Presented to: By: Date: Federal Aviation Administration OSWG Mark Patterson, FAA, AFS-470 18 March...

19
Presented to: By: Date: Federal Aviation Administration OSWG Mark Patterson, FAA, AFS-470 18 March 2015 Data Link Communications AC 120-70C and A056 operational authorization update

Transcript of Presented to: By: Date: Federal Aviation Administration OSWG Mark Patterson, FAA, AFS-470 18 March...

Page 1: Presented to: By: Date: Federal Aviation Administration OSWG Mark Patterson, FAA, AFS-470 18 March 2015 Data Link Communications AC 120-70C and A056 operational.

Presented to:

By:

Date:

Federal AviationAdministration

OSWG

Mark Patterson, FAA, AFS-470

18 March 2015

Data Link Communications

AC 120-70C and A056 operational authorization update

Page 2: Presented to: By: Date: Federal Aviation Administration OSWG Mark Patterson, FAA, AFS-470 18 March 2015 Data Link Communications AC 120-70C and A056 operational.

Federal AviationAdministration

Overview

• U.S. domestic data comm program update

• AC 120-70C

• 8900.A056 Notice and A056 templates

• Upcoming work

2

Page 3: Presented to: By: Date: Federal Aviation Administration OSWG Mark Patterson, FAA, AFS-470 18 March 2015 Data Link Communications AC 120-70C and A056 operational.

Federal AviationAdministration

CY 14 16 18 20 22 24 26 28 30

Segment 1 Phase 1- Tower Service Departure Clearances (DCL)

Avionics

Services Strategy

DepartureClearance

Ground SystemFuture Air Navigation System (FANS)

FANS 1/A transitioning to ATN

Aeronautical Telecommunications Network (ATN)

IOC

IOC

IOC

Page 4: Presented to: By: Date: Federal Aviation Administration OSWG Mark Patterson, FAA, AFS-470 18 March 2015 Data Link Communications AC 120-70C and A056 operational.

Federal AviationAdministration

CY 14 16 18 20 22 24 26 28 30

Segment 1 Phase 1- Tower Service

Segment 1 Phase 2- En Route Services

Departure Clearances (DCL)

Avionics

Initial En Route Services

Initial En Route Services

Follow- On En Route ServicesFollow- On En Route Services

Transfer of CommunicationsInitial Check-InAltitudes / Altimeter SettingsGo Button / Airborne ReroutesPilot Initiated DownlinksController Initiated Routes (Limited)Direct-to-Fix (Limited)Crossing Restrictions (Limited)

Advisory Messages (Limited)Holding Instructions (Limited)Speed and Headings Beacon CodesStuck MicrophoneTailored Arrivals (Limited)

Services Strategy

TFM Data Comm

Data Comm RoutineCommunications

Reroutes

DepartureClearance

Ground SystemFuture Air Navigation System (FANS)

FANS 1/A over VDL-2 transitioning to ATN

Aeronautical Telecommunications Network (ATN)

Tailored Arrivals

Data Comm RoutineCommunications

Segment 2- Advanced Services

Full tailored arrivals, holding instructions, advisory messages4D TrajectoriesD-TAXI

IOC

IOC

IOC

Page 5: Presented to: By: Date: Federal Aviation Administration OSWG Mark Patterson, FAA, AFS-470 18 March 2015 Data Link Communications AC 120-70C and A056 operational.

Federal AviationAdministration

U.S. domestic CPDLC-DCL trials - overview

• Started in 2012 @ KMEM

• Two locations: – KMEM – 40-80 ops / day

– KEWR – 60 ops / day (~10% of all departures)

• Participants– Part 121: FEDEX, UPS, UAL

– Part 129: Operators: BAW, SAS (pending CAA approval)

• FANS 1/A (CPDLC) and not PDC (ACARS)– Initial and revised departure clearances

• Required equipage– FANS 1/A (CPDLC)

– VDL M0/A

• Continue until 1Q 2016

5

Page 6: Presented to: By: Date: Federal Aviation Administration OSWG Mark Patterson, FAA, AFS-470 18 March 2015 Data Link Communications AC 120-70C and A056 operational.

