BIM for Safety and Construction Planning of Public Housing Development Hong Kong Housing Authority 22 May 2019 1 Presented by Ir John KL Chui (BIM Service Team)

Transcript of Presented by Ir John KL Chui (BIM Service Team)

BIM for Safety and

Construction Planning of

Public Housing Development

Hong Kong Housing Authority

22 May 2019

1

Presented by

Ir John KL Chui (BIM Service Team)

Hong Kong Housing Authority 2

Agenda

Part 1: BIM in Housing Authority

Part 2: Project Showcases for BIM Applications

Part 3: Way Forward

Hong Kong Housing Authority

Statutory Submissions

Thermal Value Calculation

(RTTV)

Automated Foundation Design (SAFD)

Planning

Scheme Design

Detail Design

Statutory Submission

Construction

Post-completion

BIM & GIS Integration Daylight Analysis

Value Management

Facility Management

Construction & Safety Planning

5D BIM (QTO)

Lighting Simulation

BIM & RFID Integration

3

Part 1- BIM in Housing Authority

A. HA’s BIM Applications Encompass Full Design and Construction Cycle

Hong Kong Housing Authority

374353

364

302295

275

236220 227

248

198

150

114.6

85.268.1 60.3 59.9 64.3 60.6 61.4 54.6 52.1 49.7 44.3 40.8 41.9 39.1 34.5 32.9 31.4

206206221

195

160

8882

90

77

129109

86

5655.8

37.8 32.8 29.2 21.011.5 11.9 16.1

9.4 9.9 9.0 7.4 7.3 6.4 9.2 6.8 6.9 7.6

56.7

35.0 17.1

8.812.9 11.3 9.7 14.6

12.3 7.4 7.3 4.8 4.1 2.2 1.5 1.5 4.2

5.1 0

50

100

150

200

250

300

350

400

1989 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 20172018#

Accident Rate per 1000 Workers

HK Construction Industry HA New Works & Maintenance Works HA New Works HA Maintenance Works

2018# : Accident Rate per 1,000 workers

HA’s new works construction sites – 7.6Hong Kong’s construction sites – 31.42018 : Fatalities

HA’s construction sites – 4Hong Kong’s construction sites – 14

Source of information: Labour Department, Census & Statistics Department and Housing Department

# based on information up to 1st Three Quarters of 2018

4

The accident rate has been decreased from 86 nos. per 1,000 workers in 2000 to 7.6 nos. per 1,000 workers in 1st Three Quarters of 2018

Part 1- BIM in Housing Authority

B. Our Achievement on Safety

Hong Kong Housing Authority 5

BIM Project Steering Committee (BIM PSC)To plan strategically the implementation of BIM. The BIM PSC plays an important role at the management level giving direction and support to staff

BIM Working Group (BIM WG)To work on specific implementation and technical details. The BIM WG underpins the BIM PSC and is represented by all professional disciplines

BIM Service Team (BIMST)To act as central support to project teams on BIM implementation. The BIMST not only builds up in-house BIM experts, but also accelerates skill development within the department.

C. Our 3-Tier BIM Management Structure

Tier 1

Tier 2

Tier 3

Part 1- BIM in Housing Authority

Hong Kong Housing Authority 6

3D Printers

Setting up a BIM Centre at 12/F, Block 3, with meeting and training rooms to provide a dedicated venue for project teams to learn and apply BIM to their projects. The BIM Centre also serves as a showcase and meeting place for outside visitors.

Part 1- BIM in Housing Authority

D. Our BIM Centre

Hong Kong Housing Authority 7

2005

• BIM

2. PRH at Tung Tau Cottage Area East (TTCAE)

1. PRH at Tai Pak Tin Street

4. PRH at Kai Tak Site 1B

PRH at Kai Tak Site 1B

5. Footbridge at Shui Chuen O Ph.2

6. SSF at Sheung Lok Street

2019

Abbreviation: PRH stands for Public Rental Housing Development, SSF stands for Sale of Subsidized Flats Development

Part 2- Project Showcases

3. Redevelopment of Lower NgauTau Kok (II) Estate

Hong Kong Housing Authority

1. PRH at Tai Pak Tin Street, Kwai Chung Area 9H

8

Quick Facts:1. 1 no. 41-storey Domestic Block;2. 839 Flat nos; 3. Completed in 08/2013.

