Previous Paid Summary Sheet for KDESH (IPC 28)

75
30+000 30+500 1,883.81 847.41 1,036.40 30+500 31+000 2,383.13 1,270.70 1,112.43 31+000 31+500 1,157.58 1,098.62 58.96 31+500 32+000 1,696.24 1,750.12 (53.88) 32+000 32+500 2,070.27 2,070.27 - 32+500 33+000 1,248.78 1,248.55 0.23 33+000 33+500 1,418.65 1,413.29 5.36 33+500 34+000 1,207.91 1,213.38 (5.47) 34+000 34+500 1,006.74 633.47 373.27 34+500 35+000 1,550.31 1,481.04 69.27 35+000 35+500 1,694.35 1,694.35 - 35+500 36+000 774.98 - 774.98 36+000 36+500 1,184.45 1,116.43 68.02 36+500 37+000 1,235.93 1,235.93 - 37+000 37+500 1,289.72 1,289.80 (0.08) 37+500 38+000 995.60 1,344.66 (349.06) 38+000 38+500 1,076.12 1,076.18 (0.06) 38+500 39+000 1,368.34 1,360.52 7.82 39+000 39+500 1,153.93 - 1,153.93 39+500 40+000 1,391.16 633.45 757.71 40+000 40+500 1,593.02 1,574.24 18.78 40+500 41+000 1,576.89 1,565.00 11.89 41+000 41+500 1,523.57 1,230.27 293.30 41+500 42+000 1,545.36 1,202.84 342.52 42+000 42+500 1,970.13 1,248.41 721.72 42+500 43+000 2,211.35 - 2,211.35 43+000 43+500 1,333.86 1,137.39 196.47 43+500 44+000 1,321.98 1,362.69 (40.71) 44+000 44+500 1,609.57 461.50 1,148.07 44+500 45+000 1,757.97 611.57 1,146.40 45+000 45+500 1,529.50 605.83 923.67 45+500 46+000 1,954.69 826.82 1,127.87 46+000 46+500 1,882.35 780.37 1,101.98 46+500 47+000 1,626.37 626.60 999.77 47+000 47+500 1,477.25 - 1,477.25 47+500 48+000 1,868.42 - 1,868.42 48+000 48+500 1,714.00 - 1,714.00 48+500 49+000 1,771.69 495.75 1,275.94 49+000 49+500 46.89 - 46.89 49+500 50+000 1,456.84 1,401.40 55.44 50+000 50+500 2,438.10 2,460.71 (22.61) 50+500 51+000 2,312.09 2,335.35 (23.26) 51+000 51+500 2,163.14 2,055.73 107.41 51+500 52+000 2,719.04 2,719.66 (0.62) 52+000 52+500 1,373.45 1,225.99 147.46 70,565.52 48,706.29 21,859.23 TOTAL CS Qty. Balance Qty. 2.1.1 Clearing and grubbing Chainage Actual Previous Paid Qty.

description

doc

Transcript of Previous Paid Summary Sheet for KDESH (IPC 28)

Page 1: Previous Paid Summary Sheet for KDESH (IPC 28)

30+000 30+500 1,883.81 847.41 1,036.40

30+500 31+000 2,383.13 1,270.70 1,112.43

31+000 31+500 1,157.58 1,098.62 58.96

31+500 32+000 1,696.24 1,750.12 (53.88)

32+000 32+500 2,070.27 2,070.27 -

32+500 33+000 1,248.78 1,248.55 0.23

33+000 33+500 1,418.65 1,413.29 5.36

33+500 34+000 1,207.91 1,213.38 (5.47)

34+000 34+500 1,006.74 633.47 373.27

34+500 35+000 1,550.31 1,481.04 69.27

35+000 35+500 1,694.35 1,694.35 -

35+500 36+000 774.98 - 774.98

36+000 36+500 1,184.45 1,116.43 68.02

36+500 37+000 1,235.93 1,235.93 -

37+000 37+500 1,289.72 1,289.80 (0.08)

37+500 38+000 995.60 1,344.66 (349.06)

38+000 38+500 1,076.12 1,076.18 (0.06)

38+500 39+000 1,368.34 1,360.52 7.82

39+000 39+500 1,153.93 - 1,153.93

39+500 40+000 1,391.16 633.45 757.71

40+000 40+500 1,593.02 1,574.24 18.78

40+500 41+000 1,576.89 1,565.00 11.89

41+000 41+500 1,523.57 1,230.27 293.30

41+500 42+000 1,545.36 1,202.84 342.52

42+000 42+500 1,970.13 1,248.41 721.72

42+500 43+000 2,211.35 - 2,211.35

43+000 43+500 1,333.86 1,137.39 196.47

43+500 44+000 1,321.98 1,362.69 (40.71)

44+000 44+500 1,609.57 461.50 1,148.07

44+500 45+000 1,757.97 611.57 1,146.40

45+000 45+500 1,529.50 605.83 923.67

45+500 46+000 1,954.69 826.82 1,127.87

46+000 46+500 1,882.35 780.37 1,101.98

46+500 47+000 1,626.37 626.60 999.77

47+000 47+500 1,477.25 - 1,477.25

47+500 48+000 1,868.42 - 1,868.42

48+000 48+500 1,714.00 - 1,714.00

48+500 49+000 1,771.69 495.75 1,275.94

49+000 49+500 46.89 - 46.89

49+500 50+000 1,456.84 1,401.40 55.44

50+000 50+500 2,438.10 2,460.71 (22.61)

50+500 51+000 2,312.09 2,335.35 (23.26)

51+000 51+500 2,163.14 2,055.73 107.41

51+500 52+000 2,719.04 2,719.66 (0.62)

52+000 52+500 1,373.45 1,225.99 147.46

70,565.52 48,706.29 21,859.23 TOTAL

CS Qty. Balance Qty.

2.1.1 Clearing and grubbing

Chainage

Actual

Previous Paid

Qty.

Page 2: Previous Paid Summary Sheet for KDESH (IPC 28)

30+000 30+500 150.24 64.47 85.77

30+500 31+000 79.91 49.16 30.75

31+000 31+500 168.46 168.54 (0.08)

31+500 32+000 106.20 105.95 0.25

32+000 32+500 140.11 140.11 -

32+500 33+000 189.11 189.13 (0.02)

33+000 33+500 180.96 99.21 81.75

33+500 34+000 112.93 112.94 (0.01)

34+000 34+500 75.05 105.24 (30.19)

34+500 35+000 193.86 194.04 (0.18)

35+000 35+500 176.93 256.52 (79.59)

35+500 36+000 1,578.51 0.44 1,578.07

36+000 36+500 266.81 257.55 9.26

36+500 37+000 300.38 359.10 (58.72)

37+000 37+500 291.03 296.72 (5.69)

37+500 38+000 280.34 328.64 (48.30)

38+000 38+500 264.89 275.74 (10.85)

38+500 39+000 276.97 280.31 (3.34)

39+000 39+500 86.16 - 86.16

39+500 40+000 175.43 81.91 93.52

40+000 40+500 376.70 374.04 2.66

40+500 41+000 437.63 483.77 (46.14)

41+000 41+500 304.29 321.39 (17.10)

41+500 42+000 416.84 416.95 (0.11)

42+000 42+500 308.47 284.53 23.94

42+500 43+000 473.81 930.18 (456.37)

43+000 43+500 267.05 267.33 (0.28)

43+500 44+000 142.76 142.84 (0.08)

44+000 44+500 180.01 133.25 46.76

44+500 45+000 247.86 122.82 125.04

45+000 45+500 284.16 163.11 121.05

45+500 46+000 327.55 243.50 84.05

46+000 46+500 251.94 193.96 57.98

46+500 47+000 317.19 174.42 142.77

47+000 47+500 364.01 - 364.01

47+500 48+000 245.84 - 245.84

48+000 48+500 210.19 - 210.19

48+500 49+000 224.36 142.07 82.29

49+000 49+500 1.20 - 1.20

49+500 50+000 232.51 232.92 (0.41)

50+000 50+500 210.35 198.05 12.30

50+500 51+000 214.00 211.83 2.17

51+000 51+500 162.06 62.91 99.15

51+500 52+000 298.12 519.74 (221.62)

52+000 52+500 10.55 (300.00) 310.55

11,603.73 8,685.33 2,918.40 TOTAL

3.1.4 Roadway excavation, unsuitable soil

Chainage CS Qty. Balance Qty.

Actual

Previous Paid

Qty.

Page 3: Previous Paid Summary Sheet for KDESH (IPC 28)

30+000 30+500 - 41.00 (41.00)

30+500 31+000 - 8.41 (8.41)

31+000 31+500 - 67.69 (67.69)

31+500 32+000 - 0.35 (0.35)

32+000 32+500 - 22.82 (22.82)

32+500 33+000 - 81.16 (81.16)

33+000 33+500 - 26.08 (26.08)

33+500 34+000 - 33.13 (33.13)

34+000 34+500 - 22.75 (22.75)

34+500 35+000 - 20.70 (20.70)

35+000 35+500 - - -

35+500 36+000 - - -

36+000 36+500 - - -

36+500 37+000 - - -

37+000 37+500 - - -

37+500 38+000 - - -

38+000 38+500 - - -

38+500 39+000 - - -

39+000 39+500 - - -

39+500 40+000 - - -

40+000 40+500 - - -

40+500 41+000 - - -

41+000 41+500 - - -

41+500 42+000 - - -

42+000 42+500 - - -

42+500 43+000 - - -

43+000 43+500 - - -

43+500 44+000 - - -

44+000 44+500 - - -

44+500 45+000 - - -

45+000 45+500 - - -

45+500 46+000 - - -

46+000 46+500 - - -

46+500 47+000 - - -

47+000 47+500 - - -

47+500 48+000 - - -

48+000 48+500 - - -

48+500 49+000 - - -

49+000 49+500 - - -

49+500 50+000 - - -

50+000 50+500 - 15.98 (15.98)

50+500 51+000 - 7.38 (7.38)

51+000 51+500 - 7.83 (7.83)

51+500 52+000 - 33.95 (33.95)

52+000 52+500 - 1,512.53 (1,512.53)

- 1,901.76 (1,901.76)

3.1.5 Roadway excavation, sub grade replacement

Chainage CS Qty. Balance Qty.

TOTAL

Actual

Previous Paid

Qty.

Page 4: Previous Paid Summary Sheet for KDESH (IPC 28)

30+000 30+500 753.17 377.97 375.20

30+500 31+000 464.44 377.86 86.58

31+000 31+500 654.15 654.15 -

31+500 32+000 675.17 675.17 -

32+000 32+500 796.60 796.60 -

32+500 33+000 680.50 680.50 0.00

33+000 33+500 996.60 996.60 -

33+500 34+000 515.20 515.20 -

34+000 34+500 336.10 336.10 -

34+500 35+000 868.80 1,225.84 (357.04)

35+000 35+500 1,116.40 1,113.60 2.80

35+500 36+000 5,607.88 2.80 5,605.08

36+000 36+500 1,017.87 719.77 298.10

36+500 37+000 1,597.93 1,479.28 118.65

37+000 37+500 1,732.46 1,774.53 (42.07)

37+500 38+000 1,187.57 1,145.50 42.07

38+000 38+500 1,137.23 1,137.23 -

38+500 39+000 1,172.72 1,165.40 7.32

39+000 39+500 396.10 - 396.10

39+500 40+000 950.21 378.57 571.64

40+000 40+500 1,414.84 1,433.93 (19.09)

40+500 41+000 1,491.43 1,473.68 17.75

41+000 41+500 1,401.32 1,374.74 26.58

41+500 42+000 1,384.28 1,403.72 (19.44)

42+000 42+500 1,687.99 1,413.54 274.45

42+500 43+000 1,900.71 - 1,900.71

43+000 43+500 1,103.80 1,103.82 (0.02)

43+500 44+000 729.18 729.18 -

44+000 44+500 1,026.99 466.63 560.36

44+500 45+000 1,513.41 554.33 959.08

45+000 45+500 1,423.32 717.48 705.84

45+500 46+000 1,450.30 732.16 718.14

46+000 46+500 1,178.03 573.29 604.74

46+500 47+000 1,307.89 655.68 652.21

47+000 47+500 1,365.54 - 1,365.54

47+500 48+000 1,105.49 - 1,105.49

48+000 48+500 982.76 - 982.76

48+500 49+000 1,113.13 467.69 645.44

49+000 49+500 7.23 - 7.23

49+500 50+000 1,121.00 1,121.00 -

50+000 50+500 1,239.56 1,239.56 -

50+500 51+000 1,358.40 1,358.40 -

51+000 51+500 1,016.21 1,017.19 (0.98)

51+500 52+000 1,686.96 1,685.96 1.00

52+000 52+500 1,563.74 1,416.00 147.74

54,230.61 36,490.64 17,739.97

3.1.7 Prepare sub grade in cut areas

Chainage CS Qty. Balance Qty.

TOTAL

Actual

Previous Paid

Qty.

Page 5: Previous Paid Summary Sheet for KDESH (IPC 28)

30+000 30+500 1,879.48 274.38 1,605.10

30+500 31+000 2,352.50 1,265.70 1,086.80

31+000 31+500 1,100.50 1,148.94 (48.44)

31+500 32+000 1,743.30 1,743.30 -

32+000 32+500 2,051.38 2,051.39 (0.01)

32+500 33+000 1,239.12 1,239.12 -

33+000 33+500 1,364.42 1,364.42 -

33+500 34+000 1,190.39 1,190.39 -

34+000 34+500 1,005.46 1,005.46 -

34+500 35+000 1,534.29 1,590.28 (55.99)

35+000 35+500 1,656.95 1,656.95 -

35+500 36+000 773.31 - 773.31

36+000 36+500 1,179.71 1,112.18 67.53

36+500 37+000 1,219.89 1,322.89 (103.00)

37+000 37+500 1,334.96 1,248.82 86.14

37+500 38+000 976.88 960.02 16.86

38+000 38+500 1,064.17 1,064.17 -

38+500 39+000 1,335.23 1,327.36 7.87

39+000 39+500 1,133.20 - 1,133.20

39+500 40+000 1,384.45 633.45 751.00

40+000 40+500 1,575.02 1,574.24 0.78

40+500 41+000 1,561.40 1,565.00 (3.60)

41+000 41+500 1,515.16 1,230.27 284.89

41+500 42+000 1,546.37 1,202.84 343.53

42+000 42+500 1,949.98 1,243.77 706.21

42+500 43+000 2,117.84 - 2,117.84

43+000 43+500 1,329.97 1,134.40 195.57

43+500 44+000 1,319.84 1,358.59 (38.75)

44+000 44+500 1,605.20 519.19 1,086.01

44+500 45+000 1,747.67 764.46 983.21

45+000 45+500 1,519.16 605.83 913.33

45+500 46+000 1,918.61 826.81 1,091.80

46+000 46+500 1,859.12 780.37 1,078.75

46+500 47+000 1,616.80 626.60 990.20

47+000 47+500 1,471.63 - 1,471.63

47+500 48+000 1,848.53 - 1,848.53

48+000 48+500 1,705.06 - 1,705.06

48+500 49+000 1,763.32 493.01 1,270.31

49+000 49+500 45.81 - 45.81

49+500 50+000 1,449.42 1,395.06 54.36

50+000 50+500 2,424.60 1,414.57 1,010.03

50+500 51+000 2,301.04 1,327.41 973.63

51+000 51+500 2,150.01 1,324.51 825.50

51+500 52+000 2,675.92 2,007.20 668.72

52+000 52+500 999.03 - 999.03

69,536.10 43,593.35 25,942.75 TOTAL

3.3.12 Trim, level and compact roadbed

Chainage CS Qty. Balance Qty.

