstallationLot1.0010B10Miscellaneous WorkLot1.00TOTAL ESTIMATED CONTRACT PRICE0.00

Sched B-Rates Measure B1ThyssenKruppIndustrial SolutionsLOY KRATHONG PROJECTSCHEDULE OF RATES - CONTRACT - METHOD OF MEASUREMENT & PAYMENT - BProject No. : 01-5004Schedule B1Rev 00Title of Works: Piping Fabrication and Erection / Mechanical ErectionThe scope of items included in Schedule B1 are defined in the following table together with the manner in which the items are measured and payments made. Attached to this schedule are a set of quantities, derived electronically from design data. These quantities are issued to clarify the basis of the Schedule of Rates quantities and are for INFORMATION ONLY to establish the ESTIMATED PRICE. The final quantities for DB will be remeasured on completion of the works and the rate set out in this Schedule will be applied to the final quantities to establish the final value.ItemDescriptionUnitQ'tyEst. Unit PriceEst. Total PriceRemarks1PIPING WORK11.1 DIRECT COST1.1.1Under Ground Piping1.1.1.1FRP Pipe- Pipelines DN: 15DI0.00.0- Pipelines DN: 20DI0.00.0- Pipelines DN: 25DI0.00.0- Pipelines DN: 40DI0.00.0- Pipelines DN: 50DI0.00.0- Pipelines DN: 80DI30.0- Pipelines DN: 100DI160.0- Pipelines DN: 150DI1980.0- Pipelines DN: 200DI3360.0- Pipelines DN: 250DI1100.0- Pipelines DN: 300DI0.00.0- Pipelines DN: 350DI0.00.0- Pipelines DN: 400DI0.00.0- Pipelines DN: 450DI0.00.0- Pipelines DN: 500DI0.00.0SUBTOTAL FOR UG PIPING6630.01.1.2Above Ground Piping1.1.2.1Welding Type-Carbons Steel (A53 Gr.B, A106 Gr.B, API 5L Gr.B)- Pipelines DN: 15DI1,5580.0- Pipelines DN: 20DI850.0- Pipelines DN: 25DI2,1030.0- Pipelines DN: 40DI1,6840.0- Pipelines DN: 50DI2,7780.0- Pipelines DN: 65DI720.0- Pipelines DN: 80DI8620.0- Pipelines DN: 100DI9620.0- Pipelines DN: 150DI1,6150.0- Pipelines DN: 200DI1,3730.0- Pipelines DN: 250DI2,9510.0- Pipelines DN: 300DI1560.0- Pipelines DN: 350DI0.0- Pipelines DN: 400DI0.0- Pipelines DN: 450DI0.0- Pipelines DN: 500DI0.0- Pipelines DN: 600DI0.0- Pipelines DN: 700DI0.0- Pipelines DN: 800DI0.0SUBTOTAL FOR AG CABON STEEL16,199.00.0-Non-Metallic pipe PE 100 (butt- fusion)- Pipelines DN: 15DI1110.0- Pipelines DN: 20DI0.00.0- Pipelines DN: 25DI330.0- Pipelines DN: 40DI0.00.0- Pipelines DN: 50DI0.00.0- Pipelines DN: 80DI0.00.0- Pipelines DN: 100DI0.00.0- Pipelines DN: 150DI0.00.0- Pipelines DN: 200DI0.00.0- Pipelines DN: 250DI0.00.0- Pipelines DN: 300DI0.00.0- Pipelines DN: 350DI0.00.0- Pipelines DN: 400DI0.00.0- Pipelines DN: 450DI0.00.0- Pipelines DN: 500DI0.00.0- Pipelines DN: 600DI0.00.0- Pipelines DN: 700DI0.00.0- Pipelines DN: 800DI0.00.0SUBTOTAL FOR AG PE 100144.00.0-Stainless Steel TP-304L- Pipelines DN: 15DI6120.0- Pipelines DN: 20DI660.0- Pipelines DN: 25DI1,7300.0- Pipelines DN: 40DI450.0- Pipelines DN: 50DI1,5780.0- Pipelines DN: 80DI8460.0- Pipelines DN: 100DI1,2380.0- Pipelines DN: 150DI7490.0- Pipelines DN: 200DI1,5700.0- Pipelines DN: 250DI1,1180.0- Pipelines DN: 300DI0.00.0- Pipelines DN: 350DI0.00.0- Pipelines DN: 400DI370.0- Pipelines DN: 450DI0.00.0- Pipelines DN: 500DI460.0- Pipelines DN: 600DI0.00.0- Pipelines DN: 700DI640.0- Pipelines DN: 750DI3450.0- Pipelines DN: 800DI2580.0-Stainless Steel TP-316L- Pipelines DN: 15DI1570.0- Pipelines DN: 20DI120.0- Pipelines DN: 25DI4290.0- Pipelines DN: 40DI590.0- Pipelines DN: 50DI1,6150.0- Pipelines DN: 80DI4950.0- Pipelines DN: 100DI1,5080.0- Pipelines DN: 125DI50.0- Pipelines DN: 150DI5,9750.0- Pipelines DN: 200DI6860.0- Pipelines DN: 250DI390.0- Pipelines DN: 300DI470.0- Pipelines DN: 350DI1090.0- Pipelines DN: 400DI0.00.0- Pipelines DN: 450DI0.00.0- Pipelines DN: 500DI0.00.0- Pipelines DN: 600DI8280.0- Pipelines DN: 700DI0.00.0- Pipelines DN: 750DI690.0- Pipelines DN: 800DI0.00.0- Pipelines DN: 900DI9110.0SUBTOTAL FOR AG SS TP 304L,316L23,246.00.01.1.2.2Threaded Type-Galvanized Pipe (CS+Hot Dip Galvnized)- Pipelines DN: 15 (completed with Galvanized)DI0.0- Pipelines DN: 20 (completed with Galvanized)DI0.0- Pipelines DN: 25 (completed with Galvanized)DI200.0- Pipelines DN: 40 (completed with Galvanized)DI250.0- Pipelines DN: 50 (completed with Galvanized)DI300.0- Pipelines DN: 80 (to be hot dip Galvanized)DI660.0- Pipelines DN: 100 (to be hot dip Galvanized)DI3590.0- Pipelines DN: 150DI0.0- Pipelines DN: 200DI0.0- Pipelines DN: 250DI0.00.0- Pipelines DN: 300DI0.00.0- Pipelines DN: 350DI0.00.0- Pipelines DN: 400DI0.00.0- Pipelines DN: 450DI0.00.0- Pipelines DN: 500DI0.00.0- Pipelines DN: 600DI0.00.0- Pipelines DN: 700DI0.00.0- Pipelines DN: 800DI0.00.0SUBTOTAL FOR AG THREADED TYPE500.00.0Sub Total to Schedule B140,752.00.0

Sched B-Rate Measure B2ThyssenKruppLOY KRATHONG PROJECTIndustrial SolutionsSCHEDULE OF RATES - CONTRACT - METHOD OF MEASUREMENT & PAYMENT - BSchedule B2Project No. : 01-5004RevRev 00Title of Works: Piping Fabrication and Erection / Mechanical ErectionThe scope of items included in Schedule B2 are defined in the following table together with the manner in which the items are measured and payments made. Attached to this schedule are a set of quantities, derived electronically from design data. These quantities are issued to clarify the basis of the Schedule of Rates quantities and are for INFORMATION ONLY to establish the ESTIMATED PRICE. The final quantities for DB will be remeasured on completion of the works and the rate set out in this Schedule will be applied to the final quantities to establish the final value.Tie In list Pricing tableNo.Tie-in No.Existing LineNew LineP&ID No.Fluid ServiceFluid PhaseNDEPWHT / Stress RelieveType of Tie-in (See also General Notes)RemarksExiting Line No.Line Size (Inch)Pipe ClassInsulationHeat TraceShort description of lineOperating ConditionDesign ConditionNew Line No.Line Size (inch)Pipe ClassInsulationHeat TraceTypeTHK (mm)E=Electrical S=SteamPressure(Barg)Temp (Deg C)Pressure(Barg)Temp (Deg C)TypeTHK (mm)E=Electrical S=Steam1IP-P-VENDOR/BIR-0001(HOLD)6"(HOLD)N/A640875U-1000/2714/6"/CO26"2714--N/A130040-010604-PID-UTL-501CO2VapourVISUALN/AFlangedSPX is to confirm the operating pressure of CO22IP-P-VENDOR/BIR-0002(HOLD)4"(HOLD)N/A20300FV/36350U-1001/1802/4"/Ve364"1802H70N/A130040-010604-PID-UTL-501Ve36VapourVISUALN/AFlanged3IP-P-VENDOR/BIR-0003(HOLD)2"(HOLD)N/A1678FV/36300U-1034/1802/2"/Ec362"1802H70N/A130040-010604-PID-UTL-501Ec36LiquidVISUALN/AFlanged4IP-P-VENDOR/BIR-0004(HOLD)4"(HOLD)N/A336550U-1003/1771/4" /Ep4"1771--N/A130040-010604-PID-UTL-501EpLiquidVISUALN/AFlanged5IP-P-VENDOR/BIR-0005(HOLD)6"(HOLD)N/A536850U-1004/1701/6"/Eb6"1701--N/A130040-010604-PID-UTL-501EbLiquidVISUALN/AFlanged6IP-P-VENDOR/BIR-0006Cooling tower basinN/A(HOLD)N/A0.05311050U-1005/1701/10"/Er12"1701--N/A130040-010604-PID-UTL-501ErLiquid100 % RTN/AWelded7IP-P-VENDOR/BIR-0007Cooling towerN/A(HOLD)N/A0.6381060U-1006/1701/10"/Err10"1701--N/A130040-010604-PID-UTL-501ErrLiquid100 % RTN/AWelded8IP-P-VENDOR/BIR-0008(HOLD)8"(HOLD)N/A11361450U-1007/1771/8"/Ei8"1771--N/A130040-010604-PID-UTL-501EiLiquid100 % RTN/AWelded10IP-P-VENDOR/BIR-001040-A/150001-SS51 1/2"(HOLD)N/A7361050U-1009/2704/2"/Ai2"2704--N/A130040-010604-PID-UTL-501AiVapour100 % RTN/AWelded11IP-P-VENDOR/BIR-0011(HOLD)2"(HOLD)N/A3.236550U-1035/_/2"/H22"(HOLD)--N/A130040-010604-PID-UTL-501H2Vapour100 % RTN/AWelded12IP-P-VENDOR/BIR-0012(HOLD)(HOLD)(HOLD)N/A10361450U-1154/_/N2(HOLD)(HOLD)--N/A130040-010604-PID-UTL-501N2Vapour100 % RTN/AWeldedGENERAL NOTE1)SPX is to confirm type of Tie-in aboveType of Tie-in shall be specificed as followings;Flanged= Tie-in requires bolt up to provided flanges connections.Welded= Tie-in requires welding to existing lines (hot work and line shut down).Hot-tap= Tie-in requies installation of valved stub to existing line or split tee for same size connection (avoid shut down).Cold-tap= Tie-in requires installation to existing line by stub branch or split tee (line shut down line).2)(HOLD) = SPX to confirm