Federal AviationAdministration

CPDLC-DCL - waterfall schedule (as of 29 Jan 2015)

6

Site Name Site ID

ARTCC ID

IOC1 Site Name Site ID ARTCC ID

IOC Site Name Site ID

ARTCC ID

IOC Site Name Site ID

ARTCC ID

IOC

KS 1: Salt Lake City SLC ZLC 06/10/15 New Orleans MSY ZHU 01/25/16 Louisville SDF ZID 02/15/16 Newark EWR ZNY 02/15/16Boise (Non-DCL) BOI ZLC 06/10/15 Austin AUS ZHU 02/08/16 Indianapolis IND ZID 02/29/16 J F Kennedy JFK ZNY 02/29/16KS 2: Houston Intcl IAH ZHU 07/16/15 San Antonio SAT ZHU 02/22/16 Cincinnati CVG ZID 03/14/16 La Guardia LGA ZNY 03/14/16

KS 3: Houston Hbby HOU ZHU 08/13/15 Los Angeles LAX ZLA 03/14/16 Fort Columbus (Non-DCL)

CMH ZID 03/14/16 Teterboro TEB ZNY 03/28/16

NAP – NAP Intgr Compl NA ZLC/ZTL

09/18/15 Las Vegas LAS ZLA 03/28/16 Memphis MEM ZME 04/04/16 Westchester HPN ZNY 04/11/16IOA Compl 11/16/15 San Diego SAN ZLA 04/11/16 Nashville BNA ZME 04/18/16 Philadelphia PHL ZNY 04/25/16In-Service Decision 12/09/15 John Wayne SNA ZLA 04/25/16 Adams Field (Non-DCL) LIT ZME 04/18/16 Boston BOS ZBW 05/16/16

Bob Hope BUR ZLA 05/09/16 Denver DEN ZDV 05/09/16 Providence PVD ZBW 05/31/16Ontario ONT ZLA 05/23/16 Atlanta ATL ZTL 05/23/16 Bradley BDL ZBW 06/14/16San Francisco SFO ZOA 06/14/16 Charlotte CLT ZTL 06/07/16 Albany (Non-DCL) ALB ZBW 06/14/16Oakland OAK ZOA 06/28/16 Piedmont (Non-DCL) GSO ZTL 06/07/16 Detroit DTW ZOB 07/06/16

1 IOC Dates apply only to the DCL Sites. San Jose SJC ZOA 07/13/16 Jacksonville JAX ZJX 06/28/16 Cleveland CLE ZOB 07/20/16The Non-DCL sites do not have an IOC because Sacramento SMF ZOA 07/27/16 Orlando MCO ZJX 07/13/16 Pittsburgh PIT ZOB 08/03/16they will only be upgrading to a new CHI. Reno (Non-DCL) RNO ZOA 07/27/16 Miami MIA ZMA 08/03/16 Buffalo (Non-DCL) BUF ZOB 08/03/16

Phoenix PHX ZAB 08/17/16 Ft Lauderdale FLL ZMA 08/17/16 Balt/Wash BWI ZDC 08/24/16Albuquerque ABQ ZAB 08/31/16 Tampa TPA ZMA 08/31/16 Dulles IAD ZDC 09/08/16El Paso (Non-DCL) ELP ZAB 08/31/16 Palm Beach PBI ZMA 09/15/16 Reagan DCA ZDC 09/22/16Seattle SEA ZSE 09/22/16 Luis Munos Marin (Non-

DCL)SJU ZMA 09/15/16 Raleigh/Durham RDU ZDC 10/06/16

Portland (Non-DCL) PDX ZSE 09/22/16 St Louis STL ZKC 10/06/16 Andrews (Non-DCL) ADW ZDC 10/06/16Dallas Love DAL ZFW 10/13/16 Kansas City MCI ZKC 10/20/16 Chicago Midway MDW ZAU 10/27/16

Dallas FTW DFW ZFW 10/27/16 Tulsa (Non-DCL) TUL ZKC 10/27/16 Chicago O’Hare ORD ZAU 11/10/16Will Rogers (Non-DCL) OKC ZFW 10/27/16 Minn-St Paul MSP ZMP 11/10/16 General Mitchell (Non-

