PRESENTATIONS AND REPORTS · TO: FROM BOARD OF DIRECTORS MARIO IGLESIAS GENERAL MANAGER DATE...
Transcript of PRESENTATIONS AND REPORTS · TO: FROM BOARD OF DIRECTORS MARIO IGLESIAS GENERAL MANAGER DATE...
TO:
FROM
BOARD OF DIRECTORS
MARIO IGLESIASGENERAL MANAGER
DATE SEPTEMBER 4 ,2020
PRESENTATIONS AND REPORTS
The following presentations and reports are scheduled
c-1) DIRECTORS' ANNOUNCEMENTS OF DISTRICT AND COMMUNITYINTEREST AND REPORTS ON ATTENDANCE AT PUBLIC MEETINGS,
TRAINING PROGRAMS, CONFERENCES AND SEMINARS.Receive Announcements and Reports from Directors
RECEIVE PUBLIC COMMENT ON PRESENTATIONS AND REPORTSPRESENTED UNDER ITEM C AND BY MOTION RECEIVE AND FILE
PRESENTATIONS AND REPORTS
c-2)
AGENDA ITEM
cSEPTEMBER 9,2020
TO:
FROM
DATE:
BOARD OF DIRECTORS
MARIO IGLESIASGENERAL MANAGER
SEPTEMBER 4,2020
CONSENT AGENDA
The following items are considered routine and non-controversial by staff and may be approved
by one motion if no member of the Board wishes an item removed. lf discussion is desired, the
item may be removed from the Consent Agenda by a Board member and will be considered
separately at the conclusion of the Administrative ltems. lndividual items on the Consent Agenda
are approued by the same vote that approves the Consent Agenda, unless an item is pulled for
sepaiate consideration. The recommendations for each item are noted in bracket. Members of
the public may comment on the Consent Agenda items.
Questions or clarification may be made by the Board memberswithout removal from the Consent Agenda
D-1) WARRANTSIRECOMMENDAPPROVALI
D-2) APPROVE AUGUST 26,2020, REGULAR BOARD MEETING MINUTES
TRECOMMEND APPROVE Ml NUTESI
D-3) ACCE PT COM P LETE D SOUTH LAN D WASTEWATER TREATM E NT FAC I LITY
SToRAGE BUILDING PROJECT IRECOMMEND, BY MOTION AND ROLL CALL
VOTE, ACCEPT PROJECT AND DIRECT STAFF TO FILE NOTICE OF
coMPLETlONl.
AGENDA ITEM
DSEPTEMBER 9,2020
TO: BOARD OF DIRECTORS
REVIEWED: MARIO IGLESIASGENERAL MANAGER s
FROM LISA BOGNUDA
DATE
F¡NANCE DIRECTOR
SEPTEMBER 4,2020
WARRANTS
HANDWRITTEN CHECKS
NONE
VOIDS - NONE
COMPUTER GENERATED CHECKS - SEE ATTACHED
TOTAL COMPUTER CHECKS
$180,530.25
AGENDA ITEM
D-1SEPTEMBER 9 2020
Vendor Name
Payment: 6331
Abalone Coast Analytical, lnc.
Item D-l Warrants SEPTEMBER 9,2020By Payment NumberNipomo Community Services District
Description (Payable) Payable Number
Lab tests 5044
Engineeringduringconstructi 2000400955
Payment Dates 09/09/2020 - 09/09/2020
Amount
6,8L6.20
Payment 6331 Total: 6,8L6,20
r,086,12Payment 6332 Total: 1,086.r2
193.96
3,530.09
Payment 6333 Total: 3,724.O5
169.62
244.40
27.83
Payment 6334 Total: 44X.85
24.18
Payment 6335 Total: 28.18
Payment:6332
AECOM USA lnc.