Sched B-Rates Measure B3ThyssenKruppIndustrial SolutionsLOY KRATHONG PROJECTSCHEDULE OF RATES - CONTRACT - METHOD OF MEASUREMENT & PAYMENT - BProject No. : 01-5004Schedule B3Rev 00Title of Works: Piping Fabrication and Erection / Mechanical ErectionThe scope of items included in Schedule C3 are defined in the following table together with the manner in which the items are measured and payments made. Attached to this schedule are a set of quantities, derived electronically from design data. These quantities are issued to clarify the basis of the Schedule of Rates quantities and are for INFORMATION ONLY to establish the ESTIMATED PRICE. The rate set out in this Schedule will be applied to the final quantities to establish the final value.PIPE SUPPORT FABRICATION&INSTALLATION BY CONTRACTORPipe SupportDescriptionQ'tyWeight KgsRate per KgsPrice1. Fabrication and installation- Fabrication and Install Pipe Shoes, U-bolts, Clamp (Painting is included)For Carbon Steel Pipe8,2100.0- Fabrication and Install Pipe Shoes, U-bolts, Clamp (Painting is included)For Stainless Steel Pipe12,0000.0- Fabrication and Install Steel standard Pipe Supports Standard and Special pipe support ( Painting is Included)For Carbon Steel Pipe and Stainless31,2300.02. Installation Only- Install onlyFor Spring Supports100.0For PTFE sliding plate100.0Sub Total to Schedule B351,4400.0

Sched B-Rates Measure B4ThyssenKruppIndustrial SolutionsLOY KRATHONG PROJECTSCHEDULE OF RATES - CONTRACT - METHOD OF MEASUREMENT & PAYMENT - BProject No. : 01-5004Schedule B4Rev 00Title of Works: Piping Fabrication and Erection / Mechanical ErectionThe scope of items included in Schedule B4 are defined in the following table together with the manner in which the items are measured and payments made. Attached to this schedule are a set of quantities, derived electronically from design data. These quantities are issued to clarify the basis of the Schedule of Rates quantities and are for INFORMATION ONLY to establish an ESTIMATED PRICE. The final quantities for the painting of the pipe spools will be remeasurable from the isometric drawings and these rates shall be applied, method of measurement will be from flange face to flange face, measuring through all fittings but excluding valves (valves not painted). Pipe spools with no flange will be remeasurable from weld joint to weld joint .Price Table For Painting of Piping Fabrication & InstallationItemSeqPaint SystemPaint SystemQuantityUnit Area (m2)Total Area (m2)Unit rateTotalQ'tyUnitBaht/M2Baht1A1Non-Insulated carbon steel (inside building)1,100.00- Surface praparation ISO-8501-10.0- Required primer,intermediate and final layer total dry film thickness 160 micron0.00.02A2Non-Insulated carbon steel (outside building)700.00- Surface praparation-ISO-8501-10.0- Required primer,intermediate and final layer total dry film thickness 320 micron0.03B1Non-Insulated galvanized steel (inside building)15.00- Surface praparation-Sweep blast0.0- Required primer and final layer total dry film thickness 120 micron0.00.04B2Non-Insulated galvanized steel (outside building)80.00- Surface praparation-Sweep blast0.0- Required primer, intermediate and final layer total dry film thickness 200 micron0.00.05C2Insulated carbon steel (outside building)50.00- Surface praparation ISO-8501-10.0- Required primer and final layer total dry film thickness 100 micron0.00.06D1Insulated stainless steel (inside building)1,200.00- Surface praparation-Sweep blast0.0- Required primer and final layer total dry film thickness 200 micron0.00.0Sub Total to Schedule B43,145.000.0

thanup:

