Presented at SC-2 2006-2 - IEEE Web Hosting · 2017. 6. 23. · These Guys? (10 CFR Part 52 PRA)...

36
Company LOGO Risk-Informed Performance Based Regulations, Models,Issues, and Implications for Qualification Standards to Existing Plants and Future Plants Presented at SC-2 2006-2 James F. Gleason, P.E. James F. Gleason. P.E. Chairman SC 2.1 [email protected]

Transcript of Presented at SC-2 2006-2 - IEEE Web Hosting · 2017. 6. 23. · These Guys? (10 CFR Part 52 PRA)...

Page 1: Presented at SC-2 2006-2 - IEEE Web Hosting · 2017. 6. 23. · These Guys? (10 CFR Part 52 PRA) And These Guys? (10 CFR Part 50.69 and Risk Based Part 50) Nuclear Codes and Standards

Company

LOGO

Risk-Informed Performance Based Regulations, Models,Issues, and Implications for

Qualification Standards to Existing Plants and Future Plants

Presented atSC-2 2006-2

James F. Gleason, P.E.

James F. Gleason. P.E.Chairman SC 2.1

[email protected]

Page 2: Presented at SC-2 2006-2 - IEEE Web Hosting · 2017. 6. 23. · These Guys? (10 CFR Part 52 PRA) And These Guys? (10 CFR Part 50.69 and Risk Based Part 50) Nuclear Codes and Standards

R RESTRICTEDUNDER 17 REQUIRES

ACCOMPANINGPARENT OR GUADIAN

James F. Gleason, P.E.

Page 3: Presented at SC-2 2006-2 - IEEE Web Hosting · 2017. 6. 23. · These Guys? (10 CFR Part 52 PRA) And These Guys? (10 CFR Part 50.69 and Risk Based Part 50) Nuclear Codes and Standards

The Future

The Doomed

James F. Gleason, P.E.

Page 4: Presented at SC-2 2006-2 - IEEE Web Hosting · 2017. 6. 23. · These Guys? (10 CFR Part 52 PRA) And These Guys? (10 CFR Part 50.69 and Risk Based Part 50) Nuclear Codes and Standards

Proof of Performance

The use of ASME NOG-1, ASME B&PVC,IEEE Nuclear Standards,ASME, and ACI codes and standards alone, are not sufficient proof of Performance in Risk-informed Performance based Regulation

James F. Gleason, P.E.

Page 5: Presented at SC-2 2006-2 - IEEE Web Hosting · 2017. 6. 23. · These Guys? (10 CFR Part 52 PRA) And These Guys? (10 CFR Part 50.69 and Risk Based Part 50) Nuclear Codes and Standards

What else is needed?

Answer: Reliability estimate of the code or standard

James F. Gleason, P.E.

Page 6: Presented at SC-2 2006-2 - IEEE Web Hosting · 2017. 6. 23. · These Guys? (10 CFR Part 52 PRA) And These Guys? (10 CFR Part 50.69 and Risk Based Part 50) Nuclear Codes and Standards

Who will provide this?

Answer: The Standards Committees.

James F. Gleason, P.E.

Page 7: Presented at SC-2 2006-2 - IEEE Web Hosting · 2017. 6. 23. · These Guys? (10 CFR Part 52 PRA) And These Guys? (10 CFR Part 50.69 and Risk Based Part 50) Nuclear Codes and Standards

Reliability Estimates

Reliability Estimates are needed for a Risk-informed, Performance Based LicenseReliability data needs to be related to the design basis criteria of the SSCs credited with prevention or mitigation of an event sequence.

James F. Gleason, P.E.

Page 8: Presented at SC-2 2006-2 - IEEE Web Hosting · 2017. 6. 23. · These Guys? (10 CFR Part 52 PRA) And These Guys? (10 CFR Part 50.69 and Risk Based Part 50) Nuclear Codes and Standards

Performance Requirements

Reliability information for SSCs (active and passive) is needed to demonstrate compliance with the performance requirements.

Reliability Estimate of Steel

James F. Gleason, P.E.

Page 9: Presented at SC-2 2006-2 - IEEE Web Hosting · 2017. 6. 23. · These Guys? (10 CFR Part 52 PRA) And These Guys? (10 CFR Part 50.69 and Risk Based Part 50) Nuclear Codes and Standards

Risk Continuum

00.20.40.60.8

1

ExistingNuclearPlants

Advanced /PassiveNuclearPlants

NewDesigns

Risk Continuum

Hey, What about These Guys?

(10 CFR Part 52 PRA)

And These Guys?(10 CFR Part 50.69

andRisk Based Part 50)

Nuclear Codes and Standards Not Good

Enough for Risk Informed 10 CFR Part 50

James F. Gleason, P.E.