Payment:6333Alexander's Contract Services,
Alexander's Contract Services,
Meter read¡ng
Meter reading
202008280873
20200828087t
152t70r2r52t70t3r52r7ort
74077
762LO
7627L7407876272762t3
022449s082020
0225708082220
Payment Date
09/09/2020
09/09/2020
09/09/202009/09/2020
09/09/202009/09/2O2O
09/09/2020
09/09/2o2o
09/o9/2O2O
09/09/202009/09/202009/09/202009/09/2O2O
09/09/2020
09/o9/2020
09/09/2020
09/09/2O2O
09l09/2020
09/09/202009/09/2020
09/09/2020
09/09/2o2o09/09/2O2O
Payment:6334AT&T
AT&T
AT&T
PaVment: 6335
Bognuda, Lisa
Payment:6336Brenntag Pacific, lnc.
Brenntag Pacific, lnc.
Brenntag Pac¡fic, lnc.
Brenntag Pacific, lnc.
Brenntag Pacific, lnc.
Brenntag Pacific, lnc,
Payment:6337Brown, Kenneth
Payment: 6338
CaIPERS
Payment: 6339
Charter Communications
Charter Communications
Payment:6340
Clever Ducks
Clever Ducks
Payment:6341
Corrpro Companies, lnc.
Payment:6342Electricraft, lnc.
Electricraft, lnc.
Train¡ng and certification rene SEPT2020
Quarterly OPEB contributions SEPT2020
Mileage reimbursement - SLO SEPT2020
Telephone
Telephone
Telephone
Sodium hypochloriteSodium hypochloriteSodlum hypochloriteSod¡um hypochloriteSodium hypochlor¡te
Sodium hypochlorite
lnternet - Shop and/or Office
lnternet - Shop and/or Office
290.36
963.35
451.O7
495.92
505.20
373.44
Computer expense
Computer expense - UPS with
29076
29L37
Payment 6336 Total: 3,079.38
216.O0
Payment 6337 Total: 216.00
25,250.00
Payment6333Total: 25,250.00
734.20
734.20
Payment 6339 Total: L,468.40
2,547.00
966.78
Payment 6340 Total: 3,5L3.78
3,725.00
Payment 6341 Total: 3,725.OO
79r.32
1,017.00
Payment 6342 Total: 1,808.32
1,743.75
Tank inspection services 6L4450
Service call - Southland WWT
Service call - Gardenia LS
15023
15013
Payment:6343Excel Personnel Services, lnc. Employment agency
a\ /4 I 2{.i2A 1 I :ll2: 35 ÂM
3576408 09/09/2020Payment 6343 Total: L,743.75
Item D-l Warrants SEPTEMBER 9,2020
Vendor Name Description (Payable)
Payment:6344Famcon Pipe and Supply, lnc. Meter coupl¡ngs, washers
Payment:6345
Farm Supply Company Copper sulfate
Payment:6346
FedEx Package handling
Payment:6347Ferguson Enterprises, lnc, Plumbing repalr kit
lJniforms
Uniforms
Office supplies
Office supplies
Payable Number
s100031759.001
72730
7-106-95999
8680617
082534082533
AUG2O2O
200800640101
200802062101
200ao2ro7roL
sEPT2020
4613419
7L3467L442
7L44L
513148438
513103074
LL7429434001
115829875001
Payment Date
0s/09/2020
09/09/2020
09l09/2020
09/09/2020
09/09/202009/09/2020
09/09/2020
os/0e/202009/09/202009/o9/2020
09/09/2O2O
os/09/2020
09/09/2020os/os/202009/09/2020
09/09/2020
oslos/202009/09/2o2o
09/09/2020
09/09/2020
os/09/2020os/09/2020
Payment Dates: 09/09/2020 - 09109/2o2o
Amount
1,694.Or
Payment 6344 Total: t,694.0L
456.72
Payment 6345 Total: 456.72
40.o7
Payment 6346 Total: 40.o7
32.63
Payment 6347 Total: 32.63
492.00
523.00
Payment 6348 Total: 1,015.00
465.40
Payment 6349 Total: 465.40
37.00
70.00
70.00
Payment 6350 Total: t77.00
75.00
Payment 6351 Totali 75.00
40.18
Payment 6352 Total: 40.18
1,334.08
t63.23239.52
Payment 6353 Total: 1,736.83