Sched B-Rates Measure B5ThyssenKruppIndustrial SolutionsLOY KRATHONG PROJECTSCHEDULE OF RATES - CONTRACT - METHOD OF MEASUREMENT & PAYMENT - BProject No. : 01-5004Schedule B5Title of Works: Piping Fabrication and Erection / Mechanical ErectionRev 00Section : Contract Price BreakdownThe scope of items included in Schedule B6 are defined in the following table together with the manner in which the items are measured and payments made. Attached to this schedule are a set of quantities, derived electronically from design data. These quantities are issued to clariy the basis of the Schedule of Rates quantities and are for INFORMATION ONLY to establish the ESTIMATED PRICE. The final quantities of Valves will be remeasured with Isometric drawings and the rate set out in this Schedule will be applied to the final quantities to establish the final value.Table of Vale InstallationItemDescriptionQuantityUnit priceTotal pricepcBaht/pcBaht1Manual Valve Installation (Flange type)0.0- Valves DN: 151100.0- Valves DN: 20240.0- Valves DN: 252760.0- Valves DN: 4030.0- Valves DN: 50640.0- Valves DN: 80200.0- Valves DN: 100390.0- Valves DN: 150730.0- Valves DN: 20090.0- Valves DN: 250200.0- Valves DN: 30010.0- Valves DN: 3500.0- Valves DN: 4000.0- Valves DN: 5000.0- Valves DN: 6000.02Control Valve, Instruments In-line Installation (Flange Type)0.0- DN: 15100.0- DN: 20- DN: 25360.0- DN: 400.0- DN: 50170.0- DN: 8070.0- DN: 10080.0- DN: 150160.0- DN: 200130.0- DN: 25090.0- DN: 30010.00.00.00.0Sub Total to Schedule B67560.0

Sched B-Rates Measure B6ThyssenKruppIndustrial SolutionsLOY KRATHONG PROJECTSCHEDULE OF RATES - CONTRACT - METHOD OF MEASUREMENT & PAYMENT - BProject No. : 01-5004Schedule B6Rev 00Title of Works: Piping Fabrication and Erection / Mechanical ErectionPRICE TABLE FOR PRESURE TESTALL PIPING CLASSItemUnitPRICE COMPONENT (BAHT)DESCRIPTIONNUMBERRATE EACHTOTALREMARKEDBLIND IN/OUTPcs0.0THESE ARE THE ESTIMATE NUMBER USED FOR REFERENCE ONLY. THE COST OF PRESSURE TEST SHALL BE INCLUDED IN UNIT RATE OF BAHT PER DB. AS STAGED IN C-9.GASKETSEach0.0TEST PACKPack0.0Sub Total to Schedule B70.0

Sched B-Rates Measure B7ThyssenKruppIndustrial SolutionsLOY KRATHONG PROJECTSCHEDULE OF RATES - CONTRACT - METHOD OF MEASUREMENT & PAYMENT - BProject No. : 01-5004Schedule B7Rev 00Title of Works: Piping Fabrication and Erection / Mechanical ErectionThe scope of items included in Schedule B8 are defined in the following table together with the manner in which the items are measured and payments made. Attached to this schedule are a set of quantities, derived electronically from design data. These quantities are issued to clarify the basis of the Schedule of Rates quantities and are for INFORMATION ONLY to ESTABLISH THE ESTIMATED PRICE. The final quantities will measured at the completion of the works and the rates applied to the final quantitative to establish the final value.PRICE TABLE FOR PIPE NDTItemDescriptionNumber of jointPRICE COMPONENTS (BAHT)Rate Per jointOther CostsPrice1Rediographic Exam. (RT)- RT DN: 15266- RT DN: 2050- RT DN: 25427- RT DN: 40120- RT DN: 50300- RT DN: 8076- RT DN: 10087- RT DN: 150139- RT DN: 20046- RT DN: 25042- RT DN: 3002- RT DN: 3501- RT DN: 4001- RT DN: 450-- RT DN: 5001- RT DN: 6004- RT DN: 7001- RT DN: 7502- RT DN: 8001- RT DN: 90032Liquid Dry Penetration Testing (PT)- PT DN: 1530- PT DN: 2025- PT DN: 2543- PT DN: 4012- PT DN: 50-- PT DN: 80-- PT DN: 100-- PT DN: 150-- PT DN: 200-Sub Total to Schedule B81,679.000.0