Page 10: Presented at SC-2 2006-2 - IEEE Web Hosting · 2017. 6. 23. · These Guys? (10 CFR Part 52 PRA) And These Guys? (10 CFR Part 50.69 and Risk Based Part 50) Nuclear Codes and Standards

Burden for Predictable Performance

I once said that for the nuclear power sector: “there is no credible industry without a credible regulator, and there is no credible regulator without a credible industry.” I will add to it that: “there is no predictable industry without a predictable regulator, and there is no predictable regulator without a predictable industry.”Burden for predictable performance is broadly distributed.

Center for Business Intelligence Nuclear Power Outlook 2004Chairman Nils J. Diaz,

U.S. Nuclear Regulatory Commission

Center for Business Intelligence Nuclear Power Outlook 2004Chairman Nils J. Diaz,

U.S. Nuclear Regulatory Commission

James F. Gleason, P.E.

Page 11: Presented at SC-2 2006-2 - IEEE Web Hosting · 2017. 6. 23. · These Guys? (10 CFR Part 52 PRA) And These Guys? (10 CFR Part 50.69 and Risk Based Part 50) Nuclear Codes and Standards

Predictable

The performance based portion of a regulatory framework must

be able to be complete have a definite end be predictable

James F. Gleason, P.E.

Page 12: Presented at SC-2 2006-2 - IEEE Web Hosting · 2017. 6. 23. · These Guys? (10 CFR Part 52 PRA) And These Guys? (10 CFR Part 50.69 and Risk Based Part 50) Nuclear Codes and Standards

Nuclear Codes and Standards

Nuclear codes and standards are unique. They have proven their worth. They have been maintained, are current, and are required to be periodically updated.

IEEE Nuclear Standards

James F. Gleason, P.E.

Page 13: Presented at SC-2 2006-2 - IEEE Web Hosting · 2017. 6. 23. · These Guys? (10 CFR Part 52 PRA) And These Guys? (10 CFR Part 50.69 and Risk Based Part 50) Nuclear Codes and Standards

Framework RI 10CFR50

The Protective Systems objective is to ensure that the systems that mitigate initiating events are adequately designed, and perform adequately, in terms of reliability and capability

James F. Gleason, P.E.

Page 14: Presented at SC-2 2006-2 - IEEE Web Hosting · 2017. 6. 23. · These Guys? (10 CFR Part 52 PRA) And These Guys? (10 CFR Part 50.69 and Risk Based Part 50) Nuclear Codes and Standards

Framework RI 10CFR50

Establishing reliability goals for protective systemsRedundancy, the use of more than a minimum number of sets of equipment to fulfill a given safety function, is an important design principle

James F. Gleason, P.E.

Page 15: Presented at SC-2 2006-2 - IEEE Web Hosting · 2017. 6. 23. · These Guys? (10 CFR Part 52 PRA) And These Guys? (10 CFR Part 50.69 and Risk Based Part 50) Nuclear Codes and Standards

Framework RI 10CFR50

The PRA will provide a means of assessing the importance of common cause failures and provide the designer the ability to ameliorate the potential for these failures through selection of diverse materials, components, and manufacturing processes.

AmeliorateImprove Revolutionize Remodel Rearrange Restore Amend

Or: Minimize Diminish Lessen Curtail Eliminate through Equipment Qualification?

James F. Gleason, P.E.

Page 16: Presented at SC-2 2006-2 - IEEE Web Hosting · 2017. 6. 23. · These Guys? (10 CFR Part 52 PRA) And These Guys? (10 CFR Part 50.69 and Risk Based Part 50) Nuclear Codes and Standards

Framework RI 10CFR50

It is worth noting that the current treatment of common cause failures is often data-driven, i.e., historical data is use to determine which common cause eventsare most likely and, hence, should be incorporated into the PRA.

ShiIShiIShiI happensEarthq

uake

James F. Gleason, P.E.

Page 17: Presented at SC-2 2006-2 - IEEE Web Hosting · 2017. 6. 23. · These Guys? (10 CFR Part 52 PRA) And These Guys? (10 CFR Part 50.69 and Risk Based Part 50) Nuclear Codes and Standards

Framework RI 10CFR50

Protection against common-cause failures has been, and will continue to be important as these types of failures can be expected to dominate the unreliability of systems with some degree of built in redundancy.

Amock

a frenzy that has traditionally been regarded as occurring in certain cultures

James F. Gleason, P.E.

Page 18: Presented at SC-2 2006-2 - IEEE Web Hosting · 2017. 6. 23. · These Guys? (10 CFR Part 52 PRA) And These Guys? (10 CFR Part 50.69 and Risk Based Part 50) Nuclear Codes and Standards

Framework RI 10CFR50

Verification of the functionality of the SSC under the required conditions is demonstrated via a reliability assurance program.