100.00
Payment 6354 Total: 100,00
170,94
170.94
Payment 6355 Total 341.88
32,430.05
Payment 6356 Total: 32,430.05
3,746.25
Payment 6357 Total: 3,746.25
L06.r2105.08
Payment 6358 Total 21L.20
2,229.r7
Payment:6349
GLM Landscape Management Landscape maintenance
Payment:6348FGL Environmental
FGL Environmental
Payment:6350
Great Western Alarm and Co
Great Western Alarm and Co
Great Western Alarm and Co
Payment: 6351
Henry, Phil
Payment:6353lntegrated lndustrial supply, I
lntegrated lndustr¡al Supply, I
lntegrated lndustrial supply, I
Payment: 6352
Home Depot Cred¡t Serv¡ces D Grinder, concrete
Lab tests
Lab tests
Alarm monitoring serv¡ce
Alarm monitoring service
Alarm monitoring service
Washer rebate
Solenoid valves
Nitrile gloves
Mesh screens
Payment:6354Koehler Plumbing, lnc
Payment: 6355
Mission Un¡form Service
Mission Uniform Service
Payment:6358
Off¡ce Depot
Office Depot
Backflow test - Honey Grove L 10369
Payment:6356MNS Eng¡neers, lnc. Construction management -P 75740
Payment: 6357
Newton ceo-Hydrology Cons Litigation support through Au AUG2020
Payment:6359Perry's Electric Motors & cont sump pump service
ù /.t l?.02iJ 1 1 : 32: 35 ÂM
24477 09/oe/2020Payment 6359 Total: 2,229.t7
Item D-1. warrants SEPTEMBER 9, 2020
Vendor Name Description (Payable)
Payment:6360Polydyne, Inc. Clarifloc
Paymenti 6361
Protective Weather Structure Progress billing #4 4
Payable Number
r474200
PC030321176
wo030046765
780137738780137463
AUG2020H
AUG2O20G
AUG2O20F
AUG2O2OA
AUG2020D
AUG2O20B
AUG2020C
AUG2020E
Payment Date
09/o9/2020
os/09/2020
09/09/20200s/09/2020
09/09/2O2O
0e/09/2020
09/09/2020
09/09/2020
09/09/2020
09/09/2O2O
09/09/2020
09/09/2O2O
09/09/2020
09/os/2o2o
0e/os/202009/09/2020
09/09/2020
os/09/2020
09/09/202009/09/2020
09/0e/202009/09/202009/09/2020
09/0e/202009/09/202009/09/2020
Payment Dates: 09/09/2020 - 09/Ogl2O2O
Amount
649.38
Payment 6360 Total 649.38
2,388.30
Payment 6361 Total 2,388.30
88,92
2,309.20
Payment 6362 Total: 2,398.t2
19,980.00
Payment 6363 Total: 19,980.00
504.50
Payment 5364 Total: 504.50
4,508.03
Payment 6365 Total: 4,508.03
7,8]-L.70
Payment 6366 Total: L,8IL,7O
7,623.50
Payment 6367 Total: 7,623.50
4,39s.50
Payment 6368 Total: 4,395.50
449.50
Payment 6369 Total: 449.50
762.54
323.36
Payment 6370 Total: 1,085.90
20,000.00
1,309.95
949.76
Payment 6371 Total: 22,259,Lt
7,554.49
Payment 6372 Total 1,554.49
2,567.25
Payment 6373 Total 2,567.25
Payment:6363R. Baker, lnc. lnstallation ofwater service at 82O2OLSL7
Payment:6364Richards, Watson & Gershon Legal services through 07-31- 228146
Payment:6365Richards, Watson & Gershon Legal Services through 7-31-2 228L48
Payment:6366Richards, Watson & Gershon Water Rights Adjudication thr 288t45
Payment:6367Richards, Watson & Gershon Legal services through 7-31-2 228L49
Payment:6368Richards, Watson & Gershon Legal services - Dana Reserve 227600
Payment: 6369
Santa Mar¡a Times Public notice - Southland Scre AUG2020
Payment:6362
Quinn Company
Quinn Company
Payment:6370SGS Guadalupe
SGS Guadalupe
Payment: 6371
Tesco Controls, lnc.