Sched B-Rates Measure B8ThyssenKruppIndustrial SolutionsLOY KRATHONG PROJECTSCHEDULE OF RATES - CONTRACT - METHOD OF MEASUREMENT & PAYMENT - BProject No. : 01-5004Schedule B8Rev 00Title of Works: Piping Fabrication and Erection / Mechanical ErectionThe scope of items included in Schedule B9 are defined in the following table together with the manner in which the items are measured and payments made. Attached to this schedule are a set of quantities, derived electronically from design data. These quantities are issued to clarify the basis of the Schedule of Rates quantities and are for INFORMATION ONLY to ESTABLISH THE ESTIMATED PRICE. The final quantities will measured at the completion of the works and the rates applied to the final quantitative to establish the final value.PRICE TABLE FOR PIPE PWHTItemDescriptionNumber of jointPRICE COMPONENTS (BAHT)Rate Per jointOther CostsPrice1Post Weld Heat Treatment (PWHT)- PWHT DN: 15none- PWHT DN: 20none- PWHT DN: 25none- PWHT DN: 40none- PWHT DN: 50none- PWHT DN: 80none- PWHT DN: 100none- PWHT DN: 150none- PWHT DN: 200none- PWHT DN: 250none- PWHT DN: 300none- PWHT DN: 350none- PWHT DN: 400none- PWHT DN: 450none- PWHT DN: 500none0.00.00.0Sub Total to Schedule B9None0.0

Sched B-Rates Measure B9ThyssenKruppIndustrial SolutionsLOY KRATHONG PROJECTSCHEDULE OF RATES - CONTRACT - METHOD OF MEASUREMENT & PAYMENT - BProject No. : 01-5004Schedule B9Section 2: Contract Price BreakdownThe scope of items included in Schedule B5 are defined in the following table together with the manner in which the items are measured and payments made. Attached to this schedule are a set of quantities, derived electronically from design data. These quaPrice Table for Equipment InstallationItemEquip TypeTagDescriptionQtyEmpty WeightInstallation CostTotal (BAHT)RemarkLabor (BAHT)Equipment (BAHT)Tool & Consum. (BAHT)SubTotalNo.KgU/PAMOUNTU/PAMOUNTU/PAMOUNTU/PAMOUNTAMOUNT1P1TR-SD/1SD silo134,0000.00.00.00.00.00.02P1TR-SD/2SD silo134,0000.00.00.00.00.00.03P1VB-TRSD/1SD silo vibrating bottom11,5300.00.00.00.00.00.04P1VB-TRSD/2SD silo vibrating bottom11,5300.00.00.00.00.00.05P7TR/1Silo 0/50 + 27/5013,0000.00.00.00.00.00.06P7TR/2Silo 0/50 + 27/5013,0000.00.00.00.00.00.07P7TR/3Silo 0/50 + 27/5013,0000.00.00.00.00.00.08P7TR/4Silo 0/50 + 27/5013,0000.00.00.00.00.00.09P7VB-TR/1Vibrating bin activators 0/50 + 27/5012900.00.00.00.00.00.010P7VB-TR/2Vibrating bin activators 0/50 + 27/5012900.00.00.00.00.00.011P7VB-TR/3Vibrating bin activators 0/50 + 27/5012900.00.00.00.00.00.012P7VB-TR/4Vibrating bin activators 0/50 + 27/5012900.00.00.00.00.00.013P7TR/5Silo 0/1313,0000.00.00.00.00.00.014P7TR/6Silo 0/1313,0000.00.00.00.00.00.015P7TR/7Silo 0/1313,0000.00.00.00.00.00.016P7TR/8Silo 0/1313,0000.00.00.00.00.00.017P7VB-TR/5Vibrating bin activators 0/1312900.00.00.00.00.00.018P7VB-TR/6Vibrating bin activators 0/1312900.00.00.00.00.00.019P7VB-TR/7Vibrating bin activators 0/1312900.00.00.00.00.00.020P7VB-TR/8Vibrating bin activators 0/1312900.00.00.00.00.00.021P14ECR-TRSD/1SD silo outlet rotary valve11600.00.00.00.00.00.022P14ECR-TRSD/2SD silo outlet rotary valve11600.00.00.00.00.00.023P14TR-EMOTSD/1Lump breaker hopper11,0000.00.00.00.00.00.024P14TR-EMOTSD/2Lump breaker hopper11,0000.00.00.00.00.00.025P14EMOT-SD/1SD lump breaker14500.00.00.00.00.00.026P14EMOT-SD/2SD lump breaker14500.00.00.00.00.00.027P14TR-TPVSDDVSD buffer hopper14000.00.00.00.00.00.028P14TPV-SDDVSD dosing screw18500.00.00.00.00.00.029P14CP-TPPSDSD pneumatic transport compressor15800.00.00.00.00.00.030P14CY-TPPSDSD pneumatic transport cyclone11,0000.00.00.00.00.00.031RECR-CYSVARotary valve outlet CYSVA11800.00.00.00.00.00.032RECR-DPSVARotary valve outlet DPCYSVA11800.00.00.00.00.00.033RECR-VT/1Rotary valve to sieves11800.00.00.00.00.00.034RECR-VT/2Rotary valve to sieves11800.00.00.00.00.00.035RECR-TR/1BIR Silo outlet rotary valve11500.00.00.00.00.00.036RECR-TR/2BIR Silo outlet rotary valve11500.00.00.00.00.00.037RECR-TR/3BIR Silo outlet rotary valve11500.00.00.00.00.00.038RECR-TR/4BIR Silo outlet rotary valve11500.00.00.00.00.00.039RECR-TR/5BIR Silo outlet rotary valve11500.00.00.00.00.00.040RECR-TR/6BIR Silo outlet rotary valve11500.00.00.00.00.00.041RECR-TR/7BIR Silo outlet rotary