Actual

Previous Paid

Qty.

Page 6: Previous Paid Summary Sheet for KDESH (IPC 28)

30+000 30+500 1,048.84 408.88 639.96

30+500 31+000 1,685.25 1,195.34 489.91

31+000 31+500 492.82 492.82 -

31+500 32+000 1,848.22 1,856.40 (8.18)

32+000 32+500 2,231.26 2,231.27 (0.01)

32+500 33+000 540.60 540.60 -

33+000 33+500 1,113.10 1,113.10 -

33+500 34+000 670.84 672.72 (1.88)

34+000 34+500 503.40 531.71 (28.31)

34+500 35+000 765.89 765.89 -

35+000 35+500 1,094.13 1,094.13 -

35+500 36+000 1,634.04 0.44 1,633.60

36+000 36+500 729.97 650.26 79.71

36+500 37+000 962.57 1,021.71 (59.14)

37+000 37+500 913.58 919.27 (5.69)

37+500 38+000 580.62 402.54 178.08

38+000 38+500 803.89 577.69 226.20

38+500 39+000 666.37 599.96 66.41

39+000 39+500 554.82 - 554.82

39+500 40+000 1,055.24 550.44 504.80

40+000 40+500 763.67 716.27 47.40

40+500 41+000 808.07 705.00 103.07

41+000 41+500 880.39 730.01 150.38

41+500 42+000 754.34 559.34 195.00

42+000 42+500 1,464.42 1,088.73 375.69

42+500 43+000 1,143.07 639.54 503.53

43+000 43+500 745.31 684.41 60.90

43+500 44+000 1,077.63 929.18 148.45

44+000 44+500 1,171.52 301.21 870.31

44+500 45+000 1,506.38 344.25 1,162.13

45+000 45+500 933.00 413.26 519.74

45+500 46+000 992.57 502.54 490.03

46+000 46+500 986.76 493.32 493.44

46+500 47+000 926.76 390.35 536.41

47+000 47+500 787.11 - 787.11

47+500 48+000 898.79 - 898.79

48+000 48+500 936.27 - 936.27

48+500 49+000 1,345.30 10.36 1,334.94

49+000 49+500 44.70 - 44.70

49+500 50+000 685.64 646.81 38.83

50+000 50+500 1,271.99 1,271.99 -

50+500 51+000 1,328.00 1,328.00 -

51+000 51+500 1,164.00 1,164.00 -

51+500 52+000 1,307.89 1,307.89 -

52+000 52+500 1,279.65 1,840.38 (560.73)

45,098.68 31,692.01 13,406.67

3.3.13 Embankment construction, Type 1

Chainage CS Qty. Balance Qty.

TOTAL

Actual

Previous Paid

Qty.

Page 7: Previous Paid Summary Sheet for KDESH (IPC 28)

30+000 30+500 - 169.10 (169.10)

30+500 31+000 754.94 678.99 75.95

31+000 31+500 - - -

31+500 32+000 261.86 261.85 0.01

32+000 32+500 772.26 772.27 (0.01)

32+500 33+000 - - -

33+000 33+500 106.83 106.83 -

33+500 34+000 43.05 43.05 -

34+000 34+500 - - -

34+500 35+000 80.42 82.28 (1.86)

35+000 35+500 404.32 404.32 -

35+500 36+000 144.23 - 144.23

36+000 36+500 95.85 (44.32) 140.17

36+500 37+000 82.18 82.18 -

37+000 37+500 176.18 116.13 60.05

37+500 38+000 16.52 - 16.52

38+000 38+500 68.68 68.68 -

38+500 39+000 54.38 49.63 4.75

39+000 39+500 42.00 - 42.00

39+500 40+000 45.20 37.05 8.15

40+000 40+500 144.50 72.61 71.89

40+500 41+000 52.64 63.30 (10.66)

41+000 41+500 32.94 46.99 (14.05)

41+500 42+000 11.92 32.78 (20.86)

42+000 42+500 341.54 211.77 129.77

42+500 43+000 859.40 876.72 (17.32)

43+000 43+500 27.44 19.50 7.94

43+500 44+000 106.15 78.28 27.87

44+000 44+500 196.66 12.83 183.83

44+500 45+000 304.82 76.14 228.68

45+000 45+500 161.21 59.30 101.91

45+500 46+000 354.18 144.61 209.57

46+000 46+500 301.11 125.18 175.93

46+500 47+000 137.17 45.04 92.13

47+000 47+500 19.04 - 19.04

47+500 48+000 257.94 - 257.94

48+000 48+500 98.90 - 98.90

48+500 49+000 283.20 - 283.20

49+000 49+500 - - -

49+500 50+000 276.60 276.60 -

50+000 50+500 769.19 769.20 (0.01)

50+500 51+000 591.95 591.95 -

51+000 51+500 351.34 351.35 (0.01)

51+500 52+000 1,232.73 1,232.73 -

52+000 52+500 198.81 48.11 150.70

10,260.28 7,963.03 2,297.25 TOTAL

3.3.14 Embankment construction, Type 2

Chainage CS Qty. Balance Qty.

Actual

Previous Paid

Qty.

Page 8: Previous Paid Summary Sheet for KDESH (IPC 28)

30+000 30+500 851.39 207.69 643.70

30+500 31+000 841.01 412.00 429.01

31+000 31+500 905.78 905.78 -

31+500 32+000 853.77 853.77 -

32+000 32+500 862.13 862.78 (0.65)

32+500 33+000 914.38 914.38 -

33+000 33+500 963.24 963.24 -

33+500 34+000 920.28 981.42 (61.14)

34+000 34+500 961.48 900.90 60.58

34+500 35+000 966.45 966.44 0.01

35+000 35+500 964.18 965.60 (1.42)

35+500 36+000 2,138.83 - 2,138.83

36+000 36+500 853.59 812.08 41.51

36+500 37+000 929.69 928.68 1.01

37+000 37+500 993.88 989.76 4.12

37+500 38+000 929.13 - 929.13

38+000 38+500 944.63 - 944.63

38+500 39+000 860.97 - 860.97

39+000 39+500 914.27 - 914.27

39+500 40+000 878.74 - 878.74

40+000 40+500 861.11 - 861.11

40+500 41+000 844.29 - 844.29

41+000 41+500 899.10 - 899.10

41+500 42+000 837.77 - 837.77

42+000 42+500 921.12 - 921.12

42+500 43+000 932.22 - 932.22

43+000 43+500 888.31 - 888.31

43+500 44+000 924.52 - 924.52

44+000 44+500 882.52 - 882.52

44+500 45+000 922.29 - 922.29

45+000 45+500 1,039.82 - 1,039.82

45+500 46+000 914.61 - 914.61

46+000 46+500 867.32 - 867.32

46+500 47+000 818.09 - 818.09

47+000 47+500 779.35 - 779.35

47+500 48+000 810.87 - 810.87

48+000 48+500 797.18 - 797.18

48+500 49+000 825.92 - 825.92

49+000 49+500 10.22 - 10.22

49+500 50+000 999.41 887.36 112.05

50+000 50+500 1,089.72 1,089.72 -

50+500 51+000 1,115.29 1,115.30 (0.01)

51+000 51+500 1,121.91 1,121.91 -

51+500 52+000 989.28 989.28 -

52+000 52+500 558.83 539.85 18.98

41,098.89 17,407.94 23,690.95

4.1.1 Sub base as compacted in position

Chainage CS Qty.Previous Paid

Qty.Balance Qty.

TOTAL

Page 9: Previous Paid Summary Sheet for KDESH (IPC 28)

30+000 30+500 661.52 - 661.52

30+500 31+000 729.24 422.64 306.60

31+000 31+500 692.00 692.00 -

31+500 32+000 692.00 688.68 3.32

32+000 32+500 692.00 686.05 5.95

32+500 33+000 692.00 683.05 8.95

33+000 33+500 824.28 824.28 -

33+500 34+000 697.53 700.19 (2.66)

34+000 34+500 692.00 696.00 (4.00)

34+500 35+000 692.00 692.00 -

35+000 35+500 713.16 691.00 22.16

35+500 36+000 1,341.10 - 1,341.10

36+000 36+500 648.00 647.50 0.50

36+500 37+000 648.00 - 648.00

37+000 37+500 648.00 - 648.00

37+500 38+000 648.00 - 648.00

38+000 38+500 648.00 - 648.00

38+500 39+000 648.00 - 648.00

39+000 39+500 648.00 - 648.00

39+500 40+000 648.00 - 648.00

40+000 40+500 648.00 - 648.00

40+500 41+000 648.14 - 648.14

41+000 41+500 648.00 - 648.00

41+500 42+000 648.00 - 648.00

42+000 42+500 647.02 - 647.02

42+500 43+000 647.42 - 647.42

43+000 43+500 648.00 - 648.00

43+500 44+000 648.00 - 648.00

44+000 44+500 648.00 - 648.00

44+500 45+000 648.00 - 648.00

45+000 45+500 648.00 - 648.00

45+500 46+000 648.00 - 648.00

46+000 46+500 648.00 - 648.00

46+500 47+000 648.00 - 648.00

47+000 47+500 648.00 - 648.00

47+500 48+000 648.00 - 648.00

48+000 48+500 648.00 - 648.00

48+500 49+000 648.00 - 648.00

49+000 49+500 13.83 21.45 (7.62)

49+500 50+000 698.13 709.79 (11.66)

50+000 50+500 745.02 745.02 -

50+500 51+000 738.12 738.12 -

51+000 51+500 731.74 731.74 -

51+500 52+000 701.82 701.82 -

52+000 52+500 289.10 290.22 (1.12)

29,883.17 11,361.55 18,521.62 TOTAL

4.1.4 Dense graded aggregate base

Chainage CS Qty.Previous Paid

Qty.Balance Qty.

Page 10: Previous Paid Summary Sheet for KDESH (IPC 28)

30+000 30+500 304.52 - 304.52

30+500 31+000 276.98 209.99 66.99

31+000 31+500 176.00 210.00 (34.00)

31+500 32+000 176.00 210.00 (34.00)

32+000 32+500 176.00 210.00 (34.00)

32+500 33+000 175.90 210.00 (34.10)

33+000 33+500 175.84 105.42 70.42

33+500 34+000 176.00 202.44 (26.44)

34+000 34+500 176.00 210.00 (34.00)

34+500 35+000 176.00 168.00 8.00

35+000 35+500 172.48 168.00 4.48

35+500 36+000 150.78 - 150.78

36+000 36+500 132.30 (37.40) 169.70

36+500 37+000 127.92 - 127.92

37+000 37+500 2.56 - 2.56

37+500 38+000 - - -

38+000 38+500 - - -

38+500 39+000 4.18 - 4.18

39+000 39+500 209.56 - 209.56

39+500 40+000 209.00 - 209.00

40+000 40+500 209.00 - 209.00

40+500 41+000 209.00 - 209.00

41+000 41+500 209.00 - 209.00

41+500 42+000 207.84 - 207.84

42+000 42+500 209.00 - 209.00

42+500 43+000 208.99 - 208.99

43+000 43+500 208.59 - 208.59

43+500 44+000 209.02 - 209.02

44+000 44+500 209.00 - 209.00

44+500 45+000 209.00 - 209.00

45+000 45+500 209.00 - 209.00

45+500 46+000 209.00 - 209.00

46+000 46+500 209.00 - 209.00

46+500 47+000 209.00 - 209.00

47+000 47+500 209.00 - 209.00

47+500 48+000 209.00 - 209.00

48+000 48+500 209.00 - 209.00

48+500 49+000 209.00 - 209.00

49+000 49+500 3.54 - 3.54

49+500 50+000 175.68 166.62 9.06

50+000 50+500 284.80 252.04 32.76

50+500 51+000 283.58 252.92 30.66

51+000 51+500 279.81 223.85 55.96

51+500 52+000 257.61 136.95 120.66

52+000 52+500 84.94 70.22 14.72

8,128.42 2,969.05 5,159.37

4.3.6 Earthen shoulder as compacted in position

Chainage CS Qty.Previous Paid

Qty.Balance Qty.

TOTAL

Page 11: Previous Paid Summary Sheet for KDESH (IPC 28)

30+000 30+500 3,950.00 - 3,950.00

30+500 31+000 3,950.00 1,767.70 2,182.30

31+000 31+500 3,950.00 3,950.00 -

31+500 32+000 3,950.00 3,989.50 (39.50)

32+000 32+500 3,950.00 3,950.00 -

32+500 33+000 3,950.00 3,950.25 (0.25)

33+000 33+500 4,756.00 4,756.00 -

33+500 34+000 3,950.00 3,950.00 -

34+000 34+500 3,950.00 3,950.00 -

34+500 35+000 3,950.00 3,950.00 -

35+000 35+500 3,950.00 3,950.00 -

35+500 36+000 3,950.00 - 3,950.00

36+000 36+500 3,950.00 3,700.00 250.00

36+500 37+000 3,950.00 - 3,950.00

37+000 37+500 3,950.00 - 3,950.00

37+500 38+000 3,950.00 - 3,950.00

38+000 38+500 3,950.00 - 3,950.00

38+500 39+000 3,950.00 - 3,950.00

39+000 39+500 3,950.00 - 3,950.00

39+500 40+000 3,950.00 - 3,950.00

40+000 40+500 3,950.00 - 3,950.00

40+500 41+000 3,950.00 - 3,950.00

41+000 41+500 3,950.00 - 3,950.00

41+500 42+000 3,950.00 - 3,950.00

42+000 42+500 3,950.00 - 3,950.00

42+500 43+000 3,950.00 - 3,950.00

43+000 43+500 3,950.00 - 3,950.00

43+500 44+000 3,950.00 - 3,950.00

44+000 44+500 3,950.00 - 3,950.00

44+500 45+000 3,950.00 - 3,950.00

45+000 45+500 3,950.00 - 3,950.00

45+500 46+000 3,950.00 - 3,950.00

46+000 46+500 3,950.00 - 3,950.00

46+500 47+000 3,950.00 - 3,950.00

47+000 47+500 3,950.00 - 3,950.00

47+500 48+000 3,950.00 - 3,950.00

48+000 48+500 3,950.00 - 3,950.00

48+500 49+000 3,950.00 - 3,950.00

49+000 49+500 3,950.00 - 3,950.00

49+500 50+000 3,950.00 3,762.38 187.62

50+000 50+500 3,950.00 3,950.00 -

50+500 51+000 3,950.00 3,950.00 -

51+000 51+500 3,950.00 3,722.88 227.12

51+500 52+000 3,950.00 3,596.47 353.53

52+000 52+500 3,950.00 1,244.25 2,705.75

178,556.00 62,089.43 116,466.57 TOTAL

4.4.13 Bituminous Prime Coat

Chainage CS Qty.Previous Paid

Qty.Balance Qty.