James F. Gleason, P.E.

Page 19: Presented at SC-2 2006-2 - IEEE Web Hosting · 2017. 6. 23. · These Guys? (10 CFR Part 52 PRA) And These Guys? (10 CFR Part 50.69 and Risk Based Part 50) Nuclear Codes and Standards

Framework RI 10CFR50

0102030405060708090

Reliability Qualification EQ Seismic

Final Score: 87 to 7Final Score: 87 to 7

Page 20: Presented at SC-2 2006-2 - IEEE Web Hosting · 2017. 6. 23. · These Guys? (10 CFR Part 52 PRA) And These Guys? (10 CFR Part 50.69 and Risk Based Part 50) Nuclear Codes and Standards

Demonstrated Performance

Qualification Reliability Estimate

1. Applies to Actual Installed Equipment YES No

2. Performance under Normal Conditions YES YES

3. Performance under Off Normal Conditions YES No

4. Performance under Design Basis Event Conditions

YES No

5. Performance under Post Accident Conditions

YES No

6. Performance under Seismic Conditions YES No

7. Performance under Radiation Conditions YES No

8. Performance under Aging Effects YES No

9. Performance due to maintenance YES No

10. Performance due to periodic testing YES No

11. Performance of replacement parts YES No

James F. Gleason, P.E.

Page 21: Presented at SC-2 2006-2 - IEEE Web Hosting · 2017. 6. 23. · These Guys? (10 CFR Part 52 PRA) And These Guys? (10 CFR Part 50.69 and Risk Based Part 50) Nuclear Codes and Standards

Call to Action

IEEE SC-2World’s Nuclear PedigreeStep up Leadership RoleNeed to ensure Predictability in RIPB

James F. Gleason, P.E.

Page 22: Presented at SC-2 2006-2 - IEEE Web Hosting · 2017. 6. 23. · These Guys? (10 CFR Part 52 PRA) And These Guys? (10 CFR Part 50.69 and Risk Based Part 50) Nuclear Codes and Standards

Agenda

1. Risk Informed Regulation

2. IEEE Std 323 Working Group

3. Hazards, Risks, Requirements

4. Potential Risk Informed 323

James F. Gleason, P.E.

Page 23: Presented at SC-2 2006-2 - IEEE Web Hosting · 2017. 6. 23. · These Guys? (10 CFR Part 52 PRA) And These Guys? (10 CFR Part 50.69 and Risk Based Part 50) Nuclear Codes and Standards

The Future

James F. Gleason, P.E.

Risk-Inform IEEE STD 323

Page 24: Presented at SC-2 2006-2 - IEEE Web Hosting · 2017. 6. 23. · These Guys? (10 CFR Part 52 PRA) And These Guys? (10 CFR Part 50.69 and Risk Based Part 50) Nuclear Codes and Standards

James F. Gleason, P.E.

Page 25: Presented at SC-2 2006-2 - IEEE Web Hosting · 2017. 6. 23. · These Guys? (10 CFR Part 52 PRA) And These Guys? (10 CFR Part 50.69 and Risk Based Part 50) Nuclear Codes and Standards

Cycle Diagram

NuclearStandards

NRCCommission

Staff

DesignConstruction

Hazards

Risk

James F. Gleason, P.E.

Page 26: Presented at SC-2 2006-2 - IEEE Web Hosting · 2017. 6. 23. · These Guys? (10 CFR Part 52 PRA) And These Guys? (10 CFR Part 50.69 and Risk Based Part 50) Nuclear Codes and Standards

Progress Diagram

ProbabilisticCapacity

ProbabilisticDemand

Hazards Analysis

Phase 1 Phase 2 Phase 3

ProbabilisticDemand<

ProbabilisticCapacity

= License

James F. Gleason, P.E.

Page 27: Presented at SC-2 2006-2 - IEEE Web Hosting · 2017. 6. 23. · These Guys? (10 CFR Part 52 PRA) And These Guys? (10 CFR Part 50.69 and Risk Based Part 50) Nuclear Codes and Standards

EQ Progress Diagram

Probability ofExceedence

SEISMIC HAZARD CURVE

DBA

Qualification is

Demonstrationof Compliance to

Requirements

Riskis

function ofRequirements

Risk Qualification License

James F. Gleason, P.E.

Page 28: Presented at SC-2 2006-2 - IEEE Web Hosting · 2017. 6. 23. · These Guys? (10 CFR Part 52 PRA) And These Guys? (10 CFR Part 50.69 and Risk Based Part 50) Nuclear Codes and Standards

Probability of Exceedence

James F. Gleason, P.E.

