Presents
Clubhouse lower levelRenovation
December 2013
Work Begins
The following slides show the progression of work during the project
Demolition
Demolition of Men's washroom
Plumbing Relocation
New Men's Washroom Existing Men's Shower
New Framing
Framing of closet and new women's washroom
New men's washroom entrance
New Framing
Steel framing of ceilings to maximize height.
Drywall
Drywall installation in progress
Rounded corners on traffic exposed areas
Flooring
Commercial grade Laminate flooring installation
Flooring
Ceramic tile added to washrooms
Paint and trim
Trim and paint completed
Kitchenette
Cabinet installation
Storage
New closet area New under-stair storage area
Before & After
The following slides are before and after photos taken from approximately the same position.
Before
After
Before
After
Before
After
Before
After
Before
After
Before
After
Final Look
The following slides show the completed Project and some fine details