Ó Copyright 2017 ABB. All rights reserved. Preventive Maintenance LX Project X ABB AB Title: Preventive Maintenance LX Project X Doc No.: Doc. Kind: Lang.: en Project name: Revision: Creator name: Pia Sandberg Status: Draft Department code: MSO Date: 2017-08-10 E-mail: [email protected] Page: 1/47 Time period:

Transcript of Preventive Maintenance LX Project X · Web viewRefer to manual Protocol: Insulation resistance of...

Page 1: Preventive Maintenance LX Project X · Web viewRefer to manual Protocol: Insulation resistance of rotor 2. Rotor coils X X 1. Visual inspection of turn to turn insulation, discoloration

Preventive Maintenance LX Project X

ÓC

opyr

ight

201

7 A

BB

. All

right

s re

serv

ed.

ABB AB Title: Preventive Maintenance LX Project X

Doc No.: Doc. Kind:

Lang.: en Project name:

Revision: Creator name: Pia Sandberg

Status: Draft Department code: MSO

Date: 2017-08-10 E-mail: [email protected]

Page: 1/37 Time period:

Page 2: Preventive Maintenance LX Project X · Web viewRefer to manual Protocol: Insulation resistance of rotor 2. Rotor coils X X 1. Visual inspection of turn to turn insulation, discoloration

ÓC

opyr

ight

201

7 A

BB

. All

right

s re

serv

ed.

Table of Contents1. General data 3

1.1. Customer reference 31.2. Machine details 31.3. Driven equipment details 31.4. Site condition and operating data 32. ABB preventive maintenance program – Basic concept 43. Summary 5

3.1. Summary of work done 53.2. Recommendations 53.3. Discovered irregularities and action taken 63.4. Spare parts 74. Preventive maintenance program 8

4.1. Machine 84.2. Stator 94.3. Stator terminal 104.4. Rotor 114.5. Bearings 124.6. Run down tank 134.7. Exciter and Rectifier 144.8. Start resistor 154.9. Permanent Magnet Generator (PMG) 164.10.Rotor earth fault brush 174.11.Rotor earth brush 184.12.Cooling system 194.13.Cooling fan motor and fan 205. Protocols 21

Protocol: Logged data 21Protocol: Insulation resistance/Polarization Index (PI) 22Protocol: Insulation resistance/Polarization Index (PI) 23Protocol: Resistance of RTD’s (PT100) 24Protocol: Resistance of RTD’s (PT100) cont. 25Protocol: Resistance of RTD’s (PT100) 26Protocol: Resistance of RTD’s (PT100) cont. 27Protocol: Insulation resistance of rotor 28Protocol: Insulation resistance of exciter and PMG stator 29Protocol: Insulation resistance of start resistor 30Protocol: Leakage test coolers 31Protocol: Coil support insulation plates 32Protocol: Coil support insulation plates 6 pole 336. Additional site and machine information 347. Appendix 34

Title: Preventive Maintenance LX Project X

Dep: DM/DMMG/MS/MST

Doc No.:

Date: 2015-06-16

Page: 2/37

Page 3: Preventive Maintenance LX Project X · Web viewRefer to manual Protocol: Insulation resistance of rotor 2. Rotor coils X X 1. Visual inspection of turn to turn insulation, discoloration

1. General data

1.1. Customer reference

Name Company Phone number e-mail address

1.2. Machine details Machine type      Serial number      Work order number      Original order number      AC/DC      Power (kW)(kVA)      Voltage (V)      Frequency (Hz)      Full load current (A)      Speed (RPM)      Poles      Insulation Class      Temperature rise class      Degree of protection      Duty      Power factor      Efficiency (%)      Motor driven by VSD      Year of manufacture      Weight      

Protection type Ex       II       T     Ex certificate number      Ex ref. standards      

1.3. Driven equipment detailsEquipment type      

1.4. Site condition and operating dataMachine protection devices      Foundation type      Machine mounting      Coupling type      

Operating hours      No. of starts      Equivalent operating hours      

Title: Preventive Maintenance LX Project X

Dep: MSO

Doc No.:

Date: 2017-08-10

Page: 3/37

Page 4: Preventive Maintenance LX Project X · Web viewRefer to manual Protocol: Insulation resistance of rotor 2. Rotor coils X X 1. Visual inspection of turn to turn insulation, discoloration

2. ABB preventive maintenance program – Basic concept

This is an overview of the preventive maintenance program. A maintenance schedule is determined from actual site conditions, number of operating hours, the mode of operation and the number of starts of the Motor/Generator. Enclosed report is information from the inspection. All cross-sections of machine parts are principal sketches and not necessary for the actual machine.