Tesco Controls, lnc.
Tesco Controls, lnc.
Payment: 6372
Tuckfield & Associates
Payment:6373United Rentals
Payment:6374
US Bank National Association
US Bank National Assoclation
US Bank National Association
US Bank National Assoclation
US Bank National Associat¡on
US Bank National Assoclation
US Bank National Association
US Bank National Assoc¡at¡on
Hydraulic oil
Service - CAT 279D
cAN-17
cAN-17
Conference phone
Storage unitVehicle R&M - battery, windsh
Board meeting supplies
Conference calls and Zoom
Travel and meals
GPS subscription
Computer expense - software
Annual SCADA ma¡ntenance OOTttgLPLC battery replacement - 70/ OO7LI97
UPS for SCADA system 0071193
Rate consultant 0597
Water truck rental 1655t0r72-023
396.77
199.s0
532,78
17.00
58.51
439.76
47,95
269.82
i/4/2i¡2i! 1 1 1.3;l:35 ÃM
Item O-1 Warrants SEPTEMBER 9, 2020
Vendor Name Description (Payable)
Payment Dates: 09/09/2020 - 09l09l2020
Amount
Payment 6374 Totâl t,962.09
3,549.95
74.54
Payment 6375 Total 3,624.49
75.00
Payment 6376 Total: 75.00
656.75
Payment 6377 Total: 656.75
3,648.85
Payment 6378 Total: 3,648.85
48.26
226.20
255.91
Payment 6379 Total: 530.37
165.00
Payment 6380 Total: 165.00
Payment:6375
USA Bluebook
USA Bluebook
Payment:6376Vatter, Robert
Payment:6377Verizon W¡reless
Payment:6378Wallace Group
Payment:6379Waste Connections
Waste Connections
Waste Connect¡ons
Payment:6380White, Christ¡an
CHEMKEYS
Ricca water
Washer rebate
Cell service
FOG program
Waste collection - Office
Waste collection - southlandWaste collection - Old Town
Payable Number
335920
327060
sEPT2020
9861371584
5L474
6990086
699L374
6991012
Payment Date
09/09/202009/09/2O2O
09/09/2O2O
09/09/2020
09/09/2O2O
09/o9/202009/09/2020oe/09/2020
09/09/2O2OUniform - Boot reimbursemen SEPT2020
9/412û20 11:3:l:35 i\M
TO:
FROM
DATE
BOARD OF DIRECTORS
SEPTEMBER 4,2020
APPROVE AUGUST 26, 2O2OREGULAR BOARD MEETING MINUTES
ITEM
Approve action minutes from previous Board meetings. IRECOMMEND APPROVE MINUTES]
BACKGROUND
The draft minutes are a written record of the previous Board Meeting action.
RECOMMENDATION
Approve Minutes
ATTACHMENT
A. August 26,2020 draft Regular Board Meeting Minutes
AGENDA ITEM
D-2SEPTEMBER 9,2020
SEPTEMBER9,2O2O
ITEM D.2
ATTACHMENT A
NIPOMO COMMUNITY SERVICES DISTRICTServing the Com\unity since 1965
DRAFT REGULAR MINUTES
AUGUST 26,2020 AT 9:00 A.M.