Probability of ExceedenceSeismic Demand

SSE SEISMIC HAZARD CURVE.

ANSI / ANS 2.27 and 2.29ASCE 43-5Not RG 1.165

DBA DemandDBA HAZARD LOCA, MSLB, HELB, Other AccidentRadiation Exposure

Page 29: Presented at SC-2 2006-2 - IEEE Web Hosting · 2017. 6. 23. · These Guys? (10 CFR Part 52 PRA) And These Guys? (10 CFR Part 50.69 and Risk Based Part 50) Nuclear Codes and Standards

Risk Based Demand

James F. Gleason, P.E.

Risk Based DemandProbability of Exceeding Demand

Typically < 1E-6Seismic Demand

SSEDBA Demand

LOCA, MSLB, HELB, Other AccidentRadiation Consequence

Page 30: Presented at SC-2 2006-2 - IEEE Web Hosting · 2017. 6. 23. · These Guys? (10 CFR Part 52 PRA) And These Guys? (10 CFR Part 50.69 and Risk Based Part 50) Nuclear Codes and Standards

State of the Art

Demand NEINew Plants

Standards

Applying technical

analysis to very low

probability events

Unintended Consequences

Problematic in practical application

Resolutions

James F. Gleason, P.E.

Page 31: Presented at SC-2 2006-2 - IEEE Web Hosting · 2017. 6. 23. · These Guys? (10 CFR Part 52 PRA) And These Guys? (10 CFR Part 50.69 and Risk Based Part 50) Nuclear Codes and Standards

Extreme Value Distributionvery low probability seismic events

0.5g

2g

8g

1E-3 1E-41E-2 1E-5

16g

James F. Gleason, P.E.

Page 32: Presented at SC-2 2006-2 - IEEE Web Hosting · 2017. 6. 23. · These Guys? (10 CFR Part 52 PRA) And These Guys? (10 CFR Part 50.69 and Risk Based Part 50) Nuclear Codes and Standards

EQ Graded Approach

EQ Risk D

EQ Risk C

EQ Risk B

EQ Risk A

SafetySignificant

Yes Yes Yes Yes

Safety Related Yes Yes Yes YesHarsh No No Yes YesHarsh

PerformanceNo No Early During/

AfterSeismic No Yes Yes Yes

James F. Gleason, P.E.

Page 33: Presented at SC-2 2006-2 - IEEE Web Hosting · 2017. 6. 23. · These Guys? (10 CFR Part 52 PRA) And These Guys? (10 CFR Part 50.69 and Risk Based Part 50) Nuclear Codes and Standards

Graded Approach

Graded ApproachSafety Significant and/or Safety Related

EQ Risk D, UnchallengedMild Environment, Low Seismic Significance

Equipment can be maintained during Design Basis Events DBEs (Includes DBAs and Safe Shutdown Earthquake)

Low expectation of redundant failures during DBE (For mild environment - Safe Shutdown Earthquake Only)

EQ Risk C, Seismic OnlyMild Environment, Seismic significant

Equipment can be maintained during DBELow expectation of redundant failures during DBEExpectation of redundant failures during earthquake

James F. Gleason, P.E.

Page 34: Presented at SC-2 2006-2 - IEEE Web Hosting · 2017. 6. 23. · These Guys? (10 CFR Part 52 PRA) And These Guys? (10 CFR Part 50.69 and Risk Based Part 50) Nuclear Codes and Standards

Graded Approach

Graded Approach (Continued)EQ Risk B, Early Event Equipment

Harsh Environment - Seismic SignificantEarly Event Equipment function onlyLow expectation of exposure to significant radiation

EQ Risk A, DBE EquipmentHarsh Environment - Seismic Significant

Safety Related function performed during and/or after DBE

Expectation of exposure to significant radiation

James F. Gleason, P.E.

Page 35: Presented at SC-2 2006-2 - IEEE Web Hosting · 2017. 6. 23. · These Guys? (10 CFR Part 52 PRA) And These Guys? (10 CFR Part 50.69 and Risk Based Part 50) Nuclear Codes and Standards

Proposed IEEE Std 323

Demand/Capacity

Aging

Seismic

DBAReport

Plan

James F. Gleason, P.E.

Page 36: Presented at SC-2 2006-2 - IEEE Web Hosting · 2017. 6. 23. · These Guys? (10 CFR Part 52 PRA) And These Guys? (10 CFR Part 50.69 and Risk Based Part 50) Nuclear Codes and Standards

Proposed IEEE Std 323

Risk Informed

CapacityPeer

ReviewDemand QA

James F. Gleason, P.E.