Level 1(L1)

Level 2(L2)

Level 3(L3)

Level 4(L4)

Interval Max. 10 000h (equivalent hours) of operation or yearly

Max. 20 000h (equivalent hours) of operation or max. 3 years

Max 40 000h (equivalent hours) of operation or max. 6 years

Max 80 000h (equivalent hours) of operation or max. 12 years

Preparation for inspection

Opening of inspection covers

Opening of inspection covers

Disassembly of covers. Opening of bearings. Opening of water coolers (if coolers)

Opening of bearings. Removal of rotor and exciter. Opening of water coolers (if coolers)

Maintenance parts

L1 Preventive Maintenance Kit

L2 Preventive Maintenance Kit and recommendations from earlier inspections

L3 Preventive Maintenance Kit and recommendations from earlier inspections

L4 Preventive Maintenance Kit and recommendations from earlier inspections

Exp. downtime Approx. 1 day Approx. 2 days Approx. 5 days Approx. 10 days

Equivalent hours = Total hours of operation + number of starts x 20

Example of maintenance scheduleInterval[approx.

1 2 3 4 5 6 7 8 9 …

Interval[hours x 10 20 30 40 50 60 70 80 90 …

Level L1 L2 L1 L3 L1 L2 L1 L4 L1 …

The table above is for information only. Consult your ABB motor/generator specialist for specific recommendations.

Electrical measurements are performed according to ABB AB Machines Technical Provisions.

3BSM005426 Measurement of impedance on rotor complete4104016E-3 Insulation resistance

4104016E-4 Polarization Index

Title: Preventive Maintenance LX Project X

Dep: MSO

Doc No.:

Date: 2017-08-10

Page: 4/37

Page 5: Preventive Maintenance LX Project X · Web viewRefer to manual Protocol: Insulation resistance of rotor 2. Rotor coils X X 1. Visual inspection of turn to turn insulation, discoloration

3. Summary 3.1. Summary of work doneThis section includes a summary of the main performed actions / surveys / findings.Details are described in the next dedicated sessions/pages.

3.2. RecommendationsThis section includes recommendations for future operation and maintenance.

Title: Preventive Maintenance LX Project X

Dep: MSO

Doc No.:

Date: 2017-08-10

Page: 5/37

Page 6: Preventive Maintenance LX Project X · Web viewRefer to manual Protocol: Insulation resistance of rotor 2. Rotor coils X X 1. Visual inspection of turn to turn insulation, discoloration

3.3. Discovered irregularities and action takenMaintenance item Discovered irregularities and actions taken

Referring to structural number in Inspection Programme in chapter 4

4.1 Machine

4.2 Stator

4.3 Stator terminal

4.4 Rotor

4.5 Bearings

4.6 Run down tank

4.7 Exciter and Rectifier

4.8 Start resistor

4.9 Permanent Magnetic Generator (PMG)

4.10Rotor earth fault brush

4.11 Rotor earth brush

4.12 Cooling system

4.13 Cooling fan motor and fan

Title: Preventive Maintenance LX Project X

Dep: MSO

Doc No.:

Date: 2017-08-10

Page: 6/37

Page 7: Preventive Maintenance LX Project X · Web viewRefer to manual Protocol: Insulation resistance of rotor 2. Rotor coils X X 1. Visual inspection of turn to turn insulation, discoloration

3.4. Spare partsMaintenance item

1. Materials and spare parts used

2. Recommended spare parts

Title: Preventive Maintenance LX Project X

Dep: MSO

Doc No.:

Date: 2017-08-10

Page: 7/37

Page 8: Preventive Maintenance LX Project X · Web viewRefer to manual Protocol: Insulation resistance of rotor 2. Rotor coils X X 1. Visual inspection of turn to turn insulation, discoloration