JON S. SEITZ BOARD ROOM 148 SOUTH WILSON STREET, NIPOMO, CA
BOARD of DIRECTORSDAN ALLEN GADDIS, PRESIDENTCRAIG ARMSTRONG, VICE PRESIDENTBOB BLAIR, DIRECTORED EBY, DIRECTORDAN WOODSON, DIRECTOR
Missionwith and cost-effective
Pursuant to Governor Newsomb Executive Order N-25-20, members of the Nipomo CommunitySerylces District Board or staff may pafticipate in this meeting in person, or via teleconference. Toprotect the health and safety of the public, Board members, and staff, social distancing will be practicedat the District's physical location, 148 S. Wilson Sfreef. Members of the public may choose topañicipate in person at this location or monitor the audio portion of the meeting and any public hearingstelephonically by calling (8001 567-5900 bode 242-2614#1. Pursuant to Governor Newsom'sExecutive Order N-29-20, members of the public may also comment - on items on this agenda oritems not on the agenda but within the jurisdiction of the Board - via email sent to Ínfo(ùncsd.cs,sovprior to the 9:00 am meeting start time. All emails received by that time will be distributed to the Board.
Public participation in the meeting and public hearings will be taken only as descnbed above. lf anyindividuatwith a disability requires asslsfance to observe or participate in the meeting, please contactthe District office by telephone at least 24 hours in advance.
A. CALLTOORDERAND FLAG SALUTE
President Gaddis catled the Regular Meeting of August 26, 2020, to order at 9:00 a.m. and led theflag salute.
B. ROLL CALL AND PUBLIC COMMENT FOR ITEMS NOT ON AGENDA
At Roll Call, all Board Members were present
There were no public comments.
C. PRESENTATIONS AND REPORTS
c-1) DTRECTORS'ANNOUNCEMENTS OF DtSTR|CT AND COMMUNITY INTEREST ANDREPORTS ON ATTENDANCE AT PUBLIC MEETINGS, TRAINING PROGRAMS,CONFERENCES AND SEMINARS.Receive Announcements and Reports from Directors
Director Eby. LAFCO did not have a meet¡ng in August.
Director Gaddiso August 13, signed Assessment District Bond documents with District Staff and
Bond Counsel.. August 24, attended IRWM meeting remotely.
PRTNCTqAL STAFFMARIO IGLESIAS, GENERAL MANAGERLISA BOGNUDA, FINANCE DIRECTORPETER SEVCIK, DIRECTOR OF ENG. & OPS.CRAIG STEELE, GENERAL COUNSEL
SUBJECT TO BOARD APPROVAL
August 26,2020 Nipomo Community Services DistrictDRAFT REGULAR MEETING
MINUTES
Page 2 of 5
c-2) RECETVE pUBL|C COMMENT ON PRESENTATTONS AND REPORTS PRESENTEDUNDER ITEM C AND BY MOTION RECEIVE AND FILE PRESENTATIONS ANDREPORTS
There were no public comments.
lJpon the motion of Director Armstrong and seconded, the Board unanimouslyapproved receiving and filing presentations and repofts.Vote 5-0.
YES YOTES NO YOIËS ABSENTDirectors Armstrong, Eby, Woodson, and Gaddrs None None
D. CONSENT AGENDA
D-1)
D-2)
D-3)
WARRANTS IRECOMM END APPROVAL]
APPROVE AUGUST 12,2020, REGULAR BOARD MEETING MINUTES
IRECOMMEND APPROVE MINUTESI
AUTHORIZE PURCHASE OF WATER TRUCK IN ACCORDANCE WITH APPROVEDFY 20-21 BUDGET IRECOMMEND AUTHORIZE STAFF TO PURCHASE WATERTRUCK FROM GIBBS INTERNATIONAL lNC. AT A COST OF $94,5661
There were no public comments.
IJpon the motion of Director Armstrong and seconded, the Board unanimously approvedthe Consent Agenda.Vote 5-0.