Page 12: Previous Paid Summary Sheet for KDESH (IPC 28)

30+000 30+500 3,950.00 - 3,950.00

30+500 31+000 3,950.00 1,767.70 2,182.30

31+000 31+500 3,950.00 3,950.00 -

31+500 32+000 3,950.00 3,950.00 -

32+000 32+500 3,950.00 3,950.00 -

32+500 33+000 3,950.00 3,239.00 711.00

33+000 33+500 4,756.00 4,727.64 28.36

33+500 34+000 3,950.00 3,987.20 (37.20)

34+000 34+500 3,950.00 3,950.00 -

34+500 35+000 3,950.00 3,950.00 -

35+000 35+500 3,950.00 4,007.38 (57.38)

35+500 36+000 3,950.00 - 3,950.00

36+000 36+500 3,950.00 3,700.00 250.00

36+500 37+000 3,950.00 - 3,950.00

37+000 37+500 3,950.00 - 3,950.00

37+500 38+000 3,950.00 - 3,950.00

38+000 38+500 3,950.00 - 3,950.00

38+500 39+000 3,950.00 - 3,950.00

39+000 39+500 3,950.00 - 3,950.00

39+500 40+000 3,950.00 - 3,950.00

40+000 40+500 3,950.00 - 3,950.00

40+500 41+000 3,950.00 - 3,950.00

41+000 41+500 3,950.00 - 3,950.00

41+500 42+000 3,950.00 - 3,950.00

42+000 42+500 3,950.00 - 3,950.00

42+500 43+000 3,950.00 - 3,950.00

43+000 43+500 3,950.00 - 3,950.00

43+500 44+000 3,950.00 - 3,950.00

44+000 44+500 3,950.00 - 3,950.00

44+500 45+000 3,950.00 - 3,950.00

45+000 45+500 3,950.00 - 3,950.00

45+500 46+000 3,950.00 - 3,950.00

46+000 46+500 3,950.00 - 3,950.00

46+500 47+000 3,950.00 - 3,950.00

47+000 47+500 3,950.00 - 3,950.00

47+500 48+000 3,950.00 - 3,950.00

48+000 48+500 3,950.00 - 3,950.00

48+500 49+000 3,950.00 - 3,950.00

49+000 49+500 3,950.00 89.68 3,860.32

49+500 50+000 3,950.00 3,397.00 553.00

50+000 50+500 3,950.00 3,950.00 -

50+500 51+000 3,950.00 3,950.00 -

51+000 51+500 3,950.00 3,634.00 316.00

51+500 52+000 3,950.00 3,215.30 734.70

52+000 52+500 1,698.50 1,659.00 39.50

176,304.50 61,073.90 115,230.60

4.4.15 Bituminous Tack Coat

Chainage CS Qty.Previous Paid

Qty.Balance Qty.

TOTAL

Page 13: Previous Paid Summary Sheet for KDESH (IPC 28)

30+000 30+500 3,950.00 - 3,950.00

30+500 31+000 3,950.00 1,531.82 2,418.18

31+000 31+500 3,950.00 3,160.00 790.00

31+500 32+000 3,950.00 3,546.31 403.69

32+000 32+500 3,950.00 3,555.00 395.00

32+500 33+000 3,950.00 1,848.00 2,102.00

33+000 33+500 4,756.00 - 4,756.00

33+500 34+000 3,950.00 - 3,950.00

34+000 34+500 3,950.00 3,634.00 316.00

34+500 35+000 3,950.00 3,950.00 -

35+000 35+500 3,950.00 3,729.25 220.75

35+500 36+000 3,950.00 - 3,950.00

36+000 36+500 3,950.00 - 3,950.00

36+500 37+000 3,950.00 - 3,950.00

37+000 37+500 3,950.00 - 3,950.00

37+500 38+000 3,950.00 - 3,950.00

38+000 38+500 3,950.00 - 3,950.00

38+500 39+000 3,950.00 - 3,950.00

39+000 39+500 3,950.00 - 3,950.00

39+500 40+000 3,950.00 - 3,950.00

40+000 40+500 3,950.00 - 3,950.00

40+500 41+000 3,950.00 - 3,950.00

41+000 41+500 3,950.00 - 3,950.00

41+500 42+000 3,950.00 - 3,950.00

42+000 42+500 3,950.00 - 3,950.00

42+500 43+000 3,950.00 - 3,950.00

43+000 43+500 3,950.00 - 3,950.00

43+500 44+000 3,950.00 - 3,950.00

44+000 44+500 3,950.00 - 3,950.00

44+500 45+000 3,950.00 - 3,950.00

45+000 45+500 3,950.00 - 3,950.00

45+500 46+000 3,950.00 - 3,950.00

46+000 46+500 3,950.00 - 3,950.00

46+500 47+000 3,950.00 - 3,950.00

47+000 47+500 3,950.00 - 3,950.00

47+500 48+000 3,950.00 - 3,950.00

48+000 48+500 3,950.00 - 3,950.00

48+500 49+000 3,950.00 - 3,950.00

49+000 49+500 3,950.00 - 3,950.00

49+500 50+000 3,950.00 2,780.80 1,169.20

50+000 50+500 3,950.00 3,160.00 790.00

50+500 51+000 3,950.00 3,333.80 616.20

51+000 51+500 3,950.00 3,634.00 316.00

51+500 52+000 3,950.00 2,485.34 1,464.66

52+000 52+500 3,950.00 - 3,950.00

178,556.00 40,348.32 138,207.68 TOTAL

4.5.21 Asphalt concrete

Chainage CS Qty.Previous Paid

Qty.Balance Qty.

Page 14: Previous Paid Summary Sheet for KDESH (IPC 28)

30+000 30+500 -

30+500 31+000 -

31+000 31+500 -

31+500 32+000 -

32+000 32+500 -

32+500 33+000 -

33+000 33+500 -

33+500 34+000 -

34+000 34+500 -

34+500 35+000 -

35+000 35+500 -

35+500 36+000 -

36+000 36+500 -

36+500 37+000 -

37+000 37+500 -

37+500 38+000 -

38+000 38+500 -

38+500 39+000 -

39+000 39+500 -

39+500 40+000 -

40+000 40+500 -

40+500 41+000 -

41+000 41+500 -

41+500 42+000 -

42+000 42+500 -

42+500 43+000 -

43+000 43+500 -

43+500 44+000 -

44+000 44+500 -

44+500 45+000 -

45+000 45+500 -

45+500 46+000 -

46+000 46+500 -

46+500 47+000 -

47+000 47+500 -

47+500 48+000 -

48+000 48+500 -

48+500 49+000 -

49+000 49+500 -

49+500 50+000 -

50+000 50+500 -

50+500 51+000 -

51+000 51+500 -

51+500 52+000 -

52+000 52+500 -

- TOTAL

3.1.4 Roadway excavation, unsuitable soil

ChainagePrevious Paid

Qty.

Page 15: Previous Paid Summary Sheet for KDESH (IPC 28)

30+000 30+500 -

30+500 31+000 -

31+000 31+500 -

31+500 32+000 -

32+000 32+500 -

32+500 33+000 -

33+000 33+500 -

33+500 34+000 -

34+000 34+500 -

34+500 35+000 -

35+000 35+500 -

35+500 36+000 -

36+000 36+500 -

36+500 37+000 -

37+000 37+500 -

37+500 38+000 -

38+000 38+500 -

38+500 39+000 -

39+000 39+500 -

39+500 40+000 -

40+000 40+500 -

40+500 41+000 -

41+000 41+500 -

41+500 42+000 -

42+000 42+500 -

42+500 43+000 -

43+000 43+500 -

43+500 44+000 -

44+000 44+500 -

44+500 45+000 -

45+000 45+500 -

45+500 46+000 -

46+000 46+500 -

46+500 47+000 -

47+000 47+500 -

47+500 48+000 -

48+000 48+500 -

48+500 49+000 -

49+000 49+500 -

49+500 50+000 -

50+000 50+500 -

50+500 51+000 -

51+000 51+500 -

51+500 52+000 -

52+000 52+500 -

- TOTAL

Previous Paid

Qty.

3.1.7 Prepare sub grade in cut areas

Chainage

Page 16: Previous Paid Summary Sheet for KDESH (IPC 28)

30+000 30+500 -

30+500 31+000 -

31+000 31+500 -

31+500 32+000 -

32+000 32+500 -

32+500 33+000 -

33+000 33+500 -

33+500 34+000 -

34+000 34+500 -

34+500 35+000 -

35+000 35+500 -

35+500 36+000 -

36+000 36+500 -

36+500 37+000 -

37+000 37+500 -

37+500 38+000 -

38+000 38+500 -

38+500 39+000 -

39+000 39+500 -

39+500 40+000 -

40+000 40+500 -

40+500 41+000 -

41+000 41+500 -

41+500 42+000 -

42+000 42+500 -

42+500 43+000 -

43+000 43+500 -

43+500 44+000 -

44+000 44+500 -

44+500 45+000 -

45+000 45+500 -

45+500 46+000 -

46+000 46+500 -

46+500 47+000 -

47+000 47+500 -

47+500 48+000 -

48+000 48+500 -

48+500 49+000 -

49+000 49+500 -

49+500 50+000 -

50+000 50+500 -

50+500 51+000 -

51+000 51+500 -

51+500 52+000 -

52+000 52+500 -

- TOTAL

ChainagePrevious Paid

Qty.

3.3.13 Embankment construction, Type 1

Page 17: Previous Paid Summary Sheet for KDESH (IPC 28)

30+000 30+500 -

30+500 31+000 -

31+000 31+500 -

31+500 32+000 -

32+000 32+500 -

32+500 33+000 -

33+000 33+500 -

33+500 34+000 -

34+000 34+500 -

34+500 35+000 -

35+000 35+500 -

35+500 36+000 -

36+000 36+500 -

36+500 37+000 -

37+000 37+500 -

37+500 38+000 -

38+000 38+500 -

38+500 39+000 -

39+000 39+500 -

39+500 40+000 -

40+000 40+500 -

40+500 41+000 -

41+000 41+500 -

41+500 42+000 -

42+000 42+500 -

42+500 43+000 -

43+000 43+500 -

43+500 44+000 -

44+000 44+500 -

44+500 45+000 -

45+000 45+500 -

45+500 46+000 -

46+000 46+500 -

46+500 47+000 -

47+000 47+500 -

47+500 48+000 -

48+000 48+500 -

48+500 49+000 -

49+000 49+500 -

49+500 50+000 -

50+000 50+500 -

50+500 51+000 -

51+000 51+500 -

51+500 52+000 -

52+000 52+500 -

- TOTAL

3.3.14 Embankment construction, Type 2

ChainagePrevious Paid

Qty.

Page 18: Previous Paid Summary Sheet for KDESH (IPC 28)

IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35

30+000 30+500 1,883.81 847.41 847.41 - 847.41 1,036.40

30+500 31+000 2,383.13 ####### (504.04) 1,270.70 - 1,270.70 1,112.43

31+000 31+500 1,157.58 382.73 715.89 1,098.62 - 1,098.62 58.96

31+500 32+000 1,696.24 90.17 494.93 1,165.02 1,750.12 - 1,750.12 (53.88)

32+000 32+500 2,070.27 593.27 48.54 1,428.46 2,070.27 - 2,070.27 -

32+500 33+000 1,248.78 444.12 804.43 1,248.55 - 1,248.55 0.23

33+000 33+500 1,418.65 590.61 822.68 1,413.29 - 1,413.29 5.36

33+500 34+000 1,207.91 472.05 741.33 1,213.38 - 1,213.38 (5.47)

34+000 34+500 1,006.74 555.67 77.80 633.47 - 633.47 373.27

34+500 35+000 1,550.31 373.25 487.27 481.02 139.50 1,481.04 - 1,481.04 69.27

35+000 35+500 1,694.35 426.06 ####### (29.83) 1,694.35 - 1,694.35 -

35+500 36+000 774.98 - - - 774.98

36+000 36+500 1,184.45 572.82 536.71 6.90 1,116.43 - 1,116.43 68.02

36+500 37+000 1,235.93 194.02 ####### (451.03) 1,235.93 - 1,235.93 -

37+000 37+500 1,289.72 ####### (863.51) 1,289.80 - 1,289.80 (0.08)

37+500 38+000 995.60 ####### 349.06 (168.30) 1,344.66 - 1,344.66 (349.06)

38+000 38+500 1,076.12 552.21 279.18 244.79 1,076.18 - 1,076.18 (0.06)

38+500 39+000 1,368.34 ####### 1,360.52 - 1,360.52 7.82

39+000 39+500 1,153.93 - - - 1,153.93

39+500 40+000 1,391.16 633.45 633.45 - 633.45 757.71

40+000 40+500 1,593.02 ####### 1,574.24 - 1,574.24 18.78

40+500 41+000 1,576.89 ####### 1,565.00 - 1,565.00 11.89

41+000 41+500 1,523.57 ####### 181.59 1,230.27 - 1,230.27 293.30

41+500 42+000 1,545.36 ####### 140.82 1,202.84 - 1,202.84 342.52

42+000 42+500 1,970.13 ####### 124.84 1,248.41 - 1,248.41 721.72

42+500 43+000 2,211.35 - - - 2,211.35

43+000 43+500 1,333.86 655.85 481.54 1,137.39 - 1,137.39 196.47

43+500 44+000 1,321.98 ####### 1,362.69 - 1,362.69 (40.71)

44+000 44+500 1,609.57 461.50 461.50 - 461.50 1,148.07

44+500 45+000 1,757.97 611.57 611.57 - 611.57 1,146.40

45+000 45+500 1,529.50 605.83 605.83 - 605.83 923.67

45+500 46+000 1,954.69 826.82 826.82 - 826.82 1,127.87

46+000 46+500 1,882.35 780.37 780.37 - 780.37 1,101.98

46+500 47+000 1,626.37 626.60 626.60 - 626.60 999.77

47+000 47+500 1,477.25 - - - 1,477.25

47+500 48+000 1,868.42 - - - 1,868.42

48+000 48+500 1,714.00 - - - 1,714.00

48+500 49+000 1,771.69 495.75 495.75 - 495.75 1,275.94

49+000 49+500 46.89 - - - 46.89

49+500 50+000 1,456.84 570.04 831.36 1,401.40 - 1,401.40 55.44

50+000 50+500 2,438.10 553.05 1,907.66 2,460.71 - 2,460.71 (22.61)

50+500 51+000 2,312.09 585.85 1,749.50 2,335.35 - 2,335.35 (23.26)

51+000 51+500 2,163.14 608.66 1,447.07 2,055.73 - 2,055.73 107.41

51+500 52+000 2,719.04 913.38 1,806.28 2,719.66 - 2,719.66 (0.62)

52+000 52+500 1,373.45 124.23 ####### 1,350.22 124.23 1,225.99 147.46

70,565.52 - - 382.73 ####### - - ####### ####### ####### ####### ####### ####### ####### 633.45 495.75 - - - - - - - ####### ######## - - - - - - - - - - - 48,830.52 124.23 48,706.29 21,859.23 TOTAL

2.1.1 Clearing and grubbing

Chainage CS Qty.