4. Preventive maintenance program4.1. MachineA=Approved / B=Approved with remarks / C=Not approved / D=Approved after action taken / NA=Not applicable

Location L1 L2 Activity A B C D NA

1. Machine X X 1. Look through all logged or recorded data available; load, temperature, vibrations etc.Protocol: Logged data

X X 2. Visual inspection of exterior of machine for rust, leaks or other defects

X X 3. Visual inspection of all external fastenings

X X 4. Visual inspection of ventilation ducts

2. Purging X X 1. Check for leaks after assembling

3. Others X X 1. Visual inspection

4.3

Title: Preventive Maintenance LX Project X

Dep: MSO

Doc No.:

Date: 2017-08-10

Page: 8/37

Page 9: Preventive Maintenance LX Project X · Web viewRefer to manual Protocol: Insulation resistance of rotor 2. Rotor coils X X 1. Visual inspection of turn to turn insulation, discoloration

4.2. StatorA=Approved / B=Approved with remarks / C=Not approved / D=Approved after action taken / NA=Not applicable

Location L1 L2 Activity A B C D NA

1. Stator winding

X X 1. Visual inspection of winding connections

X X 2. Visual inspection of winding and bracing rope

X 3. Measure and record insulation resistanceProtocol: Insulation resistance/Polarization Index (PI)

X 4. Measure Polarization IndexProtocol: Insulation resistance/Polarization Index (PI)

2. Air cover X X 1. Visual inspection of sealing

3. RTDs X X 1. Verify function of all RTDsProtocol: Resistance of RTD’s (PT100)

4. Others X X 1. Visual inspection

Title: Preventive Maintenance LX Project X

Dep: MSO

Doc No.:

Date: 2017-08-10

Page: 9/37

Page 10: Preventive Maintenance LX Project X · Web viewRefer to manual Protocol: Insulation resistance of rotor 2. Rotor coils X X 1. Visual inspection of turn to turn insulation, discoloration

Title: Preventive Maintenance LX Project X

Dep: MSO

Doc No.:

Date: 2017-08-10

Page: 10/37

Page 11: Preventive Maintenance LX Project X · Web viewRefer to manual Protocol: Insulation resistance of rotor 2. Rotor coils X X 1. Visual inspection of turn to turn insulation, discoloration

4.3. Stator terminalA=Approved / B=Approved with remarks / C=Not approved / D=Approved after action taken / NA=Not applicable

Location L1 L2 Activity A B C D NA

1. Terminal box

X X 1. Visual inspection of all line – and neutral connections and stator bushings

X X 2. Visual inspection of general condition

X X 3. Inspection of pressure relief hatch

X X 4. Visual inspection of insulators

2. Others X X 1. Visual inspection

Title: Preventive Maintenance LX Project X

Dep: MSO

Doc No.:

Date: 2017-08-10

Page: 11/37

Page 12: Preventive Maintenance LX Project X · Web viewRefer to manual Protocol: Insulation resistance of rotor 2. Rotor coils X X 1. Visual inspection of turn to turn insulation, discoloration

Title: Preventive Maintenance LX Project X

Dep: MSO

Doc No.:

Date: 2017-08-10

Page: 12/37

Page 13: Preventive Maintenance LX Project X · Web viewRefer to manual Protocol: Insulation resistance of rotor 2. Rotor coils X X 1. Visual inspection of turn to turn insulation, discoloration

4.4. RotorA=Approved / B=Approved with remarks / C=Not approved / D=Approved after action taken / NA=Not applicable

Location L1 L2 Activity A B C D NA

1. Rotor X 1. Measure and record insulation resistance. Refer to manualProtocol: Insulation resistance of rotor

2. Rotor coils X X 1. Visual inspection of turn to turn insulation, discoloration etc.

X 2. Visual inspection interconnections

3. Rotor coil support

X X 1. Check upper coil support insulation plate for movementProtocol: Coil support insulation plates

4. Pole shoes X X 1. Visual inspection of pole shoes for discoloration

5. Fan X 1. Visual inspection of fan blades and welding

6. Balancing X 1. Visual inspection balancing weights and fastening and details

7. Others X X 1. Visual inspection

Title: Preventive Maintenance LX Project X

Dep: MSO

Doc No.:

Date: 2017-08-10

Page: 13/37

Page 14: Preventive Maintenance LX Project X · Web viewRefer to manual Protocol: Insulation resistance of rotor 2. Rotor coils X X 1. Visual inspection of turn to turn insulation, discoloration

4.5. Bearings A=Approved / B=Approved with remarks / C=Not approved / D=Approved after action taken / NA=Not applicable

Location L1 L2 Activity A B C D NA

1. Bearing housing and support

X X 1. Visual inspection for leaks

X X 2. Visual inspection of all bolted joints

X X 3. Visual inspection of guide support

2. Bearing seals

X X 1. Visual inspection for leaks. If leaks are found, check for wear and damages

3. Oil piping X X 1. Visual inspection for leaks

4. Measuring instrument

X X 1. Visual inspection of all measuring instruments

5. Air filter X X 1. Visual inspection of air filters for dirt and clogging

6. Air hoses X X 1. Visual inspection of hoses for air lock seal

7. Others X X 1. Visual inspection

Title: Preventive Maintenance LX Project X

Dep: MSO

Doc No.:

Date: 2017-08-10

Page: 14/37

Page 15: Preventive Maintenance LX Project X · Web viewRefer to manual Protocol: Insulation resistance of rotor 2. Rotor coils X X 1. Visual inspection of turn to turn insulation, discoloration

4.6. Run down tank A=Approved / B=Approved with remarks / C=Not approved / D=Approved after action taken / NA=Not applicable

Location L1 L2 Activity A B C D NA

1. Air filter X X 1. Visual inspection of air filters for dirt and clogging

2. Tank X X 1. Inspect exterior of machine for rust, leaks and other defects

X 2. Verify function of level indicator

3. Hoses X X 1. Visual inspection of hydraulic hoses for leaks or other defects

4. Others X X 1. Visual inspection

Title: Preventive Maintenance LX Project X

Dep: MSO

Doc No.:

Date: 2017-08-10

Page: 15/37

Page 16: Preventive Maintenance LX Project X · Web viewRefer to manual Protocol: Insulation resistance of rotor 2. Rotor coils X X 1. Visual inspection of turn to turn insulation, discoloration

4.7. Exciter and Rectifier A=Approved / B=Approved with remarks / C=Not approved / D=Approved after action taken / NA=Not applicable

Location L1 L2 Activity A B C D NA

1. Exciter Rotor

X X 1. Visual inspection

X 2. Measure and record insulation resistanceProtocol: Insulation resistance of exciter and PMG stator

2. Exciter Stator

X X 1. Visual inspection

X 2. Measure and record insulation resistanceProtocol: Insulation resistance of exciter and PMG stator

3. Others X X Visual inspection

Title: Preventive Maintenance LX Project X

Dep: MSO

Doc No.:

Date: 2017-08-10

Page: 16/37

Page 17: Preventive Maintenance LX Project X · Web viewRefer to manual Protocol: Insulation resistance of rotor 2. Rotor coils X X 1. Visual inspection of turn to turn insulation, discoloration

4.8. Start resistorA=Approved / B=Approved with remarks / C=Not approved / D=Approved after action taken / NA=Not applicable

Location L1 L2 Activity A B C D NA

1. Start resistor

X X 1. Visual inspection of the start resistor

X 2. Measure insulation resistance, 500 V DC meggerProtocol: Insulation resistance of start resistor

X 3. Inspection for cleanliness, discoloration, condition of insulation, looseness, movement and wear. Clean if necessary.