YES YOIES NO YOIES ABSENTDirectors Armstrong, Woodson, Blair, Eby and Gaddis None None
E. ADMINISTRATIVE ITEMS
E-1) AUTHORTZE STAFF TO NEGOTTATE CONTRACT FOR ENGINEERING SERVICESFOR BLACKLAKE SEWER CONSOLIDATION PROJECT WITH CANNONcoRPoRATION IRECOMMEND APPROVAL]
Peter Sevcik, Director of Engineering and Operations, presented the item and answeredquestions from the Board.
There were no public comments.
lJpon the motion of Director Armstrong and seconded, the Board unanimously agreedto award a contract for engineering services for Blacklake Sewer Consolidation Proiectto Cannon Corporation.Vote 5-0.
YES YOIES NO YOIES AESENTDirectors Armstrong, Blair, Woodson, Eby and Gaddis None None
SUBJECT TO BOARD APPROVAL
August 26,2020 Nipomo Community Services DistrictDRAFT REGULAR MEETING
MINUTES
Page 3 of 5
RECEIVE AND APPROVE 2O2O DRAFT WATER RATE REPORT AND WATER RATEADOPTION SCHEDULE, INITIATE PROPOSITION 218 PROCESS, AUTHORIZENOTICE OF RATE HEARING, AND SET PUBLIC HEARING DATE TO CONSIDERWATER RATES IRECOMMEND APPROVE THE AUGUST 2O2O WATER RATESTUDY AND WATER RATE ADOPTION SCHEDULE, APPROVE THE PROPOSITION218 RATE NOTICE AND DIRECT STAFF TO INITIATE PROPOSITION 218PROCEEDINGS, AND SET 9:00 AM WEDNESDAY, OCTOBER 21 , 2020, YOURBOARD'S REGULARLY SCHEDULED BOARD MEETING, AS THE DATE AND ÏIMEFOR THE RATE HEARING]
Clayton Tuckfield, rate consultant, presented the 2020 water rate report and answeredquestions from the Board. He presented two options for future rates - 1) uniform ratesand 2) tiered rates.
Mario /g/esras, General Manager, pointed out minor corrections to the reporf.
Phil Henrv. NCSD resident, stated PGE has tiered rates and asked about the impactthe Dana Reserye may have on future rates and when would that be considered.
Upon the motion of Director Eby and seconded, the Board selected the uniform waterrate structure, approved the rate study as amended, approved the Prop 218 Notice asamended, set the Public Hearing for October 28 and directed Staff to mail the notices.Vote 4-1.
YES YOTES NO YOIES ABSENTDirectors Eby, Blair, Woodson and Gaddis Armstrong None
E-3) AUTHORIZE TASK ORDER FOR DANA RESERVE DEVELOPMENT WATER ANDSEWER SERVTCE EVALUATTON W|TH MKN & ASSOCTATES [RECOMMEND BYMOTION AND ROLL CALL VOTE AUTHORIZE TASK ORDER WITH MKN &ASSOCIATES IN THE AMOUNT OF $88,936]
Peter Sevcik, Director of Engineering and Operations, presented the item and answeredquestions from the Board.
Pam Wilson, NCSD customer, asked if the project changes would the contract need tobe modified.
Upon the motion of Director Eby and seconded, the Board unanimously agreed to awarda contract for engineering services for Dana Reserve development water and sewerservice evaluation to MKN & Assocrafes.Vote 5-0.
E-2)
YES YOIES NO YOIES ABSENTDirectors Eby, Armstrong, Woodson, Blair and Gaddis None None
SUBJECT TO BOARD APPROVAL
F
August 26,2020 Nipomo Community Services DistrictDRAFT REGULAR MEETING
MINUTES
Page 4 of 5
E-4) AUTHORIZE GENERAL MANAGER TO ENTER INTO A 3-YEAR AGREEMENT WITHSEDARU SOFTWARE IN SUPPORT OF NCSD'S UTILITY MAINTENANCE PROGRAMFOR THE TOTAL AMOUNT OF $44,280 IRECOMMEND AUTHORTZE GENERALMANAGER TO ENTER INTO AN AGREEMENT WITH SEDARU SOFTWARE FORSOFTWARE AND PROGRAM DEVELOPMENT IN THE TOTAL AMOUNT OF $44,280]
Mario /g/esras, General Manager, presented the item and answered questions from theBoard.