Previous Paid

Total Qty.

(IPC)

Balance Qty.

Ddt

Pocket Measur,

& Others

Actual

Previous

Qty,

Page 19: Previous Paid Summary Sheet for KDESH (IPC 28)

IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35

30+000 30+500 150.24 112.14 2.18 (49.85) 64.47 - 64.47 85.77

30+500 31+000 79.91 163.16 5.96 (119.96) 49.16 - 49.16 30.75

31+000 31+500 168.46 173.50 0.08 0.46 (5.50) 168.54 - 168.54 (0.08)

31+500 32+000 106.20 36.92 19.87 49.16 105.95 - 105.95 0.25

32+000 32+500 140.11 224.05 0.41 (84.35) 140.11 - 140.11 -

32+500 33+000 189.11 190.68 (1.55) 189.13 - 189.13 (0.02)

33+000 33+500 180.96 236.20 18.90 (155.89) 99.21 - 99.21 81.75

33+500 34+000 112.93 149.27 21.07 (57.40) 112.94 - 112.94 (0.01)

34+000 34+500 75.05 91.47 10.21 30.19 (26.63) 105.24 - 105.24 (30.19)

34+500 35+000 193.86 62.83 144.11 16.64 (29.54) 194.04 - 194.04 (0.18)

35+000 35+500 176.93 179.14 4.68 72.70 256.52 - 256.52 (79.59)

35+500 36+000 1,578.51 0.44 0.44 - 0.44 1,578.07

36+000 36+500 266.81 122.72 160.01 (25.18) 257.55 - 257.55 9.26

36+500 37+000 300.38 52.14 173.02 51.45 82.49 359.10 - 359.10 (58.72)

37+000 37+500 291.03 141.94 154.78 296.72 - 296.72 (5.69)

37+500 38+000 280.34 247.56 40.26 102.40 (61.58) 328.64 - 328.64 (48.30)

38+000 38+500 264.89 212.55 49.77 10.82 2.60 275.74 - 275.74 (10.85)

38+500 39+000 276.97 280.31 - 280.31 - 280.31 (3.34)

39+000 39+500 86.16 - - - 86.16

39+500 40+000 175.43 14.74 67.17 81.91 - 81.91 93.52

40+000 40+500 376.70 261.82 74.82 37.40 374.04 - 374.04 2.66

40+500 41+000 437.63 339.51 95.88 48.38 483.77 - 483.77 (46.14)

41+000 41+500 304.29 243.08 46.17 32.14 321.39 - 321.39 (17.10)

41+500 42+000 416.84 466.31 (90.53) 41.17 416.95 - 416.95 (0.11)

42+000 42+500 308.47 209.21 75.32 284.53 - 284.53 23.94

42+500 43+000 473.81 915.78 14.40 930.18 - 930.18 (456.37)

43+000 43+500 267.05 150.71 116.62 267.33 - 267.33 (0.28)

43+500 44+000 142.76 142.84 142.84 - 142.84 (0.08)

44+000 44+500 180.01 133.25 133.25 - 133.25 46.76

44+500 45+000 247.86 122.82 122.82 - 122.82 125.04

45+000 45+500 284.16 163.11 163.11 - 163.11 121.05

45+500 46+000 327.55 172.69 70.81 243.50 - 243.50 84.05

46+000 46+500 251.94 124.34 69.62 193.96 - 193.96 57.98

46+500 47+000 317.19 174.42 174.42 - 174.42 142.77

47+000 47+500 364.01 - - - 364.01

47+500 48+000 245.84 - - - 245.84

48+000 48+500 210.19 - - - 210.19

48+500 49+000 224.36 131.71 10.36 142.07 - 142.07 82.29

49+000 49+500 1.20 - - - 1.20

49+500 50+000 232.51 287.04 23.04 (77.16) 232.92 - 232.92 (0.41)

50+000 50+500 210.35 425.56 5.19 (232.70) 198.05 - 198.05 12.30

50+500 51+000 214.00 444.22 9.09 (241.48) 211.83 - 211.83 2.17

51+000 51+500 162.06 351.41 11.68 (300.18) 62.91 - 62.91 99.15

51+500 52+000 298.12 519.74 519.74 - 519.74 (221.62)

52+000 52+500 10.55 79.06 744.41 382.01 (1,126.42) 79.06 379.06 (300.00) 310.55

11,603.73 - - 2,555.83 991.50 - - - 1,808.83 1,099.64 1,270.93 971.55 1,519.48 648.96 207.60 131.71 10.36 30.19 - - - 51.45 - (1,126.42) - (1,179.92) 72.70 - - - - - - - - - 9,064.39 379.06 8,685.33 2,918.40 TOTAL

3.1.4 Roadway excavation, unsuitable soil

Chainage CS Qty.

Previous Paid

Total Qty.

(IPC)

Balance Qty.

Ddt

Pocket Measur,

& Others

Actual

Previous

Qty,

Page 20: Previous Paid Summary Sheet for KDESH (IPC 28)

IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35

30+000 30+500 43.80 (2.80) 41.00

30+500 31+000 7.60 0.81 8.41

31+000 31+500 67.69 67.69

31+500 32+000 0.35 0.35

32+000 32+500 22.82 22.82

32+500 33+000 81.16 81.16

33+000 33+500 26.08 26.08

33+500 34+000 33.13 33.13

34+000 34+500 22.75 22.75

34+500 35+000 20.70 20.70

35+000 35+500 -

35+500 36+000 -

36+000 36+500 -

36+500 37+000 -

37+000 37+500 -

37+500 38+000 -

38+000 38+500 -

38+500 39+000 -

39+000 39+500 -

39+500 40+000 -

40+000 40+500 -

40+500 41+000 -

41+000 41+500 -

41+500 42+000 -

42+000 42+500 -

42+500 43+000 -

43+000 43+500 -

43+500 44+000 -

44+000 44+500 -

44+500 45+000 -

45+000 45+500 -

45+500 46+000 -

46+000 46+500 -

46+500 47+000 -

47+000 47+500 -

47+500 48+000 -

48+000 48+500 -

48+500 49+000 -

49+000 49+500 -

49+500 50+000 -

50+000 50+500 16.40 (0.42) 15.98

50+500 51+000 7.40 (0.02) 7.38

51+000 51+500 7.40 0.43 7.83

51+500 52+000 35.40 (1.45) 33.95

52+000 52+500 6.20 - 1,512.53 1,518.73

- - 124.20 (3.45) 274.68 - - - - - - - - - - - - - - - - - - ####### - - - - - - - - - - - - 1,907.96 TOTAL

3.1.5 Roadway excavation, sub grade replacement

Chainage CS Qty.

Previous Paid

Total Qty.

(IPC)

Page 21: Previous Paid Summary Sheet for KDESH (IPC 28)

- 41.00 (41.00)

- 8.41 (8.41)

- 67.69 (67.69)

- 0.35 (0.35)

- 22.82 (22.82)

- 81.16 (81.16)

- 26.08 (26.08)

- 33.13 (33.13)

- 22.75 (22.75)

- 20.70 (20.70)

- - -

- - -

- - -

- - -

- - -

- - -

- - -

- - -

- - -

- - -

- - -

- - -

- - -

- - -

- - -

- - -

- - -

- - -

- - -

- - -

- - -

- - -

- - -

- - -

- - -

- - -

- - -

- - -

- - -

- - -

- 15.98 (15.98)

- 7.38 (7.38)

- 7.83 (7.83)

- 33.95 (33.95)

6.20 1,512.53 (1,512.53)

6.20 1,901.76 (1,901.76)

3.1.5 Roadway excavation, sub grade replacement

Balance Qty.

Ddt

Pocket Measur,

& Others

Actual

Previous

Qty,

Page 22: Previous Paid Summary Sheet for KDESH (IPC 28)

IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35

30+000 30+500 753.17 747.86 8.56 (378.45) 377.97

30+500 31+000 464.44 1,064.66 33.64 (720.44) 377.86

31+000 31+500 654.15 1,138.22 1.40 (485.47) 654.15

31+500 32+000 675.17 202.18 734.77 104.43 (366.21) 675.17

32+000 32+500 796.60 1,501.75 83.45 2.70 (791.30) 796.60

32+500 33+000 680.50 1,271.35 (590.85) 680.50

33+000 33+500 996.60 1,574.72 100.94 (679.06) 996.60

33+500 34+000 515.20 1,036.26 124.48 (645.54) 515.20

34+000 34+500 336.10 592.60 50.80 (307.30) 336.10

34+500 35+000 868.80 375.89 514.04 596.84 (260.93) 1,225.84

35+000 35+500 1,116.40 345.84 242.60 610.04 (84.88) 1,113.60

35+500 36+000 5,607.88 2.80 2.80

36+000 36+500 1,017.87 238.40 948.53 (467.16) 719.77

36+500 37+000 1,597.93 118.65 735.10 625.53 1,479.28

37+000 37+500 1,732.46 793.75 42.07 938.71 1,774.53

37+500 38+000 1,187.57 794.35 432.70 (81.55) 1,145.50

38+000 38+500 1,137.23 744.46 172.28 220.49 1,137.23

38+500 39+000 1,172.72 1,190.58 (25.18) 1,165.40

39+000 39+500 396.10 -

39+500 40+000 950.21 378.57 378.57

40+000 40+500 1,414.84 1,003.75 430.18 1,433.93

40+500 41+000 1,491.43 1,013.34 460.34 1,473.68

41+000 41+500 1,401.32 1,092.49 282.25 1,374.74

41+500 42+000 1,384.28 1,139.29 264.43 1,403.72

42+000 42+500 1,687.99 1,272.19 141.35 1,413.54

42+500 43+000 1,900.71 -

43+000 43+500 1,103.80 740.15 363.67 1,103.82

43+500 44+000 729.18 729.18 729.18

44+000 44+500 1,026.99 466.63 466.63

44+500 45+000 1,513.41 554.33 554.33

45+000 45+500 1,423.32 717.48 717.48

45+500 46+000 1,450.30 732.16 732.16

46+000 46+500 1,178.03 573.29 573.29

46+500 47+000 1,307.89 655.68 655.68

47+000 47+500 1,365.54 -

47+500 48+000 1,105.49 -

48+000 48+500 982.76 -

48+500 49+000 1,113.13 467.69 467.69

49+000 49+500 7.23 -

49+500 50+000 1,121.00 1,920.08 120.60 (919.68) 1,121.00

50+000 50+500 1,239.56 1,221.02 1,609.43 26.66 (1,617.55) 1,239.56

50+500 51+000 1,358.40 2,046.85 818.19 47.40 (1,554.04) 1,358.40

51+000 51+500 1,016.21 1,028.79 1,412.25 33.08 (1,456.93) 1,017.19

51+500 52+000 1,686.96 1,762.40 1,738.11 (1,814.55) 1,685.96

52+000 52+500 1,563.74 179.20 335.23 1,416.00 1,930.43

54,230.61 - 6,238.26 10,784.03 6,554.74 - - 1,678.10 4,848.52 5,880.56 3,449.54 2,455.71 1,637.08 2,678.61 378.57 467.69 - - - - - - - 1,416.00 - (11,462.34) - - - - - - - - - - 37,005.07 TOTAL

3.1.7 Prepare sub grade in cut areas

Chainage CS Qty.

Previous Paid

Total Qty.

(IPC)

Page 23: Previous Paid Summary Sheet for KDESH (IPC 28)

- 377.97 375.20

- 377.86 86.58

- 654.15 -

- 675.17 -

- 796.60 -

- 680.50 0.00

- 996.60 -

- 515.20 -

- 336.10 -

- 1,225.84 (357.04)

- 1,113.60 2.80

- 2.80 5,605.08

- 719.77 298.10

- 1,479.28 118.65

- 1,774.53 (42.07)

- 1,145.50 42.07

- 1,137.23 -

- 1,165.40 7.32

- - 396.10

- 378.57 571.64

- 1,433.93 (19.09)

- 1,473.68 17.75

- 1,374.74 26.58

- 1,403.72 (19.44)

- 1,413.54 274.45

- - 1,900.71

- 1,103.82 (0.02)

- 729.18 -

- 466.63 560.36

- 554.33 959.08

- 717.48 705.84

- 732.16 718.14

- 573.29 604.74

- 655.68 652.21

- - 1,365.54

- - 1,105.49

- - 982.76

- 467.69 645.44

- - 7.23

- 1,121.00 -

- 1,239.56 -

- 1,358.40 -

- 1,017.19 (0.98)

- 1,685.96 1.00

514.43 1,416.00 147.74

514.43 36,490.64 17,739.97

3.1.7 Prepare sub grade in cut areas

Balance Qty.

Ddt

Pocket Measur,

& Others

Actual

Previous

Qty,

Page 24: Previous Paid Summary Sheet for KDESH (IPC 28)

IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35

30+000 30+500 1,879.48 274.38 274.38 - 274.38 1,605.10

30+500 31+000 2,352.50 520.39 745.31 1,265.70 - 1,265.70 1,086.80

31+000 31+500 1,100.50 382.73 766.21 1,148.94 - 1,148.94 (48.44)

31+500 32+000 1,743.30 76.65 595.80 1,070.85 1,743.30 - 1,743.30 -

32+000 32+500 2,051.38 504.29 141.28 1,405.82 2,051.39 - 2,051.39 (0.01)

32+500 33+000 1,239.12 377.57 75.55 786.00 1,239.12 - 1,239.12 -

33+000 33+500 1,364.42 501.94 78.86 783.62 1,364.42 - 1,364.42 -

33+500 34+000 1,190.39 401.24 86.78 702.37 1,190.39 - 1,190.39 -

34+000 34+500 1,005.46 472.32 68.19 464.95 1,005.46 - 1,005.46 -

34+500 35+000 1,534.29 317.26 650.35 373.93 248.74 1,590.28 - 1,590.28 (55.99)

35+000 35+500 1,656.95 501.25 1,222.93 (67.23) 1,656.95 - 1,656.95 -

35+500 36+000 773.31 - - - 773.31

36+000 36+500 1,179.71 572.82 536.71 2.65 1,112.18 - 1,112.18 67.53

36+500 37+000 1,219.89 194.02 1,492.94 (364.07) 1,322.89 - 1,322.89 (103.00)

37+000 37+500 1,334.96 2,153.31 16.86 (921.35) 1,248.82 - 1,248.82 86.14

37+500 38+000 976.88 1,163.90 192.58 (396.46) 960.02 - 960.02 16.86

38+000 38+500 1,064.17 552.21 279.18 232.78 1,064.17 - 1,064.17 -

38+500 39+000 1,335.23 1,327.36 1,327.36 - 1,327.36 7.87

39+000 39+500 1,133.20 - - - 1,133.20

39+500 40+000 1,384.45 633.45 633.45 - 633.45 751.00

40+000 40+500 1,575.02 1,574.24 1,574.24 - 1,574.24 0.78

40+500 41+000 1,561.40 1,565.00 1,565.00 - 1,565.00 (3.60)