valve11500.00.00.00.00.00.042RECR-TR/8BIR Silo outlet rotary valve11500.00.00.00.00.00.043RVD-TRSD/1SD silo inlet diverter valve1700.00.00.00.00.00.044RVD-TRSD/2SD silo inlet diverter valve1700.00.00.00.00.00.045RVD-/1BIR silos feeding diverter valve11400.00.00.00.00.00.046RVD-/2BIR silos feeding diverter valve21400.00.00.00.00.00.047RVD-TPVTR/9Diverter valve outlet TPV 0/13 (FFS 1 or 2)1300.00.00.00.00.00.048RVD-TPVTR/8Diverter valve outlet TPV 0/13 Pharma (FFS 1 or 2)1300.00.00.00.00.00.049RVD-TPVTR/7Diverter valve outlet TPV 0/50 + 27/50 (FFS1 or 2)1300.00.00.00.00.00.050ATPV-ESSCentrifuge outlet screw conveyor15250.00.00.00.00.00.051ATPV-TR/4Screw conveyor to silos 0/13 Pharma18000.00.00.00.00.00.052ATPV-TR/5Screw conveyor to silos 0/13 FCC18000.00.00.053ATPV-TR/3Screw conveyor to silo 27/50 (or 0/50)18000.00.00.00.00.00.054ATPV-TR/2Screw conveyor to silos 0/50 TEC/Z or HN18000.00.00.00.00.00.055ATPV-TR/1Screw conveyor to silos 0/50 TEC/Z17000.00.00.00.00.00.056ATPV-TR/6Screw conveyor left/right outlet silos 0/50 TEC/Z or HN18000.00.00.00.00.00.057ATPV-TR/7Screw conveyor left/right outlet silos 0/50 + 27/5018000.00.00.00.00.00.058ATPV-TR/9Screw conveyor left/right outlet silos 0/1318000.00.00.00.00.00.059ATPV-TR/8Screw conveyor left/right outlet silos 0/13 Pharma18000.00.00.00.00.00.060ATPV-FFS/1Screw conveyor to FFS115000.00.00.00.00.00.061ATPV-FFS/2Screw conveyor to FFS214000.00.00.00.00.00.062ATPV-BBScrew conveyor to BB11,5000.00.00.00.00.00.063ATPV-SVASVA inlet screw conveyor15000.00.00.00.00.00.064P6VT/1Vibrating sieve 111,7000.00.00.00.00.00.065P6VT/2Vibrating sieve 211,70066P6VT-FFS/1Safety sieve # 3,2 x 3,2 mm to FFS1145067P6VT-FFS/2Safety sieve # 3,2 x 3,2 mm to FFS2145068ATRS-VTSieves distribution conveyor12,21069ATRS-0/13Conveyor to TPV 0/1312,50070ATRS-FFS/2Collecting conveyor to FFS216,00071ATRS-FFS/1Collecting conveyor to FFS112,00072ADV-SDSD dissolver17,57373ACRBIR crystalliser134,32074ARG-CRCR cooler135,52575ARS-LDCBLDCB vessel117,42876ARS-EMMother liquor vessel19,12377AFLSLDCB sand filter113,01678ARS-HCYHCY vessel121779ARS-EdchHot demineralised water vessel15,87080AHCYBIR slurry hydrocyclone135281ACY-SVASVA cyclone12,31482ACV-SVASVA feeding small tank11,90283AHX-RGCRHeat exchanger for RGCR11,36984ARH-EdDemineralised water heater117085AFLC-CO2CO2 filter139086AFLC-CaCl2CaCl2 filter139087AFL-EdDemineralised water filter111088RAGIT-DVSDDVSD agitator11,56089RAGIT-CVSVACVSVA agitator11,50090RPC-CRCR recycle pump14,13091RPC-RGCRRGCR recycle Ed pump13,00092RPC-DVSDDVSD outlet pump160093RPC-LDCBLDCB pump160094RPC-LCRBIR slurry outlet CR pump160095RPC-Edch1Edch Pump160096RPC-Edch2Edch Pump160097RPC-ErCooling water pump12,60098RPC-EMMother liquor pump160099RPC-VSB/1VSB pumps1110100RPC-VSB/2VSB pumps1110101RPC-HXRGCRHXRGCR pump1500102RPC-EdGNEd pump to GN Ve11,300103RPC-FO1Wash sump (1st compartment) vertical pump1600104RPC-FO2Wash sump vertical pump1600105RPC-PDA/1CaCl2 30% dosing pump1200106RPC-PDA/2CaCl2 30% dosing pump1200107P9ESSCentrifuge15,000108AVTL-DVSDDVSD fan1500109AVTL-WETWet building wall extraction fan1200110P3VTL-SVASVA fan with silencer12,000111P3FL-SVASVA fan inlet air filter (two stages)12,000112P3RH-SVASVA air heater11,200113PDP-FFS/1Packaging dedusters (bag filters, one on each TRS)12,700114PDP-FFS/2Packaging dedusters (bag filters, one on each TRS)12,700115PVTL-DPFFS/1Fans for packaging dedusters1280116PECR-DPFFS/1Rotary valves outlet packaging dedusters1300117PVTL-DPFFS/2Fans for packaging dedusters1280118PECR-DPFFS/2Rotary valves outlet packaging dedusters1300119PDP-TRSDSD silos dust filter12,000120PDP-VTSieves dedusting - bag filter115121PDP-TRS0/13TRS dedusting - bag filter115122PDP-TR/1BIR Silo deduster (bag filter)115123PDP-TR/2BIR Silo deduster (bag filter)115124PDP-TR/3BIR Silo deduster (bag filter)115125PDP-TR/4BIR Silo deduster (bag