DCL)MKE ZAU 11/10/16

Honolulu (Non-DCL) HNL 11/03/16 Eppley Field (Non-DCL) OMA ZMP 11/10/16Anchorage (Non-DCL) ANC 11/10/16

Key Sites Group A Group B Group C

Page 7: Presented to: By: Date: Federal Aviation Administration OSWG Mark Patterson, FAA, AFS-470 18 March 2015 Data Link Communications AC 120-70C and A056 operational.

Federal AviationAdministration

Questions?

7

Page 8: Presented to: By: Date: Federal Aviation Administration OSWG Mark Patterson, FAA, AFS-470 18 March 2015 Data Link Communications AC 120-70C and A056 operational.

Federal AviationAdministration

AC 120-70C – current status

Feb ‘14 - briefed AC 120-70B & A056 template revision project

AFS-470 / DCIT / PARC CWG collaborated to produce a limited-scope revision:

– New format (ICAO) and editorial changes– Domestic CPDLC DCL and European Link 2000+ added– Updates event reporting to reflect GOLD – Minor changes to authorization process (roles & responsibilities)

Highlight - Part 91 operators will not be required to have operational authorization (A056) for U.S. CPDLC-DCL

8

DCIT – Data Comm Implementation TeamPARC CWG – Performance-based Aviation Rulemaking Committee Comm Working GroupGOLD – Global Operational Data Link DocumentCPDLC – Controller Pilot Data Link Communication

Page 9: Presented to: By: Date: Federal Aviation Administration OSWG Mark Patterson, FAA, AFS-470 18 March 2015 Data Link Communications AC 120-70C and A056 operational.

Federal AviationAdministration

AC 120-70C - current Status

Posted for public comment on March 17, 2015– 30-day comment period – Due April 16, 2015 (no time extensions)– Comments out-of-scope will be held for next revision

Parallel AFS formal coordination began– 30-day comment period– Comments out-of-scope will be held for next revision

After 30-day window– Immediately adjudicate comments– AFS-400 approves adjudication – To tech writers for publication

Review current version of draft AC 120-70C (if desired)

9

Page 10: Presented to: By: Date: Federal Aviation Administration OSWG Mark Patterson, FAA, AFS-470 18 March 2015 Data Link Communications AC 120-70C and A056 operational.

Federal AviationAdministration

Questions?

10

Page 11: Presented to: By: Date: Federal Aviation Administration OSWG Mark Patterson, FAA, AFS-470 18 March 2015 Data Link Communications AC 120-70C and A056 operational.

Federal AviationAdministration

A056 templates - current Status

Operational Authorization (OpSpec / Mspec / LOA) A056 & Notice•Entered into AFS formal coordination on March 17, 2015

Highlights•Deleted the requirement for aircraft to be equipped with an approved collision avoidance system that is on and operating •Part 91 - references related to data comm operation within the U.S. has been deleted. Operators will not need operational authorization for U.S. domestic CPDLC-DCL

Review Notice and draft templates

11

Page 12: Presented to: By: Date: Federal Aviation Administration OSWG Mark Patterson, FAA, AFS-470 18 March 2015 Data Link Communications AC 120-70C and A056 operational.

Federal AviationAdministration

Part 129

Part 129 will not require a separate A056– CAA approval / authorization will be annotated on A003

Review draft A003 template

12

Page 13: Presented to: By: Date: Federal Aviation Administration OSWG Mark Patterson, FAA, AFS-470 18 March 2015 Data Link Communications AC 120-70C and A056 operational.

Federal AviationAdministration

Take aways…

Do not wait for the revised AC before submitting data link authorization applications.

– Applications being submitted (or already in approval process) referencing AC 120-70B will still be processed

– Delaying applications will cause delays in receiving authorization (and inability to participate in DCL ops at IOC)

Operators with existing A056 – Prepare your training and crew procedure documentation now so you

can respond quickly when the Notice is published

13

Page 14: Presented to: By: Date: Federal Aviation Administration OSWG Mark Patterson, FAA, AFS-470 18 March 2015 Data Link Communications AC 120-70C and A056 operational.