41+000 41+500 1,515.16 1,048.68 58.56 123.03 1,230.27 - 1,230.27 284.89

41+500 42+000 1,546.37 1,062.02 20.54 120.28 1,202.84 - 1,202.84 343.53

42+000 42+500 1,949.98 1,123.58 120.19 1,243.77 - 1,243.77 706.21

42+500 43+000 2,117.84 - - - 2,117.84

43+000 43+500 1,329.97 590.27 544.13 1,134.40 - 1,134.40 195.57

43+500 44+000 1,319.84 1,358.59 1,358.59 - 1,358.59 (38.75)

44+000 44+500 1,605.20 519.19 519.19 - 519.19 1,086.01

44+500 45+000 1,747.67 764.46 764.46 - 764.46 983.21

45+000 45+500 1,519.16 605.83 605.83 - 605.83 913.33

45+500 46+000 1,918.61 826.81 826.81 - 826.81 1,091.80

46+000 46+500 1,859.12 780.37 780.37 - 780.37 1,078.75

46+500 47+000 1,616.80 626.60 626.60 - 626.60 990.20

47+000 47+500 1,471.63 - - - 1,471.63

47+500 48+000 1,848.53 - - - 1,848.53

48+000 48+500 1,705.06 - - - 1,705.06

48+500 49+000 1,763.32 493.01 493.01 - 493.01 1,270.31

49+000 49+500 45.81 - - - 45.81

49+500 50+000 1,449.42 688.81 706.25 1,395.06 - 1,395.06 54.36

50+000 50+500 2,424.60 2,387.63 (1,698.83) 725.77 1,414.57 - 1,414.57 1,010.03

50+500 51+000 2,301.04 2,398.85 (1,686.24) 614.80 1,327.41 - 1,327.41 973.63

51+000 51+500 2,150.01 2,269.60 (1,547.04) 601.95 1,324.51 - 1,324.51 825.50

51+500 52+000 2,675.92 2,818.76 (1,744.20) 932.64 2,007.20 - 2,007.20 668.72

52+000 52+500 999.03 496.17 (324.71) 171.46 171.46 - 999.03

69,536.10 - 10,371.01 (5,134.71) 2,651.27 - - 2,198.06 7,613.64 5,899.07 1,792.95 3,509.26 1,856.59 2,839.61 633.45 493.01 - - - - - - - - 9,041.60 - - - - - - - - - - - 43,764.81 171.46 43,593.35 25,942.75 TOTAL

3.3.12 Trim, level and compact roadbed

Chainage CS Qty.

Previous Paid

Total Qty.

(IPC)

Balance Qty.

Ddt

Pocket Measur,

& Others

Actual

Previous

Qty,

Page 25: Previous Paid Summary Sheet for KDESH (IPC 28)

IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35

30+000 30+500 1,048.84 258.30 0.94 68.79 1.52 79.33 (79.33) 79.33 408.88 - 408.88 639.96

30+500 31+000 1,685.25 1,200.00 (388.91) 839.55 5.84 (461.14) 1,195.34 - 1,195.34 489.91

31+000 31+500 492.82 457.55 32.86 (29.83) 0.46 31.78 492.82 - 492.82 -

31+500 32+000 1,848.22 58.45 949.38 828.22 19.87 0.48 1,856.40 - 1,856.40 (8.18)

32+000 32+500 2,231.26 635.27 596.90 947.38 0.41 51.31 2,231.27 - 2,231.27 (0.01)

32+500 33+000 540.60 361.68 83.86 95.31 (0.25) 540.60 - 540.60 -

33+000 33+500 1,113.10 482.98 625.21 15.23 (10.32) 1,113.10 - 1,113.10 -

33+500 34+000 670.84 491.33 56.06 115.23 23.17 (13.07) 672.72 - 672.72 (1.88)

34+000 34+500 503.40 500.02 0.90 10.94 30.19 (10.34) 531.71 - 531.71 (28.31)

34+500 35+000 765.89 256.71 194.87 471.65 (157.80) 12.20 (11.74) 765.89 - 765.89 -

35+000 35+500 1,094.13 269.16 842.13 4.62 (21.78) 1,094.13 - 1,094.13 -

35+500 36+000 1,634.04 0.44 0.44 - 0.44 1,633.60

36+000 36+500 729.97 563.02 140.13 (52.89) 650.26 - 650.26 79.71

36+500 37+000 962.57 653.95 161.56 51.45 154.75 1,021.71 - 1,021.71 (59.14)

37+000 37+500 913.58 726.99 24.00 218.76 (50.48) 919.27 - 919.27 (5.69)

37+500 38+000 580.62 122.29 193.96 86.29 - 402.54 - 402.54 178.08

38+000 38+500 803.89 252.22 325.47 - 577.69 - 577.69 226.20

38+500 39+000 666.37 599.96 - 599.96 - 599.96 66.41

39+000 39+500 554.82 - - - 554.82

39+500 40+000 1,055.24 14.74 18.00 517.70 550.44 - 550.44 504.80

40+000 40+500 763.67 557.10 159.17 716.27 - 716.27 47.40

40+500 41+000 808.07 550.57 154.43 705.00 - 705.00 103.07

41+000 41+500 880.39 619.00 111.01 730.01 - 730.01 150.38

41+500 42+000 754.34 554.66 4.68 559.34 - 559.34 195.00

42+000 42+500 1,464.42 691.85 351.15 45.73 1,088.73 - 1,088.73 375.69

42+500 43+000 1,143.07 321.12 159.21 159.21 639.54 - 639.54 503.53

43+000 43+500 745.31 382.64 180.19 121.58 684.41 - 684.41 60.90

43+500 44+000 1,077.63 580.74 348.44 929.18 - 929.18 148.45

44+000 44+500 1,171.52 301.21 301.21 - 301.21 870.31

44+500 45+000 1,506.38 344.25 344.25 - 344.25 1,162.13

45+000 45+500 933.00 413.26 413.26 - 413.26 519.74

45+500 46+000 992.57 431.73 70.81 502.54 - 502.54 490.03

46+000 46+500 986.76 423.70 69.62 493.32 - 493.32 493.44

46+500 47+000 926.76 390.35 390.35 - 390.35 536.41

47+000 47+500 787.11 - - - 787.11

47+500 48+000 898.79 - - - 898.79

48+000 48+500 936.27 - - - 936.27

48+500 49+000 1,345.30 10.36 10.36 - 10.36 1,334.94

49+000 49+500 44.70 - - - 44.70

49+500 50+000 685.64 849.80 12.14 (215.13) 646.81 - 646.81 38.83

50+000 50+500 1,271.99 1,240.60 26.07 4.83 0.49 1,271.99 - 1,271.99 -

50+500 51+000 1,328.00 1,309.40 (12.92) 7.37 24.15 1,328.00 - 1,328.00 -

51+000 51+500 1,164.00 1,163.60 3.76 5.86 (9.22) 1,164.00 - 1,164.00 -

51+500 52+000 1,307.89 1,287.30 48.54 (27.95) 1,307.89 - 1,307.89 -

52+000 52+500 1,279.65 311.93 1,393.26 597.12 - 2,302.31 461.93 1,840.38 (560.73)

45,098.68 - 6,459.20 3,541.77 - - 1,473.12 1,723.05 6,456.42 2,458.11 1,739.74 760.93 2,998.80 2,025.89 658.13 - 10.36 30.19 159.21 - 159.21 51.45 - 1,393.26 597.12 (542.02) (79.33) - 79.33 - - - - - - - 32,153.94 461.93 31,692.01 13,406.67 TOTAL

3.3.13 Embankment construction, Type 1

Chainage CS Qty.

Previous Paid

Total Qty.

(IPC)

Balance Qty.

Ddt

Pocket Measur,

& Others

Actual

Previous

Qty,

Page 26: Previous Paid Summary Sheet for KDESH (IPC 28)

IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35

30+000 30+500 - 258.30 (89.20) 169.10 - 169.10 (169.10)

30+500 31+000 754.94 1,200.00 (521.01) 678.99 - 678.99 75.95

31+000 31+500 - - - - -

31+500 32+000 261.86 0.96 250.27 10.62 261.85 - 261.85 0.01

32+000 32+500 772.26 731.94 28.37 11.96 772.27 - 772.27 (0.01)

32+500 33+000 - 3.20 (3.20) - - - -

33+000 33+500 106.83 148.82 (41.99) 106.83 - 106.83 -

33+500 34+000 43.05 47.58 (4.53) 43.05 - 43.05 -

34+000 34+500 - - - - -

34+500 35+000 80.42 1.86 74.01 6.41 82.28 - 82.28 (1.86)

35+000 35+500 404.32 321.35 155.28 (72.31) 404.32 - 404.32 -

35+500 36+000 144.23 - - - 144.23

36+000 36+500 95.85 27.70 (72.02) (44.32) - (44.32) 140.17

36+500 37+000 82.18 39.88 42.30 82.18 - 82.18 -

37+000 37+500 176.18 116.13 - 116.13 - 116.13 60.05

37+500 38+000 16.52 - - - 16.52

38+000 38+500 68.68 43.44 25.28 (0.04) 68.68 - 68.68 -

38+500 39+000 54.38 47.08 2.55 49.63 - 49.63 4.75

39+000 39+500 42.00 - - - 42.00

39+500 40+000 45.20 37.05 37.05 - 37.05 8.15

40+000 40+500 144.50 72.61 72.61 - 72.61 71.89

40+500 41+000 52.64 63.30 63.30 - 63.30 (10.66)

41+000 41+500 32.94 46.99 46.99 - 46.99 (14.05)

41+500 42+000 11.92 32.78 32.78 - 32.78 (20.86)

42+000 42+500 341.54 187.49 24.28 211.77 - 211.77 129.77

42+500 43+000 859.40 350.68 263.02 263.02 876.72 - 876.72 (17.32)

43+000 43+500 27.44 19.50 19.50 - 19.50 7.94

43+500 44+000 106.15 78.28 78.28 - 78.28 27.87

44+000 44+500 196.66 12.83 12.83 - 12.83 183.83

44+500 45+000 304.82 76.14 76.14 - 76.14 228.68

45+000 45+500 161.21 59.30 59.30 - 59.30 101.91

45+500 46+000 354.18 144.61 144.61 - 144.61 209.57

46+000 46+500 301.11 125.18 125.18 - 125.18 175.93

46+500 47+000 137.17 45.04 45.04 - 45.04 92.13

47+000 47+500 19.04 - - - 19.04

47+500 48+000 257.94 - - - 257.94

48+000 48+500 98.90 - - - 98.90

48+500 49+000 283.20 - - - 283.20

49+000 49+500 - - - - -

49+500 50+000 276.60 257.17 19.43 276.60 - 276.60 -

50+000 50+500 769.19 751.00 33.34 (15.14) 769.20 - 769.20 (0.01)

50+500 51+000 591.95 572.30 (4.82) 24.47 591.95 - 591.95 -

51+000 51+500 351.34 352.30 (0.96) 0.01 351.35 - 351.35 (0.01)

51+500 52+000 1,232.73 1,059.80 281.68 (108.75) 1,232.73 - 1,232.73 -

52+000 52+500 198.81 154.21 226.80 1,027.97 (1,056.66) - 352.32 304.21 48.11 150.70

10,260.28 - 4,193.70 - 1,654.98 - - 395.36 370.96 227.15 433.79 1,106.25 88.97 749.09 388.05 - - - 263.02 - 263.02 - - (1,056.66) - (810.44) - - - - - - - - - - 8,267.24 304.21 7,963.03 2,297.25 TOTAL

3.3.14 Embankment construction, Type 2

Chainage CS Qty.

Previous Paid

Total Qty.

(IPC)

Balance Qty.

Ddt

Pocket Measur,

& Others

Actual

Previous

Qty,

Page 27: Previous Paid Summary Sheet for KDESH (IPC 28)

IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35

30+000 30+500 851.39 73.95 133.74 207.69 643.70

30+500 31+000 841.01 6.67 623.33 (60.49) (157.51) 412.00 429.01

31+000 31+500 905.78 192.86 385.72 531.73 181.15 (385.68) 905.78 -

31+500 32+000 853.77 224.66 454.12 170.55 4.44 853.77 -

32+000 32+500 862.13 170.23 415.90 276.00 0.65 862.78 (0.65)

32+500 33+000 914.38 640.16 182.91 91.31 - 914.38 -

33+000 33+500 963.24 261.19 73.58 360.86 262.97 4.64 963.24 -

33+500 34+000 920.28 95.58 305.86 327.49 89.43 37.66 183.62 (58.21) 981.42 (61.14)

34+000 34+500 961.48 67.89 217.24 419.81 95.67 47.00 113.92 (60.63) 900.90 60.58

34+500 35+000 966.45 668.75 149.59 56.31 100.68 (8.89) 966.44 0.01

35+000 35+500 964.18 369.65 371.07 92.41 90.99 41.48 965.60 (1.42)

35+500 36+000 2,138.83 - 2,138.83

36+000 36+500 853.59 6.28 735.91 81.77 (11.88) 812.08 41.51

36+500 37+000 929.69 425.40 202.49 300.79 - 928.68 1.01

37+000 37+500 993.88 337.20 652.56 - 989.76 4.12

37+500 38+000 929.13 - - 929.13

38+000 38+500 944.63 - 944.63

38+500 39+000 860.97 - 860.97

39+000 39+500 914.27 - 914.27

39+500 40+000 878.74 - 878.74

40+000 40+500 861.11 - 861.11

40+500 41+000 844.29 - 844.29

41+000 41+500 899.10 - 899.10

41+500 42+000 837.77 - 837.77

42+000 42+500 921.12 - 921.12

42+500 43+000 932.22 - 932.22

43+000 43+500 888.31 - 888.31

43+500 44+000 924.52 - 924.52

44+000 44+500 882.52 - 882.52

44+500 45+000 922.29 - 922.29

45+000 45+500 1,039.82 - 1,039.82

45+500 46+000 914.61 - 914.61

46+000 46+500 867.32 - 867.32

46+500 47+000 818.09 - 818.09

47+000 47+500 779.35 - 779.35

47+500 48+000 810.87 - 810.87

48+000 48+500 797.18 - 797.18

48+500 49+000 825.92 - 825.92

49+000 49+500 10.22 - 10.22

49+500 50+000 999.41 435.70 435.70 10.90 5.06 887.36 112.05

50+000 50+500 1,089.72 1,060.30 31.36 0.36 (2.30) 1,089.72 -

50+500 51+000 1,115.29 1,097.60 (5.03) 1.72 21.01 1,115.30 (0.01)

51+000 51+500 1,121.91 1,094.40 20.98 5.82 0.71 1,121.91 -

51+500 52+000 989.28 1,031.00 (41.72) 989.28 -

52+000 52+500 558.83 416.29 83.24 40.32 539.85 18.98

41,098.89 - 3,252.30 1,514.01 436.95 - 435.70 908.82 1,785.69 3,315.88 1,480.55 2,243.65 640.37 1,035.12 - - - - 376.89 90.99 - - - - 416.29 (565.59) - 40.32 - - - - - - - - 17,407.94 23,690.95 TOTAL

4.1.1 Sub base as compacted in position

Chainage CS Qty.Previous Paid

Total Qty.Balance Qty.