filter)115126PDP-TR/5BIR Silo deduster (bag filter)115127PDP-TR/6BIR Silo deduster (bag filter)115128PDP-TR/7BIR Silo deduster (bag filter)115129PDP-TR/8BIR Silo deduster (bag filter)115130PFLM-DPSVACYSVA bag filter11,280131PDP-SVACYSVA deduster11,280132P10VSBVenturi scrubber16,200133P11FLCA/1-2LDCB carbon bed199,050134P2BWF/1-2Second step LDCB filter1860135P4GN-VeSteam generator (main heat exchanger)12,050136P4RH-GNSteam generator (pre heater)1420137P4RS-EcGNVeGNVe condensates vessel12,050138P4SEP-VeSteam separator12,050139P15N/ADemineralised water production (skid)N/A112,000BY SPX140P13N/ASpray Dryer12,500141P5CP-AcAir compressor13,430142P5SH-CPAc/1 to 2CPAc dryer12,000143P5FL-AcAir filter121144P5RS-AcCompressed air tank17,000145ASPM-FFS/1-2Magnetic separators to FFS1/21100146AUV-EdDemineralised water UV1500147P8FFS/1FFS bagging machine Pharma (0/13)19,200148P8FFS/2FFS bagging machine (27/50 or 0/50)19,200149P803Z101Clean room for FFS Pharma14,000150P830H101Bag conveyors12,400151P830H102Bag conveyors12,400152P8PAL/1Palletiser for FFS1113,000153P8PAL/2Palletiser for FFS2113,000154P8HOUSStretch hooding machine13,500155P12BB-BIREmergency manual bigbag station12,500156P12BB-PRGVibrating big-bag loading system11,500157AECH/1Samplers (0/50)180158AECH/2Samplers (VT1 0/13)180159AECH/3Samplers (VT1 27/50)180160AECH/4Samplers (VT2 0/13)180161AECH/5Samplers (VT2 27/50)180162RN/AHoist CentrifugeN/A5,000163RN/AHoist Drop ZoneN/A1,200Sub Total to Schedule B5612,9750.00.0NOTE:1. Installation details and scope of work refer to TKIS-PI-000-EC-0021 - Construction Contract Requisition for Mechanical and Piping WorkEquipment GroupAStationary EquipmentRRotatingUPackage unitPackage No.DesicriptionP1SD silos with wibrating bottomsP2Back-wash filtersP3SVA hot air productionP4Steam generationP5Dry air productionP6Sieves distribution conveyor with rotary valvesP7BIR silos with vibrating bin activatorsP8Packaging linesP9Centrifuge with hydraulic groupP10Venturi scrubberP11Carbon bed filtersP12Big bag station packageP13Spray dryer packageP14SD pneumatic transport packageP15Demineralised water production skid

&RPage &P of &N

Sched B-Rates Measure B10ThyssenKruppIndustrial SolutionsLOY KRATHONG PROJECTSCHEDULE OF RATES - CONTRACT - METHOD OF MEASUREMENT & PAYMENT - BProject No. : 01-5004Schedule B10Title of Works: Piping Fabrication and Erection / Mechanical ErectionRev 00The scope of items included in Schedule B11 are defined in the following table together with the manner in which the items are measured and payments made. Attached to this schedule are a set of quantities, derived electronically from design data. These quantities are issued to clarify the basis of the Schedule of Rates quantities and are for INFORMATION ONLY to ESTABLISH THE ESTIMATED PRICE. The final quantities will measured at the completion of the works and the rates applied to the final quantitative to establish the final value.Table of Miscellaneous WorkItemDescriptionQuantityUNIT PriceTOTAL ( Baht)UnitQ'ty1Grouting work0.0- Equipment groutingCu.m100.0- Pipe support foundation and groutingCu.m250.02Under Ground Piping0.0- Excavation work for pipe size 8" ( Deep 0.9 m.)m.2000.0- Sandlot10.03Special item and Fire protection equipmet Items0.0Standard Wet bulb sprinkler nozzle (install only)Ea651Outdoor Fire Hose Box (install only)Ea60.0Indoor Fire Hose Carbinet (install only)Ea140.0Fire Water Hydrant (install only)Ea60.0Fixed Fire Monitor (install only)Ea30.0Portable Dry Chemical (install only)Ea330.0Deluge valv size 3"Ea10.0Safety Shower and Eye washer (install only)Ea20.0Portable Eye washer (install only)Ea90.0Expension Joint (install only)Ea20.0Sampling Valve (install only)Ea100.0Supple sleeve, clamp connection (install only)Ea400.0Spring Support (install only)Ea100.00.0Sampling point cabinet (material + labor)Ea100.00.04Manpower supply for commissioningMan-Day10.00.00.00.00.00.0Sub Total to Schedule B110.0