Title: Preventive Maintenance LX Project X

Dep: MSO

Doc No.:

Date: 2017-08-10

Page: 17/37

Page 18: Preventive Maintenance LX Project X · Web viewRefer to manual Protocol: Insulation resistance of rotor 2. Rotor coils X X 1. Visual inspection of turn to turn insulation, discoloration

4.9. Permanent Magnet Generator (PMG) A=Approved / B=Approved with remarks / C=Not approved / D=Approved after action taken / NA=Not applicable

Location L1 L2 Activity A B C D NA

1. PMG Stator X X 1. Visual inspection

X 2. Measure and record insulation resistanceProtocol: Insulation resistance of exciter and PMG stator

2. PMG Rotor X X 1. Visual inspection

3. Others X X 1. Visual inspection

Title: Preventive Maintenance LX Project X

Dep: MSO

Doc No.:

Date: 2017-08-10

Page: 18/37

Page 19: Preventive Maintenance LX Project X · Web viewRefer to manual Protocol: Insulation resistance of rotor 2. Rotor coils X X 1. Visual inspection of turn to turn insulation, discoloration

4.10. Rotor earth fault brushA=Approved / B=Approved with remarks / C=Not approved / D=Approved after action taken / NA=Not applicable

Location L1 L2 Activity A B C D NA

1. Brush and brush holder

X X 1. Visual inspection and check of brush. Replace if shorter than 15 mm

X 2. Measure and record insulation resistanceProtocol: Insulation resistance of rotor

X X 3. Check and clean brush holder

2. Slip ring X X 1. Visual inspection of slip ring

3. Others X X 1. Visual inspection

Title: Preventive Maintenance LX Project X

Dep: MSO

Doc No.:

Date: 2017-08-10

Page: 19/37

Page 20: Preventive Maintenance LX Project X · Web viewRefer to manual Protocol: Insulation resistance of rotor 2. Rotor coils X X 1. Visual inspection of turn to turn insulation, discoloration

4.11. Rotor earth brush A=Approved / B=Approved with remarks / C=Not approved / D=Approved after action taken / NA=Not applicable

Location L1 L2 Activity A B C D NA

1. Brush and brush holder

X X 1. Visual inspection and check of brushes. Replace if shorter than 15 mm

X X 2. Check and clean brush holder

2. Others X X 1. Visual inspection

Title: Preventive Maintenance LX Project X

Dep: MSO

Doc No.:

Date: 2017-08-10

Page: 20/37

Page 21: Preventive Maintenance LX Project X · Web viewRefer to manual Protocol: Insulation resistance of rotor 2. Rotor coils X X 1. Visual inspection of turn to turn insulation, discoloration

4.12. Cooling systemA=Approved / B=Approved with remarks / C=Not approved / D=Approved after action taken / NA=Not applicable

Location L1 L2 Activity A B C D NA1. Coolers X X 1. Visual inspection

X*) X*) 2. Visual inspection for cleanliness, corrosion and erosion of air and water sides

X*) X*) 3. Clean air and water sides

X*) X*) 4. Leakage testProtocol: Leakage test coolers

X X 5. Function check of casing water leakage detector

2. Others X X 1. Visual inspection

*) If bad efficiency; clean the heat exchanger by using a brush or chemical rinsing.

Title: Preventive Maintenance LX Project X

Dep: MSO

Doc No.:

Date: 2017-08-10

Page: 21/37

Actual design acc. to outline included in binder “User’s Manual” or in the introduction of this document.

Page 22: Preventive Maintenance LX Project X · Web viewRefer to manual Protocol: Insulation resistance of rotor 2. Rotor coils X X 1. Visual inspection of turn to turn insulation, discoloration

4.13. Cooling fan motor and fanA=Approved / B=Approved with remarks / C=Not approved / D=Approved after action taken / NA=Not applicable

Location L1 L2 Activity A B C D NA

1. Cooling fan motor

X X 1. Visual inspection

X X 2. Visual inspection of the exterior of fan motors

X X 3. Run the fan motor and fan during standstill to check the condition, e.g. vibration, noise, bearing, etc.