BIM Applications:1. 6-Day Construction Cycle

Simulation for Typical Floor;2. Safety Access Planning;3. Site Layout Planning; and4. 3D Printed ELS Model.

Part 2- Project Showcases

6-Day Construction Cycle for Typical Floor Site Layout Planning

BIM Modelling 3D Printed ELS Model

Lifting Zone Planning Safety Access Planning

Hong Kong Housing Authority

1. PRH at Tai Pak Tin Street, Kwai Chung Area 9H

9

Part 2- Project Showcases

Hong Kong Housing Authority

Part 2- Project Showcases

10

2. PRH at Tung Tau Cottage Area East (TTCAE)

Quick Facts:1. 1 no. Domestic Block;2. 990 Flats nos.; and3. Completed in 06/2014.

BIM Applications:1. 6-Day Construction Cycle

Simulation for Typical Floor;

2. Site Layout Planning; 3. ELS and its Safety

Planning; and4. 4D BIM Application and

Simulation.

The Photo View of the TTCAE Project under Construction (美東邨美德樓)

Hong Kong Housing Authority 11

2. PRH at Tung Tau Cottage Area East (TTCAE)

Part 2- Project Showcases

Hong Kong Housing Authority 12

Part 2- Project Showcases3. Redevelopment of Lower Ngau Tau Kok (II) Estate

Block 9

Block 10

Block 12

Hong Kong Housing Authority 13

Part 2- Project Showcases3. Redevelopment of Lower Ngau Tau Kok (II) Estate

Hong Kong Housing Authority 14

Refine demolition sequence & method;

Review safety measures of demolition sequence;

Workers familiarization of demolition sequence; and

Quantity of C&D wastes to be disposed of.

Part 2- Project Showcases3. Redevelopment of Lower Ngau Tau Kok (II) Estate

Installation of Supporting Props

Coring of Existing Floor Slab

Enclosing Screening during Demolition

Lifting of Precast Beams

Bay-by-Bay Demolition Simulation

Lifting of Wall Panels

Hong Kong Housing Authority

Removal of Non-structural Partition19

Part 2- Project Showcases3. Redevelopment of Lower Ngau Tau Kok (II) Estate

Lifting Frame for Removal of Precast Slabs (1 of 2)

Lifting Frame for Removal of Precast Slabs (2 of 2)

Temporary Scaffolding Supports to ensure Stability (1 of 2)

Temporary Scaffolding Supports to ensure Stability (2 of 2)

Hong Kong Housing Authority

Removal of Non-structural Partition19

Part 2- Project Showcases3. Redevelopment of Lower Ngau Tau Kok (II) Estate

Hong Kong Housing Authority 17

4. PRH Development at Kai Tak Site 1B

Quick Facts:1. 9 nos. Domestic Blocks;2. 8,164 Flat nos; and3. Completed in 09/2013.

BIM Applications:1. 6-Day Cycle Floor Construction;2. Installation and its Safety

Planning of Volumetric Precast Components; and

3. Maintenance Access Planning at Roof Level.

Part 2- Project Showcases

The Photo View of the Kai Tak Site 1B (德朗邨)

Maintenance Access Planning for PV Panels at Roof Level

Hong Kong Housing Authority 18

Part 2- Project Showcases

4. PRH Development at Kai Tak Site 1B

1. Lifting of Volumetric Precast Bathrooms

3. Installation of all other Precast Components

2. Base Connection of the Volumetric Precast Bathrooms

4. Wall Rebar Fixing and Erection of Large Panel Formworks

Hong Kong Housing Authority 19

Part 2- Project Showcases

4. PRH Development at Kai Tak Site 1B

Hong Kong Housing Authority

5. Footbridge of PRH Development at Shui Chuen O Ph. 2, Shatin Area 52

20

Quick Facts of the Footbridge:1. 78m Long Single-span;2. 51m Height Lift Tower;3. Natural Slope and Stream nearby; and4. Congested Construction Space.