Page 28: Previous Paid Summary Sheet for KDESH (IPC 28)

IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35

30+000 30+500 661.52 - 661.52

30+500 31+000 729.24 163.52 259.12 422.64 306.60

31+000 31+500 692.00 346.00 346.00 692.00 -

31+500 32+000 692.00 550.28 138.40 688.68 3.32

32+000 32+500 692.00 89.96 596.09 686.05 5.95

32+500 33+000 692.00 110.72 510.14 62.19 683.05 8.95

33+000 33+500 824.28 365.11 16.58 280.70 175.25 (13.36) 824.28 -

33+500 34+000 697.53 41.46 162.44 140.13 346.97 65.03 (58.27) (0.23) 2.66 700.19 (2.66)

34+000 34+500 692.00 116.09 284.69 55.28 239.94 696.00 (4.00)

34+500 35+000 692.00 207.30 241.85 242.85 692.00 -

35+000 35+500 713.16 207.30 214.21 269.49 - 691.00 22.16

35+500 36+000 1,341.10 - 1,341.10

36+000 36+500 648.00 - 648.00 (0.50) 647.50 0.50

36+500 37+000 648.00 - 648.00

37+000 37+500 648.00 - 648.00

37+500 38+000 648.00 - 648.00

38+000 38+500 648.00 - 648.00

38+500 39+000 648.00 - 648.00

39+000 39+500 648.00 - 648.00

39+500 40+000 648.00 - 648.00

40+000 40+500 648.00 - 648.00

40+500 41+000 648.14 - 648.14

41+000 41+500 648.00 - 648.00

41+500 42+000 648.00 - 648.00

42+000 42+500 647.02 - 647.02

42+500 43+000 647.42 - 647.42

43+000 43+500 648.00 - 648.00

43+500 44+000 648.00 - 648.00

44+000 44+500 648.00 - 648.00

44+500 45+000 648.00 - 648.00

45+000 45+500 648.00 - 648.00

45+500 46+000 648.00 - 648.00

46+000 46+500 648.00 - 648.00

46+500 47+000 648.00 - 648.00

47+000 47+500 648.00 - 648.00

47+500 48+000 648.00 - 648.00

48+000 48+500 648.00 - 648.00

48+500 49+000 648.00 - 648.00

49+000 49+500 13.83 21.45 21.45 (7.62)

49+500 50+000 698.13 197.85 130.93 200.62 113.81 (8.99) (13.60) 89.17 709.79 (11.66)

50+000 50+500 745.02 73.55 435.74 91.08 52.56 91.33 0.76 745.02 -

50+500 51+000 738.12 444.72 47.70 245.86 (0.16) 738.12 -

51+000 51+500 731.74 439.04 193.87 96.49 2.34 731.74 -

51+500 52+000 701.82 179.96 348.47 127.77 45.62 701.82 -

52+000 52+215 289.10 268.37 20.73 1.12 290.22 (1.12)

29,883.17 - - - - - 197.85 204.48 636.36 649.61 882.78 - 870.54 829.38 1,096.96 1,244.63 543.39 58.04 369.74 772.69 - 370.66 573.55 456.06 577.37 245.06 757.67 24.73 120.18 - - - - - - - 11,361.55 18,521.62 TOTAL

4.1.4 Dense graded aggregate base

Chainage CS Qty.Previous Paid

Total Qty.Balance Qty.

Page 29: Previous Paid Summary Sheet for KDESH (IPC 28)

IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35

30+000 30+500 304.52 - 304.52

30+500 31+000 276.98 75.35 134.64 209.99 66.99

31+000 31+500 176.00 140.80 (15.49) 84.69 210.00 (34.00)

31+500 32+000 176.00 112.64 21.12 22.53 53.71 210.00 (34.00)

32+000 32+500 176.00 88.00 35.20 86.80 210.00 (34.00)

32+500 33+000 175.90 88.00 35.20 86.80 210.00 (34.10)

33+000 33+500 175.84 35.20 88.00 (17.78) 105.42 70.42

33+500 34+000 176.00 17.60 21.12 84.48 79.24 202.44 (26.44)

34+000 34+500 176.00 17.60 79.20 26.40 86.80 210.00 (34.00)

34+500 35+000 176.00 105.60 17.60 44.80 168.00 8.00

35+000 35+500 172.48 38.02 85.18 44.80 168.00 4.48

35+500 36+000 150.78 - 150.78

36+000 36+500 132.30 (37.40) (37.40) 169.70

36+500 37+000 127.92 - 127.92

37+000 37+500 2.56 - 2.56

37+500 38+000 - - -

38+000 38+500 - - -

38+500 39+000 4.18 - 4.18

39+000 39+500 209.56 - 209.56

39+500 40+000 209.00 - 209.00

40+000 40+500 209.00 - 209.00

40+500 41+000 209.00 - 209.00

41+000 41+500 209.00 - 209.00

41+500 42+000 207.84 - 207.84

42+000 42+500 209.00 - 209.00

42+500 43+000 208.99 - 208.99

43+000 43+500 208.59 - 208.59

43+500 44+000 209.02 - 209.02

44+000 44+500 209.00 - 209.00

44+500 45+000 209.00 - 209.00

45+000 45+500 209.00 - 209.00

45+500 46+000 209.00 - 209.00

46+000 46+500 209.00 - 209.00

46+500 47+000 209.00 - 209.00

47+000 47+500 209.00 - 209.00

47+500 48+000 209.00 - 209.00

48+000 48+500 209.00 - 209.00

48+500 49+000 209.00 - 209.00

49+000 49+500 3.54 - 3.54

49+500 50+000 175.68 95.10 71.52 166.62 9.06

50+000 50+500 284.80 83.25 79.88 3.68 85.23 252.04 32.76

50+500 51+000 283.58 28.27 131.15 93.50 252.92 30.66

51+000 51+500 279.81 100.44 89.28 34.13 223.85 55.96

51+500 52+000 257.61 89.28 72.54 (24.87) 136.95 120.66

52+000 52+500 84.94 61.44 8.78 70.22 14.72

8,128.42 - - - - - 206.62 - 346.67 426.18 328.79 304.86 - - - - - - - - - - - - - - - 537.78 818.15 - - - - - - - 2,969.05 5,159.37 TOTAL

4.3.6 Earthen shoulder as compacted in position

Chainage CS Qty.Previous Paid

Total Qty.Balance Qty.

Page 30: Previous Paid Summary Sheet for KDESH (IPC 28)

IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35

30+000 30+500 3,950.00 - 3,950.00

30+500 31+000 3,950.00 1,576.05 517.45 (325.80) 1,767.70 2,182.30

31+000 31+500 3,950.00 1,619.50 1,343.00 641.50 346.00 3,950.00 -

31+500 32+000 3,950.00 2,883.50 1,106.00 3,989.50 (39.50)

32+000 32+500 3,950.00 1,185.00 1,461.50 829.50 474.00 3,950.00 -

32+500 33+000 3,950.00 2,607.00 474.00 770.25 99.00 3,950.25 (0.25)

33+000 33+500 4,756.00 711.00 2,627.00 1,355.25 62.75 4,756.00 -

33+500 34+000 3,950.00 110.00 2,102.00 660.00 1,078.00 3,950.00 -

34+000 34+500 3,950.00 829.50 829.50 790.00 1,027.00 237.00 237.00 3,950.00 -

34+500 35+000 3,950.00 592.50 3,357.50 - 3,950.00 -

35+000 35+500 3,950.00 553.00 3,081.00 316.00 3,950.00 -

35+500 36+000 3,950.00 - 3,950.00

36+000 36+500 3,950.00 3,700.00 3,700.00 250.00

36+500 37+000 3,950.00 - 3,950.00

37+000 37+500 3,950.00 - 3,950.00

37+500 38+000 3,950.00 - 3,950.00

38+000 38+500 3,950.00 - 3,950.00

38+500 39+000 3,950.00 - 3,950.00

39+000 39+500 3,950.00 - 3,950.00

39+500 40+000 3,950.00 - 3,950.00

40+000 40+500 3,950.00 - 3,950.00

40+500 41+000 3,950.00 - 3,950.00

41+000 41+500 3,950.00 - 3,950.00

41+500 42+000 3,950.00 - 3,950.00

42+000 42+500 3,950.00 - 3,950.00

42+500 43+000 3,950.00 - 3,950.00

43+000 43+500 3,950.00 - 3,950.00

43+500 44+000 3,950.00 - 3,950.00

44+000 44+500 3,950.00 - 3,950.00

44+500 45+000 3,950.00 - 3,950.00

45+000 45+500 3,950.00 - 3,950.00

45+500 46+000 3,950.00 - 3,950.00

46+000 46+500 3,950.00 - 3,950.00

46+500 47+000 3,950.00 - 3,950.00

47+000 47+500 3,950.00 - 3,950.00

47+500 48+000 3,950.00 - 3,950.00

48+000 48+500 3,950.00 - 3,950.00

48+500 49+000 3,950.00 - 3,950.00

49+000 49+500 3,950.00 - 3,950.00

49+500 50+000 3,950.00 967.75 1,155.38 335.75 128.37 177.75 (39.50) (79.00) 1,115.88 3,762.38 187.62

50+000 50+500 3,950.00 391.05 462.15 1,402.25 1,256.10 438.45 3,950.00 -

50+500 51+000 3,950.00 483.48 553.00 1,975.00 938.52 3,950.00 -

51+000 51+500 3,950.00 355.50 948.00 1,935.50 (197.50) - 681.38 3,722.88 227.12

51+500 52+000 3,950.00 513.50 2,508.25 (19.75) 79.00 515.47 3,596.47 353.53

52+000 52+500 3,950.00 1,244.25 1,244.25 2,705.75

178,556.00 - - - - - - - - - 1,358.80 2,456.51 3,752.50 7,803.22 1,619.50 8,018.50 3,752.50 2,987.80 829.50 3,566.50 829.50 4,247.25 3,186.20 2,223.50 6,636.00 355.50 (79.00) - 9,183.63 - - - - - - - 62,089.43 116,466.57 TOTAL

4.4.13 Bituminous Prime Coat

Chainage CS Qty.Previous Paid

Total Qty.Balance Qty.

Page 31: Previous Paid Summary Sheet for KDESH (IPC 28)

IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35

30+000 30+500 3,950.00 - 3,950.00

30+500 31+000 3,950.00 1,844.65 218.35 (295.30) 1,767.70 2,182.30

31+000 31+500 3,950.00 3,002.00 1,204.75 (256.75) 3,950.00 -

31+500 32+000 3,950.00 513.50 435.00 3,001.50 3,950.00 -

32+000 32+500 3,950.00 3,950.00 3,950.00 -

32+500 33+000 3,950.00 3,239.00 - 3,239.00 711.00

33+000 33+500 4,756.00 4,727.64 4,727.64 28.36

33+500 34+000 3,950.00 3,987.20 3,987.20 (37.20)

34+000 34+500 3,950.00 3,950.00 3,950.00 -

34+500 35+000 3,950.00 3,950.00 3,950.00 -

35+000 35+500 3,950.00 4,007.38 4,007.38 (57.38)

35+500 36+000 3,950.00 - 3,950.00

36+000 36+500 3,950.00 3,515.00 185.00 3,700.00 250.00

36+500 37+000 3,950.00 - 3,950.00

37+000 37+500 3,950.00 - 3,950.00

37+500 38+000 3,950.00 - 3,950.00

38+000 38+500 3,950.00 - 3,950.00

38+500 39+000 3,950.00 - 3,950.00

39+000 39+500 3,950.00 - 3,950.00

39+500 40+000 3,950.00 - 3,950.00

40+000 40+500 3,950.00 - 3,950.00

40+500 41+000 3,950.00 - 3,950.00

41+000 41+500 3,950.00 - 3,950.00

41+500 42+000 3,950.00 - 3,950.00

42+000 42+500 3,950.00 - 3,950.00

42+500 43+000 3,950.00 - 3,950.00

43+000 43+500 3,950.00 - 3,950.00

43+500 44+000 3,950.00 - 3,950.00

44+000 44+500 3,950.00 - 3,950.00

44+500 45+000 3,950.00 - 3,950.00

45+000 45+500 3,950.00 - 3,950.00

45+500 46+000 3,950.00 - 3,950.00

46+000 46+500 3,950.00 - 3,950.00

46+500 47+000 3,950.00 - 3,950.00

47+000 47+500 3,950.00 - 3,950.00

47+500 48+000 3,950.00 - 3,950.00

48+000 48+500 3,950.00 - 3,950.00

48+500 49+000 3,950.00 - 3,950.00

49+000 49+500 3,950.00 89.68 89.68 3,860.32

49+500 50+000 3,950.00 3,397.00 - 276.50 (276.50) 3,397.00 553.00

50+000 50+500 3,950.00 3,950.00 3,950.00 -

50+500 51+000 3,950.00 869.00 3,081.00 3,950.00 -

51+000 51+500 3,950.00 3,634.00 - 3,634.00 316.00

51+500 52+000 3,950.00 711.00 2,370.00 - 134.30 3,215.30 734.70

52+000 52+215 1,698.50 1,619.50 39.50 1,659.00 39.50

176,304.50 - - - - - - - - - - - - - 711.00 - - 4,503.00 12,798.00 3,515.50 - - - 3,049.40 435.00 2,963.10 27,811.22 5,634.98 339.43 - - - - - - - 61,073.90 115,230.60 TOTAL

4.4.15 Bituminous Tack Coat

Chainage CS Qty.Previous Paid

Total Qty.Balance Qty.

Page 32: Previous Paid Summary Sheet for KDESH (IPC 28)

IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No. IPC No.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35

30+000 30+500 3,950.00 - 3,950.00

30+500 31+000 3,950.00 1,475.72 186.75 (130.65) 1,531.82 2,418.18

31+000 31+500 3,950.00 2,338.40 963.80 821.60 (963.80) 3,160.00 790.00

31+500 32+000 3,950.00 379.20 316.00 2,851.11 3,546.31 403.69

32+000 32+500 3,950.00 3,555.00 3,555.00 395.00

32+500 33+000 3,950.00 1,848.00 1,848.00 2,102.00

33+000 33+500 4,756.00 - 4,756.00

33+500 34+000 3,950.00 - 3,950.00

34+000 34+500 3,950.00 3,634.00 3,634.00 316.00

34+500 35+000 3,950.00 3,950.00 3,950.00 -

35+000 35+500 3,950.00 3,792.00 (62.75) 3,729.25 220.75

35+500 36+000 3,950.00 - 3,950.00

36+000 36+500 3,950.00 - 3,950.00

36+500 37+000 3,950.00 - 3,950.00

37+000 37+500 3,950.00 - 3,950.00

37+500 38+000 3,950.00 - 3,950.00

38+000 38+500 3,950.00 - 3,950.00

38+500 39+000 3,950.00 - 3,950.00

39+000 39+500 3,950.00 - 3,950.00

39+500 40+000 3,950.00 - 3,950.00

40+000 40+500 3,950.00 - 3,950.00

40+500 41+000 3,950.00 - 3,950.00

41+000 41+500 3,950.00 - 3,950.00

41+500 42+000 3,950.00 - 3,950.00

42+000 42+500 3,950.00 - 3,950.00

42+500 43+000 3,950.00 - 3,950.00

43+000 43+500 3,950.00 - 3,950.00

43+500 44+000 3,950.00 - 3,950.00

44+000 44+500 3,950.00 - 3,950.00

44+500 45+000 3,950.00 - 3,950.00

45+000 45+500 3,950.00 - 3,950.00

45+500 46+000 3,950.00 - 3,950.00

46+000 46+500 3,950.00 - 3,950.00

46+500 47+000 3,950.00 - 3,950.00

47+000 47+500 3,950.00 - 3,950.00

47+500 48+000 3,950.00 - 3,950.00

48+000 48+500 3,950.00 - 3,950.00

48+500 49+000 3,950.00 - 3,950.00

49+000 49+500 3,950.00 - 3,950.00

49+500 50+000 3,950.00 2,780.80 - 2,780.80 1,169.20

50+000 50+500 3,950.00 3,160.00 - 3,160.00 790.00

50+500 51+000 3,950.00 869.00 2,464.80 - 3,333.80 616.20

51+000 51+500 3,950.00 3,634.00 - 3,634.00 316.00

51+500 52+000 3,950.00 711.00 1,769.60 4.74 2,485.34 1,464.66

52+000 52+500 3,950.00 - 3,950.00

178,556.00 - - - - - - - - - - - - - 711.00 - - 4,503.00 10,175.20 - 2,717.60 - - 2,439.52 1,137.60 7,481.80 11,376.00 (130.65) (62.75) - - - - - - - 40,348.32 138,207.68 TOTAL

4.5.21 Asphalt concrete

Chainage CS Qty.Previous Paid

Total Qty.Balance Qty.

