PREZENTACIJA · 0 20.000 40.000 60.000 80.000 100.000 120.000 140.000 ts dom. stanovništvo...
Transcript of PREZENTACIJA · 0 20.000 40.000 60.000 80.000 100.000 120.000 140.000 ts dom. stanovništvo...
PREZENTACIJA
2018_Rev.03 od 19.06.2018.
0
20.000
40.000
60.000
80.000
100.000
120.000
140.000
Nu
mb
er
of
resi
de
nts
dom. stanovništvo korisnici vikendica turisti
Domicile residents: about 19.500 people
Domicile residents + tourists + weekend houses keepers = 135.000 people a day
Out of 30.000 structures: 10.000 in permanent use; 20.000 periodically used
The surface area of Krk is 410 km² and 200 km of coast
RESIDENTS
84%
11%
5%
Hrvatska
Kvarner
Krk
OVERNIGHT STAYS IN CROATIA IN 2017
Croatia: 88,2 mil. overnight stays
Kvarner region:13,9 mil. overnight stays
The island of Krk: 4,5 mil. overnight stays
MUNICIPAL SERVICES
COMPANIES
1960
1986
2014 2014
WATER SUPPLY
WASTEWATER DRAINAGE
WATER SUPPLY
WASTEWATER DRAINAGE
WASTE MANAGEMENT
WATER SUPPLY
WASTEWATER DRAINAGE
WASTE MANAGEMENT
ENERGY
83 employees
16 employees
106 employees
MUNICIPALITIESOWNERSHIP
THE CITY OF
KRK 23%
MALINSKA-DUBAŠNICA 18%
OMIŠALJ 16%
VRBNIK 6%
BAŠKA 14%
PUNAT 11%
DOBRINJ 12%
100% SELF-SUFFICIENT IN ENERGY0% WASTE
THE ISLAND OF KRK:
100% SUSTAINABLE
THE ISLAND OF KRK100 - 0 - 100
100% SELF-SUFFICIENT IN ENERGY
THE ISLAND OF KRK „0” EMISSION OF THE NOXIOUS GASSES”
Year 2012: Completed: Interdisciplinary strategy of the
greenhouse gasses zero emision for the integrated
sustainable development of the island of Krk
STRATEGIC AIMS
15%45%100%
Init
ial s
itu
atio
n w
ith
ou
t th
egr
een
ho
use
zer
o e
mis
sio
n
15%
Ener
gy s
avin
g
15%
30%In
vest
men
ts
pro
fita
ble
ove
ra
sho
rt t
erm
Futu
re e
ner
gy
nec
essi
ties
Tota
l of
ener
gy
savi
ng
2030
Necessities covered by renewablesources usage (wind, sun, bio-mass)
Energy saving by rising the public awareness – 15%
Economicaly profitable investments in energy efficiency– 30%
Tota
l of
ener
gy s
avin
g-
45
%
TODAY 2020 2025
112 GWh/A
62 GWh/A
THE WIND ENERGY
There is a great potential of wind energy utilisation on the island of Krk!
The wind energy potential for the island’s necessities is 36-40 GWh/A
YEAR 2014: Completed: “Pre-investment study for the
wind farm construction on the island of Krk”
Community Wind farm „Treskavac”
THE WIND ENERGY
12
SOLAR ENERGY
The solar energy potential for the island’s necessities is 15-20 GWh/A
YEAR 2014: Completed: “Study of possible locations
for the solar farm on the island of Krk”
Building-integrated photovoltaics -Roof potential
Project of 4,8 MW The photovoltaic plants for Ponikve
Project of 7,5 MW The photovoltaic plant „Baška”
SOLAR ENERGY
BIOMASS
ENERGY
YEAR 2013: „Feasibility study for obtaining
energy from biomass”
Project proposed to InterregMEDin 2015, in collaboration with European
islands Sardegna and Mallorca, and French province
EDUCATIONAL ENERGY CENTRE
The Main project design of the future EEC is
completed.
It will be constructed next to the “Ponikve” headquarters as a
side structure.
The future EE centre:
FIRST PROJECT
The photovoltaic plant “Treskavac” 2012. god.for the production of electricity of 136 KW,
The photovoltaic plant“Treskavac”:
2017
Produced: 145.771 kWh
Consumed: 138.386 kWh
E-MOBILITY :
Charging Stations
22 Charging Stations on The island Of Krk
Electric vehicle
11 Electric cars VW eUP for all municipalities and Ponikve
Charging Stations:
2017. “Study of e-mobility on the island of Krk”.
2018. Development of e-bike shearing system on the island of Krk in cooperation with Ministry of Tourism of Croatia.
2019. plan is to bulid 10 e-bike shearing stations.
E-MOBILITY :
PUBLIC LIGHTING:
2015. project documentation for the reconstruction of public lighting on LED lighting.
2017. built-in equipment for public lighting control and management.
100% SELF-SUFFICIENT IN ENERGY0% WASTE
THE ISLAND OF KRK:
100% SUSTAINABLE
THE ISLAND OF KRK100 - 0 - 100
24
0% WASTE
System effectiveness:
18,2% 24,2% 25,8% 30,3% 31,5% 35,3% 39,4% 43,7% 46,1% 50,1% 54,2% 53,6%
planned until 2020 80,0%
2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Separately disposed waste percentage (%)
Croatia has pledged:
Until 31 December 2016
Until 2020
To reduce the quantity of biodegradable waste within the
municipal waste for 50%. Krk has achieved this in 2014.
To collect 50% of the waste separately disposed. Krk has
achieved this in 2015.
DOOR TO DOOR until 2014:
100% SELF-SUFFICIENT IN ENERGY0% WASTE
THE ISLAND OF KRK:
100% SUSTAINABLE
THE ISLAND OF KRK100 - 0 - 100
100% SUSTAINABLEWATER SUPPLY
Losses in the water
supply system
29,29
26,84
24,92
20,7721,24
23,81
20,6421,58
24,4123,48
22,23
19,719,22
18,04
15
17
19
21
23
25
27
29
31
2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017
31
PONIKVE LAKE19.12.2012.Level: 19,35 m.n.m
PONIKVE LAKE19.09.2012.level: 15,30 m.n.m
32
Existing Planned
The point of overflow 19,14 m.n.m 24 m.n.m
Accumulation 2 mil. m³ 7 mil. m³
Submerged area 75 ha 119 ha
Planned investment 20 mil. Eura
WATER SOURCEPonikve lake
71%
CONTROL ROOM:
WATER SUPPLY
WASTEWATER CONTROL
SOLIDWASTE
PUBLIC LIGHTING
CHARGING STATIONS
E-MOBILITY
SMART ISLAND KRK:
Thank you!
Krk, 19. june 2018.