Title: Preventive Maintenance LX Project X

Dep: MSO

Doc No.:

Date: 2017-08-10

Page: 22/37

Page 23: Preventive Maintenance LX Project X · Web viewRefer to manual Protocol: Insulation resistance of rotor 2. Rotor coils X X 1. Visual inspection of turn to turn insulation, discoloration

5. Protocols Protocol: Logged data

Data before shut down

Power       MW/MVA

Power factor       Cos

Stator current       kA

Excitation current       ABearing temperature, D-end       CBearing temperature, ND-end       CWinding temperature, U       CWinding temperature, V       CWinding temperature, W       CCold air,       CCold water       C (if water cooler)Warm air,       CVibration level, D-end Y       m

X       m

     Vibration level, ND-end Y       m

X       m

Operation hours       hNumber of start       noLube oil flow       Litre/minLube oil pressure       barg

Date:     

Checked by:     

Title: Preventive Maintenance LX Project X

Dep: MSO

Doc No.:

Date: 2017-08-10

Page: 23/37

Page 24: Preventive Maintenance LX Project X · Web viewRefer to manual Protocol: Insulation resistance of rotor 2. Rotor coils X X 1. Visual inspection of turn to turn insulation, discoloration

Protocol: Insulation resistance/Polarization Index (PI)

Insulation resistance and polarization index of main stator winding

Instrument no:      

Test voltage and time:       V,DC       sec

Winding temperature       C˚

1U1-1U2 1V1-1V2 1W1-1W2

1 Min                   MΩ

10Min                   MΩ

1minCorrect 1U1-1U2 1V1-1V2 1W1-1W2to 40 C˚ 0 0 0 MΩ

P/I **Expressionis faulty **

**Expressionis faulty **

**Expressionis faulty **

2U1-2U2 2V1-2V2 2W1-2W2

1 Min                   MΩ

10Min                   MΩ

1minCorrect 2U1-2U2 2V1-2V2 2W1-2W2to 40 C˚ 0 0 0 MΩ

P/I **Expressionis faulty **

**Expressionis faulty **

**Expressionis faulty **

All other phases earthed

Date:     

Checked by:     

Title: Preventive Maintenance LX Project X

Dep: MSO

Doc No.:

Date: 2017-08-10

Page: 24/37

Page 25: Preventive Maintenance LX Project X · Web viewRefer to manual Protocol: Insulation resistance of rotor 2. Rotor coils X X 1. Visual inspection of turn to turn insulation, discoloration

Protocol: Insulation resistance/Polarization Index (PI)

Insulation resistance and polarization index of main stator winding.

Instrument no:      

Test voltage and time:       V,DC       sec

Winding temperature       C˚

U V W

1 Min                   MΩ

10Min                   MΩ

1minCorrect U V Wto 40 C˚ 0 0 0 MΩ

P/I **Expressionis faulty **

**Expressionis faulty **

**Expressionis faulty **

All other phases earthed

Date:     

Checked by:     

Title: Preventive Maintenance LX Project X

Dep: MSO

Doc No.:

Date: 2017-08-10

Page: 25/37

Page 26: Preventive Maintenance LX Project X · Web viewRefer to manual Protocol: Insulation resistance of rotor 2. Rotor coils X X 1. Visual inspection of turn to turn insulation, discoloration

Protocol: Resistance of RTD’s (PT100)

Resistance measured with a digital multi meterInstrument no:      

Measured CalculatedResistance Temp.

Located Terminal no. C

Stator winding phase 1 501-502      Stator winding phase 1 502-503       -254Stator winding phase 2 504-505      Stator winding phase 2 505-506       -254Stator winding phase 3 507-508      Stator winding phase 3 508-509       -254Stator winding phase 1 511-512      Stator winding phase 1 512-513       -254Stator winding phase 2 514-515      Stator winding phase 2 515-516       -254Stator winding phase 3 517-518      Stator winding phase 3 518-519       -254                                   -254In warm air 551-552      In warm air 552-553       -254In warm air 554-555      In warm air 555-556       -254In cold air NDE 557-558      In cold air NDE 558-559       -254In cold air NDE 560-561      In cold air NDE 561-562       -254In cold air DE 563-564      In cold air DE 564-565       -254In cold air DE 566-567      In cold air DE 567-568       -254Date:     

Checked by:     

Title: Preventive Maintenance LX Project X

Dep: MSO

Doc No.:

Date: 2017-08-10

Page: 26/37

Page 27: Preventive Maintenance LX Project X · Web viewRefer to manual Protocol: Insulation resistance of rotor 2. Rotor coils X X 1. Visual inspection of turn to turn insulation, discoloration

Protocol: Resistance of RTD’s (PT100) cont.

Resistance measured with a digital multi meterInstrument no:      

Measured CalculatedResistance Temp.