Page 33: Previous Paid Summary Sheet for KDESH (IPC 28)

33+580

33+600 39.90 11.86 33+600

33+620 34.19 23.72 33+620

33+640 34.59 23.72 33+640

33+660 40.57 22.72 33+660

33+680 43.81 22.62 33+680

33+700 38.70 20.29 33+700

33+720 37.48 17.38 33+720

33+740 35.01 15.55 33+740

33+760 33.06 14.12 33+760

33+780 32.71 15.92 33+780

33+800 32.83 17.15 33+800

33+820 34.44 18.65 33+820

33+840 33.86 19.13 33+840

33+860 37.09 20.58 33+860

33+880 37.55 20.15 33+880

33+900 33.92 17.90 33+900

33+920 33.39 18.07 33+920

33+940 33.51 17.41 33+940

33+960 33.91 17.39 33+960

33+980 34.52 17.21 33+980

34+000 38.14 564.89 10.79 34+000

34+020 40.12 20.98 34+020

34+040 35.33 22.04 34+040

34+060 37.70 22.34 34+060

34+080 43.49 21.08 34+080

34+100 39.75 20.00 34+100

34+120 36.73 18.59 34+120

34+140 32.87 16.60 34+140

34+160 30.41 14.73 34+160

34+180 32.06 14.73 34+180

34+200 33.37 15.21 34+200

34+220 36.22 14.88 34+220

34+240 37.18 14.48 34+240

1,188.41 16.04 34+260

16.07 34+280

34+260 16.04 15.60 34+300

34+280 37.74 8.18 34+320

34+300 36.92 653.88

34+320 41.02

34+340 43.12

34+360 46.60

34+380 46.39

34+400 40.52

34+420 39.88

34+440 42.77

34+460 41.82

Page 34: Previous Paid Summary Sheet for KDESH (IPC 28)

34+480 36.56

34+500 35.31 704.94

34+520 40.38

34+540 43.53

34+560 43.29

34+580 41.86

34+600 41.04

34+620 40.81

34+640 41.80

34+660 39.60

34+680 36.63

34+700 34.78

34+720 34.37

34+740 34.41

34+760 31.24

34+780 29.13

34+800 34.76

34+820 41.22

34+840 41.37

34+860 40.94

34+880 39.62

34+900 38.27

34+920 37.34 604.79

1,311.08

34+940 37.17 668.75

34+960 36.94

34+980 41.69

35+000 44.09 63.96

35+020 39.36

35+040 35.35

35+060 33.82

35+080 34.24

35+100 32.54

35+120 36.58

35+140 41.98

35+160 43.08

35+180 35.17

35+200 31.50

35+220 44.13

35+240 43.65

35+260 36.49

35+280 37.33

35+300 39.94

35+320 40.78

35+340 36.80

35+360 33.26

Page 35: Previous Paid Summary Sheet for KDESH (IPC 28)

35+380 33.29

35+400 39.40

35+420 39.61

35+440 34.54

35+460 33.44

35+480 32.08

35+500 35.76 369.65

1,084.01

2,308.22

50+000 50+500

50+500 51+000

51+000 51+500

51+500 52+000

52+000 52+500

25.66

38.97

60.43

65.75

62.48

71.69

74.08

69.45

72.66

68.57

67.32

70.80

72.21

65.53

52.01

39.92

45.69

64.99

Page 36: Previous Paid Summary Sheet for KDESH (IPC 28)

65.04

1,153.25

20.66

8.46

4.58

8.54

3.31

31.67

25.61

20.06

22.48

22.82

23.00

24.66

25.14

5.94

1.83

4.37

690.59

Page 37: Previous Paid Summary Sheet for KDESH (IPC 28)

126.87

651.76

609.71

690.59

1,040.20

3,119.13

0.00

Page 38: Previous Paid Summary Sheet for KDESH (IPC 28)

30.52 11.86

32.41 23.72

33.87 23.72

35.78 22.72

37.24 22.62

36.47 20.29

36.55 17.38

33.21 15.55

30.10 14.12

33.59 15.92

41.29 17.15

38.53 18.65

33.48 19.13

40.53 20.58

44.24 20.15

37.97 17.90

34.90 18.07

33.37 17.41

29.17 17.39

29.32 17.21

358.15 31.84

141.82 26.68 10.79

217.24 10.37 20.98

22.04

385.72 22.34

21.08

20.00

18.59

16.60

14.73

14.73

15.21

14.88

14.48

16.04

16.07

15.60

8.18

359.06

IPC 09 type 1

48.97

Page 39: Previous Paid Summary Sheet for KDESH (IPC 28)

56.88

128.30

134.96

134.24

153.53

69.83

490.96

624.96

1,052.96

389.51

424.56

427.64

173.68

233.75

14.28

22.13

6.00

11.40

107.17

52.06

4,757.77

80.25 106.87 113.44

85.20 106.39 117.42

92.65 102.07 126.10

99.11 97.74 133.63

109.04 94.06 135.42

119.97 87.56 125.06

121.69 86.72 118.04

80.25 115.69 86.64 118.07

85.2 110.49 84.30 114.50

Page 40: Previous Paid Summary Sheet for KDESH (IPC 28)

92.648 104.14 83.87 110.99

99.11 101.37 86.03 106.97

109.042 102.23 86.61 100.66

103.43 86.12 98.06

104.43 88.91 107.65

104.68 90.11 116.58

97.29 87.64 118.91

91.73 87.34 124.68

93.48 91.24 139.32

94.44 93.82 147.27

94.37 94.18 78.65

94.11 95.08 72.95

88.45 96.08 52.97

87.18 98.60 42.52

2,387.63 92.24 95.75 47.02

2,398.85 93.19 92.10 53.85

2,269.60 95.87 91.94 50.91

2,818.76 94.80 92.30 48.92

496.17 90.57 92.84 51.37 553.04

10,371.01 92.42 85.01 52.24 585.85

95.90 82.60 49.14 608.65

97.00 92.09 47.24 913.38

93.50 92.27 124.24

90.52 90.60 2,785.16

92.98 90.38

94.53 89.96

98.90 95.18

106.98 95.14

113.43 96.51

112.02 107.57

3,850.26 3,600.22 2,920.53

Page 41: Previous Paid Summary Sheet for KDESH (IPC 28)

20.66

8.46

4.58

8.54

3.31

31.67

25.61

20.06

22.48

22.82

23.00

24.66

25.14

5.94

1.83

4.37

690.59

Page 42: Previous Paid Summary Sheet for KDESH (IPC 28)

126.87

651.76

609.71

690.59

1,040.20

3,119.13

0.00

Page 43: Previous Paid Summary Sheet for KDESH (IPC 28)

33+600 50+020 29.47

33+620 50+040 33.99

33+640 50+020 37.24

33+660 33.59

33+680 32.55

33+700 28.12

33+720 34.89

33+740 34.69

33+760 34.64

33+780 29.06

33+800 28.20

33+820 30.66

33+840 22.80

33+860 28.39

33+880 24.84

33+900 3.98

33+920 14.10

33+940 4.97

33+960 2.98

33+980 14.44

23.72

34+000 141.82 27.92

34+020 27.40

34+040 18.77

34+060 11.93

34+080 1.95

34+100 3.39

34+120 11.74

34+140 20.22 553.05

34+160 18.66

34+180 28.66

34+200 34.06

34+220 26.24

34+240 20.55

34+260 681.21 22.60

34+280 28.06

34+300 33.55

34+320 217.24 30.22

26.01

359.064 26.55

29.60 14.68

31.17 13.98

35.99 12.90

37.87 13.86

19.38 15.13

7.72 7.22

Page 44: Previous Paid Summary Sheet for KDESH (IPC 28)

31.57 2.27

31.77 4.95

25.31 5.18 90.17

22.00 5.69

26.65 7.58

29.27 10.76

32.56 126.87 12.67

14.89 8.02

4.20 2.02

2.98 9.35

11.15 585.85 22.72

28.23 41.86

32.20 46.44

27.53 45.08

20.22 42.57

29.58 43.14

36.74 38.30

36.44 28.93

26.78 1.89

29.86 35.54

717.62 38.22 30.54

38.21 23.63

36.26 4.28

32.13 11.52

31.95 14.48

32.42 17.71

34.66 19.97

32.95 15.95

33.65 16.03

5.66 18.01

4.44 18.59 593.27

5.19 23.49

20.81 19.79

19.34 11.23

22.63 18.29

26.56 651.76 22.39

33.40 608.66 19.28

45.82 14.61

45.57 15.39

43.16 17.24

43.52 15.54

43.29 15.53

42.33 14.42

45.27 18.03

52.21 21.50

42.62 20.14

46.78 18.34

Page 45: Previous Paid Summary Sheet for KDESH (IPC 28)

11.39

37.71 0.63

39.78 11.74

44.28 13.16

45.36 17.65

916.87 50.70 15.66

48.34 18.69

38.92 17.46

39.44 16.54

42.96 18.64

44.77 17.35 444.12

48.30 4.19

50.22 4.81

46.74 2.20

27.93 2.52

18.54 913.38 1.88

7.85 31.71

4.75 20.63

530.44 681.21 16.27 16.63

562.59 717.62 17.40 27.48

716.07 916.87 15.54 28.46

912.76 469.46 15.56 24.16

63.3 2785.16 17.81 2.32

2785.16 18.49 5.99

15.48 1.54

11.84 4.98

469.46 5.17 124.23 4.26

20.35

2,785.16 2,785.16 22.33

609.71 34.34

43.33

38.38

35.32

3.62

1.83

0.46

5.46

2.66

10.77

7.38

27.73

26.44

24.17

28.10

15.48

0.65

1.01

Page 46: Previous Paid Summary Sheet for KDESH (IPC 28)

13.96

24.81

18.27 590.61

20.66

8.46

4.58

8.54

3.31

31.67

25.61

20.06

22.48

22.82

23.00

24.66

25.14

5.94

1.83

4.37

25.14

26.56

16.08

8.59

14.46

690.59 16.80

12.61

13.26

26.30

25.36

14.00

9.84

9.91 472.05

15.96

24.64

28.79

19.10

36.20

22.64

20.61

22.52

21.26

26.33

26.81

24.57

19.54

21.23

20.29

Page 47: Previous Paid Summary Sheet for KDESH (IPC 28)

16.27

16.58

20.62

126.87 21.22

651.76 28.75

609.71 5.90

690.59 4.13

1,040.20 9.31

3,119.13 27.54

20.14

14.45

20.26 555.67

0.00 33.77

37.72

39.63

36.03

34.25

37.16

39.37

39.52

35.51

1,040.20 40.29 373.25

3,119.13 3,119.13

Page 48: Previous Paid Summary Sheet for KDESH (IPC 28)

12.10 58.14 45.51 (504.04) -504.04

12.70 50.91 35.32 715.89 715.89

13.79 48.72 33.17 1,165.00 1165.02

8.79 54.37 40.79 1,428.46 1428.46

4.87 50.27 39.36 804.43 804.43

20.79 46.76 36.44 822.68 822.68

Page 49: Previous Paid Summary Sheet for KDESH (IPC 28)

41.69 56.84 46.75 741.33 741.33

43.55 65.6 55.3 77.80 77.8

36.53 66.28 56.3 139.50 139.5

1.87 62.65 52.88 (29.83) -29.83

45.18 57.24 48.01 6.90 6.90

41.10 55.96 46.71 (451.03) (451.03)

33.94 57.55 48.1 (863.51) (863.59)

25.88 56.55 48.13 (168.30) (168.30)

19.13 58.44 49.62 244.79 244.79

18.42 65.1 55.01 831.36 831.36

25.09 79.33 71.27 1,907.66 1,907.66

34.00 75.65 68.43 1,749.50 1,749.50

35.93 63.47 53.67 1,447.07 1,447.07

29.90 62.92 49.27 1,806.28 1,806.28

18.00 62.79 48.64 11,871.94

4.05 61.92 51.47

10.99 60.18 50.83

16.95 59.98 50.15

10.33 60.49 49.14

7.34 1498.11 1230.27

9.37 1,048.68

582.27 494.93

9.59

12.07

14.10

21.34

57.10 48.54

40.31

33.44

29.39

26.30

24.89

29.15

31.30

42.19

46.45

15.09

30.67

36.72

58.45

67.63

61.28

573.26 487.27

Page 50: Previous Paid Summary Sheet for KDESH (IPC 28)

55.29

66.46

68.29

52.02

45.39

40.93

41.22

45.40

43.59

42.66

501.25 426.06

1,656.78

1,408.26 1,456.80

Page 51: Previous Paid Summary Sheet for KDESH (IPC 28)
Page 52: Previous Paid Summary Sheet for KDESH (IPC 28)
Page 53: Previous Paid Summary Sheet for KDESH (IPC 28)

5.06

9.12

9.86

10.04

10.85

- 10.34

- 8.91

(0.02) 31+000 31+500 0.08 6.58

- 31+500 32+000 36.92 4.40

- 32+000 32+500 224.05 4.16

- 32+500 33+000 190.68 5.04

Page 54: Previous Paid Summary Sheet for KDESH (IPC 28)

- 33+000 33+500 236.20 2.07

- 33+500 34+000 149.27 1.34

- 34+000 34+500 2.97

- 34+500 35+000 5.37

- 7.43

- 7.35

0.08 7.43

- 7.56

- 8.62

- 7.37

- 7.26

- 9.60

- 9.79

- 5.07

173.59

Page 55: Previous Paid Summary Sheet for KDESH (IPC 28)
Page 56: Previous Paid Summary Sheet for KDESH (IPC 28)
Page 57: Previous Paid Summary Sheet for KDESH (IPC 28)
Page 58: Previous Paid Summary Sheet for KDESH (IPC 28)

