Presentation1 phase 1

12
Interim Report Cross Media Interaction Design Phase 1 Exploration Spoorzone Analysing existing CMID’s Groep P1 Anna de Jonge 1528785 Larasati Bruijns 1354949 Loek Zuijderwijk 1396927 Britt Luijpers 1545450

description

 

Transcript of Presentation1 phase 1

Page 1: Presentation1 phase 1

Interim Report Cross Media Interaction DesignPhase 1Exploration SpoorzoneAnalysing existing CMID’s

Groep P1Anna de Jonge 1528785Larasati Bruijns 1354949Loek Zuijderwijk1396927Britt Luijpers 1545450

Page 2: Presentation1 phase 1

Content

• Analysing CMID’s SolutionsPolitical partiesAlbert Heijn AppieFringe

• Exploration Spoorzone DelftCurrent atmospherePersona’sOpportunities

Page 3: Presentation1 phase 1

Analysing Existing CMID’sPolitical Parties

Page 4: Presentation1 phase 1

Analysing Existing CMID’sAlbert Heijn Appie

Page 5: Presentation1 phase 1

Analysing Existing CMID’sFringe

Page 6: Presentation1 phase 1

Exploring Spoorzone DelftCurrent Atmosphere

Page 7: Presentation1 phase 1

Exploring Spoorzone DelftPersona’s

Page 8: Presentation1 phase 1

Exploring Spoorzone DelftPersona’s

Page 9: Presentation1 phase 1

Exploring Spoorzone DelftPersona’s

Page 10: Presentation1 phase 1

Exploring Spoorzone DelftPersona’s

Page 11: Presentation1 phase 1

Exploring Spoorzone DelftOpportunities

• Children: Don’t know a lot about the project, but when the project is finished, they are grown-ups, so they will be the eventually users.

• Construction workers:Bad working circumstances, don’t have anything to do with Delft

• Citizens:Less people would find the construction area annoying, if they had more affection with the project

Page 12: Presentation1 phase 1

Exploring Spoorzone DelftOutcomes

- Design something for the group: Children

- Make the Spoorzone less annoying

- There are also lots of people who are very proud of the project