Sched C - Dayworks C1ThyssenKruppIndustrial SolutionsLOY KRATHONG PROJECTSCHEDULE OF RATES - HOUR / DAYWORKS - CProject No. : 01-5004Schedule CRev 00Title of Works: Mechanical and Piping Fabrication and ErectionThe Rates set out in this Schedule shall be used to value additions to the scope of Work where dayworks is instructed. Rates shall be all inclusive of all costs , in particular, the followingLabour rates shall include overhead, profit, supervision, insurance, accommodation, consumables, small tools,PPEPlant rates shall include overhead, profit, fuel, maintenance, insurance, consumables, operator's wagesMaterials percentage shall include overheads, profit, freight, handling, administration. Payment of material costs shall be evidenced by CONTRACTORValue of any dayworks shall be included in the Final Contract price, one Change Order will be issued on completion of the day works to establish the final contract priceItem No.DescriptionUnitRate1LABOURFOREMANBaht/HourFITTERBaht/HourHELPERBaht/HourPAINTERBaht/HourLABORERSBaht/HourWELDERBaht/HourMILLWRIGHTBaht/Hour2MANAGEMENT AND SUPERVISIONPROJECT MANAGERBaht/HourSITE MANAGERBaht/HourENGINEERBaht/HourSUPERVISORBaht/Hour3PLANTTRUCK CRANE (Incld.Fuel) 5 TonsBaht/DayGENERATOR (Incld.Fuel) 90 KVABaht/DayAIR COMPRESSOR (Incld.Fuel) 375 CFMBaht/DayWELDING GENERATOR (Incld.Fuel) 700 AMPBaht/DayPICK UP (Incld.Fuel) 1 TonsBaht/DayMOBILE CRANE (Incld.Fuel) 25-80 TonsBaht/DayMOBILE CRANE (Incld.Fuel) 100-150 TonsBaht/DayTRUCK AND TRAILER (Incld.Fuel)Baht/DayAC/DC WELDING M/C 300 AMPBaht/DayGRINDING M/C 4"Baht/DayGRINDING M/C 7"Baht/DayDRILLING M/CBaht/DayHOLIDAY DETECTORBaht/Day4MATERIALSORIGINAL PRICE 15%Remark :1. This offered rate is for normal working day and work period from 8.00 AM to 5.00 PMfor Monday to Saturday only.2. If working for Sunday and Holiday the unit rate should be 2 time of offered rate. ( 8.00 AM to 5.00 PM ).3. If working for overtime of normal working day ( After 5.00 PM ), the unit rate should be 1.5 timeof offered rate.4. If working for overtime of Sunday and Holiday ( After 5.00 PM ), the unit rate shound be 3 timeof offered rate.

Sched C - Tepmo material C2ThyssenKruppIndustrial SolutionsLOY KRATHONG PROJECTSCHEDULE OF RATES - UNIT OF EMPORARY MATERAILS FOR COMMISSIONING - CProject No. : 01-5004Schedule C1Rev 00Title of Works: Mechanical and Piping Fabrication and ErectionThe Rates set out in this Schedule shall be used to value additions to the scope of Work where dayworks is instructed. Rates shall be all inclusive of all costs.Item No.DescriptionUnitRate1TEMPORARY GASKET (Rate 150/300#) Compress fiber- DN: 15Baht/piece- DN: 20Baht/piece- DN: 25Baht/piece- DN: 40Baht/piece- DN: 50Baht/piece- DN: 80Baht/piece- DN: 100Baht/piece- DN: 150Baht/piece- DN: 200Baht/piece- DN: 250Baht/piece- DN: 300Baht/piece- DN: 350Baht/piece- DN: 400Baht/piece2TEMPORARY GASKET (Rate 150/300#) Spiral wound Carbon steel- DN: 15Baht/piece- DN: 20Baht/piece- DN: 25Baht/piece- DN: 40Baht/piece- DN: 50Baht/piece- DN: 80Baht/piece- DN: 100Baht/piece- DN: 150Baht/piece- DN: 200Baht/piece- DN: 250Baht/piece- DN: 300Baht/piece- DN: 350Baht/piece- DN: 400Baht/piece3TEMPORARY GASKET (Rate 150/300#) Spiral wound Stainless steel- DN: 15Baht/piece- DN: 20Baht/piece- DN: 25Baht/piece- DN: 40Baht/piece- DN: 50Baht/piece- DN: 80Baht/piece- DN: 100Baht/piece- DN: 150Baht/piece- DN: 200Baht/piece- DN: 250Baht/piece- DN: 300Baht/piece- DN: 350Baht/piece- DN: 400Baht/piece4TEMPORARY BLIND AND SPADE (Rate 150/300#)- DN: 15Baht/piece- DN: 20Baht/piece- DN: 25Baht/piece- DN: 40Baht/piece- DN: 50Baht/piece- DN: 80Baht/piece- DN: 100Baht/piece- DN: 150Baht/piece- DN: 200Baht/piece- DN: 250Baht/piece- DN: 300Baht/piece- DN: 350Baht/piece- DN: 400Baht/piece