Located Terminal no. C

In bearing NDE 401-402      In bearing NDE 402-403       -254In bearing NDE 404-405      In bearing NDE 405-406       -254In bearing DE 407-408      In bearing DE 408-409       -254In bearing DE 410-411      In bearing DE 411-412       -254                                   -254                                   -254                                   -254                                   -254                                   -254                                   -254                                   -254                                   -254                                   -254Date:     

Checked by:     

Title: Preventive Maintenance LX Project X

Dep: MSO

Doc No.:

Date: 2017-08-10

Page: 27/37

Page 28: Preventive Maintenance LX Project X · Web viewRefer to manual Protocol: Insulation resistance of rotor 2. Rotor coils X X 1. Visual inspection of turn to turn insulation, discoloration

Protocol: Resistance of RTD’s (PT100)

Resistance measured with a digital multi meterInstrument no:      

Measured CalculatedResistance Temp.

Located Terminal no. C

Stator winding phase U 501-504      Stator winding phase U 501-502       -254Stator winding phase U 502-503      Stator winding phase V 505-508       -254Stator winding phase V 505-506      Stator winding phase V 506-507       -254Stator winding phase W 509-512      Stator winding phase W 509-510       -254Stator winding phase W 510-511      Stator winding phase U 513-516       -254Stator winding phase U 513-514      Stator winding phase U 514-515       -254Stator winding phase V 517-520      Stator winding phase V 517-518       -254Stator winding phase V 518-519      Stator winding phase W 521-524       -254Stator winding phase W 521-522      Stator winding phase W 522-523       -254                                   -254                                   -254                                   -254                                   -254Date:     

Checked by:     

Title: Preventive Maintenance LX Project X

Dep: MSO

Doc No.:

Date: 2017-08-10

Page: 28/37

Page 29: Preventive Maintenance LX Project X · Web viewRefer to manual Protocol: Insulation resistance of rotor 2. Rotor coils X X 1. Visual inspection of turn to turn insulation, discoloration

Protocol: Resistance of RTD’s (PT100) cont.

Resistance measured with a digital multi meterInstrument no:      

Measured CalculatedResistance Temp.

Located Terminal no. C

In warm air 551-554      In warm air 551-552       -254In warm air 552-553      In cold air NDE 555-558       -254In cold air NDE 555-556      In cold air NDE 556-557       -254In cold air DE 559-562      In cold air DE 559-560       -254In cold air DE 560-561      In warm air exciter 563-566       -254In warm air exciter 563-564      In warm air exciter 564-565       -254In bearing NDE 401-404      In bearing NDE 401-402       -254In bearing NDE 402-403      In bearing DE 405-408       -254In bearing DE 405-406      In bearing DE 406-407       -254                                   -254                                   -254                                   -254                                   -254Date:     

Checked by:     

Title: Preventive Maintenance LX Project X

Dep: MSO

Doc No.:

Date: 2017-08-10

Page: 29/37

Page 30: Preventive Maintenance LX Project X · Web viewRefer to manual Protocol: Insulation resistance of rotor 2. Rotor coils X X 1. Visual inspection of turn to turn insulation, discoloration

Protocol: Insulation resistance of rotor

Instrument no:      

Test voltage and time:       V,DC       sec

Insulation resistance complete field circuit

Winding temperature:       C

1 minute value       MΩ

Corrected value to 40˚C 0 MΩ

Insulation resistance main rotor disconnected from exciter rotor

Winding temperature:       C

1 minute value       MΩ

Corrected value to 40˚C 0 MΩ

Insulation resistance exciter rotor disconnected from rotating rectifier

Winding temperature:       C

1 minute value       MΩCorrected value to 40˚C 0 MΩ

Insulation resistance rotating rectifierWinding temperature:       C1 minute value       MΩ

Corrected value to 40˚C 0 MΩ

Insulation resistance of bearing insulation1 minute value       MΩ

Insulation resistance of brush holder1 minute value       MΩ

Date:      

Checked by:     

Protocol: Insulation resistance of exciter and PMG stator

Title: Preventive Maintenance LX Project X

Dep: MSO

Doc No.:

Date: 2017-08-10

Page: 30/37

Page 31: Preventive Maintenance LX Project X · Web viewRefer to manual Protocol: Insulation resistance of rotor 2. Rotor coils X X 1. Visual inspection of turn to turn insulation, discoloration

Instrument no:      Test voltage and time:       V,DC       sec

Insulation resistance Exciter statorWinding temperature:       C1 minute value       MΩCorrected value to 40˚C 0 MΩ

Insulation resistance PMG Stator Winding temperature:       C1 minute value       MΩCorrected value to 40˚C 0 MΩ

Date:     

Checked by:     

Title: Preventive Maintenance LX Project X

Dep: MSO

Doc No.:

Date: 2017-08-10

Page: 31/37

Page 32: Preventive Maintenance LX Project X · Web viewRefer to manual Protocol: Insulation resistance of rotor 2. Rotor coils X X 1. Visual inspection of turn to turn insulation, discoloration

Protocol: Insulation resistance of start resistor

Instrument no:      Test voltage and time:       V,DC       sec

Insulation resistance start resistorWinding temperature:       C1 minute value       MΩCorrected value to 40˚C 0 MΩ

Date:     

Checked by:     

Title: Preventive Maintenance LX Project X

Dep: MSO

Doc No.:

Date: 2017-08-10

Page: 32/37

Page 33: Preventive Maintenance LX Project X · Web viewRefer to manual Protocol: Insulation resistance of rotor 2. Rotor coils X X 1. Visual inspection of turn to turn insulation, discoloration

Protocol: Leakage test coolers

The coolers have been leakage tested with:

Medium:       For       minutesPressure       bar

Recommended test pressure is working pressure plus 10%.

Approved Approved after action

Not approved

Cooler No:                             

Cooler No:                             

Cooler No:                             

Cooler No:                             

Date:     

Checked by:     

Title: Preventive Maintenance LX Project X

Dep: MSO

Doc No.:

Date: 2017-08-10

Page: 33/37

Page 34: Preventive Maintenance LX Project X · Web viewRefer to manual Protocol: Insulation resistance of rotor 2. Rotor coils X X 1. Visual inspection of turn to turn insulation, discoloration

Protocol: Coil support insulation plates

Movement of insulation plates

Direction of rotations

Date:     

Checked by:     

Title: Preventive Maintenance LX Project X

Dep: MSO

Doc No.:

Date: 2017-08-10

Page: 34/37

Movement [mm]

A B C D E

Position Left Right Left Right Left Right Left Right Left Right

1-2                                                            

2-3                                                            

3-4                                                            

4-1                                                            

Page 35: Preventive Maintenance LX Project X · Web viewRefer to manual Protocol: Insulation resistance of rotor 2. Rotor coils X X 1. Visual inspection of turn to turn insulation, discoloration

Protocol: Coil support insulation plates 6 pole

Movement of insulation plates

Direction of rotations

Date:     

Checked by:     

Title: Preventive Maintenance LX Project X

Dep: MSO

Doc No.:

Date: 2017-08-10

Page: 35/37

Movement [mm]

A B C D E

Position Left Right Left Right Left Right Left Right Left Right

1-2                                                            

2-3                                                            

3-4                                                            

4-5                                                            

5-6                                                            

6-1                                                            

Page 36: Preventive Maintenance LX Project X · Web viewRefer to manual Protocol: Insulation resistance of rotor 2. Rotor coils X X 1. Visual inspection of turn to turn insulation, discoloration

6. Additional site and machine information

7. Appendix

Title: Preventive Maintenance LX Project X

Dep: MSO

Doc No.:

Date: 2017-08-10

Page: 36/37

Page 37: Preventive Maintenance LX Project X · Web viewRefer to manual Protocol: Insulation resistance of rotor 2. Rotor coils X X 1. Visual inspection of turn to turn insulation, discoloration

Rev. Date(yyyy-mm-dd)

Prepared by Division/ Department

Description

A 2014-11-17 Olle Ö MSO New document

B 2015-06-29 Isabelle W MST New document

Title: Preventive Maintenance LX Project X

Dep: MSO

Doc No.:

Date: 2017-08-10

Page: 37/37