4.86 2.37 7.71 7.47 10.63 4.23 9.24

5.91 2.07 7.53 4.72 5.51 2.75 7.99

7.44 1.37 7.98 4.01 5.58 5.47 7.68

8.05 1.41 8.03 4.77 7.62 6.61 6.69

7.78 3.12 10.75 6.82 8.23 3.11 6.46

28.93 1.18 13.11 10.29 10.23 2.58 6.67

3.86 13.79 12.02 10.86 3.37 6.44

2.76 12.77 12.29 11.49 9.61 3.50 5.85

3.10 10.74 10.81 12.99 9.77 4.17 4.41

3.53 9.42 10.76 14.63 9.06 3.19 12.49

7.98 11.19 9.69 14.17 7.94 6.52 62.83

Page 59: Previous Paid Summary Sheet for KDESH (IPC 28)

13.65 8.96 13.42 6.29 6.54

11.98 9.21 12.14 4.85 2.78

13.46 9.31 12.12 6.52 2.06

16.13 7.77 8.68 6.34 2.58

1.11 5.32 8.73 5.85 4.81

19.34 0.18 13.36 5.33 4.91

16.27 5.18 14.69 5.99 3.29

16.35 4.89 15.84 6.67 4.69

4.92 3.89 14.73 3.26 5.09

11.00 8.96 14.67 2.12 3.19

14.66 11.32 12.32 5.65 3.40

11.51 9.49 10.51 8.27 5.27

10.82 9.10 11.77 7.24 5.89

11.17 8.63 11.52 6.19 7.57

11.29 9.67 236.20 149.27 91.43

10.60 190.68

9.84

224.05

Page 60: Previous Paid Summary Sheet for KDESH (IPC 28)

57.90

50.68

36.97

44.23

60.05

76.80

80.50

68.26

53.55

44.27

45.96

48.71

50.06

54.76

67.32

58.52

39.89

37.34

35.34

33.96

34.81

52.21

51.23

37.72 1,221.02

51.50

61.38

62.42

62.16

58.10

58.31

1,574.87

32+000 35.47 34.68

32+020 34.48 34.61 37.86

32+040 34.13 32.22 38.16

32+060 33.87 31.97 36.24

32+080 34.09 32.41 36.27

32+100 30.51 32.33 36.95

32+120 31.75 32.71 220.16

32+140 34.79 33.06

32+160 32.36 33.10

32+180 31.78 34.05

32+200 32.97 36.01

32+220 34.44 35.91

Sub base - IPC 10

Page 61: Previous Paid Summary Sheet for KDESH (IPC 28)

32+240 33.69 279.20 70% 10.00

32+260 34.68 20.20

32+280 37.86 33.35

32+300 38.16 32.16

32+320 36.24 33.74

32+340 36.27 35.22

32+360 36.95 88.06 40% 34.48

32+380 35.05 34.13

32+400 33.88 33.87

32+420 33.28 34.09

32+440 30.91 30.51

32+460 34.49 31.75

32+480 37.81 34.79

32+500 37.77 218.87 90% 32.36

586.14 31.78

32.97

34.44

33.69

967.38

Page 62: Previous Paid Summary Sheet for KDESH (IPC 28)

29.47 28.06 38.21 48.34 11.02 21.46 41.07 10.15

33.99 33.55 36.26 38.92 - 22.99 4.69 10.60

37.24 30.22 32.13 39.44 15.35 23.67 50.61 9.17

33.59 26.01 31.95 42.96 27.49 22.11 43.69 4.95

32.55 26.55 32.42 44.77 29.71 20.67 30.32 4.52

28.12 29.60 34.66 48.30 37.73 22.15 18.43 13.08

34.89 31.17 32.95 50.22 36.65 23.37 12.00 16.59

34.69 35.99 33.65 46.74 30.04 23.99 15.25

34.64 37.87 7.79 27.93 30.97 24.74 15.91

29.06 19.37 14.00 18.54 38.66 23.69 17.15

28.20 7.72 20.81 25.92 35.98 22.66 16.34

30.66 31.57 19.34 11.98 28.36 22.88 10.01

22.80 31.77 22.63 16.27 29.70 25.73 5.08

28.39 25.31 26.56 17.40 28.63 28.95 3.49

24.84 22.00 33.40 15.54 30.86 38.16 11.09

3.98 26.65 45.82 15.56 34.04 36.75 14.78

29.21 29.27 45.57 17.81 28.13 33.47 14.76

26.09 32.56 43.16 18.49 28.74 28.21 24.25

23.72 30.92 43.52 15.48 23.78 23.74 25.46

27.92 25.68 43.29 11.84 21.24 26.37 24.09

27.40 28.23 42.33 5.17 22.23 33.77 26.81

18.77 32.20 45.27 24.48 44.42 29.15

22.08 27.53 52.21 28.03 30.17

26.28 20.22 42.62 29.72 29.88

20.22 29.58 46.78 37.28

18.66 36.74 37.71

28.66 36.44 39.78

34.06 26.78 44.28

26.24 29.86 45.36

20.55 38.22 50.70

22.60

839.57 867.64 1,085.16 577.62 688.81 593.95 200.82 382.73

14.68 8.02 19.28 43.33 12.61 19.28 -

13.98 2.02 14.61 38.38 13.26 14.61 -

Page 63: Previous Paid Summary Sheet for KDESH (IPC 28)

12.90 9.35 15.39 35.32 26.30 15.39 -

13.86 22.72 17.24 3.62 25.36 17.24 -

15.13 41.86 15.54 1.83 14.00 15.54 -

7.22 46.44 15.53 0.46 9.84 15.53 -

2.27 45.08 14.42 5.46 9.91 14.42 -

4.95 42.57 18.03 2.66 15.96 18.03 -

5.18 43.14 21.50 10.77 24.64 21.50 -

5.69 38.30 20.14 7.38 28.79 20.14 -

7.58 28.93 18.34 27.73 19.10 18.34 (0.00)

10.76 1.89 0.63 26.44 36.20 0.63 (0.00)

12.67 35.54 11.74 24.17 22.64 11.74 0.00

30.54 13.16 28.10 20.61 13.16 -

23.63 17.65 15.48 22.52 17.65 -

4.28 15.66 0.65 21.26 15.66 -

11.52 18.69 1.01 26.33 18.69 -

14.48 17.46 13.96 26.81 17.46 -

17.71 16.54 24.81 24.57 16.54 -

19.97 18.64 18.27 19.54 18.64 -

15.95 17.35 20.66 21.23 17.35 -

16.03 4.19 8.46 20.29 4.19 0.00

18.01 4.81 4.58 16.27 4.81 0.00

18.59 2.20 8.54 16.58 2.20 0.00

23.49 2.52 3.31 20.62 2.52 (0.00)

19.79 1.88 31.67 21.22 1.88 (0.00)

11.23 31.71 25.61 28.75 31.71 -

18.29 20.63 20.06 5.90 20.63 -

22.39 16.63 22.48 4.13 16.63 -

27.48 22.82 9.31 27.48 -

28.46 23.00 27.54 28.46 -

24.16 24.66 20.14 24.16 -

2.32 25.14 14.45 7.35 (5.03)

5.99 5.94 20.26 2.05 3.94

1.54 1.83 33.77 1.46 0.08

4.98 4.37 37.72 0.64 4.34

4.26 25.14 39.63 3.36 0.90

20.35 26.56 36.03 20.35 -

22.33 16.08 34.25 22.33 -

34.34 8.59 37.16 34.34 -

14.46 39.37

16.80 39.52

35.51

40.29

126.87 651.76 598.32 690.59 1,040.20 - 594.09

107.84 553.99 508.57 587.00 884.17

Page 64: Previous Paid Summary Sheet for KDESH (IPC 28)

11.39

31+500 32+000 90.17 76.64 76.65

32+000 32+500 593.27 504.28 504.29

32+500 33+000 432.73 367.82 377.57

33+000 33+500 590.61 502.02 501.94

33+500 34+000 472.05 401.24 401.24

34+000 34+500 555.67 472.32 472.32

34+500 35+000 373.25 317.26 317.26

2,641.58 2,651.27

2,651.26

9.68

14.68 22.72 19.28 43.33 12.61 12.10 40.31

13.98 41.86 14.61 38.38 13.26 12.70 33.44

12.90 46.44 15.39 35.32 26.30 13.79 29.39

13.86 45.08 17.24 3.62 25.36 8.79 26.30

15.13 42.57 15.54 1.83 14.00 4.87 24.89

7.22 43.14 15.53 0.46 9.84 20.79 29.15

2.27 38.30 14.42 5.46 9.91 41.69 31.30

4.95 28.93 18.03 2.66 15.96 43.55 42.19

5.18 1.89 21.50 10.77 24.64 36.53 46.45

5.69 35.54 20.14 7.38 28.79 1.87 36.19

7.58 30.54 18.34 27.73 31.65 45.18 30.67

10.76 23.63 0.63 26.44 36.20 41.10 36.72

4.28 11.74 24.17 22.64 33.94 58.45

11.52 13.16 28.10 20.61 25.88 67.63

14.48 17.65 15.48 22.52 19.13 61.28

17.71 15.66 0.65 21.26 18.42 55.29

19.97 18.69 1.01 26.33 25.09 66.46

15.95 17.46 13.96 26.81 34.00 68.29

16.03 16.54 24.81 24.57 35.93 52.02

18.01 18.64 18.27 19.54 29.90 45.39

18.59 17.35 20.66 21.23 18.00 40.93

23.49 4.19 8.46 20.29 4.05 41.22

19.79 4.81 7.51 16.27 10.99 45.40

11.23 2.20 8.54 16.58 16.95 43.59

18.29 2.52 3.24 20.62 10.33 42.66

22.39 1.88 31.67 21.22 7.34

4.81 25.61 28.75 9.37

2.20 20.06 34.43 9.59

Page 65: Previous Paid Summary Sheet for KDESH (IPC 28)

2.52 22.48 27.54 12.07

27.48 22.82 20.14 14.10

28.46 23.00 14.45 21.34

24.16 24.66 20.26

2.32 25.14 33.70

5.99 5.94 37.72

1.54 1.83 39.63

4.98 4.37 36.03

4.26 25.14 34.25

20.35 26.56 37.16

22.33 16.08 39.37

34.34 8.59 39.52

14.46 35.51

16.80 40.29

114.20 632.36 538.88 693.45 1,067.76 639.37 1,095.61

17.13 94.85 80.83 104.02 160.16 639.37 1,095.61

45.51 30.65

35.32 37.29

33.17 41.39

40.79 45.46

39.36 49.51

36.44 57.08

46.75 51.60

55.30 0.50

56.30 54.43

52.88 55.77

48.01 49.29

46.71 46.02

48.10 43.69

48.13 38.68

49.62 40.78

55.01 71.37

71.27 5.04

68.43 36.49

53.67 39.93

Page 66: Previous Paid Summary Sheet for KDESH (IPC 28)

49.27 38.22

48.64 46.50

51.47 50.51

50.83 41.93

50.15 40.20

49.14 40.98

50.17 38.35 1,091.66

45.75 38.19

41.68 38.82

49.89 1,230.27 38.22

60.50 1,107.24 36.69

62.64 42.15

61.12 46.77

21.66

30.89 22.39

1,654.57 35.07

39.95

46.08

48.66

54.22

53.63

50.40

47.11

28.38

13.83

49.83

55.87

56.71

50.09

42.50

38.52

38.90

39.42

40.16 1,092.57

37.61

39.02

43.65

44.34

42.65

39.27

38.34

37.44

39.36

45.39

48.29

51.05

Page 67: Previous Paid Summary Sheet for KDESH (IPC 28)

55.76

59.79

58.25

55.28

56.27

52.38

14.58

22.20

39.84

42.39

40.98

38.55

36.27

36.43 1,115.38

38.06

38.65

38.01

36.67

42.09

49.11

50.56

50.40

3.02

50.40

52.92

48.16

41.25

38.97

38.99

38.67

20.72

38.90

39.92

42.69

45.25

52.53

53.43

53.72

27.91

1,031.00

4,330.60

4,331.42

0.82

Page 68: Previous Paid Summary Sheet for KDESH (IPC 28)
Page 69: Previous Paid Summary Sheet for KDESH (IPC 28)
Page 70: Previous Paid Summary Sheet for KDESH (IPC 28)

30+000 30+500 274.38 839.57

30+500 31+000 520.39 867.64

31+000 31+500 382.73 1085.16

49+500 50+000 688.81 577.62

50+000 50+500 688.80 688.81

50+500 51+000 712.61 593.95

51+000 51+500 722.55 200.82

51+500 52+000 1,074.56 382.73

52+000 52+500 171.46 5236.3

5,236.29

Page 71: Previous Paid Summary Sheet for KDESH (IPC 28)

520.00

15,600.00

52000

615.38

Page 72: Previous Paid Summary Sheet for KDESH (IPC 28)
Page 73: Previous Paid Summary Sheet for KDESH (IPC 28)

31+500 32+000 595.8 595.81

32+000 32+500 141.27 141.28

32+500 33+000 75.55 64.91

33+000 33+500 78.86 79.68

33+500 34+000 86.78 71.24

34+000 34+500 68.19 87.5

34+500 35+000 650.35 650.35

35+000 35+500 501.25 501.25

Page 74: Previous Paid Summary Sheet for KDESH (IPC 28)

30+500 31+000 2,078.09 1,662.47 415.62 20%

31+000 31+500 3,950.00 3,160.00 790.00 20%

31+500 32+000 3,950.00 3,546.31 403.69 10%

32+000 32+500 3,950.00 3,555.00 395.00 10%

32+500 33+000 2,310.00 1,848.00 462.00 20%

49+500 50+000 3,475.75 2,780.60 695.15 20%

50+000 50+500 3,950.00 3,160.00 790.00 20%

50+500 51+000 3,950.00 3,333.80 616.20 16%

51+000 51+500 3,950.00 3,634.00 316.00 8%

51+500 52+000 3,106.68 2,485.34 621.34 20%

34,670.52 29,165.52 5,505.00 TOTAL

Balance

Percentage %

4.5.21 Asphalt concrete - KDE

Chainage

Actual

Completed

Qty.

Previous Paid

Qty.Balance Qty.

Page 75: Previous Paid Summary Sheet for KDESH (IPC 28)

CS paid

31+000 31+500 176.00 140.80

31+500 32+000 176.00 133.76

32+000 32+500 176.00 88.00

32+500 33+000 175.90 88.00

33+000 33+500 175.84 35.20

33+500 34+000 176.00 38.72

34+000 34+500 176.00 96.80

34+500 35+000 176.00 105.60

35+000 35+500 172.48 38.02

49+500 50+000 175.68 95.10

50+000 50+500 284.80 166.81

50+500 51+000 283.58 159.42

51+000 51+500 279.81 189.72

51+500 52+000 257.61 161.82

52+000 52+500 84.94 -

2,946.64 - 1,537.77

52.19%

1,366.42 - 772.87 593.55

56.56%