Federal AviationAdministration

Next steps

AC 90-[datacomm] project

Includes:AC 120-70C incorporatedNew guidance

- PBCS- FANS / ATN B1 / B2 (as available)- Post-implementation monitoring- Compliance determination- Streamlined application process for Part 91

OpSpec / MSpec / LOA template updates Additional guidance / training material as necessary

14

Page 15: Presented to: By: Date: Federal Aviation Administration OSWG Mark Patterson, FAA, AFS-470 18 March 2015 Data Link Communications AC 120-70C and A056 operational.

Federal AviationAdministration

Questions?

15

Page 16: Presented to: By: Date: Federal Aviation Administration OSWG Mark Patterson, FAA, AFS-470 18 March 2015 Data Link Communications AC 120-70C and A056 operational.

Federal AviationAdministration

Back-up slides

16

Page 17: Presented to: By: Date: Federal Aviation Administration OSWG Mark Patterson, FAA, AFS-470 18 March 2015 Data Link Communications AC 120-70C and A056 operational.

Federal AviationAdministration

U.S. domestic DCL trials - specifics

• Uses a stand-alone DCL Trials Automation Platform System (DTAP).

• Processes participating operators initial / revised DCL aircraft clearances independent of the current FAA Terminal Data Link Services (TDLS) system.

• Interfaces with the Tower ARTCC Host ATM Data Distribution System (HADDS) interface to receive NAS flight data.

• The ATC Clearance Delivery position hosts a dedicated DTAP DCL display and user interface.

17

Page 18: Presented to: By: Date: Federal Aviation Administration OSWG Mark Patterson, FAA, AFS-470 18 March 2015 Data Link Communications AC 120-70C and A056 operational.

Federal AviationAdministration

U.S. domestic DCL trials - specifics

• Participating FANS1A / FANS1A+ equipped aircraft log into the DTAP via CPDLC.

• Once the link is established, the flight deck requests and receives its initial departure clearance and any revisions to that clearance using CPDLC.

18

Page 19: Presented to: By: Date: Federal Aviation Administration OSWG Mark Patterson, FAA, AFS-470 18 March 2015 Data Link Communications AC 120-70C and A056 operational.

Federal AviationAdministration

Operator timelines

19

3/1/2015 8/11/2015

4/1/2015 5/1/2015 6/1/2015 7/1/2015 8/1/2015

Operators with Existing A056 & DCL Trials Participant

3/1/2015 8/11/2015

4/1/2015 5/1/2015 6/1/2015 7/1/2015 8/1/2015

Operators without Existing A056

3/11/2015 - 5/10/2015Draft CPDLC DCL Bulletin (Training)

5/16/2015 - 6/15/2015Notice Approval Window (30d)

Submission of Updated A056 TemplateSubmission of CPDLC DCL Bulletin

5/16/2015 - 6/15/2015Notice Approval Window (30d)

Submission of Updated A056 TemplateSubmission of CPDLC DCL Bulletin

5/15/2015A056 Template Notice Issued

3/11/2015 - 4/14/2015Submit Initial Training Plan, Draft Bulletin, Etc.

4/20/2015 - 5/14/2015Update Existing Training Plan,

Draft Bulletin, Etc. 5/15/2015A056 Template Notice Issued

4/16/2015Initial A056 Application Submit

3/1/2015 8/11/2015

4/1/2015 5/1/2015 6/1/2015 7/1/2015 8/1/2015

International Operators

6/15/2015OpSpec Issued for CPDLC DCL

6/15/2015OpSpec Issued for CPDLC DCL

6/14/2015SLC "File and Fly"

6/14/2015SLC "File and Fly"

8/4/2015HOU "File and Fly"

8/4/2015HOU "File and Fly"

7/28/2015IAH "File and Fly"

7/28/2015IAH "File and Fly"

3/11/2015 - 8/9/2015Local CAA Approval + Coordination with US FAA POI (A003) [Ongoing]