There were no public comments.
Upon the motion of Director Armstrong and seconded, the Board unanimously agreedto enter into a three year agreement with Sedaru Software.Vote 5-0.
YES YOIES NO YOIES ABSENTDirectors Armstrong, Blair, Woodson, Eby and Gaddis None None
GENERAL MANAGER'S REPORT
Mario /g/esras, General Manager, presented the item and answered questions from the Board
There were no public comments.
COMMITTEE REPORTS
None
DIRECTORS' REQUESTS TO STAFF AND SUPPLEMENTAL REPORTS
Director Blair thanked the staff for purchasing the water truck and asked about a row of treesalong Highway 101 in front of the wastewater facility.
CLOSED SESSION ANNOUNCEMENTS
1. CONFERENCE WITH DISTRICT LEGAL COUNSEL RE: PENDING LITIGATIONPURSUANT TO GC 554956.9
a. SM\ /t/CD V. NCSD (SANTA CLARA COUNTY CASE NO. CV 770214,SIXTH APPELLATE COURT CASE NO. H032750, AND ALLCONSOLIDATED CASES
Craig Steele, District Legal Counsel, stated there was no need for closed session
G
H
SUBJECT TO BOARD APPROVAL
August 26,2020 Nipomo Gommunity Services DistrictDRAFT REGULAR MEETING
MINUTES
Page 5 of 5
ADJOURN MEETING
President Gaddis adjourned the meeting at 10:39 p.m.
Respectfully subm itted,
MEETING SUMMARY HOURS & MINUTESResular Meetine I hour 39 minutesClosed Session 0 hour 00 minutes
TOTAL HOURS I hour 39 minutes
Mario lglesias, General Manager and Secretary to the Board Date
SUBJECT TO BOARD APPROVAL
TO BOARD OF DIRECTORS
REVIEWED: MARIOIGLESIASGENERAL MANAGER
AGENDA ITEM
D-3SEPTEMBER 9,2020
#FROM PETER V. SEVCIK, P.E.
DIRECTOR OFENGINEERING & OPERATIONS
DAÏE SEPTEMBER 3, 2O2O
ACCEPT COMPLETED SOUTHLAND WASTEWATER TREATMENTFAG¡LITY STORAGE BUILDING PROJECT
ITEM
Accept work performed by PWS Construction lnc. for Southland Wastewater Treatment Facility(WWTF) Storage Building Project and authorize staff to file Notice of Completion [RECOMMEND,BY MOTION AND ROLL CALL VOTE, ACCEPT PROJECT AND DIRECT STAFF TO FILENOTTCE OF COMPLETTONI.
BACKGROUND
On December 1'1 , 2019, the Board awarded a construction contract for the Southland WWTFStorage Building Project to PWS Construction lnc. The work involved the construction of a 1,440square foot metal building that will be used to store spare parts for the Southland WWTF and anintegral 960 square foot lean-to that will provide a covered storage area for equipment utilized atthe Southland \AAI/TF. Construction has been completed.
FISCAL IMPACT
Gonstruction Contract Cost SummaryOriginal Contract Amount $175,000Final Contract Amount $188,114
STRATEGIC PLAN
Goal2. FACILITIES THAT ARE RELIABLE, ENVIRONMENTALLY SENSIBLE AND EFFICIENT.Plan, provide for and maintain District facilities and other physical assets to achieve reliable,environmentally sensible, and efficient District operations.
RECOMMENDATION
Staff recommends that the Board, by motion and roll call vote, accept the project and authorizethe General Manager to file a Notice of Completion for the project.
ATTACHMENTS
None
T:\BOARD MATTERS\BOARD MEETINGS\BOARD LETTER\2020\200909 Southland WWTF Storage Building Acceptance.docx