BIM Applications:1. Footbridge Construction Sequence

Analysis; 2. Safety Measures Planning; and3. Clashing Analysis.

Part 2- Project Showcases

Hong Kong Housing Authority 21

5. Footbridge of PRH Development at Shui Chuen O Ph.2, Shatin Area 52

Part 2- Project Showcases

Hong Kong Housing Authority 22

78M

51M

Part 2- Project Showcases

BIM modelling of the Footbridges and its surrounding slopes and environment.

Photo showing the real environment

Photo showing the busy highways and congested site

5. Footbridge of PRH Development at Shui Chuen O Ph. 2, Shatin Area 52

Hong Kong Housing Authority 23

4D Construction Sequence Analysis

Part 2- Project Showcases

The Photo showing the Erection of Temporary Supporting Steel Structure

Simulation of Temporary Supporting Steel Structure.

The Photo showing the Erection of Temporary Supporting Steel Structure

5. Footbridge of PRH Development at Shui Chuen O Ph. 2, Shatin Area 52

Hong Kong Housing Authority 24

Part 2- Project Showcases

5. Footbridge of PRH Development at Shui Chuen O Ph. 2, Shatin Area 52

Hong Kong Housing Authority 25

Quick Facts:1. 3 nos. Domestic Blocks;2. 1 no. Carport Podium;3. 603 Flat nos; and4. Completed in 2019.

BIM Applications:1. 4D BIM Modelling and

Applications;2. Construction and Safety Planning

of Multiple Activities in a Congested Site;

3. Demonstration of Removal of an Existing Vertical “Soil-Nailed” Retaining Wall; and

4. ELS/Foundation Works Sequencing and its Safety Planning.

Part 2- Project Showcases6. Sale of Subsidized Flat (SSF) at Sheung Lok Street, Homantin

The Photo View of the Completed SSF Project, now named as “冠德苑”

Full BIM Modelling of the Project

Hong Kong Housing Authority 26

Part 2- Project Showcases6. Sale of Subsidized Flat (SSF) at Sheung Lok Street, Homantin

Hoarding and Gantry Planning

Tower Crane and other Machinery Positioning

Temporary Platform for Heavy Machinery for the Soldier-Piled Walls.

Existing Soil-Nailed Retaining Walls to be Removed and Re-constructed

Positioning of Single-boarded fencing

Recompaction of the Existing Filled Slope

Hong Kong Housing Authority 27

Part 2- Project Showcases6. Sale of Subsidized Flat (SSF) at Sheung Lok Street, Homantin

Demolition Sequencing of Existing Soil-nailed Retaining Walls

Hong Kong Housing Authority 28

Part 2- Project Showcases6. Sale of Subsidized Flat (SSF) at Sheung Lok Street, Homantin

Demolition Sequencing of Existing Soil-nailed Retaining Walls

1. Installation of push-pull adjustable props

2. Lower the level and frame cut the exposed soil nail

3. Hang the wall panel by Mobile Crane 4. Remove the separated wall panels.

Hong Kong Housing Authority 29

Part 2- Project Showcases6. Sale of Subsidized Flat (SSF) at Sheung Lok Street, Homantin

Hong Kong Housing Authority 30

1) There is imminency to do BIM ourselves. The time is right, things are ready. “Learn how to swim before the tide come.”

3) Cultivate the culture of using BIM for Safety in the Department; and

2) Encourage all stakeholders (i.e. Clients, Main Contractors, Consultants) to apply BIM in the field of Safety and Construction Planning.

4) Trainings.

Part 3- Way Forward

Hong Kong Housing Authority 31